REPORT. Explorations and Geotechnical Engineering Services
|
|
- Aleesha Ball
- 6 years ago
- Views:
Transcription
1 REPORT September 9, S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs Attn: Mr. Sean Tiney 2 Executive Park Drive, Suite 205 Bedford, NH PREPARED BY: S. W. Cole Engineering, Inc. 10 Centre Road Somersworth, NH (603)
2 TABLE OF CONTENTS 1.0 INTRODUCTION Scope and Purpose Existing Conditions and Proposed Construction SUBSURFACE EXPLORATION SUBSURFACE CONDITIONS Soils Groundwater SUMMARY OF RECOMMENDATIONS SPECIAL CONSIDERATIONS CLOSURE... 6 Attachment A Limitations Sheet 1 Site Location Map Sheets 2 and 3 Boring Logs Sheet 4 Key to the Notes and Symbols Sheets 5 and 6 Gradation Test Results Appendix A Drawings C1.0 and C5.0
3 S September 9, 2015 Jacobs Attention: Sean Tiney 2 Executive Park Drive, Suite 205 Bedford, NH Subject: Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire Dear Sean: In accordance with Proposal dated July 15, 2015 and our subsequent correspondence, we have undertaken subsurface explorations and geotechnical engineering services for the proposed Runway 35 Localizer Slope Reconstruction in Manchester, New Hampshire. This report summarizes our findings and recommendations, and its contents are subject to the limitations set forth in Attachment A. 1.0 INTRODUCTION 1.1 Scope and Purpose The purpose of the work was to explore subsurface conditions at the site of a localized slope failure on a property accessed from Goffs Falls Road in order to provide recommendations for slope reconstruction. Our scope of services included two test borings, soils laboratory testing, a geotechnical evaluation of the findings relative to slope reconstruction, and preparation of this report. 1.2 Existing Conditions and Proposed Construction The site is located on the south side of Goffs Falls Road on a parcel of land referred to as the localizer area, which is in the flight path on the north side Runway for MHT Airport. The runway and localizer parcel are separated by Cohas Brook. The localizer parcel is primarily level at approximately elevations 215 to 216 feet (project datum). The terrain along the southerly edge of the parcel slopes steeply downward to
4 S September 9, 2015 the south to Cohas Brook. The brook in the area of the toe of the slope creates an oxbow feature in its flow path. Based on the Existing Conditions Plan prepared by Jacobs (Drawing C1.0, dated September 2015), the ordinary high water level of Cohas Brook is at about elevation 179 feet. Given this, the south facing bank is on the order of 36 feet in height. Slopes along the bank are as steep as about 1.3:1 (H:V), generally steeper further down slope. The upper portion of the parcel near the bank is reported to be fill used to level the localizer area. In eastern and central portion of the bank, the upper portion of the slope is surfaced with stone rip rap. A wildlife fence is located along the slope face. A localizer beacon light is located along the top of the slope near the centerline of the flight path. A portion of the westerly side of the slope has undergone a localized slope failure. The width of the failure is approximately 20 to 25 feet and extends downhill to about elevations 183 to 184 feet. Based on observations of the soils exposed in the nearvertical face of the failure, the stratigraphy contains granular fill overlying native stratified silt and fine sand with some clay. We understand the approximately 380-foot long south facing slope will be reconstructed and will likely involve maintaining the toe of the slope at its present location and regrading the roughly upper third of the slope to flatten the surface. A horizontal bench will be cut into the new slope to accommodate the wildlife fence at approximately elevations 205 to 206 feet. The localizer beacon light will remain in place and will require a retaining wall to transition its grades into the new slope. We understand a permanent sheet pile retaining wall is planned for this purpose. In conjunction with slope reconstruction, the failed slope section will require repair work. We understand we have been contacted to address remediation of the failed slope area. 2
