SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION City of Oshkosh Capital Improvement Projects. Contract Concrete Paving and Utilities

Size: px
Start display at page:

Download "SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION City of Oshkosh Capital Improvement Projects. Contract Concrete Paving and Utilities"

Transcription

1

2 SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities Oshkosh, Wisconsin Prepared for City of Oshkosh Department of Public Works 215 Church Aenue P.O. Box 1130 Oshkosh, WI MES Project No January 15, 2014

3 TABLE OF CONTENTS Introduction 1 General Purpose Scope Authorization Project and Site Description 1 Site Features Project Description Exploration and Laboratory Procedures 2 Scope Summary Field Exploration Volatile Vapor Emission Screening Laboratory Testing Description of Subsurface Conditions 4 General Subsurface Conditions Considerations and Recommendations 7 General Deelopment Considerations Excaations and Site Drainage Groundwater Control Enironmental Considerations Page General Comments 10 APPENDICES (in order of appearance) A - Soil Boring Location Diagram B - Soil Boring Logs C - Soil Boring Summary Table D - Midwest Engineering Serices General Notes

4 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 1 INTRODUCTION General This report presents the results of the subsurface exploration and subgrade ealuation for Contract Concrete Paing and Utilities of the 2014 Capital Improement Projects planned in the. The work was performed for the City of Oshkosh, at the request of Mr. Joseph Sargent. Purpose The purpose of this study was to ealuate the subsurface conditions at specific boring locations, and to establish parameters for use by engineers in preparing underground utility and paement designs for the proposed project. Scope The scope of serices included the identification of the subsurface conditions within the planned depths of arious project excaations, as determined by the client, and to proide a summary of the existing paement and base course thicknesses, soil classifications, bedrock depth (if encountered), groundwater leels, and deep utility construction considerations. Additionally, laboratory PID screening of the soil samples obtained by MES was performed to identify potential enironmentally impacted soils. The scope of the field exploration program, including the location, number and depth of the borings, was determined by the City of Oshkosh. Authorization The description of serices and authorization to perform this subsurface exploration and ealuation were in the form of a City of Oshkosh Consultant Agreement between Midwest Engineering Serices, Inc. and the City of Oshkosh, dated December 11, 2013, and referencing MES Proposal No , dated December 6, PROJECT AND SITE DESCRIPTION Site Features Capital improements are planned along the portion of located between East New York Aenue and East Murdock Aenue as part of Contract of the 2014 City of Oshkosh Capital Improement Projects. The project area and soil boring locations are shown on the Soil Boring Location Diagram, which was proided by the client and has been included in Appendix A of this report. Midwest Engineering Serices, Inc.

5 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 2 Property usage along consists primarily of residential homes, with a few commercial properties located north of East Neada Aenue. Paement along, within the project limits, consists of Portland cement concrete, which was obsered to generally be in fair condition. It is important to note that isual obserations of the existing paement condition at seeral of the boring locations were limited due to the presence of ice and/or snow at the time of the exploration. Buried natural gas, sanitary and storm sewer, potable water, telecommunication and electric power lines are located within portions of the street right-of-ways, and were marked by Digger s Hotline locating personnel during a joint walk through of the proposed boring locations with MES. Project Description From the information proided by City of Oshkosh personnel, it is understood that the improements planned along for Contract will consist of the replacement of the potable water, storm and sanitary sewer systems between East New York Aenue and East Neada Aenue, and the replacement of a sanitary sewer interceptor north of East Neada Aenue. The complete reconstruction of the surface paement section is also planned. Only minor surface grade changes are planned to improe surface drainage and no horizontal alignment changes are anticipated. Design information for the planned utility improements was not proided, and soil parameters for paement design were not requested. EXPLORATION AND LABORATORY PROCEDURES Scope Summary The field and laboratory data utilized in the ealuation and analysis of the subsurface materials was obtained by drilling exploratory test borings, securing soil samples by the split-spoon sampling method, and subjecting the samples to standard laboratory testing. Photoionization Detector (PID) screening of the soil samples was performed in the laboratory to screen for the presence of olatile apors. Field Exploration Fifteen (15) soil test borings were initially planned to be performed to depths ranging from 10 to 30 feet as part of this contract. Auger and/or sampler penetration refusal on cobbles, boulders or possible bedrock was encountered in fourteen (14) of the initially planned borings at depths ranging between 12.5 and 27± feet, which were aboe the planned boring depths. As a result, at the request of City of Oshkosh personnel, eleen (11) additional borings (14-B- 2A, 14-B-3A, 14-B-5A, 14-B-8A, 14-B-9A, 14-B-10A, 14-B-11A, 14-B-12A, 14-B-13A, 14-B- 14A, and 14-B-15A) were drilled without sampling to determine if the boring depths could be extended beyond the initial refusal depths. The majority of the additional borings were completed within the abandoned boreholes at the initial boring locations. Borings 14-B-2A, 14- Midwest Engineering Serices, Inc.

