Geotech Solutions GEOTECHNICAL INVESTIGATION IRONBARK RIDGE - STAGE 2A, 3B & 5 MUSWELLBROOK. Prepared for McCloy Group.

Size: px
Start display at page:

Download "Geotech Solutions GEOTECHNICAL INVESTIGATION IRONBARK RIDGE - STAGE 2A, 3B & 5 MUSWELLBROOK. Prepared for McCloy Group."

Transcription

1 Φ Geotech Solutions Geotech Solutions Pty Ltd ABN: P.O Box 4224, Edgeworth 2285 Unit 4/5 Arunga r, Beresfield 2322 [P] [F] [E] GEOTECHNICAL INVESTIGATION IRONBARK RIGE - STAGE 2A, 3B & 5 MUSWELLBROOK Prepared for McCloy Group Prepared by Geotech Solutions Pty Ltd GS Ref: /0 July 2011

2 Page i Contents 1 INTROUCTION SITE ESCRIPTION FIEL AN LABORATORY INVESTIGATION INVESTIGATION FININGS REGIONAL GEOLOGY FIEL INVESTIGATION LABORATORY TEST RESULTS ISCUSSION AN RECOMMENATIONS PAVEMENT ESIGN ESIGN TRAFFIC LOAINGS SUBGRAE CONITIONS SUBSOIL RAINAGE EXPANSIVE SOILS PAVEMENT COMPOSITIONS SUBGRAE PREPARATION PAVEMENT CONSTRUCTION ETENTION BASIN ISCUSSION LIMITATIONS REFERENCES APPENIX A RAWINGS APPENIX B ENGINEERING LOGS GENERAL SOIL ESCRIPTION SHEET APPENIX C LABORATORY TEST RESULTS McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

3 Φ Geotech Solutions Geotech Solutions Pty Ltd ABN: P.O Box 4224, Edgeworth 2285 Unit 4/5 Arunga r, Beresfield 2322 [P] [F] [E] GS /0 13 July 2011 McCloy Group Pty Ltd PO Box angar NSW 2309 Attention: Shane Boslem GEOTECHNICAL INVESTIGATION IRONBARK RIGE- STAGES 2, 3B & 5 MUSWELLBROOK 1 INTROUCTION This report presents the findings of pavement thickness investigation undertaken for the McCloy Group associated with Stages 2, 3B & 5 of the residential subdivision known as Ironbark Ridge, Muswellbrook. The investigation was required in order to provide comment on the existing subgrade conditions in the proposed subdivision road alignments, including pavement thickness design and general issues regarding construction and earthworks. For the purpose of the investigation plan and long section design drawings, MM Hyndes Bailey & Co. Ref dated June 2011 were supplied by the client.

4 Page 2 2 SITE ESCRIPTION The proposed development encompasses Stages 2, 3B & 5 of Ironbark Ridge residential estate and comprises the part construction of sections of four (4) rural residential roads. Construction will comprise approximately 1500 m of pavement and fifty one (51) rural/residential lots. Stage 2, 3B & 5 are located to the south of Ironbark Road adjacent stages 2A and 3C of the Ironbark Ridge Estate. Topographically the site is located within regionally gentle to moderately undulating terrain with slopes falling to the south west. The alignment of the proposed roads 2, 5 & 7 are oriented generally parallel to the site slopes with while Road 3 is located towards the base and generally perpendicular to the predominate site slopes. Roads 2 and 7 follow ridgelines and road 5 follows a gully. Some rock outcrops were noted at the higher elevations in Road 2 and on the southern end of Road 3 & 7. Road 3 traverses a small rural dam around the intersection with Road 3, at approximate CH 520. Vegetation predominately comprised cleared open pasture, with thick grass cover along with some mature native trees. Isolated thicker vegetation was noted predominately within the southern end of Roads 3 & 7. Surface drainage would be expected to follow surface contours, falling either side of the ridgeline along Roads 2 and 7, with the majority of surface drainage eventually draining south-westerly to a proposed detention basin in Stage 5. Existing fill areas were noted during fieldwork and comprised contour drains in the natural gully in the Road 5 alignment and the dam wall construction in Road 3. Stockpiled spoil material understood to have been generated from previous stages was observed at the top of the Road 5 alignment. A backfilled trench associated with the sewer installation was also noted along the Road 3 alignment. 3 FIEL AN LABORATORY INVESTIGATION Field investigation work was undertaken on 2 May 2011 and involved excavation of twelve (12) test pits (TP-TP111) at the following locations: TP-TP108, TP110 and TP111 at locations along the proposed road alignment to characterize subgrade conditions with samples collected for laboratory testing at assumed subgrade depth; and Test pits TP109 at the proposed detention basin in Stage 5. A Komatsu 4t mini excavator with a 300mm toothed bucket was utilised for the excavation of test pits to a target depth of 1.5m in the road alignments and 2m in the detention basin. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

5 Page 3 The approximate locations of test pits TP-TP111 is shown on rawing 1 attached as Appendix A. The results of field investigation are summarised in Section 4.2 with detailed logs attached in Appendix B. Laboratory analysis comprised testing of samples recovered from test pits at approximate subgrade depths in the road alignments. etails of the laboratory testing are shown on the test results sheets attached in Appendix C and results are summarised in Section INVESTIGATION FININGS 4.1 REGIONAL GEOLOGY Reference to the Hunter Coalfields Regional Geology Map, Geological series sheet 9033 and part of 9133, 9032 and 9132 Second Edition 1993, indicates that the site is located within the Middle Permian Age rock of the Greta Coal Measures in the vicinity of the Rowan Formation. The formation is known to comprise rock types and soils derived from coal seams, siltstone and sandstone. 4.2 FIEL INVESTIGATION At the time of the field investigation, natural surface conditions across the site were generally characterised by sandy/clayey silt, silty sand and silty clay topsoil materials, overlying residual silty clays to silty sandy clays. The majority of the pits were terminated in hard silty clay which was grading to an extremely weathered extremely low strength siltstone or sandstone. While the excavator encountered greater digging resistance it was not refused. So while rock structure was evident, the material encountered prior to termination depth could be considered as a soil for excavation purposes. A general summary of the subsurface conditions encountered in the test pits is shown in Table 1. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

