Cascade Geotechnical Ltd.

Size: px
Start display at page:

Download "Cascade Geotechnical Ltd."

Transcription

1 Cascade eotechnical Ltd. EOTECHNICAL ASSESSMENT THE NEW MONACO DEVELOPMENT PEACHLAND, B.C. Submitted to: New Monaco Enterprise Corporation Submitted by: Cascade eotechnical Ltd. Kelowna, B.C. Date: September, 0 CL File No: J-0

2 J-0 September, 0 TABLE OF CONTENTS Page.0 INTRODUCTION....0 PROJECT AND SITE DESCRIPTION....0 OFFICE REVIEW....0 INVESTIATION PRORAM.... FIELD RECONNAISANCE.... SUBSURFACE INVESTIATION....0 EOLOY AND SOIL CONDITIONS.... BEDROCK EOLOY.... SOIL CONDITIONS.... DRAINAE CONDITIONS.... DROUHT CREEK....0 EOTECHNICAL EVALUATION AND RECOMMENDATIONS.... ENERAL.... SITE PREPARATION.... PERMANENT SLOPES UNDERROUND UTILITY INSTALLATION REUSE OF EXISTIN SOIL ENERAL FOUNDATION RECOMMENDATIONS SLAB-ON-RADE FLOORS SITE DRAINAE During Construction Perimeter Drainage and Storm water Infiltration Pit Design.... BUILDIN SETBACKS TEST PITS SLOPE STABILITY PAVEMENT SECTION REVIEWS AND CONSTRUCTION INSPECTIONS....0 LIMITATIONS CLOSURE... Cascade eotechnical Ltd.

3 J-0 September, 0 APPENDICES APPENDIX A... Figure - Test Location Plan... Figure - Cross-Section Location Plan APPENDIX B APPENDIX C APPENDIX D... Test Pit and Borehole Logs... Laboratory Test Results... eotechnical Report by Dr. Dwayne Tannant, P.Eng., Design Considerations Related to Rock Types Found at the New Monaco Development (Eastern Phase) in Peachland, B.C. APPENDIX E... eotechnical Reports eneral Conditions... Landslide Assessment Assurance Statement Cascade eotechnical Ltd.

4 J-0 September, 0.0 INTRODUCTION Cascade eotechnical Ltd. (Cascade) has been retained by the New Monaco Enterprise Corporation to conduct a geotechnical assessment of the proposed New Monaco development site. The development will include the construction of roads, underground parking, commercial/retail and residential development, and associated underground services. The purpose of the assessment was to gain an understanding of the soil and bedrock properties, and groundwater conditions, and determine the general stability within the project area. Cascade has carried out a geotechnical investigation of the property. This report summarizes our investigation findings and presents recommendations with respect to the design and construction of the development. The scope of work for this project was presented in our proposal, P-0, dated July, 0. In summary, we proposed to carry out a test pit and borehole investigation of the soil, bedrock, and groundwater profile within the proposed development, and an assessment the bedrock conditions. Following the field and laboratory work, a geotechnical report would be prepared that presented the results of the investigation and recommendations for design and construction of the project. Authorization to proceed with the assessment was received from Mr. Mark Holland, of New Monaco Enterprise Corporation, by on August, 0..0 PROJECT AND SITE DESCRIPTION We understand the proposed development may include the construction of 800 units, 0,000 sq.ft. of commercial/retail development with some underground parking, a 00 room hotel, a six storey parkade, and residential development. The development will have three distinct levels with about 0 m elevation difference between each one, with one terrace midway for Level. Access to the site will be off Highway 7. The site is located east of the Peachland town centre and is situated between Highway 7C (Okanagan Connector) and Highway 7. This phase of the development is located at the east end of the site and encompasses approximately 0 acres. The property is south facing and drains to Highway 7, has an existing orchard over much of the site, and an abandoned house and several small structures. The site is characterized by gentle to moderate rolling terrain over much of the property, and by steep bedrock bluffs in the southwest corner. The west side of the subject site is bordered by Drought Creek and a gully. At the time of our investigation, approximately 0% of the site was being used as an orchard, and the remaining area was undeveloped, sparsely treed, and vegetated with indigenous grasses and shrubs. Cascade eotechnical Ltd. - -

5 J-0 September, 0.0 OFFICE REVIEW Cascade reviewed the geotechnical report prepared for the site by older Associates (older), entitled eotechnical Investigation, New Monaco Development, dated July, 0. The geotechnical assessment conducted by older in 0 included the entire development area, about hectares. The subject property was identified in the report as being the east portion of Site B, which is on the east side of the Drought Creek gully. The geotechnical investigation in the subject property included the excavation of nine test pits to depths ranging from.0 to.8 m below ground elevation, and the advancement of two boreholes to between. to 8. m below ground elevation. The older report presented the following comments: The soil conditions generally consisted of topsoil and silty sand / sandy silt underlain by interlayered granular deposits. Inferred glacial till was encountered at a depth of.0 m at one test pit location, and bedrock was encountered between.0 and. m below ground elevation. roundwater was encountered in one test pit at a depth of. m. It was concluded that the site was geotechnically safe for development. Offsite geotechnical hazards, such as rockfalls, have been controlled by the construction of Highway 7C. Due to the relatively shallow depth of the overburden at the site, older did not recommend the on-site disposal of groundwater without a site specific assessment..0 INVESTIATION PRORAM. Field Reconnaissance A site reconnaissance was carried out on August, 0, by the author of this report and Dr. Dwayne Tannant, P.Eng. The purpose of the reconnaissance was to determine the general condition of the site and identify any bedrock related conditions that might affect the method of construction or constraints to development.. Subsurface Investigation A test pit program was carried out on August, 0, under the supervision of the author of this report. A tracked Hitachi EX-0 excavator contracted from On The Mark Locates, of Kelowna was used to dig test pits. Eleven test pits were excavated to depths ranging from 0.7 to.0 m below ground elevation. As part of the test pit program, four percolation tests were conducted for the design of infiltration pits. The results of the percolation tests are discussed in Section.8., and the approximate locations of the test pits are presented on Figure No.. A borehole program was carried out on August to 8, 0, under the supervision of the author of this report. A truck mounted portable drill rig also contracted from On The Mark Locates was used to drill the boreholes. Eleven boreholes were advanced using a combination of solid stem augers and ODEX Cascade eotechnical Ltd. - -

