Geotechnical Data Report

Size: px
Start display at page:

Download "Geotechnical Data Report"

Transcription

1 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No Prepared for: Prepared by: Terracon Consultants, Inc.

2 December 1, Mauldin Road Attn: Mr. Ryan Philmon P: x 229 F: E: timothyp@re-wa.org Re: Geotechnical Data Report Downtown Greenville Future Conveyance Study Terracon Project No Dear Mr. Philmon: Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. This study was performed in general accordance with our Proposal No. P , dated June 8, This report presents the findings of the exploration to determine pertinent geotechnical conditions along the proposed sewer line. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Nitin Dudani, P.E. Senior Geotechnical Engineer James G. Kahle, P.E. Senior Geotechnical Engineer Enclosures cc: 1 Client (PDF) 1 File Terracon Consultants, Inc Starita Road, Suite E Charlotte, North Carolina P [704] F [704] terracon.com

3 Geotechnical Engineering Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No TABLE OF CONTENTS Page 1.0 INTRODUCTION PROJECT INFORMATION Site Location SUBSURFACE CONDITIONS Geology Typical Subsurface Profile Groundwater Conditions GENERAL COMMENTS... 5 Appendix A Field Exploration Exhibit A-1 Site Location Plan Exhibit A-2 to A-10 Boring Location Plans Exhibit A-11 Field Exploration Description Exhibits A-12 to A-21 SPT Boring Logs Exhibit A-22 Laboratory Test Results Appendix B Supporting Documents Exhibit B-1 General Notes Exhibit B-2 Unified Soil Classification Systems Reliable Responsive Convenient Innovative

4 GEOTECHNICAL ENGINEERING REPORT DOWNTOWN GREENVILLE FUTURE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Terracon Project No December 1, INTRODUCTION A geotechnical engineering report has been completed for the proposed Downtown Greenville Future Conveyance Study in. Eight (8) SPT borings and fifteen (15) rock probes were performed to depths of approximately 9 ½ to 90 feet below the existing ground surface along the proposed sewer line route. Logs of the borings, a vicinity map and boring location plans are included in Appendix A of this report. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: subsurface soil conditions groundwater conditions earthwork depth to rock or Partially Weathered Bedrock 2.0 PROJECT INFORMATION 2.1 Site Location Site Location ITEM Location Existing improvements Current ground cover Existing topography DESCRIPTION The proposed sewer line will start south of E. Washington Street (Greenville Zoo parking) and will terminate near the intersection of Stone Plaza Drive and Chick Spring Road in. Existing ReWa sewer lines are installed in the vicinity of proposed line. Route has various structures and utilities. Grass, small brush and pavement etc. Based on the Greenville County GIS system contour maps, in general the site elevation at the proposed sewer is sloping down towards the east direction Responsive Resourceful Reliable 1

5 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No Project Description ITEM Proposed Study DESCRIPTION ReWa is evaluating the existing sewer lines through downtown. There are four (4) possible solutions and each needs geotechnical investigation. There are two storage options upstream of downtown, one microtunneling/ open cut route and one option of a tunnel 100 vertical feet below downtown. Should any of the above information or assumptions be inconsistent with the planned construction, please let us know so that we may make any necessary modifications to this proposal. 3.0 SUBSURFACE CONDITIONS 3.1 Geology The project site is located within the Piedmont Physiographic Province of South Carolina, an area underlain by ancient igneous and metamorphic rocks. The topography and relief of the Piedmont has developed from differential weathering of the igneous and metamorphic bedrock. The residual soils in this area are the product of in-place chemical weathering of rock. The typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. The boundary between soil and rock is not sharply defined due to variations in weathering and the presence of soft rock. The transition zone is locally termed as partially weathered rock. Partially weathered rock is defined for engineering purposes as residual material that can be drilled with soil boring methods, but exhibits standard penetration test (SPT) N- values exceeding 100 blows per foot (bpf). The depth to partially weathered rock occurs at irregular depths due to variations in degree of weathering and variations in the material composition of the rock. Responsive Resourceful Reliable 2

