ENVIRONMENTAL MANAGEMENT PLAN

Size: px
Start display at page:

Download "ENVIRONMENTAL MANAGEMENT PLAN"

Transcription

1 ENVIRONMENTAL MANAGEMENT PLAN Of GRAVEL & BUILDING STONE QUARRY For Sri Prathipati. Ram Prasad HA GRAVEL & BUILDING STONE QUARRY SY. NO. 860, Vedurupavuluru (V), Gannavaram(M), Krishna(DT), ANDHRA PRADESH Submitted by P.V.SATYANARAYANA & HAMPANNA GOUD Consultant Geologist & RQP Regn.No. RQP / DMG/ AP/ 34/ 2017 Lattice It Bommasani Sadhan, 2nd Floor, Near One Center,Gollapudi, Vijayawada Ph No

2 INTRODUCTION Sri Prathipati Ram Prasad has filed an application for grant of quarry lease for Gravel, Building Stone, over an extent of Hectares in Sy No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh, for a period of 10 years. The same was received by the Asst. Director of Mines and Geology, Vijayawada on The Assistant Director of Mines and Geology, Vijayawada submitted proposals on the application filed by Sri P. Ram Prasad duly recommending for grant of Quarry Lease for gravel & Building Stone over an extent of Hectares in Sy No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh, for a period of 10 years. The mining plan is prepared under G.O.Ms.56, I&C (Mines-II), Dt: of AP for obtaining the Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA) & annual production plan under semi mechanized open cast method of mining under Rule 7(A) of APMMCR The Mining Plan was approved by the Deputy Director Of Mines & Geology, Kakinada vide letter No. 4052/Q3/2018, Dated:

3 The mine lease area falls under the Toposheet No. 65D/14 bearing following Toposheet details: S.No. Latitude Longitude 1. N16 33'55.42" E080 45'09.40" 2. N16 33'51.29" E080 45'17.20" 3. N16 33'50.57" E080 45'11.63" 4. N16 33'51.94" E080 45'11.36" LOCATION OF THE MINE The applied area falls in the Toposheet No. 65D/14. The quarry lease area is spread over in Survey No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh. State Transport bus services ply from Nuzivid to Gannavaram towns frequently. Private transport is also available on this road network. Primary & Upper primary school education is available at Gannavaram & Vijayawada. Higher education is available at Vijayawada. Introduction of the Project Land The Quarry Lease for Gravel & Building Stone over an extent of Hectares/ 3.05 Acres in Sy. No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh. Location Hectares of Gravel & Building Stone Quarry, Sy.No.860, Vedurupavuluru Village, Gannavaram Mandal, Krishna Dt, Andhra Pradesh. The present mining lease area falls in the Government land from Vedurupavuluru at a distance of 3.2 Kms from the Quarry Lease Area. 3

4 Boundaries: North : Hill Area & Agricultural Lands. East : Othersquarrylease &HillArLands West : Hill Area & Agricultural Lands South : NunnaRoad&AgriculturalLands.. The Salient Features of the proposed project Nature of the project Sri P.Ram Prasad Mining of Gravel & Building Stone Quarry Size of the Project 1.235Ha Production 31,390.4 M 3 /annum. LOCATION OF PROJECT District & State Krishna District, Andhra Pradesh Village & Mandal Vedurupavuluru Village, Gannavaram Mandal Land Availability Ha. Nearest Village Vedurupavuluru at a distance of 3.2 Km Ownership Government Land Toposheet No. 65D/14 GENERAL CLIMATIC CONDITIONS Annual rainfall 1,000 mm Min and max temp. 25 C and 48 C Avg. relative humidity 75% Predominant wind direction WE & NS HISTORICAL / IMPORTANT PLACES Nearest human settlement Nearest town Nearest railway station Archaeological /Historically Important Site Sensitive Places Sanctuaries / National parks The Nearest Village Vedurupavuluru is situted 3.2 km due SW. Gannavaram at a distance of 6.5 Kms Gannavaram is the Nearest Railway Station is about to 7km from this Q.L.applied area. None within 10 km radius of the site Hospitals, schools and community facilities are available at Vedurupavuluru village& Gannavaram Mandal None within 10 km radius of the site. 4

