1 Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following is excerpted from a homework assignment prepared by Heather Hill, a student at the University of Alabama at Birmingham, as part of the Construction Site Erosion and Sediment Control Class taken during the summer of The assignment was given as follows: 1) Identify several different slope categories on your construction evaluation site and propose suitable control practices for each type. Justify your selections with appropriate calculations. The following is an example output screen from the North American Green software to assist in the selection of turf reinforcement mats for slopes. NAG SC150 Temporary Cover 100 slope 2) Design an appropriate diversion swale for your evaluation site. Using the previously calculated flow rates, select a suitable channel lining, including the consideration of check dams. Justify your selections with appropriate calculations. 1

2 There is not a diversion swale at this construction site. The creek that runs through the site will actually be rereouted through a 15 culvert pipe and covered to level out the site. In order to reroute the stream and install the culvert, an impermeable diversion dam was installed where the stream entered the site. A bypass pump was set up at this location to pump the water to the end of the site where it naturally releases. The average daily flow of this stream is approximately 2600 gpm. The following is an example of applying the North American Green software to evaluate a channel lining material to this channel, assuming that an open channel was an optional method. B) Example Project Assignment on Slope and Swale Design Example Hand Calculations The following is modified from a homework assignment prepared by Regan Johnson, a student at the University of Alabama, as part of the Construction Site Erosion and Sediment Control Class taken during the summer of ) Identify several different slope categories on your construction evaluation site and propose suitable control practices for each type. Justify your selections with appropriate calculations. The construction site described here is located along Kicker Road in Tuscaloosa, AL. The City of Tuscaloosa has granted permission to develop St. Charles Place, a townhouse residential development located. The following is the detailed site topographic map donated by the site developer, and a USGS aerial photograph of the surrounding area. 2

3 This site was separated into the following slope categories: 0-2%, 2-5%, 5-20%, and 20% and greater. One critical slope is examined in the following calculations for slope stability requirements, having the following characteristics: Slope = 0.5 = 50% Width of slope = 175ft Manning s n = 0.02 The modified Manning s equation was used to calculate the nominal depth for sheetflow on this particular slope, assuming a previously calculated peak flow rate of 6.4 ft 3 /sec. Where: y is the flow depth (in feet), q is the unit width flow rate (Q/W) n is the sheet flow roughness coefficient for the slope surface s is the slope (as a fraction) q= Q/W= 6.39/175= cfs n= 0.02 for sandy loam soils s= 0.50 ft/ft y= ((0.0365)(0.02) /(1.49/ )) 3/5 = ft, or about a half an inch 3

4 Therefore, the basic shear stress equation can be used to calculate the maximum shear stress expected on a slope: where: γ = specific weight of water (62.4 lbs/ft 3 ) y = flow depth (ft) S = slope (ft/ft) Thus, τ o = (62.4)(0.051)(0.50)= 1.58 lb/ft 2 Since the allowable shear stress for the soils on this hillside is only 0.15 lb/ft 2, a vegetated mat will therefore be needed. The next step is to check the shear stress under the mat. We can solve for the needed roughness factor n of the mat to find a mat that will work given the following equation: τ e = 0.15 = 1.58(1-0)[0.02/n mat ] 2 n mat = Therefore, a mat is needed having an n value of at least to provide proper soil protection. Additionally, the mat also needs a C factor to meet the maximum allowable erosion rate on the slope (0.25 inches, or less). Using RUSLE: R = 350/yr (Tuscaloosa) k = 0.21 LS = (for 150 ft slope at 50%) The base (unprotected) erosion rate is therefore: (350)(0.21)(12.75) = 643 tons/acre/year This corresponds to 643( ) = 3.8 inches per year. With a maximum allowable erosion loss of 0.25 to 0.5 inches per year, the C factor for the mat should therefore be: 0.5 to 3.8 = 0.13; or 0.25/3.8 = 0.065, or less A NAG P300 mat has a C of 0.09 (intermediate in the above range) and an n of 0.02 for this slope and unvegetated condition. The shear stress is too large, as the mat n is only 0.02, and not the desired Therefore, the only reasonable solution for this steep and long slope is to use terraces to divide the slope into several segments, and to use diversion down-slope drains to collect the water from each terrace bench and safely carry it to the bottom of the slope. If the slope was divided into 50 ft lengths, 1/3 of the original slope length, the Q would also be 1/3, or 2.1 ft 3 /sec, and the q would be cfs. The resulting flow depth would therefore be: y= ((0.012)(0.02) /(1.49/ )) 3/5 = ft, or 0.15 inch The resulting shear stress is therefore: τ o = (62.4)(0.0125)(0.50)= 0.39 lb/ft 2 4

