1 Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada Report No June 08

2 Table of Contents. Introduction.... Purpose and Scope.... Field and Laboratory Procedures.... Site Location and Surface Conditions Subsurface Conditions Fill Gravelly Sand Sand Clayey Silt Silty Sand Groundwater Dynamic Cone Penetration Testing Methane Discussion and Recommendations Excavation, Dewatering and Backfill Foundations Options Subexcavation and Engineered Fill Ground Improvement Techniques Helical Piers Floor Slab Pavement Design General Recommendations Wells Test Pits During Tendering Subsoil Sensitivity Winter Construction Design Review Statement of Limitations... Table Index Table 6. Depth to Competent Native Soil for Footings... 8 Table 6. Bearing Pressures for Footing Design... 8 Table 6. Pavement Structure... GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page i

3 Enclosure Figure Test Hole Location Plan Appendix Index Appendix A Appendix B Test Hole Logs Physical Laboratory Data GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page ii

4 . Introduction This report presents the results of a Geotechnical Investigation that was conducted in support of the proposed construction of a salt storage shed, at the Hamilton Township Works Yard located on Majestic Hills Drive, in Hamilton Township, Ontario. GHD Limited (GHD) was retained by Hamilton Township (the Client) to complete this geotechnical investigation. The work conducted for this investigation was carried out under the authorization of Mr. Paul Heffernan, representing the Client, in accordance with our proposal PG-666 dated September 7, 06 and a supplementary investigation carried out under the authorization of Mr. Heffernan in accordance with our proposal PG-55, dated April, 08. It is GHD s understanding that the project shall consist of the construction of a new salt storage shed, within a property located on Majestic Hills Drive, which is currently used as a municipal works storage yard. It is GHD s understanding that the proposed structure will have a concrete slab on grade. Proposed grading including the structure s proposed slab grade was not available to GHD at the time of writing this report.. Purpose and Scope The purpose of this geotechnical investigation is to explore the subsurface soil and groundwater conditions at the project site, and to develop geotechnical recommendations regarding earthwork construction, reuse of existing soils as backfill material, asphalt pavement design, foundations and slab-on-grade design. The information contained herein must in no way be construed as an opinion of this site s chemical, environmental, or hydrogeological status. The following scope of work was performed in order to accomplish the foregoing purposes:. A site-specific health and safety plan (SS-HASP) was prepared.. Underground services were cleared prior to advancing the boreholes.. The test holes were located as shown on the Test Hole Location Plans (Figure ).. The subsurface conditions were explored by advancing, sampling and logging four () test pits to depths ranging from.8 to.7 metres below existing grade (mbeg) and four () boreholes to depths ranging from 8. to.8 mbeg. Advancement of borehole was then continued by way of dynamic cone penetration (DCP) testing to refusal at depths of 8.6 mbeg and 9.8 mbeg in boreholes BH- and BH- respectively. 5. The ground at the borehole locations was reinstated as close as possible to its original condition upon completion of the fieldwork. 6. Recovered soils samples and monitoring wells were screened using a natural gas indicator in order to assess the potential for methane gas. 7. Groundwater monitoring wells were installed in two () test hole location. Groundwater level measurements were obtained from each borehole following completion of drilling operations, and again from the monitoring wells on May 5, 08. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

5 8. Physical laboratory analysis of the encountered material was carried out including grain size analysis, Atterberg limits test and moisture content tests. 9. Geotechnical engineering analysis of acquired field and laboratory data have been compiled in this report outlining our findings, conclusions, and geotechnical engineering recommendations.. Field and Laboratory Procedures A field investigation was conducted under the supervision of GHD staff on September 7, 06 and on May 5 and May 6, 08. The work consisted of subsurface exploration by means of advancing and sampling four () exploratory test pits to depths ranging from.8 to.7 mbeg and four () boreholes to depths ranging from 8. to.8 mbeg. The location of each test hole is illustrated on the attached Test Hole Plan (Figure ). A detailed log of each test hole was maintained and representative samples of the materials encountered in the test holes were collected. A detailed log of each test hole is presented in Appendix A. The test pits were advanced using a rubber-tire back-hoe. Representative, disturbed samples of the strata penetrated were obtained directly from the excavation walls and/or the excavators bucket. Test pits TP-,, and extended to the practical depth limits of the excavator, Test pit TP- terminated within a native gravelly sand encountered beneath the fill. The boreholes were advanced using a track mounted drill rig equipped with continuous flight, hollow stem power augers. Representative, disturbed samples of the strata penetrated were obtained using a split-barrel, 50 mm outer-diameter (OD) sampler advanced by a 6.5 kg hammer dropping approximately 760 mm. The results of these standard penetration tests (SPT s) are reported as N values on the borehole logs at the corresponding depths. Dynamic cone penetration (DCP) testing was also conducted in boreholes BH- and BH- below.7 mbeg and 9. mbeg respectively, and advanced to practical refusal to further DCP advancement - the results of the DCP testing are reported on the boreholes log at corresponding depths. Soil samples obtained from the test holes were inspected in the field immediately upon retrieval for type, texture, and colour. All test holes were backfilled following completion of the fieldwork. All samples were sealed in clean plastic containers and transported to the GHD laboratory for further visual-tactile examination, and to select appropriate samples for laboratory analysis. Groundwater measurements and observations were obtained from the open test holes during the excavation and drilling operations. Groundwater monitoring wells were installed in two of the boreholes, to a depth of.6 mbeg, with sand pack around the screened interval, and bentonite sealant above the screened interval. The monitoring wells were recorded and registered as wells with the Ministry of Environment and Climate Change (MOECC) and remains as of writing this report. Groundwater data is presented on individual borehole logs. All recovered soils samples and the monitoring wells installed in boreholes BH- and BH-, were screened using a natural gas indicator (model NP-0) in order to assess the potential for methane gas. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

