Eastgate Parking Lot Geotechnical Investigation

Size: px
Start display at page:

Download "Eastgate Parking Lot Geotechnical Investigation"

Transcription

1 Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box Hunter Street East, Peterborough Ontario, K9H G5 Telephone: (866) Facsimile: (75) cambium-inc.com

2 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24 TABLE OF CONTENTS. INTRODUCTION METHODOLOGY BOREHOLE INVESTIGATION PHYSICAL LABORATORY TESTING SUBSURFACE CONDITIONS SILTY SAND TO SANDY SILT SAND CLAYEY SILT TO CLAY AND SILT GROUNDWATER HYDRAULIC CONDUCTIVITY GEOTECHNICAL CONSIDERATIONS GENERAL SITE PREPARATION FROST PENETRATION EXCAVATIONS DEWATERING INTERNAL DRAINAGE AND GRADING BURIED UTILITIES BACKFILL AND COMPACTION PAVEMENT DESIGN DESIGN REVIEW AND INSPECTIONS CLOSING... 8 LIST OF APPENDED FIGURES Figure Site Plan and Borehole Location Map LIST OF INSERTED TABLES Table Recommended Minimum Pavement Structure... 7 LIST OF APPENDICES Appendix A Borehole Logs Appendix B Physical Laboratory Testing Results Cambium Inc. Page i

3 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24. INTRODUCTION Cambium Inc. (Cambium) was retained by the City of Peterborough (Client) to undertake a geotechnical investigation within the existing Eastgate Parking Lot on the east side of Ashburnham Drive in the City of Peterborough, Ontario (Site). The purpose of the investigation was to identify the subsurface conditions and provide specific geotechnical recommendations for the reconstruction of the parking lot, which is currently surfaced with gravel, including storm sewer installation and asphalt pavement, which is scheduled to proceed in the spring of 24. This report presents the methodology and findings of the geotechnical investigation at the Site and addresses the requirements and constraints for the parking lot reconstruction, including storm sewer and asphalt pavement within the Eastgate Parking Lot. Cambium Inc. Page

4 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, METHODOLOGY 2. BOREHOLE INVESTIGATION A borehole investigation was conducted at the Site on February 3, 24 to assess subsurface conditions at the Site. Six (6) borehole locations, designated as BH through BH6, were identified by the City at the outset of the investigation. Boreholes BH2 through BH6 were advanced to depths of.8 m to 2.4 m within and surrounding the existing parking lot area while borehole BH was advanced to 8. m depth in the location of the proposed Stormceptor. The borehole locations are shown on Figure. The location and elevation of each borehole was surveyed by the City of Peterborough and incorporated into the borehole logs. Drilling and sampling was completed using a track-mounted drill rig operating under the supervision of a Cambium technician. The boreholes were advanced to the sampling depths by means of continuous flight solid stem augers with 5 mm O.D. split spoon samplers. Standard Penetration Test (SPT) N values were recorded for the sampled intervals as the number of blows required to drive a split spoon sampler 35 mm into the soil, using a 63.5 kg drop hammer falling 75 mm, as per ASTM D586 procedures. The SPT N values are used in this report to assess consistency of cohesive soils and relative density of non-cohesive materials. Soil samples were collected at approximately.6 m intervals to 3. m depth and at.5 m intervals below 3. m. The encountered soil units were logged in the field using visual and tactile methods, and samples were placed in labelled plastic bags for transport, future reference, possible laboratory testing, and storage. Open boreholes were checked for groundwater and general stability prior to backfilling All boreholes were backfilled in accordance with O.Reg. 93, as amended, and the property was reinstated to pre-existing conditions. Borehole BH was outfitted with a monitoring well in order to measure the static groundwater elevation at the Site and for subsequent slug testing in support of a Permit to Take Water (PTTW). Borehole logs are provided in Appendix A. Site soil and groundwater conditions are described and geotechnical recommendations are discussed in the following sections of this report. 2.2 PHYSICAL LABORATORY TESTING Physical laboratory testing, including three (3) sieve analyses (LS-62) and two (2) particle size distribution analyses (LS-72), was completed on selected soil samples to confirm textural classification and granular reuse potential, and to assess geotechnical parameters. Moisture content testing was completed on all soil samples. Results are presented in Appendix B and are discussed in Section 3.. Cambium Inc. Page 2