6 J-0 September, 0 drilling. The boreholes were advanced to depths ranging from. to. m below ground elevation. The approximate locations of the boreholes are presented on Figure No., in Appendix A. Classification and index tests were conducted in our laboratory on samples collected from the test pits and boreholes to aid in the determination of engineering properties. Natural moisture content values were determined and grain size tests were performed on the recovered samples. The laboratory test results are provided in Appendix C..0 EOLOY AND SOIL CONDITIONS. Bedrock eology Bedrock outcrops are concentrated along the western and southern parts of the site. Three rock units are mapped in the immediate region of the proposed development. Okanagan Batholith rock types exist on the south part of the site and form some of the higher outcrops. These consist of granodiorite and granite, light grey weathering, massive, medium to coarse grained, equigranular to porphyritic, unfoliated to weakly foliated. At the north side of the site (primarily exposed along Highway 7C) the rock consists of Trepanier Rhyolite. Trepanier Rhyolite is exposed on all sides of the intersection between Highway 7 and Highway 7C and consists of rhyolite lava, breccia, and minor sandstone. Near Drought Creek and along Highway 7, exposures of Springbrook Formation occur and consist of conglomerate and a polymictic breccia. The fault running along Drought Creek delineates some of the boundaries between the rock types. A dominant steeply dipping joint set exists in most of the rock exposures and the joint set strikes roughly 00 to 00. This orientation is sub-parallel to the steeply dipping Drought Creek fault. This fabric in the rock mass is frequently associated with the orientation of steep bluff faces and ridges in the bedrock. It is possible that the depth of the overburden above the bedrock surface may be influenced by the shape of buried ridges and valleys running in a direction north-northeast to south-southeast. Therefore, overburden depths may vary more quickly in directions roughly perpendicular to these structures. The exposed surface of the bedrock at all locations contains small fractures associated with weathering since the last glacial period. The more extensive fracturing is expected to penetrate a few metres into the rock mass. The freshest exposures of rock are in the rock cuts along Highway 7. For a more detailed explanation of the bedrock conditions please refer to the report prepared by Dr. Dwayne Tannant, P.Eng., in Appendix D. Cascade eotechnical Ltd. - -

7 J-0 September, 0. Soil Conditions The soil conditions encountered on the site generally consisted of TOPSOIL underlain by natural, sandy SILT, SAND or SAND and RAVEL, which in turn is underlain by SAND and RAVEL TILL and/or BEDROCK. The soil conditions can be described as the following: Topsoil The topsoil layer generally ranged between 00 and 00 mm in thickness at the test pit locations and consisted of sandy silt. The topsoil was medium brown, loose and moist to wet. Silt The silt was generally sandy with varying amounts of gravel, and was stiff/compact, dry to damp and light greyish brown. The silt ranged between. to.0 m in thickness. Sand The sand gravel deposits were generally fine to medium grained, had varying amounts of silt and gravel, and were dry to damp, compact, and light brown to light grey. Sand and ravel The sand gravel (to gravel and sand) deposits were generally fine to coarse grained, had varying amounts of silt and cobbles/boulders, and were damp, compact, and light to medium brown. For a more detailed description of the soils encountered during our investigation, please refer to the test pit and borehole logs in Appendix B. It should be noted that geological conditions are innately variable and are seldom spatially uniform. At the time of the report, information on the stratigraphy at the project site was available at discrete test pit locations. In order to develop recommendations from this information, it is necessary to make some assumptions concerning conditions other than at the test pit locations. Adequate monitoring should be provided during construction to check that these assumptions are reasonable.. Drainage Conditions At the time of our investigation, the property was being used as an orchard and irrigation systems were being used. Seepage or groundwater was encountered at eight test locations situated in the centre of the property. Table below present the locations and depths where seepage or groundwater was encountered. Cascade eotechnical Ltd. - -

8 J-0 September, 0 Table Depth to roundwater/seepage Location TP-0 TP-0 BH-0 BH-0 BH-0 BH-0 BH-07 BH- Depth. m. m. m 7. m 0. m. m. m.7 m Seepage or groundwater was often encountered at the surface of bedrock, till, or at the surface of a silty layer of soil, and may be perched in some areas. The groundwater will fluctuate seasonally or after heavy rainfall events, and may currently be influenced by irrigation of the orchard.. Drought Creek The Drought Creek channel drains from upslope of Highway 7C to a culvert installed under the highway. At the time of our assessment, there was not any surface flow in the culvert. Water daylights in the channel about 00 m downslope (south) of the culvert, then disappears into the ground in an area where there appears to be a check dam installed. The water daylights again downstream of the check dam and continues down the channel to a culvert installed under Highway 7. It was noted that white PVC pipe has been installed at several locations along the creek channel, likely for irrigation purposes. The creek channel is generally heavily vegetated and is incised downstream of the check dam. The upper half of the channel has a to 0% average grade, increasing to to 0% the bottom half. The channel side slopes consisted of sand and gravel deposits which generally ranging between 0 and 0%, with some localized areas having 0 to 70% slopes. Frequent bedrock outcrops were observed on both sides of the creek, both at the creek elevation and at the crest of the side slopes. Cascade did not observe any significant indications of slope instability, such as slumping, erosion or excessively leaning trees, along the creek channel or upslope of the creek..0 EOTECHNICAL EVALUATION AND RECOMMENDATIONS. eneral The proposed development will include the construction of roads, underground parking and a six storey parkade, commercial/retail and residential development, and associated underground services. The development will have three distinct elevation levels, and access to the site will be off Highway 7. Cascade eotechnical Ltd. - -

9 J-0 September, 0 The site is characterized by gentle to moderate rolling terrain over much of the site, and by steep bedrock bluffs in the southwest corner of the property. At the time of our investigation approximately 0% of the site was being used as an orchard, and the remaining area was undeveloped, sparsely treed, and vegetated with indigenous grasses and shrubs. A previous geotechnical assessment conducted by older Associates determined that the site was geotechnically suitable for development. However, a site specific assessment for the on-site disposal of groundwater was recommended. The soil conditions at the test locations generally consisted of topsoil underlain by natural sandy silt, sand or sand and gravel, which in turn is underlain by sand and gravel till and/or bedrock. roundwater was encountered at eight test locations in the centre of the property, and was often encountered at the surface of bedrock, till, or at the surface of a silty layer of soil. Cascade eotechnical Ltd. concludes that, from a geotechnical perspective, the New Monaco site is well suited for the proposed development and can be geotechnically safe for the intended use. However, when determining final site grades, we recommend the items in the following subsections be included in the site preparation, grading, drainage, and building setback distances.. Site Preparation All organic topsoil or vegetation, fill, trees and stumps, old foundations and irrigation pipes, and any loose, soft, wet, weathered or disturbed soils should be removed from within the proposed building lot areas and areas to be paved to expose either the natural undisturbed compact sand or sand and gravel material, stiff/compact silt, or bedrock. The exposed subgrades, as described above, should be inspected by a geotechnical engineer prior to any structural fill placement. In a situation where the building pad is situated over the natural overburden or structural fill, and bedrock, then we recommend that the bedrock surface be overblasted a minimum of.0 metre below the foundation elevation and be stripped to expose the competent bedrock surface. The blast rock can then be placed and compacted to form the base of the building pad. This will reduce the risk of differential settlement of the foundation. We recommend that, in areas where a foundation subgrade consists of silt, the silt should be over-excavated by at least 0. m and replaced with granular structural fill or blast rock fill. Where structural fill is required to bring building lots up to grade, the fill should extend beyond the foundation footprint area for a distance at least equal to the depth of the fill placed below the footing. The structural fill bank should be overbuilt, then trimmed back, so that the entire bank has been compacted to the specifications below. Cascade eotechnical Ltd. - -

