1 DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland Date: July 2015 WSP Canada Inc. 500 Greber Blvd, 3 rd Floor Gatineau (Quebec) J8T 7W3 Phone: Fax:

2 July 28, 2015 Mr. Yves Rouselle, CET Assistant Director Infrastructure and Engineering City of Clarence-Rockland 415 Lemay St. Clarence Creek, ON K0A 1N0 Subject: Geotechnical Investigation Report New Sewer Installation, Morris Street, City of Clarence-Rockland, Ontario Dear Mr. Rouselle: We are pleased to submit our geotechnical investigation report for the above-noted project. A field investigation and laboratory testing program was conducted to assess soil and groundwater conditions at the site as input to design of the proposed new sewer installation. This report includes our geotechnical recommendations for the proposed sewer installation, a site plan with borehole layout, and results from our field and laboratory investigation. We trust that the report is straightforward and meets your current requirements. Please contact us if you have any questions. Yours truly, Chris Hendry, M.Eng., P.Eng. Sr. Geotechnical Engineer Director Environment, Eastern Ontario WSP Canada Inc. 500, Greber Blvd, 3rd Floor Gatineau (Québec) J8T 7W3 Phone: Fax:

3 T A B L E O F C O N T E N T S 1 INTRODUCTION Context Site Description Objectives and Limitations 1 2 SITE INVESTIGATION Desktop Study Field Investigation Laboratory Testing Program 3 3 SUBSURFACE GEOTECHNICAL CONDITIONS Topsoil Fill Sand and Silty Sand Organic Soil Silty Clay DCPT Refusal Groundwater 6

4 ii 4 RECOMMENDATIONS General Excavation and Dewatering Excavation Dewatering Frost Penetration and Frost Protection Seismic Site Classification Grade Raise Bedding Cover and Backfill Bedding and Embedment Cover Backfill Corrosion and Cement Type 10 5 GEOTECHNICAL PROJECT TEAM 11 A P P E N D I C E S Appendix A Appendix B Appendix C Drawings Borehole Logs Laboratory Testing Results

5 1 1 INTRODUCTION 1.1 CONTEXT SPL Consultants Limited (SPL) was retained by the City of Clarence-Rockland to conduct a geotechnical investigation as part the design and construction of a new sewer system connecting nine (9) townhouses to the city s public sewer system on Morris Street, in Clarence-Rockland, Ontario. The Terms of Reference (TOR) for this investigation are outlined in WSP s Proposal No. P dated April 1, 2015 and subsequent project correspondence. The purpose of the geotechnical investigation was to obtain subsurface information at the site by means of exploratory boreholes. This report presents the findings of the investigation and provides comments and recommendations related to the geotechnical aspects of the project. 1.2 SITE DESCRIPTION The site is located on Morris Street, approximately 130 m east of Lawrence Street, in the City of Clarence-Rockland, ON (see Figure No. 1). The site is located within the previously developed portion of the City, with low-rise residential development being present in the surrounding area. The site is relatively flat and is a combination of Morris Street (residential road) as well as the landscaped front lawns and driveways of the existing townhouse development. 1.3 OBJECTIVES AND LIMITATIONS The current report was prepared at the request and for the sole use of the City of Clarence-Rockland according to the specific terms of the mandate given to WSP. The use of this report by a third party, as well as any decision based upon this report, is under this party s sole responsibility. WSP may not be held accountable for any possible damages resulting from third party decisions based on this report. Furthermore, any opinions regarding conformity with laws and regulations expressed in this report are technical in nature; the report is not and shall not, in any case, be considered as a legal opinion. Information in this report is only valid for the borehole locations as described. Geotechnical Investigation Proposed Sewer Installation, Morris Street

