1 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED: August, 2006 PREPARED BY: DAWOOD ENGINEERING, INC 2020 GOOD HOPE ROAD ENOLA, PA 17025
2 State Route 15, Section C41 Stream Realignment XIV. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION STREAM REALIGNMENT S.R. 15, SECTION C41 LYCOMING COUNTY, PENNSYLVANIA A. INTRODUCTION PENNDOT plans to realign three sections of Steam Valley Run between SR 15 SB stations to The realignment is needed due to the fill slopes from the proposed roadway construction encroaching into the existing stream. The purpose of Section XIV is to analyze the effects of the stream relocation on the water surface elevations of Steam Valley Run. The drainage area upstream of the proposed culvert was determined to be 3.98 mi 2. In accordance with the Pennsylvania Department of Transportation s Design Manual Part 2 (DM2) and SOL the method of determining the flood discharges (peak rates of runoff) for a watershed of this size without a FEMA Flood Insurance Study or a gauge station record is to use the DM-2 Method for estimating peak rates of runoff for drainage areas between 1.5mi 2 and 150 mi 2. The water surface elevations for the various storm events for both the existing and proposed conditions were determined using the U.S. Army Corps of Engineers HEC-RAS Version Surface Water Profile Program. The project is the relocation of approximately 1600 of Steam Valley Run. Therefore, the project is water dependent and requires permitting. The data in this report is provided to obtain the necessary approvals for the proposed stream relocation. Line, Grade, and Typical Section approval was granted by District 3-0 on December 1, B. PROJECT LOCATION The proposed stream relocation is in Steam Valley Run in Cogan House Township, Lycoming County, Pennsylvania (refer to location map for project location) and is in three sections from approximate SR 15 SB Sta to approximate Sta (refer to Stream Relocation Plan in Appendix N for plan view and Stream Cross Sections). Steam Valley Run runs in a northwest to southeast direction along the existing S.R. 15 Southbound alignment. Steam Valley Run drains 3.98 square miles of forest land (see Appendix N). The nearest existing upstream structure crossing Steam Valley Run is a 10.5 X12 Corrugated Metal Pipe approximately 6800 upstream. The nearest existing structure downstream of the stream
3 State Route 15, Section C41 Stream Realignment
4 State Route 15, Section C41 Stream Realignment relocation is the bridge carrying SR 15 NB which is approximately 12,000 feet downstream. The stream is bound on both sides by steep forested hillsides along both of its banks for its entire length. The hillsides extend up to S.R. 15 Northbound on the east, and S.R. 15 Southbound on the west. Steam Valley Run parallels S.R. 15 Northbound and Southbound for much of its length. The detailed study area of this report includes the existing stream channel and proposed relocated alignment and overbank areas of Steam Valley Run extending for approximately 2900 feet. Refer to Appendix N for photographs taken at the project location. C. EXISTING STRUCTURE There are no existing structures crossing Steam Valley Run in this area. D. CHANNEL AND BANK CONDITIONS Steam Valley Run, in the area of the relocation, has a well defined channel with a bed consisting of cobbles and small to medium sized boulders and areas of exposed bedrock. The immediate channel banks are covered with trees and brush and appear stable. The eastern and western overbank areas consist of steep forested roadway embankment continuing up to S.R. 15. The existing alignment of S.R. 15 runs parallel to the channel. The stream alignment is relatively straight and flows between S.R 15 Northbound and Southbound along its course. The profile of the stream is moderate with an average slope of approximately 2.70% throughout the entire upstream and downstream reach. E. HYDROLOGIC ANALYSIS In accordance with the Pennsylvania Department of Transportation s Design Manual Part 2 (DM2) and SOL the method of determining the flood discharges (peak rates of runoff) for a watershed of this size without a FEMA Flood Insurance Study or a gauge station record is to use the DM-2 Method for estimating peak rates of runoff for drainage areas between 1.5mi 2 and 150 mi 2. The drainage area of Steam Valley Run upstream of the stream relocation was determined to be 3.98 mi 2. The drainage area was determined to be in Zone a from Figure The Risk Factor was determine to be negligible and was therefore 0. The Urbanization Factor was 0 due to less than 7% of the drainage area being urbanized. The Wood Factor was 0 due to the drainage area being less than 5 mi 2 and the wooded area being greater than 40 %.
