1 (Color Granite Quarry lease area Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY Flat # 7-3 Dhruvatara Apartments Amrutha Estates Erramanjil Somajiguda Hyderabad Phone: / 71 E mail: pelcpl@gmail.com, pelcpl@yahoo.co.in PEOPLE WHO CARE FOR ENVIRONMENT SAVE ENVIRONMENT

2 INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 2 2. DETAILS ABOUT THE QUARRY LEASE AREA 3 3. MINING ACTIVITY 6 4. ENVIRONMENTAL MANAGEMENT PLAN COST FOR ENVIRONMENTAL MANAGEMENT 18 1 P a g e

3 1.0 INTRODUCTION Krishna Merchants Pvt. Ltd., is an existing quarry lease operating, over an extent of Hectares at Sy. No. 1 of Addukonda Village, Tekkali Mandal, Srikakulam District, Andhra Pradesh with production capacity of 2400 m 3 Per Annum. PROFILE OF THE PROJECT PROPONENT Krishna Merchants Pvt. Ltd. is a private limited company and Mohit Gupta is the Director of the company. Mohit Gupta is highly experienced in Granite business and leads a time of professional of experts in the Granite Mining Field. The firm not only has the required machinery but is financially sound to work the quarry in a very systematic and scientific manner. BRIEF DESCRIPTION OF THE QUARRYING ACTIVITY NATURE This project involves quarrying of colour granite. This mineral will be quarried by Semi-mechanized open cast mining method. SIZE OF THE PROJECT The quarry lease being operated at the rate of production capacity of 2,400 m 3 Per Annum in Quarry Lease Area of hectares at Sy. No. 1 of Addukonda Village, Tekkali Mandal, Srikakulam District, Andhra Pradesh. The project cost is Rs. 1.5 Crores. 2 P a g e

4 2.0 DETAILS ABOUT THE PROPOSED MINE SITE The Quarry lease area of Hectares of land is situated at Sy.No. 1 of Addukonda Village, Tekkali Mandal, Srikakulam District, Andhra Pradesh. The following is the environmental setting of the Quarry lease area. a. No National Parks/ Sanctuaries within 10 Km radius. b. Suitability of land from geological and topographical aspects. c. Non intersection of ground water table with the Quarrying activity. The geographical and Environmental features with in 10 Kms. of the Mine are as following. ML area Working depth Ground water table depth Intersection of Quarrying with Ground water Table Details of water bodies / lakes / rivers / nallahs Wildlife Sanctuaries /Bird Sancturies/ National Parks Reserve Forests R & R Nearest habitation Road Network Nearest Rail Head Hectares 10 m m below the surface The maximum depth of quarrying operation will be 10 m. Hence the quarrying activity will not intercept the ground water table. There are no major water bodies within 10 Km radius of the lease area There are no Wildlife Sanctuaries/Bird Sanctuaries / National Parks within 10 Km radius. Peddakedari RF 1.9 Kms Temburukonda RF- 3.2 Kms Polavaram RF Kms Not applicable Nuguddi 0.45 Kms The Q.L area is located at a distance of 5 Kms NW of Tekkali town. It is located on Tekkali Bheempuuram village passing through villages like Borigipeta, Ramakrishnapuram and a diversion towards west from the road crossing from Seethapuram to Bheempuram leads to the quarry. The quarry is approachable by good road upto the quarry. Tekkali 3.5 Kms 3 P a g e

5 Nearest Airport Method of Quarrying Source of water Water Requirement Inter State Border Defence Installations List of Industries Seismicity Major crops Rehabilitation & Re-settlement Product Total estimated Investment Present land use Nil (Vishakapatnam Kms.) Semi-mechanized open cast method Bore well 21 KLD No interstate boundary with in 10 Km. radius. (Odisha 17.0 Kms.) Nil Few granite quarries exists within 10 Km. radius. The study area falls under seismic zone - III Paddy, Green gram, Black gram Not Applicable Colour Granite Rs. 1.5 Crores Quarrying operation being under taken to extract Colour Granite Forest land in the project site No Forest land is involved in the mine. SITE SERVICES Rest Rooms, First Aid Room, Shelters, Lavatory, Bore Well for drinking water have been provided at Quarry Site GEOLOGY OF THE AREA Regional Geology: In and around Srikakulam and Parlakimundi Blue and Brownish granite is extensively quarried. It is a part of Eastern Ghat group of rocks consisting of Chornokites. Khondalite and Granitoids a variety of hybrid rock formed by the interaction of Intrusive granite into the Khondalite. The Eastern ghat group attains a maximum thickness in the Ganjam -Cuttack tract. It occurs as ridges trending NE- SW. The eastern ghat belt exhibits high grade metamorphism as evidenced by the presence of Garnet and Silliminite. The Chornokite shows intrusive relation towards Khondalite and has itself under gone post migmatic changes. Felspathic bands are common and are due to Granitisation. Geology of the Area The terrain in and around the area is of undulating in nature. The major portion of the area is occupied by big boulders and sheet of Charnockite gneiss which consists of Quartz, Grey feldspar, Sillemanite and other Ferro Magnesium minerals like 4 P a g e