5 The needed value for n (unvegetated) is therefore: τ e = 0.15 = 0.39(1-0)[0.02/n mat ] 2 least n mat = at The NAG P300 still is not rough enough. If the slope was divided into 25 ft lengths, 1/6 of the original slope length, the Q would also be 1/6, or 1.1 ft 3 /sec, and the q would be cfs. The resulting flow depth would therefore be: y= ((0.006)(0.02) /(1.49/ )) 3/5 = ft, or inch The resulting shear stress is therefore: τ o = (62.4)(0.0043)(0.50)= 0.13 lb/ft 2 The needed value for n (unvegetated) is therefore: τ e = 0.15 = 0.13(1-0)[0.02/n mat ] 2 least n mat = at Therefore, this slope length is suitable, as the n for the mat is As an alternative, it may be suitable to re-examine the slope itself and consider reducing it from 50% to 40%, and with terraces at 50 ft spacing: y= ((0.012)(0.02) /(1.49/ )) 3/5 = ft, or 0.08 inch The resulting shear stress is therefore: τ o = (62.4)(0.007)(0.40)= 0.17 lb/ft 2 The needed value for n (unvegetated) is therefore: τ e = 0.15 = 0.17(1-0)[0.02/n mat ] 2 least n mat = at This is close to the available n of 0.2 and is also a likely a suitable solution. Either of these solutions to modify the slope would also reduce the resulting erosion rate. 2) Design an appropriate diversion swale for your evaluation site. Using the previously calculated flow rates, select a suitable channel lining, including the consideration of check dams. Justify your selections with appropriate calculations. This site consists of one channel that diverts water from the upper portion of the watershed. This channel is located in the back of the site and it will be designed to handle the flow rates that were calculated through an earlier analysis. The cross section of the channel will be a trapezoidal in shape. Other factors such as slope, Manning s n, and soil type also affect the channel s performance as well. There are two important parameters involved when designing a diversion swale (1) Allowable velocity (V 0 ) and (2) Allowable shear stress (τ 0 ). The first step of the design is to determine the applicable values associated with site specific soil conditions. The site soil is sandy loam. The following parameters should therefore be met for this design: 5

6 Maximum permissible velocity (V 0 ): 2.5 ft/sec Allowable shear stress (τ 0 ): lb/ft 2 For this particular swale design, the Manning s equation for open channel flow will be used with the Chow shape factor: Where: Q= 16.3 cfs S= ft/ft n= 0.02 It is therefore possible to calculate the nominal depth of channel flow within the swale for different swale cross sections, using an Excel spreadsheet. The spreadsheet allowed an examination of various base widths (b) and side slopes (z) of the channel. The selected alternative for the channel dimension is one with a 3ft base and 2:1 side slope. The resulting shear stress and channel velocity are also shown on this table. Channel Design Option b (ft) z (ft) Top (ft) AR 2/3 b 8/3 AR 2/3 /b 8/3 y n /b (From Chow s figure) y n τ (lb/ft 2 ) R V (ft/s) Note: Highlighted areas indicate the best option for channel design. Since the shear stress is higher than permissible, the channel will be fitted with a liner or vegetation mat. Installing a channel liner will cause the effective shear stress to decrease, thus, reducing the potential of excessive sediment erosion. Moreover, the vegetation mat will provide adequate support for the channel s exposed sediment surface. The North American Green website provides a list of suitable of potential mats to be used for erosion control for construction sites. For this channel, a P300 polypropylene fiber erosion control blanket was selected. The following calculations show that this liner meets the permissible shear stress criteria. 6

7 Where: τ e = effective shear stress exerted on soil beneath vegetation γ = 62.4 lbs/ft 3 D = the maximum flow depth in the cross section=1.05 ft S = hydraulic slope = ft/ft C f = vegetation cover factor =0.90 (Bermuda grass) n s = roughness coefficient of underlying soil = 0.02 n = roughness coefficient of erosion control blanket = 0.44 τ e = 62.4*1.05 *0.055(1-0.90)[0.02/0.044]2 = Therefore, τ e < τ o and the NAG P300 mat will be an acceptable solution to the for this the channel. 7

Module 5: Channel and Slope Stability. Channel and Slope Protection. Upslope diversions Channel Protection. Slope Protection

Module 5: Channel and Slope Stability. Channel and Slope Protection. Upslope diversions Channel Protection. Slope Protection Massive Streambank Failure at New Outfall in a Suburban Area Module 5: Channel and Slope Stability Robert Pitt Department of Civil, Construction and Environmental Engineering University of Alabama Tuscaloosa,

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized?

