ISSUED FOR CONSTRUCTION

Size: px
Start display at page:

Download "ISSUED FOR CONSTRUCTION"

Transcription

1 PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections Campsite Profiles 1 Boat Launch Parking 16 Volume Tables 17 General Notes & Materials Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 1 of 17

2 EXISTING PLAN 1:1 1 1:1 7m N Refer to page 16 for Boat Launch Parking Refer to page 3 for Western Road Site 1 Site 6 Site 7 Site Site 2 Site 3 Site 8 Site 4 Sign Pit Toilets Site 9 Site 1 Refer to page 4 for Eastern Road Site 16 Sign Pit Toilet Site 27 Site 19 Site 26 Pit Toilet Site 47 Site 2 Site 23 Site 21 Site 46 Site 24 Site Site 44 Seepage Site 2 Pit Toilets Site Site 42 Site Site 4 Site Site 28 Site Site Site 36 Site Site Site 37 Site 32 Site 33 Site Site Site Site Site 43 Site 41 Site Pit Toilet Site 4 +4 Ditch Treeline Overhead Power Lines (13 kv) Overhead Power Lines (23 kv) Power Poles Treeline Overhead Power Lines (13 kv) Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 2 of 17

3 Ditch BC Hydro Dock Upgrades N Remove Alders from Beach Refer to page 16 for Dock Parking Lot Details Existing 3mm Ø Pipe 16.7m 1.m Site Campbell Lake Site 8 Site 7 Site Site 2 Site 6 Site 1 Site 3 Site 1 Site 16 Existing 6mm Ø CMP Stake 27F Pit Toilet Site 27 Site 19 Site 26 Site 2 Site 21 Site Seepage Pit Toilets Stake 2F 6.m + +6 Site m +12 Existing 6mm Ø CMP Site 9 Site 4 Pit Toilets Sign Sign Stake 27B Existing mm Ø Pipe Pit Toilet Site 23 Site 24 Site 2 Stake 2B Site 42 Site Site 47 Site 46 Site Site 13 Site Site 11 Remove Rotten Guide Logs. Re-work Fill-Slope with Kg Class Angular Rock at a 1.2:1. (HD:VD) Widen Road to.m Site 43 Site Pit Toilet Site 4 L=16m R=16m +6 Install Cross Ditch and Berm to Limit Access on Service Road + +4 Existing 8mm Ø CMP Treeline Treeline Existing 3mm Ø CMP Existing 3mm Ø CMP L=21m R=13m Overhead Power Lines (13 kv) Overhead Power Lines (13 kv) TO BE PRINTED ON 36"X22" PAPER TO RETAIN PROPER SCALE Overhead Power Lines (23 kv) Power Poles DESIGN WESTERN PLAN 1:. 1: 2m LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TOE OF FILL TOP OF CUT TOP OF BANK TREELINE CUT FILL RE-VEGETATION RIPRAP Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 3 of 17

4 g 3mm Ø Pipe Site 1 N Site 16 Existing 6mm Ø CMP Stake 27F Pit Toilet Site 27 Site 19 Site 26 Site 2 Re-Vegetate with Native Shrubs and Trees Site 21 Site Seepage 16.7m Pit Toilets Stake 2F 6.m m Site Road Width 6.m from +4 to +6 (Widen 2.m on the Inside of Turn) +9 Site m +12 Site Site 28 Site m +18 Site 3 Site Site Site New Stake 34B Site New Stake 34F Install 7x14x9.1m Armtec Min-Span I Road Width 6.m from +17 to +24 (Widen 2.m on the Inside of Turn) Site 33 Site 3 Stake 27B.m Sign Existing mm Ø Pipe Site 47 Pit Toilet Site 23 Site 46 Site 24 Site 44 Site 2 Stake 2B Site Site Site Widen Road to.m Site 43 Site 41 Site TO BE PRINTED ON 36"X22" PAPER TO RETAIN PROPER SCALE Existing 8mm Ø CMP Road Width 6.m from + to +32 (Widen 2.m on the Inside of Turn) Treeline Existing 3mm Ø CMP Overhead Power Lines (13 kv) Site 4 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TOE OF FILL TOP OF CUT TOP OF BANK TREELINE CUT FILL RE-VEGETATION RIPRAP DESIGN EASTERN PLAN 1:. 1: 2m Location: Northing 4614 Easting UTM Zn 9 Drawing Number: 177 Page: 4 of 17