5 GOOGLE MAP AROUND 10 KM RADIUS 5

6 TOPO MAP AROUND 05 KM RADIUS 7

7 DETAILS OF THE MINE Mine Area This mine lease (ML) area is located in government land and the Quarry Lease for Gravel & Building Stone over an extent of 1.235Hectares/ 3.05 Acres in Sy. No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna Dt, Andhra Pradesh. The quarry lease applied area is located southern part of Small hillock, over the gravel & building stone outcrop with a maximum elevation of 75M above ground level. The lowest & highest contours is 30M and 105M. Regional Geology The subject area is physiographical small hillock area. The area is constituted of naturally occurring gravel. The area constitutes southernmost part of Eastern Ghat Mobile Belt (EGMB), where the belt is tapering to less than 20 km width. EGMB is trending in NNE SSW in the area. They consist of Gollanapally sandstone, fluvial geological formation, quartz, k-feldspar, and garnet, and silliminite, graphite, with or without corundum. In the Northeastern part, a number of calc granulite and quartzite bands are present, within khondalite. Rocks of Upper Gondwana Group of the Gondwana Super group, comprising Tirupati Sandstone, Gollapalle/Chintalapudi Sandstone and Kamthi Sandstone are exposed north, northwest and east of Nuzivid. These rocks trend NE-SW with 200 dip towards SE Unconformably overlaying the Gondwana rocks is a small patch of Rajahmundry Sandstone, occurring NE of Nuzividu. The sandstone is brick red in colour and contains nodules of clay. Major part of the district in the southern part is represented by the alluvial plains forming the Krishna delta. The river Krishna and its tributaries have contributed to the formation of this alluvial plain. There is no significant surface drainage in these alluvial plains. The delta is relatively a flat area. The alluvial plains along the major course of rivers form the flood plain deposits. The coastal and deltaic alluvial plain extends from Challapalli on the west to Kolleti Kota on the east and up to the coast line on the south. The main geomorphic units exist in these plains are palaeo-channels, beach ridges, lagoons, sand spits and sand barriers. The predominant soils in the district are black cotton soils/deltaic soils, red loamy soils and sandy soils. Red clayey soils with sandy loam to clayey loam in texture and occur in the northern part of the district. The deltaic alluvium is grey brown to black in colour with fine to medium texture and poorly permeable. They are fertile soils. The coastal sandy soils occur all along the coast, highly porous and lack of binding material. The rocks of Archean age are overlain by Proterozoic cover sequence of Cuddapah super group and Kurnool group. The contacts between older crystalline and the younger sediment is marked by pronounced unconformity known as Eparchaean Unconformity. 8

8 Local Geology: The Quarry lease applied area is fallen southern flack of hillock with 75m above ground level, which was trending to NE-SW directions with the lowest contour 30m and highest contour 105 m. The gravel exposed on the surface of the hillock. Which was formed insitu weathering of Khondalite group of rocks of the Eastern ghat super group of rock of Archean age. Especially in this area the rock of Khondalite were semi consolidate nature i.e., Schist formation. The Khondalite schist is not formed fully rock due to low grade of metamorphism of sedimentary rocks. Hence it is considered (or) treated as Gravel of the weathered zone of Khondalite and semi consolidated rock material upto 6m from the top surface of the hillock (or) weathered zone of Khondalite. If any hard rock of Khondalite will be arrived i.e Gneiss form of Khondalite it will be stocked at dumpy yard. The gravel utilized for formation of kaccha road & filling of low laying area formation layouts. Reserves and Average Production The deposit is found to be small hillock land. Hence, cross sectional method adopted for Estimation of Geological Reserves. Accordingly, 3 Sections A-A1 to C-C1 has drawn at equal distance perpendicular to the trend direction of the deposit to estimate the reserves (Plate IV). In this method, the ore body is divided into blocks by constructing geologic sections at intervals along the transverse lines. The interval between sections may be constant or may vary to suit the geological setting and mining methodology. As the applied area is uneven shape we use the formula V= ((s1+s2)/2)*l1+ ((s2+s3)/2)*l2+ ((s3+s4)/2)*l3+ _+ ((sn1+sn)/2)*ln Where V= Volume L1, L2, L3, _, LN are perpendicular distances between the adjoining sections with areas S1, S2, S3, _, SN. 9