What Is Water Erosion? Aren t they the same thing? What Is Sediment? What Is Sedimentation? How can Sediment Yields be Minimized? Jerald S. Fifield, Ph.D. CISEC HydroDynamics Incorporated Parker, CO 303-841-0377 Aren t they the same thing? What Is Sediment? Soil particles deposited or suspended in water or air The process of depositing

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Drivable Grass Report for Hydraulic Performance Testing

Drivable Grass Report for Hydraulic Performance Testing Drivable Grass Report for Hydraulic Performance Testing Prepared for Soil Retention Products, Inc. Prepared by Michael D. Turner Amanda L. Cox Christopher I. Thornton March 2011 Colorado State University

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

5. ROADSIDE AND MEDIAN CHANNELS

5. ROADSIDE AND MEDIAN CHANNELS 5. ROADSIDE AND MEDIAN CHANNELS Roadside and median channels are open-channel systems which collect and convey stormwater from the pavement surface, roadside, and median areas. These channels may outlet

More information

Open Channel Flow I - The Manning Equation and Uniform Flow COURSE CONTENT

Open Channel Flow I - The Manning Equation and Uniform Flow COURSE CONTENT Open Channel Flow I - The Manning Equation and Uniform Flow Harlan H. Bengtson, PhD, P.E. COURSE CONTENT 1. Introduction Flow of a liquid may take place either as open channel flow or pressure flow. Pressure

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Long Valley Meadow Restoration Project

Long Valley Meadow Restoration Project Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and

More information

Notes: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments.

Notes: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Worksheet 3: Time of Concentration (Tc) or travel time (Tt) Project By Date Location Checked Date Check one: Present Developed Check one: Tc Tt through subarea Notes: Space for as many as two segments

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

Open Channel Flow Part 2. Ch 10 Young, notes, handouts

Open Channel Flow Part 2. Ch 10 Young, notes, handouts Open Channel Flow Part 2 Ch 10 Young, notes, handouts Uniform Channel Flow Many situations have a good approximation d(v,y,q)/dx=0 Uniform flow Look at extended Bernoulli equation Friction slope exactly

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS New England East-West Solution (NEEWS) Greater Springfield Reliability

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load Large-Scale Sediment Retention Device Testing (ASTM D 7351) of SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load February 2010 Submitted to: SedCatch Environmental Products 8380 Point O

More information

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load Large-Scale Sediment Retention Device Testing (ASTM D 7351) of SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load February 2010 Submitted to: SedCatch Environmental Products 8380 Point

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Module 5: Channel and Slope Stability for Construction Site Erosion Control

Module 5: Channel and Slope Stability for Construction Site Erosion Control R. Pitt June 16, 2004 Module 5: Channel and Slope Stability for Construction Site Erosion Control Introduction...1 General Channel Stability Shear Stress Relationship...2 Allowable Velocity and Shear Stress...4

More information

Rosgen Classification Unnamed Creek South of Dunka Road

Rosgen Classification Unnamed Creek South of Dunka Road Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Flow Control Threshold Analysis for the San Diego Hydrograph Modification Management Plan. Prepared for. San Diego County and Copermittees

Flow Control Threshold Analysis for the San Diego Hydrograph Modification Management Plan. Prepared for. San Diego County and Copermittees Flow Control Threshold Analysis for the San Diego Hydrograph Modification Management Plan Prepared for San Diego County and Copermittees Prepared by Philip Williams & Associates, Ltd. December 23 rd 2009

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

Erosion and Sedimentation Basics

Erosion and Sedimentation Basics Erosion and Sedimentation Basics Coastal San Luis Resource Conservation District G.W. Bates, PE, CPESC Outline: 1. Terms & Concepts 2. Causes of Erosion 3. The Erosion/Sedimentation Process 4. Erosion