6 3 2 SITE INVESTIGATION 2.1 DESKTOP STUDY Surficial geology maps indicate the area is underlain by alluvial deposits consisting of clay, silt, sand, gravel and organic remains overlying offshore marine deposits consisting of sensitive silty clay with minor sand deposits which overlies glacial till. Bedrock geology maps indicate the bedrock in the general area includes limestone, sandstone and shale of the Rockcliffe Formation. 2.2 FIELD INVESTIGATION The field investigation was carried out on April 27, 2015 and included the drilling of two boreholes (BH15-1 and BH15-2) near the proposed sewer alignment. The boreholes were advanced using a track-mounted drill rig supplied and operated by Forage Geo Inc. of Grenville, Quebec. Boreholes BH15-1 and BH15-2 were advanced using hollow-stem auger drilling to a maximum depth of 6.1 m below the existing road surface and extended using Dynamic Cone Penetration Testing (DCPT) to a depth of up to 12.4 m below the existing road surface. The soil samples retrieved during drilling were logged and visually classified in the field by a member of SPL s geotechnical staff. In-situ tests including Standard Penetration Testing (SPT) and shear vane testing were carried out at regular intervals. A monitoring well was installed in borehole BH15-2 to allow for subsequent measurement of stabilized groundwater levels and long-term groundwater monitoring at the site. The approximate borehole locations are shown in Drawing No. 2. The borehole logs are included in Appendix I of this report. 2.3 LABORATORY TESTING PROGRAM Upon completion of drilling and in-situ testing, soil samples were returned to SPL s laboratory for further examination, classification and testing. A laboratory testing program, which was carried out on selected representative soil samples included the determination of natural water content, grain size distribution, Atterberg limits (Plasticity) and chemical analyses of soil corrosivity. The results of natural water content tests are included on the relevant borehole logs in Appendix I. The results of determination of grain size distribution are summarized on the individual borehole logs and are presented in Appendix C. The results of Atterberg limits (plasticity) testing are summarized on the individual borehole logs and presented in Appendix C. Chemical testing to determine sulphate Geotechnical Investigation Proposed Sewer Installation, Morris Street

7 4 content, chloride content, ph and resistivity was also carried out on selected soil samples obtained during drilling. The results of these tests are included in Appendix C. Geotechnical Investigation Proposed Sewer Installation, Morris Street

8 5 3 SUBSURFACE GEOTECHNICAL CONDITIONS The subsurface soil profile at the site generally consists of a layer of topsoil and fill material, overlying a layer of silty sand and sand, below which is sensitive silty clay. 3.1 TOPSOIL 3.2 FILL Specific descriptions of individual geological units are presented below. A surficial layer of topsoil 225 mm in thickness was encountered in both boreholes (which were drilled on the lawns of the existing townhomes). Underlying the topsoil in boreholes BH15-1 and BH15-2 is a layer of fill which ranged in consistency from silty sand to silty clay. This layer extended to a depth of 1.2 m below the existing surface elevation in borehole BH15-1 and to a depth of 0.8 m below the existing surface elevation in borehole BH15-2. One standard penetration test was carried out within this layer of upper fill gave an SPT N value of 6 blows per 305 mm of penetration indicating a loose state of packing. 3.3 SAND AND SILTY SAND Underlying the fill in both boreholes is a layer of native sand and silty sand. Standard penetration tests carried out within this layer gave SPT N values which ranged from 3 to 18 blows per 305 mm of penetration indicating a very loose to compact consistency. This layer extended to a depth of 2.1 m below the existing ground surface in borehole BH15-1 and to a depth of 4.1 m below the existing ground surface in borehole BH15-2. A grain size distribution analyses from this unit is summarized below. Table 1 Results of Particle Size Analysis - Sand Borehole Sample No. Depth Interval (m below grade) BH15-2 SS Grain Size Distribution 8% gravel, 84% sand; 8% fines Description Sandy Silt 3.4 ORGANIC SOIL Underlying the native sand in borehole BH15-1 is a layer of organic soil. Standard penetration tests carried out within this layer gave SPT N values which ranged from the weight of the SPT hammer to Geotechnical Investigation Proposed Sewer Installation, Morris Street

