B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

Size: px
Start display at page:

Download "B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805"

Transcription

1 B805 MEASURES - OPSS GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff and channelized flow to impact sensitive receiving waters or other environmentally sensitive areas. Temporary erosion and sediment control measures are warranted on contracts which call for grading, drainage and other work that will disturb the earth surface. Measures shall be employed to minimize erosion and to remove sediments from water flowing from the construction site in order to meet environmental legislative requirements. OPSS 805 does not identify all available erosion and sediment control measures which the designer may consider, however, it does address most of the temporary measures commonly used during construction. The specification provides a large number of options for specifying either generic or specific items. When generic items are specified, the specification is designed so that the contractor is given the option of choosing from amongst a variety of items. This permits the cost-effective selection of end result performance items. In addition, OPSS 805 addresses the management of erosion and sediment control items which includes the requirements for maintaining erosion and sediment control measures and the removal of accumulated sediments from behind such measures. Design guidance provided in this section is not intended to supercede detail design of temporary erosion and sediment controls. Information within this section is intended to assist in the design and estimating required for the preparation of the contract package. The following constraints should be observed when considering the use of tender items found within OPSS 805: For control of erosion on bare earth surfaces other than temporary control in areas of channelized flow, reference should be made to OPSS 804 Construction Specification for Seed and Cover. All temporary measures identified in OPSS 805 are intended for removal at the completion of the contract or when permanent erosion and sediment control measures are in place and functioning. Permanent erosion and sediment control measures are not covered by OPSS 805. The measures identified in OPSS 805 are intended for use only during normal spring, summer, and fall construction. Special measures not addressed by OPSS 805 may be required when permanent cover will not be established prior to winter shut down. January 2016 Page 1 of 10 B805

2 Winter construction may require special measures not addressed in OPSS 805. When identifying the location of rock flow check dams, the designer should consider their location and potential for an errant vehicle following the ditch line to impact rock flow check dams. A rock flow check dam presents a potential snagging point for an errant vehicle. Designers should try to locate rock flow check dams in roadside ditches as far from the traveled portion of the roadway as practical or where they will be located behind existing roadside barriers. Shielding of rock flow check dams should be considered as a last resort when the rock flow check dams need to be located where there is a high potential for impact Maintenance All temporary measures identified in OPSS 805 require inspection, maintenance and sediment removal to ensure that they function as intended. In selecting any temporary measures, consideration should be given to the length of time such measures shall be in place, the effectiveness of related erosion control measures such as seeding and cover specifications, resulting frequency of sediment removal and the removal of the measures at the end of the contract. The designer should consider the following factors when selecting temporary erosion and sediment control measures: Straw bales are intended for use over short periods of time to ensure protection during establishment of vegetative cover, and in conjunction with an operational constraint for a time limit (e.g. 45 days) for the placement of specified, permanent cover after the completion of grading. Placement of erosion and sediment control measures should always take into account the access needs for maintenance and final removal REFERENCES MTO Environmental Guide for Erosion and Sediment Control during Construction of Highway Projects HSB Provincial Engineering Memorandum , New Erosion and Sedimentation Control Program Design Policy TENDER ITEMS Unit of Measure - By Metre Light-Duty Sediment Barriers Light-Duty Straw Bale Barriers Light-Duty Silt Fence Barriers Light-Duty Fibre Roll Barriers January 2016 Page 2 of 10 B805

3 Heavy-Duty Sediment Barriers Heavy-Duty Silt Fence Barriers Heavy-Duty Wire-Backed Silt Fence Barriers Berm Barriers Sandbag Barriers Fibre Roll Grade Breaks Turbidity Curtains Unit of Measure - By Each Flow Check Dams Straw Bale Flow Check Dams Fibre Roll Flow Check Dams Sandbag Flow Check Dams Rock Flow Check Dams Sediment Traps Slope Drains Diversion Ditches Sediment Traps for Dewatering Filter Bags Cofferdams SPECIFICATIONS Details of the work are contained in OPSS SPECIAL PROVISIONS Refer to Chapter E of this Manual to review the applicable special provisions. The timing for installation and removal of measures is specified in SSP 805F STANDARD DRAWINGS Applicable Standard Drawings are contained in the 219 series of the Ontario Provincial Standards Drawings (OPSD) and Ministry of Transportation of Ontario Drawings (MTOD) DESIGN Three approaches to temporary erosion and sediment control are addressed by OPSS 805 including: January 2016 Page 3 of 10 B805