More information

GIS Enabled Automated Culvert Design

GIS Enabled Automated Culvert Design GIS Enabled Automated Culvert Design ASHTON GREER PH.D. STUDENT, THE UNIVERSITY OF ALABAMA DR. ANDREW GRAETTINGER, LEAH CLIFTON, ZACHARY WILBANKS, BRADFORD WILSON Outline Culvert Background Project Objectives

More information

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE (Name of Course Developer: Prof. Ashok Mishra, AgFE Department, IIT Kharagpur, Kharagpur 721 302) Module 1: Introduction and

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

Evaluation of Miramat Under High Velocity Flows

Evaluation of Miramat Under High Velocity Flows Utah State University DigitalCommons@USU Reports Utah Water Research Laboratory January 1985 Evaluation of Miramat Under High Velocity Flows C. Earl Israelsen Frank W. Haws Follow this and additional works

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Rock Sizing for Drainage Channels

Rock Sizing for Drainage Channels Rock Sizing for Drainage Channels STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined drainage channel Photo 2 Rock-lined catch drain (during construction phase) 1. Introduction Rock size is primarily dependent

More information

Uniform Channel Flow Basic Concepts Hydromechanics VVR090

Uniform Channel Flow Basic Concepts Hydromechanics VVR090 Uniform Channel Flow Basic Concepts Hydromechanics VVR090 ppt by Magnus Larson; revised by Rolf L Feb 2014 SYNOPSIS 1. Definition of Uniform Flow 2. Momentum Equation for Uniform Flow 3. Resistance equations

More information

Uniform Channel Flow Basic Concepts. Definition of Uniform Flow

Uniform Channel Flow Basic Concepts. Definition of Uniform Flow Uniform Channel Flow Basic Concepts Hydromechanics VVR090 Uniform occurs when: Definition of Uniform Flow 1. The depth, flow area, and velocity at every cross section is constant 2. The energy grade line,

More information

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Introduction Abstract: The use of ArcMap to calculate soil areas for storm water

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland Abstract The Waterbury Dam was completed in October 1938 as a method of flood control in the Winooski Valley. The construction began in April1935

More information

CONCEPTS Conservational Channel Evolution and Pollutant Transport System

CONCEPTS Conservational Channel Evolution and Pollutant Transport System CONCEPTS Conservational Channel Evolution and Pollutant Transport System Eddy J. Langendoen Watershed Physical Processes Research Unit National Sedimentation Laboratory USDA Agricultural Research Service

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

Stop 1: Marmot Dam Stop 1: Marmot Dam

Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Stop 1: Marmot Dam Following the removal of Marmot Dam in 2007, the fate of the reservoir sediments has been monitored through a series of surveys and sediment transport measurements.

More information

Spreadsheet Tools for Quantifying the Costs and Benefits of Two-Stage Channels

Spreadsheet Tools for Quantifying the Costs and Benefits of Two-Stage Channels Spreadsheet Tools for Quantifying the Costs and Benefits of Two-Stage Channels J. Witter, A. Ward, D. Mecklenburg, J. D Ambrosio, S. Roley, and J. Tank AWRA Agricultural Hydrology and Water Quality II

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

Shear Stress Estimates for Combined Wave and Surge Overtopping at Earthen Levees

Shear Stress Estimates for Combined Wave and Surge Overtopping at Earthen Levees Shear Stress Estimates for Combined Wave and Surge Overtopping at Earthen Levees by Norberto C. Nadal and Steven A. Hughes PURPOSE: The Coastal and Hydraulics Engineering Technical Note (CHETN) described

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method

Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method Scattergraph Principles and Practice Evaluating Self-Cleansing in Existing Sewers Using the Tractive Force Method Kevin L. Enfinger, P.E. and Paul S. Mitchell, P.E. ADS Environmental Services 4940 Research

More information

BACK. Stability design of a grass-lined stress requires the determination The first is the retardance curve potential of the vegetal cover to

BACK. Stability design of a grass-lined stress requires the determination The first is the retardance curve potential of the vegetal cover to 3. DETERMINATION OF CHANNEL DESIGN PARAMETERS By D.M. Temple BACK The conditions governing the stability of a grass-lined open channel are the channel geometry and slope, the erodibility of the soil boundary,

