APPENDIX B WORKSHEETS & EXHIBITS

Size: px
Start display at page:

Download "APPENDIX B WORKSHEETS & EXHIBITS"

Transcription

1 APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions and apply engineering principles to determine dimensions and specifications. An exhibit is a representative view of a measure. An exhibit often includes standardized dimensions and specifications. Several exhibits are only a representative view of the measure, and will require the designer to assess field conditions and input dimensions and specifications for the measure. These exhibits have been identified with a note. Worksheet Page Temporary Construction Ingress/Egress Pad Plan View... 5 Worksheet (Large Sites Two Acres or Larger) Temporary Construction Ingress/Egress Pad Cross-Section... 7 View Worksheet (Large Sites Two Acres or Larger) Temporary Construction Ingress/Egress Pad Plan View... 9 Worksheet (Small Sites Less Than Two Acres) Riprap Slope Protection Worksheet Temporary Diversion Worksheet Permanent Diversion Worksheet Perimeter Diversion Dike Worksheet Water Bar Worksheet Rock Check Dam Worksheet Temporary Slope Drain Worksheet Grass-Lined Channel Worksheet Riprap-Lined Channel Worksheet Energy Dissipater Worksheet Energy Dissipater Worksheet Concrete Block Chute Worksheet Excavated Drop Inlet Protection Worksheet Temporary Sediment Trap Rock Dam Worksheet Temporary Sediment Trap Outlet Worksheet October 2007 Appendix B 1

2 APPENDIX B WORKSHEETS & EXHIBITS Worksheet Page Temporary Dry Sediment Basin Earthen Dam/ Embankment Worksheet Temporary Dry Sediment Basin Spillway Worksheet Temporary Dry Sediment Basin Spillway Worksheet Concrete Washout (Above Grade System) Worksheet Concrete Washout (Below Grade System) Worksheet Surface Roughening Stair-Step Worksheet Surface Roughening Grooving Worksheet Exhibit Page Sod Exhibit Perimeter Diversion Dike Exhibit Water Bar Exhibit Rock Check Dam Exhibit Rock Check Dam Exhibit Temporary Slope Drain Exhibit Rock-Lined Chute Exhibit (requires inclusion of dimensions and specifications) Reinforced Vegetated Chute Exhibit (requires inclusion of dimensions and specifications) Excavated Drop Inlet Protection Exhibit Gravel Donut Drop Inlet Protection Exhibit Gravel Donut Drop Inlet Protection Exhibit Geotextile Fabric Drop Inlet Protection Exhibit Geotextile Fabric Drop Inlet Protection Exhibit Appendix B October 2007

3 APPENDIX B WORKSHEETS & EXHIBITS Exhibit Page Straw Bale Drop Inlet Protection Exhibit Straw Bale Drop Inlet Protection Exhibit Block & Gravel Drop Inlet Protection Exhibit Block & Gravel Drop Inlet Protection Exhibit Stone Bag Curb Inlet Protection Exhibit Stone Bag Curb Inlet Protection Exhibit Block & Gravel Curb Inlet Protection Exhibit Block & Gravel Curb Inlet Protection Exhibit Temporary Dry Sediment Basin Riser Pipe Exhibit Silt Fence Exhibit Silt Fence Exhibit Silt Fence Exhibit Straw Bale Dam Exhibit Straw Bale Dam Exhibit Straw Bale Dam Exhibit Straw Bale Dam Exhibit Temporary Stream Crossing Bridges Exhibit (requires inclusion of dimensions and specifications) Temporary Stream Crossing Culverts Exhibit (requires inclusion of dimensions and specifications) Temporary Stream Crossing Fords Exhibit (requires inclusion of dimensions and specifications) Temporary Stream Crossing Fords Exhibit (requires inclusion of dimensions and specifications) October 2007 Appendix B 3