6 Page 4 Table 1 - Summary of subsurface conditions encountered in test pits Test pit Road & Chainage Topsoil epth (m) epth to rock (m) Practical Refusal (m) Summary of subsurface profile TP R 3 /Ch Topsoil; Sandy Silty CLAY; SANSTONE/SILTSTONE TP101 R 3 /Ch (1) Cobbles & gravel; Sandy Silty CLAY; TP102 R 3 /Ch430 TP103 R 3 /Ch Fill (Silty CLAY); Silty Sandy CLAY; SANSTONE (1) Topsoil; Silty Sand; Silty CLAY; Silty CLAY TP104 R 3 /Ch (1) Topsoil; Silty CLAY; Silty CLAY TP105 R 3 /Ch810 TP106 R 2 /Ch125 TP107 R 2 /Ch255 TP108 R 2 /Ch (1) Topsoil; Sandy Silt; Silty CLAY; SANSTONE (2) Topsoil; Silty CLAY; SANSTONE (1) Topsoil; Silty CLAY; SANSTONE (1) Topsoil; Silty CLAY; SANSTONE TP109 TP110 etention Basin R 5/Ch Topsoil; Sandy Silt; Silty CLAY Silty CLAY TP111 R 5 /Ch90 Fill (Silty CLAY); Sandy Silt; Silty CLAY Notes to Table (1) Rock structure observed within hard silty clay (2) Refusal on one end of pit higher than the other Groundwater was not encountered in any of the test pit locations at the time of the field investigation. It should be noted that groundwater levels are likely to fluctuate with variations in climatic conditions. Table 1 are a general summary of the subsurface conditions encountered in the test pits. For a more detail description, reference should be made to the report log sheets and explanatory notes, which are attached in Appendix B. Notwithstanding, the above conditions across the site could vary from those encountered in the test pits. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

7 Page LABORATORY TEST RESULTS etails of the laboratory testing conducted on samples obtained from test pits are shown on the laboratory test results sheets attached in Appendix C, and are summarised in Table 2 and Table 3. The results of standard compaction and CBR testing undertaken on samples of likely subgrade soils are summarised in Table 2. Samples were compacted to a target dry density ratio of % Standard at standard optimum moisture content, surcharged with 4.5kg and soaked for 4 days. Table 2 - Summary of compaction and CBR test results Test Pit epth (m) Soil Type FMC (%) SM (t/m 3 ) SOMC (%) CBR (%) Swell (%) TP Silty CLAY TP Silty CLAY TP Silty CLAY TP Silty CLAY Notes to Table 2 FMC Field Moisture Content SM Maximum ry ensity (Standard compaction) SOMC Standard Optimum Moisture Content CBRCalifornia Bearing Ratio The results summarised in Table 2 indicate that the field moisture content of the subgrade materials tested ranged from dry to slightly dry of standard optimum moisture content at the time of the field investigation. The potential swell indicates the clay soils encountered are in the slightly to highly expansive range, with the CBR results indicating that the subgrade is of relatively low strength. The results of the electrical conductivity (EC) tests undertaken on samples of the residual silty clay soils encountered in the proposed detention basin are summarised in Table 3. Table 3 Summary of EC test results Notes to Table 2 Test Pit epth (m) Soil Type EC (µs/cm) TP Silty CLAY 138 TP Silty CLAY 238 EC Electrical Conductivity McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

8 Page 6 For further detail of the laboratory testing, reference should be made to the laboratory test results sheets attached in Appendix C. 5 ISCUSSION AN RECOMMENATIONS 5.1 PAVEMENT ESIGN ESIGN TRAFFIC LOAINGS Advice on design traffic loadings for the internal roads from Mr Siva Karthigesh, esign Engineer from Muswellbrook Shire Council (MSC) indicated that the design should be undertaken in accordance with Table 4 of MSC draft construction specification [Ref 1]. The design traffic loadings for the internal road are shown in Table. Table 4 - esign Traffic Loadings Road Name Road Type esign Traffic (ESA s) Road 2 Rural/Residential 3 x 10 5 Road 3 Rural/Residential 3 x 10 5 Road 5 Rural/Residential 3 x 10 5 If advice indicates different traffic loadings to those for which pavement design has been undertaken, the pavement design may need to be reviewed SUBGRAE CONITIONS Based on the subsurface conditions encountered in the test pits and the supplied long sections, subgrade conditions across the site of the proposed subdivision are generally expected to comprise residual clay filling, silty sand, and silty sandy clays over sandstone/siltstone bedrock. The residual clay soils could generally be expected to be the critical subgrade materials for the purpose of pavement thickness design. The majority of the road pavements will be in minor cut or fill. The results of the laboratory CBR testing (summarised on Table 2) indicated soaked CBR values in the order of 2.0% to 5.0% for the subgrade materials encountered, when compacted to % relative density using standard compactive effort. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

9 Page 7 Taking into consideration the surcharge of the overlying pavement a CBR of 3 % would be considered appropriate for design. Given the reactivity of the site clays, and the lower CBR values it is recommended that the subgrade be in-situ stabilised to aid in minimising reactive movements associated with climatic moisture changes. It is essential that trafficking of the subgrade be minimised or limited to construction traffic involved in the pavement construction. While site conditions were dry at the time of the investigation, trafficking of the subgrade particularly in an elevated moisture state will lead to excessive pore pressure development and permanent deformation of the subgrade. It is noted from the laboratory testing that the lower areas of the site and the gully area had higher moisture content than the more elevated site soils. Similarly silty sands (slopewash) were noted to a depth of 0.4m in the proposed sag point in Road 3 around Ch540. While some rock was encountered during test pitting it was not consistent over any observed length of the proposed pavement alignments and as such, the pavement thickness design allows for a clay subgrade. Should consistent weathered rock be encountered over sections of the road the need for lime stabilisation may be reassessed. It should be appreciated that a lot of the weathered rock in the test pits comprises extremely low strength siltstone which when reworked will produce a plastic silty clay SUBSOIL RAINAGE The subgrade should be constructed with sufficient cross fall (normally 3%) to assist with any moisture entering the pavement not becoming trapped. The pavement design provided assumes drained pavement conditions. The selection of appropriate construction materials that are insensitive to moisture change is essential in areas subject to periodic inundation, even if for relative short periods of time. It is understood that some sections of the proposed internal pavement will be constructed such that surface runoff will drain to the lots and will follow natural contours away from the pavement on both sides of the road (i.e. Road 2 & 7). Provided that the surface water does not pond adjacent to the road no specific additional subsoil drainage would be required. However this should be subject to assessment during construction. Subsurface drainage should be provided to protect the constructed pavements of the remaining roads in accordance with MSC s AUS-SPEC[1]. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

