1 Section IV Stream Stability Assessment 19

2

3 IV. Stream Stability Assessment Stream Stability Methodology General Concepts Natural channels, such as East Plum Creek, consist of a natural movable channel bed that will transition over time through meanders of the low flow channel, deposition of point bars, and infrequent straightening from larger flood events. A natural flowing stream that transports sediment is usually in equilibrium, with no long term trend towards aggregation or degradation (USBR 1987). This equilibrium condition implies that the sediment transport rate into a channel reach is the same sediment transport rate out of the channel reach. Changes to the contributing watershed or the channel itself can impact the sediment transport capability of the stream. For developing areas, urbanization in the surrounding watershed can cause an increase in peak runoff, changes in channel slopes or in sediment load (USDCM 2006). These changes cause a state of influx from the natural, stable characteristics of the stream. Reducing the sediment load in a stream can alter it from a stable channel to one that causes degradation until it reestablishes equilibrium. The reduction in sediment load can create conditions that are conducive to channel instability, such as, widening of the channel banks (erosion), deepening of the channel bottom (degradation) and changes in channel gradient. Increases in sediment load can cause deposition of debris and sediment (aggradation) and can force changes in flow characteristics such as increased meander or braiding. There is a fine balance reached in a stable stream. If the stream is aggrading, the newly applied sediment can destroy fish habitats. Conversely, if the stream is degrading, it can jeopardize hydraulic structures by scouring the foundations or result in a loss of micro organisms essential to a healthy habitat. Standards of Practice A stable channel design can be achieved using many approaches. One common approach is to reinforce a channel so that the maximum bed shear stress does not exceed the critical shear stress, ensuring that the channel bed does not move. This is most commonly done with channel lining procedures such as riprap or concrete. A second is to compute the bed discharge load or sediment transport rate at equilibrium and make modifications to ensure a similar carrying capacity is available through the adjacent reaches. This study will focus on the latter of the two approaches. general guidelines for longitudinal slopes of constructed channels, but does not have criteria to calculate a stable slope or sediment carrying capacity of a natural channel such as East Plum Creek. The approach presented in this report will consider historical and current observations utilizing aerial photography, a comprehensive site review, and an analytical analysis. A site review combined with an analytical analysis will be used to determine a stable channel slope, while the aerial photography will be used to determine head cutting, meander patterns, and variations in the floodplain from the past to present. For this analysis, the sediment supply from upstream coming into the Study Area is equal to the stable sediment transport capacity of the channel. Summary of Approach To apply the standards of practice and general concepts of a stream stability assessment to East Plum Creek, the study area was divided into six separate reaches. Each reach was analyzed according to the three different types of evaluation listed below: Site Review: The Site Review was conducted to observe the existing conditions within the project area. This review was conducted during September 17th and 18 th, in the year Field maps were used to note observations and photograph locations. Historic Analysis: Aerial imagery from 1937, 1967, and 2006 were obtained and reviewed to determine migration patterns of the low flow channel and flood banks. Analytical Analysis: An Analytical Analysis was performed to establish the sediment capacity coming into the study area. From the site review, the upstream undeveloped areas were assumed to be at equilibrium and were used as a baseline for a stable sediment load. Computational hydraulics were applied to determine the stable slope that will carry the equilibrium sediment load. The approach to establish a qualitative and quantitative assessment of stream stability and sediment transport for East Plum Creek is summarized in Figure IV-1 below. As shown in the flow diagram, the selection of reach designation from the site review is an important decision for the whole assessment. Reach designations were determined by similarities in hydraulic characteristics, channel degradation, bank erosion, and hydraulic structures. Many different studies have been performed to determine the sediment carrying capacity of a natural stream. Most of this research can be summarized in two distinct approaches. The first was pioneered by Einstein (1950), in which the total bed material discharge is divided into the bed load discharge and suspended-load discharge and then summed to estimate total sediment discharge. The second method is a determination of total sediment discharge as a function of hydraulic variables such as velocity, slope, and depth (Sturm 2002). The Urban Drainage Storm Water Criteria Manual (UDSWCM) does not contain a recommended standard of practice to solve for sediment transport in a natural channel. There are general guidelines presented in Volume 1 of the UDSWCM that suggest to focus on the channel behavior historically, currently, and predict for the future to make a complete assessment of the channel s stability. UDSWCM also presents 20

4 Review Computational Technique and Hydraulic Analysis Sediment Transport Assessment Analytical Analysis Site Review Historical Analysis Compute Hydraulic Properties of Channel Conduct Site Review Review Aerial Photography Compute Sediment Transport Rate for Each Section Connected by Reach Designation Establish Reach Designation by Similar Properties Connected by Reach Designation Assess Major Differences in Floodplain limits and Meandering Pattern by Reach Compute Average Transport Rate by Reach Connected by Site Review Results Summarize Results of Site Review by Reach Determine Stable Sediment Load from Site Review and Analytical Analysis Review Reach Designation No Do the Results Support the Site Review Summary? yes Compute Stable Slope For Reaches with Degradation Present Findings and Conclusions Summarize Results of Historic Analysis by Reach Figure IV-1: Sediment Transport Assessment Approach Summary for East Plum Creek 21