5 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, SUBSURFACE CONDITIONS Boreholes BH2 through BH6 were advanced to a depth of.8 m to 2.4 m within the existing, unpaved parking lot at Eastgate Park. Borehole BH was advanced to a depth of 8. m at the western end of the parking lot in the location of the proposed Stormceptor. The borehole locations are shown on Figure. Generally, the subsurface conditions consist of predominantly silty sand to sandy silt soils to the borehole termination depths. Layers of sand were encountered throughout the borehole depths and layers of much finer, cohesive clayey silt to clay and silt soils were observed in boreholes BH and BH2 at varying depths. The individual soil units are described in detail below. 3. SILTY SAND TO SANDY SILT Silty sand to sandy silt soils were encountered throughout the Site, layered with the other soils discussed below. The silty sand to sandy silt soils varied in colour from light brown to dark brown to grey and contained a trace to some gravel. In borehole BH, a trace of clay was also observed. A.6 to.7 m thick layer of silty sand to sandy silt was encountered at the surface of all of the boreholes. Deeper layers of silty sand to sandy silt were also encountered in boreholes BH, BH4, and BH6, from.7 m to.8 m depth in boreholes BH4 and BH6 and from 2.5 m to 6.4 m in borehole BH. The relative density of the silty sand to sandy silt soils varied from loose to compact based on SPT N values ranging from 6 to 22. Laboratory particle distribution analyses were completed on three samples of the silty sand to sandy silt soils, taken from boreholes BH (4.5 m to 5. m depth), and BH2 and BH4 ( to.6 m depth). The analysis results, based on the Unified Soil Classification System (USCS) scale, are summarized below and provided in Appendix B. Gravel (greater than 4.75 mm size) % to % Sand (.75 mm to 4.75 mm size) 57% to 73% Silt (less than.75 mm size) 26% to 43% 3.2 SAND Layers of predominantly sand were encountered in all of the boreholes except BH6. The sand varied in colour from light brown to black to grey and was moist to saturated at the time of the investigation. Where noted on the borehole logs, saturated conditions were generally observed below. m depth. The relative density of the sand is generally compact with SPT N values ranging from to 9. In borehole BH3, lower blow counts were observed below.5 m depth and no soil sample was recovered due to saturated conditions. The natural moisture content of the sand varied from 4% to 24%. Cambium Inc. Page 3

6 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, CLAYEY SILT TO CLAY AND SILT Clayey silt to clay and silt soils were encountered in boreholes BH and BH2. In borehole BH a.6 m thick layer of clayey silt with a trace of sand was encountered at.9 m depth and a second layer of clay and silt with some sand and a trace of gravel was encountered from 6.3 m to the termination depth of 8. m. In borehole BH2 a. m thick layer of clayey silt was encountered at a depth of.6 mbgs. The clayey silt to clay and silt was dark brown to grey in colour and was about the plastic limit (APL) at the time of the investigation, except for the upper layer in borehole BH, which was much wetter than the plastic limit (MWTPL). The natural moisture content of the clayey silt to clay and silt varied from 7% to 29%. The upper layers of clayey silt are firm to stiff based on SPT N values ranging from 5 to. The clay and silt below 6.3 m depth is hard based on an SPT N value of 42. Two samples of the clayey silt to clay and silt, taken from the two layers observed in borehole BH, were submitted for laboratory particle size distribution analysis. The analysis results, based on the Unified Soil Classification System (USCS) scale, are summarized below and provided in Appendix B. Gravel (greater than 4.75 mm size) % to 7% Sand (.75 mm to 4.75 mm size) 8% to 9% Silt (.2 mm to.75 mm size) 37% to 62% Clay (less than.2 mm size) 3% to 4% 3.4 GROUNDWATER Borehole BH caved to 5.3 m depth on completion of drilling. A monitoring well was installed in this borehole and on February 24, 24, the groundwater level in the well has measured at.4 m below ground surface, at an elevation of masl. On completion of drilling, groundwater seepage was observed in open boreholes BH2 through BH4 at depths ranging from.4 m to.8 m below ground surface. Boreholes BH5 and BH6 were open and dry. Based on these observations, the groundwater table at the Site appears to be approximately.4 m below ground surface, at an elevation of 89.7 masl. The natural moisture content of the soils varied from % to 35%. It should be noted that groundwater levels at the site may fluctuate seasonally and in response to climatic events. 3.5 HYDRAULIC CONDUCTIVITY A slug test was performed in the monitoring well in borehole BH on February 24, 24. Based on the data logger results, the calculated hydraulic conductivity of the soils in the location of borehole BH, based on the Hvorslev calculation method, is 2.6 x -3 cm/s. Cambium Inc. Page 4

