1 CTL Engineering, Inc Fisher Road, P.O. Box 4448, Columbus, Ohio Phone: 614/ Fax: 614/ AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection Services Analytical Laboratories Established 127 June 8, 2017 Columbus Engineering Consultants, Inc. 870 Michigan Avenue Columbus, Ohio 4321 Attention: Mr. Tom Hedrick, P.E. Reference: Structure Foundation Exploration Draft Borror Road (T266) Bridge over Patzer Ditch Jackson Township, Franklin County, Ohio CTL Project No COL Dear Mr. Hedrick: CTL Engineering, Inc. has completed the Structure Foundation Exploration report for the above referenced structure. A pdf copy of the draft report is being submitted. Thank you for the opportunity to work with you on this project. If you have any questions or need further information, please feel free to contact our office. Respectfully Submitted CTL ENGINEERING, INC. Joe Grani, P.E. Project Engineer Offices: Ohio, Indiana, West Virginia

2 STRUCTURE FOUNDATION EXPLORATIONDRAFT BORROR ROAD (T266) BRIDGE OVER PATZER DITCH JACKSON TOWNSHIP, FRANKLIN COUNTY, OHIO CTL PROJECT NO COL PREPARED FOR: COLUMBUS ENGINEERING CONSULTANTS 870 MICHIGAN AVE. COLUMBUS, OHIO 4321 PREPARED BY: CTL ENGINEERING, INC FISHER ROAD COLUMBUS, OHIO Phone Fax June 8, 2017

3 TABLE OF CONTENTS PAGE I. EXECUTIVE SUMMARY AND INTRODUCTION 1 II. GEOLOGY AND OBSERVATIONS OF THE PROJECT 1 III. EXPLORATION 2 IV. FINDINGS 2 V. ANALYSES AND RECOMMENDATIONS 3 A. Creek Bed Material 3 B. Foundation Support 3 C. General Construction and Earthwork 4 VI. CHANGED CONDITIONS 4 VII. TESTING AND OBSERVATION VIII. CLOSING APPENDIX A APPENDIX B APPENDIX C APPENDIX D STRUCTURE FOUNDATION EXPLORATION SHEETS TEST BORING RECORDS LABORATORY TESTING SHEETS PILE DESIGN CALCULATIONS

4 CTL Project No COL June 8, 2017 Page 1 I. EXECUTIVE SUMMARY AND INTRODUCTION The project involves the replacement of an existing bridge that carries Borror Road (T266) over Patzer Ditch in Jackson Township, Franklin County, Ohio. It is understood that the replacement structure will be a 36 feet (clear span) by feet (rise) conduit type A, precast reinforced concrete arch sections, supported on spread footings. Two test borings, identified as B0016 and B002016, were drilled for this Structure Foundation Exploration. The borings generally exhibited gravel and/or stone fragments with sand (A1b), gravel and/or stone fragments with sand and silt (A24), and sand (A3a), sandy silt (A4a) or silt and clay (A6a) soils to the drilled depths. No bedrock was encountered within the drill depths. It is understood that the foundations for the proposed arch bridge will be constructed about 12. to 14.4 feet below the existing roadway grade (Foundation Elevation = feet). Medium dense granular deposits or hard cohesive soils were encountered in the test borings at the anticipated foundation level. These soils are considered suitable to support foundations for the proposed structure. II. GEOLOGY AND OBSERVATIONS OF THE PROJECT According to the Ohio Department of Natural Resources, Physiographic Regions of Ohio, the site lies on the Columbus Lowland region of Southern Ohio Loamy Till Plain. According to Bedrock Geology Map of Ohio (2006), bedrock below the site consists of Devonian age shale. No bedrock was encountered in the drilled borings. According to web based mapping from United States Department of Agriculture, Natural Resources Conservation Service, the project area contains soils primarily described as Miamian Silty Clay Loam, 12 to 18 percent slopes, eroded (MID2), Sloan Silt Loam, frequently flooded (So), and Kendallville Silt Loam, 2 to 6 percent slopes (KeB) soils. According to the Soil Survey of Franklin County, Ohio, these soils exhibit moderately high to high permeability. According to the ODNR Website, no underground mines have been mapped below the structure. However, active sand, gravel and limestone surface mine operations are performed about 1 mile east of the structure. According to the Ohio Karst Areas map prepared by the Ohio Department of Natural Resources (ODNR), the project site does not lie in a Probable Karst Area. Historic geotechnical records were searched for on the ODOT GeoMS website. No historic geotechnical records were found for this site.

5 CTL Project No COL June 8, 2017 Page 2 III. EXPLORATION Two (2) structure test borings, designated as B0016 and B002016, were drilled to depths ranging from 60.0 to 6.0 feet below grade. The borings were performed with a track mounted drill rig utilizing hollow stem augers (HSA) on December 1 and 20, Standard penetration tests were conducted using a 140pound hammer falling 30 inches to drive a 2inch O.D. split barrel sampler. The energy transfer ratio associated with the automatic SPT hammer was 81. percent. The hammer was calibrated in July 201. Soil samples obtained from the drilling operation were preserved in glass jars, visually classified in the field and laboratory, and tested for natural moisture content. Representative soil samples were subjected to laboratory testing including grain size distribution and Atterberg limits and hand penetrometer. The ground surface elevations, station and offset at the test boring locations were taken from the boring survey plan prepared by CEC personnel. IV. FINDINGS The borings exhibited 6 to 7 inches of asphalt over 8 to inches of base course at the surface. Below the surface cover, the borings exhibited cohesive soils described as sandy silt (A4a) or silt and clay (A6a) soils and granular soils described as gravel and/or stone fragments with sand and silt (A24) extending downwards to a depth of 8.0 feet. These soils exhibited standard penetration N60 values ranging from to 1 blows per foot (bpf), with natural moisture content values ranging from 7 to 18 percent. Below the near surface soils, the borings exhibited both granular and cohesive soils described as gravel and/or stone fragments with sand (A1b), and sand (A 3a), sandy silt (A4a) or silt and clay (A6a) soils extending downwards to the drilled depths. The cohesive A4a and A6a soils encountered below 17. feet within this layer were further classified as glacial till deposits. These soils exhibited N60 values ranging from 7 bpf to 0 blows for 3 inches of penetration, with moisture content values ranging from 7 to 32 percent. Groundwater was encountered during drilling at depths ranging from 17.0 to 20.0 feet. Upon completion of drilling, groundwater levels were measured at depths ranging from 7.8 to 17.4 feet.

6 CTL Project No COL June 8, 2017 Page 3 V. ANALYSES AND RECOMMENDATIONS A. Creek Bed Material For the purpose of scour analysis, the D0 and type of creek bed materials encountered are shown in Table 1 below. Table 1. D0 Values Boring No. Sample No. (feet) D0 (mm) Soil Type SS A4a B0016 SS A4a SS A4a B SS A3a B. Foundation Support It is understood that the replacement structure will be 36 feet (clear span) by feet (rise) conduit type A, precast reinforced concrete arch sections, supported on spread footings. It is also understood that the foundations for the proposed structure will be constructed about 12. to 14.4 feet below the existing roadway grade (Foundation Elevation = feet). Medium dense granular deposits or hard cohesive soils were encountered in the test borings at the anticipated foundation level. These soils are considered suitable to support the foundations for the proposed structure. Spread foundations may be proportioned using the bearing resistance values provided in the Table 2 below. The calculations are provided in Appendix D. Boring Number Table 2. Bearing Resistance Nominal Bearing Resistance (qn), Ksf (Strength Limit State) Presumptive Bearing Resistance (qr), Ksf (Service Limit State) B B The applicable resistance factors for the bearing resistance and sliding are provided in Table 3 below. These values are obtained from AASHTO Table and section..7.

7 CTL Project No COL June 8, 2017 Page 4 Boring Number Table 3. Resistance Factors Bearing Resistance Resistance Factors Strength Limit State Service Limit State Sliding B B Surface water and groundwater seepage should be expected during excavation and construction of the spread foundations. In such an event, the groundwater level will need to temporarily lowered to facilitate construction of the foundations. Additionally, cofferdams may need to be constructed to facilitate excavation and construction of the foundations. A mud mat consisting of a few inches of lean concrete, may be needed to provide a relatively dry surface for setting reinforcing steel and placing concrete. For sliding and lateral earth pressure calculations for the proposed structure and any headwalls, wingwalls or temporary shoring, an equivalent friction angle of 30 degrees, and a total unit weight value of 12 pcf may be used. C. General Construction and Earthwork 1. Site preparation and earthwork should be performed in accordance with the ODOT Construction and Material Specifications. 2. Embankment side slopes should be seeded and vegetation growth permitted to limit erosion, sloughing and slope failure. 3. Temporary excavations in excess of 4 feet in depth should be sloped or shored according to OSHA requirements. VI. CHANGED CONDITIONS The evaluations, conclusions, and recommendations in this report are based on our interpretation of the field and laboratory data obtained during the exploration, our understanding of the project and our experience with similar sites and subsurface conditions using generally accepted geotechnical engineering practices. Although individual test borings are representative of the subsurface conditions at the boring locations on the dates drilled, they are not necessarily representative of the subsurface conditions between boring locations or subsurface conditions during other seasons of the year.

8 CTL Project No COL June 8, 2017 Page In the event that changes in the project are proposed, additional information becomes available, or if it is apparent that subsurface conditions are different from those provided in this report, CTL Engineering should be notified so that our recommendations can modified, if required. VII. TESTING AND OBSERVATION During the design process, it is recommended that CTL Engineering work with the project designers to confirm that the geotechnical recommendations are properly incorporated into the final plans and specifications, and to assist with establishing criteria for the construction observation and testing. CTL Engineering is not responsible for independent conclusions, opinions and recommendations made by others based on the data and recommendations provided in this report. It is recommended that CTL be retained to provide construction quality control services on this project. If CTL Engineering is not retained for these services, CTL shall assume no responsibility for compliance with the design concepts or recommendations provided. VIII. CLOSING This report has been prepared for the exclusive use by the client for use only on this project. Our services have been performed in accordance with generally accepted Geotechnical Engineering principles and practices. No warranty is either expressed or implied. CTL Engineering's assignment does not include, nor does this geotechnical report address the environmental aspects of this particular site. Specific design and construction recommendations have been provided in this report. Therefore, the report should be used in its entirety. Respectfully Submitted, CTL ENGINEERING, INC. Anuj Choudhari, E.I. Staff Engineer Joe Grani, P.E. Project Engineer

9 APPENDIX A STRUCTURE FOUNDATION EXPLORATION SHEETS

10

11

12 C:\Users\Kumar\Desktop\160016COL_ODOT\ZL001.dgn 6/2/2017 1:21:42 PM Kumar 3 FRAT STRUCTURE FOUNDATION EXPLORATION BR. NO. FRAT OVER PATZER DITCH BORING LOG B0016 DRAWN BRU CHECKED AC

13 C:\Users\Kumar\Desktop\160016COL_ODOT\ZL002.dgn 6/2/2017 1:23:6 PM Kumar 4 FRAT STRUCTURE FOUNDATION EXPLORATION BR. NO. FRAT OVER PATZER DITCH BORING LOG B DRAWN BRU CHECKED AC

14 C:\Users\Kumar\Desktop\160016COL_ODOT\ZL003.dgn 6/2/2017 1:2:2 PM Kumar FRAT STRUCTURE FOUNDATION EXPLORATION BR. NO. FRAT OVER PATZER DITCH BORING LOG B (CONT.) DRAWN BRU CHECKED AC

15 APPENDIX B TEST BORING RECORDS

16 SOIL DESCRIPTION Descriptors for soil consistency used in this report are based upon the Standard Penetration Test (SPT), ASTM D 187, with the penetration (N) values corrected to N 60, based upon the efficiency of the SPT Hammer used for the soil sampling. Descriptors for both noncohesive and cohesive soils are presented below, with the corresponding range of corrected penetration values. NONCOHESIVE SOIL DESCRIPTION CORRECTED PENETRATION VALUES BLOWS PER FOOT (BPF) Very Loose 0 4 Loose. Medium Dense. 30 Dense Very Dense Over 0 COHESIVE SOIL DESCRIPTION CORRECTED PENETRATION VALUES BLOWS PER FOOT (BPF) Very Soft Soft Medium Stiff Stiff Very Stiff Hard... Over 30 Moisture term descriptors for both noncohesive and cohesive soils are presented below. NONCOHESIVE COHESIVE SOIL SOIL DESCRIPTION MOISTURE TERMS DESCRIPTION Powdery... Dry... Powdery Some Moisture... Damp.. Below Plastic Limit Damp to the Touch... Moist.Above Plastic, Below Liquid Limit Free Water..Wet..Above Liquid Limit

17 STANDARD ODOT SOIL BORING LOG (8. X ) OH DOT.GDT 6/8/17 14:36 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ PROJECT: FRAT DRILLING FIRM / OPERATOR: CTL / JW DRILL RIG: MOBILE B7/#487 STATION / OFFSET: 3+40, 7' RT. TYPE: STRUCTURE FOUNDATION SAMPLING FIRM / LOGGER: CTL / JW HAMMER: MOBILE AUTOMATIC ALIGNMENT: PID: SFN: 2313 DRILLING METHOD: 3.2" HSA CALIBRATION DATE: 7/1/1 ELEVATION: (MSL) EOB: 60.0 ft. START: 12/20/16 END: 12/20/16 SAMPLING METHOD: SPT ENERGY RATIO (%): 81. COORD: N, E Asphalt (7") Base course (8") MEDIUM DENSE, DARK BROWN, GRAVEL AND/OR STONE FRAGMENTS WITH SAND AND SILT, TRACE CLAY, FILL, DAMP STIFF, BROWN, SANDY SILT, LITTLE CLAY, STONE FRAGMENTS, FILL, DAMP VERY STIFF, BROWN, SANDY SILT, SOME CLAY, TRACE GRAVEL, POSSIBLE FILL, HARD, CONTAINS STONE FRAGMENTS HARD, BROWN, SANDY SILT, SOME CLAY, LITTLE GRAVEL, TRACE SOME GRAVEL, LITTLE CLAY HARD, GRAY, SANDY SILT, LITTLE CLAY AND GRAVEL, TILL, DAMP MEDIUM DENSE, BROWN, COARSE AND FINE SAND, SOME GRAVEL, LITTLE SILT, TRACE CLAY, DENSE, GRAY, MOIST MATERIAL DESCRIPTION ELEV. SPT/ REC SAMPLE HP GRADATION (%) ATTERBERG DEPTHS N AND NOTES RQD 60 (%) ID (tsf) GR CS FS SI CL LL PL PI WC SS1 SS2 SS3 SS4 SS SS6 SS7 SS8 SS SS SS SS EXPLORATION ID B0016 ODOT CLASS (GI) A24 (0) A4a (V) A4a (V) A4a (V) A4a (4) A4a () A4a (2) A4a (V) A4a (4) A3a (V) A3a (V) A3a (V) PAGE 1 OF 2 BACK FILL

18 STANDARD ODOT SOIL BORING LOG (8. X ) OH DOT.GDT 6/8/17 14:36 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ PID: SFN: 2313 PROJECT: FRAT STATION / OFFSET: 3+40, 7' RT. START: 12/20/16 END: 12/20/16 PG 2 OF 2 B0016 MATERIAL DESCRIPTION ELEV. SPT/ REC SAMPLE HP GRADATION (%) ATTERBERG DEPTHS N AND NOTES RQD 60 (%) ID (tsf) GR CS FS SI CL LL PL PI WC MEDIUM DENSE, BROWN, COARSE AND FINE SAND, SOME GRAVEL, LITTLE SILT, TRACE CLAY, WET (continued) VERY DENSE, CONTAINS COBBLES, TRACE SILT, CLAY, DAMP HARD, GRAY, SILT AND CLAY, SOME SAND, TRACE GRAVEL, TILL, DAMP HARD, GRAY, SANDY SILT, SOME CLAY, CONTAINS STONE FRAGMENTS, TILL, DAMP NOTES: CAVED AT 24.0' ABANDONMENT METHODS, MATERIALS, QUANTITIES: NOT RECORDED EOB /3" 0/4" /3" SS13 SS14 SS1 SS16 SS17 SS ODOT CLASS (GI) A3a (0) A3a (V) A3a (V) A6a () A4a (V) A4a (V) BACK FILL

19 STANDARD ODOT SOIL BORING LOG (8. X ) OH DOT.GDT 6/8/17 14:36 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ PROJECT: FRAT DRILLING FIRM / OPERATOR: CTL / LH DRILL RIG: MOBILE B7/#487 STATION / OFFSET: 3+1, 6' LT. TYPE: STRUCTURE FOUNDATION SAMPLING FIRM / LOGGER: CTL / LH HAMMER: MOBILE AUTOMATIC ALIGNMENT: PID: SFN: 2313 DRILLING METHOD: 3.2" HSA CALIBRATION DATE: 7/1/1 ELEVATION: 71.3 (MSL) EOB: 6.0 ft. START: 12/1/16 END: 12/1/16 SAMPLING METHOD: SPT ENERGY RATIO (%): 81. COORD: N, E Asphalt (6") Base course (") VERY STIFF, BROWN, SILT AND CLAY, SOME SAND, TRACE GRAVEL, POSSIBLE FILL, STIFF, CONTAINS STONE FRAGMENTS LOOSE, BROWN, COARSE AND FINE SAND, SOME SILT, LITTLE GRAVEL, TRACE CLAY, MEDIUM WET MATERIAL DESCRIPTION ELEV. SPT/ REC SAMPLE HP GRADATION (%) ATTERBERG DEPTHS N AND NOTES RQD 60 (%) ID (tsf) GR CS FS SI CL LL PL PI WC MEDIUM DENSE, BROWN, GRAVEL AND/OR STONE FRAGMENTS WITH SAND, LITTLE SILT, TRACE CLAY, WET SS1 SS2 SS3 SS4 SS SS6 SS7 SS8 SS SS SS EXPLORATION ID B ODOT CLASS (GI) A6a (6) A6a (V) A6a (V) A3a (V) A3a (V) A3a (0) A3a (V) A1b (V) A1b (V) A1b (V) A1b (0) PAGE 1 OF 3 BACK FILL

20 STANDARD ODOT SOIL BORING LOG (8. X ) OH DOT.GDT 6/8/17 14:36 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ PID: SFN: 2313 PROJECT: FRAT STATION / OFFSET: 3+1, 6' LT. START: 12/1/16 END: 12/1/16 PG 2 OF 3 B MATERIAL DESCRIPTION ELEV. SPT/ REC SAMPLE HP GRADATION (%) ATTERBERG DEPTHS N AND NOTES 68.3 RQD 60 (%) ID (tsf) GR CS FS SI CL LL PL PI WC MEDIUM DENSE, BROWN, GRAVEL AND/OR STONE FRAGMENTS WITH SAND, LITTLE SILT, TRACE CLAY, WET 31 (continued) DENSE, TRACE HEAVY COBBLES HARD, BROWNISH GRAY, SILT AND CLAY, LITTLE SAND, TRACE GRAVEL, CONTAINS COBBLES AND STONE FRAGMENTS, TILL, DAMP HARD, GRAY, SANDY SILT, SOME CLAY, TRACE GRAVEL, CONTAINS COBBLES AND STONE FRAGMENTS, TILL, VERY STIFF, LITTLE CLAY /3" SS12 SS13 SS14 SS1 SS16 SS ODOT CLASS (GI) A1b (V) A6a (V) A6a (V) A6a (V) A4a (V) A4a (V) BACK FILL

21 STANDARD ODOT SOIL BORING LOG (8. X ) OH DOT.GDT 6/8/17 14:36 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ PID: SFN: 2313 PROJECT: FRAT STATION / OFFSET: 3+1, 6' LT. START: 12/1/16 END: 12/1/16 PG 3 OF 3 B MATERIAL DESCRIPTION ELEV. SPT/ REC SAMPLE HP GRADATION (%) ATTERBERG ODOT DEPTHS N AND NOTES 63.1 RQD 60 (%) ID (tsf) GR CS FS SI CL LL PL PI WC CLASS (GI) HARD, GRAY, SANDY SILT, SOME CLAY, TRACE GRAVEL, CONTAINS COBBLES AND STONE FRAGMENTS, TILL, DAMP 63 (continued) HARD, SOME CLAY 64 0/3" A4a (V) 60.3 SS18 EOB 6 NOTES: CAVED AT 17.3' ABANDONMENT METHODS, MATERIALS, QUANTITIES: NOT RECORDED BACK FILL

22 APPENDIX C LABORATORY TEST SHEETS

23 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A24(0) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.03 SAND D LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 31 MC PI 7 Cc 17 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

24 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A4a(4) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.01 SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay MC PI Cc GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

25 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A4a() D0 D60 D0 D30. CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.01 SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay MC PI Cc 3 23 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

26 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A4a(2) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.02 SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 28 MC PI 8 Cc GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

27 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A4a(4) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.01 SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 17 MC 21 1 PI 7 Cc GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

28 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A3a(0) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.3 SAND D LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 2 MC PI Cc 14 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

29 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B0016 B0016 COBBLES GRAVEL Classification A6a() D0 D60 D0 D30. CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 8 MC 2 24 PI Cc 33 2 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

30 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B B COBBLES GRAVEL Classification A6a(6) D0 D60 D0 D30. CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.00 SAND D 0.1 LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 8 MC PI 14 Cc 3 24 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

31 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B B COBBLES GRAVEL Classification A3a(0) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS SAND D LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay MC PI Cc 22 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

32 U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/23/ HYDROMETER PERCENT FINER BY WEIGHT CTL GRADATION 2014 ODOT.GDT 6/8/17 14:3 J:\DEPT\16 PROJECTS\160016COLCECBORROR RD BRIDGE\REPORTS\LOGS\160016COL.GPJ B B COBBLES GRAVEL Classification A1b(0) D0 D60 D0 D30 1 CTL Engineering, Inc Fisher Road Columbus, Ohio Telephone: Fax: GRAIN SIZE IN MILLIMETERS 0.14 SAND D LL 0.01 SILT OR CLAY PL %Coarse %Fine %Gravel %Silt %Clay 31 MC PI Cc 17 GRAIN SIZE DISTRIBUTION Project: FRAT Location:FRA COUNTY CTL Project Number: Cu

33 APPENDIX D BEARING RESISTANCE CALCULATIONS

34 Project Project No. Boring No. Borror Road Bridge over Patzer Ditch COL B0016 Bearing Resistance Strength Limit State Cohesion, c Friction Angle, φ b Footing Width, B Unit Wt. of Soil, Υ Footing Length, L f Footing Embedment, D f GW Below Footing, D W 3.0 ksf 0 Degrees.00 feet 0.12 kcf 3 ft 4. ft 0 ft Nom. Bearing Resistance, q n 16. ksf =c f N c s c +γd f N q s q d q C Wq +0.γBN γ s γ C Wγ Where N c.14 N q 1 Table a1 N γ 0 s c 1.0 =1+(B/L f )*(N q /N c ); or 1+(B/Lf) for φ = 0 s q 1.00 =1+(B/L f ) * tanφ f ; or 1.0 for φ = 0 Table a3 s γ 1.00 =.4*(B/L f ); or 1.0 for φ = 0 C Wq 0.0 Table a2 C Wγ B+D f ft For Cw Check D f /B 0.0 For dq by Hansen 170 d q 1.00 Hansen 170 or Table a4 Fact. Bearing Resistance, q r 8.2 ksf =φ b *q n Resistance Factor, φ b 0. Table Bearing Resistance Service Limit State Pres. Bearing Resistance, qr 8.0 ksf Table C Resistance Factor, φ r 1.0 Section..7

35 Project Project No. Boring No. Borror Road Bridge over Patzer Ditch COL B Bearing Resistance Strength Limit State Cohesion, c Friction Angle, φ b Footing Width, B Unit Wt. of Soil, Υ Footing Length, L f Footing Embedment, D f GW Below Footing, D W 0.0 ksf 30 Degrees.00 feet 0.12 kcf 3 ft 4. ft 0 ft Nom. Bearing Resistance, q n 12. ksf =c f N c s c +γd f N q s q d q C Wq +0.γBN γ s γ C Wγ Where N c 30.1 N q 18.4 Table a1 N γ 22.4 s c 1.16 =1+(B/L f )*(N q /N c ); or 1+(B/Lf) for φ = 0 s q 1.1 =1+(B/L f ) * tanφ f ; or 1.0 for φ = 0 Table a3 s γ 0.0 =.4*(B/L f ); or 1.0 for φ = 0 C Wq 0.0 Table a2 C Wγ B+D f ft For Cw Check D f /B 0.0 For dq by Hansen 170 d q 1.14 Hansen 170 or Table a4 Fact. Bearing Resistance, q r.6 ksf =φ b *q n Resistance Factor, φ b 0.4 Table Bearing Resistance Service Limit State Pres. Bearing Resistance, qr.0 ksf Table C Resistance Factor, φ r

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING. PLAN SUBGRADES Geotechnical Bulletin GB1

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING. PLAN SUBGRADES Geotechnical Bulletin GB1 OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING PLAN SUBGRADES Geotechnical Bulletin GB1 Instructions: Enter data in the shaded cells only. (Enter state route number, project description,county,

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

BRIDGE FOUNDATION INVESTIGATION

BRIDGE FOUNDATION INVESTIGATION Jackson Lake Road Bridge over Mackey Creek Henry County, Georgia BRIDGE FOUNDATION INVESTIGATION PROJECT NUMBER LOCATION (See Map) 8934 Jackson Lake Road Bridge over Mackey Creek, Henry County, Georgia

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

Technical Memorandum. Soil Borings

Technical Memorandum. Soil Borings Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

WARM SPRINGS GRADE SEPARATION AT I-15

WARM SPRINGS GRADE SEPARATION AT I-15 GEOTECHNICAL REPORT WARM SPRINGS GRADE SEPARATION AT I-15 CLARK COUNTY, NEVADA JULY 2006 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL

More information

Assistant Chief-Bureau of Structures and Geotechnical Services

Assistant Chief-Bureau of Structures and Geotechnical Services MEMO DATE: 2/10//2016 Bureau of Structures and Geotechnical Services TO: John Jones, P.E. Assistant Chief-Bureau of Structures and Geotechnical Services ATTENTION: Mark Hurt, P.E. Senior Bridge Squad Leader

More information

Introduction to Soil Mechanics Geotechnical Engineering-II

Introduction to Soil Mechanics Geotechnical Engineering-II Introduction to Soil Mechanics Geotechnical Engineering-II ground SIVA Dr. Attaullah Shah 1 Soil Formation Soil derives from Latin word Solum having same meanings as our modern world. From Geologist point

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

The Ohio Department of Transportation Office of Research & Development Executive Summary Report

The Ohio Department of Transportation Office of Research & Development Executive Summary Report The Ohio Department of Transportation Office of Research & Development Executive Summary Report Shear Strength of Clay and Silt Embankments Start Date: January 1, 2007 Duration: 2 Years- 10 Months Completion

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

EIGHT POINT WIND LLC

EIGHT POINT WIND LLC GEOTECHNICAL INVESTIGATION REPORT EIGHT POINT WIND FARM SUBSTATION AND OPERATION AND MAINTENANCE FACILITY STEUBEN COUNTY NEW YORK PREPARED FOR EIGHT POINT WIND LLC 700 UNIVERSE BLVD. JUNO BEACH, FL 33408

More information

Class Principles of Foundation Engineering CEE430/530

Class Principles of Foundation Engineering CEE430/530 Class Principles of Foundation Engineering CEE430/530 1-1 General Information Lecturer: Scott A. Barnhill, P.E. Lecture Time: Thursday, 7:10 pm to 9:50 pm Classroom: Kaufmann, Room 224 Office Hour: I have

More information

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr.

Solution:Example 1. Example 2. Solution: Example 2. clay. Textural Soil Classification System (USDA) CE353 Soil Mechanics Dr. CE353 Soil Mechanics CE353 Lecture 5 Geotechnical Engineering Laboratory SOIL CLASSIFICATION Lecture 5 SOIL CLASSIFICATION Dr. Talat A Bader Dr. Talat Bader 2 Requirements of a soil Systems Why do we need

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION I-80 WILDLIFE OVERCROSSING @ SILVER ZONE PASS ELKO COUNTY, NEVADA EA #73438 JULY 2011 MATERIALS DIVISION Table of Contents 1.0 INTRODUCTION... 1 2.0 PROJECT DESCRIPTION... 1

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4)

CE 240 Soil Mechanics & Foundations Lecture 3.2. Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) CE 240 Soil Mechanics & Foundations Lecture 3.2 Engineering Classification of Soil (AASHTO and USCS) (Das, Ch. 4) Outline of this Lecture 1. Particle distribution and Atterberg Limits 2. Soil classification

More information

Jim Christal Rd B2 B1 B3

Jim Christal Rd B2 B1 B3 Jim Christal Rd B1 B2 B3 KEY O YMBOL AND ERM LIHOLOGIC YMBOL Asphalt ARIFICIAL Aggregate Base Concrete Fill CH: High Plasticity Clay CL: Low Plasticity Clay Consistency Very oft oft Medium tiff tiff Very

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To: GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO Submitted To: Wade Chacon, P.E. Louisiana Boulevard NE, Suite 00 Albuquerque, New Mexico 0 Submitted By: GEOMAT

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012 FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO December 12, 2012 Prepared For: AMEC Environment & Infrastructure 2000 South Colorado Boulevard, Suite 21000

More information