1 1 of 5 Continuing Education Course #101 Drainage Design with WinTR WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the maximum length for sheet flow is: a. 100 feet b. 200 feet c. 300 feet d. 400feet 3. WinTR-55 does not allow the use of user-defined rainfall distributions. 4. WinTR-55 rainfall depth is limited to: a. 35 inches b. 40 inches c. 45 inches d. 50 inches 5. Sub-area entry and summary data can either be entered directly into the main window table or computed elsewhere within the program 6. Which of the following applies to drainage sub-areas entered into the Main Window of the WinTR-55 program? a. Sub-area names must be no more then ten (10) characters long with at least one alphabetical character b. An optional sub-area description may also be entered and must be no more than 25 characters long c. The sub-area drainage area, weighted curve number and time of concentration is either entered into the sub-area entry and summary table or computed using the Land Use Details window and/or the Time of Concentration Details window d. All of the above 7. Multiple hydrologic soil group entries can be made for a single cover description. 8. Which of the following does not apply to the Custom Curve Number window? a. The curve numbers for Urban and Residential land use given here are based on assumed average percent impervious area. b. If these curve numbers are not appropriate for the use intended, revised values can be computed. c. Impervious surface is assumed to have a CN = 90. d. Unconnected impervious area only occurs if impervious surface is less than or equal to 30 percent of the watershed area. 9. Which of the following applies to the Land Use Details window? a. Sub-area entries are made based on cover description and hydrologic soil group.
2 2 of 5 b. A new sub-area can be entered by clicking in the combo box and typing in the name. c. The sum of the entered sub-areas is displayed as the Project Area near the bottom left corner of the window d. All of the above 10. No more than five flow segments are allowed for a sub-area: one for sheet flow and two each for shallow concentrated and channel flow. 11. Which of the following applies to the Reach Data window? a. Every reach must have a downstream receiving reach assigned to it. b. The program will accommodate a maximum of twelve (12) reaches and no more than this will be accepted in the receiving reach box. c. Data required for channel routing includes reach length, Manning s n, friction slope, bottom width and side slope d. Channel routing is based on the Saint Venant method. e. Both a and c are correct 12. Sandler Chase is a acre proposed residential sub-division located in Duval County, Florida. The undeveloped site consist of 7.25 acres pasture in good condition with hydrologic soil group (hsg) B, 4.80 acres woods in good condition with hsg C and acres farmstead with hsg C. The flow path consist of : 100 feet sheet at ft/ft slope over light woods (0.40); 941 feet shallow concentrated at ft/ft slope over unpaved surface and 398 feet channel at ft/ft slope, Manning s coefficient 0.035, flow area 3.00 square feet and wetted perimeter 5.11 feet. What is the existing peak discharge rate during the 25-year, 24-hour storm event? Assume the Type II Florida Modified Custom Rainfall Distribution Window. a cfs b cfs c cfs d cfs Use the following data to answer questions The developed Sandler Chase site will have the following characteristics: Basin A 7.70 acres ¼-acre lots residential sub-division hsg C Pond 1.3 acres area at spillway crest 1.55 acres area at 2.65 feet above spillway crest Basin B Basin C acres ¼-acre lots residential sub-division 7.25 acres hsg B acres hsg C Pond 1.59 acres area at spillway crest 1.93 acres area at 2.75 feet above spillway crest 2.64 acres ¼-acre lots residential sub-division hsg C Pond 0.55 acre area at spillway crest 0.71 acres area at 2.75 feet above spillway crest
3 3 of What is the weighted CN for the developed Sandler Chase Basin B? a. 80 b. 78 c. 81 d What is the total proposed peak discharge rate for Sandler Chase during the 25-year, 24-hour storm event assuming 36-inch diameter outfall pipes? a cfs b cfs c cfs d cfs 15. For Sandler Chase developed condition, what is the maximum commonly available diameter pipe needed to assure attenuation of the peak discharge rate to no greater than the pre-developed rate for the 25-year, 24-hour storm event? Assume three equal diameter outfall pipes. a. 18 inch b. 24 inch c. 30 inch d. 36 inch 16. What is the peak stage in the developed Sandler Chase Basin B during the 50-year, 24-hour storm event? Assume the same diameter outfall pipes as determined in problem 15 above. a feet b feet c feet d feet Use the following data to answer questions Grant Estates is a proposed residential sub-division located in Saratoga, New York. The undeveloped site consist of three basins with a total area of 36 hectares and the following characteristics: Basin A: 5 ha pasture in good condition with hydrologic soil group (hsg) B 3 ha woods in good condition with hsg B 6 ha farmstead with hsg A The flow path consist of : 30 meters sheet at m/m slope over light woods (0.40); 275 meters shallow concentrated at m/m slope over unpaved surface and 125 meters shallow concentrated at m/m slope over unpaved surface. Basin B: 4 ha pasture in good condition with hsg A 3 ha woods/grass combination in good condition with hsg A 4 ha woods/grass combination in good condition with hsg B 6 ha farmstead with hsg A The flow path consist of : 30 meters sheet at m/m slope over light woods (0.40); 415 meters shallow concentrated at m/m slope over unpaved surface and 83 meters shallow concentrated at m/m slope over unpaved surface Basin C: 5 ha woods in good condition with hsg B