6 Upon completion, the boreholes were backfilled with a mixture of auger cuttings and bentonite pellets and sealed at the top with compacted auger cuttings. Physical laboratory testing was completed on representative soil samples, and consisted of moisture content tests on all samples recovered, gradation analyses on a total of six (6) representative soil samples and Atterberg limits test on one () soil sample. The analytical results of the moisture content tests are plotted on the attached logs. The results of the gradation test and Atterberg limits test are incorporated into the test hole logs, and are presented graphically in Appendix B.. Site Location and Surface Conditions The investigated site is located along the north side of Majestic Hills Drive, east of Burnham Street North, in Hamilton Township, Ontario. The investigated site is part of an active municipal storage yard that is apparently used for general storage purposes. The main municipal works yard and municipal office is located across the street, while the remaining surrounding properties are generally rural residential property uses. The general topography in the vicinity of the site is rolling terrain. According to a representative of the Client (Mr. Don Hamly) who was onsite during our fieldwork, the site was formerly used as a gravel borrow pit by the Client, and the western portion of the property (ie, the proposed location for the salt storage structure) was backfilled with unknown quantity and quality of fill. The eastern portion of the property is relatively flat with various stockpiles of soil. As reported by Mr. Hamly, the eastern portion of the site, generally has not been backfilled, and is approximately m lower than the western portion. The eastern portion appears to be generally used for storage of various public works related equipment. 5. Subsurface Conditions Details of the subsurface conditions encountered at the Site are graphically presented on the test hole logs (Appendix A). It should be noted that the boundaries between the strata have been inferred from the borehole observations and non-continuous samples. They generally represent a transition from one soil type to another, and should not be inferred to represent an exact plane of geological change. Further, conditions may vary between and beyond the test holes. The test holes encountered a surficial layer of fill, underlain by native soils consisting of sand containing varying amount of gravel, and clayey silt. No significant groundwater seepage and/or accumulation was observed in any of the four () test pits during excavation. Groundwater seepage and/or accumulation was observed in all four () boreholes during drilling operations at depths ranging from 6. to 6.6 mbeg. A groundwater measurement obtained on May 5, 08 from the monitoring well installed in borehole BH-, yielded a water level of.5 mbeg. The monitoring well installed in borehole BH- was measure to be dry to its full depth (.6 mbeg) on May 5, 08. The following sections describe the major soil strata and subsurface conditions encountered during this investigation in more detail. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

7 5. Fill An overlying layer of fill was encountered in all eight (8) test holes. The fill extended to a depth of approximately 0.9 mbeg in test pit TP-, and to the full depth of the excavation (ie, excavation limits of the back-hoe) in the remaining test pits (TP-, TP-, TP-). The boreholes encountered fill extending to depths ranging from 6. to 9. mbeg. In discussion with the Client s staff while on site (including Mr. Hamly), GHD was informed that backfilling of the previous pit area was accomplished by end-dumping excess soils from various sites across the Township. The fill material encountered during this investigation exhibited variable content and varied in its apparent relative density. The fill encountered in the test holes generally consisted of slough (from nearby stock pile) in the form of grey to black silty sand and gravel with organics, or grey silt with sand and gravel, construction debris and organics; or mixed fill (sand, gravel and silt with organics, trees and wood fragments). The fill encountered during the investigation generally existed in a moist, variable but typically loose to occasionally compact in-situ state. Moisture content tests conducted on representative samples of the fill yielded values ranging from to 6 % moisture by weight. (Note that the elevated moisture content is indicative of elevated organic content and wood fragments). A grain size distribution analysis conducted on a representative sample of the fill suggests the following composition: 8 % gravel, 70 % sand, and % silt and clay-sized particles. 5. Gravelly Sand A layer of what appeared to be native soil consisting of gravelly sand was encountered immediately beneath the fill in test pit TP-. The gravelly sand layer was first encountered at a depth of approximately 0.9 and extended to the full depth of the investigation (approximately.8 mbeg) in this test pit. This soil was generally grey in colour, consisted of gravelly sand, with silt, and existed in a moist, compact in-situ state. A moisture content test conducted on a sample of this soil yielded a value of approximately % moisture by weight. A grain size distribution analysis conducted on a representative sample of the gravelly sand suggests the following composition: 9 % gravel, 5 % sand, and 7 % silt and clay-sized particles. 5. Sand A layer of sand was encountered immediately beneath the fill layer in all boreholes at depths ranging from 6. to 9. mbeg. The sand layer extended to 9. mbeg and.7 mbeg in boreholes BH- and BH- respectively and to the full depth of investigation in the remaining boreholes. This soil appeared grey in colour, consisted of sand with some to trace amount clay, silt and gravel was encountered in a generally moist to wet, variable (loose to dense) in-situ condition. Moisture content tests performed on samples of the sand yielded values ranging from about to 0 % moisture by weight. Grain size distribution analyses conducted on representative samples of the sand suggests the following compositional range: to % gravel, 77 to 85 % sand, and to % silt and clay-sized particles. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

8 5. Clayey Silt A layer of clayey silt was encountered beneath the sand layer in borehole BH-. This material was first encountered at a depth of 9. mbeg and extended to the full depth of investigation. This material was generally grey in colour, and consisted of clayey silt, containing some amount of sand, and existed in a generally wet and soft in-situ state. A moisture content test conducted on a sample of the clayey silt yielded a value of approximately % moisture by weight. A grain size distribution analysis conducted on a representative sample of this material suggests the following composition: 0 % gravel; 5 % sand; and 85 % silt and claysized particles. A hydrometer analysis conducted on this sample suggests it contains approximately 67 % particles between 5 and 75 µm in size. An Atterberg analysis conducted on a sample of this soil suggests a liquid limit of % and a plasticity index of %. 5.5 Silty Sand A layer of silty sand was encountered beneath the sand layer in borehole BH-. This material was first encountered at a depth of.7 mbeg and extended to the full depth of investigation. This material was generally grey in colour, and consisted of silty sand, containing trace amount of clay and gravel, and existed in a generally wet and dense to very dense in-situ state. Moisture content tests conducted on samples of the silty sand yielded values of about 6 % moisture by weight. A grain size distribution analysis conducted on a representative sample of this material suggests the following composition: % gravel; 68 % sand; and 0 % silt and clay-sized particles. A hydrometer analysis conducted on this sample suggests it contains approximately 5 % particles between 5 and 75 µm in size. 5.6 Groundwater Groundwater observations and measurements were obtained from the open test holes during and upon completion of excavation and drilling operations. No significant groundwater seepage and/or accumulation was observed in any of the four () test pits during excavation. Groundwater seepage and/or accumulation was observed in all four () boreholes during drilling operations at depths ranging from 6. to 6.6 mbeg. Groundwater measurements obtained on May 5, 08 from the monitoring wells installed in boreholes BH- and BH- yielded a water level of.5 mbeg (BH-), and dry to its full depth of.6 mbeg (BH-). It must be noted that groundwater levels are transient and tend to fluctuate with the seasons, periods of precipitation, and temperature. 5.7 Dynamic Cone Penetration Testing Dynamic cone penetration (DCP) testing was conducted in boreholes BH- and BH-. DCP testing commenced at a depth of.7 mbeg (BH-) and 9. mbeg (BH-) and extended to a depth of 8.6 mbeg (BH-) and 9.8 mbeg (BH-), where practical refusal to further DCP testing was encountered in the form of 0 blows per 0.m. The results of the DCP testing are reported on the individual borehole logs. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page 5