7 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, GEOTECHNICAL CONSIDERATIONS The following recommendations are based on borehole information and are intended to assist designers. Recommendations should not be construed as providing instructions to contractors, who should form their own opinions about site conditions. It is possible that subsurface conditions beyond the borehole locations may vary from those observed. If significant variations are found before or during construction, Cambium should be contacted so that we can reassess our findings, if necessary. 4. GENERAL SITE PREPARATION Existing surficial soils should be excavated to the depth of the proposed pavement structure (Section 4.8) and may be stockpiled for future reuse as trench backfill and site grading. It is assumed that excavation depths for the Stormceptor will be approximately 7. m below ground surface. At these depths, the subgrade material is expected to consist of hard clay and silt soils. 4.2 FROST PENETRATION Based on climate data and design charts, the maximum frost penetration depth below the pavement at the Site is estimated at.5 m. It is assumed that any reconstructed pavement structure thickness will be less than.5 m, so grading and drainage are important for good pavement performance and life expectancy. 4.3 EXCAVATIONS All excavations must be carried out in accordance with the latest edition of the Occupational Health and Safety Act (OHSA). The generally loose to compact native soils above the groundwater table may be classified as Type 3 soils in accordance with OHSA and may be excavated with side slopes not steeper than H:V. Below the groundwater table these soils may be classified as Type 4 soils and may be excavated with side slopes no steeper than 3H:V. Excavation side slopes should be protected from exposure to precipitation and associated ground surface runoff and should be inspected regularly for signs of instability. If localized instability is noted during excavation or if wet conditions are encountered, the side slopes should be flattened as required to maintain safe working conditions or the excavation sidewalls must be fully supported (shored). 4.4 DEWATERING Groundwater seepage was observed in four (4) of the boreholes at depths ranging from.4 m to.8 m below ground surface on completion of drilling. The measured groundwater level in borehole BH, equipped with a Cambium Inc. Page 5

8 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24 monitoring well, was.4 mbgs (elevation masl) on February 24, 24. Based on these observations, the groundwater table at the Site appears to be approximately.4 mbgs at elevation 89.7 masl. Excavations for the Stormceptor installation will extend below the groundwater table, through layers of silty sand soils. The hydraulic conductivity of the soils at borehole BH is approximately 2.6 x -3 cm/s. Significant groundwater seepage is anticipated and advanced dewatering using a well-point dewatering system is recommended. A Permit to Take Water (PTTW) will be required from the Ministry of the Environment (MOE) as pumping rates are expected to exceed 5, L/day. Cambium has completed the PTTW application under separate cover. 4.5 INTERNAL DRAINAGE AND GRADING For internal drainage, we recommend that the subgrade material be sloped at a minimum of 3 percent to perimeter or designated drainage areas. The final asphalt surface should also be sloped at a minimum of 2 percent to shed runoff. Along each edge of the parking lot and extending radially from any catch basins, 5 mm diameter geotextile-wrapped perforated pipe subdrains should be installed in accordance with City of Peterborough Specification CP45. and the associated drawing CPD45.. The subdrains should be surrounded by Modified Granular B and outlet to the storm sewer or an otherwise appropriate frost-free outlet. 4.6 BURIED UTILITIES The bedding and cover material for the new sewers should consist of Class B bedding, placed in accordance with pertinent City of Peterborough Specification and Ontario Provincial Standard Drawings (OPSD 82.). The bedding and cover material shall be placed in maximum 3 mm thick lifts and should be compacted to at least percent of standard Proctor maximum dry density (SPMDD). The cover material shall be a minimum of 3 mm over the top of the pipe and compacted to percent SPMDD, taking care not to damage the utility pipes during compaction. If bedding is being placed in saturated conditions, the Granular bedding should be replaced with 9 mm diameter crushed clear stone wrapped in geotextile as specified in City of Peterborough Specification CP4.6 and Drawing CPD BACKFILL AND COMPACTION Excavated fill and native soils from the site or engineered fill may be appropriate for use as backfill material for trench backfill for the buried utilities. Backfill should be placed in maximum 3 mm thick lifts and should be compacted to a minimum of 98 percent SPMDD, taking care not to damage the utility pipes during compaction. All granular base and subbase materials should be compacted to percent SPMDD in all areas. Cambium Inc. Page 6

