Geotechnical Level 1 Supervision Report Muller Street, Redland Bay.

Size: px
Start display at page:

Download "Geotechnical Level 1 Supervision Report Muller Street, Redland Bay."

Transcription

1 TGE Geotechnical Level 1 Supervision Report Frostdale Civil Contractors 24/03/2015 TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool

2 Report No: TGE /03/2015 Contents 1. Introduction Scope of Works Inspections/Supervision Testing Conclusion Limitation of This Report... 5 Appendix 1 Site Plan... 6 Appendix 2 Testing Summary... 8 Appendix 3 Site Photographs Appendix 4 NATA Lab Results

3 Report No: TGE /03/ Introduction Total Geotechnics has been engaged by Frostdale Civil Contractors on the 1 st December 2014, to provide Level 1 Geotechnical Supervision on Muller Street, Redland Bay Project (Refer Appendix 1 Site Plans & Diagrams and Appendix 3 Site Photographs). This Level 1 report presents the results of supervision activities, compaction and moisture control, material placement and laboratory testing for ground works undertaken at Frostdale Civil Contractors. This report covers construction activities carried out from the 1 st December to 18 th December Scope of Works The scope of works involved the placement of On-site General Fill. Fill Material was placed in Level one fill areas, in accordance with AS , Guidelines on earthworks for commercial and residential developments. The level of FILL to be placed is less than 5m as per AS3798 Section 1.1. It has been a requirement of the Geotechnical testing Authority Total Geotechnics to follow Earthworks Guidelines and site plans specifications received by Frostdale Civil Contractors Pty Ltd. General fill material used for the construction was locally sourced on-site and predominantly comprising of Silt, Sand and Clay type material. 3. Inspections/Supervision Full time Level 1 supervision and inspection were undertaken between; 1 st December to 18 th December 2014 including supervision and inspections regarding the stripping and removal as per AS3798 Section 3 shall have removed: Organic soils, such as topsoils, severely root affected subsoils and peat; Contaminated soils is part of the brief; Materials which undergo volume change or loss of strength when disturbed and exposed to moisture; Silts, or materials that have deleterious engineering properties of silt; Other materials with properties that are unsuitable for the forming of structural fill; Fill that contains wood, metal plastic, boulders or other deleterious material, in sufficient proportions to affect the required performance of the fill. The maximum particle size of any rocks or other lumps, within the layer has not exceeded two thirds ( 2 / 3) of the compacted layer thickness. The lots inspected were essentially homogeneous in relation to material type and moisture condition, rolling response and compaction technique which has been used for the assessment of relative compaction of an area of work (AS3798 Section 1.2.8). 3

4 Report No: TGE /03/2015 Prior to placement any existing filled ground, for which the conditions of the placement are not adequately documented it has not been assumed to have been of either standard compaction or of the composition adequate to support fill and any material has been removed (AS3798 Section 2o). 4. Testing The project was classified as Residential Development for the purposes of AS (refer Table 5.1), thereby requiring a minimum compaction result of 95% Standard Compaction for the cohesive soils (AS & 5.1.1). AS further requires a minimum of 3 tests per day be undertaken throughout the placement of the fill (refer AS3798 Table 8.1) Tests were performed using a Nuclear Density Gauge for field density determination AS Testing was completed at a rate of 3 field density tests per day s production as based on the minimum requirements of AS and taken from each layer of fill placed. The filling operation was undertaken between 1 st December to 18 th December The material was Site-derived General Fill. Material was placed in approximately 300mm loose layers, rolling effort with on-site 825 Compactor (to seal of each layer of placed General Fill material) to a compacted 200mm layer that achieved 95% Standard Compaction which met Australian Standards specifications. This was considered the best method to achieve compaction using the plant and machinery available. A total of No.29 Field density and Laboratory Hilf Compaction tests were performed. The reports verify the achievement of the minimum density requirement of 95% Standard Compaction throughout the full depth area, with each layer tested accordingly. All test results were provided to our client Frostdale Civil Contractors for inclusion within their internal quality system (Refer to Appendix B Summary of Results). At the completion of the structural layers any material within 150mm of permanent subgrade level in cuttings was subjected to test rolling; test rolling was undertaken and the layers withstood test rolling without visible deformation or springing (AS 3798 Section 5.5). 4