9 TOTAL GEOLOGICAL RESERVES S 1 CR OS S- SE CTI ON S L1 G CROSS SECTIONAL AREA (Sq.m) L2 G& L3 G& A-A' AVERAG E DETAIL S 4,39 3 (S1+S2) /2 L1 G 52 6 AVG. CROSS SECTIONAL AREA (Sq.m) L2 G& L3 G& ,04 0 Dist anc e B/ W Sec tion s L1 G VOLUME (CU.M) L2 G& L3 G& L1 Gravel GRAVEL (60%) L2 VOLUME (CU.M) (40%) GRAVEL (40%) 34 17,884 18,088 18,122 10, ,853 7,235 7,249 L3 (60% ) 10,8 73 1,03,360 S 2 B-B ,68 7 S 3 C- C (S2+S3) / , ,275 9, , ,565 3,710 3,742 5, ,705.5 SUB TOTAL 27, ,363 27, ,48, , ,48,065.5 The Reserves in the triangles 4-3-A & 2-C-C are not used for production purposes because the area is Local Occupied Area Therefore, Total Geological Reserves of Gravel = 54,488.5 Cu.M Total Geological Reserves of Building Stone = 1,75,495.5 Cu.M Reserves Blocked under Temporary safety Benches = 31,679 Cu.M *Note-1: The Reserves Blocked under the Temporary Safety Benches are utilized for the production *Note-2: As per Executed sketch appended, Notice. No: 4052/Q3/2018,Dated: 24/11/2018, An area of 1.43 Acres / Hectare is excavated 26 i.e, 6 Mts below the surface level & 1,44,675 Cu.M of mineral is already excavated in the Quarry Lease Applied Area upto RL

10 RESERVES AVAILABLE FOR MINING Total Geological Reserves 2,29,984M 3 Reserves Blocked Under Temporary Safety Benches 31,679 M 3 Available reserves 1,98,305 M 3 Extraction of Market Grade Reserves Gravel 54,488.5 M 3 Building Stone 1,43,816.5 M 3 Production Per Annum 31,390.4 M 3 Life of the Mine = Total of Mineable Proved Reserves Average Annual Production = 1,98,305 m 3 / 31,390.4 m 3 = 6.31 Years (Say 6 Years) PROJECT DESCRIPTION MINING PROCESS The proposed Mining is an open-cast method of mining. The Gravel & Building Stone mineral by nature it is soft and loose in information, Hence no need of any type of blasting. The operations will involved only digging by excavators and directly loads into the tippers/ tractors. The same will be transporting to destination. The excavations will be carried with bench height 3 to 5 meters and width 6 to 8 meters minimum. Haul roads gradient will be 1:16. YEAR WISE PRODUCTION: YEAR PRODUCTION First Year 7,956 Second Year 41,480 Third Year 39,304 Fourth Year 36,536 Fifth Year 31,676 Total 1,56,952 Average 31,390.4 Waste Dump Management: 100% of produced gravel will be useful. Hence no need of waste dump maintenance. The top soil will be preserved within the lease area for using reclamation of the pit at the time of closure. 11

11 Employment Potential: The human resources deployed are as follows: S. No Designation Staff 1. Mines Manager 1 2. Mine Supervisor 1 3. Hitachi Oprators 1+1No. 4. Tipper Oprators 4No s 5. Skilled WorkersSemi skilled workers 4 6. Semi skilled workers 6 7. Un-skilled 11 FRESH WATER REQUIREMENT & WASTE WATER GENERATION S.No Description Fresh water Waste water Disposal 1 Domestic 1.0 KLD 0.8 KLD Septic tank followed by Green belt 3.0 KLD -- soak pit Dust suppression 4.0 KLD -- List of Machinery: SI.NO. Machinery No.S 1 Excavator 1 No.S 2 Tipper 1 No.S 3 Tractor with Trailers 2 No.S Total 4 No.S 12