5 S September 9, SUBSURFACE EXPLORATION 2.1 Exploration We coordinated and observed two test borings at locations selected and located by Jacobs. Boring B-1 was made along the top of the slope near the localizer beacon light, while Boring B-2 was made closer to the failure area. Ground surface elevations for both borings were estimated from contours shown on Drawing C1.0. The test borings were drilled by S.W.COLE Explorations, LLC working under subcontract and advanced using hollow-stem augers to a depth of 32.0 feet. Soil samples were obtained where shown on the logs using Standard Penetration Testing (SPT) procedures. We have attached a Site Location Map as Sheet 1. The approximate test boring locations are shown on Drawing C1.0, attached in Appendix A. Boring logs are attached as Sheets 2 and 3. A key to the notes and symbols used on the logs is attached as Sheet Laboratory Testing Soil samples retrieved from the test borings were visually classified in our laboratory. We performed two gradation tests on selected samples to assist in our evaluation. Results are attached as Sheets 5 and SUBSURFACE CONDITIONS 3.1 Soils Beneath surficial topsoil, the test borings encountered granular fills overlying native sands and silts. In Boring B-1, made near the localizer beacon light, the fills consist of medium dense silty sands with varying amounts of gravel extending to a depth of approximately 15 feet. A piece of apparent filter fabric was observed in the initial 0 to 2.0-foot sample. The native underlying soils are loose sands and silt with a few clayey silt layers observed well below grade. 3
6 S September 9, 2015 Boring B-2, made closer to the slope failure, encountered approximately 12 feet of loose to medium dense sandy fill with some silt (on the order of 5 to 12 percent of soil particles by weight). An apparent old topsoil layer was observed in Sample 3D (10.0 to 12.0 feet). The underlying native materials are various layers of fine to medium graded sands and finer sands with varying amounts of silt. For more information relative to the test borings findings, please refer to the attached logs. 3.2 Groundwater Soil samples were moist below a depth of approximately 21 feet in Boring B-1 and 15 feet in Boring B-2. These observation likely reflect groundwater levels at the time of the explorations. Long-term groundwater information is not available. Groundwater levels will fluctuate seasonally and in response to precipitation and snowmelt. 4.0 SUMMARY OF RECOMMENDATIONS The slope failure is limited to an approximately 20 to 25 foot wide area, and appears to be on the order of 6 to 8 feet in depth. The failure is likely a result of localized channeling of surface water runoff; groundwater flow at the interface relatively clean sandy fills and native sands overlying less pervious fine sand and silt (see log for Boring B-2); or a combination of both mechanisms. It is of note that on Drawing C1.0, the upper portion of the failed area shows the slope being considerably steeper east of the failure (about 1.3:1) when compared to the west. It is possible this may have contributed to long term channeling of surface water runoff in the years before the failure. We recommend reconstruction of the failed area at a slope of 2:1 or flatter. Given the existing terrain, we understand it will be necessary to blend in the repair surface into steeper slopes on both sides of the failure. Transitions in grading to these edges should be a smooth as practicable. We have previously submitted to you a sketch outlining our recommended repair section for the failed area. You have incorporated these recommendations into your documentation as Drawing C5.0. We have included this drawing in Appendix A. The 4