4 4 of 5 The flow path consist of : 30 meters sheet at m/m slope over dense woods (0.80); 215 meters shallow concentrated at m/m slope over unpaved surface 17. What is the existing peak discharge rate during the 25-year, 24-hour storm event? Assume the NRCC_B rainfall distribution for Saratoga County East.. a cms b cms c cms d cms 18. What time did the peak discharge rate occur for existing Basin B during the 25-year, 24-hour storm event? a hr b hr c hr d hr 19. For Grant Estates, what is the time of concentration for the existing Basin C? a hr b hr c hr d hr 20. The developed Grant Estates site will have the following characteristics: Basin A: 19ha 0.10 ha lots residential subdivision hsg A 12ha 0.10 ha lots residential subdivision hsg B Tc = 0.250hr Basin B: 5 ha woods in good condition with hsg B Tc = 0.371hr Basins A and B flow to a single pond. Pond: area at spillway crest = 1.4 ha area at 2 meters above spillway crest = 1.7 ha Outfall Pipes tested 762mm, 914mm and 1067mm diameters Spillway height is 2 meters above pipe invert What is the weighted CN for the Grant Estates proposed Basin A? a. 65 b. 66 c. 64 d For Grant Estates developed condition, what is the maximum commonly available diameter pipe needed to assure attenuation of the peak discharge rate to no greater than the pre-developed rate for the 25-year, 24-hour storm event? a. 914mm b. 1067mm c. 762mm d. 610mm 22. What is the peak stage in the developed Grant Estates Basin A during the 50-year, 24-hour storm event? Assume the same diameter outfall pipe as determined in problem 21 above.
5 5 of 5 a. 0.50m b. 0.75m c. 0.15m d. 0.32m 23. A WinTR-55 reach cross section is either a rectangular, triangular or trapezoidal channel. 24. Which of the following does not apply to the Structure Data window? a. The Structure Data window allows data entry and editing for the pond s surface area, structure outlet type and dimensions, and structure rating relationship for a structure. b. Four outlet sizes may be entered for any structure. c. The first eight characters in structure names must be unique in each file. d. The entry of a zero weir length indicates a v-notch weir. 25. Which of the following applies to the WinTR-55 processes associated with running this program? a. The Hydrograph Peak/Peak Time table will be displayed in the File Display window following a successful run. b. If the Error file appears in the File Display window, indicating an unsuccessful run, the data errors must be resolved prior to attempting another run. c. Green text indicates a computed value while blue text indicates a value that was entered directly. d. All of the above.
Stage Discharge Tabulation for Only Orifice Flow
Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationEROSION CONTROL NARRATIVE
EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment
More informationStormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)
Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationProject Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details
Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow
More informationINTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS
INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic
More information******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF
Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationChapter 13. Editing Intermediate Files. Overview
Chapter 13 Editing Intermediate Files Overview The SACPRE intermediate file is an ASCII file that contains records or lines of information. In SACPRE and HEC-1 each record represents a command for the
More informationWATER MANAGEMENT REPORT FOR PAGE ESTATES
WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher
More informationSubmitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226
RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin
More informationObjectives: After completing this assignment, you should be able to:
Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate
More informationCoal Combustion Residuals Unit Inflow Design Flood Control System Plan
Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:
More informationSeptember 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report
More informationUrban Hydrology for Small Watersheds
United States Department of Agriculture Natural Resources Conservation Service Conservation Engineering Division Urban Hydrology for Small Watersheds TR-55 Technical Release 55 June 1986 To show bookmarks
More informationDEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING Urban Drainage: Hydraulics. Solutions to problem sheet 2: Flows in open channels
DEPRTMENT OF CIVIL ND ENVIRONMENTL ENGINEERING Urban Drainage: Hydraulics Solutions to problem sheet 2: Flows in open channels 1. rectangular channel of 1 m width carries water at a rate 0.1 m 3 /s. Plot
More informationCity of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
More informationDrainage Analysis. Appendix F
Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection
More informationThe effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design
Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention
More informationChapter 10 - Sacramento Method Examples
Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer
More informationDRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE
More informationStormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO
88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More informationCity of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design
City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area
More informationFHWA - HIGHWAY HYDROLOGY
The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444
More informationAdvanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS
Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.