10 Page EXPANSIVE SOILS CBR test results indicate that the subgrade material is of low strength and the clays have moderate to high swell potential as defined in Table 5.2 of AUSTROAS 08 [3]. The subgrade would have substantial potential for volume change due to moisture variations and strategies to minimise volume change as outline in clause of AUSTROAS 2008 [3] should be employed including. The specific considerations in relation to expansive soils should include but not limited to: Specification of a moisture content range for preparation of the subgrade; The need for subsoil drainage to not be located in the expansive soils; The need for a low permeability lower subbase / select layer; Recommendation for sealed shoulders and impermeable verge material; Recommend appropriate construction techniques; and Reduction of the volume expansion potential of the expansive soils by lime stabilisation. It is recommended that the subgrade be lime stabilised to aid in reducing the impact of the reactive subgrade PAVEMENT COMPOSITIONS Pavement design for the internal roads have been undertaken in accordance with guidelines indicated in AUSTROAS 2008 AGPT02/08 [Ref 2] and using design chart Figure 8.4 with 95% confidence level used for calculation of pavement thicknesses. Two thickness designs based on construction on a CBR 3.0% clay subgrade or a clay subgrade which is lime stabilised. Pavement compositions for the proposed internal roads are shown on Table 5 and Table 6. Given the reactivity of the subgrade clay lime stabilisation would be the preferred option. The subgrade will require inspection by an experienced geotechnical consultant at preliminary boxing depth, prior to final trimming of subgrade, in order to assess the potential requirement for a select layer or localised treatment of soft zones. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

11 Page 9 Table 5 - Pavement compositions proposed internal road ROA Road 2 Road 3 Road 5 Wearing Course (mm) Two coat seal Two coat seal Two coat seal Basecourse (mm) Subbase (mm) Total Thickness (mm) Subgrade (lime stabilised) CBR min 3.0% CBR min 3.0% CBR min 3.0% Allowable ESAs 3 x x x 10 5 Table 6 - Pavement compositions proposed internal road (lime stabilised subgrade) ROA Road 2 Road 3 Road 5 Wearing Course (mm) Two coat seal Two coat seal Two coat seal Basecourse (mm) Subbase (mm) Lime stabilised subgrade (mm) Total Thickness (mm) Subgrade (lime stabilised) CBR min 7.0% CBR min 7.0% CBR min 7.0% Allowable ESAs 3 x x x 10 5 McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

12 Page 10 The pavement thicknesses shown in Table 6 are based on the assumption of a subgrade CBR of minimum 7% following stabilisation with hydrated lime. Further testing is required to confirm actual percentage of lime required; however, based on previous experience, 3% (by weight) should be satisfactory to achieve the design CBR of 7%. Table 7 - Pavement Materials and Compaction Requirements Pavement Course Material Specification Compaction Requirements Wearing course Basecourse High quality crushed rock or base quality gravel Sub-base Sub-base quality gravel Fill Select subgrade or subgrade replacement Subgrade Material complying MSC s AUS-SPEC[1] Material complying with Clause 5.17 MSC s AUS-SPEC[1]CBR 80% PI 6% Material complying with Clause 5.17 MSC s AUS-SPEC[1] CBR 30% PI 12% CBR 7% minimum Min CBR 3.0% or 7% when lime stabilised Material complying MSC s AUS-SPEC[4] Min 98% Modified (AS ) Min 95% Modified (AS ) Min % Standard (AS ) Min % Standard (AS ) Notes to Table CBR California Bearing Ratio PI Plasticity index The moisture regime associated with a pavement has a significant influence on the performance of the pavement since the stiffness /strength of the pavement materials and subgrade is very dependent on the moisture content of the materials. Accordingly, to protect the pavement materials and subgrade from wetting up and softening, particular care would be required to provide a waterproof seal for the pavement materials and adequate surface and sub-surface drainage of the pavement and adjacent area SUBGRAE PREPARATION Subgrade preparation for pavement formation for new pavements could generally be expected to comprise the following: Removal of topsoil, existing filling and slopewash and excavation (where required) to subgrade formation level, with the spoiling of any deleterious material; Proof rolling of the exposed subgrade with a heavy (minimum 10 tonne static) roller. Any soft or weak areas detected during the proof rolling should be excavated and replaced with a suitable compacted fill / subgrade replacement. epending on the depth below design subgrade levels some areas of unsuitable material could be expected around the Road 3/5 intersection; McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

13 Page 11 It is anticipated that some area of the subgrade may contain coarser gravel and rock fragments which may need to be removed prior to In-situ stabilisation; In-situ stabilisation to comprise spreading of the lime uniformly over the full formation width to the target percentage by weight. Undertake at least two passes with a dedicated insitu pulvi-mixer to achieve satisfactory mixing; Compaction of the subgrade to achieve a minimum dry density ratio of % Standard; Protection of subgrade to prevent any excessive wetting or drying of the subgrade; and Formation of the pavement in accordance with the above recommendations and specifications. Based on the supplied long sections the design pavement levels are generally above existing surface levels. While some coarser gravel or rock fragments are likely to be encountered, uniform rock is not expected to be encountered during pavement construction. However, given the variation in rock levels and strength in the test pits, there still is some potential for rock to be encountered. Rock encountered at subgrade levels should be treated by ripping to a minimum depth of 300mm below subgrade formation level and compaction of the ripped rock subgrade to achieve a minimum dry density ratio of % Standard. Any abrupt changes between subgrade conditions, such as transition from rock subgrade to soil subgrade or sand / clayey sand (extremely weathered decomposed sandstone) subgrade, should be eliminated during subgrade preparation. This could be expected to involve subgrade preparation practices such as selective grading or mixing of material to provide a transition between material types and moisture / density control of subgrade compaction. This is particularly relevant where gravelly bands/pebbly sandstone are observed, as they will provide potential pathways for groundwater to enter the pavement. Particular care should be taken in the choice of compaction equipment and methods where pavement construction is to be undertaken in the vicinity of existing residences. Observation and monitoring of existing adjacent residences for any signs of distress should be undertaken in conjunction with proof rolling and compaction of the subgrade and pavement materials PAVEMENT CONSTRUCTION Pavements should be constructed in accordance with the requirements of MSC s AUS- SPEC[1]., using recommendations in Section 5 of this report. Where recommendations differ from MCC guidelines to that shown in this report, council requirements should take precedence or clarification sought. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