6 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 3 B-13A and 14-B-15A were able to be extended to the planned boring depths by conentional augering methods. Howeer, at 14-B-3A, 14-B-5A, 14-B-8A, 14-B-9A, 14-B-10A, 14-B-11A, and 14-B-12A, rotary rock coring of the refusal materials was necessary to adance these borings into the refusal materials. Boring 14-B-14A was drilled without sampling to a depth of refusal at about 22± feet and then terminated, as City of Oshkosh personnel indicated that utility excaation work in this area will remain aboe the refusal depth experienced. After completion of drilling actiities, the ground surface eleations and boring locations were sureyed by City of Oshkosh personnel, and proided to MES for inclusion in this report. The soil test borings were performed with a truck-mounted rotary drilling rig utilizing continuous flight hollow stem augers to adance the boreholes. Representatie soil samples were obtained by the Standard Penetration Test (SPT) method in general accordance with ASTM D procedures at 2.5 foot interals to the end of the borings. The SPT proides a means of determining the relatie density of granular soils and comparatie consistency of cohesie soils, thereby proiding a method of determining the subsoils' relatie strength and compressibility characteristics. As preiously indicated, rock coring using NQ II coring equipment was performed at borings 14-B-3A, 14-B-5A, 14-B-8A, 14-B-9A, 14-B-10A, 14-B-11A, and 14-B-12A. The rock coring runs were extended 4 to 7± feet into the refusal materials. Coring was performed by rotary coring methods with a diamond impregnated bit attached to the end of a hollow core barrel. Upon completion of the core run, the core barrel was brought to the surface, the core sample was placed in a sample box and returned to the laboratory upon completion of the field operations. The percent recoery, Rock Quality Designation (RQD), and classification of the materials recoered were determined in the laboratory by a soils engineer. The recoery is the ratio of the recoered sample length to the length of the rock core run, expressed as a percent. The RQD is the ratio of the sum of the intact samples that are at least 4 inches in length to the total length drilled, expressed as a percent. The recoery and RQD alues for the core samples obtained are shown on the applicable boring logs enclosed in Appendix B. The SPT soil samples were transferred into clean glass jars immediately after retrieal, and returned to the laboratory upon completion of the field operations. Samples will be retained for 30 days, and then discarded unless other instructions are receied. All soil samples were isually classified by a soil engineer in general accordance with the Unified Soil Classification System (ASTM D-2488). A copy of the Boring Location Diagrams and Soil Boring Logs for each street are included in Appendices A and B, respectiely. The soil stratification shown on the logs represents the soil conditions at the actual boring locations at the time of the exploration. The terms and symbols used on the logs are described in the General Notes found on the last page of the Appendix. After completion of the borings, boreholes within concrete paements were backfilled to near the ground surface with bentonite chips, and the upper few inches were patched with asphalt cold mix, as authorized by the City of Oshkosh. Midwest Engineering Serices, Inc.

7 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 4 Volatile Vapor Emission Screening The split-spoon soil samples obtained from the borings were screened for olatile organic apor emissions in the laboratory with a Thermo Enironmental Model 580B PID. The PID is an electronic instrument that measures the relatie concentration of olatile organic apor emissions in the headspace of a container. The response of the instrument is dependent upon olatility, temperature, and the ionization potential of the compounds measured. The meter seres as a tool in selecting samples for analytical testing and estimating zones of more highly affected soil, as it only gies a relatie indication of the presence of olatile apors. Howeer, the PID cannot quantify concentrations of indiidual compounds. The PID was calibrated in the laboratory using span gas. Prior to the PID screening, a portion of each soil sample was placed and sealed within a clean ziplock bag, and permitted to equilibrate to at least 70 degrees Fahrenheit. The screening was then performed by inserting the probe through the bag and sampling the headspace apors. The results of the PID testing are shown on the boring logs in the Appendix. Laboratory Testing Soil samples obtained from the exploration were isually classified in the laboratory, and subjected to testing, which included moisture content determinations. Selected cohesie soil samples were tested with a calibrated hand penetrometer to aid in ealuating the soil strength characteristics. The alues of strength tests performed on soil samples obtained by the Standard Penetration Test Method (SPT) are considered approximate, recognizing that the SPT method proides a representatie but somewhat disturbed soil sample. The laboratory testing was performed in general accordance with the respectie ASTM methods, and the results are shown on the boring logs in the Appendix. DESCRIPTION OF SUBSURFACE CONDITIONS General A description of the subsurface conditions encountered at the test boring locations is shown on the Soil Boring Logs included in Appendix B. The lines of demarcation shown on the logs represent an approximate boundary between the arious soil classifications. The soil descriptions are considered representatie for the specific test boring locations, and ariations may occur between the sampling interals and between boring locations. While soil depths, topsoil layer thickness, and estimated demarcation lines may be used for preliminary construction calculations, they should not be expected to yield exact and final quantities. A summary of the major soil profile components encountered in this exploration are described in the following section. A brief summary of the data from the boring logs is also presented in the Table proided in Appendix C. Midwest Engineering Serices, Inc.

8 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 5 Fill, possible fill, and buried topsoil materials where encountered, were classified as such based on their aried isual characteristics and/or composition. Howeer, it must be recognized that in the absence of foreign substances and/or debris within the soils samples obtained, it is difficult to distinguish between natural soils and clean soil fill. Groundwater obserations were made during the drilling operations and in the open boreholes upon completion. The groundwater obserations reported on the logs and discussed in the following sections are considered approximate. It must be recognized that groundwater leels fluctuate with time due to ariations in seasonal precipitation, lateral drainage conditions, and soil permeability characteristics. Zones of water, not disclosed by the borings, may also be encountered within existing utility trench backfill and/or bedding materials, existing base course layers, and other areas. Longer term monitoring would be required to better ealuate groundwater leels on this site, based on the presence of ery dense granular and hard cohesie soils, which are generally considered to be of low permeability. Subsurface Conditions The existing paement at the borings along primarily consisted of about 8 to 9± inches of Portland cement concrete, oerlying 4 to 6± inches of graelly sand base course materials. Howeer, at 14-B-6, completed within the terrace of East Custer Aenue, about 12± inches of dark brown sandy silt topsoil were present at the surface. The existing paement section at borings 14-B-3, 14-B-7, 14-B-10, 14-B-11, 14-B-13, 14-B-14, and 14-B-15 were underlain by fill, possible fill, and/or buried topsoil materials to depths of about 1.5 to 3.5± feet below the paement surface. The fill, possible fill, and/or buried topsoil materials were generally comprised of black, dark brown, brown to reddish brown lean clay, clayey silt, and/or silt, with arying contents of sand and grael. Beneath the aboe referenced fill, possible fill, and buried topsoil materials, and below the existing paement section and topsoil at the remainder of the borings, the underlying natural soils typically consisted of a deposit of reddish brown and brown lean clay and clayey silt, to depths ranging between about 3.5 and 15 feet, oerlying brown, gray, and grayish brown sandy silt, silty sand, clayey sand, and silt to the boring termination depths. Auger penetration refusal on cobbles, boulders, or possible bedrock was encountered within all of the initial boring locations, with the exception of 14-B-6, at depths between about 12 to 27± feet. At the request of City of Oshkosh personnel, additional borings, designated as 14-B-2A, 14-B-5A, 14- B-8A, 14-B-9A, 14-B-10A, 14-B-11A, 14-B-12A, 14-B-13A, and 14-B-15A were performed within the preiously abandoned boreholes at the initial boring locations in an effort to extend these borings to the planned depth. As exceptions, borings 14-B-3A and 14-B-14A were offset approximately 5± feet south of the initial boring locations due to the relatiely shallow refusal depth and/or cobbles encountered. The additional borings 14-B-2A, 14-B-13A and 14-B-15A were subsequently performed to the planned termination depths utilizing conentional auger drilling methods. Howeer, auger refusal was experienced at the remainder of the additional borings aboe the planned termination depths, which ranged between 20 and 26± feet. Rock coring was then performed at the majority of these locations to characterize the refusal Midwest Engineering Serices, Inc.