9 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, PAVEMENT DESIGN The performance of the pavement is dependent upon proper subgrade preparation. Any existing fill or organic materials should be removed down to competent native material and backfilled with approved engineered fill or native material, compacted to percent SPMDD. The subgrade should be proof rolled and inspected by a Geotechnical Engineer. Any areas where rutting or appreciable deflection is noted should be subexcavated and replaced with suitable granular fill compacted to percent SPMDD. It is assumed that the parking lot will be reconstructed to an appropriate municipal design standard. The recommended minimum pavement thickness design has been developed assuming little heavy truck traffic is anticipated. The recommended minimum pavement structure is provided in Table. Table Recommended Minimum Pavement Structure Pavement Layer Surface Course Asphalt 4 mm HL3 Binder Course Asphalt 4 mm HL8 Granular Base 5 mm OP Granular A Granular Subbase 3 mm OP Granular B Material and thickness substitutions must be approved by the Design Engineer. We should be contacted if Superpave specifications are required. The thickness of the subbase layer could be increased at the discretion of the Engineer, to accommodate site conditions at the time of construction, including soft or weak subgrade soil replacement. Compaction of the subgrade should be verified by the Engineer prior to placing the granular fill. Granular layers should be placed in 5 mm maximum loose lifts and compacted to percent of SPMDD (ASTM D698) standard. The granular materials specified should conform to OP standards, as confirmed by appropriate materials testing. The final asphalt surface should be sloped at a minimum of 2 percent to shed runoff. Abutting pavements should be sawcut to provide clean vertical joints with new pavement areas. 4.9 DESIGN REVIEW AND INSPECTIONS Testing and inspections should be carried out during construction operations to examine and approve subgrade conditions, fill material, compaction of pipe bedding, trench backfill, and granular base courses. We should be contacted to review and approve design drawings, prior to tendering or commencing construction, to ensure that all pertinent geotechnical-related factors have been addressed. It is important that onsite geotechnical supervision be provided at this site for excavation and backfill procedures, deleterious soil removal, subgrade inspections and compaction testing. Cambium Inc. Page 7

10 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, CLOSING Please note that this work program and report are governed by the attached Qualifications and Limitations. If you have questions or comments regarding this document, please do not hesitate to contact the undersigned at (75) ext Respectfully submitted, CAMBIUM INC. Stuart Baird, P.Eng. Senior Project Manager SEB/jlw P:\3 to 3999\336- City of Peterborough - Geotechnical Investigation Monaghan Birch & Eastgate\Deliverables\FINAL - Eastgate Geotech\ RPT Eastgate Geotech.docx Cambium Inc. Page 8

11 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24 Appended Figures Cambium Inc.