5 Report No: TGE /03/2015 The lots that are covered by this Level 1 Supervision report are listed in the table below. Table 1 - Lots under Level 1 Supervision Lot,1 Lot,2 Lot,5 Lot,6 Lot,7 Lot,8 Lot,14 Lot,15 Lot,16 Lot,31 Lot,32 Lot,33 Lot,34 Lot,35 Road #1 Road #3 Bio Retention Basin Dam Wall 5. Conclusion On the completion of the earthworks and after analysing the materials used, it has been concluded that the filling procedure conducted by Frostdale Civil Contractors satisfied the requirements of AS 3798 in regards to the placement of fill materials on a project under Level 1 Supervision and in accordance with the specification as provided to Total Geotechnics. This report has been prepared for the benefit of our client with respect to the particular brief given to us and it may not be relied upon in other contexts or for any other purpose without our prior review and agreement. No responsibility for this report will be taken by Total Geotechnics if it is altered in any way, or not reproduced in full. 6. Limitation of This Report This Level 1 Report is valid for following completion of Level 1 Supervision. Total Geotechnics Pty Ltd does not accept responsibility for any distortion or deviations of measurements as reported at the given time. This report will be considered invalid if: Any works were conducted on site without the supervision of a Total Geotechnics Pty Ltd technician. Any other unforeseeable event and any event outside of time as described above. Prepared by: Authorised by: Albert Roelofs (Brisbane Laboratory Manager) Geotechnical Officer- Nata Accreditation Mob: Alvin Tan (BE Civil and Infrastructure) GradIEAust Geotechnical Engineer Mob:

6 Report No: TGE /03/2015 Appendix 1 Site Plan Level 1 Supervision 6

7 Report No: TGE /03/2015 Level 1 Supervision 7

8 Report No: TGE /03/2015 Appendix 2 Testing Summary Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 26 Easting: RL: General Fill % 0.5% Report No. 26 Northing: Wetter Sample No. 27 Easting: RL: General Fill % 1% Report No. 26 Northing: Wetter Sample No. 28 Easting: RL: General Fill % 1% Report No. 26 Northing: Wetter Sample No. 29 Easting: RL: General Fill % 0.5% Report No. 27 Northing: Drier Sample No. 30 Easting: RL: General Fill % 2% Report No. 27 Northing: Drier Sample No. 31 Easting: RL: General Fill % 1% Report No. 27 Northing: Drier 8

9 Report No: TGE /03/2015 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 32 Easting: RL: General Fill % 1% Report No. 27 Northing: Wetter Sample No. 33 Easting: RL: General Fill % 0.5% Report No. 27 Northing: Drier Sample No. 48 Easting: RL: General Fill % 0% Report No. 31 Northing: OMC Sample No. 49 Easting: RL: General Fill % 0.5% Report No. 31 Northing: Drier Sample No. 50 Easting: RL: General Fill % 1.5% Report No. 31 Northing: Wetter Sample No. 62 Easting: RL: General Fill % 0% Report No. 35 Northing: OMC 9

10 Report No: TGE /03/2015 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 63 Easting: RL: General Fill % 0% Report No. 35 Northing: OMC Sample No. 64 Easting: RL: General Fill % 0.5% Report No. 35 Northing: Wetter Sample No. 90 Dam Wall, Centre of RL: General Fill % 0.5% Report No. 45 Wall. 3m East of Outlet Pipe Drier Sample No. 91 Easting: RL:21.33 General Fill % 0% Report No. 46 Northing: OMC Sample No. 92 Easting: RL:21.33 General Fill % 1% Report No. 46 Northing: Drier Sample No. 101 Sediment Basin RL: General Fill % 1% Report No. 50 Easting: Northing: Drier 10

11 Report No: TGE /03/2015 Sample no. & Report no. Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark RL: (%) Sample No. 102 Easting: RL: General Fill %4 2% Report No. 50 Northing: Drier Sample No. 103 Easting: RL: General Fill % 1% Report No. 50 Northing: Drier Sample No. 104 Dam Wall Centre line RL:16.70 General Fill %1 1.5% Report No. 51 Sample No. 105 Of Wall. 30m West -Outlet Pipe Easting: Drier RL: General Fill % 1% Report No. 52 Northing: Wetter Sample No. 106 RL: General Fill % 0.5% Report No. 52 Sample No. 107 Easting: Northing: Wetter RL: General Fill % 1.5% Report No. 52 Easting: Northing: Wetter 11

12 Report No: TGE /03/2015 Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 108 Dam Wall Centre of RL:16.99 General Fill % 1% Report No. 53 Wall. 25m North of Southern Wetter End Wall. Sample No. 121 Easting: RL:31.51 General Fill % 1% Report No. 64 Northing: Wetter Sample No. 122 Easting: RL:31.28 General Fill % 0.5% Report No. 64 Northing: Drier Sample No. 123 Easting: RL:31.65 General Fill % 0.5% Report No. 64 Northing: Wetter Sample No. 124 Dam Wall Centre Of RL:17.10 General Fill % 1.5% Report No. 65 Wall. 10m West- Out pipe Drier 12

13 Report No: TGE /03/2015 Sample no. & Report no. Location Layer RL: Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation (%) Remark Sample No. 243 Lot,14 RL: General Fill % 0.5% Pass Report No. 111 Easting: Northing: Wetter Sample No. 244 Lot, 14 RL: General Fill % 0.0% Pass Report No. 111 Easting: Northing: OMC 13

14 Report No: TGE /03/2015 Appendix 3 Site Photographs 01/12/2014. Picture no.1 Road #1, Stripped Surface of Top Soil & Organic Materials. 01/12/2014, Road #1, Lots 31,32,33,34 & 35. Stripping of Top Soil & Organic Materials. 14

15 Report No: TGE /03/ /12/2014. Lot 33, Removal of Tree Stump. 15

16 Report No: TGE /03/ /12/2014. Lot 33, Removal of Tree Stump. 10/12/2014. Stripping of Dam Wall. 16

17 Report No: TGE /03/ /12/2014. Dam Wall Proof Roll. 17

18 Report No: TGE /03/ /12/2014. Dam Wall Proof Roll. 12/03/2014. Compaction & Moisture Conditioning of Dam Wall Fill Materials 18

19 Report No: TGE /03/2015 Appendix 4 NATA Lab Results 19

20

21 TGE Geotechnical Level 1 Supervision Report Lot 28- Muller Street, Redland Bay. Frostdale Civil Contractors June 2015 TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool

22 Lot 28- Muller Street, Redland Bay. Report No: TGE June 2015 Contents 1. Introduction Scope of Works Inspections/Supervision Testing Conclusion Limitation of This Report... 5 Appendix 1 Site Plan... 6 Appendix 2 Testing Summary... 7 Appendix 3 Site Photographs... 8 Appendix 4 NATA Lab Results

23 Lot 28- Muller Street, Redland Bay. Report No: TGE June Introduction Total Geotechnics has been engaged by Frostdale Civil Contractors on the 26 th June 2015, to provide Level 1 Geotechnical Supervision on Lot 28- Muller Street, Redland Bay Project (Refer Appendix 1 Site Plans & Diagrams and Appendix 3 Site Photographs). This Level 1 report presents the results of supervision activities, compaction and moisture control, material placement and laboratory testing for ground works undertaken at Lot 28 previous Septic tank area. Removal size was approximately 5.5m in length, 4m in width and 2m in depth from existing surface by Frostdale Civil Contractors. This report covers construction activities carried out for one day s level one filling on the 26 th June Scope of Works The scope of works involved the placement of On-site General Fill. Fill Material was placed in Level one fill areas, in accordance with AS , Guidelines on earthworks for commercial and residential developments. The level of FILL to be placed is less than 5m as per AS3798 Section 1.1. It has been a requirement of the Geotechnical testing Authority Total Geotechnics to follow Earthworks Guidelines and site plans specifications received by Frostdale Civil Contractors Pty Ltd. General fill material used for the construction was locally sourced on-site and predominantly comprising of Silt, Sand and Clay type material. 3. Inspections/Supervision Full time Level 1 supervision and inspection were undertaken was; 26 th June 2015, including supervision and inspections regarding the stripping and removal as per AS3798 Section 3 shall have removed: Organic soils, such as topsoils, severely root affected subsoils and peat; Contaminated soils is part of the brief; Materials which undergo volume change or loss of strength when disturbed and exposed to moisture; Silts, or materials that have deleterious engineering properties of silt; Other materials with properties that are unsuitable for the forming of structural fill; Fill that contains wood, metal plastic, boulders or other deleterious material, in sufficient proportions to affect the required performance of the fill. The maximum particle size of any rocks or other lumps, within the layer has not exceeded two thirds ( 2 / 3) of the compacted layer thickness. 3

24 Lot 28- Muller Street, Redland Bay. Report No: TGE June 2015 The lots inspected were essentially homogeneous in relation to material type and moisture condition, rolling response and compaction technique which has been used for the assessment of relative compaction of an area of work (AS3798 Section 1.2.8). Prior to placement any existing filled ground, for which the conditions of the placement are not adequately documented it has not been assumed to have been of either standard compaction or of the composition adequate to support fill and any material has been removed (AS3798 Section 2o). 4. Testing The project was classified as Residential Development for the purposes of AS (refer Table 5.1), thereby requiring a minimum compaction result of 95% Standard Compaction for the cohesive soils (AS & 5.1.1). AS further requires a minimum of 3 tests per day be undertaken throughout the placement of the fill (refer AS3798 Table 8.1) Tests were performed using a Nuclear Density Gauge for field density determination AS Testing was completed at a rate of 3 field density tests per day s production as based on the minimum requirements of AS and taken from each layer of fill placed. The filling operation was undertaken on the 26 th June The material was Site-derived General Fill. Material was placed in approximately 300mm loose layers, rolling effort with on-site Compactor (to seal of each layer of placed General Fill material) to a compacted 200mm layer that achieved 95% Standard Compaction which met Australian Standards specifications. This was considered the best method to achieve compaction using the plant and machinery available. A total of No.3 Field density and Laboratory Hilf Compaction tests were performed. The reports verify the achievement of the minimum density requirement of 95% Standard Compaction throughout the full depth area, with each layer tested accordingly. All test results were provided to our client Frostdale Civil Contractors for inclusion within their internal quality system (Refer to Appendix B Summary of Results). At the completion of the structural layers any material within 150mm of permanent subgrade level in cuttings was subjected to test rolling; test rolling was undertaken and the layers withstood test rolling without visible deformation or springing (AS 3798 Section 5.5). 4

25 Lot 28- Muller Street, Redland Bay. Report No: TGE June 2015 The lots that are covered by this Level 1 Supervision report are listed in the table below. Table 1 - Lots under Level 1 Supervision Lot,28 5. Conclusion On the completion of the earthworks and after analysing the materials used, it has been concluded that the filling procedure conducted by Frostdale Civil Contractors satisfied the requirements of AS 3798 in regards to the placement of fill materials on a project under Level 1 Supervision and in accordance with the specification as provided to Total Geotechnics. This report has been prepared for the benefit of our client with respect to the particular brief given to us and it may not be relied upon in other contexts or for any other purpose without our prior review and agreement. No responsibility for this report will be taken by Total Geotechnics if it is altered in any way, or not reproduced in full. 6. Limitation of This Report This Level 1 Report is valid for following completion of Level 1 Supervision. Total Geotechnics Pty Ltd does not accept responsibility for any distortion or deviations of measurements as reported at the given time. This report will be considered invalid if: Any works were conducted on site without the supervision of a Total Geotechnics Pty Ltd technician. Any other unforeseeable event and any event outside of time as described above. Prepared by: Authorised by: Albert Roelofs (Brisbane Laboratory Manager) Geotechnical Officer- Nata Accreditation Mob: Alvin Tan (BE Civil and Infrastructure) GradIEAust Geotechnical Engineer Mob:

26 Lot 28- Muller Street, Redland Bay. Report No: TGE June 2015 Appendix 1 Site Plan Lot 28 Level 1 Supervision 6

27 Report No: TGE June 2015 Appendix 2 Testing Summary Sample no. & Location Layer Material Type Date Tested Oversize (%) Density Ratio (%) Moisture Variation Remark Report no. RL: (%) Sample No. 252 Report No m off West Boundary 2m off South Boundary RL:26.90 General Fill % 0.5% Wetter Sample No. 253 Report No m off West Boundary 1m off South Boundary RL:27.30 General Fill % 1.5% Wetter Sample No. 254 Report No m off West Boundary 3m off South Boundary RL:27.68 General Fill % 2% Wetter 7

28 Report No: TGE June 2015 Appendix 3 Site Photographs Figure 1, Lot 28 Stripped surface of existing Septic Tank Area. 8

29 Report No: TGE June 2015 Figure 2, Lot 28 Stockpile of Level one fill material 9

30 Report No: TGE June 2015 Figure 3, Lot 28 Compacting fill layer 10

31 Report No: TGE June 2015 Figure 4, Lot 28 Compaction of Level one fill Material 11

32 Report No: TGE June 2015 Figure 5, Removal of Existing Roof water pipe. 12

33 Report No: TGE June 2015 Figure 6, Lot 28 Stockpile of Uncontrolled materials and rubbish. 13

34 Report No: TGE June 2015 Appendix 4 NATA Lab Results 14

35 Report No: TGE June

36

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING

REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING 29 February 2016 Project No. SGS/16/005 REPORT ON LEVEL 1 EARTHWORKS INSPECTION AND TESTING PROJECT: DEVELOPER: DILGP ECONOMIC DEVELOPMENT QLD SUPERINTENDENT: CALIBRE CONSULTING (QLD) PTY LTD CONTRACTOR:

More information

Report on Site Classification & Construction Testing

Report on Site Classification & Construction Testing Report on Site Classification & Construction Testing Northlakes Estate Stage 29, Cameron Park CGS1871 CGS1871 Prepared for Northlakes Pty Ltd C/- McCloy Group Pty Ltd December 2013 Report on Site Classification

More information

R.001.Rev1 JB:AJM Attention: Ronan Brady

R.001.Rev1 JB:AJM Attention: Ronan Brady ABN 75 053 980 117 www.douglaspartners.com.au Unit 4, 482 Scottsdale Drive Varsity Lakes QLD 4227 Phone (07) 5568 8900 Fax (07) 5568 8999 SEE Civil Pty Ltd Project 672803.00 24A Ozone Street 6 February

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

R.001.Rev0 SW:AJM Attention: Ronan Brady

R.001.Rev0 SW:AJM Attention: Ronan Brady ABN 75 053 980 117 www.douglaspartners.com.au Unit 4, 482 Scottsdale Drive Varsity Lakes QLD 4227 Phone (07) 5568 8900 Fax (07) 5568 8999 SEE Civil Pty Ltd Project 672803.00 24A Ozone Street 12 April 2018

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

DRENNAN, MAUD & PARTNERS

DRENNAN, MAUD & PARTNERS DRENNAN, MAUD & PARTNERS Consulting Civil Engineers and Engineering Geologists Registered Member : S.A. Association of Consulting Engineers PARTNERS: R.D. COLLYER, Pr.Eng.,B.Sc.(Eng.),M.Sc.(Eng.),MSAICE.

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Saving on the Geotechnical Investigation A False Economy

Saving on the Geotechnical Investigation A False Economy Saving on the Geotechnical Investigation A False Economy G. S. Young 1, BE, MEngSc, FIEAust and W. Ellis 2. 1 Douglas Partners Pty Ltd, 96 Hermitage Road, West Ryde, NSW 2114 PH (02) 9809 0666; email:

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents.

NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents. TNZ M/3 Notes : 1986 NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3 These notes must not be included in the Contract Documents. 1. INTRODUCTION There is no standard TNZ M/3 Specification for subbase

More information

Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21

Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21 Geotechnical Investigation and Site Classification, Northlakes Estate Stage 21 October 2009 North Lakes Pty Ltd Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 2103382A-PR_9366 Level 3 51

More information

Redcliffs Park Coastal inundation and coastal erosion

Redcliffs Park Coastal inundation and coastal erosion 48 Hereford Street Christchurch 8013 Attention: Deb Taylor Dear Deb 1 Introduction The (MoE) are looking to relocate Redcliffs School to a new school development at and are currently undertaking their

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation ABP Southampton Environmental Statement for Port of Southampton: Berth 201/202 Works Appendix B Dredge Material Characterisation Appendix B Dredge Material Characterisation Environmental Statement for

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

Assessing the benefit of green infrastructure/wsud on urban microclimate

Assessing the benefit of green infrastructure/wsud on urban microclimate Supporting the strategic planning of City of Unley (SA) towards a water sensitive city by quantifying the urban microclimate benefits using the Water Sensitive Cities Modelling Toolkit A Collaboration

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

Monitoring Report No. 022 GREENCASTLE BURIALS GREEN CASTLE COUNTY DOWN LICENCE NO. N/A PHILIP MACDONALD

Monitoring Report No. 022 GREENCASTLE BURIALS GREEN CASTLE COUNTY DOWN LICENCE NO. N/A PHILIP MACDONALD Monitoring Report No. 022 GREENCASTLE BURIALS GREEN CASTLE COUNTY DOWN LICENCE NO. N/A PHILIP MACDONALD Monitoring Report No. 022 Greencastle Burials (SMR No. Down 057:017) Greencastle Co. Down Philip

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE MAY 2010 Prepared for: Prepared by: BKS (PTY) LTD TERRATEST (PTY) LTD P.O. Box 272 P.O.

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

Comparative Study of Geotechnical Properties of Abia State Lateritic Deposits

Comparative Study of Geotechnical Properties of Abia State Lateritic Deposits IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. II (Jan- Feb. 2015), PP 77-84 www.iosrjournals.org Comparative Study of Geotechnical

More information

Prediction of subsoil subsidence caused by opencast mining

Prediction of subsoil subsidence caused by opencast mining Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). IAHS Publ. no. 234, 1995. 167 Prediction of subsoil subsidence caused by opencast mining

More information

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

6 MACRAES MINING PROJECT MINERAL ZONE

6 MACRAES MINING PROJECT MINERAL ZONE 6 MACRAES MINING PROJECT MINERAL ZONE 6.1 ZONE STATEMENT The Macraes Mining Zone applies to the area of land controlled by Macraes Mining Limited and included in Mining Permit 41-064 at the date of public

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

CE 240 Soil Mechanics & Foundations Lecture 5.2. Permeability III (Das, Ch. 6) Summary Soil Index Properties (Das, Ch. 2-6)

CE 240 Soil Mechanics & Foundations Lecture 5.2. Permeability III (Das, Ch. 6) Summary Soil Index Properties (Das, Ch. 2-6) CE 40 Soil Mechanics & Foundations Lecture 5. Permeability III (Das, Ch. 6) Summary Soil Index Properties (Das, Ch. -6) Outline of this Lecture 1. Getting the in situ hydraulic conductivity 1.1 pumping

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED

STATEMENT OF EVIDENCE OF SHANE LANDER (GEOTECHNICAL - QD2) ON BEHALF OF MURPHYS DEVELOPMENTS LIMITED IN THE MATTER of the Housing Accords and Special Housing Areas Act 2013 ("HASHAA") AND IN THE MATTER of Proposed Qualifying Development Application ("QD2") for 125 Murphys Road, Flat Bush BETWEEN Murphys

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Appendix F Geotechnical Investigation

Appendix F Geotechnical Investigation Appendix F Geotechnical Investigation Cie Sucriere de Bel Ombre Ltee Residential Development at Bel Ombre Environmental Impact Assessment F1 Geotechnical Investigation This appendix includes the Factual

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

Investigation into the effectiveness of Phoslock in sequestering bio-available phosphorus in the Torrens River to prevent algal bloom formation

Investigation into the effectiveness of Phoslock in sequestering bio-available phosphorus in the Torrens River to prevent algal bloom formation Investigation into the effectiveness of Phoslock in sequestering bio-available phosphorus in the Torrens River to prevent algal bloom formation Report prepared by D Skinner & P Hobson January, 2008 1 AIM

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

c) metamorphosis d) rock transformation a) melting and cooling b) heat and pressure a) igneous rock b) sedimentary rock

c) metamorphosis d) rock transformation a) melting and cooling b) heat and pressure a) igneous rock b) sedimentary rock Quizizz Rocks and Soil Name : Class : Date : 1. The process where rocks is transformed from one type to another is called a) rock cycle b) water cycle c) metamorphosis d) rock transformation 2. How are

More information

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet. Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1 Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Evaluation/Monitoring Report No. 259

Evaluation/Monitoring Report No. 259 SITE 100M EAST OF 16 LEARMORE ROAD CASTLEGORE CASTLEDERG COUNTY TYRONE LICENCE NO.: AE/13/36E NAOMI CARVER 1 Site Specific Information Site Name: 100m east of 16 Learmore Road, Castlederg, Co. Tyrone Townland:

More information

Harmonized European standards for construction in Egypt

Harmonized European standards for construction in Egypt Harmonized European standards for construction in Egypt EN 1998 - Design of structures for earthquake resistance Jean-Armand Calgaro Chairman of CEN/TC250 Organised with the support of the Egyptian Organization

More information

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Lecture - 01 Rock Cycle Good morning. I welcome you to this

More information

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to:

GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to: AMEC Earth & Environmental Limited 610 Richard Road, Prince George, BC Canada V2K 4L3 Tel +1 (250) 564-3243 Fax +1 (250) 562-7045 www.amec.com GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

EAGLE GOLD PROJECT HEAP LEACH FACILITY FOUNDATION IMPROVEMENT PLAN

EAGLE GOLD PROJECT HEAP LEACH FACILITY FOUNDATION IMPROVEMENT PLAN EAGLE GOLD PROJECT HEAP LEACH FACILITY FOUNDATION IMPROVEMENT PLAN 2017-01 JUNE 2017 THIS PAGE INTENTIONALLY LEFT BLANK Table of Contents TABLE OF CONTENTS 1 2 3 4 5 6 Introduction... 1 1.1 Overview...

More information

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA

Geotechnical Subsurface Exploration, Engineering Evaluation and Dam Visual Observation Sun Valley Drive Extension Roswell, Fulton County, GA Ranger Consulting, Inc. Geotechnical, Environmental, Drilling, Construction 3147 Martha Berry Highway, Rome, Georgia 165; Phone: 76-29-1782; Fax: 76-29-171 April 2, 215 Mr. Tommy Crochet, PE McGee Partners,

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Todmorden Wind Farm Geotechnical Site Investigations, Calderdale, West Yorkshire

Todmorden Wind Farm Geotechnical Site Investigations, Calderdale, West Yorkshire Todmorden Wind Farm Geotechnical Site Investigations, Calderdale, West Yorkshire Archaeological Watching Brief Report Oxford Archaeology North March 2013 I and H Brown Issue No: 2012-13/1370 OA North Job

More information

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON.

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Contract Report CSIR/BE/TIE/SKA/59E2214 August 2018 REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Authors: Dave Ventura Anele Sambo Michael Roux

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

REPORT Palmerston North City Council

REPORT Palmerston North City Council REPORT Palmerston North City Council North East Industrial Zone Liquefaction Assessment - Interpretive Geotechnical Report & Desk Top Ground Contamination Assessment. 71 72 REPORT Palmerston North City

More information

Stormwater Outlet Sediment Traps

Stormwater Outlet Sediment Traps Stormwater Outlet Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Excavated sediment trap just prior to scheduled clean-out (note energy dissipater at end of pipe) Photo 2 A supplementary straw bale barrier

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites.

This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites. Melbourne Water SANDS, CRUSHED ROCK AND CRUSHED SCORIA SPECIFICATION 21.A.038 1 GENERAL This Specification is for the supply of sands, crushed rock and crushed scoria to Melbourne Water work sites. 2 SOURCES

More information

Area-wide geotechnical information summary for CERA zoning review panel

Area-wide geotechnical information summary for CERA zoning review panel Area-wide geotechnical information summary for CERA zoning review panel This document contains all the area-wide geotechnical information which was considered by CERA as part of the process for making

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

Clay Robinson, PhD, CPSS, PG copyright 2009

Clay Robinson, PhD, CPSS, PG   copyright 2009 Engineering: What's soil got to do with it? Clay Robinson, PhD, CPSS, PG crobinson@wtamu.edu, http://www.wtamu.edu/~crobinson, copyright 2009 Merriam-Webster Online Dictionary soil, noun 1 : firm land

More information

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 Construction Materials Testing Geotechnical Engineering Environmental Consulting May 8, 2014 Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411 RE: Geotechnical Evaluation Stimson

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent

Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent Archaeological Monitoring of Land at Seacrest, Cliff Drive, Warden, Isle of Sheppey, Kent Site Code SEA/WB/15 Report for Kevin & Lesley O Brian Date of report 14/10/2015 SWAT ARCHAEOLOGY Swale and Thames

More information

Course Scheme -UCE501: SOIL MECHANICS L T P Cr

Course Scheme -UCE501: SOIL MECHANICS L T P Cr Course Scheme -UCE501: SOIL MECHANICS L T P Cr 3 1 2 4.5 Course Objective: To expose the students about the various index and engineering properties of soil. Introduction: Soil formation, various soil

More information

Telephone : G. Ntaka : Fax : M. Bénet :

Telephone : G. Ntaka : Fax : M. Bénet : Our Ref: P 24058 Your Ref: Drennan Maud cc. CK 95/54198/23 Consulting Geotechnical Engineers & Engineering Geologists VAT Reg ¹ 4770223594 P.O. Box 22997 Unit 7, Gayridge Business Park ¹ 2 MARGATE 13 Wingate

More information

EVALUATION OF GRAMPIAN SAND SANDSTONE

EVALUATION OF GRAMPIAN SAND SANDSTONE 14 September 2005 Sandstone Australia International 7 Disney Avenue KEILOR EAST VIC 3033 Attention: Mr. Harry Behncke EVALUATION OF GRAMPIAN SAND SANDSTONE CLIENT REFERENCE Request H. Behncke OUR REFERENCE

More information

Vyrnwy Pipeline, Old Marton, Shropshire

Vyrnwy Pipeline, Old Marton, Shropshire Vyrnwy Pipeline, Old Marton, Shropshire Archaeological Watching Brief - Supplementary Report Oxford Archaeology North February 2010 United Utilities Issue No: 2010-11/1013 OAN Job No: L10127 NGR: SJ 35083

More information

DRENNAN MAUD (PTY) LTD

DRENNAN MAUD (PTY) LTD DRENNAN MAUD (PTY) LTD GEOTECHNICAL ENGINEERS AND ENGINEERING GEOLOGISTS Incorporating Drennan Maud & Partners (Est.1975) and GAP Consulting Reg. No. 2014/038872/07 Durban Head Office Info@drennanmaud.com

More information

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE WP2. BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE Kjetil Arne Vaskinn, Sweco Gröner Norway Aslak Løvoll, Norconsult AS Norway Kaare Höeg, Norwegian Geotechnical Institute (NGI), Norway WP2. BREACH FORMATION

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Macka s Screened Sand for

Macka s Screened Sand for Macka s Screened Sand for U t i l i t y A s s e t W o r k 2 0 1 7 Specification Compliance with R11, AS3725, WSA PS-350, WSA PS-360, STS101 Macka's Sand - Screened Sand - Williamtown 2017- Result Summary

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

Section 5 Source Water Protection

Section 5 Source Water Protection 2017 WSP UPDATE Section 5 Source Water Protection As written in WAC 246-290-135, -668, and -690, Group A water systems are required to have source water protection. Source water protection is accomplished

More information

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? B.H. Rama & S.J. Palmer Tonkin & Taylor Ltd (T+T), Wellington, New Zealand. 2016 NZSEE Conference ABSTRACT: The Canterbury

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Salt Ash Site 220 Washed Sand for Asphalt & Concrete

Salt Ash Site 220 Washed Sand for Asphalt & Concrete Salt Ash Site 220 Washed Sand for Asphalt & Concrete 2 0 1 8 Specification Compliance with: AS2758.1, AS4058, B80, R53, R82, RMS 3152 Macka's Sand - Washed Sand 2018- Salt Ash Site 220 - Result Summary

More information

Omaroro Lower Playing Field - Geotechnical Interpretive Report

Omaroro Lower Playing Field - Geotechnical Interpretive Report Report Omaroro Lower Playing Field - Geotechnical Interpretive Report Prepared for Wellington Water Limited Prepared by Beca Limited 1 December 2017 Omaroro Lower Playing Field - Geotechnical Interpretive

More information

The Soils and Land Capability for Agriculture. Land North of Aberdeen, Aberdeenshire

The Soils and Land Capability for Agriculture. Land North of Aberdeen, Aberdeenshire The Soils and Land Capability for Agriculture Of Land North of Aberdeen, Aberdeenshire Report prepared for Peter Radmall Associates May 2012 Reading Agricultural Consultants Ltd Beechwood Court, Long Toll,

More information

DIDSBURY FLOOD STORAGE BASIN, GREATER MANCHESTER

DIDSBURY FLOOD STORAGE BASIN, GREATER MANCHESTER DIDSBURY FLOOD STORAGE BASIN, GREATER MANCHESTER Archaeological Watching Brief Report Oxford Archaeology North August 2009 Environment Agency Issue No: 2009-10/971 OA North Job No: L10130 NGR: SJ 8415

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES John Seitz, RA, LEED AP Assistant Adjunct Professor Professor Paul C. King, RA, AIA, ARA Assistant Professor Geology Geology is the scientific study of the structure and composition of the earth s surface

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7.

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7. CONTENTS Page 1. GeneralsG 4 2. Field Investigation WorkG 4 3. Laboratory Testing Work--- 5 4. Surface Soil Description-- 7 Appendix A Borehole Location Plan 11 Soil Profile-- 15 Bore Logs--=---- 18 Appendix

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

Clyde River Landslide

Clyde River Landslide Clyde River Landslide Department of Geology, Perkins Hall, University of Vermont, Burlington, VT 05405 Abstract: This paper investigates a landslide on the Clyde River in Newport, Vermont. The landslide

More information