14 Page 12 6 ETENTION BASIN It is understood that a detention basin is proposed for construction as part of Stage 5. A single test pit TP009 was excavated in the pegged centre of the proposed basin. A residual clay soil was encountered over the 2m depth of the test pit. Samples of the surficial soil and deeper soil profile were tested in the Laboratory for EC with the results indicating soils have an EC e of less than 2 ds/m and therefore non saline. At the time of investigation limited information was available in relation to the proposed basin or its design Excavations for the proposed basin could be readily undertaken using conventional excavation equipment. The design and construction of the basin should be undertaken in accordance with the requirements of MSC s AUS-SPEC[1]. 7 ISCUSSION A pavement design has been provided for the internal roads on the basis of construction on clay subgrade with two options detailed. Given potential reactivity issues it is recommended that the lime stabilised subgrade option be adopted. ue to the reactivity of the subgrade, which is in the moderate to highly expansive classification range as defined in Table 5.2 of Austroads 2008 [3], reference should be made to design consideration outlined in Section of this report. Subgrade inspection should be undertaken during boxing as it is anticipated that subgrade conditions will vary along the various roads with some bands of gravelly or weathered rock expected and additional treatment may be required. 8 LIMITATIONS The extent of testing associated with the site classifications is limited to discrete test pit locations, and variations in ground conditions can occur between and away from such locations. Site classifications are based on the presumption of similar subsurface conditions between test pits location. A geotechnical consultant or qualified engineer should inspect footing and excavation to confirm assumed conditions in this assessment. If subsurface conditions encountered during construction differ from those given in this report, further advice should be sought without delay. This report and associated documentation and the information herein have been prepared solely for the use of McCloy Group Pty Ltd and any reliance assumed by other parties on this report shall be at such parties own risk. McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

15 Page 13 Yours faithfully, GEOTECH SOLUTIONS PTY LT Ian Piper Associate James Young Principal REFERENCES [1] Muswellbrook Shire Council AUS-SPEC (OCT 09) Muswellbrook Shire Council raft September 2010 [2] AGPT02/08 Guide to Pavement Technology Part 2: Pavement Structural AUSTROAS (2008). McCloy Group Pty Ltd Geotechnical Investigation Stage 2a,3b & 5 Ironbark Ridge, Muswellbrook GS ref: /0 July 2011 Φ Geotech Solutions Pty Ltd

16 Appendix A rawing

17 SITE TP106 NOTES: TP108 TP107 rawing adapted from MM Hyndes, Bailey & Co, Plan showing proposed lot layout, Sheet 1, Job Ref , dated February 2010 TP105 TP104 TP103 TP111 TP110 TP102 TP109 TP101 TP LEGEN: Approximate test pit locations and numbers Ф Geotech Solutions Pty Ltd Unit 4, 5 Arunga rive, Beresfield NSW 2322 GEOTECHNICAL INVESTIGATION PROPOSE RESIENTIAL EVELOPMENT IRONBARK RIGE, MUSWELLBROOK CLIENT: McCloy Group Pty Ltd PROJECT REFERENCE: GS928 RAWING NUMBER: RAWN BY: NR APPROVE BY: IGP ATE: 15 June 2011 SCALE: NTS OFFICE: Beresfield

18 Appendix B Engineering Logs General Soil escription Sheet

19 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH 240 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL, Silty CLAY, brown, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) STRUCTURE & Other Observations VSt 0.15m Sandy Silty CLAY, very stiff, brown, dry, medium to high plasticity Grassed Area, Mature trees 0.5 Not Encountered 0.70m B 0.80m 0.70m SANSTONE / SILTSTONE, yellow brown extremely weathered extremely low strength 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.50m Testpit TP terminated at 1.50 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY XW VL - Very Loose L - Loose M - Medium ense - ense V - Very ense EL - VL GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP Page 1 OF 1

20 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH 330 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP101 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components GRAVEL / COBBLES, red brown (iron cement siltstone rock) dry, MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) Bare ground no topsoil adjacent stand of 2-4 m saplings 0.40m Silty CLAY, mottled yellow brown grey, dry, with trace sand, with rock lenses 0.50m Not Encountered STRUCTURE & Other Observations GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.50m Testpit TP101 terminated at 1.50 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP101 Page 1 OF 1

21 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH 430 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP102 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components FILL, Silty CLAY, brown, medium to high plasticity, dry, with trace coarse gravel MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / VSt YNAMIC PENETROMETER HAN PENETRO- METER (kpa) STRUCTURE & Other Observations 0.10m FILL, Silty CLAY, yellow brown grey, dry to moist, with trace of sand and some coarse gravel,medium to high plasticity Toe of damwall/spillway to M Not Encountered 0.35m SIlty CLAY, yellow brown grey, dry to moist, with trace of sand and some coarse gravel,medium to high plasticity 0.5 to M 0.70m becoming weathered sandstone Testpit TP102 terminated at 0.70 m Refusal 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP102 Page 1 OF 1

22 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH 540 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP103 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL, Silty SAN, brown, fine grained sand, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) m Silty SAN, brown, fine grained sand, dry Further adjacent test pitting at CH 570 confirmed the presence of the deeper silty sand 0.40m Silty CLAY, brown, dry to moist, very stiff, high plasticity, with trace siltstone gravel 0.50m B 0.60m Not Encountered 400 STRUCTURE & Other Observations 0.5 to M VSt 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.50m Testpit TP103 terminated at 1.50 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP103 Page 1 OF 1