12 º GEOTECHNICAL INVESTIGATION CITY OF PETERBOROUGH LEGEND D E Borehole Monitoring Well Location BH3 D E BH2 D E BH5 D E BH4 D E Notes: - 22 imagary acquired February, 24 from ESRI. Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community - Base mapping features are Queen's Printer of Ontario, 2 (this does not constitute an endorsement by the Ministry of Natural Resources or the Ontario Government). - Distances on this plan are in metres and can be converted to feet by dividing by Cambium Inc. makes every effort to ensure this map is free from errors but cannot be held responsible for any damages due to error or omissions. This map should not be used for navigation or legal purposes. It is intended for general reference use only. BH6 D E P.O. Box 325, 52 Hunter Street East Peterborough, Ontario, K9H G5 Tel: (75) Fax: (75) BOREHOLE LOCATION PLAN EASTGATE PARKING LOT Project No.: ASHBURNHAM DRIVE Scale: Metres Created by: Date: February Rev.: Projection: :, NAD 983 UTM Zone 7N Checked by: Figure: NLB SEB

13 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24 Appendix A Borehole Logs Cambium Inc.

14 Peterborough Barrie Oshawa T: Log of Borehole: BH Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks 92 - Cap Casing 9 Sandy Silt: Dark brown sandy silt, moist AS Pipe Sand: Black to grey sand, compact, moist Sandy Silt: Light grey sandy silt, trace clay, loose, saturated Clayey Silt: Grey clayey silt, trace sand, firm, MWTPL Silty Sand: Grey to brown silty sand, trace clay, compact, saturated Bentonite Plug Groundwater measured at.4 m depth on Feb 24, 24 4 GSA: Gravel % Sand 8% Silt 62% Clay 3% 87 4 Sand Pack PVC Screen Clay and Silt: Grey clay and silt, hard, APL, vertical sand seams throughout Borehole terminated at 8. m depth in silty clay Cap 6 GSA: Gravel % Sand 57% Silt and Clay 43% Borehole caved to 5.3 m depth on completion 8 GSA: Gravel 7% Sand 9% Silt 37% Clay 4% 82 9 Logged By: S. Morris Input By: J. Wales

15 Peterborough Barrie Oshawa T: Log of Borehole: BH2 Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks 9 Sandy Silt: Dark brown sandy silt, moist Silty Sand: Dark grey silty sand, moist AS AS GSA: Gravel 2% Sand 68% Silt and Clay 3% Clayey Silt: Dark brown to grey clayey silt, stiff, APL Sand: Brown sand, compact, wet to saturated Groundwater at.7 m depth in open borehole on completion Borehole terminated at 2.4 m depth in sand 88 3 Logged By: S. Morris Input By: J. Wales

16 Peterborough Barrie Oshawa T: Log of Borehole: BH3 Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks Silty Sand: Light brown silty sand, moist AS 9 Sand: Brown sand, compact to loose, wet to saturated no recovery, spoons saturated upon removal Groundwater at.4 m depth in open borehole on completion 2 Borehole terminated at.8 m depth in sand 88 3 Logged By: S. Morris Input By: J. Wales

17 Peterborough Barrie Oshawa T: Log of Borehole: BH4 Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks 9 Silty Sand: Light brown silty sand, moist AS AS GSA: Gravel % Sand 73% Silt and Clay 26% Sand: Light brown sand, compact, moist Silty Sand: Light brown silty sand, loose, saturated Borehole terminated at.8 m depth in silty sand Borehole open and saturated at bottom on completion 89 3 Logged By: S. Morris Input By: J. Wales

18 Peterborough Barrie Oshawa T: Log of Borehole: BH5 Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks Silty Sand: Dark brown silty sand, moist AS 9 Sand: Light brown sand, compact, wet to saturated Borehole terminated at.8 m depth in sand Borehole open and dry on completion 88 3 Logged By: S. Morris Input By: J. Wales

19 Peterborough Barrie Oshawa T: Log of Borehole: BH6 Page of Client: City of Peterborough Project Name: Geotech Investigation Project No.: Contractor: Eastern Drilling Method: Solid Stem / Split Spoon Date Completed: Location: Eastgate UTM: Elevation: 336- Feb 3, masl SUBSURFACE PROFILE SAMPLE Elevation (m) Depth Lithology Description Number Type % Recovery SPT (N) % Moisture SPT (N) Well Installation Remarks Sandy Silt: Dark brown sandy silt, some gravel, moist AS Silty Sand: Light grey silty sand, trace gravel, compact to loose, moist Borehole terminated at.8 m depth in silty sand Borehole open and dry on completion 88 3 Logged By: S. Morris Input By: J. Wales

20 Eastgate Parking Lot Geotechnical Investigation City of Peterborough Ref. No.: 336- March 4, 24 Appendix B Physical Laboratory Testing Results Cambium Inc.

