1 GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring : 1.2 Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11//13-11//13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11//13 12: N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " Casing Description and Identification Blows/ Pen. Rec. Blows SPT Test Description (ft) Core No. Rate (in) (in) (per in.) Value S WOH/ S-1: Top ": Black, Organic SILT, some fine to coarse 1.1 Sand, little Wood pieces, trace Shells, strong Hydrogen 2 ppm Sulfide-like Odor observed. Bottom ": Gray/black, Organic SILT, some fine to 3 medium Sand, trace Wood, Hydrogen Sulfide-like Odor observed. MARINE SILT/CLAY S S-2: Stiff, gray/olive, Marine CLAY & SILT, trace fine to coarse Sand, trace Wood, trace Shells, Hydrogen Sulfide-like Odor observed..1 ppm 8.3' -1.1' S S-3: Hard, light brown, CLAY & SILT, trace Sand. CLAY & SILT ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/1 1 2 Bottom of boring at 1.2 feet. 13.' -19.3' 1.2' BOULDER OR -.' POSSIBLE BEDROCK 1. Mudline elevation estimated based on spot elevations shown on Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. Drove and washed -inch ID casing to obtain samples S-2 and S-3. Drilled open hole from 9. to 1.2-feet below mudline. At approximately 13.-feet an increase in drill effort was observed and appeared to continue to 1.2-feet. The drill cuttings from 13. to 1.2-feet primarily consisted of gray/white granite-like pieces.. Borehole backfilled with bentonite chips to approximate mudline level upon completion. The drill wash water and cuttings were drummed. GZ-1

2 GZA BORING NO.: GZ-2 SHEET: 1 of 2 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -9. Final Boring : 31. Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11/7/13-11/11/13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11/7/13 12: 1. N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " 11/8/13 8:. N/A N/A Casing Description and Identification Blows/ Pen. Rec. Blows SPT Test Description (ft) Core No. Rate (in) (in) (per in.) Value S-1-2 WOR/ S-1: Very soft, black Organic Marine SILT, little fine to 1 1. medium Sand, Petroleum-like Odor observed, sheen 2 ppm observed. 3 MARINE SILT 7.' -1.' S S-2: Very stiff, light brown/gray Silty CLAY ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/1 1 2 S-3 S- S- S / R S-3: Very stiff, light brown with gray streaks, CLAY & SILT, trace fine Sand, trace (-) coarse Sand. (Tv =.,.7 tsf, PP = 1., 1.7 tsf) S-: Very stiff, light brown, SILT & CLAY, trace fine Sand. (Tv =.7,.7 tsf, PP = 1., 1. tsf) S-: Very stiff, brown, SILT & CLAY, trace fine Sand, occasional fine Sand seams (1/1 to 2 inches thick). (Tv =.,.7 tsf, PP =.9, 1. tsf) S-: White/black/orange, GRAVEL and fine to coarse SA, little Silt ' CLAY & SILT -3.' SA/GRAVEL OR POSSIBLE 28.' BOULDERS OR POSSIBLE WEATHERED BEDROCK 1. Mudline elevation estimated based on spot elevations shown on Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. Drove and washed -inch ID casing to obtain samples from 9. to 17-feet below mudline. Drilled open hole to obtain samples S-3 through S-.. Tv = Torvane, PP = Pocket Penetrometer. Torvane and Pocket Penetrometer estimate relative undrained shear strength in tons per square foot (tsf).. Appeared to encounter gravel or cobbles while drilling from approximately to 21-feet below mudline. 7. Observed a change in drill effort at approximately 2-feet below mudline. 8. Telescoped and spun 3-inch ID casing to approximately 28.-feet below mudline. GZ-2-37.'