6 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No Typical Subsurface Profile Based on the results of the SPT borings, subsurface conditions on the project site can be generalized as follows: Description Approximate Depth to Bottom of Stratum (feet) Material Encountered SPT N value Surface Approx. 1 to 4 inches Topsoil N/A Stratum 1 3 to 13 ½ Stratum 2 8 to 17 Stratum to 82 Stratum 3 22 ½ to 86 Stratum 4 Below 10 to 86 Fill sandy clay, clayey sand, silty sand Alluvial very soft, sandy clay, and loose clayey sand Residual very soft to soft, sandy clay and sandy silt, and very loose to very dense, silty sand Partially Weathered Rock sampled as silty sand Bedrock based on auger refusal and rock coring 2 to 24 WHO to 2 WHO to 70 Specific conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs included in Appendix A of this report. The following table is a summary of the information with respect to the twenty three (23) soil test borings and rock probes performed along the proposed sewer line NA Responsive Resourceful Reliable 3

7 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No Boring Approx. Elevation End of Boring Approx. Water Refusal Auger Refusal/Top (ft) 1 Elev. (ft) 1 Depth (ft) of Rock (ft) 2 B Yes 29.9 B-1A Yes 45.5 B-1B Yes 50.1 B-1C Yes 43.2 B-1D Yes 46.3 B-1E Yes 34.6 B Yes 17.4 B Yes 11.9 B No NE B-5A Yes 86.1 B-5B Yes 43.4 B NE Yes 12.3 B-6A Yes 33.6 B-6B Yes 22.5 B-6C Yes 31 B-6D Yes 9.7 B-6E Yes 32 B-6F Yes 13 B Yes 61.8 B-7A MR Yes 43 B-7B MR Yes 55 B-7C MR Yes 55 B Yes 29.3 B No NE Notes: 1 From Main Sea Level (MSL) 2 Top of Rock is defined as the elevation at which Auger Refusal was encountered. 3 From the Top of Ground Elevation NE: Not Encountered MR: Mud Rotary drilling method made it unable to take water table 3.3 Groundwater Conditions Groundwater was encountered in all soil test borings and rock probes from 5 to 25 feet from the existing ground surface. The boreholes were backfilled at the termination of exploration, making subsequent water level readings unobtainable. Due to the low permeability of the soils encountered in the borings, a relatively long time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials. Longer observations in Responsive Resourceful Reliable 4

8 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. In addition, perched water could develop in sand seams and layers overlying lower permeability clay soils following periods of heavy or prolonged precipitation. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 GENERAL COMMENTS Terracon should be retained to provide testing and observation during excavation and other construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated location and from other information discussed in this report. This report does not reflect variations that may occur across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive Resourceful Reliable 5

9 APPENDIX A FIELD EXPLORATION

10 PROJECT SITE Image Courtesy of Google Earth TM Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 10/02/ PH. (864) FAX. (864) SITE LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-1

11 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-7A B-7 B-7B B-7C NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-2

12 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-8 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-3

13 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-9 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-4

14 B-1C B-1B B-1D B-1A B-1E LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-1 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-5

15 LEGEND: B-5A SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-5 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. B-5B Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-6

16 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-6F B-6 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-7

17 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-4 B-6E B-6D B-6C B-6B NOTES: B-6A 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-8

18 LEGEND: SPT BORING (APPROX. LOCATION) ROCK PROBES (APPROX. LOCATION) B-3 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING MEASUREMENTS OFF OF EXISTING STRUCTURES. Image Courtesy of Google Earth TM DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: ND Drawn by: NJ Checked by: ND Approved by: ND Project No Scale: N.T.S. File Name: Date: 09/23/ PH. (864) FAX. (864) BORING LOCATION PLAN DOWNTOWN GREENVILLE CONVEYANCE STUDY GREENVILLE, SOUTH CAROLINA Exhibit A-9

19 Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No Field Exploration Description The boring locations were laid out on the site by Terracon personnel and were measured from available site features. The soil test borings were surveyed and accurate location and elevation survey was performed. The borings were drilled using a track-mounted and a truck-mounted rotary drill rig using continuous flight hollow-stem augers to advance the boreholes. Samples of the soil encountered in the borings were obtained using the split-barrel sampling procedures. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound conventional safety hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT-N). This value is used to estimate the in-situ relative density of cohesionless soils and consistency of cohesive soils. An automatic SPT hammer was used to advance the split-barrel sampler in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count (N) value by increasing the penetration per hammer blow over what would be obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. The samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further visual examination and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. The borings were backfilled with auger cuttings prior to the drill crew leaving the site. A field log of each boring was prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller s interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation and tests of the sample. Exhibit A-10

20 Laboratory Testing Description Samples retrieved during the field exploration were taken to the laboratory for further observation by the project geotechnical engineer and were classified in accordance with the Unified Soil Classification System (USCS) described in Appendix C. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Laboratory tests were conducted on selected soil samples and the test results are presented in this appendix. The laboratory test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. Laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. Selected soil samples obtained from the site were tested for the following engineering properties: Particle-Size Analysis of Soils ASTM D422 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4318 Laboratory Determination of Water (Moisture) Content of Soil ASTM D2216 Unconfined Compression of Bedrock ASTM D7012

21 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1 CLIENT: Page 1 of 3 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.2 Approximately 2 inches of Topsoil FILL - CLAYEY SAND (SC), with glass, fine to medium grained, dark brown to tan, very 3.5 loose ALLUVIAL - SANDY CLAY (CL), with organics, light gray to tan, soft DEPTH (Ft.) 5 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= N=2 SAMPLE NUMBER SS-1 SS-2 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 23 ATTERBERG LIMITS LL-PL-PI PERCENT FINES RESIDUAL - SANDY CLAY (CL), gray to red, soft N= N=2 SS-3 SS THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ SANDY SILT (ML), with mica, gray to white, very soft SILTY SAND (SM), with mica, fine to medium grained, tan to yellow, very loose to loose SILTY SAND (SM), with mica, fine to medium grained, tan to gray, very dense METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring After 24 hours See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. W.O.H./18" W.O.H./18" N= /5" SS-5 SS-6 SS-7 SS-8 R-1 R-2 88% 100% 5210 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Drill Rig: 727 Project No.: Boring Completed: 7/6/2015 Driller: CF Exhibit: A-11

22 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1 CLIENT: Page 2 of 3 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) 100 FIELD TEST RESULTS SAMPLE NUMBER R-3 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) 100% 4440 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES R-4 94% R-5 90% THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring After 24 hours See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. R-6 R-7 R-8 R-9 R-10 96% 100% 100% 100% 96% 5240 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Boring Completed: 7/6/2015 Drill Rig: 727 Driller: CF Project No.: Exhibit: A-11

23 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1 CLIENT: Page 3 of 3 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) 100 FIELD TEST RESULTS SAMPLE NUMBER R-11 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) 100% 3970 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES R % 89.9 Coring Terminated at 89.9 Feet 832 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring After 24 hours See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Boring Completed: 7/6/2015 Drill Rig: 727 Driller: CF Project No.: Exhibit: A-11

24 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 1 & 2 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

25 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 3 & 4 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

26 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 5 & 6 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

27 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 7 & 8 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

28 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 9 & 10 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

29 Downtown Greenville Future Conveyance Study B-1 Rock Core: Run 11 & 12 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

30 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1A CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-12

31 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1A CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 45.5 Auger Refusal at 45.5 Feet THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-12

32 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1B CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-13

33 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1B CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES Auger Refusal at 50.1 Feet THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-13

34 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1C CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-14

35 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1C CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. (continued) Auger Refusal at 43.2 Feet DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-14

36 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1D CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: 925 (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-15

37 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1D CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: 925 (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 46.3 Auger Refusal at 46.3 Feet THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-15

38 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-1E CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Auger Refusal at 34.6 Feet 889 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/5/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-16