5 State Route 15, Section C41 Stream Realignment The limestone Factor was 0 because there is no evidence of limestone in the area. These values were used to compute the peak discharges for various return periods in the watershed. Refer to Appendix N for hydrology backup information. Peak Discharges 300 cfs for a 2.33-year storm event 540 cfs for a 10-year storm event 690 cfs for a 25-year storm event 810 cfs for a 50-year storm event 930 cfs for a 100-year storm event These values will be used for the analysis of the stream relocation construction. F. FISH LIFE AND WATER CONDITIONS Steam Valley Run and its tributaries are not listed in Pennsylvania Code, Title 25, Part I, Subpart C, Article II, Chapter 93. However, Trout Run as a tributary to Lycoming Creek is listed as a High Quality Cold Water Fishery (HQ-CWF). Therefore, Steam Valley Run and its tributaries, being a tributary to Trout Run, are also considered High Quality Cold Water Fisheries. The PA Fish and Boat Commission does not list Steam Valley Run or its tributaries as Approved Trout Waters, a Wilderness Trout Stream, or Class A Wild Trout waters, but Steam Valley Run is listed as having a Verified Trout Reproduction. G. EXISTING CONDITION HYDRAULIC ANALYSIS Flow depths and water velocities of the existing condition were determined using the HEC-RAS Computer Program. Design information and cross sections used for this study were taken from a field survey and is based on an assumed datum. Thirty existing stream cross sections were input into the HEC-RAS program (River Stations , see cross section location map) using a Manning s n value of for the stream and 0.05 for the overbank areas. The 10, 25, 50 and 100 year storms were analyzed for the existing condition. Refer to Appendix N for existing hydraulic information. H. PROPOSED CONDITION HYDRAULIC ANALYSIS
6 State Route 15, Section C41 Stream Realignment Flow depths and water velocities for the proposed condition were determined using the HEC-RAS Computer Program. Design information and cross sections used for this study were taken from a field survey and are based on an assumed datum. The same cross section locations as were used in the Existing Analysis were used for the Proposed Analysis for comparison purposes. A new horizontal alignment for the stream relocation was created in order to try to recreate comparable stream lengths and meandering characteristics with the existing stream alignment. A proposed stream profile was created by overlaying the existing stream profile onto the existing ground profile from the proposed alignment and simulating the same approximate slopes and reach lengths. A typical 20 bottom width channel with 3:1 side slopes was then run along the proposed horizontal and vertical alignments in order to create a three dimensional model for the proposed stream. Thirty proposed stream cross sections (same locations as the existing model), modified to reflect the new 20 wide channel and also to show the existing channel filled in, were input into the HEC-RAS program (River Stations ) using a Manning s n value of for the stream and 0.05 for the overbank areas. The natural stream bottom will consist of cobbles and other natural stones from the relocated stream s location. The 10, 25, 50 and 100 year storms were then analyzed for the proposed condition. Refer to Appendix N for proposed hydraulic information. River Station Flow (cfs) 100 Year Flow and Velocity Comparisons Existing vs. Proposed Existing WSEL (ft) Proposed WSEL (ft) Change (ft) Existing Velocity (ft/s) Proposed Velocity (ft/s) Change (ft/s)
7 State Route 15, Section C41 Stream Realignment I. SCOUR ANALYSIS No scour analysis is required for the stream relocation. J. RISK ASSESSMENT The proposed stream relocation will have no adverse impacts on the public safety, public health, or surrounding environment based on the following reasons: The proposed relocation has no affect on either downstream or the upstream water surface elevations between the existing and proposed analysis beyond the limits of the relocation. There are no dwellings in the area. Therefore, there is no threat to public safety. K. CONSTRUCTION CONDITIONS The existing stream will be maintained during the construction of the relocated channel. Upon completion of the relocated channel the existing stream will be filled in (See Cross Sections in Appendix N) so that the flow can no longer follow the original course. For construction access, four temporary channel crossings have been designed utilizing either dual 30 or dual 36 smooth (Manning s n=0.012) Pipes, or their hydraulic equivalent, as shown in Appendix N Temporary Conditions. Plan view locations and typical cross section layout have been provided with appropriate pipe sizes labeled. The typical flow was calculated from an observed water depth of one foot and a typical channel width of twenty feet resulting in a flow of 143 cfs. The pipes were sized to pass the typical flow as calculated.