23 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH 690 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP104 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL, Silty SAN, brown, fine grained sand, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) Open Grassland 0.15m Silty CLAY, yellow brown, very stiff, dry to moist, medium to high plasticity, with trace sand and some gravel Not Encountered STRUCTURE & Other Observations 0.5 to M VSt 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.60m Testpit TP104 terminated at 1.60 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP104 Page 1 OF 1

24 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 3 CH810 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP105 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL,Sandy SILT, brown, dry,with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) 0.10m Sandy SILT, dry, pale brown 0.25m Silty CLAY, yellow brown, dry to moist, stiff to very stiff, medium plasticity, with sand sand content varies Not Encountered STRUCTURE & Other Observations to M St to VSt GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.70m becoming weathered sandstone Testpit TP105 terminated at 1.70 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP105 Page 1 OF 1

25 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 2 Ch135 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP106 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL,Sandy SILT, brown, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) STRUCTURE & Other Observations 0.10m Silty CLAY, red brown, dry to moist, medium to high plasticity, with fine sub-rounded gravel 0.40m 0.5 same as above but becoming yellow brown Sandstone possible floater on eastern side of pit Not Encountered to M 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.60m becoming weathered sandstone Testpit TP106 terminated at 1.60 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP106 Page 1 OF 1

26 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 2 Ch 255 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP107 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL,Sandy SILT, brown, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / CP (BLOW COUNT) HAN PENETRO- METER (kpa) m Silty CLAY, red brown, dry to moist, very stiff,medium to high plasticity, with sandstone cobbles and gravel m m 15 Not Encountered 400 STRUCTURE & Other Observations 0.5 to M VSt 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.50m becoming weathered rock Testpit TP107 terminated at 1.50 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP107 Page 1 OF 1

27 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 2 Ch 345 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP108 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL,Sandy SILT, brown, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) 0.23m Silty CLAY, red brown, dry to moist, very stiff medium to high plasticity, with sandstone cobbles and gravel as above but yellow brown Not Encountered STRUCTURE & Other Observations 0.5 to M 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.60m becoming weathered sandstone Testpit TP108 terminated at 1.60 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP108 Page 1 OF 1

28 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : etention Basin - See rawing for location TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP109 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components TOPSOIL,Sandy SILT, brown, dry, with organics MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) STRUCTURE & Other Observations 0.10m Sandy SILT, pale brown,dry, low plasticity with some fine gravel St 0.40m Silty CLAY, brown, dry to moist, very stiff, medium to high plasticity, with sand and some fine gravel 0.50m 0.5 Not Encountered 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : m WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 2.00m Testpit TP109 terminated at 2.00 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY to M VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT VSt EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP109 Page 1 OF 1

29 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 5 Ch 209 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP110 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components Silty CLAY, brown, high plasticity, with fine gravel, with trace sand MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / YNAMIC PENETROMETER HAN PENETRO- METER (kpa) STRUCTURE & Other Observations Organics and tree roost to 50mm over full depth, test pit located adjacent a tree 0.5 Not Encountered - M VSt 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.50m Testpit TP110 terminated at 1.50 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP110 Page 1 OF 1

30 CLIENT : McCloy Group Pty Ltd PROJECT : Geotechnical Investigation LOCATION : Ironbark Ridge Estate EQUIPMENT TYPE : Komatsu PC40MR ATE EXCAVATE : 02/05/11 LOCATION : Road 5 Ch 90 TESTPIT LOG METHO : 300mm toothed bucket LOGGE BY : IGP HOLE NO : TP111 PROJECT REF : GS928 SHEET : 1 OF 1 CHECKE BY : IGP GROUN WATER LEVELS SAMPLES & FIEL TESTS EPTH (m) 0.0 GRAPHIC LOG CLASSIFICATION SYMBOL MATERIAL ESCRIPTION Soil Type, colour, plasticity or particle characteristic Rock Type, colour, grain size Secondary and minor components FILL, Silty CLAY, brown, some gravel MOISTURE / WEATHERING CONSISTENCY / REL ENSITY / CP (BLOW COUNT) HAN PENETRO- METER (kpa) STRUCTURE & Other Observations 2 Fill associated with a surface flow diversion berm and dam m Sandy SILT, light brown,dry, low plasticity OL TOPSOIL LAYER 8 Not Encountered 0.80m Silty CLAY, yellow to light brown, moist stiff, medium to high plasticity 1.0 GEOTECH_SOLUTIONS_03 LIBRARY.GLB Log GS_TESTHOLE_LOG_02 GS_928_IRONBARKE RIGE.GPJ <<rawingfile>> 12/07/ : WATER / MOISTURE - ry M - Moist W - Wet OMC - Optimum MC PL - Plastic Limit Water inflow See Explanatory Notes for details of abbreviations & basis of descriptions. 1.70m Testpit TP111 terminated at 1.70 m SAMPLES & FIEL TESTS U ES B SPT HP - Undisturbed Sample - isturbed Sample - Environmental sample - Bulk isturbed Sample - Standard Penetration Test - Hand/Pocket Penetrometer CONSISTENCY VS - Very Soft S - Soft F - Firm St - Stiff VSt - Very Stiff H - Hard RELATIVE ENSITY VL - Very Loose L - Loose M - Medium ense - ense V - Very ense GEOTECH SOLUTIONS PTY LT EL VL L M H VH EH - Extremely low - Very low - Low - Medium - High - Very high - Extremely high ROCK WEATHERING RS XW W SW FR - Residual soil - Extremely weathered - istinctly weathered - Slightly weathered - Fresh rock File: GS928 TP111 Page 1 OF 1