More informationWorkshop: Build a Basic HEC-HMS Model from Scratch
Workshop: Build a Basic HEC-HMS Model from Scratch This workshop is designed to help new users of HEC-HMS learn how to apply the software. Not all the capabilities in HEC-HMS are demonstrated in the workshop
More informationWQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4
These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary
More informationGISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland. G. E. Moglen 1
GISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland G. E. Moglen 1 1 Department of Civil and Environmental Engineering, University of Maryland, College Park, MD 20742; PH (301) 405-1964;
More informationSection 3.0 Existing Systems Hydrology and Hydraulics
Section 3.0 Existing Systems Hydrology and Hydraulics This chapter summarizes the results and methodology of MACTEC s evaluation of the existing drainage systems and lakes for the City of Maitland, Florida.
More informationARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS
ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationREPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224
REPORT FOR: ISLAND LAKE ESTATES 4275 Placida Road Englewood, FL 34224 OWNER/APPLICANT: Edgewater Opportunity Fund II Contact: Ronald S Greenland 300 East Bay Heights Road Englewood, FL 34223 SUBMITTED
More informationBasic Hydraulics June 2007
Basic Hydraulics www.concrete-pipe.org June 2007 2007 Overview Open Channel Flow Manning Equation Basic Culvert Design Sanitary Sewer Design Flow, Velocity Stormwater Sewer Design Flow, Velocity 2 Open
More informationSediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources
Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable
More informationNotes: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments.
Worksheet 3: Time of Concentration (Tc) or travel time (Tt) Project By Date Location Checked Date Check one: Present Developed Check one: Tc Tt through subarea Notes: Space for as many as two segments
More informationGeorge Mason University Department of Civil, Environmental and Infrastructure Engineering
George Mason University Department of Civil, Environmental and Infrastructure Engineering Dr. Celso Ferreira Prepared by Lora Baumgartner December 2015 Revised by Brian Ross July 2016 Exercise Topic: Getting
More informationMonitoring Considerations and Costs
Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.
More informationEROSION CONTROL NARRATIVE
EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationWatershed Modeling Orange County Hydrology Using GIS Data
v. 10.0 WMS 10.0 Tutorial Watershed Modeling Orange County Hydrology Using GIS Data Learn how to delineate sub-basins and compute soil losses for Orange County (California) hydrologic modeling Objectives
More informationAPPENDIX B HYDROLOGY
APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF
More informationTable of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti
Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collection... 2 Treatment... 3 Storage... 3 Disposal... 4 Soils...
More informationSTORMWATER REPORT FRITO LAY SUBDIVISION NO. 3
STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses
More informationSTORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect
STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)
More informationUTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215
More informationFINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO
FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905
More informationPressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.
Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm
More informationDetermination of Urban Runoff Using ILLUDAS and GIS
Texas A&M University Department of Civil Engineering Instructor: Dr. Francisco Olivera CVEN689 Applications of GIS to Civil Engineering Determination of Urban Runoff Using ILLUDAS and GIS Tae Jin Kim 03.