12 Environmental Management Plan The Environmental Management Plan envisage for this Mining Project is described here under with a strong commitment to follow the best Environmental Practices to reduce the negative implication to make this Project a sustainable development endeavor. The management action plan aims at controlling pollution at the source level to the possible extent with the available and affordable technology followed by treatment measures before they are discharge. Provided hutments in the southpart of the lease area for mine workers accommodation purpose. Air Environment and control measures: Dust emissions and particulate emissions mitigation measures will be through water spraying at all the sources of dust formation and these measures are further elaborated as follows: Regular water sprinkling at dust emanating sources viz., transportation through haulage roads, etc will be carried out. Regular grading of haul roads and service roads will be taken up to clear accumulation of loose material. Periodic maintenance of transport vehicles and equipment will be carried out to check emission levels. Greenbelt will be developed with avenue plantation all along the haulage roads and peripheral plantation all around the mine in order to control dust. Overloading of trucks will be avoided and carrying the mineral in covered trucks will be taken-up to minimize pollution levels. Water Pollution Management: No rivers and other perennial water courses flow through the ML area. However, during rains the water flows through the slopes of the ML area and across the mine lease boundary and joins a natural drainage. The rainwater that collects in the mine pit bottom during the rainy season will be utilized for water spraying on the haul roads and mining area. This water will also be used for the plantation in and around the Mine Lease area. The total water requirement will be 8.0 KLD which will be utilized from nearby water tankers and treated water from septic tank. The usage will be as follows: 13

13 The following that flows in the core zone will be routed adequately through channels to avoid any erosion and contamination. The mine pit water collected due to rains will be utilized for water spraying on the haul roads and for watering plantation. The waste water generated from the domestic usage will be fed to septic tank followed by soak pit. Noise Environment: The observed noise level for various activities is as under, where the noise levels cross the limits specified, the relevant PPE is being provide to the workmen. The machinery will be maintained properly to reduce the noise levels. The protective noise reducing gear like earmuffs, the company will provide earplugs. Proper maintenance of equipment. Machinery will be fitted with properly designed noise generating acoustic silencers. Providing noise insulation/padding wherever practicable. Proper maintenance and periodic lubrication of noise generating parts of the machines Provision of thick plantation in and around the mine is planned in order to reduce the noise and prevent it from reaching to surrounding habitation areas. Solid Waste Generation of Sub-Grade or reject material and waste it nill.100% of material will be utilized including dust or soil. GREEN BELT DEVELOPMENT The development of greenbelt in the peripheral buffer zone of the mine lease area will be undertaken well before the starting of the mining activity. Green Belt has been recommended as one of the major component of Environmental Management Plan, which will improve ecology, environment and quality of the surrounding area. Plantation will be done along the haulage roads and the unused area in the ML area will be developed with green cover. Suitable advice on this plantation activity will be consulted. 14

14 Concepts of Green Belt Development The concepts of Green Belt Plantation scheme are 1. Nature of Pollutants 2. Emission Levels 3. Maximum Impact zone CRITERIA FOR SELECTION OF SPECIES Species to be selected should fulfill the following specific requirements of the area - Availability of seed material - Tolerance to specific conditions or alternatively wide adapts ability to ecophysiological conditions. - Rapid growth - Capacity to endure water stress and climatic extremes after initial establishment - Differences in height, growth habits - Pleasing appearance - Providing shade - Ability of fixing atmospheric Nitrogen - Improving waste lands. DESIGN OF GREEN DEVELOPMENT The greenbelt shall be developed around the plant to act as a sink for pollutants, attenuation of noise levels and improvement in aesthetic quality of the plant. The following criteria shall be adopted in the design of greenbelt: 1. Generally fast growing trees should be planted as otherwise it will take many years for other types of trees to attain their full height. 2. Trees will be planted along the road side in such a way that there is no direct line of sight when viewed from appoint outside the foliage perimeter. 3. Trees growing up to 10 m or more in height with thick perennial foliage should be planted around the plant. 4. Sensitive species such as magnifier indica should be planted in patches along the entire greenbelt to work as an indicator of pollution. 5. Trees shall be planted staggeredly in each row (minimum three rows encircling the perimeter of the plant). 6. Tree trunk being free foliage up to a height of 2 to 3 m, it is advisable to grow shrubs in front of trees to give coverage to the open portion. 7. Greenbelt will be developed all around the plant area with a width of 10 m. 15