9 6 3 blows per 305 mm of penetration. This layer extended to a depth of 4.9 m below the existing surface elevation in borehole BH15-1. This layer was not encountered in borehole BH15-2. A selected sample of this material was submitted for testing to determine the percent organic matter by mass which was found to be 20.1 percent. The natural water content within the organic soil ranged from 140 to 215 percent. 3.5 SILTY CLAY Underlying the silty sand in both boreholes is a layer of sensitive silty clay. This deposit generally consists of interlayered clay, silty clay and silt. Sand lenses may also be present. For simplicity this deposit is referred to in this report as silty clay (as this is the predominant soil type). The silty clay was proven through a combination of SPT sampling and shear vane testing to a depth of 6.1 m below the existing ground surface in borehole BH15-1 and to a depth of 5.5 m below the existing road surface in borehole BH15-2. In-situ soil strength was measured during drilling through a combination of SPT testing and in-situ shear vane testing at regular intervals. Standard penetration tests carried out within the silty clay gave SPT N values ranging from 1 to 2 blows for 305 mm of penetration. Shear vane testing within the silty clay deposit yielded shear strengths between 50 kpa and 90 kpa indicating a stiff to very stiff consistency. Atterberg Limits (plasticity) testing was carried out on two samples of silty clay, the results of which are summarized below. Table 2 Plasticity Test Results Silty Clay Borehole No. Sample No. Depth Interval (m below grade) Moisture Content (%) Liquid Limit (%) BH15-1 SS BH15-2 SS Plastic Limit (%) 28 Description High Plasticity Silty Clay 30 High Plasticity Silty Clay 3.6 DCPT REFUSAL Upon completion of augering, both boreholes were extended through Dynamic Cone Penetration (DCPT) Testing. In borehole BH15-1 DCPT refusal was encountered at 10.6 m below the existing ground surface. In borehole BH15-2 DCPT refusal was encountered at 12.4 m below the existing ground surface. 3.7 GROUNDWATER A monitoring well was installed in borehole BH15-2 during the field investigation. Stabilized groundwater levels were read on May 8 th and May 20 th, 2015 (11 and 23 days after drilling, respectively). Groundwater levels were found to be at 2.1 m below the ground surface on both occasions. Geotechnical Investigation Proposed Sewer Installation, Morris Street

10 7 It should be noted that the groundwater levels can vary and are subject to seasonal fluctuations as well as fluctuations in response to major weather events. 4 RECOMMENDATIONS 4.1 GENERAL It is understood that a new section of sewer will be installed to connect the existing townhouses to the existing City sewer system. It is understood that no significant changes will be made to the site grading. Based upon the borehole results the following geotechnical recommendations are provided. 4.2 EXCAVATION AND DEWATERING EXCAVATION Temporary excavations for typical sewer installations can be carried out using conventional hydraulic excavating equipment. Fill material can have, by its nature, a highly variable composition and could contain obstructions not encountered in the boreholes drilled at the site. All excavations should be carried out in accordance with the most recent Occupation Health and Safety Act (OHSA). For preliminary planning purposes, the soils encountered at the borehole locations may be classified as Type 3 soils above the groundwater table (approximately 2 m depth). The organic soils, loose silts and sands and sensitive silty clays should be classified as Type 4 soils below the groundwater table. If sufficient space does not exist to accommodate sloped excavations in these materials (which is likely the case given the amount of development in the area) then a temporary support system may be used. Temporary support for this type of project would typically include specially designed and constructed trench boxes but could also include interlocking sheet piles or similar shoring. Temporary support should be designed and installed by a contractor to both retain the existing soils and provide a safe working space, as well as to limit deflection and soil movement outside the work area to an acceptable level which will not cause damage to the existing structures and utilities. The soils at the site are a combination of silty clay, organic soils, silts and sands, some of which should be expected to have virtually no stand-up time and may behave as flowing soils if left unsupported below the water table. Caution should therefore be taken when moving trench boxes to prevent the sides of the excavation from being in an unsupported condition for any significant length of time. Similarly, caution should be exercised when excavating to ensure that the trench box fits tightly in the limits of the excavation, if not, the sides of the excavation may slough in. Where the trenches pass under the existing road, and allowance should be made for reconstructing the pavement adjacent to the trench boxes where sloughing or loosening occurs. Geotechnical Investigation Proposed Sewer Installation, Morris Street