9 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 6 materials. The lengths of the core runs performed aried from 4 to 7± feet. The results of the coring are summarized in the following table. Boring No. Depth of Refusal (ft) Depth of Boring/Core Run (ft) Length of Core Run (ft) Percent Recoery RQD Description of Refusal Materials 14-B-3A Graelly Sand 14-B-5A Limestone 14-B-8A Limestone 14-B-9A Limestone 14-B-10A Limestone 14-B-11A : Graelly Sand >22 : Limestone 14-B-12A Limestone The natural cohesie (lean clay and clayey silt) soils were stiff to hard in comparatie consistency, with unconfined compressie strength estimates ranging between about 1.25 and 4.5+ tsf. The cohesie soils were classified as moist, with moisture contents ranging from about 11 to 30 percent. As an exception, relatiely wet strata of grayish brown lean clay and gray sandy clay were encountered within 14-B-15 at a depth below about 10± feet. The natural granular soils were dense to ery dense in relatie density, with Standard Penetration resistances (N-alues) ranging from about 12 (bpf) to 50 blows for 1-inch of sampler penetration (50/1 ). Intermixed cobbles were noted within the majority of the granular strata encountered, which may hae resulted in the eleated N-alues within these strata. The moisture contents of the granular soils typically ranged from 5 to 18 percent, and were generally classified as moist to wet. There were no detectable PID readings of olatile apors in the soil samples collected from the borings completed as part of Contract Groundwater was encountered in seeral of the borings during drilling at depths ranging between about 10 and 25± feet. Upon completion of drilling and remoal of the augers, groundwater was present within the open boreholes at 14-B-4, 11-B-5, 14-B-7, 14-B-11, 14-B- 12, 14-B-13, 14-B-14, and 14-B-15 at depths ranging between about 9 and 24± feet. Additionally, at borings 14-B-2A, 14-B-5A, and 14-B-8A, which were completed within the abandoned boreholes of the initial borings, relatiely wet soil cuttings were encountered at depths below about 15 to 16± feet. The water leels obsered were ariable between the borings, which is likely attributable, at least in part, to the presence of predominantly hard cohesie soils oerlying ery dense granular soils. Based on the water leel obserations, soil sample colorations and moisture contents, the groundwater leel was estimated to be at a depth of about 10 to 25± feet below the ground surface. Midwest Engineering Serices, Inc.

10 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 7 CONSIDERATIONS AND RECOMMENDATIONS General Deelopment Considerations The subgrade soils encountered beneath the paement section and topsoil materials at seeral of the borings consisted of fill, possible fill, and buried topsoil materials, which were generally comprised of lean clay or clayey silt, to depths of about 1.5 to 3.5± feet below existing grade. Beneath the fill, possible fill, and buried topsoil materials, the underlying natural soils generally consisted of natural stiff to hard cohesie soils, oerlying dense to ery dense granular soils, which contained occasional cobbles, to depths of about 12.5 to 31± feet below the paement surface, where auger refusal was experienced on cobbles, boulders, or possible bedrock. The presence of limestone bedrock at depths ranging between about 20 and 27± feet in borings 14-B-5A, 14-B-8A, 14-B-9A, 14-B-10A, 14-B-11A and 14-B-12A was confirmed by rotary rock coring methods. Based on the soils encountered in the borings and typical utility bearing depths generally below about 6 feet, the bearing soils are expected to generally consist of a combination of natural stiff to hard lean clay and clayey silt, and dense to ery dense silty sand, sandy silt, clayey sand, and graelly sand with intermixed cobbles. Such soils are considered suitable for support of the planned utility construction. Howeer, it must be recognized that ariable fill, possible fill, and/or buried topsoil materials were encountered at seeral of the borings to depths of about 1.5 to 3.5± feet, and may be encountered to greater depths in unexplored areas along the project route. Fill, possible fill, and buried topsoil materials are not recommended for utility support, due to their compressibility and the potential excessie settlements associated with such soils. Although such soils are not expected to be present at the typical utility bearing depths, based on the borings, undercutting of unsuitable fill and/or buried topsoil materials, where encountered, in conjunction with the replacement with crushed stone or other suitable granular backfill, may be necessary to establish a suitable bearing subgrade. Utility piping, manholes and other structures supported on the natural stiff to hard lean clay and clayey silt; dense to ery dense silty sand, sandy silt, clayey sand, and graelly sand; or upon newly placed compacted structural fill used to replace unsuitable soils may be designed for a net allowable soil bearing pressure of 3,000 psf. Groundwater was estimated to be at depths ranging from about 10 to 25± feet. Perched water may also be encountered within the upper fill materials, existing backfill deposits, and/or zones of more permeable natural granular soils, which are underlain by less permeable cohesie and/or ery dense granular soils. Therefore, dewatering within utility excaations is expected below depths of about 10 to 25± feet. Excaations and Site Drainage Due to the presence of zones of granular soils, it is expected that sloping, shoring or bracing of the excaation sidewalls will be necessary. Trenching in existing fill and natural granular soils may be difficult due to the instability of ertical slopes, and will therefore require a flattening of Midwest Engineering Serices, Inc.