7 S September 9, 2015 repair scheme is summarized below. Remove loose debris from the failed area Locate the toe of the slide Construct the rip rap key into the toe as shown on the drawing Grade the subgrade to 2:1 or flatter Place and compact at least 3 feet of Structural Fill, compacting to at least 95 percent of its maximum dry density per ASTM D-1557 (Modified Proctor) The Structural Fill should be benched at least 2 feet into the subgrade on all sides during placement. Geogrid reinforcement (Miragrid 5XT or equivalent) should be installed at 2-foot vertical intervals during placement. Grade the finish slope at 2:1 or flatter. Blend into the steeper adjacent slopes as necessary. Structural Fill should meet the following gradation. STRUCTURAL FILL Sieve Size Percent Finer by Weight 4 Inch Inch 90 to 100 ¼ Inch 25 to 90 No to 30 No to 5 It is our opinion that NHDOT Item 508 Structural Fill meets the intention of the Structural Fill specification and is an adequate substitute. 5.0 SPECIAL CONSIDERATIONS Our work focused on the failure area. Other areas of the slope are naturally steeper than what is considered acceptable for an engineered slope. These areas currently appear stable, however similar failures to the one experienced are possible in other areas. 5
8 S September 9, CLOSURE We recommend that S.W.COLE be retained during slope failure reparation work to perform soils testing and to observe compliance with the design concepts, plans and specifications. It has been a pleasure to be of assistance to you with this phase of your project. If you have any questions or we may be of further assistance, please do not hesitate to contact us. Sincerely, S. W. Cole Engineering, Inc. Anthony J. Hersh, P.E. Senior Geotechnical Engineer AJH:cbm 6
9 ATTACHMENT A Limitations This report has been prepared for the exclusive use of Jacobs for specific application to the Runway 35 Localizer Slope Reconstruction project in Manchester, New Hampshire. S.W.COLE has endeavored to conduct the work in accordance with generally accepted soil and foundation engineering practices. No warranty, expressed or implied, is made. The soil profiles described in the report are intended to convey general trends in subsurface conditions. The boundaries between strata are approximate and are based upon interpretation of exploration data and samples. The analyses performed during this assessment and recommendations presented in this report are based in part upon the data obtained from subsurface explorations made at the site. Variations in subsurface conditions may occur between explorations and may not become evident until construction. If variations in subsurface conditions become evident after submission of this report, it will be necessary to evaluate their nature and to review the recommendations of this report. Observations have been made during exploration work to assess site groundwater levels. Fluctuations in water levels will occur due to variations in rainfall, temperature, and other factors. S.W.COLE s scope of work has not included the investigation, detection, or prevention of any Biological Pollutants at the project site or in any existing or proposed structure at the site. The term Biological Pollutants includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and the byproducts of any such biological organisms. Recommendations contained in this report are based substantially upon information provided by others regarding the proposed project. In the event that any changes are made in the design, nature, or location of the proposed project, S.W.COLE should review such changes as they relate to analyses associated with this report. Recommendations contained in this report shall not be considered valid unless the changes are reviewed by S.W.COLE.
10 APPROXIMATE SITE LOCATION R:\2015\ \GIS\MXDs\ SLM.mxd, 9/8/ :02:49 PM, 1:24,000, NOTE: SITE LOCATION MAP PREPARED FROM ESRI ArcGIS ONLINE AND DATA PARTNERS INCLUDING USGS AND 2007 NATIONAL GEOGRAPHIC SOCIETY. Job No. Date: Copyright: 2013 National Geographic Society, i-cubed 2, ,000 4, /08/2015 Scale in Feet MHT AIRPORT SITE LOCATION MAP RUNWAY 35 LOCALIZER SLOPE RECONSTRUCTION GOFFS FALLS ROAD MANCHESTER, NEW HAMPSHIRE Scale Sheet 1:
11 BORING LOG BORING NO.: SHEET: PROJECT NO.: B-1 OF PROJECT / CLIENT: JACOB / RUNWAY 35 LOCALIZER SLOPE RECONSTRUCTION DATE START: LOCATION: MHT AIRPORT, GOFFS FALLS ROAD, MANCHESTER, NH DATE FINISH: DRILLING CO. : S.W.COLE EXPLORATIONS, LLC DRILLER: BOB MARCOUX ELEVATION: 8/10/2015 8/10/ ' +/- CASING: SAMPLER: CORE BARREL: TYPE SIZE I.D. HAMMER WT. HAMMER FALL HSA 2 1/4" SS 1 3/8" 140 LB 30" SWC REP.: AJH WATER LEVEL INFORMATION SAMPLES MOIST BELOW 21' CASING BLOWS PER FOOT SAMPLE SAMPLER BLOWS PER 6" DEPTH STRATA & TEST DATA DEPTH NO. PEN. REC BOT 0.2' TOPSOIL 1D 24" 61" 2.0' BROWN SILTY SAND, SOME GRAVEL, PIECE OF FILTER FABRIC IN SAMPLE 1D (FILL) ~ MEDIUM DENSE ~ 6.0' 2D 24" 12" 7.0' ' DARK BROWN SILTY SAND WITH ORGANICS (FILL) BROWN GRAVELLY SILTY SAND (FILL) 3D 24" 4" 12.0' ~ MEDIUM DENSE ~ 15.0' 4D 24" 12" 17.0' BROWN SAND AND SILT 5D 24" 20" 22.0' ~ LOOSE ~ 6D 24" 16" 27.0' ' BROWN SILT AND FINE SAND, FEW CLAYEY SILT LENSES AND LAYERS 7D 24" 16" 32.0' ' ~ MEDIUM DENSE ~ BOTTOM OF EXPLORATION AT 32.0' SAMPLES: SOIL CLASSIFIED BY: REMARKS: D = SPLIT SPOON C = 2" SHELBY TUBE DRILLER - VISUALLY STRATIFICATION LINES REPRESENT THE S = 3" SHELBY TUBE X SOIL TECH. - VISUALLY APPROXIMATE BOUNDARY BETWEEN SOIL TYPES U = 3.5" SHELBY TUBE X LABORATORY TEST AND THE TRANSITION MAY BE GRADUAL. BORING NO.: B-1 2
12 BORING LOG BORING NO.: SHEET: PROJECT NO.: B-2 1 OF PROJECT / CLIENT: JACOB / RUNWAY 35 LOCALIZER SLOPE RECONSTRUCTION DATE START: LOCATION: MHT AIRPORT, GOFFS FALLS ROAD, MANCHESTER, NH DATE FINISH: DRILLING CO. : S.W.COLE EXPLORATIONS, LLC DRILLER: BOB MARCOUX ELEVATION: 8/10/2015 8/10/ ' +/- CASING: SAMPLER: CORE BARREL: TYPE SIZE I.D. HAMMER WT. HAMMER FALL HSA 2 1/4" SS 1 3/8" 140 LB 30" SWC REP.: AJH WATER LEVEL INFORMATION SAMPLES MOIST BELOW 15' CASING BLOWS PER FOOT SAMPLE SAMPLER BLOWS PER 6" NO. PEN. REC. BOT DEPTH STRATA & TEST DATA 0.1' TOPSOIL 1D 24" 15" 2.0' BROWN SAND, SOME SILT, TRACE GRAVEL (FILL) ~ LOOSE TO MEDIUM DENSE ~ 2D 24" 8" 7.0' D 24" 7" 12.0' ' 12.5' 16.0' 4D 24" 14" 17.0' PROBABLE OLD TOPSOIL BROWN SAND, TRACE SILT ~ MEDIUM DENSE ~ BROWN FINE SAND AND SILT ~ MEDIUM DENSE ~ 21.0' 5D 24" 15" 22.0' BROWN SILTY FINE SAND WITH LAYERS OF FINE SAND, SOME SILT ~ MEDIUM DENSE ~ 25.0' 6D 24" 18" 27.0' BROWN FINE SAND, SOME SILT WITH SILTY FINE SAND LAYERS ~ MEDIUM DENSE ~ 7D 24" 12" 32.0' ' BOTTOM OF EXPLORATION AT 32.0' SAMPLES: SOIL CLASSIFIED BY: REMARKS: D = SPLIT SPOON C = 2" SHELBY TUBE DRILLER - VISUALLY STRATIFICATION LINES REPRESENT THE S = 3" SHELBY TUBE X SOIL TECH. - VISUALLY APPROXIMATE BOUNDARY BETWEEN SOIL TYPES U = 3.5" SHELBY TUBE X LABORATORY TEST AND THE TRANSITION MAY BE GRADUAL. BORING NO.: B-2 3
13 KEY TO THE NOTES & SYMBOLS Test Boring and Test Pit Explorations All stratification lines represent the approximate boundary between soil types and the transition may be gradual. Key to Symbols Used: w - water content, percent (dry weight basis) q u - unconfined compressive strength, kips/sq. ft. - laboratory test S v - field vane shear strength, kips/sq. ft. L v - lab vane shear strength, kips/sq. ft. q p - unconfined compressive strength, kips/sq. ft. pocket penetrometer test O - organic content, percent (dry weight basis) W L - liquid limit - Atterberg test W P - plastic limit - Atterberg test WOH - advance by weight of hammer WOM - advance by weight of man WOR - advance by weight of rods HYD - advance by force of hydraulic piston on drill RQD - Rock Quality Designator - an index of the quality of a rock mass. γ T - total soil weight γ B - buoyant soil weight Description of Proportions: Description of Stratified Soils Parting: 0 to 1/16 thickness Trace: 0 to 5% Seam: 1/16 to 1/2 thickness Some: 5 to 12% Layer: ½ to 12 thickness Y 12 to 35% Varved: Alternating seams or layers And 35+% Occasional: one or less per foot of thickness With Undifferentiated Frequent: more than one per foot of thickness REFUSAL: Test Boring Explorations - Refusal depth indicates that depth at which, in the drill foreman's opinion, sufficient resistance to the advance of the casing, auger, probe rod or sampler was encountered to render further advance impossible or impracticable by the procedures and equipment being used. REFUSAL: Test Pit Explorations - Refusal depth indicates that depth at which sufficient resistance to the advance of the backhoe bucket was encountered to render further advance impossible or impracticable by the procedures and equipment being used. Although refusal may indicate the encountering of the bedrock surface, it may indicate the striking of large cobbles, boulders, very dense or cemented soil, or other buried natural or man-made objects or it may indicate the encountering of a harder zone after penetrating a considerable depth through a weathered or disintegrated zone of the bedrock 4