11 DEWATERING The existing groundwater levels were found to be at approximately 2.1 m below the ground surface. Assuming the base of the excavation will be approximately 3.5 m to 4 m below the ground surface to accommodate the frost cover, pipe, bedding, etc. the base of the excavation could be 1.5 m to 2 m below the water table in a combination of silty sands, sands and organic soils. It is likely that seepage can be managed using pumping from closely spaced and properly filtered sumps in the base of the excavation. In the event the groundwater is higher at the time of construction then an active dewatering system, such as pumping from well points, may be required to maintain a dry base and prevent heaving and disturbance of the excavation base. The soils present in the boreholes (silty sand, sand, organic soil and silty clay) are expected to be susceptible to disturbance due to construction activities and groundwater piping. If appropriate groundwater control is not in place during construction then disturbance of the excavation base may occur. In addition, construction activities in saturated soils can also loosen the trench base. Either condition could result in a requirement for removal and replacement of the subgrade with imported granular soil. A Permit to Take Water (PTTW), issued by the Ontario Ministry of the Environment (MOE) is required if the dewatering system results in a water taking of more than 50,000 l/day. The quantity of groundwater to be pumped will depend no only on soil types and groundwater levels, but on the size and depth of excavation which will remain open at a given time. If the excavation is kept very small and completed in sections, it is likely that the pumping will be less than 50,000 l/day. It should be noted, however, that the MOE requires 90 days to process and review a PTTW application. This process has the potential to cause major delays if unforeseen groundwater conditions are encountered, or if very large temporary excavations are used. For this reason it may be beneficial for the City to obtain a PTTW prior to construction so as to avoid major delays or constraining the contractor s activities once construction has started. The presence of the new utility trench has the potential to permanently lower the groundwater table (by providing a drainage path) which could result in long-term settlement of the silty clay. It is recommended that clay cut-offs extending the full depth and width of the trench be installed to prevent the new utility trench from acting as a drain. 4.3 FROST PENETRATION AND FROST PROTECTION Water bearing services should maintain a minimum burial depth of 2.4 m. If this depth of soil cover cannot be accommodated then the services may be insulated as an alternative to deep burial. 4.4 SEISMIC SITE CLASSIFICATION The site can be classified as Class D for seismic site response. 4.5 GRADE RAISE It is understood that no significant grade raise is anticipated for the site. Grade raises have the potential to cause settlement of the underlying clay and organic soils, and should they be required, WSP should provide additional review and consultation. Geotechnical Investigation Proposed Sewer Installation, Morris Street

12 9 4.6 BEDDING COVER AND BACKFILL BEDDING AND EMBEDMENT Flexible pie bedding and embedment material should include a minimum of 300 mm of OPSS Granular A sand and gravel. The bedding and embedment material should extend a minimum of 300 mm above the pipe as per OPSD Bedding for rigid pipes should include OPSS Granular A from a depth of 300 mm below the invert of the pipe to the springline of the pipe. Bedding and embedment material should be compacted to 95% of Standard Proctor Maximum Dry Density (SPMDD). All trench bases should be reviewed by WSP prior to placement of bedding material. Where loose, wet or disturbed soils are encountered in the base of the trench it may be necessary to excavate and replace the soil with additional granular fill or bedding COVER Pipe cover should extend to 300 mm above the top of pipe. Cover for rigid pipe may include either Granular A or B with a maximum grain size of 26.5 mm (as per OPSS 401). Cover material should be compacted to 95% SPMDD. Care should be taken when compacting overtop of the pipe so as to protect the pipe from damage due to equipment and compaction BACKFILL All backfill should consist of suitable portions of the existing soils or approved imported fill material. In paved areas, to the extent possible, backfill in the frost zone should be made to match the existing soils exposed in the excavation to minimise the potential for differential frost heave. Portions of the existing fill materials as well as the sandy soils may be salvageable for reuse as backfill. The organic soils encountered in BH15-1 are not considered suitable for reuse as trench backfill and should be discarded. It is important to note that soils present below the water table may require moisture conditioning (drying) prior to reuse. It is recommended that the soils be reviewed as excavated to confirm suitability for reuse as backfill. Both native and imported soils should be approved by the contract administrator prior to reuse. All backfill should be free from frozen lumps, cinders, ash, organic matter, rock and boulders over 150 mm in diameter or other deleterious material. Backfill should be placed in lifts not exceeding 300 mm loose thickness and compacted to 95% SPMDD. Failure to properly moisture condition the backfill material will likely lead to difficulty in achieving the required compaction. Geotechnical Investigation Proposed Sewer Installation, Morris Street

13 Corrosion and Cement Type Samples of the existing fill and native silt and silty clay were submitted to Exova Accutest for testing related to soil corrosivity and potential exposure of concrete elements to sulphate attack. The results of these tests are included in Appendix C and summarized below. Table 3 Results of Soil Corrosivity Testing Borehole Sample No. Soil Type Chloride (%) Electrical Conductivity (ms/cm) ph Resistivity (ohm-cm) Sulphate (%) BH15-1 SS3 Sand BH15-2 SS5 Silty Sand < 0.01 The soil resistivity values measured in the sand and silty sand suggest a moderately to severely corrosive environment for buried steel elements. The test results indicate low soluble sulphate content in the naïve soils. For these values, GU Portland cement is suitable. Geotechnical Investigation Proposed Sewer Installation, Morris Street

14

15 Appendix A DRAWINGS

16 JEAN STREET Lac Dollard-des-Ormeaux COUNTY ROAD 17! CLARENCE-ROCKLAND LAURIER STREET ST CARON STREET LEGEND! APPROXIMATE SITE LOCATION SITE LOCATION MAP PROPOSED NEW SEWER - MORRIS STREET For the City of Clarence-Rockland. DATE: MAY 2015 PROJECT: SCALE: 1:20000 FILE. NO.: F1 Data Source: Ministry of Natural Resources, Ontario Base Mapping, March Metres FIGURE 1

17 BH15-1 APPROXIMATE BOREHOLE LOCATION AND DESIGNATION BOREHOLE LOCATION MAP PROPOSED NEW SEWER - MORRIS STREET For the City of Clarence-Rockland. DATE: MAY 2015 PROJECT: SCALE: 1:800 FILE. NO.: F2 Data Source: Ministry of Natural Resources, Ontario Base Mapping, March Imagery, BING Metres FIGURE 2

18 Appendix B BOREHOLE LOGS

19 PROJECT NAME: NEW SEWER SYSTEM INSTALLATION BOREHOLE NO. BH15-1 PROJECT NO.: PAGE 1 of 1 CLIENT: CITY OF CLARENCE-ROCKLAND BOREHOLE TYPE: 203 mm HOLLOW STEM AUGER DATE COMPLETED: Apr 27, 2015 SUPERVISOR: DW GROUND ELEVATION: NOT DETERMINED REVIEWER: CH 0.0 DEPTH (m) 0.2 STRATIGRAPHIC DESCRIPTION TOPSOIL mm SILTY SAND trace gravel, trace roots, dark brown, moist (FILL) STRATIGRAPHY MONITOR DETAILS TYPE SS1A SS1B N VALUE 7 SAMPLE % WATER % RECOVERY RQD (%) CONE PENETRATION "N" VALUE SHEAR STRENGTH WATER CONTENT % 25 W P WL REMARKS 1.0 SS SAND dark brown, trace gravel, trace silt, moist, loose Organic Soil with wood fragments, dark brown, damp SS3 SS GSA SS3: GRAVEL: 7.8% SAND: 84.1% SILT AND CLAY: 8.1% 3.0 SS5 3 SS SS some roots and trace gravel - light brown - fine fiberous SILTY CLAY grey, wet, stiff to very stiff - Augering ended at 6.1 m. Borehole continued by DCPT testing. SILTY CLAY (Infered by DCPT results) SS8 SS9 VANE VANE AL SS9B: LL: 80 PL: 28 PI: 52 S u = 86 kpa; S = 5.7 S u = 90 kpa; S = WSP GEOLOGIC (METRIC) DYNAMIC CONE MORRIS_STREET.GPJ WSP_ENV_V1.GDT 5/21/ End of Borehole Notes: 1) Borehole was dry upon completion of augering 2) DCPT refusal at 10.6 m below surface level 100

20 PROJECT NAME: NEW SEWER SYSTEM INSTALLATION BOREHOLE NO. BH15-2 PROJECT NO.: PAGE 1 of 1 CLIENT: CITY OF CLARENCE-ROCKLAND BOREHOLE TYPE: 203 mm HOLLOW STEM AUGER DATE COMPLETED: Apr 27, 2015 SUPERVISOR: DW GROUND ELEVATION: NOT DETERMINED REVIEWER: CH DEPTH (m) STRATIGRAPHIC DESCRIPTION TOPSOIL mm SILTY SAND TO SILTY CLAY with wood fragments, brown to grey, moist (FILL) SILTY SAND brown, moist, loose STRATIGRAPHY MONITOR DETAILS TYPE SS1A SS1B SS2 N VALUE 5 9 SAMPLE % WATER % RECOVERY RQD (%) CONE PENETRATION "N" VALUE SHEAR STRENGTH WATER CONTENT % 25 W P WL REMARKS 2.0 SS grey - wet - compact - loose SS4 SS SILTY CLAY grey, wet, stiff to very stiff SS6 VANE AL SS6B: LL: 73 PL: 30 PI: VANE Augering ended at 5.5 m. Borehole continued by DCPT testing. SILTY CLAY (Infered by DCPT results) 7.0 WSP GEOLOGIC (METRIC) DYNAMIC CONE MORRIS_STREET.GPJ WSP_ENV_V1.GDT 5/21/ GLACIAL TILL (Infered by DCPT results) End of Borehole Notes: 1) Water level was at 2.7 m below surface level upon completion of augering 2) DCPT refusal at 12.4 m below surface level 3) 50mm dia. monitoring well was installed at 3.8 m below surface level 4) Date Depth-groundwater May 8, m May 20, m 100

21 Appendix C LABORATORY TESTING RESULTS

22

23

24 EXOVA ENVIRONMENTAL ONTARIO Certificate of Analysis Client: SPL Consultants Ltd. 146 Colonnade Rd., Unit 17 Ottawa, ON K2E 7Y1 Attention: Ms. Wendy McLaughlin PO#: Invoice to: SPL Consultants Ltd. Report Number: Date Submitted: Date Reported: Project: COC #: Lab I.D. Sample Matrix Sample Type Sampling Date Sample I.D Soil BH 15-1 SS Soil BH 15-2 SS Soil BH 15-1 SS8 Group Analyte MRL Units Guideline Agri. - Soil Organic Matter (@440C) 0.1 % ph 2.0 General Chemistry Cl % Electrical Conductivity 0.05 ms/cm Resistivity 1 ohm-cm SO % < Guideline = * = Guideline Exceedence MRL = Method Reporting Limit, AO = Aesthetic Objective, OG = Operational Guideline, MAC = All analysis completed in Ottawa, Ontario (unless otherwise indicated by ** which indicates analysis was completed in Mississauga, Ontario). Results relate only to the parameters tested on the samples submitted. Maximum Acceptable Concentration, IMAC = Interim Maximum Acceptable Concentration, STD = Standard, PWQO = Provincial Water Quality Guideline, IPWQO = Interim Provincial Water Quality Objective, TDR = Typical Desired Range Methods references and/or additional QA/QC information available on request. 146 Colonnade Rd. Unit 8, Ottawa, ON K2E 7Y1 Page 2 of 3

25 EXOVA ENVIRONMENTAL ONTARIO Certificate of Analysis Client: SPL Consultants Ltd. 146 Colonnade Rd., Unit 17 Ottawa, ON K2E 7Y1 Attention: Ms. Wendy McLaughlin PO#: Invoice to: SPL Consultants Ltd. Report Number: Date Submitted: Date Reported: Project: COC #: QC Summary Analyte Blank QC % Rec QC Limits Run No: Analysis Date: Method: C CSA A23.2-4B Cl <0.002 % Run No: Analysis Date: Method: Cond-Soil Electrical Conductivity ph Resistivity Run No: Analysis Date: Method: C SM4500-SO4--D SO4 <0.01 % Run No: Analysis Date: Method: Ag Soil Organic Matter (@440C) Guideline = * = Guideline Exceedence MRL = Method Reporting Limit, AO = Aesthetic Objective, OG = Operational Guideline, MAC = All analysis completed in Ottawa, Ontario (unless otherwise indicated by ** which indicates analysis was completed in Mississauga, Ontario). Results relate only to the parameters tested on the samples submitted. Maximum Acceptable Concentration, IMAC = Interim Maximum Acceptable Concentration, STD = Standard, PWQO = Provincial Water Quality Guideline, IPWQO = Interim Provincial Water Quality Objective, TDR = Typical Desired Range Methods references and/or additional QA/QC information available on request. 146 Colonnade Rd. Unit 8, Ottawa, ON K2E 7Y1 Page 3 of 3

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario Subsurface Investigation Proposed Commercial Building 8 March Road Ottawa, Ontario Houle Chevrier Engineering Ltd. 80 Wescar Lane Ottawa, Ontario K0A L0 www.hceng.ca Submitted to: Broccolini Construction