3 Casing Blows/ (ft) Core Rate GZA No. Pen. (in) Rec. (in) Blows (per in.) SPT Value Description and Identification Bottom of boring at 31. feet. BORING NO.: GZ-2 SHEET: 2 of 2 PROJECT NO: Test Description BOULDERS OR POSSIBLE WEATHERED BEDROCK 31.' -.' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/1 9. Observed approximately 1/8-inch diameter oil-like blebs and a sheen in the wash water while drilling from approximately to 31.-feet ±. Also observed occasional odor from the wash water during drilling from approximately to 31.-feet. The drill cuttings appeared to consist mostly of orange/black pieces of gravel or rock.. Stopped drilling at approximately 31.-feet. Backfilled borehole with bentonite chips. Upon removal of the drill tooling from the borehole it appeared the roller bit did not have a coating or sheen. Some of the drill rods and casing were observed to have a slight sheen and odor. The drill wash water and cuttings were drummed. GZ-2

4 GZA BORING NO.: GZ-3 SHEET: 1 of 2 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -1. Final Boring : 3. Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11/13/13-11/18/13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11/13/13 11: 1. N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " 11/1/13 8: 21. N/A N/A 11/1/13 8: 21. N/A N/A Casing Description and Identification Blows/ Core Pen. Rec. Blows SPT Test Description (ft) No. Rate (in) (in) (per in.) Value S WOR/ 1 S-1: Very soft, black, Marine SILT, little Shells, trace fine Sand, Hydrogen Sulfide-like Odor observed. 2 3 MARINE SILT 7' -23.' S S-2: Very dense, brown, fine to coarse SA and GRAVEL, little Silt. 8.2' BOULDER -.2' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/27/1 1 2 S-3 C-1 S / 2 min/ft 21 min/ft 3 min/ft 1 min/" 2 13 /3 R R S-3: Very dense, gray/black/brown, GRAVEL, some fine to coarse Sand, little Silt. C-1: Hard to very hard, gray/black, GRANITE BOULDER. S-: Very dense, GRAVEL and fine to coarse SA, little Silt. 1. Mudline elevation estimated based on spot elevations shown on Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. After a 1-inch recovery with the first sample attempt for S-1, a second sample attempt was made and approximately 7 or 8-inches of additional sample was recovered.. While drilling inside the casing from about to 7.-feet, observed the wash water change color from black to gray to brown and pieces of rubber fishing line in the drill cuttings at approximately -feet. At approximately 7-feet the driller stated he saw pieces of gravel in the wash water. Drilled through boulder from about 7 to 8.2-feet.. After obtaining sample S-2, drilled to approximately.-feet. The hole would not stay open below the -inch ID casing at 7.-feet. 3-inch ID casing was telescoped to approximately 17.-feet. Based on drill effort it appeared the casing was advanced through frequent cobbles/boulders. 7. Spun 3-inch ID casing to about 21-feet, then drilled to approximately 22.-feet. Cored from 22. to 2-feet. The coring effort appeared to lessen significantly from approximately 2 to 2-feet. After the core barrel was removed the borehole remained open to about.-feet. 8. Spun 3-inch ID casing to.-feet. Appeared to spin through the bottom of the boulder at approximately.-feet. Drilled to 2.-feet and sampled open hole for sample S-. 9. Drilled ahead of the 3-inch ID casing to approximately 29.-feet then spun 3-inch ID casing to approximately 29-feet. The drill effort changed from approximately 28 to 29.-feet indicating the presence of frequent cobbles/boulders. Drilled to about.-feet. At approximately.-feet, observed an increase in drill effort and orange/black pieces of gravel or rock in the wash water return. Drove 3-inch ID casing to 29.-feet and drilled back to about.-feet '.' BOULDER GZ-3-37.' -.'

5 Casing Blows/ (ft) Core Rate 3 GZA No. Pen. (in) Rec. (in) C Blows (per in.) 1 1/2 min/ft 1/2 min/ft 11 min/ft 18 min/ft 13 1/2 min/ft SPT Value Description and Identification C-2: Hard to very hard, fresh to very slightly weathered, coarse-grained, pink/gray/black, GRANITE with close to moderately close, moderately dipping joints/fractures. Top and bottom 1-foot of the recovered core was observed to have a slight sheen on the core. Bottom of boring at 3. feet. BORING NO.: GZ-3 SHEET: 2 of 2 PROJECT NO: Test.' 3.' Description POSSIBLE BEDROCK -.' -1.' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/27/1. When coring had reached approximately 3-feet, observed a slight sheen, odor and small black globules coming back with the wash water. The sheen, odor and globules were not observed below 3-feet during core attempt C When the core barrel was inserted for an additional core attempt, the barrel stopped at about 3-feet. The driller pulled back the core barrel to approximately 29.-feet and when the barrel was set back down it stopped at about 29.-feet. The core barrel was advanced with water and spinning to about 3.-feet. At about 3-feet a sheen, odor and black blebs were observed coming up with the wash water. When pressure was applied to the core barrel at approximately 3.-feet the water line appeared to jam up and the driller indicated he could not safely continue coring as it would cause the water line to burst. The driller indicated the borehole was not staying open enough below the casing to core. 12. The borehole was completed by backfilling with bentonite chips before the casing was removed. GZ-3