5 Reach Description Reaches were established to match certain characteristics within East Plum Creek and the surrounding watershed. Below are descriptions of the reach characteristics, a plan view of the reaches and their locations are shown in Figures IV-2 and IV-3. Reach 1 Reach 1 is approximately 1.6 miles long and is located in the upper most reach in this study. The reach is located within active agricultural land and is bounded upstream by the limit of the Town boundary and downstream by Crystal Valley Parkway. The floodplain ranges in width from approximately 180 feet to 350 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. Much of the low flow channel is braided with deposition on the inside bends of meanders. The width and flow depth of the low flow channel varied from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 1 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Plant composition and diversity are fairly variable along the reach, and species diversity and abundance appear to be higher in sections with less channel erosion. The stream channel supports intermittent herbaceous and scrub-shrub fringe wetlands that typically extend between 1 to 20 feet from the channel banks. Extensive wetland development beyond the channel fringe appears to be limited by the incised channel banks found along parts of the reach. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds in Reach 1 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), and musk thistle (Carduus nutans). Soil classifications within the flood plain of Reach 1 are predominately Type C soils of the Fondis series (FoB, Fod, and Fu). With some Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB). Reach 2 Reach 2 is approximately 1.6 miles long and is just downstream of Reach 1 and is within the upper reach of the study area. The reach begins downstream of Crystal Valley Parkway and ends to the east of Brookside Circle and South Wilcox Street. The reach is bounded to west by mostly open space, highways, and a few commercial developments and to the east by low to medium density single family development. The floodplain ranges from 300 feet to 400 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. Much of the low flow channel is braided with deposition on the inside bends of meanders. The width and flow depth of the low flow channel varied from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 2 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Plant composition and diversity are fairly uniform. The stream channel supports intermittent herbaceous and scrub-shrub fringe wetlands that typically extend between 1 to 10 feet from the channel banks. Some small wetland areas exist beyond the immediate banks of the channel, but extensive wetland development beyond the channel fringe appears to be limited by the incised channel banks. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds in Reach 2 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), and musk thistle (Carduus nutans). Soil classifications within the flood plain of Reach 2 are predominately Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB). Reach 3 Reach 3 is approximately 1.1 miles long and is located upstream of the downtown area. The reach begins downstream of Reach 2 and ends at the confluence of East Plum Creek and Sellers Gulch. The reach is bounded to the west by mostly open space, highways, and a few commercial developments and to the east by low to medium density single family development and sparse commercial development. The floodplain ranges from 200 feet to 400 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. Much of the low flow channel is braided with deposition on the inside bends of meanders. The width and depth of the low flow channel varies from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 3 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Plant composition and diversity are variable. The stream channel supports mostly continuous herbaceous and scrub-shrub fringe wetlands that typically extend between 1 to 10 feet from the channel banks, with most of the wetlands concentrated near the northern end of the reach. Some small wetland areas exist beyond the immediate banks of the channel, but extensive wetland development beyond the channel fringe appears to be limited by the incised channel banks. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds in Reach 3 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), yellow toadflax (Linaria vulgaris), and musk thistle (Carduus nutans). This reach is part of a wetland augmentation area, and good wetland and riparian habitat for Preble s meadow jumping mouse (Zapus hudsonius preblei) and other species extend throughout the reach. Soil classifications within the flood plain of Reach 3 are predominately Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB). Reach 4 Reach 4 is the shortest reach with a length of approximately 0.6 miles. The reach is located through the center of downtown. The reach begins downstream of the confluence of East Plum Creek and Sellers Gulch and ends at the East Wolfensberger Road. The reach is bounded to west by single family and commercial developments and to the east by downtown Castle Rock. The floodplain ranges from 100 feet to 150 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. The floodplain has been encroached and is bounded with supported rock gabion walls. The width and depth of the low flow channel varied from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 4 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Plant composition and diversity is fairly uniform. The stream channel supports continuous herbaceous and scrub-shrub fringe wetlands that typically extend between 10 to 20 feet from the channel banks. Many large wetland areas exist beyond the immediate banks of the channel, which are likely influenced by the small dams that raise the local water table, relatively high natural groundwater conditions and/or occasional overbank flooding. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds in Reach 4 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), and musk thistle (Carduus 22

6 nutans). This reach is part of a wetland augmentation area, and there is an abundance of good wetland and riparian habitat for Preble s meadow jumping mouse (Zapus hudsonius preblei) and other species. Soil classifications within the flood plain of Reach 4 are predominately Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB). Reach 5 Reach 5 is the longest reach measuring at approximately 3 miles. The reach begins downstream of East Wolfensberger Road and ends about ¾ of a mile downstream of Meadows Parkway. The reach is bounded to west and east be open space and single family developments. The floodplain ranges from 200 feet to 400 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. The width and flow depth of the low flow channel varied from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 5 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Plant composition and diversity are fairly variable, oftentimes in correlation with the level of channel erosion. The stream channel supports mostly continuous herbaceous and scrub-shrub fringe wetlands that typically extend between 1 to 20 feet from the channel banks. Some small wetland areas exist beyond the immediate banks of the channel, which are likely influenced by the small dams that raise the local water table, relatively high natural groundwater conditions and/or occasional overbank flooding. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds in Reach 5 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), yellow toadflax (Linaria vulgaris), and musk thistle (Carduus nutans). There is a riparian/wetland mitigation area south of the Meadows Parkway Bridge with some planted willows and other shrubs that appear to be only partially successful. Part of this reach is within a wetland augmentation area, and good wetland and riparian habitat is available for Preble s meadow jumping mouse (Zapus hudsonius preblei) and other species. Soil classifications within the flood plain of Reach 5 are comprised of Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB) and Type C soils of the Fondis series (FoB, Fod, and Fu). Reach 6 Reach 6 is the last reach within the study area measuring at approximately 1.2 miles long. The reach begins downstream of Reach 5 and ends at the downstream limit of the Town boundary. The reach is bounded to west and east be open space and single family developments. The floodplain ranges from 200 feet to 400 feet and has a gentle meander pattern. The low flow channel bed material is predominantly sand with small gravel sized particles. The width and flow depth of the low flow channel varied from approximately 5 ft to 10 ft and 0.5 ft to 1.5 ft, respectively. Vegetation within the floodplain of Reach 6 is dominated by a mixture of riparian grasses, forbs, and shrubs intermixed with pockets of woodlands. Although plant composition and diversity are fairly uniform throughout the reach, species diversity and abundance appear to be higher in sections with less channel erosion. The stream channel supports intermittent herbaceous and scrub-shrub fringe wetlands that typically extend between 1 to 5 feet from the channel banks. Some small wetland areas exist beyond the immediate banks of the channel, but extensive wetland development beyond the channel fringe appears to be limited by the incised channel banks found along much of the reach. Many of the wetlands are dominated by woody species such as sandbar willow (Salix exigua). Some of the sandbar willows that were over 50 feet from the channel appear to be dying back, perhaps from diminished availability of groundwater as the channel has become more incised over time. Herbaceous wetlands are often dominated by sedges (Carex spp.). Noxious weeds observed in Reach 6 include Canada thistle (Cirsium arvense), Russian olive (Elaeagnus angustifolia), Russian knapweed (Acroptilon repens), and musk thistle (Carduus nutans). A red-tailed hawk (Buteo jamaicensis) was observed at the site about one-half mile south of the water treatment facility located at the northern end of the reach. Soil classifications within the flood plain of Reach 6 are predominately Type C soils of the Fondis series (FoB, Fod, and Fu). With some Type B soils classified as Newlin Gravelly Sandy Loam (NeE) and the Bresser Sandy Loam (BrB). 23