More informationUNIVERSITY OF BOLTON. ENGINEERING, SPORTS and SCIENCES BSC CIVIL ENGINEERING SEMESTER 1 EXAMINATION 2014/2015 WATER ENGINEERING MODULE NO: BLT3023
[TW59] UNIVERSITY OF BOLTON ENGINEERING, SPORTS and SCIENCES BSC CIVIL ENGINEERING SEMESTER 1 EXAMINATION 014/015 WATER ENGINEERING MODULE NO: BLT303 Date: Tuesday, 0 January 015 Time: 10.00-1.00 INSTRUCTIONS
More informationJones Creek Case Study
Jones Creek Case Study Introduction In this case study we will examine the fictitious watershed of Jones Creek. This watershed has one confluence and can therefore be divided into three subbasins. The
More informationHydrology Study Report
Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology
More informationAPPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION
APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use
More informationBushkill Creek 3 rd Street Dam Removal Analysis
Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
Gates TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: Gates Road Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction Stormwater
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
High Street TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: High Street Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction
More information9. Flood Routing. chapter Two
9. Flood Routing Flow routing is a mathematical procedure for predicting the changing magnitude, speed, and shape of a flood wave as a function of time at one or more points along a watercourse (waterway
More informationHYDROLOGY REPORT Tentative Tract No. 5978
ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618
More informationA HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT
154 A HYDROLOGC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY N QUEENS, NY Monica Tsang-Rakovan, Kevin J. Phillips, Khalid Bajwa, John Ferrelli, Fanning, Phillips and Molnar Fanning,
More informationHEC-HMS Lab 4 Using Frequency Storms in HEC-HMS
HEC-HMS Lab 4 Using Frequency Storms in HEC-HMS Created by Venkatesh Merwade (vmerwade@purdue.edu) Learning outcomes The objective of this lab is to learn how HEC-HMS is used to determine design flow by
More informationDrainage Study for Civic Center Way
Drainage Study for 23401 Civic Center Way P.C.C.E. INC. CIVIL ENGINEERING AND DESIGN Drainage Study for 23401 Civic Center Way WHOLE FOODS AT THE PARK Prepared by: P.C.C.E. INC STEPHEN R. SMITH, P.E. 23801
More informationDRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE
HYDRA ENGINEERING AND CONSTRUCTION, LLC C.A. #28124 DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE Wakulla County, Florida August 8, 2016 PREPARED FOR: The North West Florida Water Management District Hydra
More informationOpen Channel Hydraulics III - Sharpcrested
PDHonline Course H140 (2 PDH) Open Channel Hydraulics III - Sharpcrested Weirs Instructor: Harlan H. Bengtson, Ph.D., PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone
More informationGIS Enabled Automated Culvert Design
GIS Enabled Automated Culvert Design ASHTON GREER PH.D. STUDENT, THE UNIVERSITY OF ALABAMA DR. ANDREW GRAETTINGER, LEAH CLIFTON, ZACHARY WILBANKS, BRADFORD WILSON Outline Culvert Background Project Objectives
More informationWal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT. February 2017
Wal-mart Store #6746-00 Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT February 2017 CPH Project No. W13900 1031-C W. 23rd Street Panama City, FL 32405 Phone
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
Gates TETRA TECH, INC. By: RH Date: 11/11/2016 Subject: Gates Road Checked By: JB Date: 11/13/2016 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction
More informationPONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks
PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1
More informationInterconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5
==== Basins ============================================================================== Name: 1A Node: Swale 1 Status: Onsite : Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh256 Peaking Factor: 256.0
More informationWMS 9.0 Tutorial GSSHA Modeling Basics Infiltration Learn how to add infiltration to your GSSHA model
v. 9.0 WMS 9.0 Tutorial GSSHA Modeling Basics Infiltration Learn how to add infiltration to your GSSHA model Objectives This workshop builds on the model developed in the previous workshop and shows you
More informationStormwater Capacity Analysis for Westover Branch Watershed
Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch
More informationAppendix E Guidance for Shallow Flooding Analyses and Mapping
Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding
More informationEROSION AND SEDIMENT TRANSPORT IN A PROPOSED REGIONAL SANITARY LANDFILL. Jorge Rivera Santos 1 * Godofredo Canino 2
EROSION AND SEDIMENT TRANSPORT IN A PROPOSED REGIONAL SANITARY LANDFILL Jorge Rivera Santos 1 * Godofredo Canino 2 1 Puerto Rico Water Resources Research Institute School of Engineering P.O.Box 5000 Mayagüez,
