1 Independent Environmental Audit Erosion and Sediment Control Commencement of YOUNG TO BETHUNGRA LOOPING PIPELINE JUNE 2016 suite 1, 39 fitzmaurice st (po box 5464) wagga wagga nsw 2650 australia t (02) /21 mary st surry hills nsw 2010 australia t (02) suite 1, 216 carp st (po box 470) bega nsw 2550 australia t (02) unit 17/27 yallourn st (po box 62) fyshwick act 2609 australia t (02) e ngh@nghenvironmental.com.au 35 morrisset st (po box 434) bathurst nsw 2795 australia tudor st hamilton nsw

2 Project Title: Document Verification Project Number: 6639 Project File Name: Y2B ERSED Audit Report Environment Revision Date Prepared by (name) Reviewed by (name) Approved by (name) Final 1/06/16 Nicole Isles Erwin Budde Erwin Budde nghenvironmental prints all documents on environmentally sustainable paper including paper made from bagasse (a byproduct of sugar production) or recycled paper. nghenvironmental is a registered trading name of NGH Environmental Pty Ltd; ACN: ABN: suite 1, 39 fitzmaurice st (po box 5464) wagga wagga nsw 2650 australia t (02) /21 mary st surry hills nsw 2010 australia t (02) suite 1, 216 carp st (po box 470) bega nsw 2550 australia t (02) unit 17/27 yallourn st (po box 62) fyshwick act 2609 australia t (02) e ngh@nghenvironmental.com.au 35 morrisset st (po box 434) bathurst nsw 2795 australia tudor st hamilton nsw

3 Erosion and Sediment Control Audit Commencement of CONTENTS 1 REPORT SUMMARY INTRODUCTION SCOPE OF THE AUDIT SUMMARY OF CORRECTIVE ACTIONS SUMMARY OF OBSERVATIONS OF CONCERN SUMMARY OF OPPORUNITIES FOR IMPROVEMENT AUDIT PROCESS OPENING MEETING CLOSING MEETING DESIGNATED FOLLOW-UP DETAILS OF AUDIT FINDINGS EROSION AND SEDIMENT CONTROL PLAN PREPARATION EROSION AND SEDIMENT CONTROL IMPLEMENTATION MAINTENANCE AND MONITORING...9 APPENDIX A AUDIT PROTOCOL... A-I 6639 Final i

4 Erosion and Sediment Control Audit Commencement of AUDITED ORGANISATION PROJECT APA Group ADDRESS Young Site Compound CONTACT DETAILS Derek Prentice DEPTH OF AUDIT Erosion and Sedimentation SCOPE OF AUDIT Statement of Commitment SG6 compliance audit of erosion and sedimentation controls within 6 months of the commencement of ground works DATE OF AUDIT AUDIT CRITERIA 25 th May 2016 APA Surface Water and Water SCL Environmental (as it relates to Erosion and Sedimentation) Relevant guidelines including the NSW Blue Book AUDIT PROGRAM Opening meeting 10:30am Project Site Office in Young Site Inspection Closing Meeting 3:00pm Project Site Office in Young PERSONS REQUIRED AUDIT TEAM Derek Prentice Nicole Isles, NGH Environmental Lead auditor Graham Stewart PREVIOUS AUDIT DATE PREVIOUS AUDIT REFERENCE NIL NIL 6639 Final 2