5 ELE: 1.3m OFFSET: -6.m - - ELE: 99.m OFFSET: -3.8m ELE: 99.m OFFSET: -2.m ELE: 99.9m OFFSET: 2.1m ELE: 99.9m OFFSET: 2.1m ELE: 99.7m OFFSET: 3.4m ELE: 99.6m OFFSET: -2.3m ELE: 99.4m OFFSET: -2.m ELE: 99.4m OFFSET: -2.1m +4 + ELE:.9m OFFSET: 3.4m ELE: 99.m OFFSET: 3.2m ELE:.8m OFFSET: 3.m 97 % Start Overhead Power Lines -% End Overhead Power Lines DESIGN WEST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale - 8% -8% +4 K:4. LVC:23.1 Install 6mm Ø x 8.m CMP + -% -9%. 1: 2m +6 -% Install 6mm Ø x 1.m CMP ELE: 99.2m OFFSET: -2.9m ELE: 99.3m OFFSET: 2.8m Install 6mm Ø x 8.m CMP WEST ROAD CROSS SECTIONS 1: ELE:.8m OFFSET: -2.2m ELE:.m OFFSET: 4.m Install 6mm Ø x 1.m CMP 3. 1:3 1m LOOKING NORTH AT WEST ROAD Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: of 17

6 . 1: 2m K:4. LVC:4.3 DESIGN EAST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale K:3. LVC:6.2 K:3. LVC: % Site 23 Site 21 Site 24 Site Site 2 + Install 6mm Ø x 8.m CMP Site Install 7mm x 14mm x 12.2m Armtec Mini-Span I Site Site Site Site Site K:14.64 LVC:22.4 K:17.4 LVC:13.3 K:19.71 LVC:8.7 % % Site Site Site Site Site Install 7mm x 14mm x 9.1m Armtec Mini-Span I Site Site Site 39 Survey Date: Oct., Approval Date: Jan. 24, 218 Site Location: Northing 4614 Easting UTM Zn Drawing Number: 177 Page: 6 of 17

7 DESIGN EAST ROAD PROFILE 1: Horizontal Scale 1: Vertical Scale. 1: 2m K:19.7 LVC:8.7 K:3. LVC:19.2 K:3. LVC:2.2 % K:3. LVC:.4 6% Install 6mm Ø x 8.m CMP % Install 6mm Ø x 8.m CMP Site Site Site Site Site Site Site LOOKING EAST FROM ON EAST ROAD LOOKING DOWNSTREAM AT CROSSING +1 ON EAST ROAD WET AREA AT +4 ON EAST ROAD Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 7 of 17

8 Install 6mm Ø x 8.m CMP Install 7x14x12.2 Armtec Mini-Span I (Shown on skew) EAST ROAD SECTION VIEWS 1: :3 1m Survey Date: Oct., 217 Approval Date: Jan. 24, Location: Northing 4614 Easting UTM Zn 9 Drawing Number: 177 Page: 8 of 17

9 Install 7x14x12.2 Armtec Mini-Span I (Shown on skew) EAST ROAD SECTION VIEWS 1: :3 1m Survey Date: Oct., 217 Approval Date: Jan. 24, Location: Northing 4614 Easting UTM Zn 9 Drawing Number: 177 Page: 9 of 17

10 Install 6mm Ø x 8.m CMP Install 6mm Ø x 8.m CMP EAST ROAD SECTION VIEWS 1: :3 1m Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: of 17

11 #4 1 % 67% -27% % # % % #23 % % % 6% 9% #2 7% 8% % 19% -- -7% -6% 1 # - % % 6% # % % -% #24 % -% % #27 % 48% 67% - % % 29% -8% -7% EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m Survey Date: Oct., 217 Location: Northing 4614 Easting UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 11 of 17

12 #28 #3 #32 #34-8% -% -% - -9% - 7%8% % -2 --%9% -1 % % % -7% - - -% % % % % #29 #31 #33 #3 -- -% -9% -9% 8% 8% -3-8% - -7% % % -% -18% -% EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m --1 8% Survey Date: Oct., 217 Location: Northing 4614 Easting UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 12 of 17

13 -8% #36 #38 #4 # % - % % - % % 7% -% -% % % -% - - -% % -8% -% -7% #37 #39 #41 #43-8%% 6% 9% % 6% % 6% % % % - - 6% 6% % % % - -% 2 % EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m Survey Date: Oct., 217 Location: Northing 4614 Easting UTM Zn 9 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 13 of 17

14 # # % - #48-6% 18% % - % -1 19% % 1 - % -9% 7% % -% - -% - #4 7% 7% % 6% - # #49-9% - 28% % -3-8% -% % -2 -% - -% 9 9 EAST ROAD SECTION VIEWS 1: Horizontal Scale 1: Vertical Scale. 1: 2m -% Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 14 of 17

15 N BC Hydro Dock Upgrades Remove Alder and Re-Contour Beach Existing 3 Ø Pipe 7% K:1. LVC:.7 9% 7% DOCK ROAD PROFILE #1 1:Horizontal Scale 1: Vertical Scale Install Parking Curbs at 3.23m c/c Pre-Cast Curb Stops to be in accordance with Provincial Parks - Facility Standards Drawing No. E-2-2A 8% % Remove Stump Embedded in Road Grade Remove Vegetation to Provide Continuous Parking Lot Existing 6 Ø Pipe - - K:1.8 LVC: L=m R=1m DOCK ROAD #2 Install One Way Traffic, Do Not Enter Sign + LEGEND DITCH DESIGN ROAD EDGE DESIGN CENTERLINE FLAGGED CENTERLINE TREELINE CUT FILL RE-VEGETATION RIPRAP L=7m R=1m +4 L=19m Sign R=9m Install Two Way Traffic Sign +4 DESIGN PLAN - BOAT LAUNCH PARKING 1:3 3. 1:3 1m DOCK ROAD #1 L=17m R=1m + Widen Turn Install One Way Traffic Sign +6 8% 8% 7% Survey Date: Oct., Location: Northing 4614 Easting UTM Zn 9 Approval Date: Jan. 24, 218 DOCK ROAD PROFILE #2 1:Horizontal Scale 1: Vertical Scale Drawing Number: 177 Page: 1 of 17

16 Station Station East Road Estimated Total Volume Table Fill Volume (m³) In Place West Road Estimated Total Volume Table Fill Volume (m³) In Place Cut Volume (m³) In Bank Cut Volume (m³) In Bank Cumulative Fill Vol (m³) In Place Cumulative Fill Vol (m³) In Place Cumulative Cut Vol (m³) In Bank Cumulative Cut Vol (m³) In Bank Campsite Volume Table Area (m2) Total Cut (m3) Total Fill (m3) Net (m3) Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Fill> Campsite <Fill> Campsite <Cut> Campsite <Fill> Campsite <Cut> Campsite <Fill> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Fill> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Cut> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Fill> Campsite <Cut> Campsite <Cut> Total Area Aggregate Volume Requirements (m3) 7 Minus Pit Run 19 Minus Road Crush 2 Minus Road Crush Bulk Fill (Sourced Locally) Kg Class Angular Rock East Road West Road Dock Parking Area Road Widening (BM67 to BM9) Culvert Re-Work (Between Sites 8 & 9)..... Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Campsite Pit Toilets Total Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 16 of 17

17 General Notes 1. Call BC One Call prior to any works. works are within the vicinity of BC Hydro overhead powerlines. BC Hydro approval is required prior to commencing works. 2. Refer to Summary of Watercouse Assessments at the, by Jacob Blanchard, RPTech, conducted on October, 217 for details on Creek assessments. Construction is to be in accordance with all applicable legislative regulations while working within the riparian areas. 3. road construction is to be constructed in accordance with the Ministry of Tourism, Sport and the Arts single campsite standard drawing number RST 481-SR-1 unless otherwise noted in the design. 4. campsites extents are shown in the drawings and are to be constructed in accordance with the Ministry of Tourism, Sport and the Arts single campsite standard drawing numbers RST 481-C-1 and RST 481-C-3. Trees are to be felled and removed within the proposed footprint. Where trees are adjacent to proposed fill slopes, the project manager is to give direction on whether to retain or remove the tree. Trees larger than 1cm (6 ) are to felled by a certified faller. Where the felled tree has the potential to damage infrastructure, use machine assist and or ropes to mitigate risk. Complete a hazard tree assessment in accordance with Worksafe BC and remove as required.. Clear and strip all organic and overburden materials within the proposed campsite footprint down to a firm bearing on undisturbed soil. All removed overburden material is to be removed and spoiled off site as determined by the project manager. A 3cm deep overburden layer has been assumed for volume determinations; however, final bearing soils are to be approved by the project manager prior to placing aggregate. 6. All placed aggregate is to be placed in 1mm lifts and compacted with a minimum lb plate compactor. If aggregate is too dry, add water as required to achieve optimal moisture content and allow for adequate compaction. Pit Run, and Gravel is to be well graded granular material, substantially free of clay lumps, organic material and other extraneous material, screened to remove all particles in excess of maximum diameter specified in the material description below. 7 Minus Pit Run Gradation Sieve Designation 19 Minus Road Crushed Grave Percent Passing 7mm > mm 7 2mm 4.7mm mm 8.7mm 2-8 Sieve Designation Percent Passing 19mm > 12.mm 7 9.mm mm mm mm mm 8 3.3mm 2.7mm Minus Road Crushed Gravel (HFSA) Sieve Designation Percent Passing 2mm > 19mm 8 9.mm mm mm 2-.3mm -3.7mm Where proposed campsite surface is not raised above the forest floor, ditches should be dug to intercept seepages and provide a minimum 2mm ditch depth with positive drainage away from the site. 8. Prior to placing Corrugated Steel Pipes, remove all organics or incompetent soils. All culverts are to be placed on a level compacted fill to allow positive drainage of the ditch-line or creek between 1- % gradient as required for each site. Bedding material within 3mm of the culverts shall consist of 19mm Minus Road Crush. Fill around the pipe is to be well compacted with a minimum lb plate compactor in 2mm lifts. Ensure a minimum 3mm depth of cover over top of the pipe. Armor both the inlet and outlet of each culvert with a 3mm nominal thickness of screened Kg Class angular rock Riprap. Kg Class Riprap Angular Rock Gradation Class (Kg) Quantity 4 6 Dia. x 8.m Corrugated Steel Pipes Item 1 6 Dia. x 1.m Corrugated Steel Pipe C/W Coupler 1 7 x 14 x 12.2m Armtec Mini Span I Arch 1 7 x 14 x 9.1m Armtec Mini Span I Arch 1 Roll Armtec 2 Non-Woven Geotextile (Or Approved Equivalent) 8 Pre-Cast Curb Stops (To Provincial Standard DWG No. E-2-2A) 31.2m³ 19mm Minus Road Crush Gravel 267m³ 2mm Minus Road Crush Gravel (HFSA) 49m³ 7mm Minus Pit Run Gravel m³ Locally Sourced Sub Base Material 77m³ Kg Class Riprap m³ Topsoil Approx. Average Dimension (mm) % 8% Armtec Mini-Span I Arches are to be installed as shown in the design and in accordance with installation procedures identified within the Mini-Span Bridges Technical Brochure. Steel Plate footings are to placed directly on a compacted Kg Class Angular Rock Pads 6mm deep x mm wide along its length overlaid by a mm depth levelling gravel. The Angular Rock Pad is to be embedded below scour such that it is a minimum 3mm deeper than the creek bed. The levelling gravel is to be spread such that there are no voids or pivoting along the entire length of the Arch footing plates. Levelling gravel is to consist of 2mm Minus Road Crushed Gravel and is to be wrapped in Non-Woven Geotextile. Materials Note: Bulking factor of used to determine the required Volumes. Location: Northing 4614 Easting UTM Zn 9 Survey Date: Oct., 217 Approval Date: Jan. 24, 218 Drawing Number: 177 Page: 17 of 17

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

SECTION AGGREGATE OR GRANULAR SUBBASE

SECTION AGGREGATE OR GRANULAR SUBBASE SECTION 02230 AGGREGATE OR GRANULAR SUBBASE PART 1 GENERAL 1.01 SECTION INCLUDES A. Aggregate or granular subbase as shown on the drawings. 1.02 RELATED SECTIONS A. Section 01400 Quality Requirements.

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix 18 12/10/2018 AGENDA ITEM 6 APPENDIX 18 2018/0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN Dalwhinnie Quarry Ground

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD 196 Coordinate System: UTM Zone NAD83 Data Source:

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

January 12, 2006 File:

January 12, 2006 File: January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL

More information

RIPRAP ASSESSMENT VARIOUS SITES HWY 40 NEAR GRANDE CACHE, AB

RIPRAP ASSESSMENT VARIOUS SITES HWY 40 NEAR GRANDE CACHE, AB RIPRAP ASSESSMENT VARIOUS SITES HWY 40 NEAR GRANDE CACHE, AB Need for Riprap Increased traffic along Hwy 40 has generated a lot of construction projects to upgrade highway Lack of good quality heavy rock

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Case Study 14. Rocky Creek Vented Box Culvert Ford

Case Study 14. Rocky Creek Vented Box Culvert Ford Case Study. Rocky Creek Vented Box Culvert Ford Location West Central Arkansas. Ouachita National Forest; Oden Ranger District. Rocky Creek crossing on Forest Road 887 (Muddy Gibbs Road). Crossing Description

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

Appendix F Channel Grade Control Structures

Appendix F Channel Grade Control Structures Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

Flood and Stream Restoration

Flood and Stream Restoration 2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # # ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD 386 N1-S30 385 BURNTWOOD RIVER Coordinate System:

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites.

This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites. Melbourne Water SANDS, CRUSHED ROCK AND CRUSHED SCORIA SPECIFICATION 21.A.038 1 GENERAL This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites. 2 SOURCES

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Design and Construction

Design and Construction Design and Construction Stream Simulation With power point slides shamelessly stolen from: Forest Service AOP Training Course Bob Gubernick Paul Anderson John Kattell USDA Forest Service Interim Directive

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms Scott Jackson University of Massachusetts Amherst Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms Dams Sub-standard Culverts Excessive Velocities Inlet Drop

More information

Hydraulic conductivity of granular materials

Hydraulic conductivity of granular materials 3 r d International Conference on New Developments in Soil Mechanics and Geotechnical Engineering, Hydraulic conductivity of granular materials Namir K.S.Al-Saoudi Building and construction Eng. Dept.

More information

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON.

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Contract Report CSIR/BE/TIE/SKA/59E2214 August 2018 REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Authors: Dave Ventura Anele Sambo Michael Roux

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

ON CONCAVE SLOPES, landslides usually initiate just above the slope break, where seepage is common.

ON CONCAVE SLOPES, landslides usually initiate just above the slope break, where seepage is common. To avoid areas more susceptible to failure, slight changes in clearcut boundary locations can often be made: ON CONVEX SLOPES, most open slope landslides occur in or near zones of change in slope angle.

More information

Track design and management

Track design and management 1 Track design and management Peter Fogarty, Certified Professional Soil Scientist NSW Soil Knowledge Network Cooma, June 18, 2018 Acknowledgements Antia Brademann, Cooma Waterwatch, Organiser Jo Powells,

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

LOGAN

LOGAN 21 LOGAN MILL 201+00 Legend Salina Power Pole Existing Stream Existing Survey Building Footprint Centerline Permanent Easement Temporary Easement Existing Right-of-Way Property Line Edge of Roadway Guardrail

More information

SIEVE ANALYSIS. Introduction

SIEVE ANALYSIS. Introduction SIEVE ANALYSIS Technology of Material II TKS 4012 Prepared by zacoeb@ub.ac.id Introduction A sieve analysis (or gradation test) is a practice or procedure used (commonly used in Civil Engineering) to assess

More information

@Copyright 2016 SKAPS Industries.

@Copyright 2016 SKAPS Industries. SKAPS INDUSTRIES 571 Industrial Pkwy, Commerce, GA 30529 Phone: (706) 336 7000 Fax: (706) 336 7007 E Mail: contact@skaps.com SKAPS GEOCOMPOSITE DROP IN SPECIFICATIONS @Copyright 2016 SKAPS Industries www.skaps.com

More information

2012 Road School Light Weight Deflectometer (LWD)

2012 Road School Light Weight Deflectometer (LWD) 2012 Road School Light Weight Deflectometer (LWD) Nayyar Siddiki, M.S., P.E. Office of Geotechnical Services Outline Testing for Compaction NO 53 and chemically modified soils (Special Prov.) Changing

More information

Geology, Soils, and Seismicity

Geology, Soils, and Seismicity Section 3.8 Geology, Soils, and Seismicity Introduction This section generally evaluates the effects of the alternatives analyzed in this Supplemental DEIS with regard to geology, soils and seismicity.

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

TABLE OF CONTENTS LIST OF TABLES. Page

TABLE OF CONTENTS LIST OF TABLES. Page TABLE OF CONTENTS Page 11.0 EFFECTS OF THE ENVIRONMENT ON THE PROJECT... 11-1 11.1 Weather Conditions... 11-1 11.2 Flooding... 11-2 11.3 Forest Fires... 11-2 11.4 Permafrost and Subsidence Risk... 11-3

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz

North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources. Wyn Menefee & Gary Schultz North Slope Tundra Travel and Ice Road Construction By Alaska Department of Natural Resources Wyn Menefee & Gary Schultz Exploratory and Production Wells on the North Slope Ice Road Construction Cross

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION Rail Environment Conference November 2016 AGENDA Objective Background Benefits

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY

NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY NHBRA SOIL LABORATORY SECTION INTERIM REVISED TEST RATES FOR THE MATERIALS LABORATORY DATE OF REVISION: ) 10th October 2010 S/N TEST DESCRIPTION UNIT RATE REMARKS 1 Sieve Analysis (wet and dry methods

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS SPRING 1 SECTION C SITE PH7-1: HWY 9:, DEADWOOD SLIDE 1. OBSERVATIONS 1.1 Field Program and Instrumentation

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

January 17, 2008 File:

January 17, 2008 File: January 17, 2008 File: 15-85-73 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 July 18, 2005 Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: H11:04 km 11.1 Erosion along

More information

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS

SLOPE STABILITY EVALUATION AND ACCEPTANCE STANDARDS INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0508 Effective: 1-26-84 DOCUMENT NO. P/BC 2002-049 Revised: 11-1-02 Previously Issued As: RGA #1-84 SLOPE STABILITY EVALUATION AND ACCEPTANCE

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT GEOTECHNICAL ENVIRONMENTAL MATERIALS September 3, 2009 File: 15-16-226 Alberta Transportation 2 nd Floor, Provincial Building 111 54 Street Edson, Alberta T7E 1T2 Attention: Mr. Cliff Corner NORTH CENTRAL

More information

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project

East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project East Branch Grand Calumet River Great Lakes Legacy Act Sediment Remediation and Restoration Project Jointly funded by the U.S. EPA Great Lakes Legacy Act, Indiana Department of Environmental Management

More information

Field Indicators of Inlet Controlled Road Stream Crossing Capacity

Field Indicators of Inlet Controlled Road Stream Crossing Capacity D E P A RTMENT OF AGRICUL E TU R United States Department of Agriculture Forest Service Technology & Development Program 7700 Transportation System 2500 Watershed and Air Management October 1997 9777 1807

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,

More information