1 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po 1 Conto DPLV conto Defau FALS 01_to urs15 Elt po 2 G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p 6!A U.S. Army Corps of Engineers Chicago District DP !A B !A 616!A B-4 B Legend Groveland Floodwall Boreholes!A!A PSI 1988 Borehole AECOM 2011 Borehole Groveland Floodwall Proposed Road Raise 610 Proposed Floodwall!A B Contour Lines Five Foot One Foot!A B Feet 607!A DP PLATE 6 FEB Path: P:\PRJ-Des Plaines II\TS-DG Geotechnical\Feasibility Appendix\Plates\Raw\Groveland.mxd 617

2 1. Type of Project: Reservoir APPENDIX E Groveland Avenue Levee Data Compilation 2. USACE Description: The Groveland Avenue Levee site (DPLV01) extends between Groveland Avenue and the Des Plaines River to the BNSF Railroad in Riverside, IL. This would be constructed with approximately 1,500 feet of SSP with a top elevation of 618 feet. In addition, the street Park Place would be raised along a 700 foot stretch which affects Groveland Ave for 550 feet and Lincoln Ave for 200 feet. 3. Description of Research Results AECOM investigated the following resources for potential information with the results as follows: Illinois State Water Survey (ISWS): AECOM performed web based research on the Illinois State Water Survey and Illinois State Geological Society. Using their interactive GIS website, AECOM identified five nearby water well logs. The information from the website is included in Attachment E.4.1. Landowner: No landowner provided information was available for this site. According to the USACE, the Groveland Levee is the same location as the Section 14, Riverside USACE project. The basic premise of that project was that an old soil berm had seepage related issues so the riverside slope was cleared of vegetation and a two foot thick clay blanket was installed. Illinois Department of Transportation (IDOT): No information was available from IDOT for the project site. Illinois Department of Natural Resources (IDNR): No information was available on the project site from the Illinois Department of Natural Resources. Reconnaissance Photographs: AECOM performed a site visit to photograph the site features. The photographs which were taken are included in Attachment E Subsurface Explorations AECOM performed two soil borings at the project site as discussed below. a. Boring Locations* Boring** Coordinates*** Surface Boring Date Drilled Borehole Northing (ft) Easting (ft) Elevation (ft) + Depth (ft) Status DP /25/11 Backfilled DP /25/11 Backfilled *: All surveying information based on survey completed by AECOM. APPENDIX E: Groveland Avenue Levee Page 1

3 **: All soil borings performed by Strata Earth Services, LLC ***: Based on NAD 83, Illinois State Plane East + : Based on NAVD 88 b. Subsurface Conditions Overall, the borings performed for the Groveland Avenue Levee evaluation were dissimilar and are discussed separately below. Boring DP Beginning from the ground surface, the soil conditions at this boring are as follows: Topsoil: A 0.7 foot thick layer of black organic topsoil was observed beginning from the ground surface. Fill: Non engineered fill was observed between 0.7 feet to 5 feet below the ground surface. The fill consisted of silty clay with trace fine to coarse sand and a topsoil seam at the 5 foot depth. The fill was hard with calibrated penetrometer values of 5.25 to 5.5 tsf. Silty Clay: Silty clay with trace amounts of fine sand (USCS:CL) was observed between 5 and 17.5 feet below the ground surface with the exception of a 3 foot thick layer of silt and sand (USCS: ML, SP SM) between 10 and 13 feet below the ground surface. The layer was generally hard with calibrated penetrometer values of 5.25 to 5.5 tsf, except a portion of the clay from 7.5 to 10 feet was of medium consistency with a calibrated penetrometer value of 0.5 tsf. Bedrock: A layer of bedrock was inferred from 17.5 feet to the boring termination depth of 20 feet based on split spoon sampler refusal and the behavior of the rock bit during drilling. Boring DP Beginning from the ground surface, the soil conditions at this boring are as follows: Topsoil: A 0.7 foot thick layer of black organic topsoil was observed beginning from the ground surface. Fill: Non engineered fill was observed between 0.7 feet to 7.5 feet below the ground surface. The fill consisted of silty clay with trace fine to coarse sand, coal pieces, and cinders. The fill was hard with calibrated penetrometer values of 5.25 to 5.5 tsf. Silt/Sand: Sandy and silty soils (USCS: SM, SP SM, ML) with trace amounts of fine gravel (USCS:CL) were observed between 7.5 and 25 feet below the ground surface with the exception of a 0.8 foot thick layer of silty clay (USCS: CL) between 8.7 and 9.5 feet below the ground surface. This layer ranged from very loose to very dense with SPT N values ranging from 1 bpf to 58 bpf, with density generally increasing with depth. Silty Clay: A layer of silty clay with trace amounts of sand and fine gravel (USCS: CL) was observed between 25 feet and the boring termination depth of 30.5 feet. This stratum was hard with SPT N values of 73 to greater than 100 blows per foot. APPENDIX E: Groveland Avenue Levee Page 2

4 c. Groundwater Conditions The groundwater observations discussed below were made at the project site at the time of drilling. Groundwater level fluctuations may occur with time and seasonal change due to variations in precipitation, evaporation, and surface water runoff. Groundwater was observed at 12 feet below the ground surface while sampling boring DP Groundwater was observed at a depth of 7.5 feet while sampling and 11 feet after completion of boring DP Engineering Properties: It is AECOM s understanding that the USACE intends to use the soil boring and laboratory testing data obtained from the investigation described in this report to perform engineering analysis for the project site. Given the variability in soil conditions observed in both the borings and the laboratory testing, AECOM recommends that the USACE use extreme caution in the selection of soil properties. Additional explorations and laboratory testing may be warranted if critical areas of particular concern are identified by USACE. The following sections illustrate the range of soil properties which were obtained from the laboratory testing for the site: Soil Property Dry density (pcf) (USCS: CL soils) Unconfined compressive strength (tsf) (USCS: CL soils) Minimum Recorded Value Maximum Recorded Value Average Value 94.5 (from 1 data point) 0.87 (from 1 data point) ATTACHMENTS E.1: Boring Location Plan E.2: Boring Logs E.3: Lab Testing Results E.4: Research Data E.4.1: Illinois State Water Survey Data E.5: Site Reconnaissance Photographs APPENDIX E: Groveland Avenue Levee Page 3

5 ATTACHMENT E.1: Boring Location Plan APPENDIX E: Groveland Avenue Levee

6 AERIAL PHOTO SOURCE: USDA NAIP 2011 Maplewood Akenside Copyright 2011 By: AECOM 171 Ridgewood DP Groveland Ave DP West Park Lincoln Pine Kimbark Woodside East EXPLORATION LOCATION PLAN GROVELAND AVE LEVEE DES PLAINES II FEASIBILITY STUDY UNITED STATES ARMY CORPS OF ENGINEERS CHICAGO DISTRICT Legend Forbes Borings Parkview Feet Drawn: Approved: Scale: PROJECT NUMBER FIGURE NUMBER JW 12/12/2011 AH 12/12/2011 AS SHOWN E1

7 ATTACHMENT E.2: Boring Logs APPENDIX E: Groveland Avenue Levee

8 DRILLING LOG 1. PROJECT Des Plaines II 2. LOCATION (Coordinates or Station) Mark Baker ELEVATION DEPTH a b LEGEND c DIVISION Great Lakes and Ohio River Groveland Ave Levee N 1,881,284.0 E 1,122, DRILLING AGENCY STRATA 4. HOLE NO. (As shown on drawing title and file number) 5. NAME OF DRILLER 6. DIRECTION OF HOLE VERTICAL INCLINED 7. THICKNESS OF OVERBURDEN 8. DEPTH DRILLED INTO ROCK 9. TOTAL DEPTH OF HOLE --- DP DEG. FROM VERT CLASSIFICATION OF MATERIALS (Description) d Topsoil (0.7') FILL: Silty clay, trace fine to coarse sand, topsoil seam at 5', with seams of gray silty clay - brown - hard (FILL: CL) INSTALLATION Chicago District 10. SIZE AND TYPE OF BIT 11. DATUM FOR ELEVATION SHOWN (TBM or MSL) Illinois State Plane East NAD83(horiz) NAVD88 (vert) 12. MANUFACTURER'S DESIGNATION OF DRILL B-61 TRUCK 13. TOTAL NO. OF OVERBURDEN SAMPLES TAKEN 14. TOTAL NUMBER CORE BOXES 15. ELEVATION GROUND WATER 16. DATE HOLE 17. ELEVATION TOP OF HOLE 18. TOTAL CORE RECOVERY FOR BORING 19. ENGINEER % CORE RECOV- ERY e 47 BOX OR SAMPLE NO. f Hole No. DP SHEET 1 OF 2 SHEETS SSA/ 2-7/8" RB DISTURBED SEE REMARKS AT END OF LOG STARTED COMPLETED 10/25/ /25/ J. Bickett UNDISTURBED REMARKS (Drilling time, water loss, depth weathering, etc., if significant) g 4, 6, 7 N = 13 Qp = 2.5 tsf % , 5, 5 N = 10 (w = 18.7%) Qp = tsf Silty clay, trace fine sand - brown - hard (CL) , 5, 5 N = 10 (w = 17.6%) Qp = tsf Silty clay, trace fine sand - brown - medium (CL) , 1, 2 N = 3 (w = 33.7%) Qp = 0.5 tsf Silt and fine to medium sand, little clay - brown - moist to wet (ML) " Shelby Tube (w = 18.3%) Fine to coarse sand, little silt, trace fine gravel - brown - very dense - wet (SP-SM) Silty clay, trace fine to coarse sand, trace fine gravel, trace shale with trace amounts of organic material and silt layers - gray to dark gray - hard (CL) A /6" N = 74* (w = 20.5%) 29, 32 N = 61 (w = 35.7%) Too disturbed for Qp measurement , 50/3" N = 100+* (w = 13.5%) Qp = 4.5+ tsf Bedrock (inferred from auger refusal, split spoon sampler refusal, and resistance of roller bit) /0" N = 100+* ENG FORM MAR PREVIOUS EDITIONS ARE OBSOLETE. PROJECT Des Plaines II HOLE NO. DP