5 Erosion and Sediment Control Audit Commencement of 1 REPORT SUMMARY 1.1 INTRODUCTION This audit represents one of two erosion and sediment control audits required to be undertaken for the construction of the project by a suitably qualified person independent of APA (Nicole Isles). The requirement for the audit is identified in the Statement of Commitment SG6, which requires two compliance audits of erosion and sediment controls to be undertaken within 6 month of the commencement of construction of on ground works and again at the completion of pipeline laying. started in early February. At the time of the audit, the following activities were being undertaken: Preparation for trenching at Burrengong Creek Dewatering of trenches Rehabilitation works over waterway at CH SCOPE OF THE AUDIT The scope of the audit focused on the implementation of erosion and sediment control measures outlined in the Managing Urban Stormwater Soils and Vol 1 (Landcom, 2004) (Blue Book) to minimise soil erosion and the discharge of sediment and other pollutants to land and/or water. Compliance with the project s approved CEMP and Surface Water and Water was also assessed. A specific site inspection was conducted for this audit on 25 May 2016 by Nicole Isles (NGH Environmental). Also on the inspection were Erwin Budde (Project Environmental Representative), Graham Stewart (CNC Projects), Vladeo Maric (APA Group Approvals Manager), James Beckett (APA Project Access and Approvals Manager) and Channy Tong (Monarc Environmental). 1.3 SUMMARY OF CORRECTIVE ACTIONS Two Corrective Actions Request (CAR) was issued to the project team at the audit Closing Meeting. CAR No. CAR SW 2016/001 CAR SW 2016/002 Section of Report Details 3.1 Section 2.1 of the Blue Book suggests that an erosion and sediment control plan (ESCP) should be prepared for areas of disturbance above 250m 2. No site specific ESCP has been prepared and should at a minimum be prepared for individual water crossings. 3.1 Erosion and sediment controls at Burrengong Creek are insufficient. This was supported by the volume of sediment that has exceeded the current erosion and sediment controls and entered the creek Final 3

6 1.4 SUMMARY OF OBSERVATIONS OF CONCERN Erosion and Sediment Control Audit Commencement of The following Observation of Concern (OoC) was identified and explained to the project team during the audit Closing Meeting. It is considered to be a deficiency in meeting specified requirements and if not rectified, which if not addressed, may lead to a risk of non-compliance. OoC No. OoC SW 2016/001 Section of Report Details 3.3 A checking process should be in place to verify that ESCP have been prepared. 1.5 SUMMARY OF OPPORUNITIES FOR IMPROVEMENT The following Opportunities for Improvement (OFI) were identified and explained to the project team during the audit Closing Meeting. They are considered to be areas of improvements that could prevent future problems. OFI No. OFI SW 2016/001 OFI SW 2016/002 Section of Report Details 3.2 Separate clean and dirty water on the ROW by preventing water from entering site. 3.2 Earthworks and clearing should be staged and programmed to limit the area of soil exposed and to minimise the potential for erosion Final 4

7 Erosion and Sediment Control Audit Commencement of 2 AUDIT PROCESS 2.1 OPENING MEETING An opening meeting was held on the morning of the 25 May Attendees were: Nicole Isles (Independent Erosion and Sedimentation Auditor) Erwin Budde (Environmental Representative) Graham Stewart (Project s Site Environmental Officer) Vladeo Maric (APA Group Approvals Manager) James Beckett (APA Project Access and Approvals Manager) Channy Tong (Monarc Environmental) 2.2 CLOSING MEETING A closing meeting was held in the afternoon of the 25 May Attendees were Nicole Isles (Independent Erosion and Sedimentation Auditor) Erwin Budde (Environmental Representative) Graham Stewart (Project s Site Environmental Officer) Vladeo Maric (APA Group Approvals Manager) James Beckett (APA Project Access and Approvals Manager) Channy Tong (Monarc Environmental) 2.3 DESIGNATED FOLLOW-UP No previous audit had been conducted by the Independent Erosion and Sedimentation Auditor. It is the responsibility of APA to follow up all actions identified in the audit report Final 5

8 Erosion and Sediment Control Audit Commencement of 3 DETAILS OF AUDIT FINDINGS This section details the findings of the audit report. It only details those findings requiring action. For complete details of the findings of the Audit, refer to the Audit Protocol contained in Appendix A. 3.1 EROSION AND SEDIMENT CONTROL PLAN PREPARATION Section 2.1 of the Blue Book details that ESCP s should be prepared where more than 250m 2 of land will be disturbed or where a high risk of polluting waters exists. A standard ESCP is included in Attachment A of the Surface Water and Water (Dated 9 November 2015) however this does not adequately identify the specific erosion and sediment controls required at each waterway. Given the high risk of erosion and sediment impacts within waterways, a specific ESCP should be prepared for each waterway to ensure that the risks areas of each waterway is identified and site specific erosion and sediment controls are implemented. Corrective Action (CAR SW 2016/001). The Blue Book also details that Soil and Water s (SWMPs) should generally be prepared for all projects where more than 2,500m 2 of land will be disturbed. The Surface Water and Water satisfies this requirement 3.2 EROSION AND SEDIMENT CONTROL IMPLEMENTATION Separating clean and dirty water on site by directing clean water around disturbed ground is the most effective way of reducing the volume of water that becomes sediment laden from coming in contact with exposed area. This also reduces the volume of runoff that has the potential to cause erosion. Clean water from the wider catchment that flows towards the construction area is directed into the work area and then treated and discharged as required (refer to Figure 3-1) It is recommended that clean and dirty water are separated on site by preventing clean water from entering site. This could be done by ensuring the berm along the alignment is continuous. Opportunity for Improvement (OFI SW 2016/001). Sediment is being adequately filtered by discharging water from excavations onto grassed area, usually through a sediment trap. Discharge is being undertaken at least 200 metres from drainage lines. Staging of work and programming of construction activities are required to minimise the extent and duration of disturbance to vegetation. This includes leaving clearing and initial earthworks in intermittent and permanent watercourses until subsequent works are about to commence. This limits the areas of soil exposed at any time to those areas being actively worked and minimises the potential for erosion and sedimentation. Opportunity for Improvement (OFI SW 2016/002). Progressive stabilisation and rehabilitation is being undertaken along the alignment and is shown in Figure 3-2 and Figure 3-3. During the site inspection is was observed that there were inadequate erosion and sediment controls within Burrengong Creek. This was supported by the volume of sediment that has exceeded the current erosion and sediment controls and entered the creek (refer to Figure 3-4). The current controls rely on secondary sediment controls instead of primary erosion controls. The erosion and sediment controls for this area should be reviewed immediately and controls installed that slow the water first, such as earthen bunds, before the water is filtered by the sediment fence. Corrective Action (CAR SW 2016/002) Final 6

9 Erosion and Sediment Control Audit Commencement of Figure 3-1 Clean water being allowed to enter site through an excavation in the berm. Figure 3-2 Progressive stabilisation and rehabilitation of a drainage line 6639 Final 7

10 Erosion and Sediment Control Audit Commencement of Figure 3-3 Progressive topsoiling and rehabilitation of the alignment Figure 3-4 Inadequate erosion and sediment controls within Burrengong Creek 6639 Final 8

11 3.3 MAINTENANCE AND MONITORING Erosion and Sediment Control Audit Commencement of Proper maintenance of erosion and sediment controls are being adequately undertaken by the Project s Site Environmental Officer and weather is being monitored to provide advice to site when particular high risk works should be postponed. This is being well managed by site personnel. planning should be undertaken by the Client to ensure that adequate erosion and sediment control have been planned for at each stage of work and in particular for works in waterways. There is currently not process in place to check and ensure that ESCP are developed with the required detail and implemented on site. A checking process should be in place to verify that ESCP have been prepared. It is recommended that a checking program, such as an Inspection and Test for ESCP, be implemented to ensure that working in high risk areas are planned for and include controls specific to the nature of each waterway Observation of Concern (OoC SW 2016/001) Final 9

12 APPENDIX A AUDIT PROTOCOL Erosion and Sediment Control Audit Commencement of 6639 Final A-I

13 Erosion and Sediment Control Audit Commencement of Objective SoC Ref # Commitment Timing Resource CEMP/Sub- reference Compliance Status Comment Soils and Geology Minimise scour impacts S1 Scour protection will be installed in creek bank areas at risk of erosion as necessary. Pre- and GS4 Comply Scour protection was being installed as part of the rehabilitation works over waterways at the time of the audit Minimise loss of top soil. S2 Erosion and sediment management controls will be prepared as part of the CEMP to manage and minimise erosion and control sediment impacts associated with the construction of the pipeline. Controls will be continually maintained in good working order Pre- and Managing Urban Stormwater: Soils and (Landcom, 2004) APIA Code GS1 to GS15 and Surface and CAR Refer to CAR SW 2016/001 S3 Soil types will be identified and delineated along the alignment. Pre- Manage soils S4 Soil management measures will be developed according to local soil type and be documented in the CEMP. Pre- and Managing Urban Stormwater: Soils and (Landcom, 2004) GS1 to GS15 and Surface and Not audited N/A APIA Code Surface and Minimise pollution to surface and groundwater SG1 Soil and water management measures will be implemented during the construction phase through the CEMP. measures will incorporate prevention strategies and a spill response procedure including aspects such as: - Spill response equipment is to be located at each work site - Routine maintenance or refuelling of mobile equipment and vehicles will not be conducted within 40m of any water course During Managing Urban Stormwater: Soils and Surface and Comply Spill response kits are available on site Fuel, storage sites and equipment are not parked up or located within 40m of anyt watercourse 6639 Final A-I

14 Erosion and Sediment Control Audit Commencement of - Storage sites will not to be located in the vicinity of any watercourse. (Landcom, 2004). Minimise changes to existing surface and groundwater regimes SG2 SG3 SG4 SG5 SG6 Where practicable, waterway crossings during construction would be undertaken during no or low flow. Bank and floor restoration techniques will be adopted to assist in stabilising watercourses and the prevention of scouring, as soon as practicable after the pipe has been laid and backfilled. Where necessary, temporary surface water diversion berms will be installed to encourage runoff discharging onto stable (vegetated) areas. The CEMP will be developed in consultation with the NSW Office of Water, and include procedures for: - Activities within 40 m of a watercourse being carried out consistently with the Guidelines for Controlled Activities on Waterfront Land. - The identification of appropriate water sources and re-use options. - The timing of rehabilitation works. Two compliance audits of erosion and sediment controls will be undertaken by a suitably qualified person independent of the APA within 6 months of the commencement of on ground works and again at the completion of pipeline laying. A copy of each audit report will be provided to Fisheries NSW for review. During construction During construction During operation Prior to construction During construction Guidelines for Controlled Activities on Waterfront Land (available from Surface and Surface and Surface and Surface and Surface and N/A Not audited Comply N/A Comply Waterway crossings were all constructed prior to the audit Bank and floor restoration was being installed as part of the rehabilitation works over waterways at the time of the audit Temporary berms are in place along alignment and runoff is discharged onto stable grassed areas N/A This audit satisfies the first audit 6639 Final A-II

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix 18 12/10/2018 AGENDA ITEM 6 APPENDIX 18 2018/0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN Dalwhinnie Quarry Ground

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES Gully erosion A complex of processes whereby the removal of soil is characterised by incised channels in the landscape. NSW Soil Conservation Service,

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

WELCOME Lake Wabukayne OPEN HOUSE

WELCOME Lake Wabukayne OPEN HOUSE WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Guide to the use of the Erosion and Sediment Control Evaluation Tool Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca

More information

Erosion and Sediment Control Measures 2.7 Silt Fences

Erosion and Sediment Control Measures 2.7 Silt Fences Erosion and Sediment Control Measures Silt fences are designed to intercept sheet flow sediment laden stormwater run-off and filter out both the larger and smaller particles of sediment. Silt fences and

More information

Instream Erosion Control General

Instream Erosion Control General Instream Erosion Control General EROSION CONTROL TECHNIQUES Revegetation Temperate Climates Short-Term Non Vegetation Wet Tropics Long-Term Weed Control [1] Semi-Arid Zones Permanent [1] Weed control attributes

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

Biophysical Interactions

Biophysical Interactions 1 River Ecology Senior Geography Biophysical Interactions Checking the Pulse of the Hawkesbury River Name 2 River Ecology Senior Geography Senior Geography Outcomes PRELIMINARY COURSE OUTCOMES P2 describes

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils Sediment Weirs SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Type 3 classification

More information

Rock Sizing for Multi-Pipe & Culvert Outlets

Rock Sizing for Multi-Pipe & Culvert Outlets Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at

More information

Crows Landing Naval Base Easement

Crows Landing Naval Base Easement 1 of 15 West Stanislaus Resource Conservation District Crows Landing Naval Base Easement Annual Reserve Monitoring Report Jamie McFarlin 11/112012 2 of 15 West Stanislaus Resource Conservation District

More information

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE

Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE Subject Name: SOIL AND WATER CONSERVATION ENGINEERING 3(2+1) COURSE OUTLINE (Name of Course Developer: Prof. Ashok Mishra, AgFE Department, IIT Kharagpur, Kharagpur 721 302) Module 1: Introduction and

More information

Sediment Weirs (Instream)

Sediment Weirs (Instream) Sediment Weirs (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [1] Sediment weirs

More information

Soil Erosion and Sediment Control. Basic Principles and Practices

Soil Erosion and Sediment Control. Basic Principles and Practices Soil Erosion and Sediment Control Basic Principles and Practices Acknowledgements The following document was created by Healthy Land and Water with some material sourced from Brisbane City Council, and

More information

Chutes Part 5: Rock linings

Chutes Part 5: Rock linings Chutes Part 5: Rock linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] Chutes

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August

FINAL REPORT NO.54. Erosion and Sediment Control Plan - Coastal Reclamation. Tauranga City Council. Private Bag Tauranga 16 August J:\Jobs\42066678\6000 Reports\Erosion Management\(Cover).doc FINAL REPORT NO.54 Erosion and Sediment Control Plan - Coastal Reclamation Prepared for Tauranga City Council Private Bag 12022 Tauranga 16

More information

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING 29 February 2016 Project No. SGS/16/005 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: DEVELOPER: DILGP ECONOMIC DEVELOPMENT QLD SUPERINTENDENT: CALIBRE CONSULTING (QLD) PTY LTD CONTRACTOR:

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

NSW MINING Health, Safety, Environment & Community

NSW MINING Health, Safety, Environment & Community NSW MINING Health, Safety, Environment & Community Developing Natural Landform in Mine Overburden Rehabilitation Tasman Willis Land Management Officer Mangoola Open Cut - Glencore Developing Natural Landform

More information

In-channel coarse sediment trap Best Management Practice

In-channel coarse sediment trap Best Management Practice In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Rock Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent installations

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

DRAFT DRAFT DRAFT DRAFT DRAFT SEDIMENT CONTROLS Method Application Description BMP Sediment fencing Flat Ground Y Anywhere low flow runoff is Sloping Ground Y Geotextile fabric, buried at the bottom

More information

CPESC Syllabus Australasia

CPESC Syllabus Australasia CPESC Syllabus Australasia 2 August 2012 PREAMBLE The purpose of this document is to provide details related to competency areas, performance objectives or syllabus relevant to the Certified Professionals

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

Erosion and Sediment Control Field Guide for Builders. Version 3, January 2013

Erosion and Sediment Control Field Guide for Builders. Version 3, January 2013 Version 3, 2013 Erosion and Sediment Control Field Guide for Builders Version 3, January 2013 Prepared by: Published by: Diagrams by: Photos by: Grant Witheridge, Catchments & Creeks Pty Ltd Catchments

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority:

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority: Title: Chemical Hygiene Written Program Effective Date: November 2005 Revision Date: February 8, 2017 Issuing Authority: Responsible Officer: VP, Facilities and Construction Management Director Environmental

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

6.11 Naas River Management Unit

6.11 Naas River Management Unit 6.11 Naas River Management Unit 6.11.1 Site 41 Issue: Bed and bank erosion Location: E 0685848 N 6058358 Waterway: Naas River Management Unit: Naas River Facing downstream from Bobeyan Rd bridge Facing

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

soil assessment and management planning for CSG projects

soil assessment and management planning for CSG projects Use of historical soils information for soil assessment and management planning for CSG projects Cameron Traill 1, Greg Holz 2, Alex Kochnieff 3, Sarah de Man 4, Adam Christison 5 1 WorleyParsons Services,

More information

EPA public register: Licensee: HV Operations Pty Ltd PO Box 315, Singleton NSW 2330

EPA public register:  Licensee: HV Operations Pty Ltd PO Box 315, Singleton NSW 2330 Hunter Valley Operations Monthly Obtained Data Summary Environment Protection Licence 640 May 2017 Date Published: 22 nd June 2017 EPA public register: http://www.epa.nsw.gov.au/publicregister/ Licensee:

More information

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Main Street @ Coconut Creek DRI QUESTION 9 MAPS The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Map

More information

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015 Project Proposal Lyme Brook Newcastle-under-Lyme 3 rd July 2015 Contents Page 1.0 Introduction... 1.0 2.0 Background and rationale... 2.0 3.0 Proposed measures... 5 4.0 Summary of Recommendations... 10

More information

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference

More information

Source Protection Zones. National Dataset User Guide

Source Protection Zones. National Dataset User Guide Source Protection Zones National Dataset User Guide Version 1.1.4 20 th Jan 2006 1 Contents 1.0 Record of amendment...3 2.0 Introduction...4 2.1 Description of the SPZ dataset...4 2.1.1 Definition of the

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

Guidance for implementing the Potential Fossil Yield Classification (PFYC) System

Guidance for implementing the Potential Fossil Yield Classification (PFYC) System Guidance for implementing the Potential Fossil Yield Classification (PFYC) System Introduction The PFYC system will aid in assessing the potential to discover or impact significant paleontological resources.

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Right of Way Mapping TxDOT Internal Audit Division Objective To determine the efficiency and effectiveness of district mapping procedures. Opinion Based on the audit scope areas reviewed,

More information

4.9 GEOLOGY AND SOILS

4.9 GEOLOGY AND SOILS 4.9 GEOLOGY AND SOILS 4.9.1 EXISTING CONDITIONS TOPOGRAPHY AND RELIEF Zone 40 is located in the central portion of Sacramento County. The topography of the county is represented by three physiographic

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

This table connects the content provided by Education Perfect to the NSW Syllabus.

This table connects the content provided by Education Perfect to the NSW Syllabus. Education Perfect Geography provides teachers with a wide range of quality, engaging and innovative content to drive positive student learning outcomes. Designed by teachers and written by our in-house

More information

Storm Sewer Design [2]

Storm Sewer Design [2] Class 5 [1] Storm Sewer Design 9. Check Q < Qf and Vmax > vf > Vmin. Vmin is normally specified to avoid sedimentation. This will normally be 1.0 m/s at pipe full condition. (BS EN 752 suggests that for

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

The Mechanics Of Sediment Basin Operation

The Mechanics Of Sediment Basin Operation March 2017 Technical Explanatory Note on Sediment Basin Design prepared by Grant Witheridge Catchments & Creeks Pty Ltd ABN 34 078 164 119 The Mechanics Of Sediment Basin Operation 1. Introduction This

More information

CHAPTER 7 GEOLOGY AND SOILS

CHAPTER 7 GEOLOGY AND SOILS CHAPTER 7 GEOLOGY AND SOILS 7.1 General Geology of the Area Based on the Geological map compiled by Cornec (2002) the area consists of Miocene/Pleistocene deposits as seen in figure 7.1. These are geologically

More information

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING

SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING SWAN LAKE FIRST NATION MATRIX SOLUTIONS INC. PARTNERSHIP INDIGENOUS CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 9 NOVEMBER 13 TH TO NOVEMBER 17 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1

More information

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017

Required Documents. Title: Number: AEP Administration 2017 No. 1. Provincial Wetlands and Water Boundaries Section. Effective Date: September 1, 2017 Title: Number: Program Name: Provincial Wetlands and Water Boundaries Section Effective Date: September 1, 2017 This document was updated on: August 25, 2017 The Provincial Wetlands and Water Boundaries

More information

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan 4 Sediment Supply Management Requirements Permit Order R9-2013-0001 as amended by Order No. R9-2015-0001Section

More information

Rock Sizing for Drainage Channels

Rock Sizing for Drainage Channels Rock Sizing for Drainage Channels STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined drainage channel Photo 2 Rock-lined catch drain (during construction phase) 1. Introduction Rock size is primarily dependent

More information

GIS data classes used within the November 2013 Environmental Statement Engineering Maps

GIS data classes used within the November 2013 Environmental Statement Engineering Maps LWM-HS2-EN-DAT-000-000001 P01 22 January 2014 GIS data classes used within the November 2013 Environmental Statement Engineering Maps Document No.:LWM-HS2-EN-DAT-000-000001 Revision Author Checked by Approved

More information

Storing, using and disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements

Storing, using and disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements Storing, using disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements Radiation Protection Control (Ionising Radiation) Regulations 2000 Requirements for

More information

Resource Consent Application Form 14A

Resource Consent Application Form 14A Resource Consent Application Form 14A To extract gravel from the bed of a river This application is made under Section 88 of the Resource Management Act 1991 (as amended) Phone: 0800 474 082 Website: www.orc.govt.nz

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Regulations concerning protection of Bjørnøya Nature Reserve in Svalbard

Regulations concerning protection of Bjørnøya Nature Reserve in Svalbard Regulations concerning protection of Bjørnøya Nature Reserve in Svalbard Laid down by the Royal Decree of 16 August 2002 pursuant to sections 12 and 17 of the Act of 15 June 2001 No. 79 relating to the

More information

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE

COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE COMMUNITY DEVELOPMENT DEPARTMENT POLICY & PROCEDURE Policy No: DSP-OO3 Release Date: January 1, 2014 Effective Date: January 1, 2014 Revision Date: March 1, 2018 TITLE: The City Policy for Site Specific

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

Edmonton International Airport

Edmonton International Airport Edmonton International Airport ZVL Airside Operations Winter Operations Program 2012/13 September 10, 2012 ZVL_pla.dgn Default 12/17/07 5:10:28 PM AIRSIDE WINTER OPERATIONS PROGRAM (AER-002P) DISTRIBUTION/REVISION

More information

Template for Sediment and Erosion Control Plan General Instructions

Template for Sediment and Erosion Control Plan General Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

GETTING BRITAIN MOVING THIS WINTER Forecast, Gritting and Snow Clearing Services from Paxman Landscapes UK Ltd

GETTING BRITAIN MOVING THIS WINTER Forecast, Gritting and Snow Clearing Services from Paxman Landscapes UK Ltd GETTING BRITAIN MOVING THIS WINTER Forecast, Gritting and Snow Clearing Services from Paxman Landscapes UK Ltd Members of the Association of Professional Landscapers and the British Association of Landscape

More information

Rock Sizing for Bank Stabilisation

Rock Sizing for Bank Stabilisation Rock Sizing for Bank Stabilisation WATERWAY MANAGEMENT PRACTICES Photo 1 Lower bank rock stabilisation with voids filled with small rocks Photo 2 Rock stabilisation with plants introduced at time of rock

More information

Duralie Open Pit Modification

Duralie Open Pit Modification Duralie Open Pit Modification Environmental Assessment SECTION 5 REHABILITATION STRATEGY TABLE OF CONTENTS 5 REHABILITATION STRATEGY 5-1 5.1 EXISTING DCM REHABILITATION 5-1 5.1.1 Rehabilitation Principles

More information

RESTORATION DESIGN FOR REROUTED WATERCOURSES

RESTORATION DESIGN FOR REROUTED WATERCOURSES With thanks to: Thames Water Utilities Limited RESTORATION DESIGN FOR REROUTED WATERCOURSES Project Design Team Colin Thorne, Nick Clifford Gary Priestnall Philip Soar Kieran Conlan, Steve Dangerfield

More information

Food Safety and Quality Management System

Food Safety and Quality Management System Introduction The company has planned, established, documented and implemented a food safety and quality management system for the site, which is maintained in order to continually improve its effectiveness

More information

HAZARD COMMUNICATION SAFETY PROGRAM

HAZARD COMMUNICATION SAFETY PROGRAM Hazard Communication Program HAZARD COMMUNICATION SAFETY PROGRAM 1. Purpose. To provide an effective, written hazard communication program in compliance with company, State and Federal regulatory requirements.

More information

SILT FENCE EFFECTIVENESS

SILT FENCE EFFECTIVENESS SILT FENCE EFFECTIVENESS Michelle G. Holloway, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: MLG@jaguar1.usouthal.edu. Sediment is the number one pollutant in Dog

More information