File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

Size: px
Start display at page:

Download "File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation"

Transcription

1 TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE ISSUED FOR USE Subject: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation 1.0 INTRODUCTION Tetra Tech Canada Inc. (Tetra Tech) was retained by the BC Ministry of Transportation and Infrastructure (MoTI) to perform a pavement drilling and coring geotechnical investigation in the travel lanes of the existing Highway 1, McKenzie Avenue and Admirals Road. This work was carried out under Tetra Tech s Consultant Agreement Number 156CS0739 with MoTI. Our scope of work included the following: Drilling of 7 auger drill holes to the bottom of subbase gravel to determine the existing pavement structure; Coring of pavement (50 mm to 100 mm core diameter) in 8 locations; Coring and drill locations measured using a hand held GPS and relative to available landmarks; Laboratory testing included: Moisture contents and visual classification testing; Up to 6 grain size analysis on the subbase and base gravels; and A brief memo documenting the results of the drilling and coring program. 2.0 LIMITATIONS OF REPORT This report and its contents are intended for the sole use of MoTI and their agents. Tetra Tech does not accept any responsibility for the accuracy of any of the data, the analysis, or the recommendations contained or referenced in the report when the report is used or relied upon by any Party other than MoTI or for any Project other than the proposed development at the subject site. Any such unauthorized use of this memo is at the sole risk of the user. Use of this report is subject to the terms and conditions stated in the General Conditions, attached to this memo. 3.0 SITE INVESTIGATION The site is located at the McKenzie Interchange in the District of Saanich (Figure 1). Seven (7) boreholes (BH1701 to BH1707) and eight (8) asphalt cores (PC1701 to PC1708) were advanced on the night of January 19, 2017 (Figure 2).

2 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE A BCOne Call was conducted to locate the underground utilities and the necessary permit was obtained from MoTI prior to the site investigation occurring. In addition, a private utility locator (Kellys 1 st Call Locating) was retained to sweep each borehole location prior to commencement of the drilling operations. Traffic control services (Island Traffic Group) were also retained for the duration of the drilling and asphalt coring operations. Drilling operations commenced just after 8:00 pm on January 19, 2017 and were completed by 1:30 am on January 20, Drilling Program Seven (7) boreholes were drilled using a truck mounted drill rig equipped with 150 mm diameter solid stem augers. Tetra Tech s field representative, Ms. Susanne Ouellet, E.I.T., supervised the drilling operations. The boreholes were advanced to general depths of 3.2 m below grade, or refusal. Representative soil samples were obtained from the augers at regular intervals and changes in soil strata. All of the boreholes were backfilled with cuttings and topped with cold asphalt mix. While drilling at BH1705, on McKenzie Avenue, a five foot (5 ) auger broke off from the drill rod at an approximate depth of 1.5 m and was unable to be retrieved. The borehole was backfilled over with cuttings and topped with cold asphalt mix. It should also be noted that BH1702 was drilled in a different location than indicated on the original site plan provided by Thurber due to a mistaken landmark being used as a reference point (Figure 2). 3.2 Asphalt Coring Program Eight (8) asphalt cores were advanced by Mr. James Buyck of Tetra Tech. Asphalt thickness and discrete asphalt layer measurements, were recorded at each of the cores, as shown in Table 1. Appendix B contains photos of each of the asphalt cores. 2 McKenzie Interchange Memo.docx