6 Hypersthene, Hornblende, Biotite and Garnet. The felsic and mafic bands alternate with i each other to which imparts a very good texture to the rock. The overall background of the rock is bluish. Two set of joints are observed, one is parallel and the other perpendicular to strike direction. They are widely spaced and are useful in splitting big blocks from the mother rock. The rock at places is intruded by quartz vein and feldspar band. The weathering extends to a depth varying from few inches to a foot in some areas. A megascopic and polished sample indicates that the rock takes good polish and exhibits fine texture. 5 P a g e

7 3.0 MINING ACTIVITY INTRODUCTION Quarry lease area being operating over an extent of Hectares is located at Sy. No. 1 of Addukonda Village, Tekkali Mandal, Srikakulam District, Andhra Pradesh. LOCATION AND ACCESSIBILITY: a) Details of the Area: District Ownership of Village Mandal Sy. No s. Extent State Occupancy Srikakulam Addukonda Tekkali Ha Govt. Land The area is located in Survey of India Topo Sheet No. 74 B/2 b) Infrastructure: The Q.L area is located at a distance of about 5 Kms NW of Tekkali town. It is located on Tekkali - Bheempuram village passing through villages like Borigipeta, Ramakrishnapuram, and a diversion towards west from the road crossing from Seethapuram to Bheempuram leads to the quarry. The quarry is approachable by a good road up to the quarry RESERVES The reserves are estimated by cross sectional method. It consists of multiplying the sectional area by the zone of influence which is the distance between the two cross sections. Based on the information obtained from the mapping the area 'proved' category reserves may be estimated from the top of the hill to a depth of 10 m. From the base of the proved zone, a 5 m depth is considered for the estimation of the reserves under the 'probable' category and from the base of the probable zone, a 5 m depth is considered for the estimation of the reserves under the 'possible' category. Total Mineable Reserves Mineable are calculated taking the Proved reserves category only into consideration which is 23, 17,000 cu m. The reserves blocked in the mine safety benches, and blocked in 7.5 m buffer zone and quantity depleted are deducted from the proved reserves. Recovery is considered as 20 %. The mine able reserves thus arrived are presented below 6 P a g e

8 S.No Description Quantity in cum. 1 In situ reserves under proved category 23,17,000 2 Reserves blocked in the 7.5 m buffer zone 1,62,660 3 Blocked in mine benches 1,15,850 4 Depleted so far 15,874 5 Total reserves blocked (2+3+4) 2,94,384 6 Balance Reserves (1-5) = 20,22, % 4,04,523 Considering the recoverable mineable reserves as 4,04,52,3 cum and an average production level of 2,400 cu m per annum, and the life of the mine is years or say 169 years. The life of the mine is likely to change once the quarry is opened up fully and the recovery parentage is arrived at correctly. MINING Method of Mining (Semi Mechanized) The Colour Granite in the applied is proposed to be mined by open cast, semi-mechanized method. The granite deposit in this area is surface covered with weathered boulders and fresh boulders. The separation of blocks from the mother rock will be carried out by drilling, blasting, excavation. The secondary splitting, dressing of blocks will be done manually. Therefore, mining operations to be carried out in this area in 2 stages. 1) Development 2) Production Stage-1 The removal of weathered and under sized boulders will be cleared in the applied area for the next five years by using Excavator. The sheet that is exposed will be subjected to drilling, blasting and splitting from mother rock. Rock Splitting / Wedging: Thus 20' x 20' to 40 x 20 to 40' mass will be separated from mother rock. Then horizontal holes will be drilled at the bottom of the bench, by wedging or blasting with water cartridges and cardex fuse, bottom separation will be achieved. Splitting the Mass: For splitting the mass from mother rock the line drilling and wedging method is in use; with Jack Hammers and this waste will be dumped at dumping yard using Tipper. 7 P a g e

9 Stage-2 After removal of weathered and under sized boulders. The large boulders will be subjected to splitting into required sizes of blocks by using Jack Hammers by drilling series of deep holes at right angles at regular intervals, later by inserting feather and wedges in these holes and hammering with sledge hammer will release the blocks. The burner cutters will be deployed for shaping the boulders. The boulders will be splited to the required sizes with drilling and if required by using chemical compound at the source only. The boulders separated will be brought to the dressing yard for dressing. If the boulders, which fit into the required market grade size will be transformed into cuboids. Secondary Splitting: After separation from the mother rock, it is properly checked by washing with water to identify defects and cracks. Based on this observation, the size is decided and the blocks are marked and separated by drilling and wedging. The separated pieces will be examined for defects and lines, then the block or blocks are marked in clear area and holes are drilled along the line of marking, with the help of feathers and wedges the waste portions are separated forming a rectangular blocks. Any bulges will be removed by drilling and wedging making it perfect blocks. A perfect block is that all the sides shall make with each other 90. Dressing: After primary separation the rock mass will be carefully examined to avoid hairline cracks, mineral segregation's and veins etc. The dressing of the rough blocks will be made by chipping the edges and geometrically equating the edges of the block at the dressing yard. The rough blocks obtained after primary cut it will be dressed for obtaining good geometric shape of coloured granite. Dressing of dimensional rough blocks for export: Dressing is the final phase of mining operation, wherein the secondary rough blocks are squared into regular perfect rectangular sizes, thereby avoiding uneven bulge or cavities and other defects. Jackhammers with compressor, feather end wedges and sledgehammers are the equipment generally used for dressing the block. 8 P a g e

10 Drilling Drill hole pattern will be uniform single lined pattern, equidistance holes from 0.33 m to 0.75 m, 4.5 m in depth. Drilling Parameter Drill hole diameter- 34 mm Spacing depends upon the size of the boulder, in general it 15 cms from hole to hole for better splitting. Production Schedule The production of colour granite will be continuous throughout the year expect during monsoon. That is 10 working months, 20 working days per month are considered. The production of 2,400 m 3 per year can be easily achieved in a single shift with sufficient men and machinery. Year Volume in cum Recoverable blocks Wastage 80% in cum (20%) cum , , , , , Handling the Blocks Within The Quarry Since the size of the boulder is big therefore it has to handled by a crane. The blocks will be dressed at the pit mouth and after checking the quality will be transported to the stock yard. The waste will loaded into the tippers and transported to the dump yard. The size of the block produced from the quarry may vary cm in length, cms in width and cms in height. Hence a crane and 4 excavators are sufficient to handle the blocks within the quarry. Magazine Type and Capacity Since there is no overburden and the boulders are exposed near the surface, the boulders can be easily dislodged and hence the requirement of explosive will be very less or negligible. However rock breaking powder will be used to split the boulders. The company has installed a portable magazine after taking necessary permission from the concerned authority. 9 P a g e

11 Description of Processing Plant The applicant intends to export dressed raw blocks and sell them to local processing units. The applicant does not possess a processing plant at the moment. Transportation of Blocks From Quarry To Yard And Destination Dressing of the blocks will be done at the pit mouth and are transported to stock yard by tippers. The dressed blocks will be transported to the various destinations by hired trucks. Man power The quarry operation will provide employment to the following: 1) Mines Manager 1 2) Compressor Operator 4 3) Drillers 20 4) Excavator operator 2 5) Excavator Helper 2 6) Tipper Drivers 4 7) Cutters 10 8) Helpers 3 9) Watch man 2 10) Water Carriers 2 11) Accountant 1 12) Store Keeper 1 13) Supervisors 2 10 P a g e

12 Site Services The rest shelter cum office, First aid room and toilets are constructed in the flat portion of the area. The roof is of asbestos sheets covered to keep it cool in Summer. A first aid certificate holder will be in charge of the first aid room. Protected drinking water will be provided and stored in earthen pots. 11 P a g e

13 4.0. ENVIRONMENTAL MANAGEMENT PLAN AIR ENVIRONMENT The major pollutant emitted from quarrying activity is dust and major sources of dust are due to Quarrying and vehicular movement. The following measures will be adopted in quarrying to eliminate the fugitive dust emission. PROPOSED MITIGATION MEASURES Wet drilling. Water sprinkling on Quarry haul roads & approach road for dust suppression. Planting of trees along Quarry haul roads. Covering loaded trucks with tarpaulin while transporting Granite Regular grading and compaction of haul roads. Proper housekeeping at the Quarrying, loading and dispatch areas will be practiced. The dust rising due to drilling will be controlled by covering the drill rods with cloth, dust extractors will also be employed. WATER ENVIRONMENT WATER REQUIREMENT The Granite Quarrying activity requires 21 KLD of water. This includes water for Drilling, identification of defects/cracks in granite blocks, Dust suppression and domestic purpose. Water required will be sourced from bore well. The depth of Bench Height will be 6 m. There will not be intersection of ground water table as the quarrying operations will be taken on hillock. S. No. Item Water Requirement in KLD 1. For Dust Suppression with in the QL roads For Dust Suppression along the approach Road For Drilling and identification of cracks For Domestic Use For plantation with in buffer area For plantation along the approach Road 1.2 Total P a g e