9 5.8 Methane Air monitoring of collected samples and the monitoring wells installed in boreholes BH- and BH-, was conducted using a natural gas indicator (model NP-0). Field monitoring results indicate that there was no detectable presence of methane encountered during our investigation. 6. Discussion and Recommendations Supporting data upon which our recommendations are based have been presented in the foregoing sections of this report. The following recommendations are governed by the physical properties of the subsurface materials that were encountered at the site and assume that they are representative of the overall site conditions. It should be noted that these conclusions and recommendations are intended for use by the designers only. Contractors bidding on or undertaking any work at the Site should examine the factual results of the assessment, satisfy themselves as to the adequacy of the information for construction, and make their own interpretation of this factual data as it affects their proposed construction techniques, equipment capabilities, costs, sequencing, and the like. Comments, techniques, or recommendations pertaining to construction should not be construed as instructions to the contractor. The test holes encountered a surficial layer of fill, underlain by native soils consisting of sand containing varying amount of gravel, and clayey silt. DCP testing beneath depths of 9. and.7 mbeg encountered practical refusal to further advancement at depths of 8.6 and 9.8 mbeg. No significant groundwater seepage and/or accumulation was observed in any of the four () test pits during excavation. Groundwater seepage and/or accumulation was observed in all four () boreholes during drilling operations at depths ranging from 6. to 6.6 mbeg. A groundwater measurement obtained on May 5, 08 from the monitoring well installed in borehole BH- yielded a water level of.5 mbeg. The monitoring well installed in borehole BH- was measure to be dry to its full depth (.6 mbeg) on May 5, 08. The final site grading and location/layout of the proposed new structure was not finalized or available to GHD as of writing this report. Details regarding our conclusions and recommendations are outlined in the following sections. 6. Excavation, Dewatering and Backfill Excavations should be carried out to conform to the manner specified in Ontario Regulation /9 and the Occupational Health and Safety Act and Regulations for Construction Projects (OHSA). All excavations above the water table not exceeding. m in depth may be constructed with unsupported slopes. The materials encountered during this investigation above the groundwater table is classed by OSHA as Type soils, provide that no significant groundwater seepage is encountered. As such, unsupported / unshored excavation walls in these soils must maintain a gradient of horizontal to vertical (H:V) or flatter, to the base of the excavation. Should groundwater seepage be encountered, the soil would be classified as Type, and unsupported / unshored excavation walls in these soils must flatten to maintain a gradient of horizontal to vertical (H:V) or flatter to the base of the excavation. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page 6

10 Prior to removing any excess soils, it is recommended that such materials be subjected to chemical testing, to characterize the excess soils for handling and disposal purposes. Based on groundwater measurements, and depending on the depth of excavations, groundwater seepage into open excavations may be encountered. Pumping from filtered collection sumps to an acceptable outlet should typically control the groundwater seepage and infiltration, however localized zones of sand and/or gravel soils could produce increased levels of groundwater into excavations. Where excavations extend into layers of sand and/or gravel below the groundwater table and thereby encounter increased amounts of groundwater infiltration requiring more intensive dewatering / groundwater control, the use of more extensive filtered sumps, well points, or other suitable method of dewatering and/or sheet piling may be necessary. If short-term pumping of groundwater at volumes greater than 50,000 L/day and less than 00,000 L/day is required during the construction stage, the Environmental Activity Sector Registry (EASR) must be completed. The EASR streamlines the process and water pumping may begin once the EASR registration is completed, the fee paid and supporting document prepared. If water taking in excess of 00,000 litres/day is required, a Permit to Take Water (PTTW) must be obtained in advance. PTTW applications may take up to 90 working days for the Ministry of the Environment and Climate Change (MOECC) to review and approve. The actual rate of groundwater taking performed during construction will be a function of the final design, time of year, and the contractor s schedule, equipment, and techniques. Depending on the strategy utilized to develop the site and the corresponding depths of construction and dewatering requirements, a detailed Hydrogeological Assessment may be required to support any EASR or PTTW application. Some excavated inorganic soils may be suitable for use as backfill, however due to the manner in which it was deposited and the amount of deleterious materials encountered during the investigation it is expected that limited amounts of existing fill would be suitable as any form of structural backfill. The reuse of all existing excavated soils is conditional on it being workable, at a suitable moisture content, and receiving final review and approval for such reuse at the time of construction. Some soils will require prior processing (such as aeration) to lower their moisture content before being considered for approval as backfill material. 6. Foundations Options At typical shallow foundation depth, the existing soils are not suitable for foundation purposes, and as such foundations for the proposed salt storage shed should be construction by either: ) subexcavating the existing fill and replacing with engineered fill, ) ground improvement techniques, or ) helical piers with structural slab. The following sections provide preliminary details regarding each strategy. The final foundation recommendations may require further subsurface exploratory boreholes to confirm soil parameters specific to the foundation option chosen, depending on the requirements of specialist design firms that would be involved with each option. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page 7