15 8. Greenbelt will be developed around the plant except wherever buildings and other structures. SOCIO-ECONOMIC ENVIRONMENT Agriculture and sheep breeding are important professions of these people living in the village besides involving themselves in quarrying activity. There is no adverse socio economic impact on the persons in the villages, due to the quarrying operations There is a positive impact of the quarry operations on the socio economic standards of the villagers. The persons from the villages are being given employment in the quarry suiting to their education level and experience. The management is also participating actively in the Corporate Responsibility schemes by grouping with other quarry managements or individually, depending on the merits of the service. SAFETY AND ENVIRONMENT In addition a safety committee will be formed and manned by equal participants from Management and Workers. Personal protection equipment (PPE) will be issued to each worker. Other safety equipments shall be used according to the nature of job involved. The management firmly believes in the concept of safety and environmentally sustainable growth. The authorities and staff are very much concern in Environment issues. The management is going to develop scientifically designed green belt around the premises to mitigate air and noise pollution impacts on the surroundings. The management proposed to monitor ambient air as per APPCB guidelines. All the employees are provided with personal protective equipment such as helmets, hand gloves, safety shoes, goggles and apron as per their place of work. The management will provide safety training to all employees periodically and regularly. POST PROJECT ENVIRONMENTAL MONITORING PROGRAMME In order to maintain the environmental quality within the standards, regular monitoring of various environmental components is necessary. The mines manager will take care of Environmental Management activities with objectives as To implement control/mitigation measures To monitor this implementation process 16

16 To determine and improve the efficiency of the implemented measures To identify any other unforeseen effect on environment not covered hereby and To inspect and maintain the plantation survival rate, regular cleaning drains, channels and water logged ponds and improve the drainage system and retaining walls over certain timelines. Regular monitoring of various environmental parameters shall be carried out to ascertain the following points: Status of air, noise, water, land pollution within the plant and in its vicinity; Generate data for predictive or corrective purpose in respect of pollution; and To assess and monitor environmental impacts periodically. Project Schedule and Cost Estimates: The envisaged maximum annual production of gravel & Building Stone is estimated to be 31,390.4 m 3 /Annum The cost of the project: 15.0 Lakhs The annual cost estimated for Environmental Monitoring is 5.0 Lakhs. CONCLUSION: The land that is going to be disturbed cannot be reclaimed during the lease period, as the gravel & Building Stone quarry is persisting at further depth and it will take a very long time to exhaust. There is no other significant negative impacts are anticipated as the involved mining activities are very small. All possible measures shall be adopted to control pollution emissions to the minimum and kept below CPCB/MoEF/SPCB standard norms (Air, water, noise standard limits). 17

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz

More information

ENVIRONMENTAL MANAGEMENT (CLUSTER)

ENVIRONMENTAL MANAGEMENT (CLUSTER) /+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna

More information

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District, 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone

More information

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha) M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. B.K.R. GRANITES 4.790 HA. BLACK GRANITE MINING COMP NO. 205 &215 RAGIMANUPENTA & PARADARAMI R.F., YADAMARRI (M) CHITTOOR (DT), ANDHRA PRADESH. Submitted by SV ENVIRO

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

lit)'*'" m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated:

lit)'*' m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated: Lr.No.233 /QlzOrL GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOGY D Dated: 7.03.2018 From Sri G. Shivaji, M.Sc., Tech.,, Asst. Director of Mines and Geology (FACJ, Srikakulam. To The SEIAA Govt.

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL & GRAVEL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) INTRODUCTION Over an extent of 0.810 Hectares in Sy. No. 01 of

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist. MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares

More information

Figure 2.1: Constituent Area

Figure 2.1: Constituent Area 2 The Region 2.1 CONSTITUENT AREA The National Capital Region includes NCT-Delhi, nine districts of Haryana, six districts of Uttar Pradesh and one district of Rajasthan. Total area of the region is 34,144

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2014 15 TO 2018 19) (FOR THE ENSUING BALANCE 2 YEARS

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

KRISHNA MERCHANTS PVT. LTD.

KRISHNA MERCHANTS PVT. LTD. (Color Granite Quarry lease area 15.00 Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 Flat # 7-3 Dhruvatara Apartments

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY 2013 GEOLOGICAL ASSESSMENT REPORT ON THE SHERIDAN HILL PROPERTY NEW WESTMINSTER MINING DIVISION BRITISH COLUMBIA NTS 092G07 49 16 31 NORTH LATITUDE, 122 39 48 WEST LONGITUDE PREPARED FOR Sheridan Hill

More information

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH Prof.P.Jagadeesara Rao Department of Geo-Engineering and Centre for Remote Sensing, College

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

Flash flood disaster in Bayangol district, Ulaanbaatar

Flash flood disaster in Bayangol district, Ulaanbaatar Flash flood disaster in Bayangol district, Ulaanbaatar Advanced Training Workshop on Reservoir Sedimentation Management 10-16 October 2007. IRTCES, Beijing China Janchivdorj.L, Institute of Geoecology,MAS

More information

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL Land Restoration / Reclamation Monitoring of more than 5 million cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2013 Ashoka & Piparwar

More information

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E) 1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,

More information

Roadmap to Stability

Roadmap to Stability Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to

More information

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007 KANSAS GEOLOGICAL SURVEY Open File Report 2007-22 LAND SUBSIDENCE KIOWA COUNTY, KANSAS Prepared by Michael T. Dealy L.G., Manager, Wichita Operations SITE LOCATION The site was approximately four miles

More information

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. 9 GEOLOGY AND SOILS INTRODUCTION This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. This chapter utilizes information from the following reports prepared

More information

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

Geology and the Aggregate Industry: The Role of Geologists

Geology and the Aggregate Industry: The Role of Geologists Geology and the Aggregate Industry: The Role of Geologists Donald G. Mikulic Illinois State Geological Survey Prairie Research Institute University of Illinois at Urbana-Champaign Outline Importance of

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Topographical Maps ANSWER KEY- Assignment 6

Topographical Maps ANSWER KEY- Assignment 6 Topographical Maps ANSWER KEY- Assignment 6 Question 1 (To be answered using toposheet 45 D/7, Grid reference 76 to 85) 1. Cite two differences between the Sipu River and the Mahadeviyo Nala? Sipu River

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

about GCC

about GCC about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com

More information

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY A PATH FOR HORIZING YOUR INNOVATIVE WORK SPECIAL ISSUE FOR NATIONAL LEVEL CONFERENCE "SUSTAINABLE TECHNOLOGIES IN CIVIL

More information

MINING PLAN FOR QUARTZ & FELDSPAR

MINING PLAN FOR QUARTZ & FELDSPAR MINING PLAN FOR QUARTZ & FELDSPAR Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / Page 1 INCLUDING PROGRESSIVE MINE CLOSURE PLAN (Under Amended Rule 7 A (1) of APMMC Rules, 1966 & Rule 7 A (3)

More information

M/s BENITA INDUSTRIES LIMITED

M/s BENITA INDUSTRIES LIMITED M/s BENITA INDUSTRIES LIMITED (Colour Granite Quarry 19.150 Ha.) Sy. No: 82-1 of Kambadur (V), Kambadur (M), Ananthapur District, Andhra Pradesh State. ENVIRONMENTAL MANAGEMENT PLAN 0 P a g e INDEX S.

More information

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

1.0 PURPOSE AND FORMAT OF THE FINAL EIR 1.0 PURPOSE AND FORMAT OF THE FINAL EIR 1.1 PROJECT OVERVIEW CEMEX (RMC Pacific Materials, dba CEMEX) operates the Bonny Doon Shale and Limestone Quarries in Santa Cruz County for the production of Portland

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT I. PHYSICAL GEOGRAPHY TAKE OUT YOUR PHYSICAL MAP OF SOUTH ASIA A. The Himalayan Mountains form the northern boundary of the region (color

More information

TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST

TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST July 1994 C.R. 1994/12 Jeremy G Gibb 2009 All rights reserved. This work is entitled to the full protection given by the Copyright

More information

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix 18 12/10/2018 AGENDA ITEM 6 APPENDIX 18 2018/0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN Dalwhinnie Quarry Ground

More information

Fukien Secondary School Monthly Vocabulary/Expression List for EMI Subjects Secondary Two. Subject: Geography

Fukien Secondary School Monthly Vocabulary/Expression List for EMI Subjects Secondary Two. Subject: Geography Focus: General Specific : Section Two : Unit One 1 Landslide 2 Downslope movement 3 Rock 4 Soil 5 Gravity 6 Natural hazard 7 Rainwater 8 Friction 9 Hilly relief 10 Unstable 11 Season 12 Saturated 13 Construction

More information

BOY SCOUTS GEOLOGY MERIT BADGE

BOY SCOUTS GEOLOGY MERIT BADGE Requirements highlighted in yellow will be covered at the club show. Merit Badge Counselors will be on-hand. Please bring your own paperwork. Children under 12 and scouts in uniform are admitted to the

More information

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare) QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT

More information

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). 1AHS Publ. no. 234, 1995. 55 Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

More information

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For MINING PLAN (QUARRYING OPERATIONS) FOR ROAD METAL & BUILDING STONE Over an extent of 2.000 Hectares in Sy. No. 134 Routhusuramala (V), Thottambedu (M), Chittoor District Andhra Pradesh State (FOR THE PLAN

More information

Smt. M. Hari Chandana

Smt. M. Hari Chandana Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY

More information

HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM. Dust Control Guidelines

HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM. Dust Control Guidelines HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM Dust Page 1 of 10 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS OF TERMINOLOGY... 3 3.0 METHODS OF DUST CONTROL...

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT ESTIMATED COST : Rs. 1392.42 Crores DESIGNED IRRIGATION : 40000 Ha. COST PER HACT. : Rs. 3.48 Lakhs ''EVERY

More information

A Remote Sensing and GIS approach to trace the Densification in Residential Areas

A Remote Sensing and GIS approach to trace the Densification in Residential Areas A Remote Sensing and GIS approach to trace the Densification in Residential Areas Valliappan AL Assistant Professor, School of Planning and Architecture, Vijayawada, India. Date:11/03/2015 What is Densification?

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

Landscape evolution. An Anthropic landscape is the landscape modified by humans for their activities and life

Landscape evolution. An Anthropic landscape is the landscape modified by humans for their activities and life Landforms Landscape evolution A Natural landscape is the original landscape that exists before it is acted upon by human culture. An Anthropic landscape is the landscape modified by humans for their activities

More information

Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland

Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland GEOLOGICA BALCANICA, 46 (2), Sofia, Nov. 2017, pp. 33 39. Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland Peter Gerginov Geological Institute, Bulgarian Academy of Sciences,

More information

AGRICULTURAL LAND CLASSIFICATION ST HELENS UDP BIRCH TREE FARM (SITE 33)

AGRICULTURAL LAND CLASSIFICATION ST HELENS UDP BIRCH TREE FARM (SITE 33) / ' '' / / AGRICULTURAL LAND CLASSIFICATION ST HELENS UDP BIRCH TREE FARM (SITE 33) R D Metcalfe Resource Planning Team ADAS Statutory Group WOLVERHAMPTON ADAS Ref: Job No: MAFFRef: 25/RPT/D689 135/95

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Prof. Stephen A. Nelson EENS 111. Groundwater

Prof. Stephen A. Nelson EENS 111. Groundwater Page 1 of 8 Prof. Stephen A. Nelson EENS 111 Tulane University Physical Geology This page last updated on 20-Oct-2003 is water that exists in the pore spaces and fractures in rock and sediment beneath

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown.

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown. Name 1. In the cross section of the hill shown below, which rock units are probably most resistant to weathering? 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different

More information

Environmental Science Institute The University of Texas - Austin

Environmental Science Institute The University of Texas - Austin Environmental Science Institute The University of Texas - Austin Geologic Wonders of Central Texas Dr. Leon Long This file contains suggestions for how to incorporate the material from this CDROM into

More information

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery

More information

Chapter 11. Rivers: Shaping our landscape

Chapter 11. Rivers: Shaping our landscape Chapter 11 Rivers: Shaping our landscape Learning outcomes In this presentation you will learn: Common terms associated with rivers About the three stages of a river About the processes of river erosion

More information

VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA

VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA Abstract: The drought prone zone in the Western Maharashtra is not in position to achieve the agricultural