14 WASTE WATER The wastewater generated during identification of defects/cracks in granite blocks will be recycled back. The only source of waste water generation is sanitary waste water (1.2 KLD), which will be sent to septic tank followed by sub-surface dispersion. No further processing of Colour Granite is envisaged. It will be directly sold to outside parties. IMPACT DUE TO VEHICULAR TRAFFIC Maximum an average of 1 trucks per day will be required to transport granite to outside agencies. NH-5 is at a distance of 3 Kms. from QL area. The existing road is capable of absorbing this additional traffic. Dust suppression will be taken up along the haulage roads & approach roads. Hence there will not be much impact on air environment due to transportation of granite. NOISE ENVIRONMENT The haulage and the drilling of boreholes generate Noise. In the Quarry lease area silent blasting will be done by using AGFRACT Chemical Compound. However, the probable noise level will be within the permissible limits and will not cause harm. The following will be noise control measure: The machinery will be maintained properly to reduce the noise. The protective noise reducing gear like earmuffs, the company will provide earplugs. Proper maintenance of equipment. The Granite will be transported by road through vehicles. All the vehicles to be used for transport will comply with MOEF norms for vehicles on noise levels (as per the rules of Motor vehicles act). Plantation will be taken-up as per norms. Acoustic enclosure will be provided to DG set. Hence there will not be any adverse impact on environment due to the Quarrying activity. LAND ENVIRONMENT ANTICIPATED IMPACTS Due to this small scale mining activity the land degradation will be very less. It is estimated that about Ha of land will be used for quarrying purpose. 13 P a g e

15 The top soil generated, if any, will be stored separately and will be used for plantation purpose. During quarrying whatever solid waste is generated will be dumped at dumping site. SOLID WASTE During the five years period the total quantity of waste likely to be generated is 41,760 cu m. It consists of granite blocks of various sizes, shapes and dimension. Soil component will be minimal but will be stacked separately from the mine waste. It is estimated that about 1, 67,040 cum of waste will be generated during the lease period. Some of the material from the waste may be sorted out and used for making small blocks known as' khandas' to be used by local units for making tiles. The market for tiles is good at the moment and they will offer a better substitute for marble in terms of price and quality. Some rejected and unsorted material may be used in the civil engineering projects in the vicinity of the area. The waste material can also be crushed into smaller sizes and can be used as road metal. The waste generated during the five years will be dumped in the zone separately reserved for dumping in the area. The dumps will be designed in such that it will have slopes equal to the angle of repose of such material. Drains have been provided and the dump terraced. Garland drains will be provided around the dump. During mining in next 5 years a total of 41,760 M 3 of waste will be generated and dumped at the dumping yard, on an average of 8352 M 3 per annum. The waste generated will be dumped in the Southern side of the quarry lease applied area (Within the quarry lease applied area). Year Waste Generation Rock 80% (M 3 ) 1 st nd rd th th 9600 TOTAL 41,760 AVERAGE 8,352 In this quarry 41,760 m 3 of waste will be generated during development and production in 5 years period. Average waste generation per Annum will be 8,352 m 3. Total Waste generation for Five years Period - 41,760 Cum 14 P a g e

16 Total Waste generation for lease period - 1,67,040 Cum Height of waste dump will be 30 m. Area required for dump will be 2 x 5568 m 2 i.e. 11,136 m 2 OR ha. The dump yard will be Southern side QL area. A retaining wall will be constructed around the dump for preventing the slanting of boulders. Garland drain will be constructed around dump yard RETAINING WALL A retaining wall will be constructed around the dump for preventing the slanting of boulders. Cost for Retaining wall for 1 m (L) x 2m (H) - Rs /- Total length of the Dump Area (perimeter of the dump) m Total Cost for proposed Retaining wall for remaining Lease Period x 1400 = Rs. 10,31,800 /- GARLAND DRAIN Garland drain of 0.5 m (W) x 0.5 (D) will be constructed around the dump Cost for proclainer per hour for 5m length Garland drain - Rs. 600 per Hour Total length of the Garland drain m Total hours m / 5m per hr = hr Cost for Proclainer for constructing total Garland drain x 600 = Rs. 88,440/- Cost for constructing Stone Pitching - Rs.73,700 Total Cost for proposed Garland drain for Lease Period = Rs. 88,400 + Rs. 73,700 = Rs. 1,62,140 /- GREEN BELT DEVELOPMENT Each year some part of the barrier zone will be subjected to afforestation and care will be taken to protect the sapling. PLANTATION COST DETAILS Cost of garden soil+ compost for filling 0.5 cum : Rs 100 Cost of sapling : Rs 60 Total capital cost per sapling : Rs 160 Total plantation area proposed with in QL area : 4500 m 2 15 P a g e

17 Total no. Of saplings in Buffer Area Total capital cost for plantation in QL area : 500 x Rs. 160 Total plantation area proposed along the approach road : 500 nos. : Rs 80,000 : 1000 m Total length for avenue plantation on both sides of approach road : 2000 m / 10 Number of plants to be 10 m space on both sides : 200 Cost per sapling with garden soil & compost : Rs. 160 Total cost for avenue plantation : 200 x 160 : Rs 32,000 Cost per each Tree Guard : Rs. 200 /- Total cost for Tree guards : 200 x 200 = Rs. 40,000 TOTAL COST FOR PLANTATION : Rs. 80, , ,000 = Rs. 1,52,000 OCCUPATIONAL HEALTH & BUDGET Dust masks (54 nos.) will be provided for control of dust. Ear plugs (54 nos.) will be provided to employees to reduce the Noise impact. Health check-up will be carried out for all employees in an external hospital yearly once and medical records will be maintained Rs. 3000/- per person/year will be allocated employee occupation health. Periodicity of health checkups done for yearly for workers working in Quarry. Blood test (once in a year) Urine test (once in a year) Complete Physical examination (once in a year) X-ray of chest (once in a year) Lung/Pulmonary function test (once in a year) Sputum Examination (once in a year) 16 P a g e

18 POST PROJECT MONITORING PROGRAMME Monitoring of all the environmental parameters viz, air, water, noise and soil as per the formulated program based on CPCB and MOEF guidelines every year in order to detect any changes from the baseline status. Monitoring program will be followed till the quarrying operations continue. For implementation of Environment management Plan a small unit will be formed under control of the Mines manager. The job of this unit will be regular environmental monitoring, preparation and submission of environmental report, green belt development, etc. 17 P a g e

19 5.0 COST FOR ENVIRONMENTAL MANAGEMENT The following is the Budget proposed for Environmental Management Plan. S.No. DESCRIPTION ITEM CAPITAL COST IN RS. RECURRING COST IN RS. 1 Air pollution Dust masks (54 nos.) Nil 16,200 Cloth for drillers- 12 nos. 1 m Nil each 4,800 Gunny bags for covering the Nil surface of jack hammer holes 4,800 Dust Suppression 6,50,000 1,89,600 Plantation in Quarry lease area and buffer zone 1,52,000 70,000 2 Water pollution Construction of garland drains 1,62,140 Nil Construction of retaining wall Nil 10,31,800 for waste dump 3 Noise pollution Maintenance of machinery Nil suitably 40,000 Ear plugs (54 nos.) Nil 13,500 4 Environmental Ambient Air Quality Nil monitoring monitoring (PM 10 & PM 2.5 ) 48,000 Noise level 5 Occupational health (54 nos.) Nil 1,62,000 Total 19,95,940 5,48, P a g e

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

INDEX. Environmental Management Plan

INDEX. Environmental Management Plan Environmental Management Plan M/s. N.V. Exports [Quarry Lease Area - 0.615 Ha.( 1.52 Acres)] Sy. No. : 11/1 Village : R.L. Puram Mandal : Chimakurthy District : Prakasam State : Andhra Pradesh ENVIRONMENTAL

More information

M/s BENITA INDUSTRIES LIMITED

M/s BENITA INDUSTRIES LIMITED M/s BENITA INDUSTRIES LIMITED (Colour Granite Quarry 19.150 Ha.) Sy. No: 82-1 of Kambadur (V), Kambadur (M), Ananthapur District, Andhra Pradesh State. ENVIRONMENTAL MANAGEMENT PLAN 0 P a g e INDEX S.

More information

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz

More information

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District, 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone

More information

Smt. M. Hari Chandana

Smt. M. Hari Chandana Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

lit)'*'" m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated:

lit)'*' m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated: Lr.No.233 /QlzOrL GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOGY D Dated: 7.03.2018 From Sri G. Shivaji, M.Sc., Tech.,, Asst. Director of Mines and Geology (FACJ, Srikakulam. To The SEIAA Govt.

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha) M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

1. INTRODUCTION. EMP Report For Colour Granite Mine of Ha, located in Nellipudi Village, Gangavaram Mandal, East Godavari District, A.P.

1. INTRODUCTION. EMP Report For Colour Granite Mine of Ha, located in Nellipudi Village, Gangavaram Mandal, East Godavari District, A.P. 1. INTRODUCTION 1.1 INTRODUCTION M/S MARS GRANITES was granted a quarry lease over an extent of 1.520 Ha in Sy No: 486/1 & 488/1, Nellipudi Village, Gangavaram Mandal, East Godavari District in the State

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. B.K.R. GRANITES 4.790 HA. BLACK GRANITE MINING COMP NO. 205 &215 RAGIMANUPENTA & PARADARAMI R.F., YADAMARRI (M) CHITTOOR (DT), ANDHRA PRADESH. Submitted by SV ENVIRO

More information

ENVIRONMENTAL MANAGEMENT (CLUSTER)

ENVIRONMENTAL MANAGEMENT (CLUSTER) /+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna

More information

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha ENVIRONMENTAL MANAGEMENT PLAN FOR CLUSTER MINES For M/s VIGNESHWARA MINES & MINERALS RAVALUDIKI DOLOMITE & STEATITE MINE Production : Dolomite-4500 TPA, High Grade Steatite-3375, Low Grade Steatite-2250

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Submission By M/s PIONEER TOR STEEL MILLS PVT LIMITED FOR LATERITE [ROM]-11,19,144.60 TPA@67% PRODUCTION-7,49,826.88 TPA Extent-9.813 Hect. Sy. No. 396 / P, Bheemanpally[V],

More information

Cluster Environmental Management Plan (13.0 Ha Ha = 15.0 Ha)

Cluster Environmental Management Plan (13.0 Ha Ha = 15.0 Ha) (13.0 Ha + 2.0 Ha = 15.0 Ha) On Quarrying of Colour Granite Of M/s. Sri.Gandi Suryanarayana Colour Granite At Survey No. 171 of Gudem (V), Tekkali (M), Srikakulam District, Andhra Pradesh SUBMITTED TO

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of GRAVEL & BUILDING STONE QUARRY For Sri Prathipati. Ram Prasad 1.235 HA GRAVEL & BUILDING STONE QUARRY SY. NO. 860, Vedurupavuluru (V), Gannavaram(M), Krishna(DT), ANDHRA

More information

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala

More information

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SRI SAI MINES & MINERALS was granted Mining lease for Quartz & Feldspar in Survey Number 3.30 over an extent of 3.30 Hect. In sy No. 326 & 330 Budharam village, Gopalpet

More information

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E) 1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,

More information

The mining plan for the above quarry lease was approved on Copy of the approved mining plan is enclosed as Annexure III.

The mining plan for the above quarry lease was approved on Copy of the approved mining plan is enclosed as Annexure III. 1.0 EXECUTIVE SUMMARY M/s. Bhargavi Granites was granted a prospective license for Color Granite over an extent of 1.820 Ha in Survey No: 319 of Byripuram Village, Kanchili Mandal, for a period of 2 years

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State SECOND SCHEME OF QUARRYING FOR BLACK GRANITE Extent : 1.36 Hectares 2019 SECOND SCHEME OF QUARRYING FOR BLACK GRANITE (Under Rule 7 B of TSMMC Rules, 1966) INCLUDING PROGRESSIVE QUARRY CLOSURE PLAN (Under

More information

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2014 15 TO 2018 19) (FOR THE ENSUING BALANCE 2 YEARS

More information

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.

More information

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE Village Ashapura Tehsil Nasirabad District Ajmer State Rajasthan Capacity 35945 TPA ROM (Max) Lease Area

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN M/s. RADHAKRISHNA MICA MINING COMPANY [QL area - 13.27 Ha.(32.8 Acres)] Sy. Nos.1134/2, 1135/1A, 1136/1, 1137/1, 1138, 1139 & 1141, Griddaluru Village, Sydapuram Mandal, SPSR Nellore District ENVIRONMENTAL

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

Appendix D Rock Blasting Report

Appendix D Rock Blasting Report Appendix D Rock Blasting Report 02-2500-01 May 20, 2005 Frank Arciero Jr. Fallingstar Homes 27231 Burbank Foothill Ranch, California 92610 Subject: ANTICIPATED ROCK EXCAVATION FRAZIER PARK ESTATES DEVELOPMENT

More information

Early Exploration Plan Activity Information

Early Exploration Plan Activity Information Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of

More information

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For MINING PLAN (QUARRYING OPERATIONS) FOR ROAD METAL & BUILDING STONE Over an extent of 2.000 Hectares in Sy. No. 134 Routhusuramala (V), Thottambedu (M), Chittoor District Andhra Pradesh State (FOR THE PLAN

More information

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist. MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares

More information

TABLE 1.1: Salient features of the project Black Granite Mine of M/s. Shashi Granites

TABLE 1.1: Salient features of the project Black Granite Mine of M/s. Shashi Granites 1. EXECUTIVE SUMMARY 1.1 Introduction M/s. Shashi Granites, is having quarry lease area for Black Granite mine over an extent of 1.0 Hectares at Survey No. 249/4, Chinthapally(V), Kuravi(M), Mahabubabad

More information

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher 1. EXECUTIVE SUMMARY: M/s. Ulikkal Stone Crusher had made an application for Granite building stones quarrying located in Sy. No. 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State.

More information

Granite Building Stone Quarry of Sri. Sajan Mani.

Granite Building Stone Quarry of Sri. Sajan Mani. 1. EXECUTIVE SUMMARY: Sri. Sajan Mani had made an application for Granite building stone quarrying located in Sy. No. 2398, Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. Over an extent

More information

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL & GRAVEL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) INTRODUCTION Over an extent of 0.810 Hectares in Sy. No. 01 of

More information

HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS

HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS BACKGROUND INFORMATION THE COMPANY The cement works are in Clitheroe. Hanson Cement owns the cement works. The cement works

More information

CHAPTER 3 SPECIFIC METHODS FOR SAMPLING ROAD CONSTRUCTION MATERIALS

CHAPTER 3 SPECIFIC METHODS FOR SAMPLING ROAD CONSTRUCTION MATERIALS CHAPTER 3 SPECIFIC METHODS FOR SAMPLING ROAD CONSTRUCTION MATERIALS NATURAL MATERIALS SAMPLING METHOD MA 1 SAMPLING OF A NATURAL ROCK MASS 1. SCOPE This method describes the taking of samples from a test

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

Geoscientific Instrumentation in River Valley Projects

Geoscientific Instrumentation in River Valley Projects J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon

More information

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

International Journal of Modern Trends in Engineering and Research   e-issn No.: , Date: April, 2016 International Journal of Modern Trends in Engineering and Research www.ijmter.com e-issn No.:2349-9745, Date: 28-30 April, 2016 Landslide Hazard Management Maps for Settlements in Yelwandi River Basin,

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE MINING PLAN FOR ROAD METAL & BUILDING STONE OVER AN EXTENT OF 1.894Hect. LOCATED IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE Introduction Sri.K.Venkataramana,

More information

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011 MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NZQA unit standard New US6 to replace and version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able

More information

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction Sri K. Ravi Shankar filed an application to Department of Mines and Geology for grant of Quarry lease for Colour Granite in Sy. No. 100, Odulapalle Village,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30

More information

PROGRESS GALLERY Advancing our projects

PROGRESS GALLERY Advancing our projects November 23, 2017. Ignition of the detonating cord for the first blast marked the start of development of the twin declines to access the ultra-high-grade Kakula Copper Discovery on the Tier One Kamoa-Kakula

More information

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants Introduction to Coal Mining History of Coal in the United States Coal was one of man s earliest sources of heat and light Coal was first

More information

List of Sites in District 2C Source Number

List of Sites in District 2C Source Number List of Sites in District 2C Source Number 03-002-1...2 03-021-1...4 03-070-1...6 14-002-1...8 14-007-1...10 14-011-1...12 14-015-1...14 26-004-1...16 26-007-1...18 26-010-1...20 26-013-1...22 26-036-1...24

More information

Roadmap to Stability

Roadmap to Stability Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to

More information

about GCC

about GCC about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com

More information

Resource Classification Systems by Dan Alexander

Resource Classification Systems by Dan Alexander Resource Classification Systems by Dan Alexander EIA US Coal Reserves: 1997 Update SME Working Party #79, 1992 USGS Geologic Survey Circular 891, 1983 USBM/USGS Circular 831, 1980 SEC Securities Act of

More information

EXECUTIVE SUMMARY INTRODUCTION

EXECUTIVE SUMMARY INTRODUCTION EXECUTIVE SUMMARY INTRODUCTION M/s Mysore Minerals Limited is a Government of Karnataka undertaking established in the year 1966 with main objective of systematic mining and planned development of mineral

More information

7 Years of Cutting Edge Technology for the Mining Industry in Canada

7 Years of Cutting Edge Technology for the Mining Industry in Canada 7 Years of Cutting Edge Technology for the Mining Industry in Canada Verena Schreiner, BAUER Resources Canada Ltd The Bauer Group The Bauer Group The Bauer Group Segment Resources Three Main Competences

More information

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh 1) Executive Summary Project Name of Company / Mine Owner Location PRE FEASIBILITY REPORT Kuppli- Koyyam Mineral Sands Deposit-I, Pre-concentration Plant (PCP). M/s. Andhra Pradesh Mineral Development

More information

9. GEOLOGY, SOILS, AND MINERALS

9. GEOLOGY, SOILS, AND MINERALS June 28, 2018 Page 9-1 9. GEOLOGY, SOILS, AND MINERALS This EIR chapter describes the existing geological, soil, and mineral conditions in the planning area. The chapter includes the regulatory framework

More information

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Summary The main shaft at the Prestwood mine has been fully rehabilitated to 4

More information

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study

Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,

More information

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL Land Restoration / Reclamation Monitoring of more than 5 million cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2013 Ashoka & Piparwar

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

The following Environmental Management Programme (EMP) was also approved in terms of the issuing of the above-mentioned mining right:

The following Environmental Management Programme (EMP) was also approved in terms of the issuing of the above-mentioned mining right: 1. INTRODUCTION Belfast Silica Mine is located on the Remaining Extent of Portion 1 of the farm Klipfontein 385 JS, which is situated approximately 8 km north west of Belfast and Siyathuthuka (Figure 2.1).

More information

Wikipedia.org BUILDING STONES. Chapter 4. Materials of Construction-Building Stones 1

Wikipedia.org BUILDING STONES. Chapter 4. Materials of Construction-Building Stones 1 Wikipedia.org BUILDING STONES Chapter 4 Materials of Construction-Building Stones 1 What is Stone? Stone is a concretion of mineral matter. Used either as a; Construction material, Manufacture of other

More information

SCHOOL OF ENVIRONMENTAL SCIENCES

SCHOOL OF ENVIRONMENTAL SCIENCES SCHOOL OF ENVIRONMENTAL SCIENCES DEPARTMENT OF MINING AND ENVIRONMENTAL GEOLOGY SYFERFONTEIN DOLOMITE MINE INDUSTRIAL ATTACHMENT SURNAME & NAMES STUDENT NUMBER MBEDZI ADAM 11602169 MULEYA SALUME 11595033

More information

Geology and Nonrenewable Mineral Resources

Geology and Nonrenewable Mineral Resources Environmental Science, 15e MILLER/SPOOLMAN G. TYLER MILLER SCOTT E. SPOOLMAN 12 Geology and Nonrenewable Mineral Resources Core Case Study: The Crucial Importance of Rare Earth Metals There are 17 rare

More information

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075 14647 State Route 511, Oberlin/Kipton, OH 44075 56 ACRES Vermilion Rd Gifford Rd Haigh Rd 44 Summary The Kipton sandstone quarry is included in 56 acre tract owned by Terry A. Johnson, of Huron, Ohio.

More information

ZONED PEGMATITES OF THE MICANITE DISTRICT FREMONT & PARK COUNTIES, COLORADO

ZONED PEGMATITES OF THE MICANITE DISTRICT FREMONT & PARK COUNTIES, COLORADO ZONED PEGMATITES OF THE MICANITE DISTRICT FREMONT & PARK COUNTIES, COLORADO By Andy Weinzapfel INTRODUCTION The below article is based on library research and field work conducted during 2007. The Micanite

More information

Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya

Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya IEM-GSM Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya DISCONTINUITIES STUDY AND ROCK SLOPES STABILITY ANALYSIS FOR ROCK MASS AT DAMANSARA

More information

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana 113 Dated: 30 June 2018 To, The Director (IA Division, Non-Coal Mining), Ministry of Environment, Forest and Climate Change (MoEF&CC) Indira Paryavaran

More information

Dolores Public Lands Office Highway 184 Dolores, CO Ph (970) Fax (970)

Dolores Public Lands Office Highway 184 Dolores, CO Ph (970) Fax (970) USDA Forest Service San Juan National Forest Mancos/Dolores Ranger District http://www.fs.fed.us/r2/sanjuan Dolores Public Lands Office 29211 Highway 184 Dolores, CO 81323 Ph (970) 882-7296 Fax (970) 882-6841

More information

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units June 26, 2007: Low Impact Development 1 Associated Earth Sciences, Inc. Associated Earth Sciences, Inc. Presented by: Matthew A. Miller, PE April 24, 2012 How & Where does infiltration work? Summary of

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

Dark Satanic Hills Slate quarries

Dark Satanic Hills Slate quarries Dark Satanic Hills Stone is fundamental to our way of life. Think of how many millions of tons of stone make up our everyday environment: the pavements we walk on, the buildings we live and work in, the

More information