11 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 8 trench sides, or some other means of protection, to facilitate construction and to protect life and property. Substantial sloughing and caing should be expected within unprotected excaations. The degree of excaation instability problems is dependent upon the depth and length of time that excaations remain open, excaation bank slopes, water leels and the effectieness of any dewatering systems. Howeer, seere instability can be expected within granular soils, especially within excaations encroaching upon and extending below the groundwater. All excaation work must be performed in accordance with OSHA and local building code requirements. Where excaations encroach upon or extend below the groundwater or perched zones and into fine sand, silt, or soft clay, they may become substantially unstable when the confining effect of the oerburden is remoed. Significant sloughing or caing of sidewalls may also occur. Some oerexcaation of softened or loosened soils, in conjunction with the use of a crushed stone working mat, may be necessary to establish a stable bearing subgrade for the support of utility pipe bedding or other structures, depending on the actual soil conditions encountered along the route of the excaation. Additionally, significantly widened excaations may result, or be required to maintain or achiee sidewall stability. Excaations in close proximity to existing structures or other improements must be performed with caution and utilize methods which will preent undermining and destabilizing of such improements. The use of properly designed shoring and bracing, sheet piling, or underpinning of existing structures will be necessary if excaation is performed near and/or below existing improements. This must be performed by an experienced specialty contractor. Due to the presence of ery dense soils, which contain zones of cobbles and possible boulders, difficulty digging and longer excaation times will likely be experienced with increasing depth along the project route. The presence of bedrock at depths of about 20 to 27± feet was confirmed by rotary rock coring methods at borings 14-B-5A, 14-B-8A, 14-B-9A, 14-B-10A, 14-B-11A, and 14-B-12A. Substantial excaation difficulties and rock remoal is anticipated to be necessary in some areas, as limestone bedrock appears to be present aboe the planned boring termination depths along the majority of the project route. It should be recognized that bedrock surface can ary significantly oer relatiely short distances; therefore, some ariation in the depths to bedrock should be expected between and beyond boring locations. Based on the typical rock quality designations (RQD) determined for the cores obtained (45 to 91), it may be necessary to fracture portions of the bedrock by pre-blasting, prior to excaation of the oerburden soils, or by hydraulic hammer or other rock remoal methods within the excaations to establish the planned inert eleations. If blasting is performed, it is recommended that an experienced specialty contractor be utilized. Blasting can cause noise, ibration disturbance, and/or damage to neighboring buildings, utilities, or other structures, and must be performed using extreme caution. It may be possible to remoe some of the more weathered/less competent bedrock materials with ripping deices and/or backhoe excaation methods. Midwest Engineering Serices, Inc.

12 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 9 Since the subgrade soils are generally sensitie to moisture, eery effort should be made to proide adequate drainage across the site during construction, and to preent ponding of runoff on the subgrade. These soils are also subject to erosion caused by runoff, and erosion control measures should be implemented where needed or required by local ordinances. Groundwater Control The groundwater leel in the borings was estimated to be between depths of about 10 to 25± feet at the time of the exploration. As preiously noted, groundwater leels can ary with time and between boring locations from the estimates made at the time of the exploration. Perched water may be encountered within the upper fill materials and zones of more permeable granular soils, which are underlain by less permeable cohesie and ery dense granular soils. On the basis of the obserations and the estimated utility excaation depths, some difficulty with groundwater is expected during excaation work. If excaations extend only a few inches or so below the groundwater, it is expected that filtered sump pumps or other conentional means should suffice to control the groundwater. Howeer, for deeper excaations, or for substantial perched zones, prolonged dewatering with a series of sumps or well points and high capacity sump pumps, or other more comprehensie means may be necessary to facilitate construction. Since the subgrade soils are subject to softening when exposed to free moisture, eery effort should be made to keep excaations dry. Site grading should be performed to direct runoff away from the construction area, so that the potential for the softening of the subgrade soils is reduced. The groundwater obserations reported herein are considered approximate. It must be recognized that groundwater leels fluctuate with time due to ariations in seasonal precipitation, lateral drainage conditions, and soil permeability characteristics. Longer term monitoring would be required to better ealuate preailing groundwater leels on this site, particularly as the time of construction approaches. Enironmental Considerations There were no detectable PID readings of olatile apors in the other soil samples collected from the project borings. The PID screening results for the soil borings were proided on a daily basis to City of Oshkosh personnel, who determined that no additional sampling or testing was required by MES at the time of drilling actiities. A summary of the readings is presented on the Soil Boring Logs located in Appendix B and Appendix C of this report. Although no detectable PID readings were obtained within the soil samples collected at the project borings, if discolored soil or unusual odors are encountered during excaation actiities, City of Oshkosh personnel should be contacted immediately. Midwest Engineering Serices, Inc.

13 Subsurface Exploration and Subgrade Ealuation 2014 City of Oshkosh Capital Improement Projects Contract Concrete Paing and Utilities MES Project No Page 10 GENERAL COMMENTS This geotechnical exploration and subgrade analysis has been prepared to aid in the ealuation of the soil conditions on this site. The recommendations presented herein are based on the aailable soil information and the preliminary project information proided. Any changes in the planned project actiities should be brought to the attention of the soil engineer to determine if modifications in the recommendations are required. The final design plans and specifications should also be reiewed by the soil engineer to determine that the recommendations presented herein hae been interpreted and implemented as intended. This geotechnical study has been conducted in a manner consistent with that leel of care ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. The findings, recommendations and opinions contained herein hae been promulgated in accordance with generally accepted practice in the fields of foundation engineering, soils mechanics, and engineering geology. No other representations, expressed or implied, and no warranty or guarantee is included or intended in this report. It is recommended that the earthwork and foundation operations be monitored by the soil engineer, to test and ealuate the subgrade stability, bearing capacities, and the selection, placement and compaction of controlled fills. The Wisconsin DOT Standard Specifications for Road and Bridge Specifications can also sere as a guide in implementing the subgrade preparation and other earthwork operations. Midwest Engineering Serices, Inc.