3 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE Table 1: Asphalt Coring Summary Asphalt Core ID # Discrete Asphalt Layers (Top to Bottom) and Asphalt Thickness Roadway/Direction Lane PC1701 (21/29/50) 100 mm TC Hwy #1/East bound Inside (fast) lane PC1702 (40/22/46) 108 mm TC Hwy #1/West bound Outside (slow) lane PC1703 (22/49/47) 118 mm TC Hwy #1/East bound Middle (slow) lane Not turning lane PC1704 (29/22/43) 94 mm Admirals Road/North bound PC1705 (36/37) 76 mm McKenzie Avenue/North bound PC1706 (32/34) 76 mm McKenzie Avenue/North bound Outside (turning) lane Outside (merge) lane Inside (fast) lane PC1707 (32/19/57) 108 mm TC Hwy #1/East bound Inside (fast) lane PC1708 (22/30/42) 94 mm TC Hwy #1/West bound Outside (slow lane) 3.3 Laboratory Testing Selected soil samples collected from the boreholes were tested at Tetra Tech s Nanaimo laboratory. The following tests were conducted on selected samples. Moisture Content: The natural moisture content of select samples were determined and the results are presented on the logs in Appendix C. Grain Size Analysis: Grain size analyses were determined on representative samples and the test results are summarized on the logs in Appendix C and are presented in Appendix D. 4.0 SUBSURFACE PROFILE 4.1 Soil Stratigraphy The soil conditions encountered during the investigation generally consisted of well graded granular pavement structure overlying silt and sand. The generalized summary of the subsurface strata encountered in each borehole is presented in Table 2 below: McKenzie Interchange Memo.docx 3

4 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE Table 2: Borehole Summary Borehole ID # Asphalt Thickness Sand and / or Gravel Fill Thickness Depth of Native Subgrade Encountered Depth of End of Hole Notes BH mm 0.10 m 0.30 m 3.05 m Clay till underlying Gravel and Sand Fill at 0.3 m. BH mm 0.11 m 0.30 m 3.05 m Clay till underlying Sand and Gravel Fill at 0.3 m. BH mm 1.40 m 1.50 m 3.05 m Clay till underlying Sand Fill at 1.5 m, Gravelly Sand Fill encountered from 0.1 m to 0.3 m. BH mm 0.82 m 0.91 m* 2.1 m Sand and Gravel with trace cobbles underlying Sand and Gravel Fill at 0.9 m. End of hole at 2.1 m due to drill rod kicking out. BH mm 0.55 m 0.60 m 2.45 m Clay till underlying Sand Fill at 0.6 m, underlying Sand and Gravel fill at 0.3 m. BH mm 0.35 m 0.45 m 0.91 m Clay till underlying Sand and Gravel Fill at 0.45 m. End of hole at 0.91 m due to refusal. BH mm 0.52 m 0.60 m 2.45 m Clay till underlying Sand and Gravel Fill at 0.6 m. Seepage noted at 2.1 m. End of hole at 2.45 m due to refusal on possible bedrock. *At BH1704, possible native material was encountered at 0.91 m, as indicated by change in drilling conditions and presence of cobbles Sand and Gravel Fill The sand and gravel fill encountered near the surface was generally consistent between the boreholes, consisting of a well graded material varying from gravel and sand to gravelly sand. Thickness of the fill material varies between 0.1 m (at boreholes BH1701 and BH1702 further west of the interchange) up to around 1.4 m at BH1703 (Northbound on Highway 1, on the West side of McKenzie Avenue). At boreholes BH1701 and BH1702, native clay till was encountered at 0.3 m depth, underlying the sand and gravel fill. At closer proximity to the interchange, at BH1703 and BH1704, a gravelly sand to sand and gravel fill was encountered, overlying additional fill consisting of sand with some gravel to gravelly sand. At BH1704, further sand and gravel was encountered at 0.9 m. Harder drilling, as noted by the driller, in addition to a presence (less than 10%) of cobbles, indicates that this material is possibly native, rather than fill. At boreholes BH1705 (located on McKenzie Avenue), BH1706, and BH1707, fill was encountered up to depths of 0.45 m (BH1706) to depths of 0.6 m (BH1705 and BH1707). 4 McKenzie Interchange Memo.docx

5 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE Native Material Clay till was encountered at depths ranging from 0.3 m to 1.5 m, with the exception of BH1704 (just east of the interchange), where a possible native sand and gravel material was encountered at 0.9 m. The clay till encountered at shallower depths was generally very stiff to hard, with the exception of BH1702, where the clay was firm to stiff, contained organic material, and was described as a possible till. 4.2 Groundwater Moderate seepage was encountered at BH1707 (further east on Highway 1) at a depth of 2.1 m. Seepage was not encountered in the other boreholes at the time of drilling. 5.0 DISCUSSION AND RECOMMENDATIONS Compact sand and gravel fill was generally encountered at relatively shallow depths and is considered to be suitable for reuse as engineered/select granular subbase (SGSB) fill. Grain size analyses, performed on select samples of the existing base and subbase material, indicate that the fill encountered on site falls slightly outside of the BCMoTI s SGSB requirements. Although it should be noted that this could be also have been caused by a sampling bias, due to more granular materials falling off the auger and therefore being misrepresented in the sample. BH1703, at 1.4 m fill thickness, had the greatest amount of granular materials suitable for reuse as subbase. Also, the possible native sand and gravel material encountered at BH1704, at a depth of 0.91 m, could also potentially be reused as a subbase material, up to a depth of about 1.5 m, where the soil increases in fines content. All recommendations presented in this report are based on the assumption that an adequate level of monitoring will be provided during construction and that all construction will be carried out by a suitably qualified Contractor, experienced in earthworks construction. Construction reviews should be carried out by qualified persons to verify the design assumptions and revise the recommendations if required. Such construction reviews include, but are not limited to excavation slopes, subgrade preparation, fill placement and compaction. 5.1 Existing Pavement Structure Completion of a pavement design was not included with the scope of services requested. The following pavement structure was encountered during the site investigation, as shown in Table 3 below. Table 3: Existing Pavement Structure Pavement Structure Layers Layer Thicknesses (mm) Asphalt Pavement 65 to 200 Well Graded Base Course / Select Granular Subbase (SGSB) 100 to McKenzie Interchange Memo.docx

6 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE 6.0 CLOSURE We trust this technical memo meets your present requirements. If you have any questions or comments, please contact the undersigned. Respectfully submitted, Tetra Tech Canada Inc. Prepared by: Susanne Ouellet, E.I.T. Geotechnical Engineer Direct Line: x291 Susanne.Ouellet@tetratech.com Reviewed by: Andrew Walker, P.Eng. Geotechnical Team Lead, Nanaimo Direct Line: x241 Andrew.Walker@tetratech.com /dr Attachments: Figures 1 and 2 Appendix A Tetra Tech s General Conditions Appendix B Asphalt Core Photos Appendix C Borehole Logs Appendix D Laboratory Results 6 McKenzie Interchange Memo.docx

7 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE FIGURES Figure 1 Figure 2 Site Location Plan Borehole Location Plan McKenzie Interchange Memo.docx

8 17 Q:\Nanaimo\Engineering\704TRN.PAVE McKenzie Interchange\TRN.PAVE dwg [FIGURE 1] January 27, :24:38 am (BY: BUYCK, JAMES) Mc Ke nz ie Av e 1 SITESITE SITE 1 ISSUED FOR USE CLIENT McKENZIE INTERCHANGE GEOTECHNICAL INVESTIGATION SAANICH, BC Site Location Plan PROJECT NO. 0 1,000m Scale: 8.5"x11" TRN.PAVE DWN CKD REV IK AW 0 OFFICE DATE Nanaimo January 24, 2017 Figure 1

9 e Av Ke nz ie Q:\Nanaimo\Engineering\704TRN.PAVE McKenzie Interchange\TRN.PAVE dwg [FIGURE 2] February 02, :39:44 am (BY: BUYCK, JAMES) Mc 1 oad rals R Admi ISSUED FOR USE LEGEND Borehole by Tetra Tech January 2017 NOTES Borehole and Pavement Core locations taken from handheld GPS CLIENT McKENZIE INTERCHANGE GEOTECHNICAL INVESTIGATION SAANICH, BC Pavement core by Tetra Tech January 2017 Borehole & Pavement Core Location Plan Thurber proposed BH location relocated to BH1702 PROJECT NO. 100m 0 Scale: 11"x17" PAVE DWN CKD REV IK AW 1 OFFICE DATE Nanaimo January 31, 2017 Figure 2

10 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE APPENDIX A Tetra Tech s General Conditions McKenzie Interchange Memo.docx

11 GENERAL CONDITIONS GEOTECHNICAL REPORT This report incorporates and is subject to these General Conditions. 1.1 USE OF REPORT AND OWNERSHIP This geotechnical report pertains to a specific site, a specific development and a specific scope of work. It is not applicable to any other sites nor should it be relied upon for types of development other than that to which it refers. Any variation from the site or development would necessitate a supplementary geotechnical assessment. This report and the recommendations contained in it are intended for the sole use of TETRA TECH s Client. TETRA TECH does not accept any responsibility for the accuracy of any of the data, the analyses or the recommendations contained or referenced in the report when the report is used or relied upon by any party other than TETRA TECH s Client unless otherwise authorized in writing by TETRA TECH. Any unauthorized use of the report is at the sole risk of the user. This report is subject to copyright and shall not be reproduced either wholly or in part without the prior, written permission of TETRA TECH. Additional copies of the report, if required, may be obtained upon request. 1.2 ALTERNATE REPORT FORMAT Where TETRA TECH submits both electronic file and hard copy versions of reports, drawings and other projectrelated documents and deliverables (collectively termed TETRA TECH s instruments of professional service); only the signed and/or sealed versions shall be considered final and legally binding. The original signed and/or sealed version archived by TETRA TECH shall be deemed to be the original for the Project. Both electronic file and hard copy versions of TETRA TECH s instruments of professional service shall not, under any circumstances, no matter who owns or uses them, be altered by any party except TETRA TECH. TETRA TECH s instruments of professional service will be used only and exactly as submitted by TETRA TECH. Electronic files submitted by TETRA TECH have been prepared and submitted using specific software and hardware systems. TETRA TECH makes no representation about the compatibility of these files with the Client s current or future software and hardware systems. 1.3 ENVIRONMENTAL AND REGULATORY ISSUES 1.4 NATURE AND EXACTNESS OF SOIL AND ROCK DESCRIPTIONS Classification and identification of soils and rocks are based upon commonly accepted systems and methods employed in professional geotechnical practice. This report contains descriptions of the systems and methods used. Where deviations from the system or method prevail, they are specifically mentioned. Classification and identification of geological units are judgmental in nature as to both type and condition. TETRA TECH does not warrant conditions represented herein as exact, but infers accuracy only to the extent that is common in practice. Where subsurface conditions encountered during development are different from those described in this report, qualified geotechnical personnel should revisit the site and review recommendations in light of the actual conditions encountered. 1.5 LOGS OF TESTHOLES The testhole logs are a compilation of conditions and classification of soils and rocks as obtained from field observations and laboratory testing of selected samples. Soil and rock zones have been interpreted. Change from one geological zone to the other, indicated on the logs as a distinct line, can be, in fact, transitional. The extent of transition is interpretive. Any circumstance which requires precise definition of soil or rock zone transition elevations may require further investigation and review. 1.6 STRATIGRAPHIC AND GEOLOGICAL INFORMATION The stratigraphic and geological information indicated on drawings contained in this report are inferred from logs of test holes and/or soil/rock exposures. Stratigraphy is known only at the locations of the test hole or exposure. Actual geology and stratigraphy between test holes and/or exposures may vary from that shown on these drawings. Natural variations in geological conditions are inherent and are a function of the historic environment. TETRA TECH does not represent the conditions illustrated as exact but recognizes that variations will exist. Where knowledge of more precise locations of geological units is necessary, additional investigation and review may be necessary. Unless stipulated in the report, TETRA TECH has not been retained to investigate, address or consider and has not investigated, addressed or considered any environmental or regulatory issues associated with development on the subject site. 1

12 General Conditions GEOTECHNICAL REPORT 1.7 PROTECTION OF EXPOSED GROUND Excavation and construction operations expose geological materials to climatic elements (freeze/thaw, wet/dry) and/or mechanical disturbance which can cause severe deterioration. Unless otherwise specifically indicated in this report, the walls and floors of excavations must be protected from the elements, particularly moisture, desiccation, frost action and construction traffic. 1.8 SUPPORT OF ADJACENT GROUND AND STRUCTURES Unless otherwise specifically advised, support of ground and structures adjacent to the anticipated construction and preservation of adjacent ground and structures from the adverse impact of construction activity is required. 1.9 INFLUENCE OF CONSTRUCTION ACTIVITY There is a direct correlation between construction activity and structural performance of adjacent buildings and other installations. The influence of all anticipated construction activities should be considered by the contractor, owner, architect and prime engineer in consultation with a geotechnical engineer when the final design and construction techniques are known OBSERVATIONS DURING CONSTRUCTION Because of the nature of geological deposits, the judgmental nature of geotechnical engineering, as well as the potential of adverse circumstances arising from construction activity, observations during site preparation, excavation and construction should be carried out by a geotechnical engineer. These observations may then serve as the basis for confirmation and/or alteration of geotechnical recommendations or design guidelines presented herein DRAINAGE SYSTEMS Where temporary or permanent drainage systems are installed within or around a structure, the systems which will be installed must protect the structure from loss of ground due to internal erosion and must be designed so as to assure continued performance of the drains. Specific design detail of such systems should be developed or reviewed by the geotechnical engineer. Unless otherwise specified, it is a condition of this report that effective temporary and permanent drainage systems are required and that they must be considered in relation to project purpose and function BEARING CAPACITY Design bearing capacities, loads and allowable stresses quoted in this report relate to a specific soil or rock type and condition. Construction activity and environmental circumstances can materially change the condition of soil or rock. The elevation at which a soil or rock type occurs is variable. It is a requirement of this report that structural elements be founded in and/or upon geological materials of the type and in the condition assumed. Sufficient observations should be made by qualified geotechnical personnel during construction to assure that the soil and/or rock conditions assumed in this report in fact exist at the site SAMPLES TETRA TECH will retain all soil and rock samples for 30 days after this report is issued. Further storage or transfer of samples can be made at the Client s expense upon written request, otherwise samples will be discarded INFORMATION PROVIDED TO TETRA TECH BY OTHERS During the performance of the work and the preparation of the report, TETRA TECH may rely on information provided by persons other than the Client. While TETRA TECH endeavours to verify the accuracy of such information when instructed to do so by the Client, TETRA TECH accepts no responsibility for the accuracy or the reliability of such information which may affect the report. 2

13 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE APPENDIX B Asphalt core photos McKenzie Interchange Memo.docx

14 MCKENZIE INTERCHANGE PAVEMENT DRILLING/CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE PAVEMENT CORE PHOTOS Photo 1: PC1701 Photo 2: PC1702 Photo 3: PC1703 Photo 4: PC McKenzie Interchange

15 MCKENZIE INTERCHANGE PAVEMENT DRILLING/CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE Photo 5: PC1705 Photo 6: PC1706 Photo 7: PC1707 Photo 8: PC McKenzie Interchange

16 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE APPENDIX C Borehole logs McKenzie Interchange Memo.docx

17 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/20 TEST HOLE No. BH01 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests Bag G SM1 ASPHALT (200 mm thick) SAND (FILL) gravelly, some silt, wellgraded, damp, brown, ACP remnants; finegrained sand, subrounded to subangular gravel. 0.2m 0.3m Bag G Bag G silty, CLAY (TILL), trace gravel, very stiff to hard, damp, low to medium plastic, mottled grey and brown. 2 Bag G m 3 Bag G SAND some gravel, some silt, trace clay, compact to dense, damp, brown. END OF BOREHOLE (3.1 m) Backfilled with cuttings and cold mix asphalt. 3.05m SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

18 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/19 TEST HOLE No. BH02 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests Bag G ASPHALT (195 mm thick) SAND and GRAVEL (FILL) trace silt, damp, brown. 0.2m 0.3m 0.3m 1 Bag G trace sand Bag G silty, CLAY (POSSIBLE TILL), trace gravel, firm to stiff, moist, low plastic, dark brown, trace rootlets, trace organics. 2 some silt Bag G Bag G CLAY some silt, trace sand, firm to stiff, moist, medium to high plastic, greyblue. END OF BOREHOLE (3.05 metres) Backfilled with cuttings and cold mix asphalt. 2.7m 3.05m SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

19 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/20 TEST HOLE No. BH03 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests Bag G SWSM ASPHALT (100 mm thick) gravelly, SAND (FILL), trace silt, well graded, damp, brown; subangular gravel, medium grained sand. 0.1m 0.3m 1 Bag G2 Bag G SW SAND (FILL) some gravel, trace silt, damp, compact, brown; fine to medium grained sand. 1.52m Bag G Bag G silty, CLAY (TILL), trace sand, damp to moist, very stiff, low plastic, grey and brown. 3 END OF BOREHOLE (3.05 metres) Backfilled with cuttings and cold mix asphalt. 3.05m SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

20 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/19 TEST HOLE No. BH04 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests ASPHALT (85 mm thick) SAND and GRAVEL (FILL) well graded, damp, brown; subrounded gravel. 0.09m 0.3m 0.3m 1 Bag G gravelly, SAND (FILL), trace silt, medium grained, moist, brown, subrounded to angular gravel. Driller observes harder drilling at 0.9 m. 0.91m Bag G2 Bag G SAND and GRAVEL trace silt, trace cobbles, well graded, damp, brown; subangular gravel, medium grained sand. silty 2 END OF BOREHOLE (2.1 metres) Backfilled with cuttings and cold mix asphalt. 2.1m 2.1m 3 SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

21 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/19 TEST HOLE No. BH05 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests 1 2 Bag G1 Bag G2 Bag G3 Bag G4 Bag G SW ASPHALT (65 mm thick) SAND and GRAVEL (FILL) trace silt, well graded, moist, brown, trace ACP remnants; subrounded to subangular gravel. SAND (FILL) trace silt, trace gravel, moist, brown; medium grained sand. CLAY (TILL) trace silt, trace sand, trace gravel, moist, very stiff to hard. SILT some sand, trace to some clay, stiff to very stiff, damp, mottled grey and brown. Auger broke off; drillers unable to retrieve it. Auger is located at a depth of approximately 1.5 m to 3.0 m. silty, SAND, some gravel, damp to moist, compact, brown. 0.07m 0.3m 0.3m 0.6m 1.1m 1.5m 2.1m SAND trace to some silt, trace gravel, damp to moist, brown END OF BOREHOLE (2.45 m) Backfilled with cuttings and cold asphalt mix. 2.45m 3 SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

22 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/19 TEST HOLE No. BH06 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests 1 Bag G1 Bag G2 Bag G ASPHALT (88 mm thick) SAND and GRAVEL (FILL) trace silt, well graded, moist, brown; subrounded to subangular gravel. SAND (FILL) trace gravel, trace silt, brown; medium grained sand, subrounded gravel. silty, CLAY (TILL), some sand, trace gravel, moist, brown; medium grained sand. driller notes grinding of rod unable to advance further (possible layer of cobbles / boulders) END OF BOREHOLE (0.91 m) due to refusal. Backfilled with cuttings and packed with cold mix asphalt. 0.09m 0.2m 0.2m 0.45m 0.91m 2 3 SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

23 Ministry of Transportation Project Location UTM SUMMARY LOG Geotechnical and Materials Engineering Highway 1 Admirals/McKenzie Interchange District of Saanich N //E Driller Method Drillwell Solid Stem Auger Dates 17/01/19 TEST HOLE No. BH07 Drilling Details Depth (m) Sample Type Blowcount Recovery (m) Shear Strength (kpa) Gradation % Gravel Sand Fines Index Properties w L w P w Classification Description Other Tests Bag G1 Bag G ASPHALT (85 mm thick) GRAVEL and SAND (FILL) trace silt, well graded, damp, brown, ACP remnants; subrounded to subangular gravel. SAND (FILL) some gravel, trace silt, moist, brown; medium grained sand, subrounded gravel. 0.09m 0.2m 0.2m 0.6m 1 trace sand, trace gravel, very stiff 2 Bag G3 Bag G soft, wet, medium to high plastic, dark brown, trace organics. CLAY (TILL) silty, trace to some gravel, very stiff to hard, moist, medium plastic, mottled grey and brown, trace rootlets. seepage at 2.1 metres. Bag G END OF BOREHOLE (2.45 metres) due to refusal on possible bedrock. 2.45m 3 SUMMARY LOG TRNPAVE GPJ BC_MOT.GDT 17/02/02 4 SAMPLE TYPE A Auger C Core D Denison S Split Spoon T Shelby Tube W Wash SHEAR STRENGTH kpa U F V Unconfined Compression Field Vane L VR Lab Vane Remoulded Blowcount = Standard Penetration Test (ASTM1586) M Q, R, S C DS w L, w Pw NOTE: Brackets ( ) denote Engineer's estimate TESTS Mechanical Analysis Triaxial Compression Consolidation Direct Shear Liquid, Plastic Limits Moisture Content FILE No. TRN.PAVE LOGGED By: SO SHEET 1 of 1

24 MCKENZIE INTERCHANGE, PAVEMENT DRILLING / CORING INVESTIGATION FILE: 704TRN.PAVE FEBRUARY 2, 2017 ISSUED FOR USE APPENDIX D Laboratory Results McKenzie Interchange Memo.docx

25

26

27

28

29

30

1.0 INTRODUCTION 2.0 OBSERVATIONS EBA FILE: W nd Avenue Whitehorse, YT Y1A 1C2. Attention:

1.0 INTRODUCTION 2.0 OBSERVATIONS EBA FILE: W nd Avenue Whitehorse, YT Y1A 1C2. Attention: August 5, 2013 City of Whitehorse 2121 2 nd Avenue Whitehorse, YT Y1A 1C2 ISSUED FOR USE EBA FILE: W14103182-01 Via Email: ben.campbell@whitehorse.ca Attention: Subject: Ben Campbell, Planner II Planning

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:

More information

Geotechnical Report for Derwent Way Transfer Station, New Westminster, BC

Geotechnical Report for Derwent Way Transfer Station, New Westminster, BC July 19, 2016 Westerra Enterprises Inc. #109-32885 Mission Way Mission, BC, V2V 6E4 ISSUED FOR USE FILE: ENG.VGEO3082-01 Attention: Subject: Mr. Myles Hargrove Geotechnical Report for Derwent Way Transfer

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

SNC-Lavalin Inc. ISSUED FOR USE HIGHWAY 99 FINAL DETAILED DESIGN GEOTECHNICAL ASSESSMENT V September 2008

SNC-Lavalin Inc. ISSUED FOR USE HIGHWAY 99 FINAL DETAILED DESIGN GEOTECHNICAL ASSESSMENT V September 2008 SNLavalin Inc. ISSUED FOR USE HIGHWAY 99 FINAL DETAILED DESIGN GEOTEHNIAL ASSESSMENT V13101216 September 2008 EBA Engineering onsultants Ltd. p. 604.68.027 f. 604.684.6241 Oceanic Plaza, 9 th Floor 1066

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Appendix F Laboratory test results

Appendix F Laboratory test results Appendix F Laboratory test results SOIL AND ROCK SAMPLE ANALYSIS LABORATORY TEST REPORT To: Bord Gais Copy: Orla Smyth (kkidd@bge.ie) From: Stephen Watson Laboratory Manager Causeway Geotech Ltd Tel: +44(0)2827666640

More information

Geotechnical Foundation Investigation Highway 1 & Highway 3 Variable Speed Limit Signs

Geotechnical Foundation Investigation Highway 1 & Highway 3 Variable Speed Limit Signs Geotechnical Foundation Investigation Highway & Highway Variable Speed Limit Signs Subsurface Site Investigation Type of Document Geotechnical Information Report, Final Prepared For: Ministry of Transportation

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING 29 February 2016 Project No. SGS/16/005 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: DEVELOPER: DILGP ECONOMIC DEVELOPMENT QLD SUPERINTENDENT: CALIBRE CONSULTING (QLD) PTY LTD CONTRACTOR:

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

DRILL HOLE # BH-BGC13-FN-01

DRILL HOLE # BH-BGC13-FN-01 DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS

APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS The City of Winnipeg Appendix A - Part 2 Bid Opportunity No. 210-2014 Addendum #1 Page 1 of 1 Template Version: C420131129 - RW APPENDIX A - PART 2 GEOTECHNICAL AND ENVIRONMENTAL REPORTS Quality Engineering

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND

OVERVIEW OF ER DRILLING IN EARTH EMBANKMENT DAMS AND OVERVIEW OF ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND 255 255 255 237 237 237 0 0 0 217 217 217 LEVEES 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 110 135 120 Requirements and Processes

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

DRAFT GEOTECHNICAL INVESTIGATION REPORT

DRAFT GEOTECHNICAL INVESTIGATION REPORT DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland 151-03483-00 Date: July 2015 WSP Canada Inc. 500 Greber

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Geotechnical Report Rifle Roundabouts Interstate 70 and Taughenbaugh Boulevard Rifle, Colorado

Geotechnical Report Rifle Roundabouts Interstate 70 and Taughenbaugh Boulevard Rifle, Colorado Geotechnical Report Rifle Roundabouts Interstate 70 and Taughenbaugh Boulevard Rifle, Colorado Project No. 24129 February 9, 2005 Prepared for: Schmueser Gordon Meyer, Inc. 118 West 6 th Street, Suite

More information

The attitude he maintains in his relation to the engineer is very well stated in his own words:

The attitude he maintains in his relation to the engineer is very well stated in his own words: Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

Cascade Geotechnical Ltd.

Cascade Geotechnical Ltd. Cascade eotechnical Ltd. EOTECHNICAL ASSESSMENT THE NEW MONACO DEVELOPMENT PEACHLAND, B.C. Submitted to: New Monaco Enterprise Corporation Submitted by: Cascade eotechnical Ltd. Kelowna, B.C. Date: September,

More information

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a

SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a Lecture-5 Soil Exploration Dr. Attaullah Shah 1 Today s Lecture Purpose of Soil Exploration Different methods 1. Test trenches and Pits 2. Auger and Wash Boring 3. Rotary Drilling 4. Geophysical Methods

More information

Dry Muliwai Sample Location Map

Dry Muliwai Sample Location Map DMM2 DMM1 P:\AthruR\K838-Makua\GIS\Layouts\Dry Muliwai.mxd.mxd - 3/26/3 - JC DMM3 5 Dry Muliwai Sample Location Map Figure 2-4 P:\AthruR\K838-Makua\GIS\Layouts\orth Background Muliwai.mxd.mxd - 3/26/3

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines. 611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po

More information

An Introduction to Field Explorations for Foundations

An Introduction to Field Explorations for Foundations An Introduction to Field Explorations for Foundations J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years

More information

Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC

Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI-01-031 Federal Highway Administration Washington, DC Geotechnical Site Characterization July 2001 by Paul W. Mayne,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

GEOTECHNICAL REPORT LA GUARDE CREEK BRIDGE CROSSING, SIPHON CREEK ROAD, 40 KM NORTHEAST OF FORT ST. JOHN, B.C. Prepared for

GEOTECHNICAL REPORT LA GUARDE CREEK BRIDGE CROSSING, SIPHON CREEK ROAD, 40 KM NORTHEAST OF FORT ST. JOHN, B.C. Prepared for GEOTECHNICAL REPORT LA GUARDE CREEK BRIDGE CROSSING, SIPHON CREEK ROAD, 40 KM NORTHEAST OF FORT ST. JOHN, B.C. Prepared for B.C. MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE PRINCE GEORGE, B.C. Prepared

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information