4 This page was intentionally left blank.

5 WORKSHEET Temporary Construction Ingress/Egress Pad Plan View Worksheet (large sites two acres or larger) Public Road L = feet Geotextile Fabric Underliner T = inches W = feet INDOT CA No. 2 Aggregate L = Ingress/Egress Pad Length W = Ingress/Egress Pad Width T = Aggregate Thickness Top-Dress First 50 Feet Adjacent to Public Roadway with 2-3 Inches of INDOT CA No. 53 Aggregate (optional) (Note: For minimum dimensions, see the Specifications section of this measure.) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 17 October 2007 Appendix B 5

6 This page was intentionally left blank.

7 WORKSHEET Temporary Construction Ingress/Egress Pad Cross-Section View Worksheet (large sites two acres or larger) Diversion Ridge with 3:1 Side Slopes Grade > 2% 15 Feet Public Road Geotextile Fabric Underliner H = inches H = Height of Diversion Ridge (Note: 8 inches minimum) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 17 October 2007 Appendix B 7

8 This page was intentionally left blank.

9 WORKSHEET Temporary Construction Ingress/Egress Pad Plan View Worksheet (small sites less than two acres) Public Road L = feet Geotextile Fabric Underliner T = inches W = feet INDOT CA No. 2 Aggregate L = Ingress/Egress Pad Length W = Ingress/Egress Pad Width T = Aggregate Thickness Top-Dress with INDOT CA No. 53 Aggregate (optional) (Note: For minimum dimensions, see the Specifications section of this measure.) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 21 October 2007 Appendix B 9

10 This page was intentionally left blank.

11 WORKSHEET Riprap Slope Protection Worksheet T = feet Smooth foundation under bedding material/ filter medium T = feet Bedding material/ filter medium 1.5 T (min.) T = Aggregate Thickness ( 2 x d 50 ) Keyway Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 69 October 2007 Appendix B 11

12 This page was intentionally left blank.

13 WORKSHEET Temporary Diversion Worksheet R W = feet C W = feet Allowance for 10% Settlement Flow Protected Area 6 inch freeboard C D = feet All constructed slopes 2:1 or flatter C D = Channel Depth C W = Channel Width R W = Ridge Width For information on this measure, see Chapter 7, page 75 October 2007 Appendix B 13

14 This page was intentionally left blank.

15 WORKSHEET Permanent Diversion Worksheet R W = feet C W = feet Allowance for 10% Settlement Flow Protected Area 6 inch freeboard C D = feet All constructed slopes 2:1 or flatter C D = Channel Depth C W = Channel Width R W = Ridge Width For information on this measure, see Chapter 7, page 79 October 2007 Appendix B 15

16 This page was intentionally left blank.

17 WORKSHEET Perimeter Diversion Dike Worksheet R W = feet C W = feet Protected Area Allowance for 10% settlement Flow R H = inches R H = Ridge Height R W = Ridge Base Width C D = Channel Depth C W = Channel Top Width 6 inch freeboard All constructed slopes 2:1 or flatter C D = inches Note: Drainage channel is optional. For information on this measure, see Chapter 7, page 83 October 2007 Appendix B 17

18 This page was intentionally left blank.

19 WORKSHEET Water Bar Worksheet R W = feet C W = feet Protected Area Allowance for 10% settlement Flow R H = inches R H = Ridge Height R W = Ridge Base Width C D = Channel Depth C W = Channel Top Width 6 inch freeboard All constructed slopes 2:1 or flatter C D = inches Note: Drainage channel is optional. For information on this measure, see Chapter 7, page 89 October 2007 Appendix B 19

20 This page was intentionally left blank.

21 WORKSHEET Rock Check Dam Worksheet S D = inches 2:1 or flatter slope Revetment riprap Geotextile fabric Filter medium on up-slope side of check dam S D = Spillway Depth (NOTE: For minimum dimensions see the Specifications section of this measure.) S D = inches Revetment riprap D H = inches Filter medium Geotextile fabric D H = Dam Height S D = Spillway Depth (NOTE: For minimum dimensions see the Specifications section of this measure.) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 97 October 2007 Appendix B 21

22 This page was intentionally left blank.

23 WORKSHEET Temporary Slope Drain Worksheet IB W = feet DB W = feet DB H = feet P D = inches TS S = feet IB H = feet Stabilized outlet LS L = feet IB H = Island Berm Height IB W = Island Berm Width DB H = Diversion Berm Height DB W = Diversion Berm Width LS L = Level Section Length TS S = Tie-Down Stake Spacing = Pipe Diameter P D (Note: For minimum and maximum dimensions, see the Specifications section of this measure.) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 103 October 2007 Appendix B 23

24 This page was intentionally left blank.

25 WORKSHEET Grass-Lined Channel Worksheet C W = feet C D = feet B W = feet Turf reinforcement mat Erosion control blanket over turf reinforcement mat B W = Designed Bottom Width of Channel C W = Designed Top Width of Channel C D = Designed Depth of Channel For information on this measure, see Chapter 7, page 111 October 2007 Appendix B 25

26 This page was intentionally left blank.

27 WORKSHEET Riprap-Lined Channel Worksheet C W = feet C D = feet T = feet B W = feet Geotextile fabric or bedding material B W = Designed Bottom Width of Channel C W = Designed Top Width of Channel C D = Designed Depth of Channel T = Thickness of Riprap Layer For information on this measure, see Chapter 7, page 115 October 2007 Appendix B 27

28 This page was intentionally left blank.

29 WORKSHEET Energy Dissipater Worksheet 1 Drain pipe with flared end section Plunge pool (optional) A L = feet Top of apron level with receiving channel Geotextile fabric or well-graded aggregate A T = feet Check slot (optional) Stable outlet A L = Apron Length A T = Apron Thickness For information on this measure, see Chapter 7, page 121 October 2007 Appendix B 29

30 This page was intentionally left blank.

31 WORKSHEET Energy Dissipater Worksheet 2 A T = feet Drain pipe Stone placed around end of drain pipe to prevent slope erosion and undercutting of the pipe Stone apron below pipe discharge A W = feet Geotextile fabric or well graded aggregate A T = Apron Thickness A W = Apron Width Note: A W is the apron width at the narrow end of the apron. For information on this measure, see Chapter 7, page 121 October 2007 Appendix B 31

32 This page was intentionally left blank.

33 WORKSHEET Concrete Block Chute Worksheet Subsurface drain tile offset from center of channel to prevent seepage of up-slope groundwater B TW = feet :1 slope :1 slope 2:1 or flatter slope Plastic sheeting Bedding material Geotextile fabric Concrete blocks B TW = Berm Top Width Source: Adapted from U.S. Department of Agriculture, Natural Resources Conservation Service For information on this measure, see Chapter 7, page 131 October 2007 Appendix B 33

34 This page was intentionally left blank.

35 WORKSHEET Excavated Drop Inlet Protection Worksheet E A = feet x feet 2:1 or flatter slope E D = inches Weep holes for dewatering Aggregate supported by geotextile fabric or hardware cloth E A = Excavated Area (as required) E D = Excavated Depth Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 145 October 2007 Appendix B 35

36 This page was intentionally left blank.

37 WORKSHEET Temporary Sediment Trap Rock Dam Worksheet :1 slope T W = feet FP E = feet S D = feet :1 slope 1 foot thick gravel filter D H = feet Geotextile filter fabric A L = Apron Length D H = Dam Height FP E = Flood Pool Elevation S D = Spillway Depth T W = Top Width A L = feet Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 183 October 2007 Appendix B 37

38 This page was intentionally left blank.

39 WORKSHEET Temporary Sediment Trap Outlet Worksheet Overfill 6 inches to allow for settlement T = inches : 1 slope S D = inches SB W = feet Geotextile filter fabric : 1 slope RB W = feet RB W = Rock Dam Bottom Width S D = Spillway Depth SB W = Spillway Bottom Width T = Spillway Side-Slope Armament Thickness Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 183 October 2007 Appendix B 39

40 This page was intentionally left blank.

41 WORKSHEET Temporary Dry Sediment Basin Earthen Dam/Embankment Worksheet E TW = feet Allowance for 10% settlement :1 slope :1 slope Cut-off Trench E H = feet Hand-compacted fill around barrel/pipe and anti-seep collar Earthen dam/embankment constructed in 6 to 8 inch lifts E H = Earthen Dam/Embankment Height E TW = Earthen Dam/Embankment Top Width (NOTE: For minimum dimensions see the Specifications section of this measure.) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 191 October 2007 Appendix B 41

42 This page was intentionally left blank.

43 WORKSHEET Temporay Dry Sediment Basin Spillway Worksheet 1 Riser pipe crest elevation = Emergency spillway crest elevation = FB D = feet Flood pool elevation = :1 slope Anti-flotation block Principal spillway barrel/pipe Cut-off trench Anti-seep collar Stabilized outlet Hand-compacted fill around pipe and anti-seep collar Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 :1 slopes ES W = feet ES W = Emergency Spillway Width FB D = Free Board Depth (NOTE: For minimum dimensions see the Specifications section of this measure.) Source: Adapted from U.S. Department of Agriculture, Natural Resources Conservation Service For information on this measure, see Chapter 7, page 191 October 2007 Appendix B 43

44 This page was intentionally left blank.

45 WORKSHEET Temporary Dry Sediment Basin Spillway Worksheet 2 Level portion of spillway Channel approach ES W = feet Flow Earthen dam/embankment 1.5 ES W = feet Slope Slope Flood pool :1 slope FB D = feet Approach channel :1 slope Exit section LS L = feet ES W = Emergency Spillway Width FB D = Free Board Depth LS L = Level Section Length (NOTE: For minimum dimensions see the Specifications section of this measure.) For information on this measure, see Chapter 7, page 191 Source: Adapted from USDA Natural Resources Conservation Service October 2007 Appendix B 45

46 This page was intentionally left blank.

47 WORKSHEET Concrete Washout (Above Grade System) Worksheet For information on this measure, see Chapter 7, page 247 October 2007 Appendix B 47

48 This page was intentionally left blank.

49 WORKSHEET Concrete Washout (Below Grade System) Worksheet For information on this measure, see Chapter 7, page 247 October 2007 Appendix B 49

50 This page was intentionally left blank.

51 WORKSHEET Surface Roughening Stair-Step Worksheet Slope V = inches H = inches H = Horizontal Cut V = Vertical Cut H > V Note: See Roughening Slopes (Not to be Mowed) under the Specifications section of this measure. Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 297 October 2007 Appendix B 51

52 This page was intentionally left blank.

53 WORKSHEET Surface Roughening Grooving Worksheet G D = inches G W = inches G D = Groove Depth G W = Groove Width Note: See Roughening Slopes (Not to be Mowed) under the Specifications section of this measure. Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 297 October 2007 Appendix B 53

54 This page was intentionally left blank.

55 EXHIBIT Sod Exhibit 1 Perspective View Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 47 October 2007 Appendix B 55

56 This page was intentionally left blank.

57 EXHIBIT Perimeter Diversion Dike Exhibit 1 Flow Flow Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 83 October 2007 Appendix B 57

58 This page was intentionally left blank.

59 EXHIBIT Water Bar Exhibit 1 For information on this measure, see Chapter 7, page 89 October 2007 Appendix B 59

60 This page was intentionally left blank.

61 EXHIBIT Rock Check Dam Exhibit 1 A B A B A = Crest of Dam B = Toe of Dam For information on this measure, see Chapter 7, page 97 October 2007 Appendix B 61

62 This page was intentionally left blank.

63 EXHIBIT Rock Check Dam Exhibit 2 Flow Filter medium Revetment riprap Channel bottom width Channel top width For information on this measure, see Chapter 7, page 97 October 2007 Appendix B 63