9 DRILLING LOG (Cont Sheet) PROJECT INSTALLATION 2 Des Plaines II ELEVATION a DEPTH b LEGEND c ELEVATION TOP OF HOLE Hole No. DP CLASSIFICATION OF MATERIALS (Description) d End of boring at 20'. Chicago District % CORE RECOV- ERY e BOX OR SAMPLE NO. f SHEET OF 2 SHEETS REMARKS (Drilling time, water loss, depth weathering, etc., if significant) g 50/0" N = 100+* SPT Sampling with 140 lb. Auto Hammer 30" of Fall 2" O.D. Split Spoon Sampler *: SPT-N value based on 6" of penetration or less w = moisture content Boring advanced with SSA to 17.5 feet 4-1/4" casing set to 17.5 feet. Boring advanced with roller bit to 20 feet. GW at 12.0' W.S. Hole No. DP Borehole backfilled with auger cuttings and bentonite chips. ENG FORM JUN A PROJECT Des Plaines II HOLE NO. DP

10 DRILLING LOG 1. PROJECT Des Plaines II 2. LOCATION (Coordinates or Station) Mark Baker ELEVATION DEPTH a b LEGEND c DIVISION Great Lakes and Ohio River Groveland Ave Levee N 1,880,033.0 E 1,122, DRILLING AGENCY STRATA 4. HOLE NO. (As shown on drawing title and file number) 5. NAME OF DRILLER 6. DIRECTION OF HOLE VERTICAL INCLINED 7. THICKNESS OF OVERBURDEN 8. DEPTH DRILLED INTO ROCK 9. TOTAL DEPTH OF HOLE --- DP DEG. FROM VERT CLASSIFICATION OF MATERIALS (Description) d Topsoil (0.7') INSTALLATION FILL: Silty clay, little fine to coarse sand, trace fine gravel, with layers of silt and cinders/coal - gray (FILL: CL) Chicago District 10. SIZE AND TYPE OF BIT % CORE RECOV- ERY e 60 BOX OR SAMPLE NO. f SSA 11. DATUM FOR ELEVATION SHOWN (TBM or MSL) Illinois State Plane East NAD83(horiz) NAVD88 (vert) 12. MANUFACTURER'S DESIGNATION OF DRILL B-61 TRUCK 13. TOTAL NO. OF OVERBURDEN SAMPLES TAKEN 14. TOTAL NUMBER CORE BOXES 15. ELEVATION GROUND WATER 16. DATE HOLE 17. ELEVATION TOP OF HOLE 18. TOTAL CORE RECOVERY FOR BORING 19. ENGINEER DISTURBED SEE REMARKS AT END OF LOG STARTED COMPLETED 10/25/ /25/ J. Bickett Hole No. DP SHEET 1 OF 2 SHEETS UNDISTURBED REMARKS (Drilling time, water loss, depth weathering, etc., if significant) g 5, 6, 8 N = 14 Qp = 2.25 tsf % , 2, 2 N = 4 (w = 18.0%) Too disturbed for Qp measurement FILL: Silty clay, trace fine to coarse sand, trace fine gravel, trace coal - dark brown - medium (FILL: CL) " Shelby Tube Qp = 0.75 tsf (w = 29.5%) Silty fine to coarse sand - gray - loose - wet (SM) Silty clay, trace fine to coarse sand, trace fine gravel - gray - stiff (CL) Fine to medium sand, little clay, trace silt - gray (SM) A , 1, 4 N = 5 (w = 24.8%) 4/6" N = 8* (w = 18.5%) Qp = tsf 3" Shelby Tube (w = 24.8%) Fine to coarse sand, little silt, trace fine gravel - gray - very loose - wet (SP-SM) WOH, WOH, 1, 1 N = 1 (w = 29.2%) Silty fine to coarse sand, trace fine gravel - gray - dense - wet (SM) , 8, 22 N = 30 (w = 22.4%) ENG FORM MAR PREVIOUS EDITIONS ARE OBSOLETE. PROJECT Des Plaines II HOLE NO. DP

11 DRILLING LOG (Cont Sheet) ELEVATION TOP OF HOLE Hole No. DP Hole No. DP PROJECT INSTALLATION SHEET 2 Des Plaines II Chicago District OF 2 SHEETS CLASSIFICATION OF MATERIALS % CORE BOX OR REMARKS ELEVATION DEPTH LEGEND RECOV- SAMPLE (Drilling time, water loss, depth (Description) ERY NO. weathering, etc., if significant) a b c d e f g , 23, 35 Silt, little fine to coarse sand, little fine to 20.0 N = 58 (w = 9.8%) coarse gravel, trace clay - gray - very dense wet (ML) Silty clay, trace fine to coarse sand, trace fine gravel, trace shale with occasional silt seams - gray - hard (CL) , 28, 45 N = 73 (w = 15.2%) Too disturbed for Qp measurement End of boring at 30.5' /6" N = 100+* (w = 14.7%) Too disturbed for Qp measurement SPT Sampling with 140 lb. Auto Hammer 30" of Fall 2" O.D. Split Spoon Sampler *: SPT-N value based on 6" of penetration or less w = moisture content Boring advanced with SSA to 30 feet Boring advanced with split spoon sampler to 30.5 feet. GW at 7.5' W.S. GW at 11' A.B. Borehole backfilled with auger cuttings and bentonite chips. ENG FORM JUN A PROJECT Des Plaines II HOLE NO. DP

12 ATTACHMENT E.3: Lab Testing Results APPENDIX E: Groveland Avenue Levee

13

14

15

16

17

18

19

20

21

22 ATTACHMENT E.4: Research Data APPENDIX E: Groveland Avenue Levee

23 APPENDIX E: Groveland Avenue Levee E.4.1: Illinois State Water Survey Data

24 Illinois State Water Survey Well Database Search Results SITE NAME: GROVELAND AVENUE LEVEE (DPLV01) COUNTY: Cook CITY: Riverside TOWNSHIP: 39N RANGE: 12E SECTION: 35 AREA PLAN WITH WELL LOCATIONS: DPLV01 2 DPLV01 1 DPLV01 3* DPLV01 4 DPLV01 5 NOTE: Refer to attached sheets for logs available for each location. *: More than two well/boring logs available for cluster of wells/boring logs. Deepest log is provided on attached sheets.

25 Page 1 ILLINOIS STATE GEOLOGICAL SURVEY Engineering Test Top Bottom Total Depth 386 Driller's Log filed Permit Date: Permit #: COMPANY Knoeler Bender Stone FARM Des Plaines Riv Syst DATE DRILLED December 1, 1975 NO. ELEVATION 615GL COUNTY NO LOCATION SE SW NE LATITUDE LONGITUDE COUNTY Cook API N - 12E

26 Page 1 ILLINOIS STATE GEOLOGICAL SURVEY Noncommunity - Public Water Well Total Depth Top Bottom Permit Date: Permit #: COMPANY FARM Zoo Woods DATE DRILLED NO ELEVATION 0 COUNTY NO LOCATION NW SE NE LATITUDE LONGITUDE COUNTY Cook API N - 12E

27 Page 1 ILLINOIS STATE GEOLOGICAL SURVEY Engineering Test Top Bottom Total Depth 27 Driller's Log filed Permit Date: Permit #: COMPANY Chicago Sanitary Dist. FARM Test Boring DATE DRILLED NO. 5C ELEVATION 0 COUNTY NO LOCATION SW SE NE LATITUDE LONGITUDE COUNTY Cook API N - 12E

28 Page 1 ILLINOIS STATE GEOLOGICAL SURVEY Engineering Test Top Bottom Total Depth 31 Driller's Log filed Permit Date: Permit #: COMPANY Chicago Sanitary Dist. FARM Test Pit DATE DRILLED NO. 5 ELEVATION 607GL COUNTY NO LOCATION NW NE SE LATITUDE LONGITUDE COUNTY Cook API N - 12E

29 Page 1 ILLINOIS STATE GEOLOGICAL SURVEY Water Well Top Bottom Total Depth 2047 Driller's Log filed Survey Sample Study filed Sample set # 276 (200' ') Received: January 9, 1922 Permit Date: Permit #: COMPANY Miller, J. P. Art. Well FARM Riverside City DATE DRILLED April 1, 1924 NO. 3 ELEVATION 619TM COUNTY NO LOCATION NW NW SW LATITUDE LONGITUDE COUNTY Cook API N - 12E

30 ATTACHMENT E.5: Site Reconnaissance Photographs APPENDIX E: Groveland Avenue Levee

31 Groveland Avenue Levee Photograph #1 Looking North Along Groveland Avenue from Forest Avenue Photograph #2 Forest Avenue Bridge Over Des Plaines River Client: US Army Corps of Engineers Contract No: W911XK-09-D-0015 Project: Des Plaines II Site Investigations AECOM Project No:

32 Groveland Avenue Levee Photograph #3 Looking South Along Groveland Avenue from Park Place Photograph #4 Structures Adjacent to DP on the River Bank Client: US Army Corps of Engineers Contract No: W911XK-09-D-0015 Project: Des Plaines II Site Investigations AECOM Project No:

33 Groveland Avenue Levee Photograph #5 Structures Adjacent to DP on the River Bank Photograph #6 As-drilled Location of DP Client: US Army Corps of Engineers Contract No: W911XK-09-D-0015 Project: Des Plaines II Site Investigations AECOM Project No:

34 Groveland Avenue Levee Photograph #7 As-drilled Location of DP Photograph #8 As-drilled Location of DP Client: US Army Corps of Engineers Contract No: W911XK-09-D-0015 Project: Des Plaines II Site Investigations AECOM Project No:

35 Groveland Avenue Levee Photograph #9 Access Restrictions at DP Location Photograph #10 Site Clean-up at DP Client: US Army Corps of Engineers Contract No: W911XK-09-D-0015 Project: Des Plaines II Site Investigations AECOM Project No:

36 Logo USACE CLIENT PROJECT NUMBER PROJECT NAME PROJECT LOCATION SUBSURFACE DIAGRAM Topsoil USCS Low Plasticity Clay USCS Poorly-graded Sand USCS Low Plasticity Sandy Clay USCS Silt Limestone USCS Silty Sand Fill (made ground) USCS Poorly-graded Sand with Silt ,000 1,100 1,200 1,300 DP DP B-3 B-5 B-2 B-4 B STRATIGRAPHY & GW - B SIZE - GINT STD US.GDT - 2/13/12 10:11 - P:\PRJ-DES PLAINES II\TS-DG GEOTECHNICAL\FEASIBILITY APPENDIX\PLATES\GROVELAND.GPJ Elevation (ft) ,000 1,100 1,200 1, Distance Along Baseline (ft)

37 Borings along Grovelend Ave Levee (DPLV01)

38 Borings along Grovelend Ave Levee (DPLV01)

39 Borings along Grovelend Ave Levee (DPLV01)

40 Borings along Grovelend Ave Levee (DPLV01)

41 Borings along Grovelend Ave Levee (DPLV01)

42 Borings along Grovelend Ave Levee (DPLV01)

43 Borings along Grovelend Ave Levee (DPLV01)

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

UAS Student Residence

UAS Student Residence General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

APPENDIX B: BORING LOGS

APPENDIX B: BORING LOGS New Orleans Levee Systems Independent Levee Hurricane Katrina Investigation Team July, 6 APPENDIX B: BORING S As part of the field investigation 9 borings were performed at the sites of interest, as listed

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1 N 64650 N 64600 N 64550 N 64500 N 64450 N 64400 N 64350 N 64300 N 64250 N 64200 N 64150 N 64100 N 64050 N 64000 N 63950 N 63900 N 63850 N 63800 N 63750 N 63700 N 63650 N 63600 N 63550 N 63500 N 63450 N

More information

HDD PA-IN RD (W-N57 and W-N56)

HDD PA-IN RD (W-N57 and W-N56) HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

The attitude he maintains in his relation to the engineer is very well stated in his own words:

The attitude he maintains in his relation to the engineer is very well stated in his own words: Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Assistant Chief-Bureau of Structures and Geotechnical Services

Assistant Chief-Bureau of Structures and Geotechnical Services MEMO DATE: 2/10//2016 Bureau of Structures and Geotechnical Services TO: John Jones, P.E. Assistant Chief-Bureau of Structures and Geotechnical Services ATTENTION: Mark Hurt, P.E. Senior Bridge Squad Leader

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate

More information

APÉNDICE F. Evaluación Geotécnica

APÉNDICE F. Evaluación Geotécnica APÉNDICE F Evaluación Geotécnica REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED LAGUNA DEL MAR PLAZA PROJECT ASHFORD AVE. SAN JUAN, PUERTO RICO GUTIERREZ - LATIMER - C.S.P. MR. ROBERTO CACHO I LAGUNA

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

REPORT. Explorations and Geotechnical Engineering Services

REPORT. Explorations and Geotechnical Engineering Services REPORT September 9, 2015 15-0690 S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs

More information

EIGHT POINT WIND LLC

EIGHT POINT WIND LLC GEOTECHNICAL INVESTIGATION REPORT EIGHT POINT WIND FARM SUBSTATION AND OPERATION AND MAINTENANCE FACILITY STEUBEN COUNTY NEW YORK PREPARED FOR EIGHT POINT WIND LLC 700 UNIVERSE BLVD. JUNO BEACH, FL 33408

More information

Appendix D Geotechnical

Appendix D Geotechnical USACE JACKSONVIE DISTRICT Appendix D Geotechnical LEE COUNTY GASPARIA SHORE PROTECTION PROJECT 934 REPORT June 216 TABLE OF CONTENTS 1 Background... 1 1.1 Regional Geology... 1 1.2 Local Geology... 2 2

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

HDD PA-LA SR (S-K34, S-K35, PEM-K32)

HDD PA-LA SR (S-K34, S-K35, PEM-K32) HDD PA-LA-0004.0000-SR (S-K34, S-K35, PEM-K32) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low.

More information

APPENDIX E GEOTECHNICAL INVESTIGATIONS, 2014

APPENDIX E GEOTECHNICAL INVESTIGATIONS, 2014 APPENDIX E GEOTECHNICAL INVESTIGATIONS, 14 Submerged Aquatic Vegetation Mitigation EA 2 SECTION 31 32 Geotechnical Data Report for Construction Dredging - Mitigation Prepared by Geotechnical Branch Engineering

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00 Závěrka 12,Praha 6,169 00 Log of Boring BH1 Project ID: 2018_A-017 Annex no.: A.1G Drilling equipment: Hütte 202 TF Location: Prague 12 Overall depth: 2 m Borehole position: Date start: 22.11.2017 Foreman:

More information

Existing Bridge Proposed Bridge 66003

Existing Bridge Proposed Bridge 66003 922 335 9 T2 X 924 919 9 T4 923 T3 919 922 9 T1 925 919 Existing Bridge 6842 919 9 Proposed Bridge 66003 Minnesota Department of Transportation Geotechnical Section Boring Log Descriptive Terminology (English

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

WELL NUMBER 14-BW03 PAGE 1 OF 5

WELL NUMBER 14-BW03 PAGE 1 OF 5 WELL 14-BW03 PAGE 1 OF 5 IENT PROJECT DATE STARTED 4/30/14 COMPLETED 5/1/14 GROUND ELEVATION 1157.89 ft HOLE SIZE 9 5/8 inches DRILLING CONTRACTOR Cascade Drilling NORTHING 670592.2 EASTING 1937845.8 DRILLING

More information

December 20, 2017 (Revised from December 15, 2017) Project No

December 20, 2017 (Revised from December 15, 2017) Project No December 20, 2017 (Revised from December 15, 2017) Project No. 92270.02 Ms. Laura Krusinski, P.E. Senior Geotechnical Engineer Maine Department of Transportation State House Station 16 Augusta, Maine 04333-016

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information