14 Report of Gradation ASTM C-117 & C-136 Project Name Client Exploration Material Source 15' - 17' MANCHESTER ME - MHT AIRPORT RUNWAY 35 LOCALIZER SLOPE REHABILITATION - GEOTECHNICAL ENGINEERING SERVICES JACOBS ENGINEERING GROUP, INC. B-1, 4D Project Number Lab ID 13818S Date Received 8/11/2015 Date Completed 8/12/2015 Tested By MURRAY SWINDELL STANDARD DESIGNATION (mm/µm) SIEVE SIZE AMOUNT PASSING (%) 6.3 mm 4.75 mm 2.00 mm 850 um 425 um 250 um 150 um 75 um 1/4" 100 No No No No No No No % Gravel 59.6% Sand 40.4% Fines 100% 3" 2" 1" 1/2" 1/4" #10 #20 #40 #100 #200 90% 80% AMOUNT PASSING 70% 60% 50% 40% 30% 20% 10% 0% SIEVE SIZE - mm Comments: Sheet 5
15 Report of Gradation ASTM C-117 & C-136 Project Name Client Exploration Material Source 5' - 7' MANCHESTER ME - MHT AIRPORT RUNWAY 35 LOCALIZER SLOPE REHABILITATION - GEOTECHNICAL ENGINEERING SERVICES JACOBS ENGINEERING GROUP, INC. B-2, 2D Project Number Lab ID 13819S Date Received 8/11/2015 Date Completed 8/12/2015 Tested By MURRAY SWINDELL STANDARD DESIGNATION (mm/µm) SIEVE SIZE AMOUNT PASSING (%) 6.3 mm 4.75 mm 2.00 mm 850 um 425 um 250 um 150 um 75 um 1/4" 100 No No No No No No No % Gravel 89.6% Sand 9.7% Fines 100% 3" 2" 1" 1/2" 1/4" #10 #20 #40 #100 #200 90% 80% AMOUNT PASSING 70% 60% 50% 40% 30% 20% 10% 0% SIEVE SIZE - mm Comments: Sheet 6
16 APPENDIX A DRAWINGS C1.0 AND C5.0
17 Jacobs - P:\2015\E2X74702 MHT RW 35 Localizer Slope Repair\700 CADD\plans\03 - Existing Conditions Plan.dwg [Layout1] September 04, :54am [stiney] LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC C1.0
18 Jacobs - P:\2015\E2X74702 MHT RW 35 Localizer Slope Repair\700 CADD\plans\ Typ. Sections and Details.dwg [layout1] September 09, :29pm [stiney] C5.0
Town of Brunswick, Maine
1. Project Presentation Town of Brunswick, Maine Miller Point Shoreline Stabilization Project Rob and Nancy King Applicant Staff Meeting 6:00 P.M. June 27, 2016 Room 206 Town Hall 85 Union Street Open
More informationB-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.
N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232
More informationATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY
ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com
More informationProject: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major
More informationField Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:
March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin
More informationENGINEERING ASSOCIATES
July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9
More informationPreliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky
Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation
More informationAPPENDIX C. Borehole Data
APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL
More informationAPPENDIX E SOILS TEST REPORTS
Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this
More informationPRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts
More informationDATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS
DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,
More informationGeotechnical Data Report
Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road
More informationCivil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx
2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt
More informationREPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:
REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials
More informationLimited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming
Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering
More informationPierce County Department of Planning and Land Services Development Engineering Section
Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT
More informationADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON
F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142
More informationCITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3
GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL
More informationSITE INVESTIGATION 1
SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.