64 This page was intentionally left blank.

65 EXHIBIT Temporary Slope Drain Exhibit 1 Diversion berm Diversion channel Anchor stake spacing (maximum of 10 feet) Flow Corrugated, non-perforated, plastic drain pipe Anchor stakes Stablized outlet Earthen island over inlet section of drain Level section (4 foot min.) For information on this measure, see Chapter 7, page 103 October 2007 Appendix B 65

66 This page was intentionally left blank.

67 EXHIBIT Rock-Lined Chute Exhibit 1 Flow Riprap placed over geotextile fabric Subsurface drain tile offset from center of channel to prevent seepage of up-slope groundwater NOTE: This measure requires the designer to provide design specifications and dimensions. Source: Adapted from USDA Natural Resources Conservation Service For information on this measure, see Chapter 7, page 127 October 2007 Appendix B 67

68 This page was intentionally left blank.

69 EXHIBIT Reinforced Vegetated Chute Exhibit 1 Aggregate or crushed stone Erosion control blanket over turf-reinforcement mat Flow Riprap over geotextile fabric Subsurface drain tile offset from center of channel to prevent seepage of up-slope NOTE: This measure requires the designer to provide design specifications and dimensions. Source: Adapted from USDA Natural Resources Conservation Service For information on this measure, see Chapter 7, page 135 October 2007 Appendix B 69

70 This page was intentionally left blank.

71 EXHIBIT Excavated Drop Inlet Protection Exhibit 1 Flow Main Flow Flow Flow Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 145 October 2007 Appendix B 71

72 This page was intentionally left blank.

73 EXHIBIT Gravel Donut Drop Inlet Protection Exhibit 1 For information on this measure, see Chapter 7, page 149 October 2007 Appendix B 73

74 This page was intentionally left blank.

75 EXHIBIT Gravel Donut Drop Inlet Protection Exhibit 2 Filter stone (1 foot thick) 2:1 or flatter slope 3:1 or flatter slope 1 to 2 feet Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 149 October 2007 Appendix B 75

76 This page was intentionally left blank.

77 EXHIBIT Geotextile Fabric Drop Inlet Protection Exhibit 1 36 inches (maximum) Cross bracing 12 to 18 inches 18 inches (minimum) Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 153 October 2007 Appendix B 77

78 This page was intentionally left blank.

79 EXHIBIT Geotextile Fabric Drop Inlet Protection Exhibit 2 Geotextile fabric Secured with lathe Compacted fill 36 inch (min.) hardwood post Flow 8 inches 18 inches (min.) Geotextile fabric laid on down-slope side and bottom of trench 4 inches For information on this measure, see Chapter 7, page 153 October 2007 Appendix B 79

80 This page was intentionally left blank.

81 EXHIBIT Straw Bale Drop Inlet Protection Exhibit 1 Two stakes per straw bale Source: Adapted from Michigan Soil Erosion and Sedimentation Control Guidebook, 1975 For information on this measure, see Chapter 7, page 159 October 2007 Appendix B 81

82 This page was intentionally left blank.

83 EXHIBIT Straw Bale Drop Inlet Protection Exhibit 2 Compacted fill to prevent piping Flow Bale turned on its side to prevent deterioration of bindings Bales entrenched four (4) inches into the soil Source: Adapted from Michigan Soil Erosion and Sedimentation Control Guidebook, 1975 For information on this measure, see Chapter 7, page 159 October 2007 Appendix B 83

84 This page was intentionally left blank.

85 EXHIBIT Block & Gravel Drop Inlet Protection Exhibit 1 One concrete block, in bottom row of blocks on each side of structure, laid horizontally to allow for dewatering Aggregate blanket with 2:1 slope or flatter Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 163 October 2007 Appendix B 85

86 This page was intentionally left blank.

87 EXHIBIT Block & Gravel Drop Inlet Protection Exhibit 2 Concrete block laid horizontally for dewatering Hardware cloth 2:1 or flatter slope Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 163 October 2007 Appendix B 87

88 This page was intentionally left blank.

89 EXHIBIT Stone Bag Curb Inlet Protection Exhibit 1 For information on this measure, see Chapter 7, page 169 October 2007 Appendix B 89

90 This page was intentionally left blank.

91 EXHIBIT Stone Bag Curb Inlet Protection Exhibit 2 Upper layer(s) of stone bags overlapped onto back of curb Flow Spillway at or below curb height Flow Stone bags tightly stacked and abutted together For information on this measure, see Chapter 7, page 169 October 2007 Appendix B 91

92 This page was intentionally left blank.

93 EXHIBIT Block & Gravel Curb Inlet Protection Exhibit 1 Source: Adapted from Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation For information on this measure, see Chapter 7, page 173 October 2007 Appendix B 93

94 This page was intentionally left blank.

95 EXHIBIT Block & Gravel Curb Inlet Protection Exhibit 2 Filter aggregate Blocks laid with openings horizontal to the pavement to allow for drainage Hardware cloth 2 x 4 wooden stud For information on this measure, see Chapter 7, page 173 October 2007 Appendix B 95

96 This page was intentionally left blank.

97 EXHIBIT Temporary Dry Sediment Basin Riser Pipe Exhibit 1 Perforated riser pipe with trash guard 12 inches of filter aggregate over perforations (min.) Emergency spillway crest Hardware cloth or wire mesh to prevent aggregate from plugging perforations One foot (min.) INDOT CA No. 5 aggregate filter stone over filter pack Riprap or INDOT CA No. 2 aggregate filter pack Anti-flotation block NOTE: For minimum dimensions see the Specifications section of this measure. Source: Adapted from North Carolina Erosion and Sediment Control Planning and Design Manual, 1993 For information on this measure, see Chapter 7, page 191 October 2007 Appendix B 97

98 This page was intentionally left blank.

99 EXHIBIT Silt Fence Exhibit Silt Fence End of silt fence turned up-slope to prevent bypass flow and allow for ponding of stormwater runoff Source: Adapted from Commonwealth of Pennsylvania Erosion and Sediment Pollution Control Program Manual, 1990 For information on this measure, see Chapter 7, page 215 October 2007 Appendix B 99

100 This page was intentionally left blank.

101 EXHIBIT Silt Fence Exhibit 2 Geotextile fabric secured with lathe Compacted fill 36 inch (min.) hardwood post Flow 8 inches 18 inches (min.) Geotextile fabric laid on down-slope side and bottom of trench 4 inches For information on this measure, see Chapter 7, page 215 October 2007 Appendix B 101

102 This page was intentionally left blank.

103 EXHIBIT Silt Fence Exhibit 3 Post Silt Fence For information on this measure, see Chapter 7, page 215 October 2007 Appendix B 103

104 This page was intentionally left blank.

105 EXHIBIT Straw Bale Dam Exhibit Turn ends of straw bale dam up slope to prevent bypass flow and allow for ponding of storm water runoff Source: Adapted from Minnesota Pollution Control Agency, Minnesota Construction Site Erosion and Sediment Control Planning Handbook, 1987 For information on this measure, see Chapter 7, page 223 October 2007 Appendix B 105

106 This page was intentionally left blank.

107 EXHIBIT Straw Bale Dam Exhibit 2 10 foot minimum spacing from toe of slope to allow for ponding of stormwater runoff Source: California Regional Water Quality Control Board, San Francisco Bay Region Erosion and Sediment Control Field Manual, Second Edition For information on this measure, see Chapter 7, page 223 October 2007 Appendix B 107

108 This page was intentionally left blank.

109 EXHIBIT Straw Bale Dam Exhibit 3 For information on this measure, see Chapter 7, page 223 October 2007 Appendix B 109

110 This page was intentionally left blank.

111 EXHIBIT Straw Bale Dam Exhibit 4 For information on this measure, see Chapter 7, page 223 October 2007 Appendix B 111

112 This page was intentionally left blank.

113 EXHIBIT Temporary Stream Crossing - Bridges Exhibit 1 NOTE: This measure requires the designer to provide design specifications and dimensions. For information on this measure, see Chapter 7, page 267 October 2007 Appendix B 113

114 This page was intentionally left blank.

115 EXHIBIT Exhibit 1 Temporary Stream Crossing - Culverts NOTE: This measure requires the designer to provide design specifications and dimensions. For information on this measure, see Chapter 7, page 273 October 2007 Appendix B 115

116 This page was intentionally left blank.

117 EXHIBIT Temporary Stream Crossing - Fords Exhibit 1 Stone over geotextile fabric 5 foot (max.) bank height All excavated slopes 2:1 or flatter Flow Road alignment straight for a minimum of 30 feet (min.) Temporary diversion channel NOTE: This measure requires the designer to provide design specifications and dimensions. Source: Adapted from Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation, 1992 For information on this measure, see Chapter 7, page 279 October 2007 Appendix B 117

118 This page was intentionally left blank.

119 EXHIBIT Temporary Stream Crossing - Fords Exhibit 2 Temporary diversion channel 5 foot maximum bank height Temporary diversion channel 5:1 slope (max.) Geotextile fabric for stabilization and separation NOTE: This measure requires the designer to provide design specifications and dimensions. Source: Adapted from Virginia Department of Conservation and Recreation, Division of Soil and Water Conservation, 1992 For information on this measure, see Chapter 7, page 279 October 2007 Appendix B 119

120 This page was intentionally left blank.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX:

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX: Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA 15601 724-837-5271 Tech. FAX: 724-837-4127 www.wcdpa.com 0 Typical Best Management Practices TABLE OF CONTENTS Mission,

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES City of Moncton Engineering and Environmental Services Revised March 2011 TABLE OF CONTENTS INTRODUCTION... 2 THE EROSION AND SEDIMENT CONTROL

More information

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4 These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK A Guide for Protection of State Waters through the use of Best Management Practices during Land Disturbing Activities Second Edition MARCH 2002 TENNESSEE EROSION

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

Sediment and Erosion Control Techniques on Stream Restoration Projects

Sediment and Erosion Control Techniques on Stream Restoration Projects Sediment and Erosion Control Techniques on Stream Restoration Projects D. R. Clinton, G. D. Jennings, R. A. McLaughlin, D. A. Bidelspach 1 ABSTRACT Erosion control, sediment loss and turbidity control

More information

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes

Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes City of New Castle Presentation Delaware Bay Dikes Repair and Prevention Project Preliminary Design for New Castle Dikes New Castle Conservation District DNREC August 22, 2012 Agenda Project Background

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Long Valley Meadow Restoration Project

Long Valley Meadow Restoration Project Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Rock Sizing for Multi-Pipe & Culvert Outlets

Rock Sizing for Multi-Pipe & Culvert Outlets Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Introduction and Organization of Instructions The following is a brief outline for use the skimmer, how to size and shape the basin, how to construct

Introduction and Organization of Instructions The following is a brief outline for use the skimmer, how to size and shape the basin, how to construct A Manual for Designing, Installing, and Maintaining Skimmer Sediment Basins J. W. Faircloth & Son Post Office Box 757 Hillsborough, North Carolina 27278 Telephone/Fax (919) 732-1266 From fairclothskimmer.com,

More information

Appendix F Channel Grade Control Structures

Appendix F Channel Grade Control Structures Stream Simulation Appendix F Channel Grade Control Structures This appendix briefly describes permanent grade control structures that are sometimes needed in the upstream and/or downstream reaches adjacent

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer

ONE ROCK DAM ORD. capture more sediment. The original ORD becomes the splash apron for the new layer. STEP 4: When ORD fills in, add a new layer ONE ROCK DAM ORD A low grade control structure built with a single layer of rock on the bed of the channel. ORDs stabilize the bed of the channel by slowing the flow of water, increasing roughness, recruiting

More information

Module 5: Channel and Slope Stability. Channel and Slope Protection. Upslope diversions Channel Protection. Slope Protection

Module 5: Channel and Slope Stability. Channel and Slope Protection. Upslope diversions Channel Protection. Slope Protection Massive Streambank Failure at New Outfall in a Suburban Area Module 5: Channel and Slope Stability Robert Pitt Department of Civil, Construction and Environmental Engineering University of Alabama Tuscaloosa,

More information

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized? Jerald S. Fifield, Ph.D. CISEC HydroDynamics Incorporated Parker, CO 303-841-0377 Aren t they the same thing? What Is Sediment? Soil particles deposited or suspended in water or air The process of depositing

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids Concrete Sustainability Conference April 14 th 2010, Tempe, AZ Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological l Performance and Suspended Solids Discharge Luis A. Mata,

More information

DRAFT DRAFT DRAFT DRAFT DRAFT SEDIMENT CONTROLS Method Application Description BMP Sediment fencing Flat Ground Y Anywhere low flow runoff is Sloping Ground Y Geotextile fabric, buried at the bottom

More information

Local Conditions-NE Minnesota

Local Conditions-NE Minnesota Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE

More information

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: AUGUST 2014 PERIODIC

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Guide to the use of the Erosion and Sediment Control Evaluation Tool Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca

More information

Flood and Stream Restoration

Flood and Stream Restoration 2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

5. ROADSIDE AND MEDIAN CHANNELS

5. ROADSIDE AND MEDIAN CHANNELS 5. ROADSIDE AND MEDIAN CHANNELS Roadside and median channels are open-channel systems which collect and convey stormwater from the pavement surface, roadside, and median areas. These channels may outlet

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

LEVEE DESIGN FOR FLOOD PROTECTION ON ALLUVIAL FANS

LEVEE DESIGN FOR FLOOD PROTECTION ON ALLUVIAL FANS LEVEE DESIGN FOR FLOOD PROTECTION ON ALLUVIAL FANS BRUCE M. PHILLIPS 1 ABSTRACT The dynamic nature of alluvial fans in arid environments offers numerous floodplain management challenges primarily due to

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

DAM SAFETY PROGRAM DAM INSPECTION REPORT FORM FOR REGULATORY INSPECTION

DAM SAFETY PROGRAM DAM INSPECTION REPORT FORM FOR REGULATORY INSPECTION DAM SAFETY PROGRAM DAM INSPECTION REPORT FORM FOR REGULATORY INSPECTION Please complete this form in accordance with the instructions (DEEP-DAM-INST-002). Part I: Summary of Dam Inspection Dam Name: Knofla

More information

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion Chapter 8. EROSION AND SEDIMENT CONTROL 8.1. Introduction Natural erosion has been occurring since the earth was formed. This process, which generally occurs at a relatively slow rate, has shaped and molded

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

The results of KCB s site inspection observations and our recommendations for further work are presented herein. July 14, 2015 Central Region 401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Tony Penney, P.Eng. Construction Engineer Dear Mr. Penney: June 25, 2015 Site Inspection Report The above site was visited

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

Degradation Concerns related to Bridge Structures in Alberta

Degradation Concerns related to Bridge Structures in Alberta Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to

More information

Evaluation of Public Safety at Run-of-River Dams

Evaluation of Public Safety at Run-of-River Dams Evaluation of Public Safety at Run-of-River Dams - An Illinois Statewide Program By G. Nicholas Textor, PE, CFM Daniel W. Tornil Lee Von Gynz-Guethle, CFM Authority Section 23a of the Rivers, Lakes and

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Appendix D2: Geotechnical Engineering

Appendix D2: Geotechnical Engineering Project and Reach 5 Appendix D2: Geotechnical Engineering and Geology Appendix D2: Geotechnical Engineering and Geology Fargo Moorhead Metropolitan Area Project Reach 5 Engineering and Design Phase P2#370365

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information