New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

Size: px
Start display at page:

Download "New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1"

Transcription

1 88 E. Marshall Street, Suite 0 Tulsa, OK Phone FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR New WW Hastings Hospital Geotechnical Investigation RFP Addendum #. Please find attached Preliminary Subsurface Exploration Letter dated November, 0 for the Proposed WW Hastings Hospital Additions. This letter is provided for bidder information only and will not be considered in the event that the site conditions differ from the preliminary report. END OF ADDENDUM

2 November, 0 Mr. Andrew Ruleford, Project Manager Cherokee Nation Construction Resources, LLC 88 East Marshall Street, Suite 0 Tulsa, Oklahoma 76 Subject: Preliminary Subsurface Exploration Letter Proposed Additions Project No.: 809 Dear Mr. Ruleford In accordance with your request, Kleinfelder has completed the authorized soil borings and laboratory testing for the above referenced project. The services provided were in general accordance with our Proposal TUL P0879 dated November, 0. At this time, the location, number of stories, type of building, and loading conditions are not available. The exact location of the parking area is also not available. A grading plan has not been developed. However, the proposed building additions and parking areas will be added to the east and south side of the existing hospital building. The purpose of the preliminary geotechnical engineering services is to obtain general subsurface conditions (soil types, depth to bedrock) and evaluate suitable foundation types for the proposed additions. Foundation recommendations (bearing capacity, bearing depth, etc) are beyond the scope of this project, and a detailed geotechnical investigation will be performed when the location and details of the proposed additions are developed. Kleinfelder conducted the field work on November 0, 0, which consisted of seven (7) borings that extended to approximate depths of.0 feet below the existing grade or auger refusal. The approximate location of the site is presented on the attached Plate, Site Location Diagram. The borings were performed near the locations indicated on the proposal TULP0879, and are presented on the attached Plate, Boring Location Diagram. Elevations at the boring locations were not available. The borings were performed with a track mounted (CME-C) rotary drill rig using solid flight augers to advance the borings. Samples were obtained by performing a Standard Penetration test (SPT) using a -inch O.D. split-barrel sampler. Split-barrel sampling was conducted in general accordance with ASTM D86 (Standard Test Method for Standard Penetration Test and Split-Barrel Sampling of Soils). The split-barrel sampler is driven into the bottom of the boring over an 8-inch sampling interval by a -pound hammer that is dropped a distance of 0 inches. A CME automatic SPT hammer with an approximate hammer efficiency of 76 percent was used to advance the split-barrel TULL098 Page of December, 0 Copyright 0 Kleinfelder Interchange Business Park, 8 East Independence, Suite, Tulsa, OK p f