10 J-0 September, 0 Structural fill in building lots should generally consist of 00 mm minus granular material with less than 8% passing the #00 sieve size, and should be compacted to a minimum of % Modified Proctor Maximum Dry Density (MPMDD) in accordance with ASTM D7, and within % of the optimum moisture content. The reuse of the on-site soil deposits as structural fill is discussed in Section.. The structural fill should be placed in lifts not exceeding 0. m. We recommend that the compaction of each lift of structural fill be determined with in situ density tests prior to placing subsequent lifts. Structural fill placed on slopes greater than 0% should be keyed into the slope at each lift. The key should extent at least. m into the natural slope.. Permanent Slopes Permanent cut and fill slopes in the natural or compacted sand or sand and gravel structural fill residential lots should be graded no steeper than.0(h):.0(v). Structural fill consisting of compacted angular blast rock should be graded no steeper than.(h):.0(v). Permanent cut and fill slopes for road construction should be graded no steeper than.(h):.0(v) for the natural soils or compacted sand or sand and gravel fill. Permanent slopes in bedrock should be sloped no steeper than 0.(H):.0(V). For additional recommendations about bedrock cuts, blasting and catchment areas please refer to the report prepared by Dr. Dwayne Tannant, P.Eng., in Appendix D.. Underground Utility Installation Temporary trenches for underground utilities should be excavated at a slope no steeper than.0(h):.0(v) for the compact sand or sand and gravel to a maximum depth of. m. Trenches deeper than. m should be reviewed by a professional engineer in accordance with Work Safe BC uidelines. The soil conditions and the stability of the excavation should be reviewed by Cascade prior to workers entering the excavation. Alternatively, service line trenches or excavations can be shored. Temporary cuts should be cleaned of cobbles and boulders prior to workers entering the excavation. Seepage will likely be encountered during excavation of the deep bench cuts and in trenches. Cascade should be contacted in order to evaluate the stability of the cuts in soils and bedrock trenches and drainage. To maintain the stability of the trench, all materials excavated from the trench should be placed a minimum distance away from the excavation, equal to the depth of the excavation. Cascade eotechnical Ltd

11 J-0 September, 0 Excavated trenches left open for longer than a few days should be covered with polyethylene sheeting to prevent surface saturation during wet weather conditions, or drying out during warm weather conditions. All work conducted in and around excavations should be carried out in accordance with requirements specified by Work Safe BC uidelines. All services should be bedded as per District of Peachland standards. eneral trench backfill should be placed in maximum 0. m thick lifts, and each lift should be compacted to a minimum of % of Modified Proctor maximum dry density.. Reuse of Existing Soil Any topsoil, other organic soil or silt on this site is considered unsuitable for use as structural fill in building areas. We consider the natural sand or sand and gravel to be suitable as structural fill in the foundation areas. We consider the natural sand, sand and gravel and sandy silt to be suitable as subgrade material in areas to be paved and as general trench backfill. Blast rock would also be considered suitable for reuse as subgrade fill or trench fill. Natural soils, fill or blast rock material proposed for reuse as structural fill, road subgrade/subbase or trench backfill should be confirmed by Cascade prior to placement.. eneral Foundation Recommendations The building areas should first be prepared as outlined above. Foundations supported on the natural, compact sand, sand and gravel, silt and sand, or on granular structural fill which has been compacted to a minimum of % of Modified Proctor maximum dry density, as outlined above, may be designed on the basis of an allowable bearing pressure of 0 kpa. A minimum of 0. m of soil cover must be provided above the bottom of all exterior footings in order to ensure adequate protection from frost. The settlement of foundations designed for a maximum allowable bearing pressures presented above should be within the normally acceptable limits of up to about mm total, post-construction settlement, and up to about 0 mm of postconstruction differential settlement over a horizontal distance of about 0 m..7 Slab-On-rade Floors Cascade recommends that granular structural fill placed below slab-on-grade floors be compacted to a minimum of % of Modified Proctor maximum dry density. The floor slabs should be underlain by polyethylene sheeting to prevent the migration of moisture through the slab. Cascade eotechnical Ltd

12 J-0 September, 0.8 Site Drainage.8. During Construction Surface drainage protection of the site should be maintained during grading and after construction. Precautions should be taken during the performance of site clearing, excavations, and grading to protect the work site from ponding by poor or improper surface drainage. Temporary provisions should be made to direct surface drainage away from and off the work site..8. Perimeter Drainage and Storm Water We recommend a foundation drainage system be installed around the perimeter of all the foundations where a floor slab is lower in elevation than the surrounding ground surface. The perimeter drainage system should include a minimum 00 mm diameter perforated PVC pipe covered with a minimum 0. m of drain rock. The drain rock should be covered with filter fabric prior to backfilling against the foundation walls. We recommend that foundation drainage systems, and storm water from road catch basins and roof downspouts, be drained to the storm sewer system, to Drought Creek if allowed, or to infiltration pits. If infiltration pits are used, the actual size and suitable location of the pits should be determined on a site-by-site basis. Infiltration pits should be located a minimum of m away from the building foundations and from the crest of slopes. Cascade should be provided with the proposed location of infiltration pits in order to provide recommendations for construction. Sidewalks, paved or landscaped areas within a zone of approximately m of the exterior perimeter of any buildings should be sloped to drain water away from the structure at a minimum gradient of %. Drainage considerations established during design and construction should be maintained for the life of the development. Property owners should be made aware that altering drainage patterns can be detrimental to slope stability and foundation performance..8. Infiltration Pit Design For the design of the infiltration pits, four percolation tests were conducted, and four grain size analyses was performed on sand or sand and gravel samples obtained during the test pit program. The grain size analyses used Hazen s formula, which calculates the approximate coefficient of permeability of sand (K). Table below presents the results of the percolation tests and sieve analyses: Cascade eotechnical Ltd. - -