11 6.. Subexcavation and Engineered Fill Structural loading for the proposed structure may be supported on reinforced, spread and continuous strip footings for column and load bearing walls, respectively. The footings should be placed on engineered fill placed directly on the competent (compact) native soil, requiring full-depth removal of the existing fill materials down to competent and approved native soils throughout the building footprint (including floor slab area). Such suitable competent native soils were encountered at the following depths in each borehole location. Table 6. Depth to Competent Native Soil for Footings Borehole ID Depth (mbeg*) Borehole ID Depth (mbeg*) BH- 6. BH- 9. BH- 6. BH- 9. * mbeg = metres below existing grade It is recommended that footings constructed on engineered fill placed directly on competent (compact) native soils be proportioned using the following bearing capacities: Table 6. Bearing Pressures for Footing Design Parameter Factored Bearing Capacity at ULS () Bearing Pressure on Engineered Fill Rock-based Fill () Granular Fill () Earth Borrow Fill () 50 kpa 00 kpa 0 kpa Bearing Capacity at SLS 50 kpa 0 kpa 95 kpa Notes: () Resistance factor Φ =0.5 applied to the ULS bearing pressure for design purposes. () At least.0m of Rock-based, Granular or Earth Borrow fill. Quality of material is to be approved prior to use as engineered fill. Any engineered fill upon which footings are placed must be a minimum thickness corresponding to the notes that accompany the above table. Rock-based fill must be completely encapsulated with suitable filter fabric to minimize any migration of fine-grained particles from surrounding soils into the voids within the rock fill. Footings (and foundation walls) placed on engineered fill must be suitably reinforced; as a minimum, and where not already specified in the design drawings, this reinforcing should use continuous runs of 5M rebar throughout the footings, and runs of 5M rebar throughout near the top and bottom of the foundation walls. The following is recommended for the construction of any engineered fill for the footings:. Remove any and all existing vegetation, topsoil, fill, organics, and organic-bearing soils to the competent, undisturbed native soil from within the area of the proposed engineered fill.. The area of the engineered fill should extend horizontally m beyond the outside edge of the building foundations and then extend downward at a : slope to the competent native soil. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page 8

12 . The base of the engineered fill area must be approved by a member of GHD prior to placement of any fill, to ensure that all unsuitable materials have been removed, that the materials encountered are similar to those observed, and that the subgrade is suitable for the engineered fill.. All engineered fill material is to be approved by GHD at the time of construction. 5. Place approved engineered fill, in maximum 00 mm lifts, compacted to 0% of its SPMDD. Any fill material placed under sufficiently wet conditions should consist of an approved, rockbased fill, with the inclusion of appropriate geotextile fabric around the rock-based fill should the rock fill contain enough voids to warrant. 6. Full time testing and inspection of the engineered fill will be required, to ensure compliance with material and compaction specifications. All exterior footings or footings in unheated areas, should be founded at least. m below the final adjacent grade for frost protection, or be treated with an equivalent frost protection (such as suitable insulation). Footings and walls exposed to frost action should be backfilled with non-frost susceptible granular material. Under no circumstances should the foundations be placed above organic materials, loose, frozen subgrade, construction debris, or within ponded water. Prior to forming, all foundation excavations must be inspected and approved by a member of GHD. This will ensure that the foundation bearing material has been prepared properly at the foundation subgrade level and that the soils exposed are similar to those encountered during this investigation. For foundations constructed in accordance with the foregoing manner, total and differential settlements are estimated to be less than 5 mm. 6.. Ground Improvement Techniques As an alternative, the structural loading for the new building may be able to be supported on shallow footings founded on soils improved using suitable ground improvement techniques. This could include (but is not necessarily limited to) rammed aggregate piers (RAPs), or other appropriate systems or techniques. An engineering firm specializing in such systems such as GeoSolv Design Build, Menard, or another suitable firm, should assess the soils information and provide advice regarding suitability of their various systems and techniques including design criteria, load capacities, and further details regarding the construction and overall costing associated with such techniques. Appropriately designed and constructed soil improvement systems could allow for standard strip and spread footings and floor slab to be utilized. 6.. Helical Piers As another alternative, structural loads may be supported on deep foundations consisting of helical piers. The helical piers would be advanced through the fill and/or loose soils encountered in the boreholes, to the underlying compact to very dense native soils. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page 9

13 For design purposes, a helical pier installation depth of mbeg is anticipated in order to achieve the sufficiently dense native soils. It is recommended that a unit price for pier installation depth be requested in the helical pier tendering to allow for the expected variations in depth of pier installation. The helical piers should be designed by experienced engineers specializing in such foundation elements, who will confirm the products available, mechanisms and equipment that would best suit this project s conditions, and the structural load capacities of their piers. The piers must be installed by an experienced and qualified contractor. The installation of the helical piers should be monitored and reviewed by a representative of GHD. 6. Floor Slab Should the subexcavation and engineered fill option or ground improvement options be utilized, the floor of the proposed building may be designed and constructed as a normal slab-on-grade, on granular fill over the approved subsoils. Such a floor slab should be formed over a base course consisting of at least 50 mm of Granular A material, compacted to a minimum of 0 % of its SPMDD. A normal slab constructed in conjunction with the ground improvement option may require a specially-designed granular fill pad beneath the slab this would be designed by others in conjunction with the ground improvement technique. All grade increases or infilling below the Granular A should be constructed in accordance with the engineered fill steps provided in Section 6.. of this report. All fill placed as engineered fill must be inspected, approved and compaction verified by personnel from GHD. The use of a helical pier option would require the floor slab to be designed by a qualified structural engineer as a structural floor slab to span over the existing fill that remains in place. While no methane was encountered during our borehole investigation, the Client may wish to consider including a passive methane venting system beneath the floor slab should any of the existing fill remain in place. 6. Pavement Design It is recommended that the existing fill be removed at least 0.6 m below the proposed subbase of the new pavement structure (see pavement structures provided in the Table 6. below) at which point an assessment of the exposed soils by a member of GHD s geotechnical group will deem whether further removal or other treatment is required. Overly loose, or otherwise deleterious materials will require removal and replacement with an approved backfill material. Based on the results of this investigation, we would recommend the following procedures be implemented to prepare the proposed asphalt paved access way and parking areas for its construction:. Remove all asphalt, topsoil, fill, organics, organic-bearing materials and other deleterious materials from the planned pavement areas to at least 0.6m below the design pavement subgrade required to allow the new pavement structure. Place woven geotextile such as Terrafix 00W or Mirafi HP70 on the exposed surface, after its approval and prior to placement of any subsequent fill. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