39 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-3 CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) Augered to bedrock refusal prior to coring. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard 868 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring After 24 hours See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. R-1 R-2 R-3 R-4 80% 100% 100% 100% 5110 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 7/7/2015 Boring Completed: 7/7/2015 Drill Rig: 727 Driller: CF Project No.: Exhibit: A-17

40 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-3 CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) 100 FIELD TEST RESULTS SAMPLE NUMBER R-5 R.Q.D. 100% UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES R-6 100% R-7 94% THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Coring Terminated at 77.4 Feet 808 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring After 24 hours See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. R-8 R-9 R-10 R-11 R-12 98% 94% 100% 100% 100% 5300 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 7/7/2015 Boring Completed: 7/7/2015 Drill Rig: 727 Driller: CF Project No.: Exhibit: A-17

41 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run 1 & 2 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

42 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run 3 & 4 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

43 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run 4-6 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

44 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run 6-8 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

45 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run 8-10 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

46 Downtown Greenville Future Conveyance Study B-3 Rock Core: Run Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

47 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-4 CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.7 Approximately 8 inches of Topsoil RESIDUAL - SANDY CLAY (CL), with silt, brown, very stiff SANDY SILT (ML), with organics, red to brown, stiff 5.5 CLAYEY SAND (SC), with mica, fine to 838 medium grained, light brown, loose SILTY SAND (SM), with mica, fine to medium grained, yellow to brown, medium dense DEPTH (Ft.) 5 10 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= N= N= N=20 SAMPLE NUMBER SS-1 SS-2 SS-3 SS-4 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ METAMORPHIC BEDROCK - QUARTZOSE GRANITIC GNEISS, close fracture to moderate spacing, very thin bedding, very slightly weathered, hard 36.9 Coring Terminated at 36.9 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. R-1 R-2 R-3 R-4 R-5 88% 100% 100% 86% 88% Hammer Type: Automatic Safety Hammer Notes: Boring Started: 7/8/2015 Boring Completed: 7/8/2015 Drill Rig: 727 Driller: CF Project No.: Exhibit: A-18

48 Downtown Greenville Future Conveyance Study B-4 Rock Core: Run 1-2 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

49 Downtown Greenville Future Conveyance Study B-4 Rock Core: Run 2-4 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

50 Downtown Greenville Future Conveyance Study B-4 Rock Core: Run 5 Various Locations Field Engineer: Nathan Jackson, E.I.T. Date: 07/31/2015 Taylors, SC Scale: Not to Scale BD000P, , Rev.0

51 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5 CLIENT: Page 1 of 2 SITE: GRAPHIC LOG DEPTH ELEVATION (Ft.) 0.5 Approximately 6 inches of Asphalt FILL - CLAYEY SAND (SC), with asphalt, fine to medium grained, red to yellow, loose 922 FILL - SILTY SAND (SM), with clay, fine to medium grained, red, loose Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: FILL - SANDY CLAY (CL), with mica, red to brown, stiff ALLUVIAL - SILTY SAND (SM), with organics, dark brown, very loose Surface Elev.: (Ft.) DEPTH (Ft.) 5 10 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= N= N= N=1 SAMPLE NUMBER SS-1 SS-2 SS-3 SS-4 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 22 ATTERBERG LIMITS LL-PL-PI 76 NP PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ RESIDUAL - SANDY CLAY (CL), with trace mica, dark brown to red, medium stiff SILTY SAND (SM), with mica, fine to coarse grained, gray to yellow, very loose to loose SANDY SILT (ML), with mica, fine to medium grained, light brown to yellow, loose Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations N= N= N= N= N= N=4 SS-5 SS-6 SS-7 SS-8 SS-9 SS-10 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Drill Rig: Geoprobe 7822 DT Project No.: Boring Completed: 6/18/2015 Driller: JG Exhibit: A-19

52 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5 CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SANDY SILT (ML), with mica, fine to medium grained, light brown to yellow, loose (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES N=8 SS Boring Terminated at 50 Feet N=6 SS-12 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Boring Completed: 6/18/2015 Drill Rig: Geoprobe 7822 DT Driller: JG Project No.: Exhibit: A-19

53 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5A CLIENT: Page 1 of 3 SITE: GRAPHIC LOG LOCATION Various Locations See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/6/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-20

54 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5A CLIENT: Page 2 of 3 SITE: GRAPHIC LOG LOCATION Various Locations See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/6/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-20

55 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5A CLIENT: Page 3 of 3 SITE: GRAPHIC LOG LOCATION DEPTH Various Locations See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) ELEVATION (Ft.) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 82.0 Hard drilling action at around 82 feet indicates dense soils/ Partially Weathered Bedrock (PWR) 86.1 Auger Refusal at 86.1 Feet THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/6/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-20

56 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5B CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/6/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-21

57 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-5B CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: DEPTH ELEVATION (Ft.) Hard drilling action at around 40 feet indicates dense soils/ Partially Weathered Bedrock (PWR) 43.4 Auger Refusal at 43.4 Feet Surface Elev.: (Ft.) 898 DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/6/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-21

58 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6 CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.3 Approximately 3 inches of Topsoil FILL - SILTY SAND (SM), with mica, fine to medium grained, brown, medium dense RESIDUAL - SILTY SAND (SM), with mica, fine to medium grained, yellow to brown, loose DEPTH (Ft.) 5 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= N=6 SAMPLE NUMBER SS-1 SS-2 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 9 ATTERBERG LIMITS LL-PL-PI PERCENT FINES CLAYEY SAND (SC), with trace mica, fine to medium grained, red to yellow, loose N= N=6 SS-3 SS Auger Refusal at 12.3 Feet 861 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS No free water observed See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/18/2015 Boring Completed: 6/18/2015 Drill Rig: Geoprobe 7822 DT Driller: JG Project No.: Exhibit: A-22

59 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6A CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Auger Refusal at 33.6 Feet 809 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-23

60 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6B CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 4.0 Hard drilling action at around 6 feet indicates dense soils/ Partially Weathered Bedrock (PWR) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Auger Refusal at 22.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-24

61 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6C CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Hard drilling action at around 28 feet indicates dense soils/ Partially Weathered Bedrock (PWR) 31.0 Auger Refusal at 31 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/14/2015 Boring Completed: 8/14/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-25

62 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6D CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 4.0 Hard drilling action at around 4 feet indicates dense soils/ Partially Weathered Bedrock (PWR) Auger Refusal at 9.7 Feet THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Water Level After Boring See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/5/2015 Boring Completed: 8/6/2015 Drill Rig: CME-45 Driller: JP Project No.: Exhibit: A-26

63 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6E CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Hard drilling action at around 30 feet indicates dense soils/ Partially Weathered Bedrock (PWR) Auger Refusal at 32 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/14/2015 Boring Completed: 8/14/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-27

64 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-6F CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.3 Approximately 3 inches of Topsoil 858 FILL - SANDY SILT (ML), with mica, brown, medium stiff DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N=7 SAMPLE NUMBER SS-1 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ ALLUVIUM - SILTY SAND (SM), with mica, fine grained, tan to brown, loose to medium dense Hard drilling action at around 11 feet indicates dense soils/ Partially Weathered Bedrock (PWR) Auger Refusal at 13 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling 5 10 See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations N= N= N=13 SS-2 SS-3 SS-4 Hammer Type: Rope and Cathead Notes: Boring Started: 11/20/2015 Drill Rig: CME-45 Project No.: Boring Completed: 11/20/2015 Driller: J. Pawless Exhibit: A-28

65 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7 CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.1 Approximately 1 inch of Topsoil FILL - SILTY SAND (SM), with concrete, fine to coarse grained, light gray, very dense FILL - CLAYEY SAND (SC), with organics, fine to medium grained, red to brown, medium dense DEPTH (Ft.) 5 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= 79/9" N=13 SAMPLE NUMBER SS-1 SS-2 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 16 ATTERBERG LIMITS LL-PL-PI PERCENT FINES FILL - SILTY SAND (SM), with gravel, fine to medium grained, dark brown, loose ALLUVIAL - SANDY CLAY (CL), with organics, olive to gray, very soft N= N=6 SS-3 SS-4 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ RESIDUAL - SILTY SAND (SM), with mica, fine grained, gray, very loose SILTY SAND (SM), with mica, fine to coarse grained, yellow to brown, loose 30.0 Augered to refusal Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. W.O.H./18" N= N= N=5 SS-5 SS-6 SS-7 SS-8 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/22/2015 Drill Rig: Geoprobe 7822 DT Project No.: Driller: JG Boring Completed: 6/22/2015 Exhibit: A-29 61

66 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7 CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: DEPTH Augered to refusal. (continued) Surface Elev.: (Ft.) ELEVATION (Ft.) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Auger Refusal at 61.8 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/22/2015 Boring Completed: 6/22/2015 Drill Rig: Geoprobe 7822 DT Driller: JG Project No.: Exhibit: A-29

67 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7A CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: 934 (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/13/2015 Boring Completed: 8/13/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-30

68 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7A CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: 934 (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. (continued) Auger Refusal at 43 Feet DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/13/2015 Boring Completed: 8/13/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-30

69 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7B CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES Lost fluid circulation at 8 feet due to Gravel/ Rubble THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/15 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/13/2015 Boring Completed: 8/13/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-31

70 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7B CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES Lost fluid circulation at 8 feet due to Gravel/ Rubble. (continued) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Hard drilling action at around 53 feet indicates dense soils/ Partially Weathered Bedrock (PWR) Auger Refusal at 55 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken 55 See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/13/2015 Boring Completed: 8/13/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-31

71 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7C CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) SILTY SAND/ SANDY SILT/ SANDY CLAY, Performed augering without SPT samples to advance the hole. DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES Lost fluid circulation at 8 feet due to Gravel 5 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/14/2015 Boring Completed: 8/14/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-32

72 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-7C CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) Hard drilling action at around 40 feet indicates dense soils/ Partially Weathered Bedrock (PWR) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Auger Refusal at 55 Feet 880 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS Due to mud rotary, water level couldn't be taken 55 See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 8/14/2015 Boring Completed: 8/14/2015 Drill Rig: CME-550X Driller: Aaron Project No.: Exhibit: A-32

73 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-8 CLIENT: Page 1 of 1 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.3 Approximately 3 inches of Topsoil FILL - SILTY SAND (SM), with mica, fine to medium grained, brown, medium dense 928 FILL - CLAYEY SAND (SC), with mica, fine grained, yellow to brown, very loose DEPTH (Ft.) 5 OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N= N=3 SAMPLE NUMBER SS-1 SS-2 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 15 ATTERBERG LIMITS LL-PL-PI PERCENT FINES FILL - CLAYEY SAND (SC), with organics, red to brown, very loose N= N=1 SS-3 SS THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ ALLUVIAL - CLAYEY SAND (SC), with organics, fine to coarse grained, gray to tan, very loose RESIDUAL - SILTY SAND (SM), with trace mica, fine to coarse grained, gray, very loose SILTY SAND (SM), with mica, fine to medium grained, gray to white, very dense PARTIALLY WEATHERED ROCK- sampled as silty sand (SM), very dense, No Recovery Auger Refusal at 29.3 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations N= N= N=70 N= 50/0" SS-5 SS-6 SS-7 SS-8 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/19/2015 Drill Rig: Geoprobe 7822 DT Project No.: Boring Completed: 6/19/2015 Driller: JG Exhibit: A-33

74 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-9 CLIENT: Page 1 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) 0.3 Approximately 3 inches of Topsoil FILL - SANDY CLAY (CL), with asphalt, dark brown, soft DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS N=4 SAMPLE NUMBER SS-1 R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) 29 ATTERBERG LIMITS LL-PL-PI PERCENT FINES N=4 SS ALLUVIAL - CLAYEY SAND (SC), with mica, fine to medium grained, gray, very loose N= N=2 SS-3 SS-4 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ RESIDUAL - SILTY SAND (SM), with trace mica, fine to medium grained, gray to white, loose SILTY SAND (SM), with mica, fine to coarse grained, yellow to tan, very loose SILTY SAND (SM), fine to coarse grained, yellow, loose 30.0 Augered to 70 feet with no refusal Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations N= N= N= N=4 SS-5 SS-6 SS-7 SS-8 Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/19/2015 Drill Rig: Geoprobe 7822 DT Project No.: Boring Completed: 6/19/2015 Driller: JG Exhibit: A-34

75 PROJECT: Downtown Greenville Conveyance Study BORING LOG NO. B-9 CLIENT: Page 2 of 2 SITE: GRAPHIC LOG Various Locations LOCATION See Exhibit A-2 Latitude: Longitude: Surface Elev.: (Ft.) DEPTH ELEVATION (Ft.) Augered to 70 feet with no refusal. (continued) DEPTH (Ft.) OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS SAMPLE NUMBER R.Q.D. UNCONFINED COMPRESSIVE STRENGTH (psi) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL GPJ TERRACON2015.GDT 12/1/ Boring Terminated at 70 Feet 855 Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2-1/4" Hollow Stem Auger Abandonment Method: Borings backfilled with soil cuttings upon completion. OBSERVATIONS While drilling See Exhibit A-3 for description of field procedures See Appendix B for explanation of symbols and abbreviations. Hammer Type: Automatic Safety Hammer Notes: Boring Started: 6/19/2015 Boring Completed: 6/19/2015 Drill Rig: Geoprobe 7822 DT Driller: JG Project No.: Exhibit: A-34

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Veterans Parkway Bridge Approaches Investigation Savannah, Georgia July 20, 2015 Terracon Project No. ES155020 Prepared for: Chatham County Engineering Department Savannah, Georgia

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Bruce and Lee Industrial Site Florence, South Carolina August 31, 2015 Terracon Project No. 73155060 Prepared by: Terracon Consultants, Inc. August 31, 2015

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-10 Bridge Over Council Hollow Creek Ottawa County, Oklahoma Project No. STPY-255F (191) EC Job Piece No. 30308 (06) April 1, 2015 Terracon Project No. 04155008 Prepared

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by: Terracon Consultants,

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

BRIDGE FOUNDATION INVESTIGATION

BRIDGE FOUNDATION INVESTIGATION Jackson Lake Road Bridge over Mackey Creek Henry County, Georgia BRIDGE FOUNDATION INVESTIGATION PROJECT NUMBER LOCATION (See Map) 8934 Jackson Lake Road Bridge over Mackey Creek, Henry County, Georgia

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report S-38-50 (Four Holes Road) over I-26 Emergency Bridge Replacement Orangeburg County, South Carolina May 22, 2018 (Revision 1) SCDOT Project ID.: P037465 Terracon Project No. 73155050U

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia Geotechnical Report Fauquier County Cedar Lee Middle School Safety Routes to School Project Number: GEO 121913.08 April 30, 2015 Prepared for McCormick Taylor, Inc. 113 Mill Place Parkway, Unit 103 Verona,

More information

CHEROKEE NATION BUSINESSES, LLC

CHEROKEE NATION BUSINESSES, LLC REPORT OF PRELIMINARY SUBSURFACE EXPLORATION AND GEOTECHNICAL EVALUATION PROPOSED CHEROKEE SPRINGS PLAZA TAHLEQUAH, OKLAHOMA BUILDING & EARTH PROJECT NO. OK10004 PREPARED FOR: CHEROKEE NATION BUSINESSES,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report REPORT COVER PAGE Geotechnical Engineering Report Proposed T-Line Structure Tahlequah, Oklahoma October 17, 2018 Terracon Project No. 04185192 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants,

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

4. Soil Consistency (Plasticity) (Das, chapter 4)

4. Soil Consistency (Plasticity) (Das, chapter 4) 4. Soil Consistency (Plasticity) (Das, chapter 4) 1 What is Consistency? Consistency is a term used to describe the degree of firmness of fine-grained soils (silt and clay). The consistency of fine grained

More information