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa,

More information

Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario

Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario February 2016 REPORT ON Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario Submitted to: 1095 Algoma Road Inc. 1294 Algoma Road Ottawa, Ontario K1B 3W8 REPORT Report

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario September 6 REPORT ON Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario Submitted to: Claridge Homes Corporation - Gladstone Avenue Ottawa, ON KP Y6 REPORT Report Number:

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited Geotechnical Engineering Environmental Environmental Engineering Engineering Hydrogeology Hydrogeology Geological Engineering Geological Engineering Materials Testing Materials Testing Building Science

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2

PAVEMENT REPORT. Submitted to: Lee Jablonski, P.Eng. J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, ON K1Z 5M2 PAVEMENT REPORT GEOTECHNICAL INVESTIGATION FOR THE REHABILITATION OF LOUIS HEBERT STREET, VAUDREUIL STREET, MARQUELLE STREET AND LASALLE STREET, ROCKLAND, ONTARIO Submitted to: Lee Jablonski, P.Eng. J.L.

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Elementary School 300 Esprit Drive Archaeological Services Prepared For

More information

REPORT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAWA, ONTARIO.

REPORT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAWA, ONTARIO. 8 escar Lane R.R. Carp, Ontario, KA L Tel: (6) 86- Fax: (6) 86-97 www.hceng.ca REPT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAA, ONTARIO Submitted

More information

316 SOMERSET STREET GEOTECHNICAL REPORT

316 SOMERSET STREET GEOTECHNICAL REPORT 316 SOMERSET STREET GEOTECHNICAL REPORT Project No.: CP-17-0637 Prepared for: TC United Group 800 Industrial Ave. Unit 9 Ottawa, ON, K1G 4B8 Prepared by: McIntosh Perry 115 Walgreen Rd, R.R. 3 Carp, ON

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario

Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario REPORT REPORT ON Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario Submitted to: Claridge Homes 210 Gladstone Avenue, Suite 2001 Ottawa, Ontario K2P 0Y6 Report

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to:

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02 REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive

patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive January 0, 04 File: P345-LET.0 City View Curling Club 50 Capilano Drive Ottawa, Ontario KE 64 Attention: Ms. Cheryl Carroll Consulting Engineers 54 Colonnade Road South Ottawa, Ontario KE 7J5 Tel: (63)

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2 REPORT: T020846-A2 VIVA RETIREMENT COMMUNITIES Geotechnical Investigation Report Five-Story Retirement Home Strandherd Drive and Tartan Drive Ottawa, Ontario June 5, 2013 Ottawa, June 5, 2013 Ms. Monica

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-Page) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Geotechnical Report Site Investigation and Design Recommendations Kanata Collision Centre 6801 Hazeldean Rd, Carp, Ontario

Geotechnical Report Site Investigation and Design Recommendations Kanata Collision Centre 6801 Hazeldean Rd, Carp, Ontario Geotechnical Report Site Investigation and Design Recommendations Kanata Collision Centre 6801 Hazeldean Rd, Carp, Ontario Prepared for: Bel-Con Design-Builders Ltd 10 Dundas Street West Belleville, ON

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION Site Plan Application Pace Redevelopment Stouffville, Ontario Submitted to: Mr. Terry Chapman Pace Savings & Credit Union Limited 8111 Jane Street, Unit

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

APPENDIX D. Acheson Zone 4 Reservoir Expansion Geotechnical Investigation. Parkland County Acheson, AB. Project number: (433)

APPENDIX D. Acheson Zone 4 Reservoir Expansion Geotechnical Investigation. Parkland County Acheson, AB. Project number: (433) APPENDIX D Acheson Zone 4 Reservoir Expansion Geotechnical Investigation Acheson, AB Project number: 60586018 (433) November 21, 2018 Acheson Zone 4 Reservoir Expansion Geotechnical Investigation Statement

More information

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough Geotechnical Investigation Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario City of Peterborough September, 0 Pido Road, Unit, Peterborough, Ontario, Canada KJ X

More information

CONQUEST ENGINEERING LTD.

CONQUEST ENGINEERING LTD. CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO Prepared for: CIMA+ #900, 101 Frederick Street Kitchener,

More information