14 Soil Boring Location Diagram APPENDIX A

15 MONROE ST MONROE ST EVANS ST EVANS ST BOWEN ST BOWEN ST GROVE ST GROVE ST OAK ST OAK ST E MURDOCK AVE 14-B-15!> 14-B-14!> 14-B-13!> HURON AVE Soil Boring Diagram Contract Concrete Paing & Utilities - Legend 14-B-12!> Soil Borings (Eleation)!> 14-B-1 (755.4')!> 14-B-2 (755.6') 14-B-11!> E BENT AVE!> 14-B-3 (755.8')!> 14-B-4 (756.8') 14-B-10!>!> 14-B-5 (757.6')!> 14-B-6 (758.1') Ü 14-B-9!> E NEVADA AVE 14-B-8!>!> 14-B-7 (757.5')!> 14-B-8 (756.6')!> 14-B-9 (755.4')!> 14-B-10 (754.7')!> 14-B-11 (754.2') Feet B-7!>!> 14-B-12 (752.9')!> 14-B-13 (752.1') E CUSTER AVE 14-B-6 14-B-5!>!>!> 14-B-14 (751.3')!> 14-B-15 (750.7') BROAD ST POWERS ST 14-B-4!> 14-B-3!> E TENNESSEE AVE 14-B-2!> City of Oshkosh Engineering Diision City of Oshkosh maps and GIS data are intended to be used for reference purposes only. The maps and GIS Data are not intended to be used to independently erify information identified. While the City attempts to maintain complete and accurate maps, these maps and data are primarily compilations of information proided by arious sources. Therefore, anyone iewing these maps is expected to erify the information they are interested in through other sources such as Diggers Hotline, other public maps, official and unofficial land records, field sureys and inspections, and other records held by property owners and/or property users. BROAD ST E NEW YORK AVE I:\Engineering\Soil Borings\2014\Maps\Soil Boring Diagrams\Bowen.mxd 14-B-1!> Persons using City maps and/or data do so at their own risk. Property owners are solely responsible for underground facilities and all other features related to their property. The City of Oshkosh shall not be responsible for any problems or damages resulting from the use of City maps and/or data. Persons belieing that City maps and/or contain inaccuracies or incomplete information are requested to bring these issues to the City s attention. Printed Date: 1/7/2014

16 Soil Boring Logs APPENDIX B

17 SOIL BORING LOG: 14-B-1 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 18, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 5-inches of grayish brown Graelly Sand BASE COURSE, moist Dark brown to reddish brown Lean CLAY, trace sand and grael, moist 1-SS <1 24 Frost = 24" SS < SS < SS 31 < SS < Grayish brown to gray Clayey SAND, with grael and occasional cobbles, moist 6-SS 46 < SS 58 < Gray Sandy SILT, with grael and occasional cobbles, moist SS 50/3" < SS 50/2" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22.5± FEET END OF 22.5± FEET 10-SS** 50/S1" Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 21± feet below ground surface (EL ±) **No sample recoery

18 SOIL BORING LOG: 14-B-2 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 18, 2013 (feet) GROUND SURFACE ELEVATION: ": 9-inches of Concrete PAVEMENT, oerlying 5-inches of grayish brown Graelly Sand BASE COURSE, moist Reddish brown Lean CLAY, with grael, trace sand, moist 1-SS <1 14 Frost = 24" SS < SS < Brown to gray Sandy SILT, with grael and occasional cobbles, moist to wet 4-SS 50/5" < SS* 50/4" < (Relatiely wet below a depth of 12.5± feet) 6-SS 44 < SS 72 < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 18.5± FEET END OF 18.5± FEET 8-SS* 50/5" < Water Leel during drilling : 12.5± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 16.5± feet below ground surface (EL ±) *Poor sample recoery

19 SOIL BORING LOG: 14-B-2A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 10, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 20 FEET, WHERE SAMPLING RESUMED TO THE PLANNED TERMINATION DEPTH (Auger cuttings were wet at a depth of about 15± to 18.5± feet) Gray Sandy SILT, with grael and cobbles, moist to wet 1-SS* 50/S3" < SS* 50/S2" < SS 50/2" < SS** 50/S1" AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 30.5± FEET END OF 30.5± FEET 5-SS* 50/S4" <1 7 Water Leel during drilling : 15± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 16± feet below ground surface (EL ±) Boring was performed within abandoned borehole of boring 14-B-2. *Poor sample recoery **No sample recoery

20 SOIL BORING LOG: 14-B-3 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 18, 2013 (feet) GROUND SURFACE ELEVATION: ": 9-inches of Concrete PAVEMENT, oerlying 4-inches of grayish brown Graelly Sand BASE COURSE, moist Black to dark gray Lean CLAY, moist (BURIED TOPSOIL) 1-SS 19 <1 29 Frost = 24" Brown Lean CLAY, with grael, trace sand, moist SS < (Interbedded with seams of silt) 3-SS < Brown Sandy SILT, with grael and occasional cobbles, moist SS 55 < SS 76/11" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 12.5± FEET END OF 12.5± FEET 6-SS** 50/S1" Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 10.5± feet below ground surface (EL ±) **No sample recoery

21 SOIL BORING LOG: 14-B-3A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 10, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 15± FEET, WHERE SAMPLING RESUMED. AUGER REFUSAL WAS THEN EXPERIENCED AT A DEPTH OF 24± FEET, WHERE ROCK CORING EQUIPMENT WAS SET-UP AND PERFORMED TO A DEPTH OF 31± FEET Gray Sandy SILT, with grael and cobbles, wet SS* 50/4" < SS* 50/4" < SS* 50/3" < Gray Graelly SAND, with silt and cobbles, wet (Auger refusal 24± feet) 4-SS* 50/5" < (CORE RUN FROM 24 TO 31± FEET - % RECOVERY = 24; RQD = 0) NQ-CORE END OF BORING/CORE 31± FEET Water Leel during drilling : 15± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 15± feet below ground surface (EL ±) Boring was offset about 5± feet south of boring 14-B-3. *Poor sample recoery

22 SOIL BORING LOG: 14-B-4 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 19, 2013 (feet) GROUND SURFACE ELEVATION: ": 9-inches of Concrete PAVEMENT, oerlying 5-inches of grayish brown Graelly Sand BASE COURSE, moist Reddish brown Lean CLAY, with grael, trace sand, moist 1-SS <1 20 Frost = 24" SS < SS < Brown Sandy SILT, with grael, occasional cobbles, trace clay, moist 4-SS* 50/5" < SS 96/11" < SS 60 < Gray Sandy SILT, with grael and occasional cobbles, moist 7-SS 50/3" < SS 50/2" < SS* 50/4" < SS* 50/5" < Gray Graelly SAND, with silt and cobbles, wet 11-SS* 50/3" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 27± FEET END OF 27± FEET 12-SS 50/S1" < Water Leel during drilling : 25± feet below ground surface (EL ±) Water Leel upon completion : 24± feet below ground surface (EL ±) Caed at upon completion : 25± feet below ground surface (EL ±) *Poor sample recoery

23 SOIL BORING LOG: 14-B-5 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 19, 2013 (feet) GROUND SURFACE ELEVATION: ": 9-inches of Concrete PAVEMENT, oerlying 5-inches of grayish brown Graelly Sand BASE COURSE, moist Reddish brown Lean CLAY, trace sand and grael, moist 1-SS <1 13 Frost = 24" SS < SS < Brown to grayish brown Sandy SILT, with grael and occasional cobbles, moist 4-SS 91/11" < SS* 50/4" < SS 50/5" < SS* 50/2" < SS* 50/2" < SS* 50/5" < SS** 50/1" 11-SS* 50/2" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 27± FEET END OF 27± FEET 12-SS** 50/S1" Water Leel during drilling : Not encountered Water Leel upon completion : 20± feet below ground surface (EL ±) Caed at upon completion : 24± feet below ground surface (EL ±) *Poor sample recoery **No sample recoery

24 SOIL BORING LOG: 14-B-5A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 9, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 27± FEET, WHERE AUGER REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 32± FEET (Soil cuttings were wet below a depth of about 16± feet) (Auger refusal 27± feet) Gray LIMESTONE (% Recoery = 83; RQD = 68) NQ-CORE < END OF BORING/CORE 32± FEET Water Leel during drilling : 16± feet below ground surface (EL ±) Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-5.

25 SOIL BORING LOG: 14-B-6 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 26, 2013 (feet) GROUND SURFACE ELEVATION: ": Dark brown Sandy SILT, with root matter, moist (TOPSOIL) Brown to reddish brown Lean CLAY, moist SS 15 < Frost = 18" Reddish brown Lean CLAY, with sand and grael, moist (Occasional cobbles encountered below a depth of about 4± feet) 2-SS < SS < Brown Sandy SILT, with grael and occasional cobbles, moist 4-SS* 50/4" < SS 96/9" < END OF 11.5± FEET Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 7± feet below ground surface (EL ±) *Poor sample recoery

26 SOIL BORING LOG: 14-B-7 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 19, 2013 (feet) GROUND SURFACE ELEVATION: ": 9-inches of Concrete PAVEMENT, oerlying 6-inches of grayish brown Graelly Sand BASE COURSE, moist Dark brown to brown Clayey SILT, with grael, trace sand, moist (FILL) 1-SS <1 24 Frost = 24" Reddish brown Lean CLAY, with sand and grael, moist Brown to gray Sandy SILT, with grael and occasional cobbles, moist to wet SS < SS 65 < SS 50/4" < SS* 50/2" < SS* 50/1" < SS* 50/1" < SS* 50/5" < SS* 50/2" < SS* 50/5" < (Wet at a depth of about 25± feet) AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 26± FEET END OF 26± FEET 11-SS* 50/3" < Water Leel during drilling : 25± feet below ground surface (EL ±) Water Leel upon completion : 16± feet below ground surface (EL ±) Caed at upon completion : 23± feet below ground surface (EL ±) *Poor sample recoery

27 SOIL BORING LOG: 14-B-8 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 20, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 4-inches of brown Graelly Sand BASE COURSE, moist Reddish brown Lean CLAY, with grael, trace sand, moist 1-SS <1 14 Frost = 24" Brown to gray Sandy SILT, with grael and occasional cobbles, moist 2-SS* 31 < SS 46 < SS 50/3" < SS* 50/3" < SS* 50/4" < SS* 50/2" < SS* 50/4" < SS* 50/3" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22.5± FEET END OF 22.5± FEET 10-SS** 50/0" Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 16± feet below ground surface (EL ±) *Poor sample recoery **No sample recoery

28 SOIL BORING LOG: 14-B-8A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 9, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 22.5± FEET, WHERE AUGER REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 27.5± FEET (Soil cuttings were wet below a depth of about 15± feet) (Auger refusal 22.5± feet) Gray LIMESTONE (% Recoery = 91; RQD = 73) NQ-CORE < END OF BORING/CORE 27.5± FEET Water Leel during drilling : 15± feet below ground surface (EL ±) Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-8.

29 SOIL BORING LOG: 14-B-9 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 20, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 4-inches of brown Graelly Sand BASE COURSE, moist Brown to reddish brown Lean CLAY, with grael, trace sand, moist 1-SS* 23 <1 25 Frost = 24" SS* < SS 42 < Brown Silty SAND, with grael, occasional cobbles, and trace clay, moist 4-SS* 74/9" < Brown to gray Sandy SILT, with grael and occasional cobbles, moist 5-SS 72/9" < SS 74/9" < SS* 50/4" < SS* 50/4" < SS* 50/5" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22± FEET END OF 22± FEET Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 17± feet below ground surface (EL ±) *Poor sample recoery

30 SOIL BORING LOG: 14-B-9A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 3, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 25± FEET, WHERE SAMPLING RESUMED. AUGER PENETRATION REFUSAL EXPERIENCED AT A DEPTH OF 26± FEET, WHERE ROCK CORING EQUIPMENT WAS SET-UP AND PERFORMED TO A DEPTH OF 31± FEET Gray Sandy SILT, with grael and occasional cobbles, wet (Auger refusal 26± feet) Gray LIMESTONE (% Recoery = 100; RQD = 91) 1-SS 50/4" < NQ-Core END OF BORING/CORE 31± FEET Water Leel during drilling : 25± feet below ground surface (EL ±) Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-9.