13 J-0 September, 0 Table Coefficient of Permeability for Infiltration Pits Test Location Depth (m) K - Coefficient of Permeability (m/s ) TP x 0 - TP-0.. x 0 - TP x 0 - TP x 0 - TP x 0 - TP-.8.0 x 0 - Between older 0.. x 0 - TP-0 and BH-0 BH x 0 - We recommend that a factor of safety of be used to the above K values for the design of the infiltration pits.. Building Setbacks The required setback from the crest of slopes will depend on the size of the building, and whether the subgrade consists of compacted sand and gravel (or blast rock) structural fill, or sound, unfractured bedrock. As general rule, buildings four storeys or less should be located no closer than.0 m from the crest of slopes. Buildings four storeys or higher will likely require a greater setback distance and should be evaluated on a case-by-case basis..0 Test Pits The test pits were excavated at the approximate locations as indicated on Figure. In the situation where a portion of any proposed building area or paved area is found to be located over a test pit area, we recommend that the test pit area be over excavated and the loose soil replaced with granular structural fill compacted to a minimum of % of Modified Proctor maximum dry density.. Slope Stability Cascade has carried out static and dynamic analyses of the project area at five cross sections using an interactive slope stability software. The locations of the cross sections are provided on Figure in Appendix A. The static analyses of the cross sections indicate that the slopes on the subject property have a factor of safety of greater than.. The dynamic analyses were carried out using empirical pseudo-static equilibrium analysis using methods presented by Bray and Travasarou (00), as presented in the APEBC uidelines for Legislated Landslide Assessments for Proposed Residential Developments in BC, revised in May of 00 (the uidelines). For the analysis, a magnitude M=7 earthquake and a spectral response acceleration for a period of 0.s, Sa(0.), was used for a % in 0 year seismic event (:,7). Cascade eotechnical Ltd

14 J-0 September, 0 The results of the analyses indicate that the slopes have a factor of safety greater than.0, indicating that the slopes would have a displacement of less than cm, as per the uidelines. 7.0 PAVEMENT SECTION We recommend areas to be paved be prepared as described in Section.. Our design method for the asphalt pavement takes into account the anticipated traffic loading conditions, or Equivalent Single Axle Loads (ESALs), and the strength of the subgrade soil immediately below the pavement section. The classification of the pavement structure is determined by the estimated number of ESAL's over the service design life. The strength of the subgrade is measured in terms of the California Bearing Ratio (CBR) testing procedures. Based on the soil conditions encountered during the test pit investigation, a road subgrade can consist of either sandy silt, or sand (sand and gravel) subgrade. We anticipate that a sandy silt subgrade to have a CBR value between and 0, and a sand subgrade to have a CBR value greater than 0. Table below presents the recommended asphalt pavement structure for a Local Road on a silt or sand subgrade. Table Asphalt Pavement Structure Materials Road Type Silt Subgrade Sand and ravel Subgrade Asphalt pavement 0 mm 0 mm Base course - 0 mm minus 00 mm 00 mm crushed gravel and sand Select granular sub-base (SSB) 00 mm - The pavement structure presented above assumes that the exposed natural granular deposits are a suitable subbase material, and that suitable base and subbase materials will be compacted to a minimum of % of Modified Proctor maximum dry density, and within % of optimum moisture content. We recommend that the suitability of the natural deposits as a subbase material be verified prior to placement of base course material. The actual compaction of all granular materials placed should be confirmed with in situ density testing. The gradation of all materials used in construction should be tested prior to construction to confirm they conform to District of Peachland gradation specifications. Cascade eotechnical Ltd. - -

15 J-0 September, REVIEWS AND CONSTRUCTION INSPECTIONS It is recommended that Cascade be given the opportunity to review details of the design and specifications related to the geotechnical aspects of this project prior to construction. Past experience has shown that this action may prevent inconsistencies that may lead to disputes. It is recommended that geotechnical / materials engineering field services, such as observation of bearing surface and backfill, and testing of soil density be performed to ensure that the requirements of this report are followed..0 LIMITATIONS The recommendations contained in this report have been prepared for the proposed development described in Section.0 of this report, and can be relied upon by the New Monaco Enterprise Corporation and their agents, and the District of Peachland. Should the intended use for the property, at any time, vary from our understanding of the project, Cascade should be given the opportunity to review the project to ensure that our recommendations are both accurate and sufficient. Please also refer also to the attached eotechnical Report - eneral Conditions. We have also included in Appendix E, the Appendix D: Landslide Assessment Assurance Statement form, which is a requirement for hazard assessment reports (from uidelines for Legislated Landslide Assessments for Proposed Residential Development in British Columbia, Revised May, 00, prepared by The Association of Professional Engineers and eoscientists of British Columbia). 0.0 CLOSURE We trust that you will find our recommendations sufficient at this time. If you require any additional details, please do not hesitate to contact us. Yours truly, CASCADE EOTECHNICAL LTD. Prepared by: Ron Campbell, P.Eng. eotechnical Engineer Cascade eotechnical Ltd. - -

16 APPENDIX A

17 BH-0 Highway 7C TP-07 BH-0 BH- TP-0 BH-0 BH-0 TP-0 BH-0 TP-0 BH-0 TP-0 BH-0 BH-0 TP-08 BH-07 TP-0 Drought Creek TP- TP-0 BH-08 TP-0 R- TP-0 R- Highway 7 Base Plan Taken From Regional District of Central Okanagan Website LEEND Test Pit Locations Borehole Locations Rock Sample Locations CASCADE EOTECHNICAL LTD. New Monaco Resort Development New Monaco Enterprise Corporation TEST LOCATION PLAN Shallow/Exposed Bedrock Project No: J-0 Scale: NTS Drawn By: RC Date: Sept. 0 Figure:

18 BH-0 TP-0 BH-0 BH- BH-0 BH-0 TP-0 BH-0 BH-0 BH-0 BH-07 BH-08 Base Plan Taken From older Associates eotechnical Report (dated July, 0) LEEND Test Pit Locations Borehole Locations CASCADE EOTECHNICAL LTD. New Monaco Resort Development CROSS-SECTION LOCATION PLAN Project No: J-0 Scale: NTS Drawn By: RC Date: Sept, 0 Figure:

19 APPENDIX B

20 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface TOPSOIL silt, fine-grained sandy, loose, dry, light brown. SILT gravelly, fine-grained sandy, compact, dry, light grey brown. A. SAND fine to medium-grained, trace gravel, trace silt, loose, dry, medium grey. - sloughing from.m. B - sand and gravel from.7m. C 7 - occasional cobbles from.m. 8 0 FRACTURED BEDROCK END OF TESTPIT ON BEDROCK AT.0 METRES. NO ROUNDWATER ENCOUNTERED. Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

21 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT fine-grained sandy, firm, dry, light brown. SAND fine to medium-grained, some silt, compact, wet, medium grey. 7 END OF TESTPIT ON BEDROCK AT.0 METRES. ROUNDWATER ENCOUNTERED AT. METRES. 8 0 Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

22 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT fine-grained sandy, firm, dry, light brown. SILT gravelly, sandy, compact, dry to damp, light brown. A 8. 7 SILT sandy, stiff, dry to damp, light brown. SAND fine to medium-grained, some silt, trace gravel, compact, damp, grey to mottled rusty. SAND AND RAVEL (TILL) silty, compact to dense, damp, medium grey brown. B C D.. 8 END OF TESTPIT ON BEDROCK AT.7 METRES. NO ROUNDWATER ENCOUNTERED. 0 Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

23 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT fine-grained sandy, loose to firm, dry, light brown. SAND AND RAVEL silty, compact, dry to damp, light brown. SAND fine to medium-grained, trace to some silt, trace gravel, loose, dry, light brown to medium grey. A SAND AND RAVEL (TILL) silty, compact, damp, light grey brown. B. - dense from.8m. 7 8 C 0 - seepage at.m. END OF TESTPIT ON DENSE TILL AT. METRES. ROUNDWATER ENCOUNTERED AT. METRES. Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

24 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 TOPSOIL silt, firm, moist, dark brown. round Surface SILT firm, moist, light brown. END OF TESTPIT ON BEDROCK AT 0.7 METRES. NO ROUNDWATER ENCOUNTERED Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

25 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 TOPSOIL silt, soft, dry, dark brown. round Surface SILT gravelly, sandy, compact, dry, light brown. SAND AND RAVEL silty, occasional cobbles, compact, dry to damp, light brown. SAND fine to medium-grained, trace silt, compact, dry to damp, light brown to light grey. SILT firm, dry to damp, light brown. RAVEL sandy, trace silt, occasional cobbles, compact, dry to damp, medium brown. 7 A. 8 0 END OF TESTPIT AT.0 METRES. NO ROUNDWATER ENCOUNTERED. Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

26 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-07 Depth Description Number Type Moisture Content % ft m 0 0 round Surface RAVEL sandy, some silt to silty, occasional cobbles, compact, dry to damp, light brown. 7 7A END OF TESTPIT AT.7 METRES. NO ROUNDWATER ENCOUNTERED. Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-07 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

27 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-08 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SAND AND RAVEL some silt to silty, compact, dry to damp, light brown. 8A 7. SAND AND RAVEL (TILL) silty, dense to very dense, damp, medium brown. 8B END OF TESTPIT ON VERY DENSE TILL AT. METRES. NO ROUNDWATER ENCOUNTERED. 8 0 Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-08 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

28 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT gravelly, sandy, stiff, dry to damp, light brown. RAVEL sandy, trace silt, loose, dry, medium grey. A 7 8 END OF TESTPIT AT. METRES. NO ROUNDWATER ENCOUNTERED. SEVERE SLOUHIN FROM 0. METRES. 0 Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

29 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP-0 Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT gravelly, sandy, stiff, dry to damp, light brown. RAVEL sandy to sand and gravel, trace to some silt, loose to compact, dry to damp, medium grey. 0A END OF TESTPIT AT.7 METRES. NO ROUNDWATER ENCOUNTERED. SLOUHIN FROM 0. METRES. Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B-0 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

30 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of TestpitTP- Depth Description Number Type Moisture Content % ft m 0 0 round Surface SILT gravelly, sandy, stiff, dry to damp, light brown. RAVEL sandy to sand and gravel, trace to some silt, loose to compact, dry to damp, medium grey. 7 A. 8 END OF TESTPIT AT. METRES. NO ROUNDWATER ENCOUNTERED. SLOUHIN FROM 0. METRES. 0 Investigation Date: August, 0 Contractor: On The Mark Northing: 0 Easting: 0 Equipment: EX0 Tracked Excavator Elevation: 0 Logged By: HF Figure No: B- Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

31 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SILT trace to some fine-grained sand, firm, dry to damp, light grey. SILT trace clay, firm, damp, light to medium grey. SAND AND RAVEL trace silt, fine to medium-grained sand, compact, damp, medium grey brown. SAND AND RAVEL silty to some silt, fine to medium-grained sand, dense, damp to wet, medium brown. BEDROCK END OF BOREHOLE AT 7. METRES. ROUNDWATER ENCOUNTERED AT. METRES. Investigation Date: August, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: BP Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

32 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SAND AND RAVEL some silt, compact to dense, dry, light grey. SAND medium to coarse-grained, some gravel, trace silt, compact, dry, light brown grey. SAND fine-grained, trace to some silt, compact, damp, medium grey brown. - fine to medium-grained from.m. - moist to wet from 7.m. REFUSAL ON SUSPECTED BEDROCK AT 8. METRES. ROUNDWATER ENCOUNTERED AT 7. METRES. Investigation Date: August, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: BP Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C D Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

33 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SILT trace gravel, trace fine-grained sand, firm, dry to damp, light grey. SAND medium to coarse-grained, some gravel, trace silt, compact, dry, light brown grey. - trace gravel, damp, medium grey brown from.m. END OF BOREHOLE AT. METRES. NO ROUNDWATER ENCOUNTERED. NO BEDROCK ENCOUNTERED. Investigation Date: August, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: BP Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

34 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of Borehole BH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SAND fine to medium-grained, trace to some silt, trace gravel, compact, dry, light brown grey. SAND medium to coarse-grained, trace gravel, trace silt, compact, dry, medium grey brown. SAND fine to medium-grained, trace gravel, trace silt, compact to dense, damp, light to medium grey brown. - medium-grained from.m. - trace to some gravel from 7.0m. END OF BOREHOLE AT. METRES. NO ROUNDWATER ENCOUNTERED. NO BEDROCK ENCOUNTERED. A B C D Investigation Date: August, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: BP Northing: 0 Easting: 0 Elevation: 0 Figure No: C ascade eotechnical Ltd. #0-88 Spall Road Kelowna, B.C. VY R

35 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SAND fine to medioum-grained, silty to some silt, compact, moist to wet, light grey brown. - seepage at 0.m. - medium brown from.m. - some gravel, medium grey from.0m. SILT some fine-grained sand, stiff, wet, light reddish grey. BEDROCK END OF BOREHOLE AT 8. METRES. ROUNDWATER ENCOUNTERED AT 0. METRES. BEDROCK ENCOUNTERED AT. METRES. Investigation Date: August 7, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: HF Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

36 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m round Surface SAND AND RAVEL some silt, compact, dry to damp, light to medium brown. SILT fine-grained sandy, firm, damp, light brown. SAND medium to coarse-grained, some gravel, trace silt, compact, damp, medium brown. - seepage at.m. - wet from.m. - occasional thin silt layers from.m. - trace gravel from.m. BEDROCK END OF BOREHOLE AT 0.0 METRES. ROUNDWATER ENCOUNTERED AT. METRES. BEDROCK ENCOUNTERED AT 7. METRES. Investigation Date: August 7, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: HF Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C D E Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

37 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-07 Depth Description Number Type Moisture Content Percent ft m 0 0 TOPSOIL silt, dry, light brown. round Surface SAND fine to medium-grained, silty, moist, light grey brown BEDROCK - seepage at.m END OF BOREHOLE AT. METRES. ROUNDWATER ENCOUNTERED AT. METRES. BEDROCK ENCOUNTERED AT.7 METRES. ROUNDWATER MONITORIN WELL INSTALLED, SLOTTED, BACKFILLED WITH DRILL CUTTINS. Investigation Date: August 7, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: RC Northing: 0 Easting: 0 Elevation: 0 Figure No: Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

38 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-08 Depth Description Number Type Moisture Content Percent ft m 0 0 TOPSOIL sod, silt, dry, dark brown. round Surface SAND fine-grained, gravelly, some silt to silty, occasional cobbles, damp, light grey brown. 8A 7 - trace gravel from.8m some gravel, dense light brown gret from.m. - cobbley/bouldery at.7m. BEDROCK END OF BOREHOLE AT.7 METRES. NO ROUNDWATER ENCOUNTERED. BEDROCK ENCOUNTERED AT. METRES. 8B Investigation Date: August 7, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: RC Northing: 0 Easting: 0 Elevation: 0 Figure No: Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

39 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m TOPSOIL sod, silt, dry, dark brown. Investigation Date: August 7, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: RC round Surface SAND fine-grained, gravelly, trace to some silt, occasional cobbles, compact, damp, light yellow brown. SAND fine-grained, some silt, trace gravel, compact, damp, light to medium grey brown. - cobbley at.m. SAND AND RAVEL (TILL) silty, dense to very dense, damp. BEDROCK END OF BOREHOLE AT. METRES. NO ROUNDWATER ENCOUNTERED. BEDROCK ENCOUNTERED AT. METRES. Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

40 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH-0 Depth Description Number Type Moisture Content Percent ft m TOPSOIL sod, silt, dry, dark brown. Investigation Date: August 8, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: RC round Surface SAND AND RAVEL trace to some silt, compact, damp, light to medium grey brown. - gravelly from.8m. - cobbles at.0m. SAND AND RAVEL (TILL?) silty, dense to very dense, damp. BEDROCK END OF BOREHOLE AT. METRES. NO ROUNDWATER ENCOUNTERED. End of Borehole BEDROCK ENCOUNTERED AT. METRES. Northing: 0 Easting: 0 Elevation: 0 Figure No: 0A 0B Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

41 Project: New Monaco Development Location: Peachland, BC Client: New Monaco Enterprise Corp. Cascade Project No: J-0 Log of BoreholeBH- Depth Description Number Type Moisture Content Percent ft m round Surface SAND AND RAVEL some silt to silty, some cobbles, compact, dry to damp, light brown. SILT some fine-grained sand, stiff, damp, medium brown. SAND fine to medium-grained, compact, damp, medium grey brown. - some gravel from.m. SAND AND RAVEL (TILL) silty, dense to very dense, damp, grey. - seepage at.7m. END OF BOREHOLE AT 0.0 METRES. ROUNDWATER ENCOUNTERED.7 METRES. NO BEDROCK ENCOUNTERED. Investigation Date: August 8, 0 Contractor: On The Mark Equipment: Truck-Mounted Drill Rig Logged By: HF Northing: 0 Easting: 0 Elevation: 0 Figure No: A B C D E F..8 Cascade eotechnical Ltd. #0-88 Spall Road Kelowna,B.C. VY R

42 APPENDIX C

43 Percent Passing Project: New Monico Development Insite File No.: CAS Location: Hwy 7 - Peachland Figure No: -0 Client: New Monico Dev Corp cc: Attention: 0 RAIN SIZE ANALYSIS RESULTS Sample Source: Jobsite Date Sampled: August 7, 0 Sample Location: ' Date Received: August 0, 0 Specification: None Date Tested: September, 0 Material Type: SAND & RAVEL, trace silt Sampled by: HOWARD Natural Moisture Content:.% Tested by: WH Sieve Series 8//0/0 Test Method: ASTM C - C7 ravel Sizes Sand, Silt and Clay Sizes Sieve Sizes Percent radation Limits Sieve Sizes Percent radation Limits US Sieve Metric (mm) Passing Max Min US Sieve Metric (mm) Passing Max Min " # " # ½" #.0. "..8 # ¾". 8. # ½".7 7. # ⅜". 7.0 # COARSE RAVEL FINE SAND COARSE MEDIUM FINE SILT CLAY 00 U.S. Standard Seive Sizes " " ½" " ¾" ½" ⅜" # #8 #0 # #0 #0 #0 #0 #0 #00 # Reviewed By: rain Size (mm) μm

44 Percent Passing Project: New Monico Development Insite File No.: CAS Location: Hwy 7 - Peachland Figure No: -0 Client: New Monico Dev Corp cc: Attention: 0 RAIN SIZE ANALYSIS RESULTS Sample Source: Jobsite Date Sampled: August 7, 0 Sample Location: ' Date Received: August 0, 0 Specification: None Date Tested: September, 0 Material Type: SAND, some silt, trace gravel Sampled by: HOWARD Natural Moisture Content: 8.% Tested by: WH Sieve Series 8//0/0 Test Method: ASTM C - C7 ravel Sizes Sand, Silt and Clay Sizes Sieve Sizes Percent radation Limits Sieve Sizes Percent radation Limits US Sieve Metric (mm) Passing Max Min US Sieve Metric (mm) Passing Max Min " #.7. " #8.0. ½" #.0 7. " # ¾" # ½" # ⅜" # COARSE RAVEL FINE SAND COARSE MEDIUM FINE SILT CLAY 00 U.S. Standard Seive Sizes " " ½" " ¾" ½" ⅜" # #8 #0 # #0 #0 #0 #0 #0 #00 # Reviewed By: rain Size (mm) μm

45 Percent Passing Project: New Monico Development Insite File No.: CAS Location: Hwy 7 - Peachland Figure No: -7 Client: New Monico Dev Corp cc: Attention: 0 RAIN SIZE ANALYSIS RESULTS Sample Source: Jobsite Date Sampled: September, 0 Sample Location: ' Date Received: September, 0 Specification: None Date Tested: September, 0 Material Type: RAVEL & SAND, trace silt Sampled by: HOWARD Natural Moisture Content:.8% Tested by: WH Sieve Series 8//0/0 Test Method: ASTM C - C7 ravel Sizes Sand, Silt and Clay Sizes Sieve Sizes Percent radation Limits Sieve Sizes Percent radation Limits US Sieve Metric (mm) Passing Max Min US Sieve Metric (mm) Passing Max Min " # " #8.0. ½" #.0.70 ". 80. # ¾". 7. # ½".7. # ⅜"..7 # COARSE RAVEL FINE SAND COARSE MEDIUM FINE SILT CLAY 00 U.S. Standard Seive Sizes " " ½" " ¾" ½" ⅜" # #8 #0 # #0 #0 #0 #0 #0 #00 # Reviewed By: rain Size (mm) μm

46 Percent Passing Project: New Monico Development Insite File No.: CAS Location: Hwy 7 - Peachland Figure No: -8 Client: New Monico Dev Corp cc: Attention: 0 RAIN SIZE ANALYSIS RESULTS Sample Source: Jobsite Date Sampled: September, 0 Sample Location: ' Date Received: September, 0 Specification: None Date Tested: September, 0 Material Type: SAND & RAVEL, trace silt Sampled by: HOWARD Natural Moisture Content:.% Tested by: WH Sieve Series 8//0/0 Test Method: ASTM C - C7 ravel Sizes Sand, Silt and Clay Sizes Sieve Sizes Percent radation Limits Sieve Sizes Percent radation Limits US Sieve Metric (mm) Passing Max Min US Sieve Metric (mm) Passing Max Min " #.7.0 " # ½" 8.. #.0.8 ". 8. # ¾". 80. # ½".7 7. # ⅜".. # COARSE RAVEL FINE SAND COARSE MEDIUM FINE SILT CLAY 00 U.S. Standard Seive Sizes " " ½" " ¾" ½" ⅜" # #8 #0 # #0 #0 #0 #0 #0 #00 # Reviewed By: rain Size (mm) μm

47 APPENDIX D

48 eotechnical Design Considerations Related to Rock Types Found at the New Monaco Development (Eastern Phase) in Peachland, B.C. DRAFT Submitted to Mark Holland MCIP, RPP, LEED Vice President Development New Monaco Enterprise Corporation 0 Machleary Street Nanaimo, B.C. VR By Dr. Dwayne Tannant, P.Eng. Changed Standard Proctor to Modified Changed : slope for blast rock fill to.: Terrace Hill Place Kelowna, B.C. VV T dwayne.tannant@ubc.ca September, 0

49 Introduction New Monaco plans to construct roads, residential and commercial building lots, and associated underground services in an area located east of the Peachland town centre and situated between Highway 7C (Okanagan Connector) and Highway 7. The work reported here was completed in collaboration with Ron Campbell from Cascade eotechnical Ltd. to provide New Monaco Enterprise Corp. (New Monaco) with geotechnical engineering services. The purpose of this report is to summarize geotechnical considerations related to the rock types found at this site.. Scope of Work The scope of the work for this investigation is summarized in the proposal from Cascade eotechnical Ltd. dated July, 0 (CL File No: P 0). The work performed was to describe the general geological conditions and nature of the rock where it could be observed or extrapolated from exposures along the Okanagan Connector and Highway 7. Examination of the rock included an assessment of: the durability and weathering resistance of the rock, the possible short and long term stability of steep blasted rock cuts and the possible use of large boulders for constructing retaining walls.. Authorization Authorization to proceed with the work was received via on August from Mark Holland.. Site Inspection On August, Ron Campbell and I performed an inspection of the site. The work pertaining to the soils inspection will be covered under a separate report from Ron Campbell. This report deals with the bedrock at the site. Site Topography The development will be built on the southern flank of Drought Mountain. The top of Drought Mountain lies at an elevation just over 000 m above sea level. The proposed development lies between elevations of approximately 00 m and 0 m. The total elevation change from Highway 7C to Highway 7 ranges from roughly a few metres at the east portion of the development to approximately 0 m along Drought Creek. The ground surface has moderate slopes (0 to %) in the area of the current orchard. Where bedrock is exposed, the ground can be quite steep and there are a series of bedrock outcrops along the western and southwest portions of the site (Figure and Figure ).

50 Figure Rock outcrop above Highway 7. Figure Small rock bluff east of Drought Creek.

51 Bedrock eology Bedrock outcrops are concentrated along the western and southern parts of the site. In most areas, the bedrock is covered with silty sand or sand and gravel, interbedded with silt and/or clay. The granular and fine grained soils are sometimes underlain by dense sand and gravel till. A map based on a 00 aerial orthophotograph from RDCO (8E ) showing these features accompanies this report. Drought Creek is located at the western edge of the currently proposed development phase. Drought Creek is located in a gully that is coincident with a fault strike NNE to SSW mapped by Church (80 ) and Okulitch (0 ). Bedrock outcrops form the eastern side of the creek over most of the width of the site. Three rock units are mapped in the immediate region of the proposed development. Okanagan Batholith rock types exist on the south part of the site and form some of the higher outcrops on the site. These consist of granodiorite and granite, light grey weathering, massive, medium to coarse grained, equigranular to porphyritic, unfoliated to weakly foliated. At the north side of the site (primarily exposed along Highway 7C) the rock consists of Trepanier Rhyolite. Trepanier Rhyolite is exposed on all sides of the intersection between Highway 7 and Highway 7C and consists of rhyolite lava, breccia, and minor sandstone. Near Drought Creek and along Highway 7 exposures of Springbrook Formation occur. These consist of conglomerate and a polymictic breccia. The fault running along Drought Creek delineates some of the boundaries between the rock types. Just outside the project site, exposures of Kitley Lake Member trachyandesite occur along Highway 7C. A dominant steeply dipping joint set exists in most of the rock exposures on the site. The joint set strikes roughly 00 to 00. This orientation is sub parallel to the steeply dipping Drought Creek fault, which has a strike of approximately 00. This fabric in the rock mass is frequently associated with the orientation of steep bluff faces and ridges in the bedrock. It is possible that the depth of the overburden above the bedrock surface may be influenced by the shape of buried ridges and valleys running in a direction NNE to SSW. Thus, overburden depths may vary more quickly in directions roughly perpendicular to these structures, i.e., NW to SW. Church B.N. 80. eology of the Kelowna Tertiary Outlier (West Half). Preliminary Map. Okulitch A.V. (comp.) 0. eology, Okanagan Watershed, British Columbia; eological Survey of Canada, Open File 8, scale :00 000

52 Strength and Weathering Resistance of Different Rock Types The exposed surface of the bedrock at all locations contains small fractures associated with weathering since the last glacial period. The more extensive fracturing is expected to penetrate a few metres into the rock mass. The freshest exposures of rock are in the rock cuts along Highway 7. Hand specimens of rock were collected from rock cuts (#: 07780E, N and #: 07E, 8N) exposed along the north side of Highway 7. The sample locations are presented on Figure (Appendix A) of the Cascade eotechnical report. The rocks were tested in a Roctest point load machine to estimate their compressive strength and the results are summarized in Table. The granodiorite rock has a typical uniaxial compressive strength around 00 MPa classifying this strong to very strong rock according to the ISRM classification scale. Table Point Load Strength Index and Estimated Rock Strength Location Description Number of Tests Mean Point Load Index Uniaxial Compressive Strength (MPa) Is 0 (MPa) Mean Std. Dev. # Conglomerate.7 # ranodiorite # ranodiorite 7. 0 Tested according to ASTM D7 Standard Test Method for Determination of the Point Load Strength Index of Rock and Application to Rock Strength Classifications The hand specimens had mineral alteration and weathering, which is commonly seen as thin mineral infilled small fractures in the rock. These form weakness surfaces in the rock and failure of the rock when loaded typically occurs by fracturing along the mineral infilling. The Okanagan Batholith rocks appear to be the most weathering resistant of the rock units present at the site. Many of the bedrock outcrops (small hills and bluffs) at the current development site are located in this rock. The rock bluffs have little talus accumulation at their toes and few loose large rocks at their tops. This indicates relatively low weathering rates. The rock cuts along both highways in this rock type also exhibit slow weathering rates with only minor accumulations of small rockfalls at the base of the cuts. International Society for Rock Mechanics (8) Rock characterization, testing and monitoring ISRM suggested methods.

53 The Trepanier Rhyolite displays a variation of composition and extent of jointing and fracturing in the exposures seen along Highway 7C. In areas where the rock mass is highly fractured there is a tendency for small rockfalls to accumulate at the base of rock cuts. It may be noteworthy that rock blocks taken from a blasted rock cut in Trepanier Rhyolite located approximately km to the west of the development site at Island View Villas were used to construct small dry stacked retaining walls. Unfortunately, these volcanic rock blocks have been found have a predisposition to weather and fracture into smaller tabular fragments. The fracturing appears to have occurred along very fine sub parallel and subtle changes in the rock mineralogy. The rock cuts in the Kitley Lake Member trachyandesite lava have experienced considerable weathering resulting in accumulation of significant talus deposits in the highway ditch. This appears to be the most weathering prone rock type near the site. Rock Related Hazards. Slope instability Currently the steepest slopes on the site are those leading down to Drought Creek and small bluffs leading towards Highway 7 at the southwest portion of the site. Based on the field investigation and photo interpretation there are no concerns for large scale bedrock slope instabilities in these slopes.. Rockfalls The hazard posed by rockfalls from the existing steeper bluffs is typically low. If steep rock cuts are created as part of the proposed development, the rockfall hazard may increase but it can be mitigated using controlled blasting and careful scaling of the excavated face. The low susceptibility for the granitic rock to weather is another mitigating factor.. Acid Drainage eneration In the areas inspected, little evidence for sulphide mineralization was observed along joints in the rock. Therefore, generation of acidic groundwater from seepage through fill constructed from blast rock is not expected. roundwater roundwater seepage was observed coming out of a fracture in the bedrock exposed on the north side of Highway 7C (Figure ). While this specific seepage location is of little concern to the proposed development it does illustrate the possibility for other seepage zones that may be encountered once excavation begins on the site.

54 Figure Seepage coming from a shallow dipping fracture on the north side of Highway 7C (0777E, 0N), directly opposite from the site of the proposed development. Perched water tables may occur along the surface of the bedrock during snowmelt and periods of heavy rainfall runoff. Seepage along this surface will be controlled by the topography of the bedrock surface, which in turn has been influenced by past glacial erosion and the joint sets in the rock. The bedrock surface will be better understood after the planned test pits and boreholes are completed. The outcomes of this investigation will help guide plans for dealing with drainage from down spouts, perimeter drains, patios, driveways, or other hard surfaces and whether infiltration into rock pits is a suitable option. 7 Blasting The closest building (excluding old farm buildings on the site) is approximately 0 m to the southwest across Highway 7 and below Drought Road. Blasting vibrations at this house should be well below accepted thresholds for initiation of damage. Blasting will likely occur as close as 0 to 0 m to Highway 7 and will be located at and above the highway elevation. 7

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-Page) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

January 17, 2008 File:

January 17, 2008 File: January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-BPage) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report APPENDICES Appendix A City Standard Details Appendix B Engineering Geology Report APPENDIX A CITY STANDARDS DETAILS APPENDIX B ENGINEERING GEOLOGY REPORT ENGINEERING GEOLOGY REPORT WATER

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Telephone : G. Ntaka : Fax : M. Bénet :

Telephone : G. Ntaka : Fax : M. Bénet : Our Ref: P 24058 Your Ref: Drennan Maud cc. CK 95/54198/23 Consulting Geotechnical Engineers & Engineering Geologists VAT Reg ¹ 4770223594 P.O. Box 22997 Unit 7, Gayridge Business Park ¹ 2 MARGATE 13 Wingate

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 7006.3, 7014.1 Effective: 01-01-2017 DOCUMENT NO.: P/BC 2017-049 Revised: 12-21-2016 Previously Issued As: P/BC 2014-049 SLOPE STABILITY

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES

3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES 3.0 SUMMARY OF POTENTIAL GEOTECHNICAL IMPACTS AND MITIGATION MEASURES This section summarizes the principal geotechnical conditions that occur in the project area. The potential impact that each condition

More information

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario Subsurface Investigation Proposed Commercial Building 8 March Road Ottawa, Ontario Houle Chevrier Engineering Ltd. 80 Wescar Lane Ottawa, Ontario K0A L0 www.hceng.ca Submitted to: Broccolini Construction

More information

GEOTECHNICAL PHASE 1

GEOTECHNICAL PHASE 1 GEOTECHNICAL PHASE 1 FOR PROPOSED SKUKUZA SAFARI LODGE FOR KRUGER NATIONAL PARK MPUMALANGA PROVINCE SEPTEMBER 2014 Report No: G14-0902 Issue 2 Prepared by: Conic North Consulting Engineers PO Box 11862

More information

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer

,Baynes Lake. TO...?&.?...A 2...KO.?'!!&... Sr. *logical Engineer > i evernment OF BRITISH COLUMBIA a TO...?&.?...A 2....KO.?'!!&... Sr. *logical Engineer... Grou,,water. Section Hydrology Division Wat.er... In~.~s.tiga.ti.On.s..Branck.... 5 u BJECT...C;.roun.dw.ater...Snve

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

REFERENCE NO S135 NOVEMBER 2015

REFERENCE NO S135 NOVEMBER 2015 A REPORT TO DUNPAR DEVELOPMENTS INC. A SOIL INVESTIGATION FOR PROPOSED RESIDENTIAL DEVELOPMENT 020, 024, 032, 042, 048 AND 052 6 TH LINE, TOWN OF OAKVILLE REFERENCE NO. 505-S35 NOVEMBER 205 DISTRIBUTION

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

=%REPORT RECONNAISSANCE OF CHISHOLM LAKE PROSPECT. October 25, 1977

=%REPORT RECONNAISSANCE OF CHISHOLM LAKE PROSPECT. October 25, 1977 =%REPORT ON FIELD RECONNAISSANCE OF CHISHOLM LAKE PROSPECT October 25, 1977 Bruce D. Vincent Imperial Oil Limited, Minerals - Coal, CALGARY, ALBERTA CHISHOLM LAKE PROSPECT Introduction The Chisholm Lake

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to:

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to: AMEC Earth & Environmental Limited 610 Richard Road, Prince George, BC Canada V2K 4L3 Tel +1 (250) 564-3243 Fax +1 (250) 562-7045 www.amec.com GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is based upon the City of El Segundo General Plan and General Plan EIR and addresses the following geologic issues: soil erosion,

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

Table 9. FAI accession log

Table 9. FAI accession log Table 9. FAI-02045 accession log UA Accession # FS # Depth (cm BS) Artifact Type n= Material Color UA2010-187-0001 1 5-10 utilized flake 1 basalt black UA2010-187-0002 2 5-10 flake 1 chert black UA2010-187-0003

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix 18 12/10/2018 AGENDA ITEM 6 APPENDIX 18 2018/0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN Dalwhinnie Quarry Ground

More information