6 GZA BORING NO.: GZ- SHEET: 1 of 2 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME Final Boring : 3. Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 12/2/13-12//13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 12/2/13 9: 19.8 N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " 12/2/13 : 18.7 N/A N/A 12//13 8: 1. N/A N/A Casing Description and Identification Blows/ Core Pen. Rec. Blows SPT Test Description (ft) No. Rate (in) (in) (per in.) Value S WOR/ 1 S-1: Very soft, black, Marine SILT, little fine to medium Sand, trace Gravel, trace Shells, Hydrogen Sulfide-like Odor observed, occasional faint sheen observed, faint possible Petroleum-like Odor observed. 2 3 MARINE SILT S S-2: Brown, WOOD, trace Shells, trace Silt, trace fine Sand. 1. ppm 7' 9' WOOD -19.7' -21.7' POSSIBLE S / R S-3: N/A 7 12' -.7' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/27/1 1 2 S- S- C / min/ft 1/2 min/ft min/ft S-: Very dense, brown, fine to coarse SA and GRAVEL, trace Silt. S-: Very dense, brown, fine to coarse SA, little Gravel, little Silt. C-1: Hard to very hard, fresh, coarse-grained, pink/gray/black GRANITE, with moderately close to wide subhorizontal fractures. (RQD = 9%) ' 21.' ' 27.' BOULDERS 1. Mudline elevation estimated based on spot elevations shown on Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. Pushed -inch ID casing to approximately 1.-feet where resistance was observed. The driller indicated the resistance may be part of the marine railway. Offset the boring approximately 3-inches to the northeast and continued.. Pushed the -inch ID casing to approximately 7-feet then washed out and sampled.. Observed a change in drill effort at approximately 9-feet. 7. Drove and washed casing to approximately 12-feet. Drilled through boulder from about 12 to 1-feet. Encountered casing driving refusal at approximately 12.2-feet. 8. Advanced the -inch ID casing to approximately 17.-feet. Based on drill effort, cobbles or boulders were likely encountered from about to 13-feet and from 1 to 1-feet. Frequent cobbles were encountered from 1 to 21.-feet while drilling. 9. The top -inches of sample S- appeared disturbed.. Drove the -inch ID casing to refusal at approximately 21.-feet. Drilled through a boulder from about 21. to -feet then drilled under less effort from to 2-feet. The borehole below about -feet would not stay open and so 3-inch ID casing was telescoped and spun to 2-feet. The 3-inch casing was cleaned out to 2-feet and sample S- was obtained. 11. Spun 3-inch ID casing about 27.-feet where the rate of advancement appeared to stop. Drilled to approximately 27.-feet. The drill cuttings appeared to consist of pink/gray/black rock fragments of approximately uniform size. Spun the 3-inch ID casing to approximately 27.-feet. BOULDER BOULDER GZ ' -3.2' -3.7' -.1'

7 Casing Blows/ (ft) Core Rate GZA No. Pen. (in) Rec. (in) Blows (per in.) SPT Value Description and Identification BORING NO.: GZ- SHEET: 2 of 2 PROJECT NO: Test Description 3 C /2 min/ft min/ft 1/2 min/ft 7 1/2 min/ft 1/2 min/ft min/ft C-2: Hard to soft, fresh to severely weathered, pink/gray/black coarse-grained GRANITE, with very close to close subhorizontal to subvertical joints/fractures. (RQD = %) Apparent SA. Bottom of boring at 3. feet ' 3.' BOULDER SA -8.7' -9.2' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/27/1 12. Appeared to encounter sand at approximately 3-feet based on core effort and change in wash water color to brown. 13. At approximately 3.-feet observed many blebs of oil-like substance with strong oil-like odor in the wash water. The boring was stopped and ended at approximately 3.-feet. 1. The top approximate 17-inches of core run C-2, was mostly fresh with a slight sheen observed. The middle approximate 22-inches of core run C-2 appeared slightly weathered and partially coated with an oil-like substance. The bottom approximate 7-inches of core run C-2 appeared severely weathered and coated with an oil-like substance with a strong oil-like odor observed. 1. The borehole was backfilled to about 17.-feet with bentonite chips then grouted to about the mudline upon completion. GZ-

8 GZA BORING NO.: GZ- SHEET: 1 of 1 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -13. Final Boring : 22.8 Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11/19/13-11/19/13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11/19/13 9: 1. N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " Casing Description and Identification Blows/ Pen. Rec. Blows SPT Test Description (ft) Core No. Rate (in) (in) (per in.) Value S WOR/ S-1: Top 13": Gray/brown/black, fine to medium SA, little Organic Silt, littel Gravel, trace Wood. 2 ppm Bottom 1": Black, Marine SILT, little fine to coarse Sand,. trace Shells, odor observed. 3 ppm MARINE SILT A SA.' -18.'.' PROBABLE SILT/CLAY -19.' S S-2: Dense, brown, fine to medium SA, little Silt, trace Gravel. 7.' POSSIBLE BOULDER -.' SA ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/1 1 2 S-3 C / min/ft min/ft min/ft min/ft 1/2 min/ft R S-3: Pink/gray/black, GRAVEL, little fine to coarse Sand, trace Silt. C-1: Very hard to hard, fresh to very slightly weathered, coarse-grained, pink/gray/black, GRANITE, with moderately close to close, moderately to subvertically dipping, sand coated joints/fractures. (RQD = 8%) Bottom of boring at 22.8 feet ' 13.' 1' 17.' BOULDER -2.' -2.' -28.' -.' BOULDER OR POSSIBLE BEDROCK 1. Mudline elevation was estimated based on a taped measurement from the top of the granite block wall to the water surface to the north/northwest of the borehole location and from a taped measurement from the water surface to the mudline at the borehole location. The elevation of the top of the granite block wall to the north/northwest of the boring was obtained from a plan by Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. Drove and washed -inch ID casing to 3-feet, the drill cuttings to 3-feet consisted of mostly fine to coarse sand.. Drove and washed -inch ID casing to 7-feet. Observed mostly light brown, silt/clay in the wash water from about. to.-feet. Observed increased drill effort from about. to 7.-feet. Drilled ahead to 8-feet.. Observed an increase in drill effort at approximately 12-feet. Drove and washed -inch ID casing to 13-feet. 7. Drilled open hole through apparent boulder from 13. to 1-feet. Then drilled to approximately 17.-feet where the drilling effort appeared to increase and advanced the roller bit with increased effort to 17.8-feet. The borehole would not stay open below the bottom of -inch ID casing at 13-feet. The -inch ID Casing was then driven to apparent refusal at 17.-feet and washed to 17.8-feet. 8. The coring rotation speed was increased at approximately.8-feet. 9. Backfilled borehole with bentonite chips upon completion. 22.8' GZ- -3.8'

9 GZA BORING NO.: GZ-7 SHEET: 1 of 1 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME Final Boring : 9 Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11//13-11//13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11//13 9: 12.3 N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " Casing Description and Identification Blows/ Pen. Rec. Blows SPT Test Description (ft) Core No. Rate (in) (in) (per in.) Value S S-1: Stiff, black, Marine SILT, little fine to medium Sand, 8. 7 trace Shells, trace Wood, trace fine Gravel, Hydrogen 1 ppm MARINE SILT Sulfide-like Odor observed ' S /2 R S-2: Very dense, brown fine to coarse SA and GRAVEL, little Silt. -1.' Bottom of boring at 9 feet. 7 9' -21.3' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/ Mudline elevation estimated based on spot elevations shown on Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. After collecting sample S-1, shifted barge approximately -inches west and attempted a tube sample at the mudline. The tube was pushed with apparent difficulty and upon retrieval it was observed that the tube had broken off the drill rods.. Drove -inch ID casing to 3.3-feet. Drilled to approximately.-feet through apparent cobbles/boulders based on drill effort. Drove -inch ID casing to about.-feet then drilled to.-feet and sampled.. Drilled ahead of casing from. to 9-feet with difficulty. The driller indicated there were likely frequent cobbles and boulders between. to 9-feet based on drill effort. At about 9-feet the driller indicated roller bit refusal had been encountered. 7. Borehole backfilled with bentonite chips upon completion. GZ-7