31 Φ Geotech Solutions Explanatory Notes The methods of description and classification of soils and rocks used in this report are based on Australian Standard 1726 Geotechnical Site Investigations Code. Material descriptions are deduced from field observation or engineering examination, and may be appended or confirmed by in situ or laboratory testing. The information is dependent on the scope of investigation, the extent of sampling and testing, and the inherent variability of the conditions encountered. Subsurface investigation may be conducted by one or a combination of the following methods. Method Test Pitting: excavation/trench BH Backhoe bucket EX X Excavator bucket Existing excavation Natural Exposure: existing natural rock or soil exposure Manual drilling: hand operated tools HA Hand Auger Continuous sample drilling PT Hammer drilling AH AT Spiral flight auger drilling AS A/V A/T Rotary non-core drilling WS RR Rotary core drilling HQ NMLC NQ Concrete coring T Push tube Air hammer Air track Large diameter short spiral auger Continuous spiral flight auger: V-Bit Continuous spiral flight auger: TC-Bit Washbore (mud drilling) Rock roller 63mm diamond-tipped core barrel 52mm diamond-tipped core barrel 47mm diamond-tipped core barrel iatube Sampling is conducted to facilitate further assessment of selected materials encountered. Sampling method isturbed sampling B ES Undisturbed sampling SPT Bulk disturbed sample isturbed sample Environmental soil sample Standard Penetration Test sample U# Undisturbed tube sample (#mm diameter) Water samples EW Environmental water sample Field testing may be conducted as a means of assessment of the in-situ conditions of materials encountered. Field testing SPT HP/PP Standard Penetration Test (blows/150mm) Hand/Pocket Penetrometer ynamic Penetrometers (blows/150mm) VS PBT CP PSP Vane Shear ynamic Cone Penetrometer Perth Sand Penetrometer Plate Bearing Test If encountered with SPT or dynamic penetrometer testing, refusal (R), virtual refusal (VR) or hammer bouncing (HB) may be noted. The quality of the rock can be assessed be the degree of fracturing and the following. Rock quality description TCR Total Core Recovery (%) (length of core recovered divided by the length of core run) RQ Rock Quality esignation (%) (sum of axial lengths of core greater than mm long divided by the length of core run) Notes on groundwater conditions encountered may include. Groundwater Not Encountered Excavation is dry in the short term Not Observed Seepage Inflow Groundwater observation not possible Groundwater seeping into hole Groundwater flowing/flooding into hole Perched groundwater may result in a misleading indication of the depth to the true water table. Groundwater levels are likely to fluctuate with variations in climatic and site conditions. Notes on the stability of excavations may include. Excavation conditions Spalling Unstable Material falling into excavation, may be described as minor or major spalling Collapse of the majority, or one or more face, of the excavation

32 Φ Geotech Solutions Explanatory Notes - General Soil escription The methods of description and classification of soils used in this report are based on Australian Standard 1726 Geotechnical Site Investigations Code. In practice, if the material can be remoulded by hand in its field condition or in water it is described as a soil. The dominant soil constituent is given in capital letters, with secondary textures in lower case. In general, descriptions cover: soil type, strength / relative density, moisture, colour, plasticity and inclusions. Soil types are described according to the dominant particle size on the basis of the following assessment. Soil Classification CLAY SILT Particle Size < 0.002mm 0.002mm 0.075mm SAN fine 0.075mm to 0.2mm medium coarse 0.2mm to 0.6mm 0.6mm to 2.36mm GRAVEL fine 2.36mm to 6mm COBBLES BOULERS medium coarse 6mm to 20mm 20mm to 63mm 63mm to 200mm > 200mm Soil types are qualified by the presence of minor components on the basis of field examination or grading. escription Trace With Percentage of minor component < 5% in coarse grained soils < 15% in fine grained soils 5% to 12% in coarse grained soils 15% to 30% in fine grained soils The strength of cohesive soils is classified by engineering assessment or field/laboratory testing as follows. Strength Symbol Undrained shear strength Very Soft VS < 12kPa Soft S 12kPa to 25kPa Firm F 25kPa to 50kPa Stiff St 50kPa to kpa Very Stiff VSt kpa to 200kPa Hard H > 200kPa Cohesionless soils are classified on the basis of relative density as follows. Relative ensity Symbol ensity Index Very Loose VL < 15% Loose L 15% to 35% Medium ense M 35% to 65% ense 65% to 85% Very ense V > 85% The moisture condition of soil is described by appearance and feel and may be described in relation to the Plastic Limit (PL) or Optimum Moisture Content (OMC). Moisture condition and description ry Moist Wet Cohesive soils; hard, friable, dry of plastic limit. Granular soils; cohesionless and free-running Cool feel and darkened colour: Cohesive soils can be moulded. Granular soils tend to cohere Cool feel and darkened colour: Cohesive soils usually weakened and free water forms when handling. Granular soils tend to cohere The plasticity of cohesive soils is defined as follows. Plasticity Liquid Limit Low plasticity 35% Medium plasticity > 35% 50% High plasticity > 50% The structure of the soil may be described as follows. Zoning Layer Lens Pocket escription Continuous across exposure or sample iscontinuous layer (lenticular shape) Irregular inclusion of different material The structure may include; defects such as softened zones, fissures, cracks, joints and root-holes; and coarse grained soils may be described as strongly or weakly cemented. The soil origin may also be noted if possible to deduce. Soil origin and description Fill Topsoil Colluvial soil Aeolian soil Alluvial soil Lacustrine soil Marine soil Residual soil Man-made deposits or disturbed material Material affected by roots and root fibres Transported down slopes by gravity Transported and deposited by wind eposited by rivers eposited by lakes eposits in beaches, bays, estuaries eveloped on weathered rock The origin of the soil generally cannot be deduced on the appearance of the material and may be assumed based on further geological evidence or field observation.