21 PERCENT PAING PERCENT RETAINED Grain Size Distribution Chart Client: City of Peterborough Project No.: 336- Project: Eastgate Parking Lot Hole No.: BH Sample No.: Sampled By: S-4 Depth: m Steve Morris - Cambium Inc. Date: February 8, 24 UNIFIED SOIL CLAIFICATION SYSTEM CLAY & SILT (<.75mm) SAND (<4.75 to.75mm) MEDIUM GRAVEL (>4.75mm) DIAMETER (mm) CLAY SILT VERY SAND MEDIUM GRAVEL GRAVEL U.S. BUREAU OF SOILS CLAIFICATION Borehole No. Sample No. Depth Gravel Sand Silt Clay Moisture BH S m Description Classification D 6 D 3 D C u C c CLAYEY SILT trace sand CL #VALUE! #VALUE!

22 PERCENT PAING PERCENT RETAINED Grain Size Distribution Chart Client: City of Peterborough Project No.: 336- Project: Eastgate Parking Lot Hole No.: BH Sample No.: Sampled By: S-6 Depth: m Steve Morris - Cambium Inc. Date: February 8, 24 UNIFIED SOIL CLAIFICATION SYSTEM CLAY & SILT (<.75mm) SAND (<4.75 to.75mm) MEDIUM GRAVEL (>4.75mm) DIAMETER (mm) CLAY SILT VERY SAND MEDIUM GRAVEL GRAVEL U.S. BUREAU OF SOILS CLAIFICATION Borehole No. Sample No. Depth Gravel Sand Silt Clay Moisture BH S m Description Classification D 6 D 3 D C u C c SILTY SAND SM #VALUE! #VALUE!

23 PERCENT PAING PERCENT RETAINED Grain Size Distribution Chart Client: City of Peterborough Project No.: 336- Project: Eastgate Parking Lot Hole No.: BH Sample No.: Sampled By: S-8 Depth: m Steve Morris - Cambium Inc. Date: February 8, 24 UNIFIED SOIL CLAIFICATION SYSTEM CLAY & SILT (<.75mm) SAND (<4.75 to.75mm) MEDIUM GRAVEL (>4.75mm) DIAMETER (mm) CLAY SILT VERY SAND MEDIUM GRAVEL GRAVEL U.S. BUREAU OF SOILS CLAIFICATION Borehole No. Sample No. Depth Gravel Sand Silt Clay Moisture BH S m Description Classification D 6 D 3 D C u C c CLAY AND SILT some sand trace of gravel CL #VALUE! #VALUE!

24 PERCENT PAING PERCENT RETAINED Grain Size Distribution Chart Client: City of Peterborough Project No.: 336- Project: Eastgate Parking Lot Hole No.: BH2 Sample No.: Sampled By: S- Depth:. -.6 m Steve Morris - Cambium Inc. Date: February 8, 24 UNIFIED SOIL CLAIFICATION SYSTEM CLAY & SILT (<.75mm) SAND (<4.75 to.75mm) MEDIUM GRAVEL (>4.75mm) DIAMETER (mm) CLAY SILT VERY SAND MEDIUM GRAVEL GRAVEL U.S. BUREAU OF SOILS CLAIFICATION Borehole No. Sample No. Depth Gravel Sand Silt Clay Moisture BH2 S m Description Classification D 6 D 3 D C u C c SILTY SAND trace of gravel SM #VALUE! #VALUE!