More informationConverse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services
Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North
More informationAPPENDIX A GEOTECHNICAL REPORT
The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation
More informationGeotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado
2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,
More informationAppendix 11-B Preliminary Geotechnical Investigation
Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,
More informationDepth (ft) USCS Soil Description TOPSOIL & FOREST DUFF
Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,
More informationGeotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No
Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,
More informationAPPENDIX C HYDROGEOLOGIC INVESTIGATION
Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT
More informationENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods
ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design
More informationREPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION
REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.
More informationPhoto 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking
More informationGeotechnical Investigation
Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationGZA GeoEnvironmental, Inc.
GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring
More informationSOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED
More informationGeotechnical Data Report
Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina
More informationPreliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION
File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary
More informationGeneral. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation
DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM
More informationBoreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.
Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground
More informationUAS Student Residence
General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN
More informationREPORT OF SUBSURFACE EXPLORATION
REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON
More informationSoil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.
Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE
More informationPRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.
PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park
More informationAppendix A. Producer Statement Advisory Note
Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More informationGEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.
Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,
More information3.0 SUMMARY OF FINDINGS
AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,
More informationM E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI
M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical
More informationPRELIMINARY GEOTECHNICAL ENGINEERING REPORT
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More informationTP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan
More informationSUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California
October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource
More informationNAPLES MUNICIPAL AIRPORT
NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans
More informationReport of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011
11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -
More informationDecember 20, 2017 (Revised from December 15, 2017) Project No
December 20, 2017 (Revised from December 15, 2017) Project No. 92270.02 Ms. Laura Krusinski, P.E. Senior Geotechnical Engineer Maine Department of Transportation State House Station 16 Augusta, Maine 04333-016
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared
More informationHNTB Corporation January 29, 2018 Project No
www.schonewaldengineering.com HNTB Corporation January 29, 2018 Project No. 17-032 PROJECT BACKGROUND AND OBJECTIVES Localized slope failures and associated open tension cracks are located along the southerly
More informationDecember 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.
December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset
More informationSlope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.
Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works
More informationREPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.
REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post
More informationNorthern Colorado Geotech
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.
More informationpatersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01
patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade
More informationProject No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD
Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed
More informationR-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map
More informationSLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO
SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900
More informationGEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC
GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August
More informationINVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G
GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015
More informationChapter 12 Subsurface Exploration
Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface
More information16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN
16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested
More informationPREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY
SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.
More informationREPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.
REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU
More informationThe process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper
More informationAugust 10, 2007 File:
August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)
More informationNew WW Hastings Hospital Geotechnical Investigation RFP Addendum #1
88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR
More informationThe attitude he maintains in his relation to the engineer is very well stated in his own words:
Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings
More informationIN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION
IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity
More informationHydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)
TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,
More informationMay 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411
Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,
More informationSUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue
SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works
More informationGeotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project
TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482
More informationPLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.
611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po
More informationGEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA
GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN #271-120-011) ORINDA, CALIFORNIA A 580 Ts 590 HMA-1 600 HMA-2 70 Ts 610 Ts HMA-3 HLA-5 GJA-6 LD-2 23
More informationpatersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.
Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson
More informationAppendix G GEOLOGICAL INVESTIGATION
Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR
More informationCENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM
SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION
More informationReference No S072 APRIL 2012
A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION
More informationTown of Amenia Dutchess County New York
Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007
More informationAN EMPLOYEE OWNED COMPANY
CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection
More informationHDD PA-IN RD (W-N57 and W-N56)
HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing
More informationB-1 SURFACE ELEVATION
5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION
More informationPreliminary Geotechnical Engineering Report
Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,
More informationAppendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING
Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation
More informationDate: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303
City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120
More informationGotechnical Investigations and Sampling
Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of
More informationAPÉNDICE F. Evaluación Geotécnica
APÉNDICE F Evaluación Geotécnica REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED LAGUNA DEL MAR PLAZA PROJECT ASHFORD AVE. SAN JUAN, PUERTO RICO GUTIERREZ - LATIMER - C.S.P. MR. ROBERTO CACHO I LAGUNA
More informationGeotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA
Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,
More informationpatersongroup memorandum 1.0 Field Investigation consulting engineers
consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential
More information