33 Φ Geotech Solutions Explanatory Notes - General Rock escription The methods of description and classification of rocks used in this report are based on Australian Standard 1726 Geotechnical Site Investigations Code. In general, if a material cannot be remoulded by hand in its field condition or in water it is described as a rock, is classified by its geological terms. In general, descriptions cover: rock type, degree of weathering, strength, colour, grain size, structure and minor components or inclusions. Sedimentary rock types are generally described according to the predominant grain size as follows. Rock Type CONGLOMERATE SANSTONE SILTSTONE SHALE CLAYSTONE escription Rounded gravel sized fragments >2mm cemented in a finer matrix Sand size particles defined by grain size and often cemented by other materials fine 0.06mm to 0.2mm medium 0.2mm to 0.6mm coarse 0.6mm to 2mm Predominately silt sized particles Fine particles (silt or clay) and fissile Predominately clay sized particles The classification of rock weathering is described based on definitions outlined in AS1726 as follows. Term and symbol Residual Soil Extremely weathered istinctly weathered RS XW W Slightly SW weathered Fresh Rock FR efinition Soil developed on extremely weathered rock; mass structure and substance are no longer evident Weathered to such an extent that it has soil properties Strength usually changed and may be highly discoloured. Porosity may be increased by leaching, or decreased due to deposition in pores Slightly discoloured; little/no change of strength from fresh rock Rock shows no sign of decomposition or staining Rock material strength (distinct from mass strength which can be significantly weaker due to the effect of defects) can be defined based on the point load index as follows. Term and symbol Extremely low EL < 0.03MPa Point Load Index I s50 Very Low VL 0.03MPa to 0.1MPa Low L 0.1MPa to 0.3MPa Medium M 0.3MPa to 1MPa High H 1MPa to 3MPa Very High VH 3MPa to 10MPa Extremely High EH > 10MPa For preliminary assessment and in cases where no point load testing is available, the rock strength may be assessed using the field guide specified by AS1726. The defect spacing and bedding thickness of rocks, measured normal to defects of the same set or bedding, can be described as follows. efinition Thinly laminated Laminated Very thinly bedded efect Spacing < 6mm 6mm to 20mm 20mm to 60mm Thinly bedded 60mm to 0.2m Medium bedded 0.2m to 0.6m Thickly bedded Very thickly bedded 0.6m to 2m > 2m efects in rock mass are often described by the following. Terms Joint JT Sheared zone SZ Bed Parting BP Sheared surface SS Contact CO Seam SM yke K Crushed Seam CS ecomposed Zone Z Infilled Seam IS Fracture FC Foliation FL Fracture Zone FZ Vein VN The shape and roughness of defects are described using the following terms. Planarity Roughness Planar PR Very Rough VR Curved CU Rough RF Undulating U Smooth S Irregular IR Polished POL Stepped ST Slickensides SL The coating or infill associated with defects can be described as follows. efinition Clean Stain Veneer Coating escription No visible coating or infilling No visible coating or infilling; surfaces discoloured by mineral staining Visible coating or infilling of soil or mineral substance (<1mm). If discontinuous over the plane; patchy veneer Visible coating or infilling of soil or mineral substance (>1mm)

34 Φ Geotech Solutions Graphics Symbols Index CLAYS GRAVELS SEIMENTARY ROCK CLAY GRAVEL CONGLOMERATE Silty CLAY Clayey GRAVEL BRECCIA Sandy CLAY Silty GRAVEL SANSTONE Gravelly CLAY Sandy GRAVEL SILTSTONE SILTS Organic SILT COBBLES & BOULERS SHALE MUSTONE / CLAYSTONE SILT Clayey SILT MISCELLANEOUS FILL COAL METAMORPHIC ROCK Sandy SILT TOPSOIL SLATE / PHYLLITE / SCHIST Gravelly SILT CONCRETE GNEISS SANS ASPHALT QUARTZITE SAN CORE LOSS IGNEOUS ROCK Clayey SAN PAVEMENT GRAVEL GRANITE Silty SAN PAVEMENT (Natural Gravels) BASALT Gravelly SAN PAVEMENT (Crushed Rock) TUFF

Report on Site Classification & Construction Testing

Report on Site Classification & Construction Testing Report on Site Classification & Construction Testing Northlakes Estate Stage 29, Cameron Park CGS1871 CGS1871 Prepared for Northlakes Pty Ltd C/- McCloy Group Pty Ltd December 2013 Report on Site Classification

More information

SITE CLASSIFICATION SUMMARY STAGE 27A NORTHLAKES ESTATE CAMERON PARK

SITE CLASSIFICATION SUMMARY STAGE 27A NORTHLAKES ESTATE CAMERON PARK Cardno (NSW/ACT) Pty td trading as Cardno Geotech Solutions ABN 95 001 145 035 P.O Box 4224, Edgeworth 2285 Unit 4/5 Arunga r, Beresfield 2322 [P] 0249 494300 [F] 0249 660485 [E] geotech@cardno.com.au

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report REPORT Housing Re-Zone Middle Road and Iona Road - Geotechnical Investigation Report Prepared for Hastings istrict Council Prepared by Tonkin & Taylor Ltd ate April 06 Job Number 464.000 istribution: Hastings

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Geotechnical Investigation and Site Classification, Northlakes Estate Stages 22, 22A and 51A

Geotechnical Investigation and Site Classification, Northlakes Estate Stages 22, 22A and 51A Geotechnical Investigation and Site Classification, Northlakes Estate Stages, A and 5A November 009 North Lakes Pty Ltd Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 03369A-PR_930RevC Level

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

GEOTECHNICAL INVESTIGATION NORTH LAKES ESTATE STAGE 40 CAMERON PARK. Prepared for North Lakes Pty Ltd. Prepared by RCA AUSTRALIA

GEOTECHNICAL INVESTIGATION NORTH LAKES ESTATE STAGE 40 CAMERON PARK. Prepared for North Lakes Pty Ltd. Prepared by RCA AUSTRALIA GEOTECHNICAL INVESTIGATION NORTH LAKES ESTATE STAGE 40 CAMERON PARK Prepared for North Lakes Pty Ltd Prepared by RCA AUSTRALIA RCA ref 6749-301/0 CLIENT ref 0112/NL-03-040/08 APRIL 2008 Contents 1 INTRODUCTION...1

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULDS ROAD ROLLESTON

GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULDS ROAD ROLLESTON GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULS ROA ROLLESTON SUBMITTE TO: R.. HUGHES EVELOPMENTS LT PO BOX 848 CHRISTCHURCH 8140 21 ecember 2011 ISTRIBUTION 2 Copies R.. Hughes evelopments Ltd 1 Copy Geoscience

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1 Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet. Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead

Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead Reference : 11-358 Dated : February 2012 MOORE SPENCE JONES (PTY) LTD Consulting Geotechnical,

More information

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING 29 February 2016 Project No. SGS/16/005 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: DEVELOPER: DILGP ECONOMIC DEVELOPMENT QLD SUPERINTENDENT: CALIBRE CONSULTING (QLD) PTY LTD CONTRACTOR:

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Telephone : G. Ntaka : Fax : M. Bénet :

Telephone : G. Ntaka : Fax : M. Bénet : Our Ref: P 24058 Your Ref: Drennan Maud cc. CK 95/54198/23 Consulting Geotechnical Engineers & Engineering Geologists VAT Reg ¹ 4770223594 P.O. Box 22997 Unit 7, Gayridge Business Park ¹ 2 MARGATE 13 Wingate

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21

Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21 Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21 October 2009 North Lakes Pty Ltd Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 2103382A-PR_9366 Level 3 51

More information

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents.