More informationOPEN CHANNEL FLOW. One-dimensional - neglect vertical and lateral variations in velocity. In other words, Q v = (1) A. Figure 1. One-dimensional Flow
OPEN CHANNEL FLOW Page 1 OPEN CHANNEL FLOW Open Channel Flow (OCF) is flow with one boundary exposed to atmospheric pressure. The flow is not pressurized and occurs because of gravity. Flow Classification
More informationWEST CATARACT CREEK DAM FINAL DESIGN REPORT
DAMsel In Distress Engineering 2112 S Huffer Ln Flagstaff, AZ 86011 (520) 981-9515 WEST CATARACT CREEK DAM FINAL DESIGN REPORT Prepared for: Dr. Charles Schlinger Mr. Mark Lamer TABLE OF CONTENTS Contents
More informationA GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner
Texas A&M University Zachry Department of Civil Engineering CVEN 658 Civil Engineering Applications of GIS Instructor: Dr. Francisco Olivera A GIS-based Approach to Watershed Analysis in Texas Author:
More informationDRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design
DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage
More informationDRAINAGE CALCULATIONS
DRAINAGE CALCULATIONS NW 8 th Street and NW 8 th Terrace Roadway and Drainage Improvements City of Miami Project B-30745 And NW 14 th Court Roadway and Drainage Improvements City of Miami Project B-30746
More informationHydrology and Hydraulics Design Report. Background Summary
To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationLESSON HEC-HMS
LESSON 2.2 - HEC-HMS Introduction: TEAM 8 SCS method: The input data: Thiessen Polygons: Concentration Lag Time: SCS Method: Calculation of CN: Result figures: CONSTRUCTING HYDROGRAPH WITH HEC-HMS: Rainfall
More informationP = 2Rθ. The previous Manning formulas are used to predict V o and Q for uniform flow when the above expressions are substituted for A, P, and R h.
Uniform Flow in a Partly Full, Circular Pipe Fig. 10.6 shows a partly full, circular pipe with uniform flow. Since frictional resistance increases with wetted perimeter, but volume flow rate increases
More informationVillages at Riverdale Thornton, CO
FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:
More informationTitle: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars
Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars Introduction Abstract: The use of ArcMap to calculate soil areas for storm water
More informationRucker Pond. Background
Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different
More informationThe Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin)
Current World Environment Vol. 10(Special Issue 1), 842-851 (2015) The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin) Arman
More informationPARADIGM ODP FORT COLLINS, CO 80525
DRAINAGE REPORT PARADIGM ODP FORT COLLINS, CO 80525 Prepared For: Paradigm Properties, LLC 2186 Knoll Drive Ventura, CA 93003 Prepared By Coffey Engineering & Surveying 4045 St. Cloud Drive, Suite 180
More informationHydrologic Modeling System HEC-HMS
Hydrologic Engineering Center Hydrologic Modeling System HEC-HMS Quick Start Guide Version 3.3 September 2008 Approved for Public Release Distribution Unlimited CPD-74D REPORT DOCUMENTATION PAGE Form Approved
More informationINTRODUCTION TO HEC-HMS
INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),
More informationCaledon Villas Corporation
Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential
More informationWeb (Java, ArcGIS Server [WebADF, flex, silverlight]) Mobile (ArcGIS Mobile, ArcPad, Windows Mobile) Deskt
GIS Services company in Lincoln, NE Custom GIS database design and build (for local, county, state and private corporations) Custom (ESRI and non-esri) application design and build in Java, C++, C#,.Net
More informationPECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY. Hydrology Appendix. New York District
PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY Hydrology Appendix New York District May 2018 Table of Contents 1.0 OBJECTIVE OF STUDY... 1 2.0 WATERSHED DESCRIPTION... 1 3.0 PRIOR
More informationPhillips Ditch Drainage Study
Phillips Ditch Drainage Study By: David L. McCormick, PE, D. WRE McCormick Engineering, LLC For: St. Joseph County, Indiana Revision Date: March 29, 2017 Table of Contents 1. INTRODUCTION... 1 1.1. Review
More informationENGINEERING HYDROLOGY
ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,
More informationStormwater Management Engineering Report
March 12, 2018 Stormwater Management Engineering Report for Brighton Oaks Subdivision Cato Road Bay County, Florida Prepared for: DR Horton PO Box 958 Lynn Haven, Florida, 32444 Ph. 850.265.6979 Fax. 850.265.9942
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:
More informationCONCEPTS Conservational Channel Evolution and Pollutant Transport System
CONCEPTS Conservational Channel Evolution and Pollutant Transport System Eddy J. Langendoen Watershed Physical Processes Research Unit National Sedimentation Laboratory USDA Agricultural Research Service
More information