More information

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings

More information

GOVERNMENT OF NEPAL MINISTRY OF IRRIGATION GROUND WATER RESOURCES DEVELOPMENT BOARD BABARMAHAL, KATHMANDU, NEPAL

GOVERNMENT OF NEPAL MINISTRY OF IRRIGATION GROUND WATER RESOURCES DEVELOPMENT BOARD BABARMAHAL, KATHMANDU, NEPAL GOVERNMENT OF NEPAL MINISTRY OF IRRIGATION GROUND WATER RESOURCES DEVELOPMENT BOARD BABARMAHAL, KATHMANDU, NEPAL GIS Based Updating of Groundwater Level Siraha District Final Report Submitted to Ground

More information

CHAPTER 07 CANAL DESIGN

CHAPTER 07 CANAL DESIGN CHAPTER 07 CANAL DESIGN Dr. M. R. Kabir Professor and Head, Department of Civil Engineering University of Asia Pacific (UAP), Dhaka LECTURE 17 Canal Design Types Canal Design Drainage Channel Design Irrigation

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SRI SAI MINES & MINERALS was granted Mining lease for Quartz & Feldspar in Survey Number 3.30 over an extent of 3.30 Hect. In sy No. 326 & 330 Budharam village, Gopalpet

More information

April 9, Phosphate Mining and Reclamation Overview

April 9, Phosphate Mining and Reclamation Overview April 9, 2012 Phosphate Mining and Reclamation Overview Business & Mission Mosaic produces the majority of the phosphate used by American farmers Employs approximately 7,000 people worldwide, 3,000 in

More information

24.0 Mineral Extraction

24.0 Mineral Extraction Chapter 24 - Mineral Extraction 24.0 Mineral Extraction 24.1 Introduction Apart from gravel, sand, rock, limestone and salt extraction in relatively small quantities mineral extraction is not a strong

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha ENVIRONMENTAL MANAGEMENT PLAN FOR CLUSTER MINES For M/s VIGNESHWARA MINES & MINERALS RAVALUDIKI DOLOMITE & STEATITE MINE Production : Dolomite-4500 TPA, High Grade Steatite-3375, Low Grade Steatite-2250

More information

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore BEDRO CK For the complete encyclopedic entry with media resources,

More information

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES &MANAGEMENT HYDROGEOMORPHOLOGY OF CHEVELLA BASIN, RANGA REDDY DISTRICT, TELANGANA STATE Penumaka Ramesh* 1 & Podila Sankara Pitchaiah 2 * 1&2 Department of

More information

MAFF Ministry of IfiriLE Agriculture Fisheries and Food

MAFF Ministry of IfiriLE Agriculture Fisheries and Food MAFF Ministry of IfiriLE Agriculture Fisheries and Food STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION UPSLAND, KIRKLINGTON NORTH YORKSHIRE EXTRACTION OF SAND AND GRAVEL MARCH

More information

SITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL

SITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL SITE SELECTION CRITERIA FOR A SOLAR PV PLANT Under The Guidence of SOHEL PATEL CONTENTS Introduction Selection of land 1.area longitude & latitude 2.quality of soil 3.soil test report 4.Terrain & contours

More information

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands Page - 1 Laboratory Exercise #4 Geologic Surface Processes in Dry Lands Section A Overview of Lands with Dry Climates The definition of a dry climate is tied to an understanding of the hydrologic cycle

More information

FOREST RESEARCH INSTITUTE, DEHRADUN

FOREST RESEARCH INSTITUTE, DEHRADUN PROJECT REPORT DRAINAGE AND REPLENISHMENT STUDY OF MINED AREA OF GANGA SHYAMPUR RIVER HARIDWAR Submitted to UTTARAKHAND FOREST DEVELOPMENT CORPORATION (UFDC) 73, Nehru Road, Deharadun Prepared&Submitted

More information

INDEX. Environmental Management Plan

INDEX. Environmental Management Plan Environmental Management Plan M/s. N.V. Exports [Quarry Lease Area - 0.615 Ha.( 1.52 Acres)] Sy. No. : 11/1 Village : R.L. Puram Mandal : Chimakurthy District : Prakasam State : Andhra Pradesh ENVIRONMENTAL

More information