14 . Place granular, select subgrade, or otherwise approved material compacted to a minimum 98 % of its SPMDD up to the granular subbase, in maximum 00 mm lifts, compacted to 0% of its SPMDD. Contour the subgrade surface to prevent ponding of water during the construction and to promote rapid drainage of the sub-base and base course materials. 5. To maximize drainage potential, 50 mm diameter perforated pipe subdrains should be installed below any curb lines. The pipe should be encased in filter fabric and surrounded by clear stone aggregate. It is recommended that the subdrains discharge to a suitable, frostfree outlet. 6. Construct transitions between varying depths of granular base materials at a rate of :5 minimum. The subgrade materials in the proposed pavement areas will consist of fill containing variable amounts of organic matter and wood fragments. The frost susceptibility of these soils is assessed as being high. In this regard, the following minimum flexible pavement structures are recommended for the construction of the new access and parking areas. Table 6. Pavement Structure Profile Material Thickness (mm) Light Duty Heavy Duty In Conformance with OPSS Form Asphalt Surface H.L. 0 0 Asphalt Base H.L Granular Base Granular A Granular Subbase Granular B The following steps are recommended for optimum construction of paved areas:. The Granular A and B courses should be compacted to a minimum 0 % of their respective SPMDD s.. All asphaltic concrete courses should be placed, spread and compacted conforming to OPSS Form or equivalent. All asphaltic concrete should be compacted to a minimum 9.0 % of their respective laboratory Maximum Relative Densities (MRD s).. Adequate drainage should be provided to ensure satisfactory pavement performance. It is recommended that all fill material be placed in uniform lifts not exceeding 00 mm in thickness before compaction. It is suggested that all granular material used as fill should have an in-situ moisture content within % of their optimum moisture content. All granular materials should be compacted to 0 % SPMDD. Granular materials should consist of Granular A and B conforming to the requirements of OPSS Form or equivalent. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

15 The performance of the pavement structure is highly dependent upon the subgrade support conditions. Stringent construction control procedures should be maintained to ensure that uniform subgrade moisture and density conditions are achieved as much as practically possible. It is noted that the above recommended pavement structures are for the end use of the project. The most severe loading conditions on pavement areas and the subgrade may occur during construction. As such, during construction of the project the recommended granular depths may not be sufficient to support loadings encountered. Consequently, special provisions such as appropriate sequencing, restricted lanes, half-loads during paving, etc. may be required, especially if construction is carried out during unfavorable weather. 6.5 General Recommendations 6.5. Wells Any decommissioning of wells on-site must be performed by an appropriately-licensed well contractor, in compliance with O.Reg Test Pits During Tendering It is strongly recommended that test pits be excavated at representative locations of this Site during the tendering phase, with mandatory attendance of interested contractors. This will allow them to make their own assessment of the groundwater and soil conditions at the Site and how these will affect their proposed construction methods, techniques and schedules Subsoil Sensitivity The native subsoils are susceptible to strength loss or deformation if saturated or disturbed by construction traffic. Therefore, where the subgrade consists of approved soil, care must be taken to protect the exposed subgrade from excess moisture and from construction traffic Winter Construction The subsoils encountered across the site are frost-susceptible and freezing conditions could cause problems to the structures. As preventive measures, the following recommendations are presented:. During winter construction, exposed surfaces intended to support foundations must be protected against freezing by means of loose straw and tarpaulins, heating, etc.. Care must be exercised so that any sidewalks and/or asphalt pavements do not interfere with the opening of doors during the winter when the soils are subject to frost heave. This problem may be minimized by any one of several means, such as keeping the doors well above outside grade, installing structural slabs at the doors, and by using well-graded backfill and positive drainage, etc.. Because of the frost heave potential of the soils during winter, it is recommended that the trenches for exterior underground services be excavated with shallow transition slopes in order to minimize the abrupt change in density between the granular backfill, which is relatively nonfrost susceptible, and the more frost-susceptible native soils. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

16

17 Enclosure GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0)

18 TP- TP- BH- BH- TP- TP- TP- TP- BH- TP- BH- TP- Source: Base plan obtained from Ministry of Natural Resources and Forestry, Make a Topographic Map, accessed June, 08. Scale - See Above HAMILTON TOWNSHIP PROPOSED STORAGE SHED GEOTECHNICAL INVESTIGATION June, 08 Coordinate System: NAD 98 UTM Zone 8T TEST HOLE LOCATION PLAN FIGURE

19 Attachment A Test hole Logs GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0)

20 REFERENCE No.: CLIENT: Hamilton Township PROJECT: Salt Storage Shed LOGGED BY: P. Hynes TEST PIT No.: TP- ELEVATION: Existing Grade DATE: 7 September 06 ENCLOSURE No.: A- TEST PIT REPORT Page: of LEGEND GS - GRAB SAMPLE - WATER LEVEL EXCAVATION COMPANY: Hamilton Township METHOD: Rubber Tire, Back-hoe NOTES: Depth m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Moisture Content Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l Field Lab COMMENTS ft m 0.0 GROUND SURFACE FILL - Brown Sand and Gravel, moist, loose % Open testpit did not encounter groundwater seepage and/or accumulation during excavation operations Dark brown to dark grey to black Silty Sand and Gravel, with ORGANICS, moist, compact Grey Silt with Sand and Gravel, moist, compact 6.0 TEST PIT LOG GEOTECH , , BOREHOLE LOGS.GPJ GEOLOGIC.GDT // END OF TEST PIT GS- Test Pit terminated a practical depth (extent of excavator)