4 1) the use of mitigation measures that control erosion by slowing the velocity of water in channelized flow; 2) the use of mitigation measures that control sedimentation by ponding water from overland flow and allowing sediment to settle out; and 3) the use of mitigation measures that minimize damage from sediment release by isolating environmentally sensitive areas and work areas. Under each approach a number of items are available for selection by the designer through OPSS 805. Table 1 provides design criteria and limits of use for temporary erosion and sediment control measures addressed in OPSS 805. The MTO Environmental Guide for Erosion and Sediment Control during Construction of Highway Projects shall be consulted for more detailed guidance on selection and design of temporary erosion and sediment controls including development of Erosion and Sediment Control Plans when required Slowing Water to Control Erosion in Channelized Flow The following tender items are available in OPSS 805 to minimize and control erosion of bare earth surfaces in channels, ditches and swales until such time as the specified permanent protection is provided: Flow Check Dams Straw Bale Flow Check Dams Fibre Roll Flow Check Dams Sandbag Flow Check Dams Rock Flow Check Dams Ponding Water to Control Sediment OPSS 805 addresses two kinds of temporary sediment control measures to pond water: sediment barriers; and sediment traps. The following sediment barrier tender items are available in OPSS 805 to prevent sediment from entering concentrated flows found in swales, ditches, and watercourses, or from reaching other sensitive locations including private property: Light-Duty Sediment Barriers Light-Duty Straw Bale Barriers Light-Duty Silt Fence Barriers January 2016 Page 4 of 10 B805

5 Light-Duty Fibre Roll Barriers Heavy-Duty Sediment Barriers Heavy-Duty Silt Fence Barriers Heavy-Duty Wire Backed Silt Fence Barriers Berm Barriers Sandbag Barriers Fibre Roll Grade Breaks Sediment traps are designed to receive sediments and control the release of water by intercepting and ponding sediment-laden concentrated flows in ditches and channels or from dewatering operations. They are designed to hold water for sufficient duration for settling sediments. The following trap tender items are available in OPSS 805: Sediment Traps Sediment Traps for Dewatering Filter Bags Isolating Sensitive Areas and Work Areas OPSS 805 addresses the following situations where measures are required to isolate sensitive areas and work areas: where work must be done within a waterbody and sediments generated in the work area must be prevented from entering the adjacent waterbody; and where runoff or other water flowing from adjacent areas into the work area can cause erosion damage to the work area and result in the need for additional erosion and sediment control downstream of the work area. The following tender items are available in OPSS 805 to isolate in-water work areas to prevent the passage of sediments to the adjacent water body: Coffer Dams Turbidity Curtains Where runoff or other water can flow into or over the work area resulting in erosion and sediment damage, the following tender items are available in OPSS 805: Light-Duty Sediment Barriers Heavy-Duty Sediment Barriers Slope Drains Diversion Ditches January 2016 Page 5 of 10 B805

6 805.8 COMPUTATION Sources of Information The main sources for information are field investigations, drainage plans, grading plans, fisheries assessments, erosion and sediment overview risk assessments, the Regional Geotechnical Section and the Regional Environmental Section Method of Calculation All tender items in this specification are PQP and are measured in metres or by each. The quantity for items measured in metres is calculated following the alignment of the item and the contour of the ground. All elements, including the rock flow check dam, required for the construction of a sediment trap are included with the sediment trap tender item. All elements, including the barrier and rock flow check dam, required for the construction of a sediment trap for dewatering are included with the sediment trap for dewatering tender item. All elements, including the corrugated pipe, inlet and outlet end sections, sediment trap and berm barrier, required for the construction of a slope drain are included with the slope drain tender item. All elements required for the construction of diversion ditches, including the excavation of the ditch, flow check dams, and other applicable components, are included with the diversion ditch tender item. All elements required for the construction of berm barriers, including the berm material, geotextile, and other applicable components, are included with the berm barriers tender item. Removal of materials used in the construction of measures and sediment removal are paid under the appropriate tender item for the temporary measure involved. Sediment removal is part of the maintenance component of the work DOCUMENTATION Contract Drawings Show the location and, where applicable, the plan alignment of the following items. Include a reference to the appropriate OPSD number. In some cases, a drawing detail will be required to clearly show the requirements. January 2016 Page 6 of 10 B805

7 Light-Duty Straw Bale Barriers Light-Duty Silt Fence Barriers Light-Duty Fibre Roll Barriers Heavy-Duty Silt Fence Barriers Heavy-Duty Wire-Backed Silt Fence Barriers Sandbag Barriers Fibre Roll Grade Breaks Straw Bale Flow Check Dams Fibre Roll Flow Check Dams Sandbag Flow Check Dams Rock Flow Check Dams Sediment Traps Slope Drains Sediment Traps for Dewatering Turbidity Curtains With the OPSD reference, show applicable dimensional information, as follows: Light Duty Fibre Roll Barriers roll diameter, d Fibre Roll Grade Breaks - roll diameter, d Fibre Roll Flow Check Dams - roll diameter, d Sediment Traps - basin length, L m Slope Drains - pipe diameter, mm Sediment Traps for Dewatering - basin dimensions, L x L m Typical fibre roll diameters are 150, 200, and 300 mm. When a silt fence barrier is used for property delineation, a notation ( For Property Delineation ) shall be included under the OPSD reference. When the contract drawings do not include removal or new construction drawings, the above information may be included in table format on the location or typical section drawings. There is no OPSD for the cofferdams, filter bags, diversion ditches, and berm barriers items. The work required for these items shall be shown on a drawing detail. Details and components may include but not be limited to: Cofferdams - alignment, offset from waterbody Filter Bags - volume of water to be filtered, geotextile filtration opening size (FOS) Diversion Ditches - alignment, dimensions, erosion control blanket, check dams, riprap Berm Barriers - alignment, dimensions, geotextile, outlet, riprap January 2016 Page 7 of 10 B805

8 Quantity Sheets Record all items on the Quantities - Miscellaneous Sheets. Each tender item requires a separate column. Enter each separate installation on one line of the Q-sheet. Show the chainage and offset in the location column. For linear measured (metre) tender items, enter the calculated installation length. For items with each measure, enter the unit quantity 1 for each installation Documentation Accuracy Stations are recorded to the nearest metre. Offsets are recorded to the nearest 0.1 m. Quantity entries are recorded to the nearest metre Non-Standard Special Provisions Write project and item specific requirements in an NSSP using the standard format described in this manual. Topics that may require an NSSP are: a filter bag geotextile with different properties than those specified is required; the retention of riparian vegetation constraint must be relaxed; a different timing constraint for the protection of erodible stockpiles is required; changes to the earth layer compaction method. January 2016 Page 8 of 10 B805

9 TABLE 1 OPSS 805 Design Criteria and Limits for Temporary Erosion and Sediment Control Temporary Control Measure Catchment Area Flow Velocity Slowing Water to Control Erosion in Channelized Flow Channel Slope Barrier Length/Unit Area Upstream Life Expectancy **** Flow Check Dams*** 2 ha 0.15 m/s 0.5 % N.A. N.A. 45 days Straw Bale Flow Check Dams Fiber Roll Flow Check Dams Sand Bag Flow Check Dams Rock Flow Check Dams* Ponding Water to Control Sediment Light-Duty Sediment Barriers *** Light-Duty Straw Bale Barriers Light-Duty Silt Fence Barriers Light-Duty Fibre Roll Barriers Heavy-Duty Sediment Barriers *** Heavy-Duty Silt Fence Barriers Heavy-Duty Wire-Backed Silt Fence Barriers 2 ha 0.3 m/s 0.5 % N.A. N.A. 45 days 2 ha 0.15 m/s 0.5 % N.A. N.A. 6 months 2 ha 1 m/s 0.5 % N.A. N.A. 6 months 4 ha 2 m/s 0.5 % N.A. N.A. 6 months N.A m/s N.A. 3:1 30 m/1000m 2 45 days N.A. 0.3 m/s N.A. 3:1 30 m/1000m 2 45 days N.A m/s N.A. 3:1 30 m/1000m 2 6 months N.A. Roll size dependent N.A. 3:1 30 m/1000m 2 45 days N.A m/s N.A. 2:1 30 m/1000m 2 45 days N.A m/s N.A. 2:1 30 m/1000m 2 6 months N.A m/s N.A. 2:1 30 m/1000m years Berm Barriers N.A. 1 m/s N.A. 2:1 30 m/1000m 2 6 months Sand Bag Barriers N.A. 1 m/s N.A. 2:1 30 m/1000m 2 6 months Fibre Roll Grade Breaks N.A. 1 m/s N.A. Up to 1:1 30 m/1000m 2 6 months Sediment Traps 2 ha 1.5 m/s N.A. N.A. N.A. 6 months Sediment Traps for Dewatering Filter Bags Pump size dependent N.A. N.A. N.A. N.A. 6 months ** Pump and sediment particle size dependent N.A. N.A. N.A. N.A. Variable per manufacturer s direction January 2016 Page 9 of 10 B805

10 Temporary Control Measure Catchment Area Isolating Sensitive Areas and Work Areas Flow Velocity Turbidity Curtains N.A. 0.3 m/s Coffer Dams Light-Duty Sediment Barriers *** Heavy-Duty Sediment Barriers *** Channel Slope Barrier Length/Unit Area Upstream all in-water body controls require site specific engineering design all in-water body controls require site specific engineering design Life Expectancy **** 2 ha 0.15 m/s N.A. 3:1 30 m/1000m 2 45 days 2 ha m/s N.A. 2:1 30 m/1000m 2 45 days Slope Drains 2 ha N.A. N.A. 1.5:1 N.A. 6 months Diversion Ditches 2 ha N.A. 6 months * Rock Flow Check Dams intended for placement in situations which exceed the limits outlined in this table require site specific engineering design. ** Life Expectancy of Sediment Traps for Dewatering is dependent on the type of sediment barrier used in its construction. *** Minimum design criteria have been used for the general category control measures. If this limit is to be exceeded, the designer must specify a specific measure. **** Life Expectancy assumes that regular maintenance is being undertaken. January 2016 Page 10 of 10 B805

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

DRAFT DRAFT DRAFT DRAFT DRAFT SEDIMENT CONTROLS Method Application Description BMP Sediment fencing Flat Ground Y Anywhere low flow runoff is Sloping Ground Y Geotextile fabric, buried at the bottom

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C.

M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio., A.Sc.T., CPESC. EDI Environmental Dynamics Inc Continental Way Prince George, B.C. OVERVIEW OF BEST PRACTICES FOR SURFACE EROSION PROTECTION AND SEDIMENT CONTROL FOR THE DEVELOPMENT PHASE OF SURFACE MINING FOR COAL IN NORTHEAST BRITISH COLUMBIA M. Sloat, AAg., CPESC R.J. Redden, R.P.Bio.,

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services

EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES. City of Moncton Engineering and Environmental Services EROSION AND SEDIMENT CONTROL AT CONSTRUCTION SITES GUIDELINES City of Moncton Engineering and Environmental Services Revised March 2011 TABLE OF CONTENTS INTRODUCTION... 2 THE EROSION AND SEDIMENT CONTROL

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Guide to the use of the Erosion and Sediment Control Evaluation Tool Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Sediment and Erosion Control Techniques on Stream Restoration Projects

Sediment and Erosion Control Techniques on Stream Restoration Projects Sediment and Erosion Control Techniques on Stream Restoration Projects D. R. Clinton, G. D. Jennings, R. A. McLaughlin, D. A. Bidelspach 1 ABSTRACT Erosion control, sediment loss and turbidity control

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August J:\Jobs\42066678\6000 Reports\Erosion Management\(Cover).doc FINAL REPORT NO.54 Erosion and Sediment Control Plan - Coastal Reclamation Prepared for Tauranga City Council Private Bag 12022 Tauranga 16

More information

Independent Environmental Audit Erosion and Sediment Control

Independent Environmental Audit Erosion and Sediment Control Independent Environmental Audit Erosion and Sediment Control Commencement of YOUNG TO BETHUNGRA LOOPING PIPELINE JUNE 2016 suite 1, 39 fitzmaurice st (po box 5464) wagga wagga nsw 2650 australia t (02)

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Local Conditions-NE Minnesota

Local Conditions-NE Minnesota Local Conditions-NE Minnesota Identifying Regional Stormwater Challenges Selecting BMPs for our area Experience & observations from MNDOT & MPCA BMPs that work / don t work in NE Minnesota Local Conditions-NE

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

Soil Erosion and Sediment Control. Basic Principles and Practices

Soil Erosion and Sediment Control. Basic Principles and Practices Soil Erosion and Sediment Control Basic Principles and Practices Acknowledgements The following document was created by Healthy Land and Water with some material sourced from Brisbane City Council, and

More information

Snead Pond Restoration

Snead Pond Restoration Snead Pond Restoration Project overview Location: Crewe, VA Date of Project: Summer 2016 Scope of work: Construction of check dam & hydraulic dredging of 530 cubic yards of in situ sediment utilizing geotubes

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT February 18, 2003 File: 15-76-11 Alberta Transportation Room 223, Provincial Building 4709 44 Avenue Stony Plain, Alberta T7Z 1N4 Attention: Mr. Rob Lonson, P.Eng. NORTH CENTRAL REGION LANDSLIDE ASSESSMENT

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Sediment Distribution and Characteristics

Sediment Distribution and Characteristics Sediment Distribution and Characteristics Sediments at the bottom of ponds are a source or sink for nutrients in relation to the water column, contribute to turbidity during storm events, serve as the

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX:

Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA Tech. FAX: Westmoreland Conservation District Donohoe Center 218 Donohoe Road Greensburg, PA 15601 724-837-5271 Tech. FAX: 724-837-4127 www.wcdpa.com 0 Typical Best Management Practices TABLE OF CONTENTS Mission,

More information

GIS data classes used within the November 2013 Environmental Statement Engineering Maps

GIS data classes used within the November 2013 Environmental Statement Engineering Maps LWM-HS2-EN-DAT-000-000001 P01 22 January 2014 GIS data classes used within the November 2013 Environmental Statement Engineering Maps Document No.:LWM-HS2-EN-DAT-000-000001 Revision Author Checked by Approved

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill 1 When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill Robin McKillop 1, Dan McParland 1 & Cassie Scobie 2 TRIECA conference March 22-23, 2017 1 Palmer Environmental

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018

Little Swan Lake. Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Little Swan Lake Dam Inspection & Siltation Study Prepared By: William Klingner, P.E., CFM October 28, 2018 Agenda Little Swan Lake Dam Inspection Theoretical Little Swan Lake Siltation Rate Calculations

More information

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Rock Scaling Recommendations Logan Creek Drive Cut Slope Rock Scaling Recommendations Logan Creek Drive Cut Slope US 50, Milepost DO 8.47 to DO 8.61 Douglas County, Nevada January 2008 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

1.0 INTRODUCTION 2.0 OBSERVATIONS EBA FILE: W nd Avenue Whitehorse, YT Y1A 1C2. Attention:

1.0 INTRODUCTION 2.0 OBSERVATIONS EBA FILE: W nd Avenue Whitehorse, YT Y1A 1C2. Attention: August 5, 2013 City of Whitehorse 2121 2 nd Avenue Whitehorse, YT Y1A 1C2 ISSUED FOR USE EBA FILE: W14103182-01 Via Email: ben.campbell@whitehorse.ca Attention: Subject: Ben Campbell, Planner II Planning

More information

DREDGING A land manager s guide to the rules

DREDGING A land manager s guide to the rules DREDGING A land manager s guide to the rules Introduction Farmers have long practised sediment management, commonly referred to as dredging. The introduction of controls on these activities in 2006 was

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 4

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information

January 12, 2006 File:

January 12, 2006 File: January 12, 2006 File: 15-85-13 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL

More information

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.

GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards. GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS A. GOALS: To protect life and property from natural disasters and hazards. B. POLICIES: 1. Floodplains shall be maintained as natural drainage-ways.

More information

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017 SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &

More information

Erosion and Sedimentation Basics

Erosion and Sedimentation Basics Erosion and Sedimentation Basics Coastal San Luis Resource Conservation District G.W. Bates, PE, CPESC Outline: 1. Terms & Concepts 2. Causes of Erosion 3. The Erosion/Sedimentation Process 4. Erosion

More information

33. Eroding downstream left bank, new bridge, Attlebridge (TG ).

33. Eroding downstream left bank, new bridge, Attlebridge (TG ). 33. Eroding downstream left bank, new bridge, Attlebridge (TG 12831675). 58 34. Eroding upstream right bank at Attlebridge Hall (TG 13871557), ford and cattle crossing. 35. Eroding upstream left bank at

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

Controlling Processes That Change Land

Controlling Processes That Change Land 1 Name Date Controlling Processes That Change Land People try to control some of the processes that change land. To do this, people apply technology- the use of science to solve problems in everyday life.

More information

Erosion Surface Water. moving, transporting, and depositing sediment.

Erosion Surface Water. moving, transporting, and depositing sediment. + Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration

More information

ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES

ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES Interstate Reliability Project 345-kV Transmission Lines Development & Management Plan Volume 2 ATTACHMENT D SNOW REMOVAL AND DE-ICING PROCEDURES INTERSTATE RELIABILITY PROJECT The Interstate Reliability

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

Sediment Deposition LET THE RIVER RUN T E A C H E R. Activity Overview. Activity at a Glance. Time Required. Level of Complexity.

Sediment Deposition LET THE RIVER RUN T E A C H E R. Activity Overview. Activity at a Glance. Time Required. Level of Complexity. Activity at a Glance Grade: 6 9 Subject: Science Category: Physical Science, Earth Science Topic: Deposition, River Systems Time Required Two 45-minute periods Level of Complexity Medium Materials* TI-73

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25 ± DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N1\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131207.MXD N1-S11 Tower 10 E-723206, N-6272609 N1-Soils-154

More information