7 Figure IV-2 Reaches 1 to 3 on East Plum Creek Figure IV-3 Reaches 4 to 6 on East Plum Creek 24

8

9 Engineering Analysis Site Review A comprehensive site review was necessary to support any conclusions or implications that may result from the aerial review and the analytical analysis. East Plum Creek was observed for channel degradation, channel bank erosion and instability, extreme degradation, and for areas where East Plum Creek may be cutting into private property, or threatening hydraulic structures. In general, channel degradation, bank erosion, and undercutting of hydraulic structures became more pronounced the further downstream the site review was conducted. At the beginning in Reach 1, channel degradation and minor bank erosion were only found around hydraulic structures. As the site review progressed, extreme bank erosion and undercutting of hydraulic structures was found to be more common. At the end of the site review, the channel was consistently incised 4 to 5 feet from channel degradation. The following sections describe the findings for each of the six reaches. Reach 1 The far upstream portion of Reach 1 was a stable channel with little channel degradation or bank erosion except for locations around hydraulic structures. The first location of a hydraulic structure was at the crossing of East Plum Creek and a dirt road that leads to a quarry. After this crossing, portions of the upstream reach are experiencing invert degradation, most likely from a 72-inch Corrugated Metal Pipe CMP that is concentrating and accelerating the low flows. At the 72 inch CMP a drop in invert elevation of 8 ft has occurred at the downstream end of the structure. This is shown in Exhibit IV-1. Exhibit IV-2. East Plum Creek Downstream of 72 inch CMP Signs of Channel Degradation at Residential Bridge Exhibit IV-3. Residential Bridge on East Plum Creek Exhibit IV-1. Channel Degradation from 72-inch CMP The channel downstream of this structure is incised with 5 to 6 foot banks that are primarily composed of sandy gravel and are very steep with sparse vegetation as shown in Exhibit IV-2. The second hydraulic structure in Reach 1 is a residential bridge crossing located near the midpoint of the reach. The residential bridge has signs of invert degradation of approximately 1 to 2 feet as shown in Exhibit IV-3. Aside from areas around hydraulic structures, the overall stability of Reach 1 appeared to be. For most of the reach, the channel banks are laid back at a natural slope and contain a healthy amount of vegetation. Exhibit IV-4 shows a typical section of Reach 1 that is not located near hydraulic structures. 25

10 is the first location to exhibit major bank erosion and consistent channel degradation. Hydraulic structures located in the tributaries to Reach 2 were undercut and deteriorating. Reach 2 starts near the newly constructed Crystal Valley Parkway Bridge. The supporting piers of the bridge are properly protected with 2- to 3-foot riprap. Just past the bridge is another, older bridge crossing that exhibited channel degradation of 3 to 4 feet. The channel between these two structures is showing signs of bank erosion, which is captured in Exhibit IV-6 below. Exhibit IV-4: Typical Section of Reach 1 not Located near Hydraulic Structures The latter reaches of Reach 1 continue to remain stable, with sandy banks laid back at a natural slope and healthy vegetation. Exhibit IV-5 shows the last stretch of Reach 1 with the new Crystal Valley Parkway Bridge in the backdrop. The location of the bridge marks the beginning of Reach 2. Exhibit IV-6: Beginning of Reach 2 Most of the low flow channel in Reach 2 exhibits channel degradation of about 2 to 3 feet. The banks of the low flow channel are incised and too steep to maintain healthy amounts of vegetation. In areas where East Plum Creek is adjacent to the banks of the floodplain, major bank erosion has occurred. Exhibits IV-7 and IV-8 show a typical low flow channel section and an area exhibiting major bank erosion, respectively. Tributaries that flow from the east into East Plum Creek are showing signs of severe erosion and undercutting. Some areas appear that the channel has head cut up the tributary nearly causing failure to existing culverts. Exhibit IV-9 shows a culvert that passes flows under the existing railroad tracks. An attempt to stop the back cutting up the tributary has been made by placing railroad tracks and sheets of wood downstream of the culvert. Exhibit IV-5: Latter Part of Reach 1 Reach 2 The upper end of Reach 2 is the beginning of local development within the study area. East of the low flow channel of East Plum Creek are newly built single family residences and a large golf course. Reach 2 26

11 Exhibit IV-7: Typical low flow Channel Section for Reach 2 Exhibit IV-9: Head Cutting on a Tributary to East Plum Creek Locations in East Plum Creek that are downstream from tributaries with extreme erosion and degradation appear to have more stable banks and minimal channel degradation. This is likely caused from the sediment load entering from the tributary and balancing the sediment load in East Plum Creek. Exhibit IV- 10 shows a section of East Plum Creek downstream of a tributary that was showing signs of extreme erosion. Exhibit IV-8: Major Bank Erosion on East Plum Creek Exhibit IV-10: Typical Section Downstream of Tributaries on East Plum Creek 27

12 Reach 3 The floodplain of Reach 3 has less of the preferred wetland plant species. Most of these species are confined to areas near the low flow channel. It is predicted that degradation of the low flow channel has reduced the groundwater table in the area, resulting in less wetland vegetation and leaving large tree species and noxious weeds that have a deep enough root system to gather water. Steep vertical banks are observed throughout Reach 3, which are a result of the low flow channel meandering into the floodplain banks, cutting into the toe of the bank and causing a slope failure. Major hydraulic structures found in this reach are experiencing sever undercutting around piers that are located within East Plum Creek. The lack of preferred wetland species and exposure of piers are a direct result of the incising low flow channel within this reach. Eroding Bank on East Plum Creek The beginning of Reach 3 is marked by a steep bank that is being eroded by the low flow channel of East Plum Creek. The bank is being slowly cut back towards the property line of local commercial property. Exhibit IV-11 shows this bank from the view at the low flow elevation and Exhibit IV-12 is an aerial view that shows the plan view of the property and bank erosion. Exhibit IV-12: Plan View of Bank Erosion near Commercial Development Within this reach, East Plum Creek crosses two major bridges, South Wilcox Street and East Plum Creek Parkway. As previously mentioned, the incised low flow channel is exposing the pile foundations of the bridges. Exhibit IV-13 shows exposure of the pier foundations at the South Wilcox Bridge and East Plum Creek. Exhibit IV-11: Bank Erosion near Commercial Development Exhibit IV-13: Pier group underneath South Wilcox Bridge and East Plum Creek Between the South Wilcox Bridge and East Plum Creek Parkway outcroppings of shale rock are seen in the low flow channel. At East Plum Creek Parkway degradation of the low flow channel has caused exposure 28

13 to the bridge s pier foundations similar to Wilcox Bridge. Exhibit IV-14 shows the exposed piers under East Plum Creek Parkway Bridge. Exhibit IV-15: Check Structures Installed as Part of the HCP Exhibit IV-14: Exposed Piers under East Plum Creek Parkway Bridge Between the two bridges and the confluence with Sellers Gulch, East Plum Creek parallels Interstate 25 (I- 25). Bank stabilization is found along the latter part of this reach where East Plum Creek runs against the Interstate s embankment. The channel shows continuous signs of degradation causing steep incised banks. Towards the latter part of Reach 3 the low flow channel is on average 4 to 5 feet incised. Reach 4 Reach 4 begins at the confluence of East Plum Creek and Sellers Gulch and ends at the Wolfensberger Bridge. There is a recreational trail neighboring East Plum Creek throughout the reach. This reach is unique since it has been restored through a Habitat Conservation Plan (HCP) for the Preble s Jumping Mouse, which was a joint effort by the Colorado Department of Transportation (CDOT), U.S. Fish and Wildlife Service (USFWS), Federal Highway Association (FHWA), and the U.S. Army Corps of Engineers (USACE). The improvements include a series of check structures that were installed as part of the HCP, which have kept the low flow channel stable and maintained a healthy groundwater table to support endogenous wetland species of plants. An example of these check structures is shown in Exhibit IV-15. Within this reach East Plum Creek passes under two major bridges, I-25 and 5 th street Bridge. No scour of hydraulic structures or exposure of pier foundations was found within this reach. Although the low flow channel has been stabilized with the HCP improvements, the floodplain banks are consistently very steep and unstable and will likely continue to erode with higher flow rates. Exhibit IV-16 shows a section of bank at the edge of the floodplain in Reach 4. Exhibit IV-16: Section of Floodplain Bank within Reach 4 Reach 5 Past the HCP improvements of Reach 4, East Plum Creek once again exhibits signs of degradation and bank erosion. The only major hydraulic structure within this reach is at the downstream end where Meadows Parkway crosses East Plum Creek. At this location there was no observed scour around the bridge piers. Exhibit IV-17 depicts a typical section of the low flow channel in Reach 5. The degradation of 29

14 the low flow channel is causing steep, incised banks that can not hold vegetation. The lowered groundwater table results in a scarcity of the preferred wetland plant species. Reach 6 Reach 6 spans from the end of Reach 5 to the downstream limit of the study area. The channel and floodplain characteristics are similar to that of Reach 5. Some minor differences are the steep floodplain banks that reach heights of 10 to 20 feet above the low flow channel. Exhibit IV-19 is a typical section where the low flow channel has meandered out to the floodplain banks. The erosion has caused slope failure and is slowly progressing towards private property, which is shown by the barb wire fence on the right. Exhibit IV-17: Typical Channel Section for Reach 5 Locations where the low flow channel has meandered out to the floodplain banks are showing signs of severe bank erosion that have resulted from slope failure. Exhibit IV-18 shows a typical bank failure seen in Reach 5. Aerial Review Exhibit IV-19: Typical Section with Low Flow Channel at Floodplain Banks Historic aerial photographs were analyzed to assess the performance of East Plum over a period of time. Three unique time periods of historic photographs were chosen for this analysis; these years were 1934, 1967, and The 1934 photographs were used to get an estimate of the original meander pattern of the stream. The 1967 photographs provided insight as to how East Plum Creek was changed as a result of the 1965 flood event. The 2005 photographs provide a near current state of East Plum Creek. Meander patterns of the three historic aerial photographs are shown in Exhibits IV-20, IV-21, and IV-22. General interpretations of these photographs are discussed below. Exhibit IV-18: Bank Failure in Reach 5 Reach 1 The upstream portion of Reach 1 shows a significant difference in the meander patterns from 1934, 1965, and According the to 1934 aerial photograph, East Plum Creek used to have a more pronounced meander pattern of the low flow channel and the floodplain limits. It was also observed that the floodplain is narrower and more closely follows the low flow channel. The pattern is typical of a perennial stream with a stable natural slope and moderate deviations in peak flow rates. 30

15 The 1967 photographs show a significant straightening of the low flow channel and floodplain. The 2005 photograph shows floodplain limits similar to The low flow channel of East Plum Creek has reestablished a natural meander pattern similar to 1937 within the floodplain limits. In general, it appears that the 1965 flood had a significant impact on the floodplain of East Plum Creek. The newly cut banks have most likely confined the low flow channel since that event. Reach 2 The 1934 floodplain is similar in width and meander to the 1967 and 2005 floodplain. In some areas, the 1934 floodplain is wider than both the 1967 and 2005 floodplain. As with Reach 1, the 1967 photographs show a significant straightening and widening of the floodplain exhibits a noticeable difference in the low flow channel compared to The low flow channel meanders within the floodplain banks but does not come as close to the banks as From the site review it was noted that close meandering of the low flow channel to the floodplain banks is causing significant erosion and slope failure near property lines. The resolution of the historic aerial photographs does not allow for a close analysis of the banks. Reach 3 The 1967 photographs show the widened floodplain banks following I-25. The floodplain banks of the 1934 photographs extend into what is now commercial development. Encroachment through the Town and near bridges creates similar floodplain limits and low flow meandering between the 2005 and 1967 photographs. Reach 4 The floodplains for the three photographs at this location are predominately controlled by the location of I- 25. The 1934 photographs show a different alignment of I-25 compared to what is seen today and was seen in The floodplain widths and low flow meandering appear similar between the three photographs. Reach 5 As East Plum Creek turns west of the I-25 corridor, similar situations that were observed in Reach 1 and 2 are observed in Reach 5. The meander of the 1934 floodplain is more pronounced than 2005 and The 1965 flood had an apparent straightening of the floodplain. The 2005 low flow channel seems to be cutting into the floodplain banks more often than what was seen in Reach 6 Within Reach 6 East Plum Creek becomes somewhat confined by the State Highway 85 (SH-85) to the northeast and railroad tracks to the southwest. The aerial photographs imply that these structures have existed since The floodplain limits appear to be more narrow than the 1967 and 2005 floodplain limits. The consistent straightening of the floodplain after the 1965 flood is observed in Reach 6 as well. Figure IV-4: Historic Comparison of East Plum Creek for Reaches 1 and 2 31

16 Figure IV-5: Historic Comparison of East Plum Creek for Reaches 3, 4, and part of 5 Figure IV-6: Historic Comparison of East Plum Creek for Reaches 5 and 6 32

17 Analytical Analysis The best methods to predict sediment transport characteristics can be difficult and hard to quantify. The overall process and information required to perform typical sediment transport analysis is time consuming and extensive. A practical application for sediment transport is presented in the report titled Design Guidelines and Criteria of Channels and Hydraulic Structures on Sandy Soil, which was written for the UDFCD in Denver Colorado. The determination of sediment transport is presented as a power relationship between sediment transport rate and velocity and depth. Equation 1 presents this relationship. C 2 3 q = c y v C (1) 1 Where, q = sediment transport rate in cfs/foot, y = flow depth in feet, v = flow velocity in feet per second, c 1, c 2, and c 3 are constants that are defined in Table IV-1 below. TABLE IV-1 Constants for Sediment Transport Equation taken from (Simons and Associates 1981) Soil Classification Size (mm) Geometric Mean (mm) C 1 C 2 C 3 Very Fine Sand x Fine Sand x Medium Sand x Coarse Sand* x Very Coarse Sand x *Selected Values for this Study Geotechnical investigations were not conducted as part of this study. For computational purposes, a constant value of coarse sand is sufficient to represent the sediment transport rate through the study area. Exhibit IV-20 shows a representative soil grain diameter and the pen is placed as a tool to estimate grain size from the photograph. The analytical process is used to estimate the incoming sediment load, the stable sediment load for East Plum Creek within the Study Area, and then to determine a stable slope that will minimize degradation. Exhibit IV-20: Representative Grain Size for East Plum Creek Sediment Transport Calculations Equation 1 was applied to each cross section of a detailed hydraulic analysis using Hydraulic Engineering Center River Analysis Software (HEC-RAS) model of East Plum Creek. The values produced from this analysis were input into Equation 1 to compute the sediment transport rate at each section. The natural construct of East Plum Creek includes a sandy stream bed and a floodplain that consists of woodlands and plant species. For most of East Plum Creek, the banks on the low flow channel will be overtopped during a 2 to 5 year event. Since the sediment carrying capacity of East Plum Creek is mostly within the low flow channel, the flow depth and channel velocity were assumed to be the depth from the low flow channel to the water surface and the velocity of the main channel. Local accelerations and backwater effects due to hydraulic structures and varying channel geometry created a set of highly skewed sediment transport results. The power relationship of Equation 1 suggests that small changes in velocity can lead to large differences in the computation of the sediment transport rate. To determine a baseline sediment carrying capacity the data were analyzed by taking the geometric mean of the sediment transport rate for each reach. The geometric mean has an advantage over the arithmetic mean since it is less affected by very small or very large values within a skewed data set. The power relationship of Equation 1 and the results from the hydraulic analysis are more accurately represented by using the mathematical properties of the geometric mean to compute a baseline sediment transport rate value. Figures IV-7, IV-8, and IV-9 show the computed values for sediment transport rates for each event along each reach. Also shown in the below figures are the computed values of sediment transport for each cross section and a 5 point moving trend. The 5 point moving trend is intended to reflect any changes within a reach that are not observed by the overall reach transport rate value. 33

18 The 2, 10, and 100-year peak flow rates for the future conditions were taken from the companion East Plum Creek Watershed Baseline Hydrology and are summarized in Table IV-2. TABLE IV-2 East Plum Creek Peak Flow Rates taken from East Plum Creek Watershed Baseline Hydrology Report (CH2M HILL 2007) Future Condition Peak Flow Rates (cfs) Junction ID Station ID* 2-YR 10-YR 100-YR EPC ,910 6,380 14,810 EPC ,980 7,250 16,950 EPC ,840 7,450 17,340 EPC ,210 7,720 18,050 EPC ,170 8,110 18,230 *First station to which the flow rate is applied 34

19 3.00E-01 Future Condtition Sediment Transport Calculations East Plum Creek 2 yr 2 yr geometric mean 5-point Geometric Mean Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Transport Rate (cfs/foot) 2.00E E E Stationing Figure IV-7: Sediment Transport Rate using 2-year Peak Flow Rates 35

20

21 1.00E+00 Future Condtition Sediment Transport Calculations East Plum Creek 9.00E yr 10 yr geometric mean 5-point Geometric Mean 8.00E E-01 Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Transport Rate (cfs/foot) 6.00E E E E E E E Stationing Figure IV-8: Sediment Transport Rate using 10-year Peak Flow Rates 36

22

23 2.00E+00 Future Condtition Sediment Transport Calculations East Plum Creek 100 yr 100 yr geometric mean 5-point Geometric Mean 1.50E+00 Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Transport Rate (cfs/foot) 1.00E E E Stationing Figure IV-9: Sediment Transport Rate using 100-year Peak Flow Rates 37

24

25 Stable Slope Calculations The computation of a stable slope from the sediment transport analysis required a quantitative understanding of the sediment transport rate results that are presented in the previous figures. Notice that for the 2, 10, and 100-year flow rates the geometric mean for the transport rate of Reach 1 and 4 are similar, with most deviation occurring for the 100-year peak flow rates. From the site review, Reach 1 was still in a mostly natural state with minor degradation as a result of hydraulic structures. Reach 4 spanned the length of the HCP improvements, which included check structures to stabilize the channel slope and raise the groundwater table. The similarities between the sediment transport rate values and the site characteristics allowed for the determination of the sediment transport value that would create a stable slope on East Plum Creek within the study area. Table IV-3 presents the stable sediment transport rate assumed for this study. TABLE IV-3 Stable Slope Sediment Transport Rate Values for East Plum Creek Flow Rates Stable Transport Rate Value (cfs/ft) 2-YR YR YR Knowing the sediment transport rate that creates a stable channel is pertinent in calculating a stable channel slope. Figures 3-25 to 3-27 were used to select channel cross sections that have a transport rate equal to the geometric mean transport rate for that reach. Representative cross sections were also determined by their relationship to the friction slope and normalized n value. These criteria for each section are not always the same for each flow rate and a different representative cross section within a reach for different flow rates. The stationing of these cross sections for the 2, 10, and 100-year flow rates are presented in Table IV-4. TABLE IV-4 Cross Sections Representative of Baseline Sediment Transport Value Representative Cross Sections from HEC RAS Model Reach ID 2-YR Station ID 10-YR Station ID 100-YR Station ID Reach Reach Reach Reach The hydraulic properties of these sections were analyzed to determine the change in slope that will be required to match the stable transport rate. To do this, an optimization model was created to calculate normalized sections and determine a slope that would carry the stable sediment transport rate defined in Table 3-3. In functional form, the value for velocity in an open channel assuming uniform flow can be written as, v~f(s f, A, n) and A~f(y) In which, S f = friction slope, A = cross sectional area of flow, n = Manning s roughness value, and y = flow depth. The process to create a normalized cross section and solve for a stable slope is outlined in the following steps: 1. Determine hydraulic characteristics and sediment transport rate of representative sections 2. Create a normalized section that has the same velocity and depth 3. Back calculate a normalized roughness value for the normalized section 4. Use optimization model to solve the normalized section such that the calculated sediment transport rate equals the stable sediment transport rate Results Results of the analytical assessment allow the computation of a stable slope for East Plum Creek. The stable sediment load from Reach 1 was applied to Reaches 2, 3, 5 and 6 determined that the stable sediment load is approximately the value of the sediment transport capacity of Reach 1. This transport rate was applied to determine the stable channel slope for each reach under the 2, 10, and 100-year flow rates. These values are included in Table IV-5 below: TABLE IV-5 Stable Slope Computation for the 2, 10, and 100-Year Flow Rates Reach ID Channel Flow Depth (ft) 2-YR Initial Conditions 2-YR Stable Conditions Channel Velocity (ft/sec) Energy Slope (ft/ft) n (normalized) Normalized Depth (ft) Normalized Velocity (ft/sec) Stable Channel Slope (ft/ft) Stable Slope (%) % % % % Reach ID 10-YR Initial Conditions 10-YR Stable Conditions Channel Flow Depth (ft) Channel Velocity (ft/sec) Energy Slope (ft/ft) n (normalized) Normalized Depth (ft) Normalized Velocity (ft/sec) Average 0.61% Stable Channel Slope (ft/ft) Stable Slope (%) % % % % Average 0.55% 100-YR Initial Conditions 100-YR Stable Conditions 38

26 TABLE IV-5 Stable Slope Computation for the 2, 10, and 100-Year Flow Rates Reach ID Channel Flow Depth (ft) 2-YR Initial Conditions 2-YR Stable Conditions Channel Velocity (ft/sec) Energy Slope (ft/ft) n (normalized) Normalized Depth (ft) Normalized Velocity (ft/sec) Stable Channel Slope (ft/ft) Stable Slope (%) % Reach ID Channel Flow Depth (ft) Channel Velocity (ft/sec) Energy Slope (ft/ft) n (normalized) Normalized Depth (ft) Normalized Velocity (ft/sec) Stable Channel Slope (ft/ft) Stable Slope (%) % % 5* % % Average 0.53% *The optimization model converged on two separate solutions the upper stable slope value equaled 0.67% and the lower stable slope value equaled 0.42%. The lesser of the two values was taken. Non-linear optimization models, such as the one used for this study, have a tendency to converge on local maxima or minima as solutions that satisfy all constraints and optimality. A value of 0.40% was used as a beginning point for iterations to solve the objective function. Reach 5 for the 100 year iterations showed the most instability and converged at two different solutions. For this case, the lower of the two values was chosen. Given that Reach 1 defined the stable sediment load analytical computations were used to determine a stable slope for Reaches 2, 3, 5, and 6 based on that stable transport rate. The average of the stable slope computations for the 2, 10, and 100-year flow rates are presented in Table IV-6. TABLE IV-6 Average Stable Slope by Reach Reach ID Average Stable Slope Reach % Reach % Reach % Reach % Overall Average by Reach 0.56% Concepts used for the computation of sediment transport innately include a margin of error. In general, the methods used in this assessment provide the concept of a target slope that will reduce degradation and aggradation of the main channel. The less degradation in the main channel the higher the groundwater table will be and more vegetation will grow to protect the banks, thus reducing bank erosion. The findings of this study suggest that a stable slope for East Plum Creek within the study area is between 0.5% and 0.6%. Summary A qualitative and quantitative analysis was performed to determine the sediment transport rate and stable sediment transport rate for East Plum Creek within the Town limits of Castle Rock, Colorado. A site review, historic assessment, and analytical analysis were used to separate East Plum Creek into six defined reaches. From the site review two reaches were determined to be representative of a stable slope for East Plum Creek. The furthest upstream Reach, Reach 1, had not been largely affected by development within the watershed and the Reach through downtown, Reach 4, had undergone improvements designed to stabilize the channel within a defined HCP. The site review revealed that channel degradation, bank erosion, and undercutting of hydraulic structures became more pronounced the further downstream the site review was conducted. At the beginning in Reach 1, channel degradation and minor bank erosion were only found around hydraulic structures. At the end of the site review, the channel was consistently incised 4 to 5 feet from channel degradation. The analytical computations from Reach 1 were compared to Reach 4 and were found to be similar. Having the analytical computations match observations from the site review strengthened the assumption to use Reach 1 to define the stable sediment load. A channel slope that can carry this load through the study area was assumed to be the slope that would create a stable channel. 39

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012 Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

Dolores River Watershed Study

Dolores River Watershed Study CHAPTER 4: RIVER AND FLOODPLAIN ISSUES The Dolores River falls into a category of streams in Colorado that share some unique characteristics. Like some other mountain streams in the state, it has a steep

More information

Four Mile Run Levee Corridor Stream Restoration

Four Mile Run Levee Corridor Stream Restoration Four Mile Run Levee Corridor Stream Restoration 30% Design Summary U.S. Army Corps of Engineers, Baltimore District Presentation Outline Four Mile Run 1.) Historic Perspective 2.) Existing Conditions 3.)

More information

6.11 Naas River Management Unit

6.11 Naas River Management Unit 6.11 Naas River Management Unit 6.11.1 Site 41 Issue: Bed and bank erosion Location: E 0685848 N 6058358 Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing

More information

NORTHUMBERLAND COUNTY, PA

NORTHUMBERLAND COUNTY, PA QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Degradation Concerns related to Bridge Structures in Alberta

Degradation Concerns related to Bridge Structures in Alberta Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

Why Stabilizing the Stream As-Is is Not Enough

Why Stabilizing the Stream As-Is is Not Enough Why Stabilizing the Stream As-Is is Not Enough Several examples of alternatives to the County s design approach have been suggested. A common theme of these proposals is a less comprehensive effort focusing

More information

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water. Aggradation raising of the streambed by deposition that occurs when the energy of the water flowing through a stream reach is insufficient to transport sediment conveyed from upstream. Alluvium a general

More information

The last three sections of the main body of this report consist of:

The last three sections of the main body of this report consist of: Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental

More information

Step 5: Channel Bed and Planform Changes

Step 5: Channel Bed and Planform Changes Step 5: Channel Bed and Planform Changes When disturbed, streams go through a series of adjustments to regain equilibrium with the flow and sediment supply of their watersheds. These adjustments often

More information

Rosgen Classification Unnamed Creek South of Dunka Road

Rosgen Classification Unnamed Creek South of Dunka Road Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

!"#$%&&'()*+#$%(,-./0*)%(!

!#$%&&'()*+#$%(,-./0*)%(! 8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO Prepared For Trout Unlimited 300 North Main Street, Hailey, Idaho, 83333 Prepared By P. O. Box 8578, 140 E. Broadway, Suite 23,

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

NATURAL RIVER. Karima Attia Nile Research Institute

NATURAL RIVER. Karima Attia Nile Research Institute NATURAL RIVER CHARACTERISTICS Karima Attia Nile Research Institute NATURAL RIVER DEFINITION NATURAL RIVER DEFINITION Is natural stream of water that flows in channels with ih more or less defined banks.

More information

Assessment. Assessment

Assessment. Assessment 2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Chapter 3 Erosion in the Las Vegas Wash

Chapter 3 Erosion in the Las Vegas Wash Chapter 3 Erosion in the Las Vegas Wash Introduction As described in Chapter 1, the Las Vegas Wash (Wash) has experienced considerable change as a result of development of the Las Vegas Valley (Valley).

More information

Fish Passage at Road Crossings

Fish Passage at Road Crossings Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

Hydraulics of bendway weirs

Hydraulics of bendway weirs River Basin Management IV 389 Hydraulics of bendway weirs C. Thornton 1, S. Abt 1, D. Baird 2 & R. Padilla 3 1 Colorado State University, Fort Collins, CO, USA 2 U.S. Bureau of Reclamation, Denver, CO,

More information

PolyMet NorthMet Project

PolyMet NorthMet Project RS 26 Draft-01 December 8, 2005 RS26 Partridge River Level 1 Rosgen Geomorphic Survey Rosgen Classification Partridge River from Headwaters to Colby Lake Prepared for PolyMet NorthMet Project December

More information

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6. The Eklutna River was divided into study reaches (figure 1) prior to this site visit. Prominent geologic or

More information

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs. Riparian Assessment vs. Monitoring Riparian Assessment What is a healthy stream? Determine stream/riparian health Determine change or trend, especially in response to mgmt Classification = designation

More information

Tom Ballestero University of New Hampshire. 1 May 2013

Tom Ballestero University of New Hampshire. 1 May 2013 Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the

More information

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009 BY

More information

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin? Bruce Rhoads Department of Geography University of Illinois at Urbana-Champaign

More information

EAGLES NEST AND PIASA ISLANDS

EAGLES NEST AND PIASA ISLANDS EAGLES NEST AND PIASA ISLANDS HABITAT REHABILITATION AND ENHANCEMENT PROJECT MADISON AND JERSEY COUNTIES, ILLINOIS ENVIRONMENTAL MANAGEMENT PROGRAM ST. LOUIS DISTRICT FACT SHEET I. LOCATION The proposed

More information

Fluvial Driven Alluvial Fans

Fluvial Driven Alluvial Fans Fluvial Driven Alluvial Fans Restoration Project Evaluations - Examples from the Russian and Napa River Watersheds Mia Docto Masters Thesis UC Berkeley 1. Basic Fan Description 2. Fluvial Driven Fan Characteristics

More information

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011 APPENDIX A REACH DECRIPTIONS Basin 615, South Fork of Quantico Creek - Project Reach Descriptions Reach Name: 615-A Coordinates (NAD 83, Virginia State Plane North): 11796510.57, 6893938.95 to 11801555.79,

More information

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA

Vegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA Vegetation effects on river hydraulics Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA jjdevries@ford-consulting.com SAC05 D2P31 RM 99.0L VIEW UPSTREAM AT UPSTREAM END DWR

More information

Bank Erosion and Morphology of the Kaskaskia River

Bank Erosion and Morphology of the Kaskaskia River Bank Erosion and Morphology of the Kaskaskia River US Army Corps Of Engineers St. Louis District Fayette County Soil and Water Conservation District Team Partners : Carlyle Lake Ecosystem Partnership Vicinity

More information

STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction.

STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction. STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE I. A. Introduction General The Old Stone Dam is located in the upper reach of Cottonwood Creek

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:

HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for: HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering

More information

Case Study 2: Twenty-mile Creek Rock Fords

Case Study 2: Twenty-mile Creek Rock Fords Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek

More information

Ways To Identify Background Verses Accelerated Erosion

Ways To Identify Background Verses Accelerated Erosion Ways To Identify Background Verses Accelerated Erosion Establish Background Condition From Old Ground Photos, Aerial Photos, and Maps Compare Rate Over Time At the Same Location, or for Reaches Channel

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy. 1 2 Function... Sevier River... to successfully carry sediment and water from the watershed....dissipate energy. 3 ALLUVIAL FEATURES 4 CHANNEL DIMENSION The purpose of a stream is to carry water and sediment

More information

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted Version: 8/25/14 Meadow Name Date : / / MM DD YYYY GPS Location:. N. W GPS Datum (e.g., WGS 84, NAD 27) Elevation (ft) Slope ( ) County Watershed (HUC8) Landowner USGS Quad Name Observers: 7.5 or 15 (circle

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan 4 Sediment Supply Management Requirements Permit Order R9-2013-0001 as amended by Order No. R9-2015-0001Section

More information

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2 MEMORANDUM TO: FROM: Jim Well, Ducks Unlimited Mike Harvey, PhD, PG SUBJECT: M&T/ Llano Seco Fish Screen Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report

More information

GEOL 1121 Earth Processes and Environments

GEOL 1121 Earth Processes and Environments GEOL 1121 Earth Processes and Environments Wondwosen Seyoum Department of Geology University of Georgia e-mail: seyoum@uga.edu G/G Bldg., Rm. No. 122 Seyoum, 2015 Chapter 6 Streams and Flooding Seyoum,

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Erosion Surface Water. moving, transporting, and depositing sediment.

Erosion Surface Water. moving, transporting, and depositing sediment. + Erosion Surface Water moving, transporting, and depositing sediment. + Surface Water 2 Water from rainfall can hit Earth s surface and do a number of things: Slowly soak into the ground: Infiltration

More information

Griswold Creek August 22, 2013

Griswold Creek August 22, 2013 Creek August 22, 2013 1 Lake Erie Protection Fund Creek Study ver Evaluate the overall condition of Creek Determine stable channel dimensions & appropriate restoration techniques Starting Stat gpoint for

More information

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE

HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,

More information

TSEGI WASH 50% DESIGN REPORT

TSEGI WASH 50% DESIGN REPORT TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

GEOL 652. Poudre River Fieldtrip

GEOL 652. Poudre River Fieldtrip GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning

More information

Field Trip Number One. By: Pat Dryer. Geography 360

Field Trip Number One. By: Pat Dryer. Geography 360 Field Trip Number One By: Pat Dryer Geography 360 Table of Contents Introduction. Page 1 Stop One... Page 2 Stop Two... Page 4 Stop Three... Page 5 Stop Four... Page 7 Bibliography Page 8 Campus Map Source:

More information

Do you think sediment transport is a concern?

Do you think sediment transport is a concern? STREAM RESTORATION FRAMEWORK AND SEDIMENT TRANSPORT BASICS Pete Klingeman 1 What is Your Restoration Project Like? k? Do you think sediment transport is a concern? East Fork Lewis River, WA Tidal creek,

More information

Rapid Geomorphic Assessments: RGA s

Rapid Geomorphic Assessments: RGA s Establishing Current Reference Conditions Rates and concentrations of suspended-sediment transport vary over time and space due to factors such as precipitation characteristics and discharge, geology,

More information

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS Probabilistic Evaluation of a Meandering Low-Flow Channel February 24 th, 2014 2014 UMSRS 1 2 acknowledgments Low- Flow Channel (LFC) overview Proposed Diversion Channel collects runoff from: The Rush

More information

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California Mike Rudd (Project Manager), Charley Miller & Chad Krofta Declines in Tahoe s Water Clarity The

More information

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012 GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012 Eric W. Larsen Technical Memorandum Prepared for Cache Creek Technical Advisory Committee Natural Resources Program Yolo County Board of Supervisors 2012 Prepared

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Identifying, Understanding and Addressing Flood-Related Hazards

Identifying, Understanding and Addressing Flood-Related Hazards Identifying, Understanding and Addressing Flood-Related Hazards Julie Moore, P.E. July 9, 2012 Agenda Traditional approach to river management Understanding flood-related hazards Common flood and flood

More information

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009

Sixteen Mile Creek Tributaries Meander Belt Width Assessment November 2009 SIXTEEN MILE CREEK TRIBUTARIES THE CATHOLIC CEMETERIES OF THE DIOCESE OF HAMILTON -MEANDER BELT WIDTH ASSESSMENT - Report to: Attention: From: Director of Cemeteries Catholic Cemeteries of the Diocese

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods

Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods Historical channel change on the Upper Gila River, Arizona and New Mexico in response to anthropogenic modifications and extreme floods www.archives.gov www.paztcn.wr.usgs.gov wrh.noaa.gov Upper Gila River

More information

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation) Stream Restoration and Environmental River Mechanics Pierre Y. Julien Malaysia 2004 Objectives Brief overview of environmental river mechanics and stream restoration: 1. Typical problems in environmental

More information

Flood and Stream Restoration

Flood and Stream Restoration 2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

Long Valley Meadow Restoration Project

Long Valley Meadow Restoration Project Long Valley Meadow Restoration Project USDA Forest Service Mogollon Rim Ranger District Coconino National Forest Coconino County, Arizona T13N, R9E, Section 12 and T13N, R10E, Sections 6 and 7 Gila and

More information

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan Erosion, Debris Mows and Environment in Mountain Regions (Proceedings of the Chengdu Symposium, July 1992). IAHS Publ. no. 209, 1992. 423 The effectiveness of check dams in controlling upstream channel

More information

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN Conor Shea - Hydrologist U.S. Fish and Wildlife Service Conservation Partnerships Program Arcata, CA Learning Objectives Examine

More information

Dam Removal Analysis Guidelines for Sediment

Dam Removal Analysis Guidelines for Sediment A review of: Dam Removal Analysis Guidelines for Sediment Joe Rathbun (Retired) rathbunj@sbcglobal.net Some Potential Sediment Issues Reservoir restoration Downstream water quality Downstream deposition

More information

Lower South Fork McKenzie River Floodplain Enhancement Project

Lower South Fork McKenzie River Floodplain Enhancement Project Lower South Fork McKenzie River Floodplain Enhancement Project McKenzie River Ranger District Willamette National Forest Project Location The project is located in the South Fork McKenzie River Watershed,

More information

11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow

11/12/2014. Running Water. Introduction. Water on Earth. The Hydrologic Cycle. Fluid Flow Introduction Mercury, Venus, Earth and Mars share a similar history, but Earth is the only terrestrial planet with abundant water! Mercury is too small and hot Venus has a runaway green house effect so

More information

Channel Assessments of Selected Watersheds within TFL 52

Channel Assessments of Selected Watersheds within TFL 52 Channel Assessments of Selected Watersheds within TFL 52 prepared for: West Fraser Mills Ltd. Quesnel, BC prepared by: John Berry, M.Sc., R.P.F. Victoria, BC Channel Assessments TFL 52 Summary SUMMARY

More information

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis 2009 MWEA Annual Conference Rob Myllyoja, CET rmyllyoja@hrc-engr.com Watershed Assessment of River

More information

1 INTRODUCTION AND MAJOR FINDINGS... 1

1 INTRODUCTION AND MAJOR FINDINGS... 1 Memorandum To: Lindsey Clark, Stillwater Valley Watershed Council Coordinator From: Chad Raisland, Pioneer Technical Services, Inc. and Karin Boyd, Applied Geomorphology, Inc. CC: Tanya Lester, Stillwater

More information

Working with Natural Stream Systems

Working with Natural Stream Systems Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?

More information

Flooding in Dolgellau

Flooding in Dolgellau Flooding in Dolgellau Graham Hall MMath, PhD University of Wales, Bangor Background Flooding has historically been a cause for concern in Dolgellau. Following a serious flood in December 1964 when shops

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River

Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Scott McBain and Bill Trush McBain & Trush, Inc. Clavey River and Cherry Creek vicinity

More information

Sediment Transport Model of the San Benito River Between Hollister and the Pajaro River Confluence

Sediment Transport Model of the San Benito River Between Hollister and the Pajaro River Confluence 720 California Street, Suite 600, San Francisco, CA 94108-2404 tel: 415.262.2300 fax: 415.262.2303 email: sfo@pwa-ltd.com Sediment Transport Model of the San Benito River Between Hollister and the Pajaro

More information

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435 Assignment 1 Measuring River Characteristics- Vernon Creek Applied Fluvial Geomorphology Field Techniques EESc 435 Amanda Jardine 30100093 Jaime McDonald 14177083 Erica Massey 50870088 April 28, 2012 Introduction

More information

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 % Stream Stability Assessment & BEHI Surveys Joe Rathbun MDEQ Water Resources Division rathbunj@michigan.gov 517--373 517 373--8868 Stability Stream can transport its water and sediment inputs without changing

More information

DRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for:

DRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for: DRAFT Design Hydraulic Study Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew Humboldt County Prepared for: Morrison Structures Incorporated 1890 Park Marina Drive, Suite 104 Redding,

More information

Southwest LRT Habitat Analysis. May 2016 Southwest LRT Project Technical Report

Southwest LRT Habitat Analysis. May 2016 Southwest LRT Project Technical Report Southwest LRT Habitat Analysis Southwest LRT Project Technical Report This page intentionally blank. Executive Summary This technical report describes the habitat analysis that was performed to support

More information

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido

The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Symposium Proceedings of the INTERPRAENENT 2018 in the Pacific Rim The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Daisuke

More information

Upper Mississippi River Basin Environmental Management Program Workshop

Upper Mississippi River Basin Environmental Management Program Workshop Presentation to the Upper Mississippi River Basin Environmental Management Program Workshop by Michael Rodgers River Engineer US Army Corps of Engineers, St. Louis District August 17, 2007 Engineering

More information