21 REFERENCE No.: CLIENT: Hamilton Township PROJECT: Salt Storage Shed LOGGED BY: P. Hynes TEST PIT No.: TP- ELEVATION: Existing Grade DATE: 7 September 06 ENCLOSURE No.: A- TEST PIT REPORT Page: of LEGEND GS - GRAB SAMPLE - WATER LEVEL EXCAVATION COMPANY: Hamilton Township METHOD: Rubber Tire, Back-hoe NOTES: Depth m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Moisture Content Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l Field Lab COMMENTS ft m 0.0 GROUND SURFACE FILL - Brown Sand, loose % Open testpit did not encounter groundwater seepage and/or accumulation during excavation operations GRAVELLY SAND - Grey Gravelly Sand, with Silt, moist GS- GS-: 9% Gravel 5% Sand 7% Silt and Clay END OF TEST PIT.0 TEST PIT LOG GEOTECH , , BOREHOLE LOGS.GPJ GEOLOGIC.GDT //

22 REFERENCE No.: CLIENT: Hamilton Township PROJECT: Salt Storage Shed LOGGED BY: P. Hynes TEST PIT No.: TP- ELEVATION: Existing Grade DATE: 7 September 06 ENCLOSURE No.: A- TEST PIT REPORT Page: of LEGEND GS - GRAB SAMPLE - WATER LEVEL EXCAVATION COMPANY: Hamilton Township METHOD: Rubber Tire, Back-hoe NOTES: Depth m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Moisture Content Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l Field Lab COMMENTS ft m 0.0 GROUND SURFACE FILL - Mixed Fill (Sand, Gravel and Silt) with ORGANICS/TREES, loose % Open testpit did not encounter groundwater seepage and/or accumulation during excavation operations GS TEST PIT LOG GEOTECH , , BOREHOLE LOGS.GPJ GEOLOGIC.GDT // Light grey to dark grey Clayey Silt to Silty Clay with ORGANICS, moist to wet END OF TEST PIT GS- 8 Test Pit terminated a practical depth (extent of excavator)

23 REFERENCE No.: CLIENT: Hamilton Township PROJECT: Salt Storage Shed LOGGED BY: P. Hynes TEST PIT No.: TP- ELEVATION: Existing Grade DATE: 7 September 06 ENCLOSURE No.: A- TEST PIT REPORT Page: of LEGEND GS - GRAB SAMPLE - WATER LEVEL EXCAVATION COMPANY: Hamilton Township METHOD: Rubber Tire, Back-hoe NOTES: Depth m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Moisture Content Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l Field Lab COMMENTS ft m GROUND SURFACE FILL - Brown Sand, loose Grey % Open testpit did not encounter groundwater seepage and/or accumulation during excavation operations Grey Clayey Sandy Silt, trace Gravel, Debris with ORGANICS, loose.0 GS-. Light brown to grey Silty Sand with Gravel TEST PIT LOG GEOTECH , , BOREHOLE LOGS.GPJ GEOLOGIC.GDT // END OF TEST PIT GS- 7 Test Pit terminated a practical depth (extent of excavator)

24 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-5 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/8 ft Depth m m Below Existing Grade 0.0 GROUND SURFACE % % N FILL - Brown Sand, Some Gravel, Some Silt, Moist, 6 SS Compact Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Brown/Black Organic Silt, Some Gravel, Some Sand, Moist, Compact Brown Wood Fragments, Trace Sand, Trace Silt Silt, Moist, Very Loose Brown Sand, Some Gravel, Some Wood Fragments, Moist, Very Loose Grey Sand with Rootlets, Some Silt and Clay, Some Gravel, Moist, Very Loose Brown Wood Fragments, Trace Sand, Trace Silt, Moist, Loose SAND Grey Sand, Some Gravel, Some Silt and Clay, Wet, Compact Dense END OF BOREHOLE Type and Number SS- SS- SS- SS-5 SS-6 SS-7a SS-7b SS-8 SS-9 SS- Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index 6 6 Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) Field Lab RQD CONE 6 COMMENTS SS-6: 8% Gravel 70% Sand % Silt and Clay WL - 6. m 5/5/08 SS-9: % Gravel 77% Sand % Silt and Clay

25 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-6 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK FILL - Brown Sand, Some Gravel, Trace Silt, With Organics (wood fragments), Moist, Compact to Loose Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS m m BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/ Dark Brown to Black, Sandy Silt, With Organics, Moist, Very Loose Dark Brown Gravelly Sand, Some Silt, With Organics, Loose SAND - Brown to Grey Sand, Some Silt and Clay, Trace Gravel, Moist, Compact SS- SS- SS- SS WL -.5 m 5/5/08 WL - 6. m (Upon completion of drilling) SS-: % Gravel 85% Sand % Silt and Clay

26 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-6 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS Wet, Very Loose CLAYEY SILT - Grey Clayey Silt, Some Sand, Wet, Soft SS-5a SS-5b 0 0 SS-5b: 0% Gravel 5% Sand 85% Silt and Clay 67% between 5-75 µm LL = % PI = % UNDETERMINED - Dynamic Cone Penetration Testing Commenced at.7 m 6 8 BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/

27 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-6 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS END OF BOREHOLE 0 Practical refusal to Dynamic Cone Penetration encountered at 8.6 m BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/

28 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-7 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m.0.0 m Below Existing Grade 0.6. Stratigraphy DESCRIPTION OF SOIL AND BEDROCK FILL - Brown Sand, Some Gravel, Trace Silt, Some Organics, Moist, Compact to Loose Grey Clayey Sandy Silt, Trace Gravel, Debris with Organics, Moist, Loose Light Brown to grey Silty Sand, With Gravel, With Rootlets, Moist, Very Loose Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS m m WL - Dry 5/5/08 9 BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/ With Wood Fragment Wet, Compact - Asphalt fragment at ~6. m SAND - Grey Sand, Some Silt, Trace Gravel, Wet, Very Loose SS- SS- SS- SS WL - 6. m 5/5/08

29 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-7 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS UNDETERMINED - 8 Dynamic Cone Penetration Testing Commenced at 5 9. m BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/

30 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-7 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 5 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS END OF BOREHOLE 0 Practical refusal to Dynamic Cone Penetration encountered at 9.8 m 67 BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/

31 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-8 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 6 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N FILL - Brown Sand with Gravel, Some Silt, With 5 SS- 0 9 Organics, Moist, Loose Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS Brown Gravely Sand, Some Silt, Moist, Compact SS-a SS-b Boulders BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/ Dark Brown to Black Orgainc Sandy Silt with Gravel, Cobbles, Wood fragments and Rootlets, Moist, Very loose Grey Sand with Gravel trace Silt, Wet, Very Loose Dark Brown to Black Organic Sandy Silt trace Gravel and Rootlets, Wet, Compact Trace Clay, Wet, Loose SS- SS- SS-5a SS-5b SS WL m 5/6/08

32 REFERENCE No.: BOREHOLE No.: BH- ELEVATION: Existing Grade ENCLOSURE No.: A-8 BOREHOLE REPORT Page: of CLIENT: Hamilton Township LEGEND PROJECT: Salt Storage Shed LOGGED BY: JC DRILLING COMPANY: Strata Drilling Group NOTES: DATE: 6 May 08 METHOD: Hollow Stem Augers & Split Spoon SS AS ST CS - SPLIT SPOON - AUGER SAMPLE - SHELBY TUBE - CORE SAMPLE - WATER LEVEL ft Depth m m Below Existing Grade Stratigraphy DESCRIPTION OF SOIL AND BEDROCK Type and Number Shear test (Cu) Sensitivity (S) Water content (%) Atterberg limits (%) w p w l "N" Value (blows / 0. m) 0.0 GROUND SURFACE % % N Recovery Moisture Content Blows per 6 in. / 5 cm Penetration Index Field Lab RQD CONE COMMENTS SAND - Grey Sand, Some Gravel, Trace Silt, Wet, Dense SS SILTY SAND - Grey Silty Some, Trace Clay and Gravel, Clay and Silt, Wet, Dense SS SS-8: % Gravel 68% Sand 0% Silt and Clay 5% between 5-75 µm BOREHOLE LOG GEOTECH 568-0, , BOREHOLE LOGS, JC.GPJ GEOLOGIC.GDT /6/ Very Dense END OF BOREHOLE SS =5" 80

33 Attachment B Physical Laboratory Data GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0)

34 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-6-99 Project/Site: Salt Storage Shed Project no.: Borehole no.: TP Sample no.: GS Depth: 0.9 to. mbeg Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt TP GS Remarks: Performed by: Verified by: Date: Date: November 5, 06 November 5, 06 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

35 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-8-9 Project/Site: Proposed Salt Done, Majestic Hills Drive Project no.: Borehole no.: BH- Sample no.: SS-6 Depth:.-.9m Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt BH- SS Remarks: Performed by: J. Sullivan Date: May, 08 Verified by: Date: June, 08 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

36 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-8-9 Project/Site: Proposed Salt Dome, Majestic Hills Drive Project no.: Borehole no.: BH- Sample no.: SS-9 Depth: m Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt BH- SS-9 77 Remarks: Performed by: J. Sullivan Date: May, 08 Verified by: Date: June, 08 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

37 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-8-9 Project/Site: Proposed Salt Dome, Majestic Hill Drive Project no.: Borehole no.: BH- Sample no.: SS- Depth: m Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt BH- SS- 85 Remarks: Performed by: J. Sullivan Date: May, 08 Verified by: Date: June,08 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

38 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-8-9 Project/Site: Proposed Salt Dome, Majestic Hills Drive Project no.: Borehole no.: BH- Sample no.: SS-5B Depth: m Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt BH- SS-5B Remarks: Performed by: J. Sullivan Date: May, 08 Verified by: Date: June, 08 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

39 Plasticity Index and Liquid Limit Testing LS-70&70 PLASTICITY CHART Project Name: Proposed Salt Dome Project No.: Client: Hamilton Township Depth: m Borehole No.: BH SS5B Enclosure: B-6 Low High LL 50 HIGH PLASTICITY INORGANIC CLAY LOW PLASTICITY INORGANIC CLAY CH PLASTICITY INDEX (PI)% 0 0 LOW COMPRESSIBILITY INORGANIC SILT CL MH OH HIGH COMPRESSIBILITY INORGANIC SILT OR INORGANIC CLAY 0 0 CL ML ML ML OL LIQUID LIMIT (LL)% MEDIUM COMPRESSIBILITY INORGANIC SILT INORGANIC CLAY Symbol Borehole Sample Depth Sample Results Value BH- SS-5B m Plasticity Index (%) Liquid Limit (%) Performed By: J. Sullivan Date: May, 08 Verified By: Date: May, 08

40 Particle-Size Analysis of Soils (Geotechnical) (USCS) (ASTM D) Client: Hamilton Township Lab no.: SS-8-9 Project/Site: Proposed Salt Dome, Majestic Hills Drive Project no.: Borehole no.: BH- Sample no.: SS-8B Depth:.7-.m Enclosure: B Percent Passing Percent Retained Diameter (mm) Clay & Silt Sand Gravel Fine Medium Coarse Fine Coarse Unified Soil Classification System Soil Description Gravel Sand Clay & Silt BH- SS-8B 68 0 Remarks: Performed by: J. Sullivan Date: May, 08 Verified by: Date: June, 08 GHD FO-90.-Particle-Size Analysis of Soils Geotechnical (USCS) (ASTM D) - Rev. 0-07/0/05