3 sampler. The SPT N-value, recorded on the boring logs, is the number of blows required to drive the split-barrel sampler the final inches of the 8-inch sampling interval. Boring B- was drilled in an existing gravel covered parking area with approximately -inches of gravel surfacing. Approximately to inches of topsoil was encountered at the surface in Borings B- to B-7. Native soils encountered below the gravel and topsoil were generally comprised of clay and gravel with varying amounts of silt, sand, and chert and limestone gravels and cobbles, and extended to the bottom of the borings. Auger refusal was encountered in Boring B- at a depth of approximately twelve feet below the existing ground surface in chert cobbles. Generally, the upper layers of the native soils were firm to hard, overlaying loose materials encountered in the lower portion of the borings. Silty, clayey sand with a relative density of loose to very dense was encountered in Boring B-. Sand and gravel with relative densities of loose to very dense were encountered in Borings B- through B-7. Bedrock was not encountered within the exploration limits. No groundwater was encountered within the borings at the completion of drilling. However, the materials encountered in the test borings can have a wide range of permeability, and observations over an extended period of time, through use of piezometers or cased borings, would be required to better define groundwater conditions. Fluctuations of groundwater levels can occur due to seasonal variations in the amount of rainfall, runoff, and other factors not evident at the time the borings were performed. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. Field logs included visual classification of the materials encountered during drilling, as well as drilling characteristics. Our final boring logs represent the engineer s interpretation of the field logs combined with laboratory observation and testing of the samples. Stratification boundaries indicated on the boring logs were based on observations during our field work, an extrapolation of information obtained by examining samples from the borings, and comparisons to soils with similar engineering characteristics. Locations of these boundaries are approximate, and the transitions between material types may be gradual rather than clearly defined. Copies of the boring logs are attached. Atterberg limits and sieve analysis tests were performed on selected samples for classification purposes. Additional testing/observation of the samples were limited to moisture content and visually classifying the subsurface materials. Laboratory tests were performed in general accordance with applicable standards. The results of the tests are presented on the respective boring logs. Boring logs included in this appendix present such data as soil and bedrock descriptions, depths, sampling intervals, and observed groundwater conditions. Conditions encountered in each of the borings were monitored and recorded by the drill crew. The site is generally sloping downward to the south. It is anticipated that cut on the north, and fill on the south will be required to achieve the final design grade. However, the amounts of cut and fill are not available at this time. Based on the results of field exploration and laboratory testing, it is our opinion that a shallow foundation system could be used for a one to two-story structure, provided that the structural loadings are relatively light to moderate (column loads less than 0 kips). A multi-floor structure with moderate to heavy structural loads may require a drilled pier foundation system. The shallow foundation system which includes spread and wall footings can be constructed with conventional grading and construction techniques. The drilled pier foundation system will require more difficult drilling techniques to penetrate through the subsurface layers with gravel and cobbles. TULL098 Page of December, 0 Copyright 0 Kleinfelder

4 Casing maybe required for the installation of drilled pier foundation system to prevent the cave-in of the gravel and cobbles. It is anticipated that fills higher than feet will result in the settlement of the subsurface soils. Settlement monitoring will be required to ensure that primary settlement of the subsurface materials is completed prior to the construction of the proposed buildings and structures supported on the fill materials. When the building and parking layout are delineated, a detailed subsurface exploration and geotechnical engineering services should be performed. Depending on the structural loading, the geotechnical exploration depths will need to be modified to obtain sufficient samples of subsurface conditions. For structures with light to moderate building loads, and with cut no more than feet, it is recommended to extend the geotechnical borings to a minimum depth of 0 feet below the proposed final grade. For structures with moderate to heavy loads, or where proposed cut exceeds feet to achieve the final grade, the borings should extend to the top of bedrock. At this time, it is difficult to estimate the depth to bedrock, but it is anticipated to be within 0 feet of the existing ground surface. ******************************************************************************************************************** Recommendations contained in this report are based on our field observations and subsurface explorations, limited laboratory tests, and our present knowledge of the proposed construction. It is possible that subsurface conditions could vary between or beyond the points explored. If subsurface conditions are encountered during construction that differ from those described herein, we should be notified immediately in order that a review may be made and any supplemental recommendations provided. If the scope of the proposed construction, including the proposed loads or structural locations, changes from that described in this report, our recommendations should also be reviewed. We have prepared this report in substantial accordance with the generally accepted geotechnical engineering practice as it exists in the site area at the time of our study. No warranty is expressed or implied. The recommendations provided in this report are based on the assumption that Kleinfelder will conduct an adequate program of tests and observations during the construction phase in order to evaluate compliance with our recommendations. The scope of our services did not include any environmental assessment or exploration for the presence of hazardous or toxic materials in the soil, surface water, groundwater or air, on, below or around this site. This report may be used only by the client and only for the purposes stated, within a reasonable time from its issuance, but in no event later than three years from the date of report. Land use, site conditions (both on-site and off-site), regulations, or other factors may change over time, and additional work may be required with the passage of time. Any party other than the client who wishes to use this report shall notify Kleinfelder of such intended use. Based on the intended use of the report, Kleinfelder may require that additional work be performed and that an updated report be issued. Non-compliance with any of these requirements by the client or anyone else will release Kleinfelder from any liability resulting from the use of this report by any unauthorized party and client agrees to defend, indemnify and hold harmless Kleinfelder from any claim or liability associated with such unauthorized or non-compliance. TULL098 Page of December, 0 Copyright 0 Kleinfelder

5

6 TULSA, OKLAHOMA Approximate Location NORTH PROJECT NO. N/A Source: ESRI The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations of warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor it is designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the soile risk of the party using or misusing DRAWN: /6/0 SMO FILE NAME: Plate SITE LOCATION DIAGRAM PRELIMINARY GEOTECHNICAL ENGINEERING SERVICES WW HASTINGS HOSPITAL TAHLEQUAH, OKLAHOMA

7 TULSA, OKLAHOMA B- B- B-6 B- B-7 Bore hole locations for preliminary geotech B- B- NORTH PROJECT NO. N/A Source: Cherokee Nation Construction Resources, LLC The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no representations of warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor it is designed or intended as a construction design document. The use or misuse of the information contained on this graphic representation is at the soile risk of the party using or misusing DRAWN: /6/0 SMO FILE NAME: Plate BORING LOCATION DIAGRAM PRELIMINARY GEOTECHNICAL ENGINEERING SERVICES WW HASTINGS HOSPITAL TAHLEQUAH, OKLAHOMA

8 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B- Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log GRAVEL Silty Clayey SAND with Chert Gravel (SC-SM): brown, medium dense - red and brown Latitude:.909 N Longitude: W No Elevation Available - with cobbles, yellow, very dense - with cobbles, brown, tan and orange, very dense - brown, tan and orange, loose - red and brown, medium dense The exploration was terminated at approximately ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= 6 BC=6 0/" BC=0/0" BC=8 BC= 7 Recovery (NR=No Recovery) NR 6 USCS Symbol Water Content (%) SC-SM Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) 7 GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B- Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B- of

9 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B- Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL SILT (ML): brown, hard, with gravel SILT with Chert Gravel (ML): brown CHERT with Gravel and Cobbles: very dense Clayey GRAVEL with Cobbles (GC): orange and tan, very dense - brown and red - orange and brown - red and brown Latitude: N Longitude: W No Elevation Available The exploration was terminated at approximately ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= 6 BC=0/" BC=0/0" BC=0/6" BC= 9 Recovery (NR=No Recovery) NR USCS Symbol Water Content (%).7.. Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%).6 0 GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B- Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B- of

10 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B- Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL Latitude:.96 N Longitude: W No Elevation Available Sandy SILT (ML): brown Clayey GRAVEL (GC): red trace of yellow, moist, medium dense Sandy GRAVEL with Cobbles (GW): tan, very dense Clayey SAND with Gravel (SC): reddish brown, medium dense Clayey GRAVEL (GC): red, brown and gray, medium dense CHERT with Gravel and Cobbles The exploration was terminated because of practical auger refusal at approximately. ft. below ground surface on Chert and Cobbles. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= 8 BC=0/" BC=0 6 8 BC= Recovery (NR=No Recovery) 9 9 USCS Symbol Water Content (%) Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B- Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B- of

11 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B- Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL Sandy SILT (ML): brown Clayey GRAVEL (GC): red and brown, loose - red and yellow, very dense - medium dense Latitude:.98 N Longitude: W No Elevation Available Sandy Lean to Fat CLAY with Gravel (CL-CH): gray trace of red and yellow, medium dense Sandy Fat CLAY with Chert Gravel (CH): red, very hard The exploration was terminated at approximately ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= BC= 9 9 BC= 8 BC= 6 BC=9 0/" Recovery (NR=No Recovery) USCS Symbol Water Content (%) Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B- Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B- of

12 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B- Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL Silty CLAY with Gravel (CL-ML): brown, firm Clayey GRAVEL (GC): red trace of yellow, very dense - red and yellow Latitude:.987 N Longitude: W No Elevation Available Limestone GRAVEL with Chert: red and yellow, medium dense Gravelly Lean CLAY (CL): red, very hard The exploration was terminated at approximately. ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= BC= 0/" BC=0/" BC=0/" BC=0/" Recovery (NR=No Recovery) NR NR USCS Symbol Water Content (%) Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B- Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B- of

13 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B-6 Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL Latitude:.98 N Longitude: -9.9 W No Elevation Available Lean to Fat CLAY with Siltstone nodules (CL-CH): brown, soft Gravelly CLAY (GC): red and yellow, very hard Clayey GRAVEL (GC): red and yellow, very dense Sandy Fat CLAY (CH): red trace of yellow - tan trace of gray and yellow, hard The exploration was terminated at approximately ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= BC=0/" BC=8 0/" BC=8 0/" BC= 9 7 Recovery (NR=No Recovery) 8 USCS Symbol Water Content (%) Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B-6 Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B-6 of

14 Date Begin - End: /0/0 Drill Company: Kleinfelder BORING LOG B-7 Logged By: Drill Crew: Hor.-Vert. Datum: Not Available Drill Equipment: CME-C Hammer Type - Drop: lb. Auto - 0 Exploration Plunge: -90 degrees Exploration Method: Solid Stem Auger Hammer Efficiency: 76% Weather: Auger Diameter:. O.D. Hammer Cal. Date: //0 FIELD EXPLORATION LABORATORY RESULTS gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [KLF_BORING/TEST PIT SOIL LOG] Depth (feet) Graphical Log TOPSOIL Latitude:.9 N Longitude: -9.9 W No Elevation Available SILT with Chert Gravel (ML): brown Sandy CLAY with Chert Gravel (CL): brown trace of red, firm Sandy CLAY with Chert Gravel (CL-ML): red and yellow, very hard Lean to Fat CLAY trace of Highly Weathered Shale (CL-CH): brown, gray and yellow, hard Clayey SILT (ML): brown and red, wet, firm The exploration was terminated at approximately ft. below ground surface. The exploration was backfilled with bentonite on November 0, 0. Sample Number BC= 9 BC=8 0/" BC=0/" BC=8 7 BC= Recovery (NR=No Recovery) USCS Symbol SC Water Content (%). 7. Dry Density (pcf) Passing No. Sieve (%) Passing #00 Sieve (%) GROUNDWATER LEVEL INFORMATION: Groundwater was not encountered during drilling or after completion. GENERAL NOTES: BORING LOG B-7 Liquid Limit (NV=No Value) Plasticity Index (NP=No Plasticity) KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Blow Counts(BC)= Uncorr. blows/6 PROJECT NO.: 809 DATE: //0 Sample Type PAGE: Other Tests/ Remarks B-7 of

15 SAMPLE/SAMPLER TYPE GRAPHICS UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 87) gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [GEO-LEGEND (GRAPHICS KEY) WITH USCS] SOLID STEM AUGER STANDARD PENETRATION SPLIT SPOON SAMPLER ( (0.8 mm.) outer diameter and -/8 (.9 mm.) inner diameter) GROUND WATER GRAPHICS WATER LEVEL (level where first observed) WATER LEVEL (level after exploration completion) WATER LEVEL (additional levels after exploration) OBSERVED SEEPAGE NOTES. The report and log key are an integral part of these logs. All data and interpretations in this log are subject to the explanations and limitations stated in the report.. Lines separating strata on the logs represent approximate boundaries only. Actual transitions may be gradual or differ from those shown.. No warranty is provided as to the continuity of soil or rock conditions between individual sample locations.. Logs represent general soil or rock conditions observed at the point of exploration on the date indicated.. In general, Unified Soil Classification System designations presented on the logs were based on visual classification in the field and were modified where appropriate based on gradation and index property testing. 6. Fine grained soils that plot within the hatched area on the Plasticity Chart, and coarse grained soils with between % and % passing the No. 00 sieve require dual USCS symbols, ie., GW-GM, GP-GM, GW-GC, GP-GC, GC-GM, SW-SM, SP-SM, SW-SC, SP-SC, SC-SM. 7. If sampler is not able to be driven at least 6 inches, 0/X indicates number of blows required to drive the identified sampler X inches with a pound hammer falling 0 inches. COARSE GRAINED SOILS (More than half of material is larger than the #00 sieve) CLEAN SANDS WITH <% FINES >_ < _ Cc _ < Cu < and/ > > Cu _ > and _ < Cc _< Cu < and/ > > < or > Cc > Cu _ > 6 and _ < Cc _ < Cu < 6 and/ > > SILTS AND CLAYS (Liquid Limit less than 0) SILTS AND CLAYS (Liquid Limit greater than 0) SW-SM SILTY SANDS, SAND-GRAVEL-SILT MIXTURES CLAYEY SANDS, SAND-GRAVEL-CLAY MIXTURES CLAYEY SANDS, SAND-SILT-CLAY MIXTURES KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: GRAVELS (More than half of coarse fraction is larger than the # sieve) SANDS (More than half of coarse fraction is smaller than the # sieve) FINE GRAINED SOILS (More than half of material is smaller than the #00 sieve) CLEAN GRAVEL WITH <% FINES GRAVELS WITH % TO % FINES GRAVELS WITH > % FINES SANDS WITH % TO % FINES SANDS WITH > % FINES PROJECT NO.: 809 DATE: //0 Cu and or Cc or Cc Cu >_ 6 and _ < Cc _< Cu 6 and/ or Cc ML CL CL-ML OL MH CH OH GW GP GW-GM GW-GC GP-GM GP-GC GM GC GC-GM SW SP SW-SC SP-SM SP-SC SM SC SC-SM WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE OR NO FINES POORLY GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE OR NO FINES INORGANIC SILTS AND VERY FINE SANDS, SILTY OR CLAYEY FINE SANDS, SILTS WITH SLIGHT PLASTICITY INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS INORGANIC CLAYS-SILTS OF LOW PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, SILTY CLAYS, LEAN CLAYS ORGANIC SILTS & ORGANIC SILTY CLAYS OF LOW PLASTICITY INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS FINE SAND OR SILT INORGANIC CLAYS OF HIGH PLASTICITY, FAT CLAYS ORGANIC CLAYS & ORGANIC SILTS OF MEDIUM-TO-HIGH PLASTICITY GRAPHICS KEY WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE OR NO FINES POORLY GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE OR NO FINES WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE FINES WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE CLAY FINES POORLY GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE FINES POORLY GRADED GRAVELS, GRAVEL-SAND MIXTURES WITH LITTLE CLAY FINES SILTY GRAVELS, GRAVEL-SILT-SAND MIXTURES CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES CLAYEY GRAVELS, GRAVEL-SAND-CLAY-SILT MIXTURES WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE FINES WELL-GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE CLAY FINES POORLY GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE FINES POORLY GRADED SANDS, SAND-GRAVEL MIXTURES WITH LITTLE CLAY FINES A-

16 GRAIN SIZE DESCRIPTION Boulders Cobbles coarse Gravel fine coarse Sand medium fine Fines ANGULARITY SIEVE SIZE > (0.8 mm.) - ( mm.) / - (9-76. mm.) # - / (# - 9 mm.) # - # #0 - # #00 - # Passing #00 GRAIN SIZE > (0.8 mm.) - ( mm.) / - (9-76. mm.) (.8-9 mm.) ( -.9 mm.) (0. - mm.) ( mm.) <0.009 (<0.07 mm.) APPROXIMATE SIZE Larger than basketball-sized Fist-sized to basketball-sized Thumb-sized to fist-sized Pea-sized to thumb-sized Rock salt-sized to pea-sized Sugar-sized to rock salt-sized Flour-sized to sugar-sized Flour-sized and smaller Munsell Color NAME Red Yellow Red Yellow Green Yellow Green Blue Green Blue Purple Blue Purple Red Purple ABBR R YR Y GY G BG B PB P RP DESCRIPTION CRITERIA Angular Subangular Subrounded Rounded Particles have sharp edges and relatively plane sides with unpolished surfaces Particles are similar to angular description but have rounded edges Particles have nearly plane sides but have well-rounded corners and edges Particles have smoothly curved sides and no edges Rounded Subrounded Subangular Angular gint FILE: C:\pwworking\dms090\809_ww Hastings Hospital Additions.gpj R:KLF_STANDARD_GINT_LIBRARY_SR...GLB [GEO-LEGEND (SOIL DESCRIPTION KEY)] PLASTICITY DESCRIPTION Non-plastic Low (L) Medium (M) High (H) APPARENT DENSITY Very Loose Loose Medium Dense Dense Very Dense SPT-N 60 (# blows/ft) < >0 (# blows/ft) < >60 NOTE: AFTER TERZAGHI AND PECK, 98 DESCRIPTION Stratified Laminated Fissured Slickensided Blocky Lensed Homogeneous LL FIELD TEST A /8- ( mm.) thread cannot be rolled at NP any water content. The thread can barely be rolled and the lump < 0 or thread cannot be formed when drier than the plastic limit. The thread is easy to roll and not much time is required to reach the plastic limit. 0-0 The thread cannot be rerolled after reaching the plastic limit. The lump or thread crumbles when drier than the plastic limit It takes considerable time rolling and kneading to reach the plastic limit. The thread can be > 0 rerolled several times after reaching the plastic limit. The lump or thread can be formed without crumbling when drier than the plastic limit APPARENT / RELATIVE DENSITY - COARSE-GRAINED SOIL STRUCTURE MODIFIED CA SAMPLER CALIFORNIA RELATIVE SAMPLER DENSITY (# blows/ft) (%) < > CRITERIA Alternating layers of varying material or color with layers at least /- thick, note thickness Alternating layers of varying material or color with the layer less than /- thick, note thickness Breaks along definite planes of fracture with little resistance to fracturing Fracture planes appear polished or glossy, sometimes striated Cohesive soil that can be broken down into small angular lumps which resist further breakdown Inclusion of small pockets of different soils, such as small lenses of sand scattered through a mass of clay; note thickness Same color and appearance throughout DESCRIPTION KLEINFELDER - 8 E. Independence, Suite Tulsa, OK 76 PH: FAX: Dry Moist Soft Firm Hard Wet DESCRIPTION None Weak Strong Very Hard > 8000 DESCRIPTION Weakly Moderately Strongly FIELD TEST Absence of moisture, dusty, dry to the touch Damp but no visible water Visible free water, usually soil is below water table No visible reaction FIELD TEST Some reaction, with bubbles forming slowly Violent reaction, with bubbles forming immediately CONSISTENCY - FINE-GRAINED SOIL UNCONFINED CONSISTENCY COMPRESSIVE CRITERIA STRENGTH (Qu)(psf) Very Soft < 00 Thumb will penetrate soil more than ( mm.) PROJECT NO.: 809 MOISTURE CONTENT REACTION WITH HYDROCHLORIC ACID DATE: // < < 8000 CEMENTATION Thumb will penetrate soil about ( mm.) Thumb will indent soil about /- (6 mm.) Thumb will not indent soil but readily indented with thumbnail Thumbnail will not indent soil FIELD TEST Crumbles or breaks with handling or slight finger pressure Crumbles or breaks with considerable finger pressure Will not crumble or break with finger pressure SOIL DESCRIPTION KEY A-

February 16, 2015 File No Ms. Robin Yates TRC Engineers Inc N. Fresno Street, Suite 200 Fresno, California 93710

February 16, 2015 File No Ms. Robin Yates TRC Engineers Inc N. Fresno Street, Suite 200 Fresno, California 93710 February 16, 2015 File No. 20152738 Ms. Robin Yates TRC Engineers Inc. 6051 N. Fresno Street, Suite 200 Fresno, California 93710 SUBJECT: Geotechnical Design Memorandum Fresno BPMP Scour Countermeasure

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

CIVE.5370 EXPERIMENTAL SOIL MECHANICS Soil Sampling, Testing, & Classification Review

CIVE.5370 EXPERIMENTAL SOIL MECHANICS Soil Sampling, Testing, & Classification Review DATA COLLECTION, INTERPRETATION, & ANALYSIS TO GEOTECHNICAL SOLUTIONS FLOW CHART PRIOR INFORMATION Reconnaissance Topography Geology Hydrology Environment SITE EXPLORATION Geophysics Drilling and Coring

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

SOIL FORMATION SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS. Soil Properties and Classification

SOIL FORMATION SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS. Soil Properties and Classification SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS Soil Properties and Classification Soil Formation Soil Types Particle Size Analysis and Grading Characteristics Consistency Indices Engineering classification

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

APPENDIX B: BORING LOGS

APPENDIX B: BORING LOGS New Orleans Levee Systems Independent Levee Hurricane Katrina Investigation Team July, 6 APPENDIX B: BORING S As part of the field investigation 9 borings were performed at the sites of interest, as listed

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Geotechnical Engineering Report

Geotechnical Engineering Report REPORT COVER PAGE Geotechnical Engineering Report Proposed T-Line Structure Tahlequah, Oklahoma October 17, 2018 Terracon Project No. 04185192 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants,

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

CHEROKEE NATION BUSINESSES, LLC

CHEROKEE NATION BUSINESSES, LLC REPORT OF PRELIMINARY SUBSURFACE EXPLORATION AND GEOTECHNICAL EVALUATION PROPOSED CHEROKEE SPRINGS PLAZA TAHLEQUAH, OKLAHOMA BUILDING & EARTH PROJECT NO. OK10004 PREPARED FOR: CHEROKEE NATION BUSINESSES,

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

GEOLOGIC SUBSURFACE CONDITIONS. October 31, 2017 Project No

GEOLOGIC SUBSURFACE CONDITIONS. October 31, 2017 Project No October 31, 2017 Project No. 108205001 Ms. Shawna Anderson San Dieguito River Park Joint Powers Authority 18372 Sycamore Creek Road Escondido, California 92025 Subject: Addendum to Geotechnical Evaluation

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Introduction to Soil Mechanics Geotechnical Engineering-II

Introduction to Soil Mechanics Geotechnical Engineering-II Introduction to Soil Mechanics Geotechnical Engineering-II ground SIVA Dr. Attaullah Shah 1 Soil Formation Soil derives from Latin word Solum having same meanings as our modern world. From Geologist point

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

UAS Student Residence

UAS Student Residence General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN

More information

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN #271-120-011) ORINDA, CALIFORNIA A 580 Ts 590 HMA-1 600 HMA-2 70 Ts 610 Ts HMA-3 HLA-5 GJA-6 LD-2 23

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Tikrit University College of Engineering Civil engineering Department

Tikrit University College of Engineering Civil engineering Department Tikrit University SOIL CLASSIFICATION College of Engineering Civil engineering Department Soil Mechanics 3 rd Class Lecture notes Up Copyrights 2016 Classification of soil is the separation of soil into

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

UNIT DESCRIPTIONS: Artificial Fill, Undocumented (Afu): Locally derived sandy silt and silty sand, locally with clay and varying amounts of gravel and man-made debris. Abundant concrete rubble, in places

More information

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Appendix J. Geological Investigation

Appendix J. Geological Investigation Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF

More information

Page 4.1 Overview 4-3

Page 4.1 Overview 4-3 Chapter 4 Contents Page 4.1 Overview 4-3 4.2 Soil Classification 4-3 4.2.1 Coarse Grained Soils 4-4 4.2.2 Fine-Grained Inorganic Soils 4-7 4.2.3 Organic Fine Grained Soils 4-7 4.2.4 Angularity 4-10 4.2.5

More information

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia

Fauquier County Cedar Lee Middle School Safety Routes to School Bealeton, Virginia Geotechnical Report Fauquier County Cedar Lee Middle School Safety Routes to School Project Number: GEO 121913.08 April 30, 2015 Prepared for McCormick Taylor, Inc. 113 Mill Place Parkway, Unit 103 Verona,

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

Chapter 6 MATERIAL DESCRIPTION, CLASSIFICATION, AND LOGGING

Chapter 6 MATERIAL DESCRIPTION, CLASSIFICATION, AND LOGGING Chapter 6 MATERIAL DESCRIPTION, CLASSIFICATION, AND LOGGING Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 6.1 Introduction...6-1 6.2 Soil Description and Classificiation...6-1

More information

REPORT. Explorations and Geotechnical Engineering Services

REPORT. Explorations and Geotechnical Engineering Services REPORT September 9, 2015 15-0690 S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information