8 State Route 15, Section C41 Stream Realignment L. ECONOMIC ANALYSIS The relocation is required due the high cost and engineering difficulties of constructing retaining walls to contain the proposed roadway fill limits. M. CONCLUSION The proposed Stream Relocation does not show either an increase in water surface elevations or an appreciable increase in velocities beyond the limits of the relocation. There is no increase in flooding risk to private parties as all work will be contained within the department right of way.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP HUNTINGDON COUNTY. Prepared for:
HYDROLOGIC AND HYDRAULIC REPORT FOR SR. 0522, SECTION 5BN ALONG BLACKLOG CREEK CROMWELL TOWNSHIP Prepared for: KCI Technologies, Inc. Mechanicsburg, PA and Pennsylvania Department of Transportation Engineering
More informationLOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD.
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT for SR 3062, SECTION 29S STRASBURG ROAD over WEST BRANCH OF BRANDYWINE CREEK EAST FALLOWFIELD TOWNSHIP, CHESTER COUNTY
More information!"#$%&&'()*+#$%(,-./0*)%(!
8:30 Sign in Hoosic River Revival Coalition!"#$%&&'()*+#$%(,-./0*)%(! 12-#30+4/#"5-(60 9:00 Welcome and Introductions 9:15 Goals for Today s Program: A Description of the Planning Process 9:30 First Session:
More informationLOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationUPPER COSUMNES RIVER FLOOD MAPPING
UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe
More informationYELLOWSTONE RIVER FLOOD STUDY REPORT TEXT
YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationField Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah
Intermountain Center for River Rehabilitation and Restoration, Utah State University 31 July 2018 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I.
More informationCase Study 2: Twenty-mile Creek Rock Fords
Case Study : Twenty-mile Creek Rock Fords Location Crossing Description Washington. Okanagan National Forest. Methow Valley Ranger District. Chewuch river basin, East Chewuch Road. The Twenty-mile Creek
More informationAnalysis of Hydraulic Impacts on the Schuylkill River
Analysis of Hydraulic Impacts on the Schuylkill River Manayunk Sewer Basin Construction Project and the Venice Island Recreation Center Reconstruction Project Venice Island, Manayunk, Philadelphia, PA
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationTechnical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth
Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:
More informationCASE STUDIES. Introduction
Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts
More informationThe last three sections of the main body of this report consist of:
Threatened and Endangered Species Geological Hazards Floodplains Cultural Resources Hazardous Materials A Cost Analysis section that provides comparative conceptual-level costs follows the Environmental
More informationSTABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE. Introduction.
STABILIZATION OF THE H&CT RAILWAY STONE DAM WALTER E. SKIPWITH, PE, JOYCE CRUM, AIA AND JOHN BAUMGARTNER, PE I. A. Introduction General The Old Stone Dam is located in the upper reach of Cottonwood Creek
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationWhy Geomorphology for Fish Passage
Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the
More informationStream Geomorphology. Leslie A. Morrissey UVM July 25, 2012
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012 What Functions do Healthy Streams Provide? Flood mitigation Water supply Water quality Sediment storage and transport Habitat Recreation Transportation
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationDesign Hydraulic Study. Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River. Plumas County. Prepared for:
Design Hydraulic Study Bridge 09C-0134, Blairsden-Graeagle Road over Middle Fork Feather River Plumas County Prepared for: Quincy Engineering, Inc 3247 Ramos Circle Sacramento, CA 95827-2501 Prepared by:
More informationARMSTRONG COUNTY, PA
ARMSTRONG COUNTY, PA Revised Preliminary DFIRM Mapping March 31, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Armstrong County DFIRM Overview - June 25, 2010 DFIRM
More informationLateral Inflow into High-Velocity Channels
Lateral Inflow into High-Velocity Channels by Richard L. Stockstill PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN) investigates lateral flow discharging into a high-velocity channel.
More informationPressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.
Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm
More information3.11 Floodplains Existing Conditions
Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales
More informationTom Ballestero University of New Hampshire. 1 May 2013
Tom Ballestero University of New Hampshire 1 May 2013 1 Hydrology 2 Basic Hydrology Low flows most common Flows that fill the stream to the banks and higher are much less common Filling the stream to the
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationHYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE
PUBLIC WORKS CANADA HYDROLOGY AND HYDRAULICS MUSKEG RIVER BRIDGE KILOMETRE 207.9, LIARD HIGKWAY December 1978 I I f I I I I # Bolter Parish Trimble Ltd. ONLIULTINO Public Works, Canada, 9925-109 Street,
More informationWhy Stabilizing the Stream As-Is is Not Enough
Why Stabilizing the Stream As-Is is Not Enough Several examples of alternatives to the County s design approach have been suggested. A common theme of these proposals is a less comprehensive effort focusing
More informationCase Study 14. Rocky Creek Vented Box Culvert Ford
Case Study. Rocky Creek Vented Box Culvert Ford Location West Central Arkansas. Ouachita National Forest; Oden Ranger District. Rocky Creek crossing on Forest Road 887 (Muddy Gibbs Road). Crossing Description
More informationImplementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns
Implementing a Project with 319 Funds: The Spring Brook Meander Project Leslie A. Berns "...to acquire... and hold lands... for the purpose of protecting and preserving the flora, fauna and scenic beauties...
More informationFish Passage at Road Crossings
Fish Passage at Road Crossings 1 Crossing Design Workshop Outline 1:00 to 2:00 Intro, Design Overview, Channel Width 2:00 to 2:15 Break 2:15 to 3:15 No-Slope, Stream Simulation Design 3:15 to 3:30 Break
More informationTSEGI WASH 50% DESIGN REPORT
TSEGI WASH 50% DESIGN REPORT 2/28/2014 Daniel Larson, Leticia Delgado, Jessica Carnes I Table of Contents Acknowledgements... IV 1.0 Project Description... 1 1.1 Purpose... 1 Figure 1. Erosion of a Headcut...
More informationDevelopment of a Fluvial Erosion Hazard Mitigation Program for Indiana
Development of a Fluvial Erosion Hazard Mitigation Program for Indiana Indiana Watersheds Webinar Series October 12,2011 Robert Barr Center for Earth and Environmental Science Department of Earth Sciences
More informationRosgen Classification Unnamed Creek South of Dunka Road
Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September 2013 Rosgen Classification Unnamed Creek South of Dunka Road Prepared for Poly Met Mining Inc. September
More informationCASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia
CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia Brushy Fork Dam is a flood control structure built by the Soil Conservation Service southeast of the city of Franklin in Pendleton County, West
More informationBushkill Creek 3 rd Street Dam Removal Analysis
Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents
More informationGREENE COUNTY, PA. Revised Preliminary DFIRM Mapping FEMA. Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. April 10, 2013
GREENE COUNTY, PA Revised Preliminary DFIRM Mapping April 10, 2013 Kevin Donnelly, P.E., CFM GG3, Greenhorne & O Mara, Inc. Presentation Agenda Greene County DFIRM Overview September 30, 2010 DFIRM Countywide
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationJOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME
JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology VOLUME 18 2010 REDUCED CHANNEL CONVEYANCE ON THE WICHITA RIVER AT WICHITA FALLS, TEXAS,
More informationRed River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood
More informationRock Sizing for Batter Chutes
Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,
More informationNORTHUMBERLAND COUNTY, PA
QUAKER RUN Stream and Wetland Restoration As-Built Completion Report and First Year Monitoring Data Coal Township NORTHUMBERLAND COUNTY, PA Upstream Before Upstream After Prepared for: COAL TOWNSHIP 805
More informationDRAFT Design Hydraulic Study. Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew. Humboldt County. Prepared for:
DRAFT Design Hydraulic Study Bridge 04C-0055, Mattole Road Bridge over Mattole River at Honeydew Humboldt County Prepared for: Morrison Structures Incorporated 1890 Park Marina Drive, Suite 104 Redding,
More informationCR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District
CR AAO Bridge Dead River Flood & Natural Channel Design Mitch Koetje Water Resources Division UP District Old County Road AAO Bridge Map courtesy of Marquette County Silver Lake Basin McClure Basin
More informationProbabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS
Probabilistic Evaluation of a Meandering Low-Flow Channel February 24 th, 2014 2014 UMSRS 1 2 acknowledgments Low- Flow Channel (LFC) overview Proposed Diversion Channel collects runoff from: The Rush
More informationAPPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels
APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels B-1 B-2 APPENDIX B HYDRAULIC CONSIDERATIONS FOR PIPELINE CROSSINGS OF STREAM CHANNELS Pipeline crossings of perennial, intermittent,
More informationRivers and Streams. Streams. Hydrologic Cycle. Drainage Basins and Divides. Colorado River Drainage Basin. Colorado Drainage Basins.
Chapter 14 Hydrologic Cycle Rivers and Streams Streams A stream is a body of water that is confined in a channel and moves downhill under the influence of gravity. This definition includes all sizes of
More informationSummary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,
Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,
More informationSquaw Creek. General Information
General Information is a tributary to the Salmon River. It enters the north side of the river about 0 miles downstream of North Fork, Idaho. The study reach is about a 30 ft length of stream about 2 miles
More information3.12 Geology and Topography Affected Environment
3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed
More informationGEOL 652. Poudre River Fieldtrip
GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning
More informationSwift Creek Sediment Management Action Plan (SCSMAP)
Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 2 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013
More informationOut with the Old, In with the New: Implementing the Results of the Iowa Rapid Floodplain Modeling Project
Out with the Old, In with the New: Implementing the Results of the Iowa Rapid Floodplain Modeling Project Traci Tylski, E.I., CFM Hydraulics Engineer USACE - Omaha District Traci.M.Tylski@USACE.army.mil
More informationSaganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study
2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...
More informationChapter 10 - Sacramento Method Examples
Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationAPPENDIX B HYDROLOGY
APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF
More informationASFPM - Rapid Floodplain Mapping
ASFPM - Nicole Cominoli Hydraulic Engineer USACE - Omaha District mary.n.cominoli@usace.army.mil June 3, 2015 US Army Corps of Engineers Mitigation = Risk Informed Decisions 2 The National Flood Insurance
More informationGeomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River
Geomorphic Importance of Winter Peak Flows and Annual Snowmelt Hydrographs in a Sierra Nevada Boulder-Bedrock River Scott McBain and Bill Trush McBain & Trush, Inc. Clavey River and Cherry Creek vicinity
More informationSTREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX
STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,
More informationAppendix E Guidance for Shallow Flooding Analyses and Mapping
Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding
More informationEffects of input DEM data spatial resolution on Upstream Flood modeling result A case study in Willamette river downtown Portland
Effects of input DEM data spatial resolution on Upstream Flood modeling result A case study in Willamette river downtown Portland By Hue Duong GEOG 593 Fall 2015 Digital Terrain Analysis Photo: Anh Duc
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More informationHydrology Study Report
Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology
More informationState Water Survey Division SURFACE WATER SECTION
State Water Survey Division SURFACE WATER SECTION AT THE UNIVERSITY OF ILLINOIS Illinois Department of Energy and Natural Resources SWS Miscellaneous Publication 88 SEDIMENTATION OF POOL 19 ON THE MISSISSIPPI
More informationFOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED
FOLLOW-UP ON CHANNELIZATION IN SPRING CREEK SUB-WATERSHED Justin R. Beebe, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. jrb308@jaguar1.usouthal.edu. Spring Creek is a tributary
More informationFlooding in Dolgellau
Flooding in Dolgellau Graham Hall MMath, PhD University of Wales, Bangor Background Flooding has historically been a cause for concern in Dolgellau. Following a serious flood in December 1964 when shops
More informationTechnical Memorandum No
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and
More informationRoger Andy Gaines, Research Civil Engineer, PhD, P.E.
Roger Andy Gaines, Research Civil Engineer, PhD, P.E. Research Civil Engineer/Regional Technical Specialist Memphis District August 24, 2010 Objectives Where we have been (recap of situation and what s
More informationThe Following was Noted: US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG
US Army Corps of Engineers Philadelphia District Geotechnical Section, CENAP-EN-DG Wanamaker Bldg, 7th Floor 100 Penn Square East Philadelphia, PA 19107-3396,USA Site Visit Report Date: Tuesday, Nov. 6,
More informationTable E1. Site details for reaches selected for PHABSIM surveys in 2007
SURVEY DATA The relationships between available trout habitat and stream flow were investigated during the 2007, 2008 and 2009 field seasons in 21 locations using the PHABSIM (Physical Habitat Simulation)
More informationALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR. Appendix P
ALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR Appendix P Additional Monitoring Station Details of Stream Gauging Stations S1, S2, S3, S4, and
More informationHydrologic hazards can be considered in three categories; An indication of flooding potential for areas located
4.0 General Hydrologic Design Critera 4.1 Hydrologic Hazards Hydrologic hazards can be considered in three categories; flooding, channel migration, and tributary stajility. An indication of flooding potential
More informationDolores River Watershed Study
CHAPTER 4: RIVER AND FLOODPLAIN ISSUES The Dolores River falls into a category of streams in Colorado that share some unique characteristics. Like some other mountain streams in the state, it has a steep
More informationModified Level II Streambed-Scour Analysis for Structure Crossing Little Eagle Creek and I-65 in Marion County, Indiana
Modified Level II Streambed-Scour Analysis for Structure 1-65-120-6016 Crossing Little Eagle Creek and I-65 in Marion County, Indiana By ROBERT L. MILLER, BRET A. ROBINSON, and DAVID C. VOELKER Prepared
More informationSolutions to Flooding on Pescadero Creek Road
Hydrology Hydraulics Geomorphology Design Field Services Photo courtesy Half Moon Bay Review Solutions to Flooding on Pescadero Creek Road Prepared for: San Mateo County Resource Conservation District
More informationLower South Fork McKenzie River Floodplain Enhancement Project
Lower South Fork McKenzie River Floodplain Enhancement Project McKenzie River Ranger District Willamette National Forest Project Location The project is located in the South Fork McKenzie River Watershed,
More informationREDWOOD VALLEY SUBAREA
Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD
More informationSAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #
SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE
More informationEach basin is surrounded & defined by a drainage divide (high point from which water flows away) Channel initiation
DRAINAGE BASINS A drainage basin or watershed is defined from a downstream point, working upstream, to include all of the hillslope & channel areas which drain to that point Each basin is surrounded &
More informationAssessment. Assessment
2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com
More informationMonmouthshire County Council Review of Landslips within the County December February 2014
Monmouthshire County Council Review of Landslips within the County December 2013- February 2014 Introduction The County of Monmouthshire suffered a period of extreme weather between December 2013 and February
More informationSession 1 Healthy Streams Stream Hydraulics Natural Channel Design
Session 1 Healthy Streams Stream Hydraulics Natural Channel Design Bill Brant Heart of America Flyfishers Black & Veatch Kansas City, MO February 21, 2014 http://www.bobswebspace.com Audience? What do
More informationA STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA
A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important
More informationBlack Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget
Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationGOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS. To protect life and property from natural disasters and hazards.
GOAL 7 AREAS SUBJECT TO NATURAL DISASTERS AND HAZARDS A. GOALS: To protect life and property from natural disasters and hazards. B. POLICIES: 1. Floodplains shall be maintained as natural drainage-ways.
More informationClinton and Potter Counties, Pennsylvania
Clinton and Potter Counties, Pennsylvania Prepared For: Trout Unlimited & Kettle Creek Watershed Association Prepared By: LARSON DESIGN GROUP, INC. 1000 COMMERCE PARK DRIVE WILLIAMSPORT, PA 17703-0487
More informationWhat discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?
Gregory Indivero 31 October 2011 What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? What discharge was required to deposit observed
More informationBeaver Creek Corridor Design and Analysis. By: Alex Previte
Beaver Creek Corridor Design and Analysis By: Alex Previte Overview Introduction Key concepts Model Development Design Accuracy Conclusion Refresh v = Beaver Creek Site = Wittenberg Introduction Low head
More informationLas Colonias Subdivision September 2010 Flood Study
Las Colonias Subdivision September 2010 Flood Study Curtis Beitel, P.E., CFM Scott Muchard, P.E. Project Engineer William Badini, CFM Senior Meteorologist Location Map Background Los Colonias Subdivision
More informationVegetation effects on river hydraulics. Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA
Vegetation effects on river hydraulics Johannes J. (Joe) DeVries David Ford Consulting Engineers, Inc. Sacramento, CA jjdevries@ford-consulting.com SAC05 D2P31 RM 99.0L VIEW UPSTREAM AT UPSTREAM END DWR
More informationHigh-Gradient Streams
Chapter 4 Surface Processes Section 4 High-Gradient Streams What Do You See? Learning Outcomes In this section, you will Use models and real-time streamflow data to understand the characteristics of highgradient
More informationFlood and Stream Restoration
2 3 4 Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure
More informationIllinois State Water Survey Division
Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989
More informationDegradation Concerns related to Bridge Structures in Alberta
Degradation Concerns related to Bridge Structures in Alberta Introduction There has been recent discussion regarding the identification and assessment of stream degradation in terms of how it relates to
More informationCONCEPTS Conservational Channel Evolution and Pollutant Transport System
CONCEPTS Conservational Channel Evolution and Pollutant Transport System Eddy J. Langendoen Watershed Physical Processes Research Unit National Sedimentation Laboratory USDA Agricultural Research Service
More informationDealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain?
Dealing with Zone A Flood Zones Topics of Discussion Overview of Zone A Floodplains Permitting Development in Zone A Floodplains Estimating Flood Elevations in Zone A Flood Insurance Implications Letters
More informationENVG/SC 10110L-20110L PLANET EARTH LABORATORY. Laboratory #9: Surface Hydrology & Map Scale
Name: Lab day: Tuesday Wednesday ENVG/SC 10110L-20110L PLANET EARTH LABORATORY Laboratory #9: Surface Hydrology & Map Scale Readings: Chapter 9. http://www.nd.edu/~cneal/physicalgeo/lab-surfacehydrology/index.html
More information