More information

CFD Modeling for Structure Designs in Environmental Impacts Mitigation

CFD Modeling for Structure Designs in Environmental Impacts Mitigation CFD Modeling for Structure Designs in Environmental Impacts Mitigation June 05 Navid Nekouee, Hugo Rodriguez and Steven Davie Environmental Impact Mitigation Design Savannah Harbor Expansion Project (SHEP)

More information

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2012 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: The Eagle River Watershed Council Prepared By: RiverRestoration.org - I. Introduction Interstate 70 is a major highway

More information

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

Geomorphology 5. Stream Sediment Stream Sediment

Geomorphology 5. Stream Sediment Stream Sediment Geomorphology 5. Stream Sediment 1 Name 47 Points LEARNING OUTCOMES 5. Stream Sediment By the end of this assignment you should be able to: Describe the relationship between particle size and critical

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

Sediment and Erosion Design Guide

Sediment and Erosion Design Guide Sediment and Erosion Design Guide Sediment Transport & Bulking Factors Goals of this Session Review key principals Review basic relationships and available tools Review bulking factor relationships Purposes

More information

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014

Mass Movements. Rock Weathering. Accumulation of Debris on Slopes. Landslides 12/8/2014 Mass Movements Already talked a little about landslides with earthquakes AKA mass wasting A mass movement is any displacement of large amounts of soil down slopes over (often) a comparatively short period

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

Surface Processes Focus on Mass Wasting (Chapter 10)

Surface Processes Focus on Mass Wasting (Chapter 10) Surface Processes Focus on Mass Wasting (Chapter 10) 1. What is the distinction between weathering, mass wasting, and erosion? 2. What is the controlling force in mass wasting? What force provides resistance?

More information

FINAL STREAM. Prepared For: Discharge. Draft Stream. Level Hay Street, Subiaco WA Indiana Street. Golden, CO USA

FINAL STREAM. Prepared For: Discharge. Draft Stream. Level Hay Street, Subiaco WA Indiana Street. Golden, CO USA Draft Stream Discharge and Water Supply Estimates S F FINAL STREAM DISCHARGE AND WATER SUPPLYS ESTIMATES CITRONEN FJORD F DEVELOPMENT PROJECT Prepared For: Ironbark Zinc Limited Level 1 350 Hay Street,

More information

Two-Dimensional Simulation of Truckee River Hydrodynamics

Two-Dimensional Simulation of Truckee River Hydrodynamics Two-Dimensional Simulation of Truckee River Hydrodynamics by Stephen H. Scott PURPOSE: The purpose of this Coastal and Hydraulics Engineering Technical Note (CHETN) is to demonstrate the use of multidimensional

More information

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for: HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering

More information

Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005.

Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005. Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005. IMPERVIOUS SURFACES IN URBAN WATERSHEDS Celina Bochis-Micu and Robert

More information

Data Collection and GIS Applications

Data Collection and GIS Applications Data Collection and GIS Applications Governor s s Conference on the Management of the Illinois River System Jeff Jack of all Trades Boeckler, IDNR Introduction Collecting available GIS data sets Creating

More information

Chapter 10. HYDRAULICS OF OVERLAND FLOW

Chapter 10. HYDRAULICS OF OVERLAND FLOW 10.1 Chapter 10. HYDRAULICS OF OVERLAND FLOW J.E. Gilley and M.A. Weltz 10.1 Introduction Proper identification of hydraulic parameters is essential for the operation of other WEPP model components. Routing

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner Texas A&M University Zachry Department of Civil Engineering CVEN 658 Civil Engineering Applications of GIS Instructor: Dr. Francisco Olivera A GIS-based Approach to Watershed Analysis in Texas Author:

More information

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435 Assignment 1 Measuring River Characteristics- Vernon Creek Applied Fluvial Geomorphology Field Techniques EESc 435 Amanda Jardine 30100093 Jaime McDonald 14177083 Erica Massey 50870088 April 28, 2012 Introduction

More information

EAST PLUM CREEK WATERSHED MASTER PLAN PRELIMINARY DESIGN REPORT. Section IV Stream Stability Assessment

EAST PLUM CREEK WATERSHED MASTER PLAN PRELIMINARY DESIGN REPORT. Section IV Stream Stability Assessment Section IV Stream Stability Assessment 19 IV. Stream Stability Assessment Stream Stability Methodology General Concepts Natural channels, such as East Plum Creek, consist of a natural movable channel

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation