SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

Size: px
Start display at page:

Download "SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue"

Transcription

1

2 SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works 215 Church Avenue P.O. Box 1130 Oshkosh, WI MES Project No August 8, 2013

3 TABLE OF CONTENTS PAGE INTRODUCTION 1 General Purpose Scope Authorization PROJECT AND SITE DESCRIPTION 1 Project Location Project Description Site Description SITE PEDOLOGY 2 EXPLORATION AND LABORATORY PROCEDURES 3 Scope Summary Field Exploration Laboratory Testing DESCRIPTION OF SUBSURFACE CONDITIONS 4 General Soil Conditions Groundwater Observations EVALUATION AND RECOMMENDATIONS 6 Existing Pavement Section Pavement Subgrade Analysis Pavement Reconstruction Selective Subgrade Removal and Replacement Site Drainage Utility Work CONSTRUCTION CONSIDERATIONS 9 Pavement Subgrade Preparation Borrow Material Fill Placement and Compaction Groundwater Considerations Excavation Considerations Subgrade Frost Action GENERAL COMMENTS 13

4 TABLE OF CONTENTS (CONTINUED) APPENDICES (in order of appearance) A - Figure 1 - Boring Location Diagram B - Soil Boring Logs C - Table 1 - Summary of Subsurface Condtions D - Laboratory Data Sheets E - General Notes

5 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 1 INTRODUCTION General This report presents the results of the subsurface exploration and subgrade evaluation for the proposed pavement reconstruction along North Main Street in the City of Oshkosh, Winnebago County, Wisconsin. The work was performed for the City of Oshkosh, at the request of Mr. Joseph Sargent. Purpose The purpose of this study was to evaluate the subsurface conditions at specific boring locations along the roadway, and to establish parameters for use by the design engineers in preparing the subgrade, pavement section, and utility designs for the proposed roadway reconstruction. Scope The scope of services included a site reconnaissance, the subsurface exploration, a determination of soil characteristics by field and laboratory testing, and an evaluation and analysis of the data obtained. The scope of the field work, including the number and locations of the borings, was determined by MES. The depths of the borings were requested by the City of Oshkosh. Authorization The description of services and authorization to perform this subsurface exploration and evaluation were in the form of a City of Oshkosh Consultant Agreement between Midwest Engineering Services, Inc. and the City of Oshkosh, dated July 5, 2013, and referencing MES Proposal No , dated June 19, This report has been prepared on behalf of, and exclusively for the use of the City of Oshkosh. The information contained in this report may not be relied upon by any other parties without the express written consent of MES, and acceptance by such parties of MES General Conditions. PROJECT AND SITE DESCRIPTION Project Location The subject site consists of an approximately 2,600 foot section of North Main Street, located between New York Avenue and Murdock Avenue in the City of Oshkosh, Winnebago County, Wisconsin. The general location of the site is depicted in the enclosed Boring Location Diagram (Figure 1).

6 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 2 Project Description From the information provided by the City of Oshkosh, it is understood that the proposed project will consist of the complete removal of the existing asphalt roadway, including curb and gutter, and the replacement of a concrete pavement section and new curb and gutter along the project route. Utility work, consisting of water main, sanitary sewer, and storm sewer replacement, along the project route is also planned. It is understood that the vertical alignment of the roadway will remain relatively unchanged. As a result, only minor grade changes are anticipated. Site Description The existing pavement along the project route generally consists of an urban asphalt roadway, with two (2) lanes of travel, two (2) parking lanes, and curb and gutter. Plans and associated typical existing cross sections were not available at the time of this report. At the time of the site reconnaissance, the asphalt pavement was in generally poor condition with extensive cracking and patching observed. The project route is understood to have been paved in 1981, indicating a pavement age of approximately 32 years. The topography along the project route and within the surrounding area is relatively flat, with the roadway gradually sloping toward the south. Existing grades along the project route ranged between EL ± at the north end near Murdock Avenue and EL ± at boring B-10. SITE PEDOLOGY The U.S. Department of Agriculture Soil Survey of Winnebago County, Wisconsin was reviewed to determine the pedological classification of the major soil types along the project route. The soil survey indicates the predominant map unit in the general area of the project route is the Kewaunee-Manawa-Hortonville unit, which is generally comprised of loamy or clayey soils underlain by loamy or clayey glacial till. More specifically, Kewaunee silt loam (KnB) is the primary soil series identified along the project route. The typical profile of the Kewaunee silt loam soils generally consists of 10 inches of silt loam, overlying silty clay loam and clay to a depth of 60 inches. The USCS soil classifications typically associated with the Kewaunee silt loam series are ML, CL, CL-ML, and A-4, A-6, and A-7 using the AASHTO classification system. In general, the Kewaunee silt loam soils are assigned a Design Group Index (DGI) of about 12; a Frost Index (FI) of about F-3; and a subgrade modulus of approximately 150 pci by the USDA.

7 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 3 EXPLORATION AND LABORATORY PROCEDURES Scope Summary The field and laboratory data utilized in the evaluation and analysis of the subsurface materials was obtained by drilling exploratory test borings, securing soil samples by the split-spoon sampling method, and subjecting the samples to laboratory testing. Field Exploration A total of fourteen (14) soil test borings were initially planned to a depth of 20 feet for this evaluation. Auger and/or sampler penetration refusal on cobbles, boulders or possible bedrock was encountered in seven (7) of the initially planned borings at depths above the planned boring termination depths. As a result, seven (7) additional borings (B-7A, B-9A, B- 10A, B-11A, B-12A, B-13A and B-14A) were drilled without sampling at offset locations to determine if the boring depths could be extended beyond the initial refusal depths. At B-9A, and B-12A through B-14A, the borings were extended past the initial refusal depths, where sampling resumed to the planned termination depths. However, rotary rock coring of the refusal materials was required at three (3) of the additional boring locations in order to advance the borings beyond the refusal materials and to characterize the refusal materials encountered. After completion of drilling activities, the ground surface elevations and boring locations were surveyed by City of Oshkosh personnel, and provided to MES for inclusion in this report. The soil test borings were performed with a truck-mounted rotary drilling, utilizing continuous flight hollow stem augers to advance the holes. Representative samples were obtained by the Standard Penetration Test (SPT) method in general accordance with ASTM D-1586 procedures at 2.5-foot sampling intervals. The SPT provides a means of estimating the relative density of granular soils and comparative consistency of cohesive soils, thereby providing a method of evaluating the subsoils relative strength and compressibility characteristics. Rock coring using NQ II coring equipment was performed at borings B-7A, B-10A, and B-11A to extend the borings to the planned depth and to classify the refusal materials. The rock coring runs extended 4 to 5.5± feet into the refusal materials. Coring was performed by rotary coring methods with a diamond impregnated bit attached to the end of a hollow core barrel. Upon completion of the core run, the core barrel was brought to the surface, the core samples removed and placed in sample boxes, and returned to the laboratory upon completion of the field operations. The percent recovery, Rock Quality Designation (RQD), and classification of the materials recovered were determined in the laboratory by a soils engineer. The recovery is the ratio of the recovered sample length to the length of the rock core run, expressed as a percent. The RQD is the ratio of the sum of the intact samples that are at least 4 inches in length to the total length drilled, expressed as a percent. The recovery and RQD values for the core samples obtained are shown on the boring logs enclosed in the Appendix. The SPT samples were transferred into clean glass jars immediately after retrieval, and returned to the laboratory upon completion of the field operations. Samples will be discarded