41 STATEMENT OF LIMITATIONS This report is intended solely for Hamilton Township, and other parties explicitly identified in the report and is prohibited for use by others without GHD s prior written consent. This report is considered GHD s professional work product and shall remain the sole property of GHD. Any unauthorized reuse, redistribution of or reliance on the report shall be at the Client and recipient s sole risk, without liability to GHD. Client shall defend, indemnify and hold GHD harmless from any liability arising from or related to Client s unauthorized distribution of the report. No portion of this report may be used as a separate entity; it is to be read in its entirety and shall include all supporting drawings and appendices. The recommendations made in this report are in accordance with our present understanding of the project, the current site use, ground surface elevations and conditions, and are based on the work scope approved by the Client and described in the report. The services were performed in a manner consistent with that level of care and skill ordinarily exercised by members of geotechnical engineering professions currently practicing under similar conditions in the same locality. No other representations, and no warranties or representations of any kind, either expressed or implied, are made. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. All details of design and construction are rarely known at the time of completion of a geotechnical study. The recommendations and comments made in the study report are based on our subsurface investigation and resulting understanding of the project, as defined at the time of the study. We should be retained to review our recommendations when the drawings and specifications are complete. Without this review, GHD will not be liable for any misunderstanding of our recommendations or their application and adaptation into the final design. By issuing this report, GHD is the geotechnical engineer of record. It is recommended that GHD be retained during construction of all foundations and during earthwork operations to confirm the conditions of the subsoil are actually similar to those observed during our study. The intent of this requirement is to verify that conditions encountered during construction are consistent with the findings in the report and that inherent knowledge developed as part of our study is correctly carried forward to the construction phases. It is important to emphasize that a soil investigation is, in fact, a random sampling of a site and the comments included in this report are based on the results obtained at the eight (8) test hole locations only. The subsurface conditions confirmed at the 8 test hole locations may vary at other locations. The subsurface conditions can also be significantly modified by construction activities on site (e.g. excavation, dewatering and drainage, blasting, pile driving, etc.). These conditions can also be modified by exposure of soils or bedrock to humidity, dry periods or frost. Soil and groundwater conditions between and beyond the test locations may differ both horizontally and vertically from those encountered at the test locations and conditions may become apparent during construction which could not be detected or anticipated at the time of our investigation. Should any conditions at the site be encountered which differ from those found at the test locations, we request that we be notified immediately in order to permit a reassessment of our recommendations. If changed conditions are identified during construction, no matter how minor, the recommendations in this report shall be considered invalid until sufficient review and written assessment of said conditions by GHD is completed. GHD Geotechnical Investigation Report, Hamilton Township Works Yard, Proposed Salt Storage Shed, Majestic Hills Drive, Hamilton Township, Ontario 568 (0) Page

42 Leandro Ramos Garnet Brenchley

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough Geotechnical Investigation Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario City of Peterborough September, 0 Pido Road, Unit, Peterborough, Ontario, Canada KJ X

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario September 6 REPORT ON Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario Submitted to: Claridge Homes Corporation - Gladstone Avenue Ottawa, ON KP Y6 REPORT Report Number:

More information

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited Geotechnical Engineering Environmental Environmental Engineering Engineering Hydrogeology Hydrogeology Geological Engineering Geological Engineering Materials Testing Materials Testing Building Science

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Elementary School 300 Esprit Drive Archaeological Services Prepared For

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

DRAFT GEOTECHNICAL INVESTIGATION REPORT

DRAFT GEOTECHNICAL INVESTIGATION REPORT DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland 151-03483-00 Date: July 2015 WSP Canada Inc. 500 Greber

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario Subsurface Investigation Proposed Commercial Building 8 March Road Ottawa, Ontario Houle Chevrier Engineering Ltd. 80 Wescar Lane Ottawa, Ontario K0A L0 www.hceng.ca Submitted to: Broccolini Construction

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF-2018-012 CITY OF CLARENCE-ROCKLAND Prepared for: The City of Clarence-Rockland Attn: Mr. Alain Beaulieu, Coordinator, Capital Projects 1560

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa,

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO

LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO LIMITED SUPPLEMENTARY GEOTECHNICAL INVESTIGATION REPORT FOR PROPOSED ROAD, DRAINAGE, AND SIDEWALK IMPROVEMENTS IN THE VILLAGE OF NEWBURY, ONTARIO Prepared for: CIMA+ #900, 101 Frederick Street Kitchener,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive

patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive January 0, 04 File: P345-LET.0 City View Curling Club 50 Capilano Drive Ottawa, Ontario KE 64 Attention: Ms. Cheryl Carroll Consulting Engineers 54 Colonnade Road South Ottawa, Ontario KE 7J5 Tel: (63)

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2 REPORT: T020846-A2 VIVA RETIREMENT COMMUNITIES Geotechnical Investigation Report Five-Story Retirement Home Strandherd Drive and Tartan Drive Ottawa, Ontario June 5, 2013 Ottawa, June 5, 2013 Ms. Monica

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to:

More information

REFERENCE NO S135 NOVEMBER 2015

REFERENCE NO S135 NOVEMBER 2015 A REPORT TO DUNPAR DEVELOPMENTS INC. A SOIL INVESTIGATION FOR PROPOSED RESIDENTIAL DEVELOPMENT 020, 024, 032, 042, 048 AND 052 6 TH LINE, TOWN OF OAKVILLE REFERENCE NO. 505-S35 NOVEMBER 205 DISTRIBUTION

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-Page) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Soils. Technical English - I 10 th week

Soils. Technical English - I 10 th week Technical English - I 10 th week Soils Soil Mechanics is defined as the branch of engineering science which enables an engineer to know theoretically or experimentally the behavior of soil under the action

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta

Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta Geotechnical Investigation Bow Ridge Subdivision Phase 3 Cochrane, Alberta FINAL Prepared for: The Town of Cochrane 101 Ranchehouse Road Cochrane, Alberta Prepared by: Stantec Consulting Ltd. Calgary,

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

Town of Amenia Dutchess County New York

Town of Amenia Dutchess County New York Appendix 9.14.2 Preliminary Geotechnical Investigation 2/2007 Preliminary Geotechnical Interpretive Report for Silo Ridge Golf Resort Community Town of Amenia Dutchess County New York February 16, 2007

More information

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER AND NAME C55 H861:02 Slide LEGAL DESCRIPTION NW 14-40-14-W4 CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM HIGHWAY & KM NAD 83 COORDINATES N 5811217 E 437291 PREVIOUS INSPECTION

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront

More information

Construction Exits Vibration grids

Construction Exits Vibration grids Construction Exits Vibration grids SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1]

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-BPage) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

GEOTECHNICAL REPORT. 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON. October 14, 2016 TULLOCH Project #:

GEOTECHNICAL REPORT. 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON. October 14, 2016 TULLOCH Project #: GEOTECHNICAL REPORT 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON October 14, 2016 TULLOCH Project #: 16-1116 October 14, 2016 The City of Great Sudbury P.O. Box 3700, Station A, Sudbury, ON

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse