Geotechnical Data Report

Size: px
Start display at page:

Download "Geotechnical Data Report"

Transcription

1 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N Prepared for: Project Consulting Services, Inc. Prepared by: Terracon Consultants, Inc. Columbus, Ohio

2 March 3, 2015 Project Consulting Services, Inc. 155 Lafayette Road Suite 2 New Hampton, NH Attn: Re: Mr. Ronald P. Gourgeot, Jr., P.E. P: [603] E: rgourgeot@projectconsulting.com Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio Terracon Project No. N Dear Mr. Gourgeot: Terracon Consultants, Inc. (Terracon) has completed the geotechnical field and laboratory services for the proposed I-77 HDD project. This report presents the findings of the subsurface exploration and results of laboratory tests performed on selected soil and rock samples. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Mohammad Kayser Staff Engineer Steven B. Larimer Staff Geologist Prasad S. Rege, P.E. Regional Manager/Senior Principal Terracon Consultants, Inc. 800 Morrison Road Columbus, Ohio P [614] F [614] terracon.com

3 TABLE OF CONTENTS Page 1.0 INTRODUCTION PROJECT DESCRIPTION SUBSURFACE CONDITIONS Geology Typical Subsurface Profile Water Level Observations GEOTECHNICAL DESIGN PARAMETERS Soil Parameters GENERAL COMMENTS... 4 APPENDIX A FIELD EXPLORATION Field Exploration Description...Exhibit A-1 Boring Location Plan...Exhibit A-2 Boring Logs... Exhibit A-3 to A-4 Subsurface Profile...Exhibit A-5 APPENDIX B LABORATORY TESTING Laboratory Testing...Exhibit B-1 Laboratory Test Results... Exhibit B-2 to B-32 APPENDIX C SUPPORTING DOCUMENTS General Notes... Exhibit C-1 Unified Soil Classification System... Exhibit C-2 Description of Rock Properties... Exhibit C-3 Sample Photos... Exhibit C-4

4 GEOTECHNICAL DATA REPORT PROPOSED I-77 HDD CORES D4-A AND D4-B STARK COUNTY, OHIO Terracon Project No. N March 3, INTRODUCTION This report presents the results of our geotechnical field and laboratory services performed for the proposed I-77 HDD project located in Stark County, Ohio. Our scope of work for this project included the advancement of two (2) borings, designated as D4-A and D4-B which were extended to an approximate depth range of about 60 to 140 feet below the existing ground surface, visual classification and laboratory testing of representative soil and rock samples, groundwater sample lab results (if applicable) and preparation of this geotechnical data report. Logs of the borings and a boring location plan are included in Appendix A of this report. 2.0 PROJECT DESCRIPTION The project consists of crossing Interstate 77 using horizontal directional drilling means and methods for the Rover Pipeline Project. Details are presented below for your information. Locations Item Current Ground Cover Existing Topography Structures Description Boring D4-A (40 40'5.63"N 81 26'10.62"W) is located on the east side of I-77 and D4-B (40 40'6.05"N 81 26'23.83"W) is located on the west side of the Interstate Highway. The existing ground cover in the area of the proposed HDD pipeline is mainly mowed grass fields, agricultural fields, and wooded areas. Based on provided survey information, the ground surface elevation across the proposed HDD pipeline alignment ranges from about elevation 906 to 983 feet. Horizontally directionally drilled (HDD) natural gas pipeline crossings. An overhead power line is located within the vicinity of the proposed HDD. Responsive Resourceful Reliable 1

5 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N SUBSURFACE CONDITIONS 3.1 Geology The project site is contained in the Ohio Physiographic Region on the Allegheny Muskingum- Pittsburgh Plateau with a moderately high to high relief (300 feet 600 feet) dissected plateau having broad major valleys that contain outwash terraces, and tributaries with lacustrine terraces; medium-grained bedrock sequences coarser than those in Marietta Plateau but finer than those in Ironton Plateau. Bedrock at the site can be described as sedimentary from the Pennsylvanian geologic age from the Allegheny and Pottsville Groups, Undivided containing shale and siltstone with minor amounts of underclay (claystone), sandstone, limestone, and coal. These rocks were deposited in a wide variety of environments such as deep valleys that were cut into the Mississippian rocks and also shallow marine environments, shorelines, deltas, large rivers, bays, and lagoons that occurred across the coastal lowlands. The shale is black, gray, and olive; clayey to silty; locally contains marine fossils; calcareous in part. The siltstone is gray, greenish and olive; clayey to sandy; thin bedded to medium bedded; locally contain marine fossils. Underclay is gray and olive; generally 3 feet or less in thickness; clayey to silty; commonly rooted and underlying coal beds. Sandstone is light to medium gray weathering to shades of yellow-brown; mostly very fine to medium grained, locally quartzose and conglomeratic in lower one-third of unit; thin to massive to cross bedded; locally calcareous. The limestone is black to light gray; micritic to medium grained; locally grades into chert; thin to medium bedded to discoidal concretions containing marine fossils; locally nonmarine, micritic limestones occur beneath coal beds in upper one third of unit. Coal is mostly banded bituminous, locally cannel; thin to locally as much as 12 feet thick; generally in discrete beds but locally contain shale partings and split into multiple beds. Economic coals in this unit are the Lower Mercer (No. 3), Upper Mercer (No. 3a), Newland (No. 4, Brookville), Clarion (No. 4a), Lower Kittanning (No. 5), Middle Kittaning (No. 6), Lower Freeport (No. 6a), and Upper Freeport (No. 7). Unconfined compressive strength in shale, coal, and siltstone is low to high. Limestone and sandstone have high compressive strength. This unit is underlain by the Logan Formation, Maxville Limestone, and is overlain by the Conemaugh Group. D4-A (outwash) Chili gravelly loam, moderately eroded (SSURGO Export: ) The Chili series consists of very deep, well drained soils on outwash plains, terraces, kames, and beach ridges. They formed in Wisconsinan-age outwash deposits, mainly of non-calcareous sandstone and shale with a large amount of quartz gravel. Commonly, the outwash is mantled with silt. In some places the upper part of the solum formed in silty alluvium or loess as much as 18 inches in thickness. Permeability is moderately rapid in the subsoil and rapid in the substratum. The slope gradient typically is 0 to 18 percent.

6 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N D4-B (glacio-lacustrine deposits) Sebring silt loam (SSURGO Export: ) The Sebring series consists of very deep poorly drained soils formed in stratified Wisconsinanage glacio-lacustrine sediments and are on broad flats and depressions on lake plains and slack water terraces. Permeability is moderately slow in the subsoil and moderate or moderately slow in the substratum. Slope ranges from 0 to 2 percent. 3.2 Typical Subsurface Profile Boring D4-A encountered native granular soils (silty sand with gravel and well graded sand) of medium dense to dense relative density to a depth of about 14.4 feet below existing grades. The native granular soils were underlain by sedimentary bedrock consisting of shale, sandstone, limestone and siltstone. This test boring was terminated at an approximate depth of 140 feet below the existing ground surface. Boring D4-B encountered native granular soils (silty clayey sand with gravel, clayey sand, silty clayey sand, silty sand and poorly graded sand with silt) of very loose to very dense relative density to an approximate depth of 58.5 feet below the existing grades. The granular soil deposits were underlain by native cohesive soils (lean clay with sand) of hard consistency. The test boring was terminated at an approximate depth of 60 feet below the existing ground surface. Specific conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. 3.3 Water Level Observations The boreholes were observed while drilling for the presence and level of groundwater. Groundwater was not encountered in boring D4-A while drilling. Groundwater was observed in boring D4-B at a depth of about 7 feet while drilling. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. In addition, perched or trapped water can develop over low permeability soils. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.

7 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N GEOTECHNICAL DESIGN PARAMETERS 4.1 Soil and Rock Parameters Based on the borings and laboratory test results, the following shear strength and unit weight values may be considered for design: Soil description Very loose to loose (clayey sand, silty sand, poorly graded sand with silt Medium dense to very dense granular soils (silty sand with gravel, well graded sand, silty clayey sand with gravel, clayey sand, silty clayey sand and silty sand) Hard cohesive soils (lean clay with sand) Average Undrained Shear Strength, s u (psf) Angle of Internal Friction, φ (degrees) Total Unit Weight of Soil, γ (pcf) Rock description Soft to moderately hard (shale, sandstone, siltstone and limestone) Hard and hard to very hard (shale, sandstone, siltstone and limestone) Average Unconfined Compressive Strength (tsf) Total Unit Weight of Rock, γ (pcf) GENERAL COMMENTS The information presented in this report is based upon the data obtained from the borings performed at the indicated locations, laboratory testing of selected samples obtained from the borings and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or

8 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This data report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either expressed or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.

9 APPENDIX A FIELD EXPLORATION

10 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N Field Exploration Description The subsurface exploration consisted of drilling and sampling two (2) borings at the site to an approximate depth range of about 60 to 140 feet below existing grades. The boring locations were staked in the field by the Rover Pipeline surveyor. The approximate boring locations are indicated on the attached Boring Location Plan. Surveyed elevations at the ground surface were provided by the surveyor. Elevations are rounded to the nearest foot. The locations and elevations of the borings should be considered accurate only to the degree implied by the means and methods used to define them. The borings were drilled with a track-mounted rotary drill rig using continuous flight hollow-stem augers to advance the boreholes. Samples of the soil encountered in the borings were obtained using the split barrel sampling procedures. Water was added at 30 and 28 feet in borings D4-A and D4-B respectively to assist drilling. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound auto-hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT-N). The SPT N values were corrected for N 60 values using a hammer efficiency of 80.8% for the CME 55 track rig. This value is used to estimate the in-situ relative density of cohesionless soils and consistency of cohesive soils. An automatic SPT hammer was used to advance the splitbarrel sampler in the borings performed on this site. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT-N value. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. Rock coring was performed in both borings using a NQ2-size double tube-swivel core barrel. Recovery and rock quality designation (RQD) were calculated for the core samples and are noted at their depths of occurrence on the boring logs. RQD is the percent of total length cored consisting only of rock pieces at least 4 inches or more in length and is a measure of the integrity of the rock mass in-situ. Rock quality, in terms of RQD, can generally be designated as excellent (90%-100%), good (75%-90%), fair (50%-75%), poor (25%-50%) and very poor (<25%). The recovered samples were sent to the laboratory for testing and classification. The samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further examination, testing, and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and any groundwater conditions. The borings were backfilled with cement bentonite grout prior to the drill crew leaving the site. Responsive Resourceful Reliable Exhibit A-1

11 A field log of each boring was prepared by the field engineer/geologist. These logs included visual classifications of the materials encountered during drilling, as well as, the engineer/geologist s interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the geologist's interpretation of the field logs and include modifications based on laboratory observation and tests of the samples. Responsive Resourceful Reliable Exhibit A-1

12 D4-B D4-A APPROXIMATE BORING LOCATION DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES Project Manager: PSR Drawn by: MK Checked by: PSR Approved by: PSR Project No. N Scale: N.T.S. File Name: N BLP Date: March Morrison Road Columbus, Ohio PH. (614) FAX. (614) TEST BORING LOCATION PLAN I-77 HDD Cores D4-A and D4-B Various Locations in Ohio Stark County, Ohio Exhibit A-2

13 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 1 of 6 SITE: Mainline Segment (various locations in OH) GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: Surface Elev.: 983 (Ft.) DEPTH ELEVATION (Ft.) 0.5 TOPSOIL (6") SILTY SAND WITH GRAVEL (SM), light gray, medium dense to dense DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS RQD % Penetration Per foot LABORATORY TORVANE/HP (tsf) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/ WELL GRADED SAND (SW), trace clay, light gray, medium dense SHALE, completely weathered, pinkish gray to yellowish gray, very soft noted coal fragments Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Morrison Road Columbus, Ohio See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations N= N= N= N=34 50/3" Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3

14 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 2 of 6 SITE: Mainline Segment (various locations in OH) GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: Surface Elev.: 983 (Ft.) DEPTH ELEVATION (Ft.) SHALE, completely weathered, pinkish gray to yellowish gray, very soft noted coal fragments (continued) DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS RQD % Penetration Per foot LABORATORY TORVANE/HP (tsf) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI 3 50/3" 8 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/ SHALE, severely weathered, soft to very soft, thinly bedded to laminar, fair RQD, brown, contains few interbedded sandstones LIMESTONE, fresh to slightly weathered, hard, close to moderately close joints, thick bedding, excellent RQD, gray to dark gray Qu = 34.1ft SHALE, slightly to moderately weathered, soft, laminar, good RQD, dark gray to black, carbonaceous SHALE, severely weathered, very soft to soft, laminar, fair RQD, gray to dark gray SANDSTONE, slightly weathered, moderately hard, close joints, medium bedding, fair RQD, tight to slightly open, gray SHALE, moderately to severely weathered, very soft to soft, laminar, poor RQD, black, carbonaceous SILTSTONE, slightly weathered, slightly weathered, soft to medium, gray SHALE, severely weathered, soft to very soft, laminar, poor RQD, gray to dark gray Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Morrison Road Columbus, Ohio See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations s 23s 3m 28s 3m 46s 3m 3m 13s 2m 57s 2m 7s 28s 24s 4m 21s 4m 32s 4m 40s 6m 50s 4m 26s 42s 2m 16s 28s Water was added at 30 feet to assist drilling 0 0 Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3

15 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 3 of 6 SITE: Mainline Segment (various locations in OH) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/15 GRAPHIC LOG LOCATION DEPTH ELEVATION (Ft.) SANDSTONE, slightly to moderately weathered, soft to moderately hard, close joints, thick bedding, fair RQD, tight to open, gray (continued) Qu = 53.3ft I-77 HDD Latitude: Longitude: SHALE, slightly weathered, soft to medium, laminar, fair RQD, tight, gray SHALE, slightly weathered to very severely weathered, very soft to soft, laminar, poor RQD, gray to black SANDSTONE, fresh to slightly weathered, moderately hard, close joints, medium bedding, fair RQD, tight to open, gray to dark gray, contains few carbonaceous laminations SHALE, moderately weathered, soft, laminar, poor RQD, gray SANDSTONE, fresh to slightly weathered, moderately hard, close joints, poor RQD, tight to open, gray SHALE, slightly to severely weathered, soft to very soft, laminar, fair RQD, tight to slightly open, gray to black Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Surface Elev.: 983 (Ft.) DEPTH (Ft.) WATER LEVEL OBSERVATIONS 800 Morrison Road Columbus, Ohio SAMPLE TYPE See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). RECOVERY (In.) See Appendix C for explanation of symbols and abbreviations. FIELD TEST RESULTS Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N RQD % Penetration Per foot 10s 12s 2m 14s 2m 26s 2m 5s 2m 21s 58s 2m 46s 58s 2m 5s 5m 6s 3m 1s 4m 5s 4m 18s 8m 46s 10m 5s 7m 52s 28s 46s 36s 21s 24s 15s 5s 2m 9s 8m 47s LABORATORY TORVANE/HP (tsf) Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI

16 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 4 of 6 SITE: Mainline Segment (various locations in OH) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/15 GRAPHIC LOG LOCATION DEPTH ELEVATION (Ft.) SHALE, slightly to severely weathered, soft to very soft, laminar, fair RQD, tight to slightly open, gray to black (continued) I-77 HDD Latitude: Longitude: SILTSTONE, slightly weathered, soft to medium, fair RQD, gray SHALE, slightly weathered, soft to very soft, laminar, fair RQD, tight to slightly open, dark gray to black SANDSTONE, fresh, moderately hard, close to moderately close joints, thick bedding, fair to good RQD, tight to open, gray, contains few interbedded shales Qu = 94.9ft Qu = 101.1ft SANDSTONE, fresh, moderately hard to hard, close joints, thin bedding, fair RQD, tight, gray, contains few argillaceous, laminations SHALE, slightly to moderately weathered, soft to very Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Surface Elev.: 983 (Ft.) DEPTH (Ft.) WATER LEVEL OBSERVATIONS 800 Morrison Road Columbus, Ohio SAMPLE TYPE See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). RECOVERY (In.) See Appendix C for explanation of symbols and abbreviations. FIELD TEST RESULTS Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N RQD % Penetration Per foot 8m 15s 5m 40s 5m 50s 8m 9s 7m 55s 8m 2m 32s 51s 53s 43s 44s 46s 38s 27s 31s 2m 28s 53s 47s 45s 38s 41s 51s 34s 43s 39s 28s LABORATORY TORVANE/HP (tsf) Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI

17 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 5 of 6 SITE: Mainline Segment (various locations in OH) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/15 GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: DEPTH ELEVATION (Ft.) soft, laminar, poor RQD, gray SANDSTONE, slightly weathered to fresh, moderately hard, close to moderately close joints, thin to medium bedding, fair RQD, tight to open, gray to dark gray, contains few interbedded shales and carbonaceous laminations (continued) Qu = 108.3ft SANDSTONE, fresh, moderately hard, close joints, medium bedding, good RQD, tight to open, gray, contains few carbonaceous laminations, siliceous (quartz) Qu = 110.6ft SHALE, fresh, soft to medium, laminar, good RQD, tight to slightly open, black, carbonaceous thin sandstone 116.6' ' LIMESTONE, fresh, hard, moderately close joints, medium bedding, excellent RQD, tight to slightly open, dark gray to black, fossiliferous Qu = 124ft SILTSTONE, fresh, medium, close joints, fair RQD, black, fossiliferous, calcareous SHALE, fresh, moderately hard, close joints, laminar, fair RQD, tight, dark gray to black, contains few interbedded sandstones Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Surface Elev.: 983 (Ft.) DEPTH (Ft.) WATER LEVEL OBSERVATIONS 800 Morrison Road Columbus, Ohio SAMPLE TYPE See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). RECOVERY (In.) See Appendix C for explanation of symbols and abbreviations. FIELD TEST RESULTS Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N RQD % Penetration Per foot 32s 41s 43s 39s 28s 39s 24s 36s 38s 4m 37s 4m 45s 3m 4s 4m 40s 2m 11s 6m 17s 4m 26s 3m 18s 2m 16s 9m 14s 8m 23s 2m 45s 46s 3m 58s 2m 20s 2m 56s 2m LABORATORY TORVANE/HP (tsf) Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI

18 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-A Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 6 of 6 SITE: Mainline Segment (various locations in OH) THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/15 GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: DEPTH ELEVATION (Ft.) SHALE, fresh, moderately hard, close joints, laminar, fair RQD, tight, dark gray to black, contains few interbedded sandstones (continued) SANDSTONE, and shale interbedded, soft to moderately hard, thin bedding, excellent RQD, tight to slightly open, gray to black SANDSTONE, fresh, moderately hard, close to moderately close joints, medium bedding, excellent RQD, tight, gray, contains few carbonaceous laminations Boring Terminated at 140 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS No free water observed Surface Elev.: 983 (Ft.) DEPTH (Ft.) WATER LEVEL OBSERVATIONS 800 Morrison Road Columbus, Ohio SAMPLE TYPE See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). RECOVERY (In.) See Appendix C for explanation of symbols and abbreviations. FIELD TEST RESULTS Hammer Type: Automatic Notes: Boring Started: 1/26/2015 Drill Rig: Track Project No.: N RQD % Penetration Per foot 43s 3m 5s 3m 16s 3m 6s 2m 58s 48s 51s 2m 28s 2m 29s 55s 3m 5s 3m 8s LABORATORY TORVANE/HP (tsf) Boring Completed: 1/30/2015 Driller: BK Exhibit: A-3 WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI

19 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-B Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 1 of 3 SITE: Mainline Segment (various locations in OH) GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: Surface Elev.: 906 (Ft.) DEPTH ELEVATION (Ft.) 0.1 TOPSOIL (1") 906 SILTY CLAYEY SAND WITH GRAVEL (SC-SM), gray, medium dense DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS RQD % Penetration Per foot LABORATORY TORVANE/HP (tsf) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/ CLAYEY SAND (SC), trace gravel, dark grayish-brown, loose SILTY SAND (SM), trace gravel, reddish-brown, very loose to loose POORLY GRADED SAND WITH SILT (SP-SM), trace gravel, light brown, very loose Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS Water observed at 7 feet while drilling Water observed at 10.5 feet at completion of drilling Morrison Road Columbus, Ohio See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations N= N= N= N= N=3 Hammer Type: Automatic Notes: Grounwater sample was collected at 25 feet while drilling. Water properties are: Temp. 42F, TDS 354ppm, Conductivity 557microS/cm, Salt Concentration 450ppm, ph 7.89 Boring Started: 12/17/2014 Drill Rig: Track Project No.: N Driller: BK Boring Completed: 12/18/2014 Exhibit: A-4

20 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-B Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 2 of 3 SITE: Mainline Segment (various locations in OH) GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: Surface Elev.: 906 (Ft.) DEPTH ELEVATION (Ft.) POORLY GRADED SAND WITH SILT (SP-SM), trace gravel, light brown, very loose (continued) DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (In.) FIELD TEST RESULTS RQD % Penetration Per foot LABORATORY TORVANE/HP (tsf) WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI N=9 20 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/ SILTY SAND (SM), trace gravel, light brown, dense SILTY CLAYEY SAND (SC-SM), light olive brown, dense, noted coal fragments SILTY CLAYEY SAND (SC-SM), reddish-brown, very dense, noted coal fragments CLAYEY SAND (SC), trace gravel, reddish-brown, medium dense, noted coal fragments Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS Water observed at 7 feet while drilling Water observed at 10.5 feet at completion of drilling Morrison Road Columbus, Ohio See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations N= N= N= N=23 Hammer Type: Automatic Notes: Water was added at 28 feet while drilling Boring Started: 12/17/2014 Drill Rig: Track Project No.: N Driller: BK Boring Completed: 12/18/2014 Exhibit: A-4

21 PROJECT: ETC Rover Pipeline BORING LOG NO. D4-B Project Consulting Services, Inc. CLIENT: New Hampton, NH Page 3 of 3 SITE: Mainline Segment (various locations in OH) GRAPHIC LOG LOCATION I-77 HDD Latitude: Longitude: Surface Elev.: 906 (Ft.) DEPTH ELEVATION (Ft.) CLAYEY SAND (SC), trace gravel, reddish-brown, medium dense, noted coal fragments (continued) SILTY SAND (SM), dark brown, medium dense DEPTH (Ft.) 55 WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (In.) 18 FIELD TEST RESULTS N=12 RQD % Penetration Per foot LABORATORY TORVANE/HP (tsf) WATER CONTENT (%) 15 ATTERBERG LIMITS LL-PL-PI THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL ETC ROVER PIPLINE MAINLINE.GPJ TERRACON2012.GDT 2/24/ LEAN CLAY WITH SAND (CL), gray, hard, noted coal fragments Boring Terminated at 60 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 3.25" Hollow Stem Auger Abandonment Method: Boring backfilled with cement/bentonite grout upon completion. WATER LEVEL OBSERVATIONS Water observed at 7 feet while drilling Water observed at 10.5 feet at completion of drilling Morrison Road Columbus, Ohio 18 See Exhibit A-1 for description of field procedures See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations N=36 Hammer Type: Automatic Notes: Boring Started: 12/17/2014 Drill Rig: Track Project No.: N (HP) Driller: BK Boring Completed: 12/18/2014 Exhibit: A-4

22

23 APPENDIX B LABORATORY TESTING

24 Geotechnical Data Report Proposed I-77 HDD Cores D4-A and D4-B Stark County, Ohio March 3, 2015 Terracon Project No. N Laboratory Testing As a part of the laboratory testing program, the soil samples were classified in the laboratory based on visual observation, and texture. The soil descriptions presented on the boring logs for native soils are in accordance with our enclosed General Notes and Unified Soil Classification System (USCS). A brief description of the Unified System is included in this report. Classification was predominantly by visual manual procedures. Moisture content, grain size analysis, Atterberg limit, Jar Slake and unconfined compressive strength tests were performed on selected samples. Chloride corrosivity testing was also performed on groundwater sample. The results of this laboratory testing are presented on the boring logs and laboratory data sheets included in Appendix B. Responsive Resourceful Reliable Exhibit B-1

25 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) 1 3/4 1/2 3/8 #4 #10 #20 #40 #100 # Soil Description Light gray SILTY SAND with gravel Atterberg Limits PL= NP LL= NP PI= NP Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = Classification USCS= SM AASHTO= A-4(0) Remarks F.M.=2.43 * (no specification provided) Source of Sample: D4-A Sample Number: S-2 TERRACON CONSULTANTS, INC. Columbus, Ohio Depth: 8.5'-10.0' Client: Project: Project No: 2/20/15 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" N Date: Tested By: DS Checked By: CG Exhibit B-2

26 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) 3/4 1/2 3/8 #4 #10 #20 #40 #100 # mm mm mm mm mm mm Soil Description Dark grayish brown CLAYEY SAND, trace gravel Atterberg Limits PL= 13 LL= 22 PI= 9 Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = Classification USCS= SC AASHTO= A-2-4(0) Remarks F.M.=2.31 * (no specification provided) Source of Sample: D4-B Sample Number: S-2 TERRACON CONSULTANTS, INC. Columbus, Ohio Depth: 8.5'-10.0' Client: Project: Project No: Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" N Date: Tested By: DS Checked By: AM Exhibit B-3

27 4 7 PLASTICITY INDEX LIQUID AND PLASTIC LIMITS TEST REPORT Dashed line indicates the approximate upper limit boundary for natural soils CL or OL CH or OH 10 CL-ML ML or OL MH or OH LIQUID LIMIT WATER CONTENT NUMBER OF BLOWS MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS Dark grayish brown CLAYEY SAND, trace gravel SC Project No. N Client: Project Consulting Services, Inc. Remarks: Project: Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" Date: Source of Sample: D4-B Depth: 8.5'-10.0' Sample Number: S-2 TERRACON CONSULTANTS, INC. Columbus, Ohio Tested By: DS Checked By: AM Exhibit B-4

28 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) 3/8 #4 #10 #20 #40 #100 # mm mm mm mm mm mm Soil Description Light brown poorly graded SAND with silt, trace gravel Atterberg Limits PL= NP LL= NP PI= NP Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = 4.71 Classification USCS= SP-SM AASHTO= A-1-b Remarks F.M.=2.03 * (no specification provided) Source of Sample: D4-B Sample Number: S-6 TERRACON CONSULTANTS, INC. Columbus, Ohio Depth: 28.5'-30.0' Client: Project: Project No: Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" N Date: Tested By: DS Checked By: AM Exhibit B-5

29 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) / / / # # # # # # mm mm mm mm mm mm. 8.7 * (no specification provided) Source of Sample: D4-B Sample Number: S-10 TERRACON CONSULTANTS, INC. Columbus, Ohio Depth: 48..5'-50.0' Client: Project: Project No: Soil Description Reddish brown CLAYEY SAND, trace gravel Atterberg Limits PL= 15 LL= 23 PI= 8 Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = 3.79 USCS= F.M.=2.32 SC Classification AASHTO= A-2-4(0) Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" N Remarks Date: Tested By: DS Checked By: AM Exhibit B-6

30 4 7 PLASTICITY INDEX LIQUID AND PLASTIC LIMITS TEST REPORT Dashed line indicates the approximate upper limit boundary for natural soils CL or OL CH or OH 10 CL-ML ML or OL MH or OH LIQUID LIMIT WATER CONTENT NUMBER OF BLOWS MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS Reddish brown CLAYEY SAND, trace gravel SC Project No. N Client: Project Consulting Services, Inc. Remarks: Project: Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" Date: Source of Sample: D4-B Depth: 48..5'-50.0' Sample Number: S-10 TERRACON CONSULTANTS, INC. Columbus, Ohio Tested By: DS Checked By: AM Exhibit B-7

31 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) 3/8 #4 #10 #20 #40 #100 # mm mm mm mm mm mm Soil Description Gray LEAN CLAY with sand Atterberg Limits PL= 16 LL= 32 PI= 16 Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = Classification USCS= CL AASHTO= A-6(10) Remarks F.M.=0.41 * (no specification provided) Source of Sample: D4-B Sample Number: S-12 TERRACON CONSULTANTS, INC. Columbus, Ohio Depth: 58.5'-60.0' Client: Project: Project No: Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" N Date: Tested By: DS Checked By: AM Exhibit B-8

32 4 7 PLASTICITY INDEX LIQUID AND PLASTIC LIMITS TEST REPORT Dashed line indicates the approximate upper limit boundary for natural soils CL or OL CH or OH 10 CL-ML ML or OL MH or OH LIQUID LIMIT WATER CONTENT NUMBER OF BLOWS MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS Gray LEAN CLAY with sand CL Project No. N Client: Project Consulting Services, Inc. Remarks: Project: Proposed Rover ETC Pipeline Project - "MAIN LINE SEGMENT" Date: Source of Sample: D4-B Depth: 58.5'-60.0' Sample Number: S-12 TERRACON CONSULTANTS, INC. Columbus, Ohio Tested By: DS Checked By: AM Exhibit B-9

33 Exhibit B-10

34 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-11

35 Exhibit B-12

36 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-13

37 Exhibit B-14

38 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-15

39 Exhibit B-16

40 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-17

41 Exhibit B-18

42 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-19

43 Exhibit B-20

44 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-21

45 Exhibit B-22

46 ETC Rover Pipeline Project Terracon Project No: N Exhibit B-23

47 Client: Project Consultant Services, Inc. Project: Proposed Rover ETC Pipeline Project Project No.: N Sample Depth (ft) 1 Hour 4 Hour Hour Material ph (Water) ph (Final) D4-A Shale D4-A Shale D4-A Shale D4-A Shale D4-A Shale D4-A Shale D4-A Shale D4-A Shale D4-A Siltstone D4-A Shale D4-A Shale D4-A Shale D4-A Siltstone D4-A Shale Jar Slake Index( Ij) General behavior during test Degrades rapidly into a pile of flakes or mud Breaks readily and/or forms many chips Breaks slowly and/or forms few chips Breaks rapidly and/or develops several fractures Breaks slowly and/or develops few fractures Very little or no change *Test conducted in general accordance with WSDOT Test Method T 501 Terracon Consultants, Inc. Exhibit B-24

48 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project N Terracon Sample D4-A (31.0 ) Pre Soak Sample D4-A (31.0 ) Post 24 Hour Soak Sample D4-A (37.2 ) Pre Soak Sample D4-A (37.2 ) Post 24 Hour Soak Sample D4-A (47.0 ) Pre Soak Sample D4-A (47.0 ) Post 24 Hour Soak Exhibit B-25

49 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project N Terracon Sample D4-A (56.7 ) Pre Soak Sample D4-A (56.7 ) Post 24 Hour Soak Sample D4-A (62.2 ) Pre Soak Sample D4-A (62.2 ) Post 24 Hour Soak Sample D4-A (72.2 ) Pre Soak Sample D4-A (72.2 ) Post 24 Hour Soak Exhibit B-26

50 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project N Terracon Sample D4-A (74.9 ) Pre Soak Sample D4-A (74.9 ) Post 24 Hour Soak Sample D4-A (79.2 ) Pre Soak Sample D4-A (79.2 ) Post 24 Hour Soak Sample D4-A (84.5 ) Pre Soak Sample D4-A (84.5 ) Post 24 Hour Soak Exhibit B-27

51 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project N Terracon Sample D4-A (102.8 ) Pre Soak Sample D4-A (102.8 ) Post 24 Hour Soak Sample D4-A (114.2 ) Pre Soak Sample D4-A (114.2 ) Post 24 Hour Soak Sample D4-A (119.3 ) Pre Soak Sample D4-A (119.3 ) Post 24 Hour Soak Exhibit B-28

52 Project Consulting Services, Inc. Proposed Rover ETC Pipeline Project N Terracon Sample D4-A (126.2 ) Pre Soak Sample D4-A (126.2 ) Post 24 Hour Soak Sample D4-A (132.1 ) Pre Soak Sample D4-A (132.1 ) Post 24 Hour Soak Exhibit B-29

53 #=AR# Pace Analytical Services, Inc. Not NELAP Accredited 4860 Blazer Parkway Dublin, OH (614) Pace Analytical Services, Inc Moller Road Indianapolis, IN (317) ANALYTICAL RESULTS Project: Pace Project No.: Geotechnical Investigation Sample: D4-B Lab ID: Collected: 12/18/14 08:00 Received: 01/16/15 10:22 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 4500 Chloride Analytical Method: SM 4500-Cl-E Chloride 57.3 mg/l /20/15 15: H3 REPORT OF LABORATORY ANALYSIS Date: 01/26/ :36 PM This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Exhibit B-30

54 #=QC# Pace Analytical Services, Inc. Not NELAP Accredited 4860 Blazer Parkway Dublin, OH (614) Pace Analytical Services, Inc Moller Road Indianapolis, IN (317) QUALITY CONTROL DATA Project: Pace Project No.: Geotechnical Investigation QC Batch: QC Batch Method: WETA/14386 SM 4500-Cl-E Analysis Method: Analysis Description: SM 4500-Cl-E 4500 Chloride Associated Lab Samples: , , , , METHOD BLANK: Associated Lab Samples: , , , , Parameter Units Blank Result Matrix: Water Reporting Limit Analyzed Chloride mg/l ND /20/15 15:02 Qualifiers LABORATORY CONTROL SAMPLE: Parameter Units Spike Conc. LCS Result LCS % Rec % Rec Limits Chloride mg/l Qualifiers MATRIX SPIKE SAMPLE: Parameter Units Result Spike Conc. MS Result MS % Rec % Rec Limits Chloride mg/l Qualifiers MATRIX SPIKE & MATRIX SPIKE DUPLICATE: MS Spike Parameter Units Result Conc. MSD Spike Conc MS Result MSD Result MS % Rec MSD % Rec Max % Rec Limits RPD RPD Chloride mg/l Qual Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS Date: 01/26/ :36 PM This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Exhibit B-31

55 #=QL# Pace Analytical Services, Inc. Not NELAP Accredited 4860 Blazer Parkway Dublin, OH (614) Pace Analytical Services, Inc Moller Road Indianapolis, IN (317) QUALIFIERS Project: Pace Project No.: Geotechnical Investigation DEFINITIONS DF - Dilution Factor, if reported, represents the factor applied to the reported data due to changes in sample preparation, dilution of the sample aliquot, or moisture content. ND - Not Detected at or above adjusted reporting limit. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL - Adjusted Method Detection Limit. PQL - Practical Quantitation Limit. RL - Reporting Limit. S - Surrogate 1,2-Diphenylhydrazine (8270 listed analyte) decomposes to Azobenzene. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean-Up U - Indicates the compound was analyzed for, but not detected. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI - The NELAC Institute. ANALYTE QUALIFIERS H3 P6 Sample was received or analysis requested beyond the recognized method holding time. Matrix spike recovery was outside laboratory control limits due to a parent sample concentration notably higher than the spike level. Date: 01/26/ :36 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Exhibit B-32

56 APPENDIX C SUPPORTING DOCUMENTS

57

58 UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Coarse Grained Soils: More than 50% retained on No. 200 sieve Fine-Grained Soils: 50% or more passes the No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Sands: 50% or more of coarse fraction passes No. 4 sieve Silts and Clays: Liquid limit less than 50 Silts and Clays: Liquid limit 50 or more Group Symbol Soil Classification Group Name B Clean Gravels: Cu 4 and 1 Cc 3 E GW Well-graded gravel F Less than 5% fines C Cu 4 and/or 1 Cc 3 E GP Poorly graded gravel F Gravels with Fines: Fines classify as ML or MH GM Silty gravel F,G,H More than 12% fines C Fines classify as CL or CH GC Clayey gravel F,G,H Clean Sands: Cu 6 and 1 Cc 3 E SW Well-graded sand I Less than 5% fines D Cu 6 and/or 1 Cc 3 E SP Poorly graded sand I Sands with Fines: Fines classify as ML or MH SM Silty sand G,H,I More than 12% fines D Fines classify as CL or CH SC Clayey sand G,H,I Inorganic: Organic: Inorganic: Organic: PI 7 and plots on or above A line J CL Lean clay K,L,M PI 4 or plots below A line J ML Silt K,L,M Liquid limit - oven dried Liquid limit - not dried 0.75 OL Organic clay K,L,M,N Organic silt K,L,M,O PI plots on or above A line CH Fat clay K,L,M PI plots below A line MH Elastic Silt K,L,M Liquid limit - oven dried Liquid limit - not dried 0.75 OH Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat Organic clay K,L,M,P Organic silt K,L,M,Q A Based on the material passing the 3-inch (75-mm) sieve B If field sample contained cobbles or boulders, or both, add with cobbles or boulders, or both to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay E Cu = D 60 /D 10 Cc = D (D ) 2 x D 60 F If soil contains 15% sand, add with sand to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add with organic fines to group name. I If soil contains 15% gravel, add with gravel to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add with sand or with gravel, whichever is predominant. L If soil contains 30% plus No. 200 predominantly sand, add sandy to group name. M If soil contains 30% plus No. 200, predominantly gravel, add gravelly to group name. N PI 4 and plots on or above A line. O PI 4 or plots below A line. P PI plots on or above A line. Q PI plots below A line. Exhibit C-2

59 DESCRIPTION OF ROCK PROPERTIES WEATHERING Fresh Very slight Slight Moderate Moderately severe Severe Very severe Complete Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline. Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show bright. Rock rings under hammer if crystalline. Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer. Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength as compared with fresh rock. All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority show kaolinization. Rock shows severe loss of strength and can be excavated with geologist s pick. All rock except quartz discolored or stained. Rock fabric clear and evident, but reduced in strength to strong soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left. All rock except quartz discolored or stained. Rock fabric discernible, but mass effectively reduced to soil with only fragments of strong rock remaining. Rock reduced to soil. Rock fabric not discernible or discernible only in small, scattered locations. Quartz may be present as dikes or stringers. HARDNESS (for engineering description of rock not to be confused with Moh s scale for minerals) Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist s pick. Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen. Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of a geologist s pick. Hand specimens can be detached by moderate blow. Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small chips to pieces about 1-in. maximum size by hard blows of the point of a geologist s pick. Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure. Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be broken with finger pressure. Can be scratched readily by fingernail. Joint, Bedding, and Foliation Spacing in Rock a Spacing Joints Bedding/Foliation Less than 2 in. Very close Very thin 2 in. 1 ft. Close Thin 1 ft. 3 ft. Moderately close Medium 3 ft. 10 ft. Wide Thick More than 10 ft. Very wide Very thick a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so. Rock Quality Designator (RQD) a Joint Openness Descriptors RQD, as a percentage Diagnostic description Openness Descriptor Exceeding 90 Excellent No Visible Separation Tight Good Less than 1/32 in. Slightly Open Fair 1/32 to 1/8 in. Moderately Open Poor 1/8 to 3/8 in. Open Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide 4 in. and longer/length of run. References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual. Exhibit C-3

60 ETC Rover Pipeline Project Terracon Project No: N Photograph 1: Sample-1 Depth: feet Photograph 2: Sample-2 Depth: feet Boring D4-A Exhibit C-4

61 ETC Rover Pipeline Project Terracon Project No: N Photograph 3: Sample-3 Depth: feet Photograph 4: Sample-4 Depth: feet Boring D4-A Exhibit C-4

62 ETC Rover Pipeline Project Terracon Project No: N Photograph 5: Sample-5 Depth: feet Photograph 6: Sample-6 Depth: feet Boring D4-A Exhibit C-4

63 ETC Rover Pipeline Project Terracon Project No: N Photograph 7: Sample-R-1, 2 Depth: feet Photograph 8: Sample-R-3, 4 Depth: feet Boring D4-A Exhibit C-4

64 ETC Rover Pipeline Project Terracon Project No: N Photograph 9: Sample-R-5, 6 Depth: feet Photograph 10: Sample-R-7, 8 Depth: feet Boring D4-A Exhibit C-4

65 ETC Rover Pipeline Project Terracon Project No: N Photograph 11: Sample-R-9, 10 Depth: feet Photograph 12: Sample-R-11, 12 Depth: feet Boring D4-A Exhibit C-4

66 ETC Rover Pipeline Project Terracon Project No: N Photograph 13: Sample-R-13, 14 Depth: feet Photograph 14: Sample-15, 16 Depth: feet Boring D4-A Exhibit C-4

67 ETC Rover Pipeline Project Terracon Project No: N Photograph 15: Sample-R-17, 18 Depth: feet Photograph 16: Sample-R-19, 20 Depth: feet Boring D4-A Exhibit C-4

68 ETC Rover Pipeline Project Terracon Project No: N Photograph 17: Sample-R-21, 22 Depth: feet Photograph 18: Sample-R-23 Depth: feet Boring D4-A Exhibit C-4

69 ETC Rover Pipeline Project Terracon Project No: N Photograph 1: Sample-1 Depth: feet Photograph 2: Sample-2 Depth: feet Boring D4-B Exhibit C-4

70 ETC Rover Pipeline Project Terracon Project No: N Photograph 3: Sample-3 Depth: feet Photograph 4: Sample-4 Depth: feet Boring D4-B Exhibit C-4

71 ETC Rover Pipeline Project Terracon Project No: N Photograph 5: Sample-5 Depth: feet Photograph 6: Sample-6 Depth: feet Boring D4-B Exhibit C-4

72 ETC Rover Pipeline Project Terracon Project No: N Photograph 7: Sample-7 Depth: feet Photograph 8: Sample-8 Depth: feet Boring D4-B Exhibit C-4

73 ETC Rover Pipeline Project Terracon Project No: N Photograph 9: Sample-9 Depth: feet Photograph 10: Sample-10 Depth: feet Boring D4-B Exhibit C-4

74 ETC Rover Pipeline Project Terracon Project No: N Photograph 11: Sample-11 Depth: feet Photograph 12: Sample-12 Depth: feet Boring D4-B Exhibit C-4

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

If you have any questions concerning this report, please feel free to contact me. REPORT OF LABORATORY ANALYSIS

If you have any questions concerning this report, please feel free to contact me. REPORT OF LABORATORY ANALYSIS #=CL# LIMS USE: FR - JILL LAVOIE LIMS OBJECT ID: July 16, 2015 Jill Lavoie Merrimack Village District - UCMR3 2 Greens Pond Road Merrimack, NH 03054 RE: Dear Jill Lavoie: Enclosed are the analytical results

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-10 Bridge Over Council Hollow Creek Ottawa County, Oklahoma Project No. STPY-255F (191) EC Job Piece No. 30308 (06) April 1, 2015 Terracon Project No. 04155008 Prepared

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN #271-120-011) ORINDA, CALIFORNIA A 580 Ts 590 HMA-1 600 HMA-2 70 Ts 610 Ts HMA-3 HLA-5 GJA-6 LD-2 23

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Veterans Parkway Bridge Approaches Investigation Savannah, Georgia July 20, 2015 Terracon Project No. ES155020 Prepared for: Chatham County Engineering Department Savannah, Georgia

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Technical Memorandum. Soil Borings

Technical Memorandum. Soil Borings Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:

More information

Geotechnical Engineering Report

Geotechnical Engineering Report REPORT COVER PAGE Geotechnical Engineering Report Proposed T-Line Structure Tahlequah, Oklahoma October 17, 2018 Terracon Project No. 04185192 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants,

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Geotechnical Aspects of the Ohio River Bridges Project

Geotechnical Aspects of the Ohio River Bridges Project Geotechnical Aspects of the Ohio River Bridges Project Mark A. Litkenhus, PE Sr. Geotechnical Engineer Stephen H. Bickel, PE Sr. Geotechnical Engineer STGEC Ohio River Bridges at Louisville Geotechnical

More information

If you have any questions concerning this report, please feel free to contact me. REPORT OF LABORATORY ANALYSIS

If you have any questions concerning this report, please feel free to contact me. REPORT OF LABORATORY ANALYSIS #=CL# LI USE: FR - JILL LAVOIE LI OBJECT ID: August 22, 2014 Jill Lavoie Merrimack Village District - UCMR3 2 Greens Pond Road Merrimack, NH 03054 RE: Dear Jill Lavoie: Enclosed are the analytical results

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report S-38-50 (Four Holes Road) over I-26 Emergency Bridge Replacement Orangeburg County, South Carolina May 22, 2018 (Revision 1) SCDOT Project ID.: P037465 Terracon Project No. 73155050U

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Correlation of unified and AASHTO soil classification systems for soils classification

Correlation of unified and AASHTO soil classification systems for soils classification Journal of Earth Sciences and Geotechnical Engineering, vol. 8, no. 1, 2018, 39-50 ISSN: 1792-9040 (print version), 1792-9660 (online) Scienpress Ltd, 2018 Correlation of unified and AASHTO classification

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Bruce and Lee Industrial Site Florence, South Carolina August 31, 2015 Terracon Project No. 73155060 Prepared by: Terracon Consultants, Inc. August 31, 2015

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

Log of Monitoring Well D58B

Log of Monitoring Well D58B Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Sabal Trail Transmission Hannahatchee Creek HDD Stewart County, Georgia for Gulf Interstate Engineering November 17, 2014 Geotechnical Data Report Sabal Trail Transmission Hannahatchee

More information

Sci.Int (Lahore), 25(4), , 2013 ISSN ; CODEN: SINTE 8 531

Sci.Int (Lahore), 25(4), , 2013 ISSN ; CODEN: SINTE 8 531 Sci.Int (Lahore), 25(4),531-537, 2013 ISSN 1013-5316; CODEN: SINTE 8 531 PROFILING AND ZONING OF GEOTECHNICAL SUB-SOIL DATA USING GEOGRAPHIC INFORMATION SYSTEM Mahmood Ahmad*, Qaiser Iqbal and Fayaz Ahmad

More information

Introduction to Soil Mechanics Geotechnical Engineering-II

Introduction to Soil Mechanics Geotechnical Engineering-II Introduction to Soil Mechanics Geotechnical Engineering-II ground SIVA Dr. Attaullah Shah 1 Soil Formation Soil derives from Latin word Solum having same meanings as our modern world. From Geologist point

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

Sediment and sedimentary rocks Sediment

Sediment and sedimentary rocks Sediment Sediment and sedimentary rocks Sediment From sediments to sedimentary rocks (transportation, deposition, preservation and lithification) Types of sedimentary rocks (clastic, chemical and organic) Sedimentary

More information

Appendix J. Geological Investigation

Appendix J. Geological Investigation Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF

More information

GLM & Associates. February 9, 2018

GLM & Associates. February 9, 2018 GLM & Associates Geoffrey L. Maddux Environmental Consultant 7497 Harvest Village Court P.O. Box 5339 Navarre, Florida 32566 (850) 939-8037, Fax (850) 939-8037 February 9, 2018 Ms. Dawn Templin, P.E. Florida

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information