8 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 4 unless other instructions are received. All soil samples were visually classified by a soils engineer in general accordance with the Unified Soil Classification System (ASTM D-2488). After completion of the borings, the auger holes were backfilled to just beneath the pavement surface with bentonite chips and then patched with asphalt cold mix. A copy of the Soil Boring Logs and Boring Location Diagram (Figure 1) are enclosed in the Appendix. The soil stratification shown on the logs represents the approximate soil conditions in the actual boring locations at the time of the exploration. The terms and symbols used on the logs are described in the General Notes found in the Appendix. Laboratory Testing Soil samples obtained from the exploration were visually classified in the laboratory, and subjected to testing, which included moisture content determinations, Atterberg Limits, and grain-size analysis by the mechanical method. Selected cohesive soil samples were tested in unconfined compression with a controlled strain loading rate and/or with a calibrated hand penetrometer to aid in evaluating the soil strength characteristics. The values of strength tests performed on soil samples obtained by the Standard Penetration Test Method (SPT) are considered approximate, recognizing that the SPT method provides a representative but somewhat disturbed soil sample. The laboratory testing was performed in general accordance with the respective ASTM methods, as applicable, and the results are shown on the boring logs and data sheets in the Appendix. DESCRIPTION OF SUBSURFACE CONDITIONS General A description of the pavement and subsurface conditions encountered at the test boring locations is shown on the Soil Boring Logs. The lines of demarcation shown on the logs represent an approximate boundary between the various soil classifications. It must be recognized that the soil descriptions are considered representative estimates for the specific test hole location, but that variations may occur between and beyond the sampling intervals and boring locations. Soil depths, topsoil and layer thicknesses, and demarcation lines utilized for preconstruction planning should not be expected to yield exact and final quantities. A summary of the major pavement and soil profile components is described in the following paragraphs.

9 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 5 Soil Conditions The existing pavement section encountered at the boring locations typically consisted of about 2 to 5± inches of asphalt, overlying approximately 5 to 8± inches of gray to dark gray crushed base course. Beneath the pavement section, possible fill and fill materials were encountered to a depth of about 2± feet at borings B-1 and B-10, respectively. The possible fill and fill materials consisted of dark brown lean clay and brown silty fine sand, respectively. At B-7, B- 12, and B-14, buried topsoil materials, comprised of black to dark gray clayey silt with varying contents of sand, gravel, organic and wood matter, were encountered below the existing pavement section and extended to a depth of about 1.5± feet. The fill, possible fill, and buried topsoil materials were classified as such based on their varied visual composition. However, it must be recognized that in the absence of foreign substances and/or debris within the soil samples obtained, it is difficult to distinguish between natural soils and clean soil fill. Beneath the existing pavement section, existing fill, possible fill, and buried topsoil materials at the borings, the underlying natural soils typically consisted of reddish brown to brown lean clay and fat clay, with varying sand and gravel contents, overlying dense to extremely dense, brown to gray silt, sandy silt, silty sand, and gravelly sand to the maximum depths explored. As an exception, the pavement section at B-13 was underlain by medium dense, reddish brown to brown sandy silt, which extended to a depth of about 2.5± feet. Auger and sampler penetration refusal on cobbles, boulders or possible bedrock was encountered at depths of about 8 to 17.5± feet in borings B-7, and B-9 through B-14. Rock coring performed in borings B-7A and B-10A indicated that the refusal materials at these locations likely consisted of cobbles and/or boulders, intermixed within an extremely dense matrix of silt to sandy silt. The rock core obtained within the refusal materials at B-11A appeared to consist of possible weathered bedrock, based on the 1 to 3± inch intact limestone pieces recovered and the infilling of fractures observed. Approximately 35 to 40 percent recovery was obtained during the 4 to 5.5 foot core runs at B-7A, B-10A, and B-11A. The core samples were determined to have Rock Quality Designations (RQD) of 0 percent, further indicating that the refusal materials consisted of cobbles, boulders, or weathered bedrock. Standard Penetration (N-value) resistances within the natural lean clay and silty clay soils ranged between 9 and 30 blows per foot (bpf), with unconfined compressive strength estimates ranging between about 1.7 and 4.5+ tons per square foot (tsf). The natural granular soils (i.e. silt, sand and/or combination thereof) yielded N-values between 18 bpf and 50 blows for 1-inch of sampler penetration (50/1 ). Mechanical sieve analyses and Atterberg limits determination were performed on samples of the natural near surface subgrade materials encountered at borings B-2 and B-11 at a depth of about 1 to 3 feet below existing grade. The sieve analyses yielded approximately 98 to 92 percent passing the No. 4 sieve, 85 to 75 percent passing the No. 40 sieve, and 69 to 66 percent passing the No. 200 sieve. Atterberg Limits testing performed on the samples from B- 2 and B-11 yielded Liquid Limits (LL) of 54 and 39, respectively, and Plasticity Indices (PI) of 36 and 23, respectively, which indicates the samples tested are of relatively high plasticity.

