1 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Prepared for: Renewable Water Resources Greenville, South Carolina Prepared by: Terracon Consultants, Inc. Taylors, South Carolina

2

3 March 31, 2014 Renewable Water Resources 561 Mauldin Road Greenville, SC Attn: Mr. Brian Bishop, P.E. P: x 213 F: E: brianb@re-wa.org Re: Proposal for Geotechnical Investigation Richland Creek Trunk Sewer Greenville, South Carolina Terracon Proposal No Dear Mr. Bishop: Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering services for the above referenced project. This study was performed in general accordance with our Proposal No. P , dated February 25, This report presents the findings of the exploration to determine pertinent geotechnical conditions along the proposed sewer line and recommendations for the design and construction of the project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us. Sincerely, Terracon Consultants, Inc. Nitin Dudani, P.E. Senior Geotechnical Engineer Rex T. Brown, P.E. Senior Engineer Enclosures cc: 1 Client (PDF) 1xc: File Terracon Consultants, Inc Starita Road, Suite E Charlotte, North Carolina P [704] F [704] terracon.com

4

5 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No TABLE OF CONTENTS Page 1.0 INTRODUCTION PROJECT INFORMATION Site Location SUBSURFACE COITIONS Geology Typical Subsurface Profile Groundwater Conditions RECOMMEATIONS FOR DESIGN A CONSTRUCTION General Excavation Conditions General Excavation Conditions Trenchless Crossing Conditions General Backfilling Recommendations Material Types Compaction Requirements Construction Considerations Excavations Difficult Excavation GENERAL COMMENTS... 9 Appendix A Field Exploration Exhibit A-1 Site Location Plan Exhibit A-2 to A-10 Boring Location Plans Exhibit A-11 Field Exploration Description Exhibits A-12 to A-21 SPT Boring Logs Exhibit A-22 Laboratory Test Results Appendix B Supporting Documents Exhibit B-1 General Notes Exhibit B-2 Unified Soil Classification Systems ii

6

7 GEOTECHNICAL ENGINEERING REPORT RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Terracon Project No March 31, INTRODUCTION A geotechnical engineering report has been completed for the proposed Richland Creek Trunk Sewer in Greenville, South Carolina. Nine (9) SPT borings, designated B-1 through B-9 were performed to depths of approximately 12.4 to 30 feet below the existing ground surface along the proposed sewer line. Logs of the borings, a vicinity map and boring location plans are included in Appendix A of this report. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: subsurface soil conditions groundwater conditions earthwork depth to rock or Partially Weathered Bedrock 2.0 PROJECT INFORMATION 2.1 Site Location Site Location ITEM Location Existing improvements Current ground cover Existing topography DESCRIPTION The proposed sewer line will start south of E. Washington Street (Greenville Zoo parking) and will terminate near the intersection of Stone Plaza Drive and Chick Spring Road in Greenville, SC. Existing ReWa sewer lines are installed in the vicinity of proposed line. Grass, small brush and pavement. Based on the Greenville County GIS system contour maps, in general the site elevation at the proposed sewer is sloping down towards the south direction Responsive Resourceful Reliable 1

8 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Project Description ITEM Proposed Sewer Line DESCRIPTION The project will include approximately 14,000 feet of gravity sewer, ranging in size between 24 and 48 inches. It is anticipated that the new sewer will be constructed via open cut methods, except for the crossings of major highways. These crossings will be achieved by jacking and boring a steel casing. Should any of the above information or assumptions be inconsistent with the planned construction, please let us know so that we may make any necessary modifications to this proposal. 3.0 SUBSURFACE COITIONS 3.1 Geology The project site is located within the Piedmont Physiographic Province of South Carolina, an area underlain by ancient igneous and metamorphic rocks. The topography and relief of the Piedmont has developed from differential weathering of the igneous and metamorphic bedrock. The residual soils in this area are the product of in-place chemical weathering of rock. The typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced, underlain by sandy silts and silty sands that generally become harder with depth to the top of parent bedrock. The boundary between soil and rock is not sharply defined due to variations in weathering and the presence of soft rock. The transition zone is locally termed as partially weathered rock. Partially weathered rock is defined for engineering purposes as residual material that can be drilled with soil boring methods, but exhibits standard penetration test (SPT) N- values exceeding 100 blows per foot (bpf). The depth to partially weathered rock occurs at irregular depths due to variations in degree of weathering and variations in the material composition of the rock. Responsive Resourceful Reliable 2