10 GZA BORING NO.: GZ-7A SHEET: 1 of 1 PROJECT NO: Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.2 Final Boring : 11. Logged By: Michael Ostrowski Drilling Method: Drive and Wash V. Datum: NGVD29 Date Start - Finish: 11/21/13-11/21/13 Auger/Casing Type: HW r Type: Split Spoon Groundwater I.D/O.D.(in): "/ 1/2" I.D./O.D. (in.): 1-3/8"/2" Date Time Water Casing Stab. Time Hammer Weight (lb.): lbs r Hmr Wt (lb): 1 lbs 11/21/13 : N/A N/A Hammer Fall (in.): " r Hmr Fall (in): " 11/21/13 1: 1. N/A N/A Casing Description and Identification Blows/ Pen. Rec. Blows SPT Test Description (ft) Core No. Rate (in) (in) (per in.) Value S MARINE SILT S-1: Top ": Black, Marine SILT and fine to coarse SA,.' 8. little Shells, Hydrogen Sulfide Odor observed. 1 ppm Bottom 9": Light brown, CLAY & SILT, trace fine to.9 medium Sand. 2 SILT & CLAY 3 ppm.2' -.' -1.' S / R S-2: Brown, GRAVEL, some Silt & Clay, some fine to coarse Sand.. ppm 7.' -17.7' BOULDER OR POSSIBLE BEDROCK Bottom of boring at 11. feet. 11.' -21.7' ADDITIONAL GEOTECH SERVICES GPJ; -ADDITIONAL GEOTECH SERVICES; 3/3/ Mudline elevation was estimated based on a taped measurement from the top of the granite block wall to the water surface to the north/northwest of the borehole location and from a taped measurement from the water surface to the mudline at the borehole location. The elevation of the top of the granite block wall to the north/northwest of the boring was obtained from a plan by Harbor Loop Existing Conditions Plan by Hancock Associates, latest revision dated /9/ testing results represent total organic vapor levels, referenced to a benzene standard, measured in the headspace of sealed soil sample jars using a ThermoEnvironmental 8B organic vapor meter equipped with a photoionization detector (PID) and.ev lamp. Results in parts per million by volume (ppmv). indicates nothing detected (<.1 ppmv). 3. Water level reading information is the depth to the mudline at the borehole location at the date and time recorded.. Drove -inch ID casing with difficulty to 2-feet. Drilled to.-feet and based on drilling difficulty appeared to encounter frequent cobbles/boulders to.-feet. Drove and washed -inch ID casing to.-feet.. After sample S-2, drilled with difficulty to approximately 7.-feet. At 7.-feet the drilling effort appeared to increase and appeared uniform while drilling from 7. to 11.-feet. The drilling from 7. to 11.-feet took approximately 1/2-hour and the drill cuttings were pink/gray/black colored rock fragments.. Backfilled boring with bentonite chips upon completion. GZ-7A

11 LABORATORY TESTING DATA SHEET Project Name Location Gloucester, MA Reviewed By Project No Assigned By Jennifer Lenz Project Manager John Colbert Report Date 2/21/1 Date Reviewed 2/21/1 Identification Tests Strength Tests Consol. Boring/ Test Pit No. No. ft. Lab No. Water Content % LL % PL % Sieve - % Hyd -2µ % ORG % G s Total unit wt. pcf Dry unit wt. pcf s c psf Failure Criteria s 1 - s 3 psf C c Strain % 1 + e Laboratory Log and Soil Description GZ-1 S GZ-1 S Brown CLAY & SILT, trace Sand GZ-2 S GZ-2 S GZ-2 S GZ-3 S GZ- S GZ- S GZ- S GZ-7A S GZ-7A S Brown Silty CLAY Brown SILT & CLAY, trace Sand Brown f-c SA and f-c GRAVEL, little Silt Brown f-c SA and f-c GRAVEL, trace Silt Gray f-m SA, little Silt, little fine Gravel Brown f-m SA, little Silt, trace fine Gravel Brown CLAY & SILT, trace Sand Brown f-c GRAVEL, some Silt & Clay, some f-c Sand GZ-8 GZ-8 19 Frances Avenue Cranston, RI

12 U.S. STAARD SIEVE A HYDROMETER ASTM D22 3" 2" 1" 3/" 1/2" # # # # # # # Percent Finer by Weight GRAVEL SA SILT C L A Y Coarse Fine Coarse Medium Fine 1 Grain Size (mm) Gravel Sand Fines 38.8% 1.% 19.8% Lab # Exploration Description WC LL PL PI 1 GZ-3 S ' Brown f-c SA and f-c GRAVEL, little Silt Sieve Size % Passing ¾" 7.9 ½" 7. # 1.2 # 1. # 2.7 # 3.3 # 31.7 Tested by: 19 Frances Ave., Cranston, RI 29 # 27.2 Reviewed by: 1-7- # 19.8 CTS Gloucester, MA GZA File # MP/MS Date: 2/1/1 MBP Date: 2/19/1

13 U.S. STAARD SIEVE A HYDROMETER ASTM D22 3" 2" 1" 3/" 1/2" # # # # # # # Percent Finer by Weight GRAVEL SA SILT C L A Y Coarse Fine Coarse Medium Fine 1 Grain Size (mm) Gravel Sand Fines 39.% 2.7% 7.8% Lab # Exploration Description WC LL PL PI 17 GZ- S- 1-18' Brown f-c SA and f-c GRAVEL, trace Silt Sieve Size % Passing ¾" 93. ½" 8.9 #. # 7.9 # 37.1 # 27. # 19.1 Tested by: 19 Frances Ave., Cranston, RI 29 # 13.2 Reviewed by: 1-7- # 7.8 CTS Gloucester, MA GZA File # MP/MS Date: 2/1/1 MBP Date: 2/19/1

14 U.S. STAARD SIEVE A HYDROMETER ASTM D22 3" 2" 1" 3/" 1/2" # # # # # # # Percent Finer by Weight GRAVEL SA SILT C L A Y Coarse Fine Coarse Medium Fine 1 Grain Size (mm) Gravel Sand Fines 12.2% 9.9% 17.9% Lab # Exploration Description WC LL PL PI 18 GZ- S-1-1.1' Gray f-m SA, little Silt, little fine Gravel Sieve Size % Passing ¾". ½". # 87.8 # 82.2 # 1.1 # 9. # 2. Tested by: 19 Frances Ave., Cranston, RI 29 # 3. Reviewed by: 1-7- # 17.9 CTS Gloucester, MA GZA File # MP/MS Date: 2/1/1 MBP Date: 2/19/1

15 U.S. STAARD SIEVE A HYDROMETER ASTM D22 3" 2" 1" 3/" 1/2" # # # # # # # Percent Finer by Weight GRAVEL SA SILT C L A Y Coarse Fine Coarse Medium Fine 1 Grain Size (mm) Gravel Sand Fines 1.% 8.2% 1.8% Lab # Exploration Description WC LL PL PI 19 GZ- S-2 8-' Brown f-m SA, little Silt, trace fine Gravel 1.8 Sieve Size % Passing ¾". ½". # 99. # 9.7 # 8. # 8.3 # 1.7 Tested by: 19 Frances Ave., Cranston, RI 29 # 32. Reviewed by: 1-7- # 1.8 CTS Gloucester, MA GZA File # MP/MS Date: 2/1/1 MBP Date: 2/19/1

16 U.S. STAARD SIEVE A HYDROMETER ASTM D22 3" 2" 1" 3/" 1/2" # # # # # # # Percent Finer by Weight GRAVEL SA SILT C L A Y Coarse Fine Coarse Medium Fine 1 Grain Size (mm) Gravel Sand Fines 8.% 22.% 29.1% Lab # Exploration Description WC LL PL PI 21 GZ-7A S-2.-.8' Brown f-c GRAVEL, some Silt & Clay, some f-c Sand. Sieve Size % Passing ¾" 7.1 ½" 7.1 # 1. #. # 2.1 #.2 # 39. Tested by: 19 Frances Ave., Cranston, RI 29 # 3. Reviewed by: 1-7- # 29.1 CTS Gloucester, MA GZA File # MP/MS Date: 2/1/1 MBP Date: 2/19/1

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

December 20, 2017 (Revised from December 15, 2017) Project No

December 20, 2017 (Revised from December 15, 2017) Project No December 20, 2017 (Revised from December 15, 2017) Project No. 92270.02 Ms. Laura Krusinski, P.E. Senior Geotechnical Engineer Maine Department of Transportation State House Station 16 Augusta, Maine 04333-016

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

ATTACHMENT 2 GEOTECHNICAL INFORMATION

ATTACHMENT 2 GEOTECHNICAL INFORMATION ATTACHMENT 2 GEOTECHNICAL INFORMATION Memorandum 2301 Chestnut Street Philadelphia, PA 19103 USA +1.215.569.2900 Fax +1.215.569.5963 Date May 24, 2017 To From Dave Phelan, PE, Sean Robert, PE - Jacobs

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG GEOLOGIC LOG DATE STARTED: DATE COMPLETED: 08-Sep-09 08-Sep-09 LOGGER: Quin Kinnebrew WEATHER: Clear & Warm PAGE 1 OF 2 WELL NO. GMW-66 COMPANY NAME:

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Log of Monitoring Well D58B

Log of Monitoring Well D58B Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report S-38-50 (Four Holes Road) over I-26 Emergency Bridge Replacement Orangeburg County, South Carolina May 22, 2018 (Revision 1) SCDOT Project ID.: P037465 Terracon Project No. 73155050U

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

UAS Student Residence

UAS Student Residence General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN

More information

REPORT. Explorations and Geotechnical Engineering Services

REPORT. Explorations and Geotechnical Engineering Services REPORT September 9, 2015 15-0690 S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs

More information

APPENDIX B: BORING LOGS

APPENDIX B: BORING LOGS New Orleans Levee Systems Independent Levee Hurricane Katrina Investigation Team July, 6 APPENDIX B: BORING S As part of the field investigation 9 borings were performed at the sites of interest, as listed

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

WELL NUMBER 14-BW03 PAGE 1 OF 5

WELL NUMBER 14-BW03 PAGE 1 OF 5 WELL 14-BW03 PAGE 1 OF 5 IENT PROJECT DATE STARTED 4/30/14 COMPLETED 5/1/14 GROUND ELEVATION 1157.89 ft HOLE SIZE 9 5/8 inches DRILLING CONTRACTOR Cascade Drilling NORTHING 670592.2 EASTING 1937845.8 DRILLING

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00 Závěrka 12,Praha 6,169 00 Log of Boring BH1 Project ID: 2018_A-017 Annex no.: A.1G Drilling equipment: Hütte 202 TF Location: Prague 12 Overall depth: 2 m Borehole position: Date start: 22.11.2017 Foreman:

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

Existing Bridge Proposed Bridge 66003

Existing Bridge Proposed Bridge 66003 922 335 9 T2 X 924 919 9 T4 923 T3 919 922 9 T1 925 919 Existing Bridge 6842 919 9 Proposed Bridge 66003 Minnesota Department of Transportation Geotechnical Section Boring Log Descriptive Terminology (English

More information

Town of Brunswick, Maine

Town of Brunswick, Maine 1. Project Presentation Town of Brunswick, Maine Miller Point Shoreline Stabilization Project Rob and Nancy King Applicant Staff Meeting 6:00 P.M. June 27, 2016 Room 206 Town Hall 85 Union Street Open

More information

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN #271-120-011) ORINDA, CALIFORNIA A 580 Ts 590 HMA-1 600 HMA-2 70 Ts 610 Ts HMA-3 HLA-5 GJA-6 LD-2 23

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

HNTB Corporation January 29, 2018 Project No

HNTB Corporation January 29, 2018 Project No www.schonewaldengineering.com HNTB Corporation January 29, 2018 Project No. 17-032 PROJECT BACKGROUND AND OBJECTIVES Localized slope failures and associated open tension cracks are located along the southerly

More information

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPT CAPITAL REGION RESOURCE RECOVERY CENTRE APPENDIX A Borehole Records December Report No. //vol III LIST OF ABBREVIATIONS The abbreviations coonly employed

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

APPENDIX C SUBSURFACE EXPLORATIONS

APPENDIX C SUBSURFACE EXPLORATIONS APPENDIX C SUBSURFACE EXPLORATIONS 51-1-52-021 APPENDIX C SUBSURFACE EXPLORATIONS TABLE OF CONTENTS Page C.1. C.2. C.3. C.4. C.5. C.6. GENERAL...C-1 DRILLING PROCEDURES...C-1 SAMPLING PROCEDURES...C-2

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Technical Memorandum. Soil Borings

Technical Memorandum. Soil Borings Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Jim Christal Rd B2 B1 B3

Jim Christal Rd B2 B1 B3 Jim Christal Rd B1 B2 B3 KEY O YMBOL AND ERM LIHOLOGIC YMBOL Asphalt ARIFICIAL Aggregate Base Concrete Fill CH: High Plasticity Clay CL: Low Plasticity Clay Consistency Very oft oft Medium tiff tiff Very

More information

Appendix J. Geological Investigation

Appendix J. Geological Investigation Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

APPENDIX E GEOTECHNICAL INVESTIGATIONS, 2014

APPENDIX E GEOTECHNICAL INVESTIGATIONS, 2014 APPENDIX E GEOTECHNICAL INVESTIGATIONS, 14 Submerged Aquatic Vegetation Mitigation EA 2 SECTION 31 32 Geotechnical Data Report for Construction Dredging - Mitigation Prepared by Geotechnical Branch Engineering

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

Minnesota Department of Transportation MEMO Office of Materials Mailstop Gervais Avenue Maplewood, MN 55109

Minnesota Department of Transportation MEMO Office of Materials Mailstop Gervais Avenue Maplewood, MN 55109 Minnesota Department of Transportation MEMO Office of Materials Mailstop 4 1400 Gervais Avenue Maplewood, MN 9 DATE: April 2, 09 TO: FROM: D. J. Sosa, Final Design Project Manager Metro Waters Edge Gary

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

FOUNDATION ANALYSIS AND DESIGN REPORT. Mark Bishop, PE, Kimley-Hom and Associates, Inc. Jeffery K. Voyen, PE, American Engineering Testing, Inc.

FOUNDATION ANALYSIS AND DESIGN REPORT. Mark Bishop, PE, Kimley-Hom and Associates, Inc. Jeffery K. Voyen, PE, American Engineering Testing, Inc. FOUNDATION ANALYSIS AND DESIGN REPORT TO: FROM: Mark Bishop, PE, Kimley-Hom and Associates, Inc. Jeffery K. Voyen, PE, American Engineering Testing, Inc. DATE: June 25, 2014 SUBJECT: LRT Bridge over Excelsior

More information

Core Barrels. Core Barrels

Core Barrels. Core Barrels Core Barrels To collect the core of the rock drilled, a device known as the core barrel is used. Core barrel retains rock core samples from drilling operations Its length varies from 0.5 to 3 m. There

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Highway Subsurface Exploration

Highway Subsurface Exploration Highway Subsurface Exploration D. G. S hurig, Research A ssistant E. J. Yoder, Research E ngineer Joint Highway Research Project Purdue University Introduction This paper pertains to the operation and

More information

Appendix E. Phase 2A Geotechnical Data

Appendix E. Phase 2A Geotechnical Data Appendix E Phase 2A Geotechnical Data Appendix E1 Geotechnical Testing of Sediment ApPENDIX El. GEOTECHNICAL TESTING OF SEDIMENT (Modified from Exponent, 20Q1c) E.I Introduction This appendix presents