10 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 6 Based on the laboratory test results, the samples from B-2 and B-11 have been classified as CH and CL, respectively, by the USCS classification system and as A-7-6 and A-6, respectively, by the AASHTO system. It is important to note that the horizontal and vertical transitions between fat clay and lean clay were not defined by the limited testing performed for this evaluation. The results of the laboratory testing are provided on the Grain Size Distribution Reports located in the Appendix. The foregoing discussion of soil conditions on this site represents a generalized soil profile as determined at the test boring locations. A more detailed description and supporting data for each test location can be found on the individual Soil Boring Logs. Groundwater Observations Groundwater observations were made during the drilling operations and in the open boreholes upon completion of the drilling operations. Groundwater was encountered in several of the borings during auger advancement at depths ranging between about 7.5 and 20± feet (EL and EL ±) below existing grade. Groundwater was not encountered within any of the open boreholes above the caved depths upon completion of drilling. The water levels noted during drilling were erratic between the borings, which is likely attributable to the relative density/consistency of the fine grained soils encountered. Long term monitoring of the water levels would be required to further define the groundwater levels along the project route. It should be noted that perched zones of water may be present within the backfill materials associated with the existing utility trenches and/or within the base course section. It must be recognized that groundwater levels fluctuate with time due to variations in seasonal precipitation, lateral drainage conditions, and soil permeability characteristics. EVALUATION AND RECOMMENDATIONS Existing Pavement Section The existing asphalt pavement observed along the project route is considered to be in generally poor condition with respect to serviceability and structural integrity. The existing pavement section at the borings generally consisted of 2 to 5± inches of asphalt, overlying 5 to 8± inches of crushed stone base course. The existing base course may be reused, provided there is adequate layer thickness, and that excessive fines intrusion has not occurred. The suitability for reuse of the existing materials should be verified prior to or at the time of construction. It is anticipated that a structural layer coefficient (a) of 0.14 can be used for both the existing aggregate base and existing HMA layer, if properly pulverized/recycled as additional base material. The WisDOT Standard Specifications referenced above, and in the following sections, refers to the State of Wisconsin Standard Specifications for Highway and Structure Construction, latest edition, with current interim specifications.

11 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 7 Pavement Subgrade Analysis On the basis of the data obtained in the exploration, the subgrade soils encountered immediately below the pavement section at the borings along the project route generally consisted of a combination of natural lean clay, fat clay, buried topsoil materials, and existing fill/possible fill materials, consisting of a combination of lean clay and silty sand. Based on the results of laboratory testing performed on representative samples of the anticipated pavement subgrade materials from B-2 and B-11, the subgrade materials have been classified as either A-6 or A-7-6 by the AASHTO classification system, which are generally rated as poor in applications for pavement subgrade. These soils are also generally poorly drained, can exhibit low bearing support when wet, and are considered to have moderate shrink-swell potential and high frost susceptibility. Although granular soils, with more favorable design values, are present along portions of the roadway subgrade or may be used to raise grades, the pavement design parameters included herein have been based upon the poorer A-6/A-7-6 subgrade soils that exist along the project route. Analysis of the visual soil classifications and laboratory testing information has been made in determining pertinent engineering properties of the subgrade soils. Based on the engineering properties determined from the subgrade soils tested, and with proper subgrade preparation and drainage, the following pavement subgrade design coefficients are recommended for pavement section thickness design along the roadway alignment. These values are representative of the support conditions exhibited by the anticipated clay subgrade materials. All fill used to raise grades or replace unsuitable materials must have equal or greater support characteristics. PAVEMENT SUBGRADE DESIGN COEFFICIENTS SOIL PARAMETER VALUE AASHTO Soil Classification A-6 to A-7-6 Drainage Poor Shrink/Swell Potential Moderate Design Frost Index F-3 to F-4 Design Group Index 12 Soil Support Value 4.2 Estimated Resilient Modulus (Mr) 3,000 psi Estimated Subgrade Modulus (k) 150 pci Pavement Reconstruction The existing clay subgrade soils are generally rated as poor for pavement subgrade support, due to their sensitivity to moisture and potential volume changes from freeze-thaw cycles and moisture fluctuation. Typically, it is recommended that deposits of these soils be removed from beneath pavements due to their high fines content, poor drainability, and potential volume changes from freeze/thaw and/or moisture fluctuations. However, the removal and

12 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 8 replacement of these soils along the entire project is not considered to be economically feasible. Therefore, reconstruction of the pavement on the existing subgrade soils will require a somewhat thicker pavement section, as well as drainage improvements. The existing subgrade soils can be used for pavement support, provided the subgrade is properly evaluated and any unsuitable support areas are replaced, prior to construction of the new pavement section. In addition, due to the frost susceptible subgrade materials encountered along the project route, it will be necessary to control surface runoff and water seepage, as well as performing routine pavement maintenance. Recommendations for subgrade preparation are provided in the following sections of this report. Selective Subgrade Removal and Replacement The existing fill and natural soils can be used as the pavement subgrade, provided the soils are evaluated and prepared as discussed in this report. However, removal of buried topsoil deposits, where encountered, is recommended. Isolated zones of unsuitable fill and/or natural materials may also be encountered; therefore, some removal and replacement of these soils may be required. In addition, portions of the soils along the project route are moisture sensitive and subject to substantial instability in the presence of water, especially when exposed to construction traffic. During wet and/or cool weather, softened subgrade soils can be expected to develop over large areas. This can result in the need for substantial drying times; significant reworking, drying, discing; and/or the necessity for removal and replacement with crushed stone or compacted structural fill. It must be noted that some future consolidation of the existing fill materials may occur due to traffic loads, the weight of the existing overburden, and any new fill soils. Therefore, some risk of isolated surface depressions, cracking, and more frequent and increased maintenance costs must be accepted for pavements constructed on such materials. It must be recognized that differential settlements and poorer pavement performance may also occur (resulting in a reduced life span). Site Drainage In general, the subgrade soils along the project route are considered to be poorly drained. Drainage action of the subgrade is dependent in part upon the amount of fines (silt and clay) present. Based on the results of the limited laboratory tests performed, the existing subgrade materials have relatively high fines contents (up to 69 percent passing the No. 200 sieve). The presence of fines decreases the drainability of a soil, and therefore, increases its sensitivity to moisture and frost, thereby resulting in increased instability. In addition, the proposed project is located in an area that experiences annual freezing cycles and the subgrade soils encountered have been classified as moderately to highly susceptible to frost action when free water is present. The detrimental effects of frost action on frost susceptible subgrade materials are manifested by non-uniform heave of pavements during winter months and/or the loss of strength of the

13 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 9 subgrade during thawing periods. In order to maintain a relatively dry subgrade condition and reduce the potential for frost action and volume change, it will be necessary to control surface runoff and water seepage as complete removal and replacement of the frost susceptible and moisture sensitive subgrade soils is typically not considered economically feasible. It is anticipated that a properly designed and installed underdrainage system will be adequate to control surface water infiltration and therefore minimize frost action. Therefore, standard pavement underdrainage, such as a drainage layer or underdrains, should be incorporated in the pavement reconstruction, so that a relatively dry subgrade condition is maintained. Drainage layers consisting of pervious (free draining) granular subbase materials with longitudinal collector drains connected to drainage outfalls or to the storm sewer (if present) is one method, which can be considered. Underdrains should be installed per Section 612 of the Standard Specifications Utility Work The subgrade soils encountered beneath the pavement in the borings completed generally consisted of natural very stiff to hard cohesive soils, overlying dense to extremely dense granular soils, which contained some cobbles. Auger penetration refusal was encountered above the planned boring depth at several of the boring locations at depths of about 8 to 17.5± feet. The presence of cobbles, boulders, and/or possible weathered bedrock was confirmed by rotary rock coring within B-7A, B-10A, and B-11A. Based on the soils encountered in the borings and typical utility bearing depths generally below about 6 feet, the bearing soils are expected to consist of natural very stiff to hard cohesive, and natural dense to extremely dense granular soils with intermixed cobbles to the refusal depths. Such soils are considered suitable for support of the planned utility construction. Utility piping, manholes and other structures supported on the natural very stiff to hard clay, and dense to extremely dense granular soils may be designed for a net allowable soil bearing pressure of 3,000 psf. Groundwater was estimated to be at depths ranging from about 7.5 to 20± feet. Therefore, dewatering within utility excavations is expected within excavations extending below depths of about 7.5 to 20± feet. CONSTRUCTION CONSIDERATIONS Pavement Subgrade Preparation Subgrade preparation will require the removal of the existing pavement. If elected, pulverization of the existing pavement should be performed with suitable equipment and to a depth that extends through the existing HMA surface and into the existing base, but not into the underlying subgrade soils. This will likely require adjustment of the pulverizing depth and should be monitored to prevent intermixing the silty and clayey subgrades into the recycled

14 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 10 base material. Asphalt millings and the existing base course have the potential for reuse as aggregate base, if properly separated from the existing subgrade materials. After removal of the existing asphalt pavement, base course, and any buried topsoil, unsuitable fill and/or natural soils, the exposed subgrade should be prepared as outlined in Section 211 of the WisDOT Standard Specifications. The subgrade should be thoroughly proofrolled to detect unstable, yielding or unsuitable soils, which must be removed or improved by appropriate preparation and compaction techniques. Scarification and drying of unsuitable soils, or removal and replacement with suitable fill, are two methods, which can be considered, but this should be determined at the time of construction by a qualified soils engineer. Additionally, any near surface buried organic topsoil underlying the pavement section must be removed. Low areas may then be raised to the planned grades with suitable properly compacted fill, where necessary. In areas where isolated wet, soft or yielding subgrade conditions are encountered during subgrade preparation, or a stable subgrade cannot be obtained, selective excavation below subgrade (EBS) and replacement may be required for proper support of new fills, or pavement reconstruction. Excavation below subgrade (EBS) should be performed as outlined in Section 205 of the WDOT Standard Specifications. The necessity and ultimate extent of undercutting will be dependent upon the moisture condition and stability of the exposed subgrade at the time of construction. In areas of EBS, limited excavation below subgrade to a depth of 1 to 3 feet and replacement with select granular fill can generally be used to improve the stability of the subgrade. It must be recognized that soil stability is dependent on such factors as soil type and moisture content, weather conditions at the time of construction, and also construction disturbance. Thus, the necessity of EBS generally must be determined in the field at the time of construction, based upon observations made during subgrade preparation. If relatively wet or somewhat unstable inorganic soils are encountered below EBS, it may be necessary to use an SAS (Subgrade Aggregate Separation) geotextile fabric and/or a select crushed material for stabilization (such as that specified in Section 312 of the WisDOT Standard Specifications) before placing backfill soils. The SAS geotextile fabric used in this application should meet the physical requirements identified in Section 645 of the WisDOT Standard Specifications, and shown in the following table. Test Units Values Grab Tensile Strength N 750 min. Puncture Strength N 300 min. Apparent Opening Size um 212 max. Permittivity s min. The fine-grained soils present within the subgrade are considered sensitive to moisture and construction activity; therefore, every effort should be made to prevent ponding during reconstruction operations and maintain a relatively dry and stable working subgrade. If the soils become disturbed, removal and replacement may be required.

15 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 11 Borrow Material As indicated by the client, only minor grade changes are anticipated along the project route. Generally, granular material with limited fines is recommended for use in regrading, or to replace unsuitable soils, such as a granular fill meeting Grad. No. 2 specified in Section 209 or those specified in Section 305 of the Standard Specification for ¾-inch to 1¼-inch materials. The existing base course and/or recycled asphaltic pavement materials may also be used to balance grades, and are generally considered suitable for such purposes. However, clay and silt soils are not considered suitable for such purposes. All fill used must have subgrade design coefficients equal to or greater than those previously specified. Fill Placement and Compaction Fill should be placed in layers of not more than 9 inches in loose thickness before compaction, except that when the fill consists of well-graded granular material and the compaction equipment is adequate for such purpose, the loose layer thickness may be increased to a maximum of 12 inches. Each lift must be compacted to a density of at least 95 percent of the maximum dry density as determined by ASTM designation D-698. Proper moisture control is essential to reduce the amount of compactive effort necessary to achieve the desired densities. This is especially true of silty and clayey soils, where scarification and aeration may be required to achieve near-optimum moisture levels prior to compaction. It is recommended the fill soils be placed at moisture contents within a few percent of their optimum moisture content. Depending upon seasonal moisture conditions, some drying and/or reworking of these fine-grained soils may be necessary prior to placement. The selection of fill materials for various applications should be done in consultation with the soils engineer. Similarly, the evaluation of the subgrade preparation, and placement and compaction of fill for structural application should be monitored and tested by a qualified representative of the soils engineer. Compaction testing is recommended to ensure that the pavement subgrade materials develop the subgrade design coefficients previously specified for adequate pavement section thickness design. Compaction should be performed with equipment suitable for such purpose, such as a sheepsfoot roller for clayey soils, and a vibratory smooth drum roller for granular material. Groundwater Considerations The groundwater level at the time of the exploration is considered to have been at depths ranging between about 7.5 and 20± feet (EL and EL ±). As previously noted, groundwater levels can vary with time and between boring locations from the estimates made at the time of the exploration. Perched water may be encountered within the existing fill materials and zones of more permeable granular soils which are underlain by less permeable cohesive and very dense granular soils.

16 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 12 Based upon the groundwater observations, no major problems with water are expected for the roadway reconstruction. However, on the basis of the estimated utility excavation depths, some difficulty with groundwater may be experienced during utility excavation work. If excavations extend only a few inches or so below the groundwater, it is expected that filtered sump pumps or other conventional means should suffice to control the groundwater. However, for deeper excavations, or for substantial perched zones, prolonged dewatering with a series of sumps or well points and high capacity sump pumps, or other more comprehensive means may be necessary to facilitate construction. Since the subgrade soils are subject to softening when exposed to free moisture, every effort should be made to keep excavations dry. Site grading should be performed to direct runoff away from the construction area, so that the potential for the softening of the subgrade soils is reduced. Excavation Considerations Considering the presence of intermixed zones of granular soils along the project route, excavation bank stability problems will occur, especially in the presence of water. Sloping, shoring or temporary bracing will therefore be needed to control excavation bank instability. Substantial sloughing and caving should be expected within unprotected excavations, especially encroaching upon perched zones or the long term groundwater level. Provisions for shoring and bracing of all excavation trenches must be in accordance with OSHA and local building codes to maintain worker safety. Proper care must be taken to protect the integrity of nearby pavements and other structures during construction. Excavations in close proximity to existing structures or other improvements must be performed with caution and utilize methods which will prevent undermining and destabilizing of such improvements. The use of properly designed shoring and bracing, sheet piling, or underpinning of existing structures will be necessary if excavation is performed near and/or below existing improvements. This must be performed by an experienced specialty contractor. Due to the presence of very dense to extremely dense soils, which contain zones of cobbles and/or boulders, difficulty digging and longer excavation times will likely be experienced with increasing depth in most areas. The potential presence of weathered bedrock at a depth of about 17± feet in boring B-11A was confirmed by rotary rock coring methods, and may be present in other portions of the project area, based on the auger penetration refusal encountered in other borings performed for this exploration. Substantial excavation difficulties and rock removal is anticipated to be necessary in some areas, as possible weathered bedrock appears to be present above the planned boring depths along portions of the project. It should be recognized that the bedrock surface can vary significantly over relatively short distances; therefore, some variation in the depths to bedrock should be expected between and beyond boring locations. Based on the results of the borings and subsequent rock coring, it is anticipated that utility excavation work will likely be feasible through the use of a ripping tooth and backhoe excavation methods. However, it may be necessary to fracture portions of weathered bedrock and/or bedrock, if encountered, by pre-blasting, prior to excavation of the overburden soils, or

17 Subsurface Exploration and Subgrade Evaluation Proposed North Main Street Reconstruction (Contract 14-02) MES Project No Page 13 by hydraulic hammer or other rock removal methods within the excavations. If blasting is performed, it is recommended that an experienced specialty contractor be utilized. Blasting can cause noise, vibration disturbance, and/or damage to neighboring buildings, utilities, or other structures, and must be performed using extreme caution. Subgrade Frost Action The proposed reconstruction project is located in an area that experiences annual freezing cycles and the subgrade soils encountered have been classified as highly susceptible to frost action when free water is present. Therefore, some frost movement should be expected. GENERAL COMMENTS This geotechnical exploration and subgrade analysis has been prepared to aid in the evaluation of the soil conditions on this site. The recommendations presented herein are based on the available soil information and the preliminary design information provided. Any changes in the design information should be brought to the attention of the soils engineer to determine if modifications in the recommendations are required. The final design plans and specifications should also be reviewed by the soils engineer to determine that the recommendations presented herein have been interpreted and implemented as intended. This geotechnical study has been conducted in a manner consistent with that level of care ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. The findings, recommendations and opinions contained herein have been promulgated in accordance with generally accepted practice in the fields of foundation engineering, soils mechanics, and engineering geology. No other representations, expressed or implied, and no warranty or guarantee is included or intended in this report. It is recommended that the earthwork and foundation operations be monitored by the soils engineer, to test and evaluate the subgrade stability, bearing capacities, and the selection, placement and compaction of controlled fills. The Wisconsin DOT Standard Specifications for Highway and Structure Construction can also serve as a guide in implementing the subgrade preparation and other earthwork operations.

18 Figure 1 Boring Location Diagram APPENDIX A

19 A 1723A CENTRAL CENTRAL ST ST JEFFERSON JEFFERSON ST ST N N MAIN MAIN ST ST HURON AVE HURON AVE A 1631A A 1707A A!> 4 W MURDOCK AVE W MURDOCK AVE !> B-6 I:\Engineering\2014 CONTRACTS\14-02 N Main St Reconst\Geotechnical Work\Soil Boring Diagram - 1.mxd!> B-1!> B-2!> B-3 B-4 W BENT AVE W BENT AVE!> B-5 Soil Boring Diagram Contract N. Main Street (Murdock to New York) Legend Soil Borings (Elevation)!> B-1 (762.6')!> B-2 (762.1')!> B-3 (761.4')!> B-4 (761.1')!> B-5 (760.6')!> B-6 (760.1') Ü Feet City of Oshkosh Engineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh.

20 CENTRAL ST CENTRAL ST W NEVADA AVE B-7A B-7!>!> N MAIN ST N MAIN ST B-8!> B-9AB-9!> E NEVADA AVE JEFFERSON ST JEFFERSON ST HARRISON HARRISON ST MMT VERNON ST MT MT VERNON VERNON ST ST Soil Boring Diagram Contract N. Main Street (Murdock to New York) Legend Soil Borings (Elevation)!> B-7 (759.0')!> B-7A (758.9')!> B-8 (758.7')!> B-9 (758.1') Ü W CUSTER AVE B-10 B-10A!>!> E CUSTER AVE!> B-9A (758.1')!> B-10 (757.5')!> B-10A (757.5') Feet !> B-11 (758.0') B-11A B-11!>!>!> B-11A (757.7')!> B-12 (758.1')!> B-12A (757.8')!> B-13 (758.5') CENTRAL ST CENTRAL ST B-12A!> B-12!> W TENNESSEE AVE E TENNESSEE AVE B-13AB-13!> B-14!> B-14A!> I:\Engineering\2014 CONTRACTS\14-02 N Main St Reconst\Geotechnical Work\Soil Boring Diagram - 2.mxd JEFFERSON ST JEFFERSON ST!> B-13A (758.5')!> B-14 (758.9')!> B-14A (758.8') City of Oshkosh Engineering Division This map is neither a legally recorded map nor a survey and it is not intended to be used as one. Mapped soil borings do not reflect exact locations in field. This drawing is a compilation of records, data and information located in various city, county and state offices and other sources affecting the area shown and it is to be used for reference purposes only. The City of Oshkosh is not responsible for any inaccuracies herein contained. If discrepancies are found, please contact the City of Oshkosh.

21 Soil Boring Logs APPENDIX B

22 SOIL BORING LOG: B - 1 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 3-inches of ASPHALT Pavement, over 6-inches of gray Crushed STONE (BASE COURSE) Dark brown Lean CLAY, with sand and gravel, moist (POSSIBLE FILL) SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS Reddish brown Lean CLAY, with sand and gravel, moist 1-SS SS Brown Sandy SILT, with gravel and occasional cobbles, moist 3-SS* 50/5" SS Brown to grayish brown Gravelly SAND, with silt and occasional cobbles, moist 5-SS SS* 50/2" Brown Silty Fine SAND, wet v SS Gray SILT, with sand, gravel, and occasional cobbles, wet 8-SS* 50/3" SS* 50/S5" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 15± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 10± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

23 SOIL BORING LOG: B - 2 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 15, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 6-inches of gray Crushed STONE (BASE COURSE) Reddish brown to brown Fat CLAY, with sand, trace gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS LL=54; PI=36 %P200= Brown Sandy SILT, with gravel, moist 2-SS Brown Silty SAND, with gravel and occasional cobbles, moist SS SS Brown to grayish brown Sandy SILT, with gravel and occasional cobbles moist 5-SS SS* 50/3" SS* 50/3" Brown Silty Fine SAND to Sandy SILT, wet 8-SS 50/3" 20 v Gray SILT, with sand, gravel and occasional cobbles, wet SS 50/4" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 17.5± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 15± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

24 SOIL BORING LOG: B - 3 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 3-inches of ASPHALT Pavement, over 8-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown Lean CLAY, with gravel, trace sand, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS Brown SILT, with sand and gravel, moist 2-SS Brown Sandy SILT, with gravel and occasional cobbles, moist 3-SS SS 89/10" SS 50/3" Gray SILT, with sand, gravel, and occasional cobbles, moist 6-SS 85/11" SS* 50/S5" SS* 50/S5" SS* 50/S5" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 10± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

25 SOIL BORING LOG: B - 4 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 15, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 5-inches of ASPHALT Pavement, over 6-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown to brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS Reddish brown Lean CLAY, trace gravel, moist 2-SS Brown to grayish brown Sandy SILT to Silty SAND, with gravel and occasional cobbles, moist to wet 3-SS SS 50/3" SS* 50/4" (Sample 6-SS was relatively wet) 6-SS 50/5" 15 v Gray SILT, with sand, gravel, and occasional cobbles, moist SS 50/4" SS 50/4" SS 50/4" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 13± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 15± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

26 SOIL BORING LOG: B - 5 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 5-inches of ASPHALT Pavement, over 5-inches of grayish brown Crushed STONE (BASE COURSE) Reddish brown to brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS Reddish brown Lean CLAY, with gravel, trace sand, moist 2-SS SS** Brown to grayish brown Sandy SILT, with gravel and occasional cobbles, moist 4-SS SS* 50/S5" Gray SILT, with sand, gravel, and occasional cobbles, moist 6-SS* 50/5" SS* 50/3" SS* 50/4" SS* 50/S4" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 10± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

27 SOIL BORING LOG: B - 6 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 15, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 5-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS SS Brown Sandy SILT, with gravel and occasional cobbles, moist 3-SS SS 50/5" SS 50/5" Gray SILT, with sand, gravel, and occasional cobbles, moist 6-SS** 50/S3" SS* 50/2" SS** 50/S2" SS 50/4" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 12± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

28 SOIL BORING LOG: B - 7 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 6-inches of dark gray Crushed STONE (BASE COURSE) Dark gray Clayey SILT, with sand, trace gravel, moist (BURIED TOPSOIL) Reddish brown to brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) 1-SS 9 9 REMARKS SS SS Brown Sandy SILT, with gravel and occasional cobbles, moist 4-SS* 50/3" SS 87/10" AUGER REFUSAL ON COBBLES OR 12± FEET END OF 12± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 8± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

29 SOIL BORING LOG: B - 7A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 18, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 12± FEET, WHERE AUGER PENETRATION REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 17± FEET; AFTER WHICH, DRILLING AND SAMPLING RESUMED Gray to dark gray LIMESTONE COBBLES, and/or BOULDERS, damp Gray to grayish brown SILT, with sand, gravel, and cobbles, moist to wet NQ-CORE % Recovery=40; RQD= (Sample 1-SS was relatively wet) v SS 89/10" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 20± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 12± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 5± feet northwest of boring B-7. Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

30 SOIL BORING LOG: B - 8 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 15, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 2-inches of ASPHALT Pavement, over 8-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown to brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS SS Dark brown to brown Lean CLAY, trace sand and gravel, moist 3-SS 56/10" SS* SS Gray SILT, with sand, gravel, and occasional cobbles, moist to wet v (Sample 6-SS was relatively wet) 6-SS 85/11" SS 50/4" SS* 50/S4" SS* 50/S3" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 12.5± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 14± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

31 SOIL BORING LOG: B - 9 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 6-inches of gray Crushed STONE (BASE COURSE) Reddish brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS SS SS Brown SILT, with sand, trace clay, moist to wet v Grayish brown Sandy SILT, with gravel and occasional cobbles, moist 4-SS SS AUGER REFUSAL ON COBBLES OR 11.5± FEET END OF 11.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 7.5± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 5± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

32 SOIL BORING LOG: B - 9A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 16, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 12.5± FEET, WHERE SAMPLING RESUMED Gray Sandy SILT, with gravel and occasional cobbles, moist 1-SS 87/8" SS** 50/S1" Gray SILT, with sand, gravel and occasional cobbles, moist SS 50/4" SS 50/3" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 14± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 5± feet northwest of boring B-9. **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

33 SOIL BORING LOG: B - 10 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 17, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 8-inches of grayish brown Crushed STONE (BASE COURSE) Brown Silty Fine SAND, trace clay and gravel, moist (FILL) SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS Reddish brown Lean CLAY, with sand and gravel, moist 1-SS SS* Reddish brown Lean CLAY, trace sand and gravel, moist SS Brown to grayish brown Sandy SILT, with gravel and occasional cobbles, moist to wet 4-SS* 99/7" (Sample 5-SS was relatively wet) v SS Brown to grayish brown Silty CLAY, with gravel, moist SS 87/10" Varved brown to grayish brown Silty CLAY, moist SS AUGER REFUSAL ON COBBLES OR 17.5± FEET END OF 17.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 10± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 12± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

34 SOIL BORING LOG: B - 10A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 22, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 16± FEET, WHERE AUGER PENETRATION REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 20± FEET Gray LIMESTONE Cobbles or Boulders Gray SAND and GRAVEL, with silt and few cobbles, moist (Medium to Coarse Sand retrieved from wash return) NQ-CORE % Recovery=35; RQD= Gray LIMESTONE Cobbles or Boulders END OF BORING/CORE 20± FEET FIELD OBSERVATIONS: Water Level during drilling : N/A Water Level upon completion : N/A Caved at upon completion : N/A v ADDITIONAL COMMENTS: Boring was offset 10± feet south of boring B-10. Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

35 SOIL BORING LOG: B - 11 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 17, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 2-inches of ASPHALT Pavement, over 6-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown to brown Lean CLAY, with sand, trace gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) 1-SS* SS REMARKS LL=39; PI=23 %P200= Reddish brown Lean CLAY, moist Gray SILT, trace sand, moist 3-SS Brown Sandy SILT, with gravel, occasional cobbles, trace clay, moist 4-SS 70/9" AUGER REFUSAL ON COBBLES OR 11± FEET END OF 11± FEET 5-SS* 50/S4" FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 7± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

36 SOIL BORING LOG: B - 11A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 18, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 12.5± FEET, WHERE SAMPLING RESUMED. AUGER PENETRATION REFUSAL THEN OCCURRED AT 16.5± FEET. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 22± FEET Gray Clayey SAND, with gravel and occasional cobbles, moist 1-SS* 76/10" SS** 50/S2" Red GRANITE Cobble Gray LIMESTONE Cobbles, with zones of gravel, and sand and silt infilling of voids (POSSIBLE WEATHERED BEDROCK) NQ-CORE % Recovery=40; RQD= END OF BORING/CORE 22± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : N/A Caved at upon completion : 12± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 5± feet northwest of boring B-11. *Poor sample recovery **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

37 SOIL BORING LOG: B - 12 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 17, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 2-inches of ASPHALT Pavement, over 8-inches of dark gray Crushed STONE (BASE COURSE) Black to dark gray Clayey SILT, trace sand, organics and wood matter, moist (BURIED TOPSOIL) Reddish brown Lean CLAY, with sand and gravel, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) 1-SS* REMARKS SS SS Reddish brown Lean CLAY, moist SS Brown to gray SILT, trace sand, wet 5-SS v Varved reddish brown to grayish brown Silty CLAY, trace gravel, moist 6-SS Grayish brown Clayey SAND, with gravel, moist SS AUGER REFUSAL ON COBBLES OR 17.5± FEET END OF 17.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 10.5± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 14± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

38 SOIL BORING LOG: B - 12A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 22, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 20± FEET, WHERE SAMPLING RESUMED Gray Sandy SILT, with gravel and occasional cobbles, moist AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS OR POSSIBLE 20.5± FEET END OF 20.5± FEET 1-SS* 67/5" FIELD OBSERVATIONS: Water Level during drilling : Not enountered v Water Level upon completion : Dry Caved at upon completion : 15± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 10± feet north of boring B-12. *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

39 SOIL BORING LOG: B - 13 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 17, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 4-inches of ASPHALT Pavement, over 8-inches of dark gray Crushed STONE (BASE COURSE) Reddish brown to brown Sandy SILT, with gravel, trace clay, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS SS Reddish brown Lean CLAY, with sand and gravel, moist 2-SS SS Reddish brown Lean CLAY, moist SS Gray to dark gray SILT, trace sand, wet v SS AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES OR 12.5± FEET 6-SS** 50/S0" END OF 12.5± FEET FIELD OBSERVATIONS: Water Level during drilling : 10± feet below ground surface (EL ±) v Water Level upon completion : Dry Caved at upon completion : 9± feet below ground surface (EL ±) ADDITIONAL COMMENTS: **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

40 SOIL BORING LOG: B - 13A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 22, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 12.5± FEET, WHERE SAMPLING RESUMED Grayish brown Sandy SILT, with gravel, occasional cobbles, and trace clay, moist 1-SS* 50/4" Grayish brown Silty CLAY, with gravel, occasional cobbles, and trace sand, moist 2-SS SS* 50/3" AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 20.5± FEET 4-SS** 50/S3" END OF 20.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 9± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 5 feet south of boring B-13. *Poor sample recovery **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

41 SOIL BORING LOG: B - 14 Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 17, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: ": 5-inches of ASPHALT Pavement, over 8-inches of dark gray Crushed STONE (BASE COURSE) Dark gray Clayey SILT, with sand, moist (BURIED TOPSOIL) Reddish brown to brown Lean CLAY, with sand, moist SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) 1-SS REMARKS Reddish brown Sandy CLAY, with gravel and pockets of sand, moist 2-SS Reddish brown Lean CLAY, with sand, trace gravel, moist SS AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES OR 8± FEET END OF 8± FEET 4-SS* 50/S5" FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 5± feet below ground surface (EL ±) ADDITIONAL COMMENTS: *Poor sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

42 SOIL BORING LOG: B - 14A Project: Proposed North Main Street Reconstruction Project No.: Location: New York Avenue to Murdock Avenue Drill Date: July 22, 2013 DEPTH/EL. VISUAL SOIL CLASSIFICATION (feet) GROUND SURFACE ELEVATION: SAMPLE N Qp Qu MC NO. (bpf) (tsf) (tsf) (%) REMARKS BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 10± FEET, WHERE SAMPLING RESUMED Brown to grayish brown Sandy SILT, with gravel and occasional cobbles moist 1-SS* 50/2" SS* 50/S4" Gray Silty CLAY, with sand, gravel, and occasional cobbles, moist 3-SS* 50/1" SS** 50/S2" SS 92/8" END OF 21.5± FEET FIELD OBSERVATIONS: Water Level during drilling : Not encountered v Water Level upon completion : Dry Caved at upon completion : 10± feet below ground surface (EL ±) ADDITIONAL COMMENTS: Boring was offset 15± feet south of boring B-14. *Poor sample recovery **No sample recovery Note: Lines of stratification represent an approximate boundary between soil types. Variations may occur between sampling intervals and/or boring locations. Transitions may also be gradual.

43 Table 1 Summary of Subsurface Conditions APPENDIX C

44 TABLE 1 - SUMMARY OF SUBSURFACE CONDITIONS North Main Street Reconstruction Existing Pavement Section Depth to Ground Boring Depths Pavement Base Course Bottom of Surface Planned Actual Thickness Thickness Fill/BTS Native Soil Depth of Refusal Boring No. EL. feet EL. feet EL. Type (inches) (inches) (feet) Classifications feet EL. B HMA LC; S$; GS; $S ;$ NR NR B HMA 4 6 N/A FC; S$; $S; $ NR NR B HMA 3 8 N/A LC; $; S$ NR NR B HMA 5 6 N/A LC; S$; $S; $ NR NR B HMA 5 5 N/A LC; S$; $ NR NR B HMA 4 5 N/A LC; S$; $ NR NR B HMA C$; LC; S$ B-7A* HMA C/B; $ B HMA 2 8 N/A LC; $ NR NR B HMA 4 6 N/A LC; $; S$ B-9A HMA S$; $ NR NR B HMA LC; S$; $C B-10A* HMA C/B B HMA 2 6 N/A LC; $; S$ B-11A* HMA CS; C/B B HMA LC; $; $C; CS B-12A HMA S$ NR NR B HMA 4 8 N/A S$; LC; $ B-13A HMA S$; $C NR NR B HMA LC; SC B-14A HMA S$; $C NR NR Abbreviations: LC Lean Clay $S Silty Sand FC Fat Clay GS Gravelly Sand $C Silty Clay C/B Cobbles and/or Boulders SC Sandy Clay NR: Refusal not experienced above the planned boring depth $ Silt HMA: Hot Mix Asphalt S$ Sandy Silt BTS: Buried Topsoil CS Clayey Sand * Rock coring performed to confirm presence of bedrock or penetration refusal Note: This table is intended to provide a brief overview of the Soil Boring Logs completed along the above-referenced street, and should not be considered as a substitute for the actual Boring Logs. Each log contains a detailed description of the subsurface conditions encountered at each location, and should be read in conjunction with the respective Table.

45 Laboratory Data Sheets APPENDIX D

46 Grain Size Distribution Report in. - 1½ in. - 1 in. - ¾ in. - ⅜ in. - #4 - #10 - #40 - #100 - # PERCENT FINER GRAIN SIZE (mm) % Cobbles ( 3") % Gravel % Sand Coarse Fine Coarse Medium Fine % Fines 69.2 Sieve Size 3/4" 3/8" #4 #10 #40 #100 #200 Percent Finer Specified Gradation* Pass? (X=No) Soil Description: Atterberg Limits: PL = 18 Reddish brown to brown Fat CLAY, with sand, trace gravel Coefficients: D 85 = 0.44 D 60 = D 30 = D 15 = C u = C c = LL = 54 PI = 36 D 50 = D 10 = Classifications: USCS = CH AASHTO = A-7-6 Remarks: * No specification provided CLIENT: City of Oshkosh SAMPLE NO: 1 DATE: 7/26/2013 PROJECT: North Main Street Reconstruction SAMPLE SOURCE: B-2 EL./DEPTH: -1 to 3 ft PROJECT NO: PROPOSED USE: Pavement subgrade SAMPLED BY: GW Tested By: KD QA/QC By: RJP

47 Grain Size Distribution Report in. - 1½ in. - 1 in. - ¾ in. - ⅜ in. - #4 - #10 - #40 - #100 - # PERCENT FINER GRAIN SIZE (mm) % Cobbles ( 3") % Gravel % Sand Coarse Fine Coarse Medium Fine % Fines 66.1 Sieve Size 3/4" 3/8" #4 #10 #40 #100 #200 Percent Finer Specified Gradation* Pass? (X=No) Soil Description: Atterberg Limits: PL = 16 Reddish brown to brown Lean CLAY, with sand, trace gravel LL = 39 Coefficients: D 85 = 2.19 D 60 = D 30 = D 15 = C u = C c = PI = 23 D 50 = D 10 = Classifications: USCS = CL AASHTO = A-6 Remarks: * No specification provided CLIENT: City of Oshkosh SAMPLE NO: 2 PROJECT: North Main Street Reconstruction SAMPLE SOURCE: B-11 PROJECT NO: PROPOSED USE: Pavement subgrade DATE: 7/26/2013 EL./DEPTH: -1 to 3 ft SAMPLED BY: GW Tested By: KD QA/QC By: RJP

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION City of Oshkosh Capital Improvement Projects. Contract Concrete Paving and Utilities

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION City of Oshkosh Capital Improvement Projects. Contract Concrete Paving and Utilities SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION 2014 City of Oshkosh Capital Improement Projects Contract 14-04 - Concrete Paing and Utilities Oshkosh, Wisconsin Prepared for City of Oshkosh Department

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Subsurface Exploration and Geotechnical Engineering Analysis Armory Detention Pond Oshkosh, Wisconsin

Subsurface Exploration and Geotechnical Engineering Analysis Armory Detention Pond Oshkosh, Wisconsin Submitted to City of Oshkosh 215 Church Ave. Oshkosh, Wisconsin 54901 Submitted by AECOM 558 North Main Street Oshkosh, WI 54901 May 2012 Subsurface Exploration and Geotechnical Engineering Analysis Armory

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS

APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS APPENDIX D GEOTECHNICAL ENGINEERING RECOMMENDATIONS USKH Juneau International Runway 8/26 Rehabilitation Prepared For: Prepared By: 11/27/2013 PND No. 132070.02 November 2013 TABLE OF CONTENTS Page No.

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS The City of Winnipeg Appendix A - Part 2 Bid Opportunity No. 210-2014 Addendum #1 Page 1 of 1 Template Version: C420131129 - RW APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS Quality Engineering

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Report of Subsurface Exploration and Geotechnical Engineering Evaluation

Report of Subsurface Exploration and Geotechnical Engineering Evaluation Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Chatham County Jail Pittsboro, North Carolina F&R Project No. 66N-0097 Prepared For: CHATHAM COUNTY P.O. Box 1809 Pittsboro,

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

CHEROKEE NATION BUSINESSES, LLC

CHEROKEE NATION BUSINESSES, LLC REPORT OF PRELIMINARY SUBSURFACE EXPLORATION AND GEOTECHNICAL EVALUATION PROPOSED CHEROKEE SPRINGS PLAZA TAHLEQUAH, OKLAHOMA BUILDING & EARTH PROJECT NO. OK10004 PREPARED FOR: CHEROKEE NATION BUSINESSES,

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Route 0 (Patrick Henry Highway) Bridge and Approaches over Louse Creek Charlotte County, Virginia UPC 907, VDOT Project: 000-019-807 Schnabel Reference P1079 / 110, On-Call

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

REPORT OF TOWER OAKS PRESERVE PARKWAY ROCKVILLE,MARYLAND EYA

REPORT OF TOWER OAKS PRESERVE PARKWAY ROCKVILLE,MARYLAND EYA REPORT OF PRELIMINARY SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS TOWER OAKS PRESERVE PARKWAY ROCKVILLE,MARYLAND ECS PROJECT NO.: 1-664 FOR EYA NOVEMBER 26, 214 November 26, 214 Mr. Jason Sereno EYA

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION, LABORATORY TESTING AND GEOTECHNICAL ENGINEERING ANALYSES

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION, LABORATORY TESTING AND GEOTECHNICAL ENGINEERING ANALYSES REPORT OF PRELIMINARY SUBSURFACE EXPLORATION, LABORATORY TESTING AND GEOTECHNICAL ENGINEERING ANALYSES Maryland Masonic Home Cockeysville, Baltimore County, Maryland ECS Project No. 7 Prepared For BALTIMORE

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To: GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO Submitted To: Wade Chacon, P.E. Louisiana Boulevard NE, Suite 00 Albuquerque, New Mexico 0 Submitted By: GEOMAT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Town of Brunswick, Maine

Town of Brunswick, Maine 1. Project Presentation Town of Brunswick, Maine Miller Point Shoreline Stabilization Project Rob and Nancy King Applicant Staff Meeting 6:00 P.M. June 27, 2016 Room 206 Town Hall 85 Union Street Open

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information