31 SOIL BORING LOG: 14-B-10 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 23, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 5-inches of brown Graelly Sand BASE COURSE, moist Dark brown to reddish brown Lean CLAY, trace sand and grael, moist (FILL) 1-SS <1 20 Frost = 24" Reddish brown Lean CLAY, moist SS < Reddish brown to brown Clayey SILT, with sand, trace grael, moist 3-SS < Brown to grayish brown SILT, with sand, trace grael, moist 4-SS 24 < SS* 34 < Brown to gray Sandy SILT, with grael and occasional cobbles, moist to wet 6-SS 51 < SS 84 < SS* 50/4" < (Wet at a depth of about 20± feet) AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 20± FEET END OF 20± FEET SS** 50/S1" Water Leel during drilling : 20± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 18± feet below ground surface (EL ±) *Poor sample recoery **No sample recoery

32 SOIL BORING LOG: 14-B-10A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 4, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 20± FEET, WHERE AUGER REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 25± FEET (Auger refusal 20± feet) Gray LIMESTONE (% Recoery = 100; RQD = 87) NQ-Core END OF BORING/CORE 25± FEET Water Leel during drilling : N/A Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-10.

33 SOIL BORING LOG: 14-B-11 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 23, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 4-inches of grayish brown Graelly Sand BASE COURSE, moist Dark brown Lean CLAY, trace root matter, moist (BURIED TOPSOIL) Reddish brown Lean CLAY, trace grael, moist 1-SS <1 30 Frost = 24" SS < SS* 22 < SS < Grayish brown SILT, wet 5-SS 17 < Brown Lean CLAY, moist 6-SS < Gray Clayey SAND, with grael and occasional cobbles, wet 7-SS* 96/9" < Gray Sandy SILT, with grael and occasional cobbles, moist to wet SS* 50/3" < (Wet at a depth of about 20± feet) AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 20± FEET END OF 20± FEET SS** 50/S1" Water Leel during drilling : 10± feet below ground surface (EL ±) Water Leel upon completion : 9± feet below ground surface (EL ±) Caed at upon completion : 17± feet below ground surface (EL ±) *Poor sample recoery **No sample recoery

34 SOIL BORING LOG: 14-B-11A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 2, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 20± FEET, WHERE AUGER REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 24± FEET (Auger refusal 20± feet) Gray Graelly SAND, with cobbles, wet Gray LIMESTONE (% Recoery = 94; RQD = 90) NQ-Core END OF BORING/CORE 24± FEET Water Leel during drilling : N/A Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-11.

35 SOIL BORING LOG: 14-B-12 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 23, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 4-inches of grayish brown Graelly Sand BASE COURSE, moist Reddish brown Lean CLAY, with grael, trace sand, moist 1-SS <1 21 Frost = 24" SS < Brown Silty SAND, with grael and occasional cobbles, moist to wet 3-SS* 27 < SS* 50/3" < (Wet below a depth of about 10± feet) 5-SS 91 < Gray Sandy SILT to Silty SAND, with grael and occasional cobbles, moist to wet SS* 50/3" < (Wet below a depth of about 15± feet) 7-SS* 50/1" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 18± FEET END OF 18± FEET 8-SS* 50/S3" < Water Leel during drilling : 10± feet below ground surface (EL ±) Water Leel upon completion : 12± feet below ground surface (EL ±) Caed at upon completion : 13± feet below ground surface (EL ±) *Poor sample recoery

36 SOIL BORING LOG: 14-B-12A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 13, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 18± FEET, WHERE AUGER REFUSAL OCCURRED. ROCK CORING EQUIPMENT WAS THEN SET-UP AND PERFORMED TO A DEPTH OF 23± FEET (Auger cuttings were wet at at depth of about 7± feet) (Auger refusal 18± feet) Gray LIMESTONE (% Recoery = 74; RQD = 45) NQ-CORE < END OF BORING/CORE 23± FEET Water Leel during drilling : 7± feet below ground surface (EL ±) Water Leel upon completion : N/A Caed at upon completion : N/A Boring was performed within abandoned borehole of boring 14-B-12.

37 SOIL BORING LOG: 14-B-13 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 23, 2013 (feet) GROUND SURFACE ELEVATION: " 9-inches of Concrete PAVEMENT, oerlying 4-inches of grayish brown Graelly Sand BASE COURSE, moist Dark brown Lean CLAY, trace sand, moist (BURIED TOPSOIL) Reddish brown Lean CLAY, moist 1-SS <1 24 Frost = 24" SS < Reddish brown Lean CLAY, with grael, trace sand, moist 3-SS 13 < Brown Silty SAND, with grael and occasional cobbles, moist 4-SS 53 < SS** 50/3" SS* 50/5" < Gray Clayey SAND, with grael and occasional cobbles, wet 7-SS 50/4" < Gray Sandy SILT, with grael and occasional cobbles, moist SS* 50/5" < AUGER AND SAMPLER PENETRATION REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 21± FEET END OF 21± FEET 9-SS* 50/S4" < Water Leel during drilling : 15± feet below ground surface (EL ±) Water Leel upon completion : 10.5± feet below ground surface (EL ±) Caed at upon completion : 11± feet below ground surface (EL ±) *Poor sample recoery **No sample recoery

38 SOIL BORING LOG: 14-B-13A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 2, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 22.5± FEET, WHERE SAMPLING RESUMED TO THE PLANNED TERMINATION DEPTH Gray Sandy SILT, with grael and occasional cobbles, wet SS** 50/1" < SS 82/10" < END OF 26.5± FEET Water Leel during drilling : 22.5± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 12± feet below ground surface (EL ±) Boring was performed within abandoned borehole of boring 14-B-13. **No sample recoery

39 SOIL BORING LOG: 14-B-14 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 26, 2013 (feet) GROUND SURFACE ELEVATION: ": 8-inches of Concrete PAVEMENT, oerlying 4-inches of grayish brown Graelly Sand BASE COURSE, moist Dark brown to reddish brown Lean CLAY, with grael, trace sand, moist (FILL) 1-SS <1 19 Frost = 24" Reddish brown Lean CLAY, with sand and grael, moist 2-SS* < SS < Brown to gray Silty SAND, with grael and occasional cobbles, moist to wet 4-SS* 33 < SS 80/9" < SS 93/9" < (Wet at a depth of about 15± feet) 7-SS 90/10" < Gray Sandy SILT, with grael and occasional cobbles, moist SS* 50/3" < SS 50/3" < AUGER REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22± FEET END OF 22± FEET Water Leel during drilling : 15± feet below ground surface (EL ±) Water Leel upon completion : 15.5± feet below ground surface (EL ±) Caed at upon completion : 16± feet below ground surface (EL ±) *Poor sample recoery

40 SOIL BORING LOG: 14-B-14A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 13, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 22± FEET, WHERE AUGER REFUSAL OCCURRED AUGER REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22± FEET END OF 22± FEET Water Leel during drilling : Not encountered Water Leel upon completion : Dry Caed at upon completion : 14± feet below ground surface (EL ±) Boring was offset 5± feet south of boring 14-B-14.

41 SOIL BORING LOG: 14-B-15 Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: December 26, 2013 (feet) GROUND SURFACE ELEVATION: Brown to reddish brown Lean CLAY, with sand, trace grael, moist ": 9-inches of Concrete PAVEMENT, oerlying 5-inches of grayish brown Graelly Sand BASE COURSE, moist Black SILT, trace root matter, moist (BURIED TOPSOIL) 1-SS 14 < SS <1 22 Frost = 30" SS* < Grayish brown Lean CLAY, trace sand and organic matter, moist to wet 4-SS < (Wet at a depth of 10± feet) Gray Sandy CLAY, with grael, wet 5-SS 14 < Grayish brown Sandy SILT, with grael and occasional cobbles, moist SS* 50/3" < Grayish brown Sandy CLAY, with grael, wet 7-SS < Gray Graelly SAND, with occasional cobbles, trace silt, wet SS 86/8" < Gray Silty SAND, with grael and cobbles, wet 9-SS 80/9" < AUGER REFUSAL ON COBBLES, BOULDERS, OR POSSIBLE 22± FEET END OF 22± FEET Water Leel during drilling : 10± feet below ground surface (EL ±) Water Leel upon completion : 17± feet below ground surface (EL ±) Caed at upon completion : 18± feet below ground surface (EL ±) *Poor sample recoery

42 SOIL BORING LOG: 14-B-15A Location: Between E. New York Aenue and E. Murdock Aenue Drill Date: January 2, 2014 (feet) GROUND SURFACE ELEVATION: BORING DRILLED WITHOUT SAMPLING TO A DEPTH OF 25± FEET, WHERE SAMPLING RESUMED TO THE PLANNED TERMINATION DEPTH Gray Silty SAND, with grael and cobbles, wet 1-SS 69/10" < END OF 26.5± FEET Water Leel during drilling : 25± feet below ground surface (EL ±) Water Leel upon completion : Dry Caed at upon completion : 4± feet below ground surface (EL ±) Boring was performed within abandoned borehole of boring 14-B-15.

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Report of Preliminary Geotechnical Investigation for Ponds

Report of Preliminary Geotechnical Investigation for Ponds Florida Department of TRANSPORTATION Report of Preliminary Geotechnical Investigation for Ponds Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID:

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Subsurface Exploration and Geotechnical Engineering Analysis Armory Detention Pond Oshkosh, Wisconsin

Subsurface Exploration and Geotechnical Engineering Analysis Armory Detention Pond Oshkosh, Wisconsin Submitted to City of Oshkosh 215 Church Ave. Oshkosh, Wisconsin 54901 Submitted by AECOM 558 North Main Street Oshkosh, WI 54901 May 2012 Subsurface Exploration and Geotechnical Engineering Analysis Armory

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Town of Brunswick, Maine

Town of Brunswick, Maine 1. Project Presentation Town of Brunswick, Maine Miller Point Shoreline Stabilization Project Rob and Nancy King Applicant Staff Meeting 6:00 P.M. June 27, 2016 Room 206 Town Hall 85 Union Street Open

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

Log of Monitoring Well D58B

Log of Monitoring Well D58B Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

CHEROKEE NATION BUSINESSES, LLC

CHEROKEE NATION BUSINESSES, LLC REPORT OF PRELIMINARY SUBSURFACE EXPLORATION AND GEOTECHNICAL EVALUATION PROPOSED CHEROKEE SPRINGS PLAZA TAHLEQUAH, OKLAHOMA BUILDING & EARTH PROJECT NO. OK10004 PREPARED FOR: CHEROKEE NATION BUSINESSES,

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

The attitude he maintains in his relation to the engineer is very well stated in his own words:

The attitude he maintains in his relation to the engineer is very well stated in his own words: Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings

More information

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report APPENDICES Appendix A City Standard Details Appendix B Engineering Geology Report APPENDIX A CITY STANDARDS DETAILS APPENDIX B ENGINEERING GEOLOGY REPORT ENGINEERING GEOLOGY REPORT WATER

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a Lecture-5 Soil Exploration Dr. Attaullah Shah 1 Today s Lecture Purpose of Soil Exploration Different methods 1. Test trenches and Pits 2. Auger and Wash Boring 3. Rotary Drilling 4. Geophysical Methods

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

Report of Subsurface Exploration and Geotechnical Engineering Evaluation

Report of Subsurface Exploration and Geotechnical Engineering Evaluation Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Chatham County Jail Pittsboro, North Carolina F&R Project No. 66N-0097 Prepared For: CHATHAM COUNTY P.O. Box 1809 Pittsboro,

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To: GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO Submitted To: Wade Chacon, P.E. Louisiana Boulevard NE, Suite 00 Albuquerque, New Mexico 0 Submitted By: GEOMAT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information