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents. TNZ M/3 Notes : 1986 NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3 These notes must not be included in the Contract Documents. 1. INTRODUCTION There is no standard TNZ M/3 Specification for subbase

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Yumbah Nyamat Works Approval Application October Appendix J. Geotechnical Site Investigation

Yumbah Nyamat Works Approval Application October Appendix J. Geotechnical Site Investigation Yumbah Nyamat Works Approval Application October 2018 Appendix J Geotechnical Site Investigation GEOTECHNICAL SITE INVESTIGATION PROJECT NO: 23269-1 Client: Proposed: Location: P DESIGN GROUP NEW AQUACULTURE

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Appendix F Laboratory test results

Appendix F Laboratory test results Appendix F Laboratory test results SOIL AND ROCK SAMPLE ANALYSIS LABORATORY TEST REPORT To: Bord Gais Copy: Orla Smyth (kkidd@bge.ie) From: Stephen Watson Laboratory Manager Causeway Geotech Ltd Tel: +44(0)2827666640

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

DRENNAN, MAUD & PARTNERS

DRENNAN, MAUD & PARTNERS DRENNAN, MAUD & PARTNERS Consulting Civil Engineers and Engineering Geologists Registered Member : S.A. Association of Consulting Engineers PARTNERS: R.D. COLLYER, Pr.Eng.,B.Sc.(Eng.),M.Sc.(Eng.),MSAICE.

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Geotechnical verification of impact compaction

Geotechnical verification of impact compaction PII-73 Geotechnical verification of impact compaction P. J. Waddell1, R. A. Moyle2 & R. J. Whiteley1 1 2 Coffey Geotechnics, Sydney, Australia Coffey Geotechnics, Harrogate, UK Abstract Remediation of

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

Geotechnical Level 1 Supervision Report Muller Street, Redland Bay.

Geotechnical Level 1 Supervision Report Muller Street, Redland Bay. TGE15051-1 Geotechnical Level 1 Supervision Report Frostdale Civil Contractors 24/03/2015 TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool Report No: TGE15051-1

More information

APPENDIX D1 GEOTECHNICAL REPORT BY DOUGLAS PARTNERS

APPENDIX D1 GEOTECHNICAL REPORT BY DOUGLAS PARTNERS Submissions Report Wellington Solar Farm APPENDIX D1 GEOTECHNICAL REPORT BY DOUGLAS PARTNERS 17-076 Final v1 E-I Report on Geotechnical Investigation Proposed Solar Farm Goolma Road, Wellington, NSW Prepared

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

UAS Student Residence

UAS Student Residence General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

Superficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m):

Superficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m): Superficial Geology Superficial Deposits are the youngest geological deposits formed during the most recent period of geological time, the Quaternary, which extends back about 1.8 million years from the

More information

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE MAY 2010 Prepared for: Prepared by: BKS (PTY) LTD TERRATEST (PTY) LTD P.O. Box 272 P.O.

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7.

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7. CONTENTS Page 1. GeneralsG 4 2. Field Investigation WorkG 4 3. Laboratory Testing Work--- 5 4. Surface Soil Description-- 7 Appendix A Borehole Location Plan 11 Soil Profile-- 15 Bore Logs--=---- 18 Appendix

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

NORTH LAKES ESTATE - STAGE 20 SITE CLASSIFICATION

NORTH LAKES ESTATE - STAGE 20 SITE CLASSIFICATION NORTH LAKES ESTATE - STAGE 20 SITE CLASSIFICATION North Lakes Pty Ltd GEOTWARA20569AA-AB 28 November 2007 Coffey Geotechnics Pty Ltd ABN 93 056 929 483 19 Warabrook Boulevard Warabrook NSW 2304 Australia

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

ECoast Homes Pty Ltd: Proposed 76-lot subdivision, Penquite Road, Newstead GEOTECHNICAL ASSESSMENT 7 April 2009

ECoast Homes Pty Ltd: Proposed 76-lot subdivision, Penquite Road, Newstead GEOTECHNICAL ASSESSMENT 7 April 2009 99 Attachment 11 (8 pages including this page) Interpretation of site geology and soils, laboratory test results, and generalised AS2870 classifications 100 Geological setting The proposed subdivision

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

GEOLOGICAL PROCESSES AND MATERIALS SGM210

GEOLOGICAL PROCESSES AND MATERIALS SGM210 University of Pretoria GEOLOGICAL PROCESSES AND MATERIALS SGM210 23 April 2014 1 SOIL PROFILING According to Jennings, Brink & Williams (1973) Very important part of a geotechnical site investigation.

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

GEOTECHNICAL INVESTIGATION REPORT PROPOSED MIXED USE DEVELOPMENT 54 PARKWAY DRIVE ROSEDALE, AUCKLAND

GEOTECHNICAL INVESTIGATION REPORT PROPOSED MIXED USE DEVELOPMENT 54 PARKWAY DRIVE ROSEDALE, AUCKLAND K170412-1 9 August 2017 GEOTECHNICAL INVESTIGATION REPORT PROPOSED MIXED USE DEVELOPMENT 54 PARKWAY DRIVE ROSEDALE, AUCKLAND Prepared For: Lucy Li c/- DCS Ltd Unit 67 Victoria Park Market PO Box 91247,

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Saving on the Geotechnical Investigation A False Economy

Saving on the Geotechnical Investigation A False Economy Saving on the Geotechnical Investigation A False Economy G. S. Young 1, BE, MEngSc, FIEAust and W. Ellis 2. 1 Douglas Partners Pty Ltd, 96 Hermitage Road, West Ryde, NSW 2114 PH (02) 9809 0666; email:

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information