9 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Typical Subsurface Profile Based on the results of the SPT borings, subsurface conditions on the project site can be generalized as follows: Description Approximate Depth to Bottom of Stratum (feet) Material Encountered SPT N value Surface Approx. 3 to 6 inches Topsoil N/A Stratum 1 3 to 12 in all borings except B-3 and B-7 Fill sandy silt, clayey sand, silty sand 2 to 19 Stratum 2 8 to 30 Stratum 3 9 ½ to 20 Residual soft to stiff, sandy clay and clayey silt. Loose to medium dense, silty/clayey sand. Partially Weathered Rock sampled as silty sand 2 to Stratum 4 Below 12 ½ to 24 ½ in boring B- 2, B-5, B-6 and B-7 Bedrock based on auger refusal and rock coring NA Specific conditions encountered at each boring location are indicated on the individual boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in-situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs included in Appendix A of this report. The following table is a summary of the information with respect to the nine (9) soil test borings performed along the proposed sewer line. Boring Approx. Elevation (ft) 1 Depth (ft) 3 End of Boring Elev. (ft) 1 Approx. Water Elev. (ft) 1 Refusal Auger Refusal/To p of Rock (ft) 2 B No NE B NE Yes B No NE B No NE B Yes B Yes B NE Yes B-7A No NE B No NE B NE No NE Notes: 1 From Main Sea Level (MSL) Responsive Resourceful Reliable 3

10 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Top of Rock is defined as the elevation at which Auger Refusal was encountered. 3 From the Top of Ground Elevation NE: Not Encountered 3.3 Groundwater Conditions Groundwater was encountered in all soil test borings except B-2, B-6 and B-9 from 5 to 25 feet from the existing ground surface. The boreholes were backfilled at the termination of exploration, making subsequent water level readings unobtainable. Due to the low permeability of the soils encountered in the borings, a relatively long time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials. Longer observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. In addition, perched water could develop in sand seams and layers overlying lower permeability clay soils following periods of heavy or prolonged precipitation. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 RECOMMEATIONS FOR DESIGN A CONSTRUCTION 4.1 General Our evaluation and recommendations are based on the project information outlined previously and on the data obtained from the field testing program. If project plans are changed significantly, Terracon requests the opportunity to review our recommendations based on the new information and make necessary changes. 4.2 Excavation Conditions General Excavation Conditions The boring data indicate that the site soils to the anticipated excavation depths should generally be readily excavatable using moderate powered construction equipment. We anticipate that large earthwork equipment will be performing these tasks due to the depth of excavation to be made and volume of soil to be removed. Based on the summary table of Section 3.2 of this report, we anticipate that difficult excavations could be encountered in the Responsive Resourceful Reliable 4

11 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No surrounding areas of soil test borings B-2, B-5, B-6 and B-7. It is expected that rock will be encountered in these areas that will require blasting or impact hammering to excavate. Based on the estimated depth of the proposed sewer line and the groundwater level encountered, we anticipate that groundwater may be encountered in the areas of soil test borings B-1 to B-3, B-4, B-5, B-7A and B-8. If groundwater is encountered during construction, temporary dewatering will be required. Recommendations regarding groundwater control are discussed in the following sections of the report. We anticipate that the soils will become increasingly wet with depth. Based on the provided pipeline profile and the groundwater depths, the excavations will expose moist to wet subgrades. In the areas where these conditions are encountered, subgrade improvement measures may be needed to provide proper pipe support conditions. Typical bedding for the type of pipe being considered generally consists of 6 to 12 inches of #57 stone to provide a means of confining the exposed pipe subgrade. The actual depth of the stone should be determined in the field based on the conditions exposed by the excavation. All excavations should be sloped or braced as required by Occupational Health and Safety Administration (OSHA) regulations to provide stability and safe working conditions. Temporary excavations will probably be required during grading operations. The grading contractor, by his contract, is usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. Construction site safety is the sole responsibility of the contractor who controls the means, methods and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean that Terracon is assuming any responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred Trenchless Crossing Conditions Trenchless crossings are expected at three (3) roadway crossings present along the three proposed alignments. It is expected the roadway crossings will typically be installed by bore and jack as the length of the trenchless sections are relatively short and the pit depths would likely not be deep. It is typical to install jacking pits at each end of boring and jacking section to provide access to excavate for the sleeves to install the pipelines. The contractor may consider supporting the excavation walls by temporary shoring, either fully or in some combination with sloping. Responsive Resourceful Reliable 5

12 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Excavation support can be achieved by a number of methods, but most likely by driven sheet piles with either an internally braced system or tie-backs. The earth pressure magnitude and distribution on a tied-back or braced retaining structure differs from earth pressures calculated with equivalent fluid pressures for typical retaining walls. To account for the pressures of the retained earth, we recommend that the support system design assume that the soils behind the bracing system will apply a trapezoidal stress distribution based on the excavation depth and the soil s shear strength. The lateral pressures developed by heavy equipment, stored material, stockpiles soils, existing building foundations, etc., near the top of the excavation must be added to the lateral soil stresses to determine the horizontal loads which must be resisted. Based on the boring data and the assumed minimum invert depth, groundwater may be encountered in the trench bottom along the planned trench. If groundwater is encountered at or above the minimum pipe invert prior to construction, we offer the following recommendations. For all trenchless excavation pits, it may be possible to control the groundwater in this area from within the excavation using temporary drainage sumps to pump out the seeping water while the pipe is being installed where the groundwater surface will be penetrated by less than 2 feet using an open-graded stone (#57 stone or equal) at the bottom of the excavated trench to serve as a drainage medium. These materials would also provide bedding for the pipe and would probably not be in addition to the general bedding layer. Periodically, the contractor would need to excavate a sump pit within the trench to allow an area for water to collect and the pump to be set. Groundwater control should be provided until trench backfill is above the original static groundwater level. Where the groundwater will be penetrated by more than 2 feet, it should be anticipated that additional dewatering measures will be needed throughout the excavation and backfilling process. Infiltration of groundwater is expected to be rapid due to the sandy nature of the site soils and, as such, the inflow may be greater than can be controlled from within the excavation. Responsive Resourceful Reliable 6

13 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No General Backfilling Recommendations Material Types As a minimum, the engineered fill should meet the following material property requirements: Fill Type 1 USCS Classification Acceptable Location for Placement Imported Structural Fill SW and SM All locations and elevations On-Site Soils ML, SP,SM, and SC All locations and elevations Notes: 1. Controlled, compacted fill should consist of approved materials that are free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade. A sample of each material type should be submitted to the geotechnical engineer for evaluation Compaction Requirements We recommend that the trench backfill be tested for moisture content and compaction during placement. Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. Backfill soils should meet the following compaction requirements: ITEM Fill Lift Thickness Compaction Requirements 1 Moisture Content DESCRIPTION 8 inches or less in loose thickness when heavy, self-propelled compaction equipment is used. 4 inches when hand-guided equipment (i.e. jumping jack or plate compactor) is used. Roadways and Areas within the SCDOT rightsof-way: 95 percent of the material s maximum standard Proctor dry unit weight (ASTM D 698). Non-structural Areas: 90 percent of the material s maximum standard Proctor dry unit weight (ASTM D 698). As a minimum, the moisture content to be within ±3 percent of optimum moisture based on the material s maximum standard Proctor dry unit weight (ASTM D 698). Responsive Resourceful Reliable 7

14 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No ITEM DESCRIPTION 1. We recommend that engineered fill be tested for moisture content and compaction during placement. Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. The geotechnical engineer should be retained during the construction phase of the project to observe backfill operations and to perform necessary tests. 4.4 Construction Considerations Excavations Excavations for the sewer line are anticipated to encounter groundwater and may require dewatering. Typical dewatering methods include drainage trenches to divert groundwater away from large open excavations and pumping groundwater from a low area within the excavation. We anticipate that a horizontal to vertical slope of 3:1 for construction slopes should provide stable excavations. Where excavations extend below the water table, the excavation sidewalls may slough or flow into the excavation. As such, the excavations may need temporary shoring if sidewalls cannot be sloped back sufficiently enough to provide a stable excavation. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards Difficult Excavation Based on the results of our field exploration, difficult excavation in competent rocks should be expected along the placement of the sewer line in several sites. It is our opinion that a clear and appropriate definition of competent rock be included in the project specifications to reduce the potential for misunderstandings. A sample definition of rock for excavation specifications is provided below: Competent Rock is defined as any material that cannot be dislodged by a CAT 325 hydraulic backhoe, or equivalent without the use of drilling and blasting. Boulders or masses of rock exceeding ½ cubic yard in volume shall also be considered rock excavation. This classification does not include materials such as loose rock, concrete, or other materials that can be removed by means other than drilling and blasting, but which for any reason, such as economic reasons, the Contractor chooses to remove by drilling and blasting. Responsive Resourceful Reliable 8

15 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No GENERAL COMMENTS Terracon should be retained to provide testing and observation during excavation and other construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated location and from other information discussed in this report. This report does not reflect variations that may occur across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive Resourceful Reliable 9

16

17 APPEIX A FIELD EXPLORATION

18

19 PROJECT SITE Image Courtesy of Google Earth TM Project Manager: Drawn by: NJ Checked by: Approved by: Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) SITE LOCATION PLAN Exhibit RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA A-1

20 LEGE: SPT BORING (APPROX. LOCATION) NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-001, DATED 03/05/2014. B-1 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-2

21 LEGE: SPT BORING (APPROX. LOCATION) NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-001, DATED 03/05/2014. B-2 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-3

22 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-002, DATED 03/05/2014. LEGE: SPT BORING (APPROX. LOCATION) B-3 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-4

23 LEGE: SPT BORING (APPROX. LOCATION) NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-002, DATED 03/05/2014. B-4 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-5

24 LEGE: SPT BORING (APPROX. LOCATION) NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-003, DATED 03/05/2014. B-5 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-6

25 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-004, DATED 03/05/2014. LEGE: SPT BORING (APPROX. LOCATION) B-6 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-7

26 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-006, DATED 03/05/2014. LEGE: SPT BORING (APPROX. LOCATION) B-7A B-7 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-8

27 LEGE: SPT BORING (APPROX. LOCATION) NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-007, DATED 03/05/2014. B-8 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-9

28 NOTES: 1. THE EXPLORATION POINTS WERE LOCATED IN THE FIELD BY TERRACON ENGINEER USING GPS COORDINATES OBTAINED USING OVERLAY OF SITE PLAN ON GOOGLE EARTH SOFTWARE. 2. THE BORING LOCATION PLAN PREPARED BASED ON AN ELECTRONIC COPY OF THE DRAWING PROVIDED BY RENEWABLE WATER RESOURCES TITLED RICHLA CREEK TRUNK SEWER, PLAN & PROFILE STA TO STA , DRAWING NO. 100-C-009, DATED 03/06/2014. LEGE: SPT BORING (APPROX. LOCATION) B-9 DIAGRAM IS FOR GENERAL LOCATION ONLY, A IS NOT INTEED FOR CONSTRUCTION PURPOSES Project Manager: Drawn by: Checked by: Approved by: NJ Project No Scale: N.T.S. File Name: Date: 04/17/ Rutherford Road Taylors, South Carolina PH. (864) FAX. (864) BORING LOCATION PLAN RICHLA CREEK TRUNK SEWER GREENVILLE, SOUTH CAROLINA Exhibit A-10

29 Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No Field Exploration Description The boring locations were laid out on the site by Terracon personnel and were measured from available site features. The soil test borings were not surveyed and its locations are approximated. The borings were drilled with an ATV-mounted rotary drill rig using hollow stem auger and rotary wash boring procedures to advance the boreholes. Soil samples were obtained by the split-barrel sampling procedure. In the split-barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split-barrel sampler the last 12 inches of the typical total 18-inch penetration by means of a 140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value (N). This value is used to estimate the in-situ relative density of cohesionless soils and the consistency of cohesive soils. The sampling depths and penetration distance, plus the standard penetration resistance values are shown on the boring logs. A safety hammer was used to advance the split-barrel sampler in the borings performed on this site. The safety hammer is operated by lifting and dropping the hammer using a cathead rope attached to the hammer. Some of the borings were advanced to auger refusal. Refusal materials are materials that cannot be penetrated with the soil drilling methods employed. Refusal, thus indicated, may result from hard cemented soil, soft weathered rock, coarse gravel or boulders, thin rock seams or the upper surface of sound continuous rock. Core drilling procedures are required to determine the character and continuity of refusal materials. The samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further visual examination and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. The borings were backfilled with auger cuttings prior to the drill crew leaving the site. A field log of each boring was prepared by our Senior Geotechnical Field Technician. These logs included visual classifications of the materials encountered during drilling as well as the driller s interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs. The soil samples were tagged for identification and sealed to reduce moisture loss, and were taken to our laboratory for further examination and classification. Information provided on the boring logs attached to this report includes soil descriptions, consistency evaluations, boring depths, sampling intervals, and groundwater conditions. The borings were backfilled with auger cuttings prior to the drill crew leaving the site. Exhibit A-11

30

31 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-1 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/14 SITE: GRAPHIC LOG LOCATION DEPTH inches of Topsoil FILL - SILTY SA (SM), with mica, fine grained, red brown, loose See Exhibit A-2 FILL - SAY SILT (ML), with organics, brown, medium stiff FILL - SAY SILT (ML), red brown, soft RESIDUAL - SAY CLAY (CL), with mica, red, soft SILTY SA (SM), fine to medium grained, tan gray, loose to medium dense Boring Terminated at 30 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Richland Creek Trunk Sewer Greenville, South Carolina Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS After Boring DEPTH (Ft.) See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N= N= N= N= N= N= N= N=18 SS-1 SS-2 SS-3 SS-4 SS-5 SS-6 SS-7 SS-8 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: SAMPLE NUMBER RQD WATER CONTENT (%) Driller: JP Boring Completed: 3/14/2014 Exhibit: A-12 ATTERBERG LIMITS LL-PL-PI PERCENT FINES 16

32 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-2 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/14 SITE: GRAPHIC LOG LOCATION DEPTH inches of Topsoil FILL - SILTY SA (SM), with mica, fine grained, red brown, loose See Exhibit A-2 FILL - SAY SILT (ML), with organics, brown, soft RESIDUAL - CLAYEY SILT (ML), with mica, red brown, soft PARTIALLY WEATHERED ROCK - sampled as CLAYEY SA (SC), fine to medium grained, red yellow, very dense, with rock fragments METAMORPHOSED GRANITE GNEISS SCHIST, close fracture spacing, very thin to thin bedding, slight to moderate weathering, medium hard to hard Coring Terminated at 19.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: Wash Rotary and NQ2 Core Barrel Richland Creek Trunk Sewer Greenville, South Carolina Abandonment Method: Borings left open for water table analysis. WATER LEVEL OBSERVATIONS No free water observed DEPTH (Ft.) 59.2 See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations WATER LEVEL OBSERVATIONS 3534 Rutherford Road Taylors, South Carolina SAMPLE TYPE RECOVERY (%) FIELD TEST RESULTS N= N= N=3 N=62/10" SS-1 SS-2 SS-3 SS-4 SS-5 Hammer Type: Safety Hammer Notes: Boring Started: 3/19/2014 Drill Rig: 915 Project No.: SAMPLE NUMBER RQD 27.1% WATER CONTENT (%) Boring Completed: 3/19/2014 Driller: JP Exhibit: A-13 ATTERBERG LIMITS LL-PL-PI PERCENT FINES

33 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-3 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 DEPTH inches of Topsoil RESIDUAL - SILTY SA (SM), with mica, fine to coarse grained, brown yellow, medium dense to dense DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N=11 SAMPLE NUMBER SS-1 RQD WATER CONTENT (%) 16 ATTERBERG LIMITS LL-PL-PI PERCENT FINES N=10 SS THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ SILTY SA (SM), with mica, fine to medium grained, light brown, medium dense PARTIALLY WEATHERED ROCK- sampled as SILTY SA (SM), fine to medium grained, brown white, very dense, with rock fragments SILTY SA (SM), with mica, fine to medium grained, light brown, medium dense Boring Terminated at 25 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Abandonment Method: Borings left open for water table analysis. WATER LEVEL OBSERVATIONS After Casing Removal See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina N= N= N=16 N=50/4" N=15 SS-3 SS-4 SS-5 SS-6 SS-7 Hammer Type: Safety Hammer Notes: Boring Started: 3/19/2014 Drill Rig: 915 Project No.: Boring Completed: 3/19/2014 Driller: JP Exhibit: A-14

34 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-4 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/14 SITE: GRAPHIC LOG LOCATION DEPTH inches of Topsoil FILL - SILTY SA (SM), with gravel, fine grained, brown, loose See Exhibit A-2 RESIDUAL - SAY CLAY (CL), with mica, tan red, medium stiff SILTY SA (SM), fine to medium grained, yellow brown, loose to medium dense SILTY SA (SM), fine to medium grained, red brown, very dense Boring Terminated at 15 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Richland Creek Trunk Sewer Greenville, South Carolina Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS After Boring DEPTH (Ft.) See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N= N= N= N= N=52 SS-1 SS-2 SS-3 SS-4 SS-5 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: SAMPLE NUMBER RQD WATER CONTENT (%) Driller: JP Boring Completed: 3/14/2014 Exhibit: A-15 ATTERBERG LIMITS LL-PL-PI PERCENT FINES

35 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-5 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION DEPTH inches of Asphalt FILL - SILTY SA (SM), with gravel, fine grained, brown, medium dense 3.0 Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 RESIDUAL - SILTY SA (SM), fine to medium grained, yellow brown, loose to medium dense DEPTH (Ft.) 5 WATER LEVEL OBSERVATIONS SAMPLE TYPE RECOVERY (%) FIELD TEST RESULTS N= N=3 SAMPLE NUMBER SS-1 SS-2 RQD WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ PARTIALLY WEATHERED ROCK - sampled as SILTY SA (SM), fine to coarse grained, brown gray, very dense, with rock fragments METAMORPHOSED GRANITE GNEISS SCHIST, close fracture spacing, very thin bedding, moderately weathered, hard Coring Terminated at 17.5 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: Wash Rotary and NQ2 Core Barrel Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS After Boring Rutherford Road Taylors, South Carolina 98.3 See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations N=15 N=55/11" SS-3 SS-4 SS-5 Hammer Type: Safety Hammer Notes: Boring Started: 3/19/2014 Drill Rig: 915 Project No.: % Boring Completed: 3/19/2014 Driller: JP Exhibit: A-16

36 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-6 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 DEPTH inches of Topsoil FILL - SILTY SA (SM), with mica, fine grained, red brown, medium dense, with rock fragments DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N=19 SAMPLE NUMBER SS-1 RQD WATER CONTENT (%) 18 ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ RESIDUAL - SILTY SA (SM), with mica, fine to medium grained, tan white, very loose to loose, with rock fragments SILTY SA (SM), with mica, fine to coarse grained, brown yellow, very dense, with rock fragments SILTY SA (SM), with mica, fine to medium grained, tan yellow, medium dense, with rock fragments Auger refusal at 28.4 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Abandonment Method: Borings left open for water table analysis. WATER LEVEL OBSERVATIONS After Boring See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina N= N= N= N=3 N=83/17" N=27 SS-2 SS-3 SS-4 SS-5 SS-6 SS-7 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: Boring Completed: 3/14/2014 Driller: JP Exhibit: A-17

37 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-7 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 DEPTH inches of Asphalt RESIDUAL - SILTY SA (SM), with mica, fine grained, red brown, medium dense, with rock fragments DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N=22 SAMPLE NUMBER SS-1 RQD WATER CONTENT (%) 6 ATTERBERG LIMITS LL-PL-PI PERCENT FINES N=15 SS-2 10 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ Auger refusal at 12.4 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS No free water observed See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina N= N=21 SS-3 SS-4 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: Boring Completed: 3/14/2014 Driller: JP Exhibit: A-18

38 BORING LOG NO. B-7A PROJECT: Richland Creek Trunk Sewer CLIENT: Renewable Water Resources Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 DEPTH FILL - SILTY SA (SM), with gravel, fine to medium grained, brown to dark brown, loose to medium dense DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N=21 SAMPLE NUMBER SS-1 RQD WATER CONTENT (%) ATTERBERG LIMITS LL-PL-PI PERCENT FINES N=9 SS-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ RESIDUAL - PARTIALLY WEATHERED ROCK - sampled as SILTY SA (SM), fine to coarse grained, gray brown, very dense, with rock fragments Boring Terminated at 20 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS After Boring See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina N= N=4 N= 50/3" N= 50/2" SS-3 SS-4 SS-5 SS-6 Hammer Type: Safety Hammer Notes: Boring Started: 3/25/2014 Drill Rig: 975 Project No.: Boring Completed: 3/25/2014 Driller: JP Exhibit: A-19

39 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-8 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 SITE: GRAPHIC LOG LOCATION Richland Creek Trunk Sewer Greenville, South Carolina See Exhibit A-2 DEPTH inches of Topsoil FILL - SILTY SA (SM), with organics and gravel, fine grained, brown, very loose to loose DEPTH (Ft.) WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N=5 SAMPLE NUMBER SS-1 RQD WATER CONTENT (%) 18 ATTERBERG LIMITS LL-PL-PI PERCENT FINES THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/ RESIDUAL - SAY CLAY (CL), with mica, yellow, medium stiff CLAYEY SA (SC), with mica, fine to medium grained, yellow gray, loose SILTY SA (SM), with mica, fine to medium grained, gray, very loose Boring Terminated at 15 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS After Boring See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina N= N= N= N=3 SS-2 SS-3 SS-4 SS-5 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: Boring Completed: 3/14/2014 Driller: JP Exhibit: A-20

40 PROJECT: Richland Creek Trunk Sewer BORING LOG NO. B-9 Renewable Water Resources CLIENT: Greenville, SC Page 1 of 1 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO LOG-DEPTH TO BOTTOM OF PAGE GPJ TEMPLATE UPDATE GPJ 4/22/14 SITE: GRAPHIC LOG LOCATION DEPTH inches of Topsoil FILL - CLAYEY SA (SC), with organics and gravel, fine grained, brown, loose See Exhibit A-2 RESIDUAL - SAY SILT (MH), with organics, red brown, stiff SILTY SA (SM), with mica, fine to medium grained, red brown, loose to medium dense Boring Terminated at 15 Feet Stratification lines are approximate. In-situ, the transition may be gradual. Advancement Method: 2.25" hollow stem auger Richland Creek Trunk Sewer Greenville, South Carolina Abandonment Method: Borings backfilled with soil cuttings upon completion. WATER LEVEL OBSERVATIONS No free water observed DEPTH (Ft.) See Exhibit A-11 for description of field procedures See Appendix B for explanation of symbols and abbreviations Rutherford Road Taylors, South Carolina WATER LEVEL OBSERVATIONS SAMPLE TYPE FIELD TEST RESULTS N= N= N= N= N=12 SS-1 SS-2 SS-3 SS-4 SS-5 Hammer Type: Safety Hammer Notes: Boring Started: 3/14/2014 Drill Rig: 975 Project No.: SAMPLE NUMBER RQD WATER CONTENT (%) Driller: JP Boring Completed: 3/14/2014 Exhibit: A-21 ATTERBERG LIMITS LL-PL-PI PERCENT FINES

41 GRAIN SIZE DISTRIBUTION ASTM D U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/ / HYDROMETER LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT GRAIN SIZE RPT GPJ TERRACON_STD_TEMPLATE.GDT 4/22/14 PERCENT FINER BY WEIGHT D 60 D 30 D 10 C C C U COBBLES 100 BORING ID B-1 B-3 B-6 coarse GRAIN SIZE GRAVEL COEFFICIENTS PROJECT: Richland Creek Trunk Sewer SITE: Richland Creek Trunk Sewer Greenville, South Carolina 10 fine coarse SIEVE (size) GRAIN SIZE IN MILLIMETERS medium SA % COBBLES % GRAVEL % SA PERCENT FINER 3534 Rutherford Road Taylors, South Carolina fine 0.1 % SILT 0.01 % FINES % CLAY USCS REMARKS SILT OR CLAY SOIL DESCRIPTION PROJECT NUMBER: CLIENT: Renewable Water Resources Greenville, SC EXHIBIT: B PERCENT COARSER BY WEIGHT

42 GRAIN SIZE DISTRIBUTION ASTM D U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS /4 1/ / HYDROMETER LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT GRAIN SIZE RPT GPJ TERRACON_STD_TEMPLATE.GDT 4/22/14 PERCENT FINER BY WEIGHT D 60 D 30 D 10 C C C U COBBLES BORING ID B-7A coarse GRAIN SIZE COEFFICIENTS GRAVEL PROJECT: Richland Creek Trunk Sewer SITE: Richland Creek Trunk Sewer Greenville, South Carolina 10 fine coarse SIEVE (size) 1 GRAIN SIZE IN MILLIMETERS medium SA % COBBLES % GRAVEL % SA PERCENT FINER 3534 Rutherford Road Taylors, South Carolina fine 0.1 % SILT 0.01 % FINES % CLAY USCS 21.2 REMARKS SILT OR CLAY SOIL DESCRIPTION PROJECT NUMBER: CLIENT: Renewable Water Resources Greenville, SC EXHIBIT: B PERCENT COARSER BY WEIGHT

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION MACON WATER AUTHORITY (MWA) SANITARY SEWER RELOCATION MACON, GEORGIA GEC PROJECT NO. 14077.2 PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC.

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California

SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue

SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION. Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue SUBSURFACE EXPLORATION AND SUBGRADE EVALUATION Proposed North Main Street Reconstruction (Contract 14-02) From New York Avenue and Murdoch Avenue Prepared for City of Oshkosh Department of Public Works

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To: GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO Submitted To: Wade Chacon, P.E. Louisiana Boulevard NE, Suite 00 Albuquerque, New Mexico 0 Submitted By: GEOMAT

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Veterans Parkway Bridge Approaches Investigation Savannah, Georgia July 20, 2015 Terracon Project No. ES155020 Prepared for: Chatham County Engineering Department Savannah, Georgia

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Bruce and Lee Industrial Site Florence, South Carolina August 31, 2015 Terracon Project No. 73155060 Prepared by: Terracon Consultants, Inc. August 31, 2015

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS

DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS DRILLED DISPLACMENT PILE PERFORMANCE IN COASTAL PLAIN AND RESIDUAL SOILS Presented by: W. Morgan NeSmith, P.E. Berkel & Company Contractors Inc. 770.941.5100 mnesmith@berkelapg.com SC Engineering Conference

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Route 0 (Patrick Henry Highway) Bridge and Approaches over Louse Creek Charlotte County, Virginia UPC 907, VDOT Project: 000-019-807 Schnabel Reference P1079 / 110, On-Call

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Report of Subsurface Exploration and Geotechnical Engineering Evaluation

Report of Subsurface Exploration and Geotechnical Engineering Evaluation Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Chatham County Jail Pittsboro, North Carolina F&R Project No. 66N-0097 Prepared For: CHATHAM COUNTY P.O. Box 1809 Pittsboro,

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

APPENDIX B GEOTECHNICAL INVESTIGATION

APPENDIX B GEOTECHNICAL INVESTIGATION APPENDIX B GEOTECHNICAL INVESTIGATION INTENTIONALL LEFT BLANK GEOTECHNICAL INVESTIGATION 2016 SEWER AND WATER GROUP 1 CIP, WATER PROJECT 1 15 TH STREET AND AVENIDA PRIMAVERA DEL MAR, CALIFORNIA PREPARED

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

REPORT. Explorations and Geotechnical Engineering Services

REPORT. Explorations and Geotechnical Engineering Services REPORT September 9, 2015 15-0690 S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs

More information

BRIDGE FOUNDATION INVESTIGATION

BRIDGE FOUNDATION INVESTIGATION Jackson Lake Road Bridge over Mackey Creek Henry County, Georgia BRIDGE FOUNDATION INVESTIGATION PROJECT NUMBER LOCATION (See Map) 8934 Jackson Lake Road Bridge over Mackey Creek, Henry County, Georgia

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information