25 PERCENT PAING PERCENT RETAINED Grain Size Distribution Chart Client: City of Peterborough Project No.: 336- Project: Eastgate Parking Lot Hole No.: BH4 Sample No.: Sampled By: S- Depth:. -.6 m Steve Morris - Cambium Inc. Date: February 8, 24 UNIFIED SOIL CLAIFICATION SYSTEM CLAY & SILT (<.75mm) SAND (<4.75 to.75mm) MEDIUM GRAVEL (>4.75mm) DIAMETER (mm) CLAY SILT VERY SAND MEDIUM GRAVEL GRAVEL U.S. BUREAU OF SOILS CLAIFICATION Borehole No. Sample No. Depth Gravel Sand Silt Clay Moisture BH4 S m Description Classification D 6 D 3 D C u C c SILTY SAND trace of gravel SM #VALUE! #VALUE!

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

DRAFT GEOTECHNICAL INVESTIGATION REPORT

DRAFT GEOTECHNICAL INVESTIGATION REPORT DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland 151-03483-00 Date: July 2015 WSP Canada Inc. 500 Greber

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough Geotechnical Investigation Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario City of Peterborough September, 0 Pido Road, Unit, Peterborough, Ontario, Canada KJ X

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS The City of Winnipeg Appendix A - Part 2 Bid Opportunity No. 210-2014 Addendum #1 Page 1 of 1 Template Version: C420131129 - RW APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS Quality Engineering

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Elementary School 300 Esprit Drive Archaeological Services Prepared For

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited Geotechnical Engineering Environmental Environmental Engineering Engineering Hydrogeology Hydrogeology Geological Engineering Geological Engineering Materials Testing Materials Testing Building Science

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa,

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION Site Plan Application Pace Redevelopment Stouffville, Ontario Submitted to: Mr. Terry Chapman Pace Savings & Credit Union Limited 8111 Jane Street, Unit

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2 PAVEMENT REPORT GEOTECHNICAL INVESTIGATION FOR THE REHABILITATION OF LOUIS HEBERT STREET, VAUDREUIL STREET, MARQUELLE STREET AND LASALLE STREET, ROCKLAND, ONTARIO Submitted to: Lee Jablonski, P.Eng. J.L.

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario Subsurface Investigation Proposed Commercial Building 8 March Road Ottawa, Ontario Houle Chevrier Engineering Ltd. 80 Wescar Lane Ottawa, Ontario K0A L0 www.hceng.ca Submitted to: Broccolini Construction

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2 REPORT: T020846-A2 VIVA RETIREMENT COMMUNITIES Geotechnical Investigation Report Five-Story Retirement Home Strandherd Drive and Tartan Drive Ottawa, Ontario June 5, 2013 Ottawa, June 5, 2013 Ms. Monica

More information

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To: GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO Submitted To: Wade Chacon, P.E. Louisiana Boulevard NE, Suite 00 Albuquerque, New Mexico 0 Submitted By: GEOMAT

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO Prepared for: CIMA+ #900, 101 Frederick Street Kitchener,

More information

GEOLOGY Local Geology Local geologic mapping shows the site underlain by Goble Volcanics consisting of basalt and andesite, with basalt breccia, volcanic conglomerate, and interbedded siltstone and pyroclastics

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario September 6 REPORT ON Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario Submitted to: Claridge Homes Corporation - Gladstone Avenue Ottawa, ON KP Y6 REPORT Report Number:

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

SECTION AGGREGATE OR GRANULAR SUBBASE

SECTION AGGREGATE OR GRANULAR SUBBASE SECTION 02230 AGGREGATE OR GRANULAR SUBBASE PART 1 GENERAL 1.01 SECTION INCLUDES A. Aggregate or granular subbase as shown on the drawings. 1.02 RELATED SECTIONS A. Section 01400 Quality Requirements.

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

PRELIMINARY GEOTECHNICAL EXPLORATION Additional MeadWestvaco Ridgeville Property 331 acres Dorchester County, South Carolina S&ME Project No. 1131-09-259A Prepared For: BP Barber & Associates Post Office

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia Geotechnical Report Fauquier County Cedar Lee Middle School Safety Routes to School Project Number: GEO 121913.08 April 30, 2015 Prepared for McCormick Taylor, Inc. 113 Mill Place Parkway, Unit 103 Verona,

More information