1 Environmental Management Plan M/s. N.V. Exports [Quarry Lease Area Ha.( 1.52 Acres)] Sy. No. : 11/1 Village : R.L. Puram Mandal : Chimakurthy District : Prakasam State : Andhra Pradesh ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited by Flat # 7-3 Dhruvatara Apartments Amrutha Estates Erramanjil Somajiguda Hyderabad- 82 E mail: info@pioneerenvirolabs.com, pelcpl@ gmail.com PEOPLE WHO CARE FOR ENVIRONMENT SAVE ENVIRONMENT 0

2 INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 2 2. DETAILS ABOUT THE QUARRY LEASE AREA 3 3. MINING ACTIVITY 4 4. ENVIRONMENTAL MANAGEMENT PLAN 14 1

3 1.0 INTRODUCTION M/s N. V. EXPORTS, represented by its Mg. Partner: Sri N. Venkateswara Reddy, have applied for grant of quarry lease for Black Galaxy Granite over an extent of Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh State. The Asst. Director of Mines and Geology, Ongole, has submitted proposals recommending for grant of quarry lease for Black Galaxy Granite over an extent of Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh State, in favour of M/s N. V. EXPORTS, represented by its Managing Partner: Sri N. Venkateswara Reddy. After careful examination of the proposals of the Assistant Director of Mines and Geology, Ongole, it is decided in principle to grant a quarry lease for Black Galaxy Granite over an extent of Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh State, in favour of M/s N. V. EXPORTS, represented by its Managing Partner: Sri N. Venkateswara Reddy, for a period of (20) years vide notice No.13655/R2-2/2015 dated07/07/2015. Profile Of The Project Proponent: Sri. N. Venkateswara Reddy, is the managing Partner M/s. NV Exports at Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The company will operate the quarry under the supervision of well experienced Mining Consultant. Brief Description Of The Quarrying Activity: Nature: This project involves quarrying of Black galaxy granite. This mineral will be quarried by open cast Semi-mechanized mining method. Size Of The Project: The quarry lease will be operated at maximum production capacity of m 3 /Annum in Quarry Lease Area of Hectares (1.52 Acres)at Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The proposed project cost is Rs Lakhs. 2

4 2.0 DETAILS ABOUT THE QUARRY LEASE AREA The Quarry lease area of Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The following are the environmental settings of the QL area within 10 Kms. Details of water bodies / lakes / rivers / nallahs Wildlife Sanctuaries /Bird Sancturies/ National Parks Reserve Forests R & R Nearest habitation Rail Head Airport Inter State Border Defence Installations Forest land in the project site Nagarjuna sagar RBC- 0.2 Kms. Musi river 4.6 Kms Ramateertham Reservoir- 2.2 Kms Pedda cheruvu -4.9 Kms Gadi vagu -4.3 kms There are no Wildlife Sanctuaries/Bird Sanctuaries / National Parks within 10 Km radius. Devarapalem RF, Chimakurthi RF and Errakonda RF are present with in 10 Kms radius from QL area Not applicable Ramateetrham Village 0.11 Kms Nil Nil No interstate boundary with in 10 Km. radius. Nil No Forest land is involved in the mine. Site Services: Office room, Rest Rooms, Shelters, Lavatory, and drinking water will be provided in the quarry lease area. The topographical map showing quarry lease area and surrounding 10 km. radius area is shown below. 3

5 3.0 MINING ACTIVITY Details of the Area: District State Prakasam Andhra Pradesh Village Mandal Sy. No. Extent R.L Ha. Chimakurthy 11/1 Puram ( 1.52 Acres) Ownership of Occupancy Patta Land Geology: Physiography: The quarry lease area is located on a part of plain land. The area is unfit for agriculture and surrounded by black galaxy granite quarries. The drainage network is due West & SW. Musi river flows at the distance of 4.6 Km due SW of the quarry lease area. Topography: The quarry lease area is a part of plain land raised about 1 m above ground level within the quarry lease area with topo relief in South direction. The lowest contour is 200 M and highest contour is 201 M in topo plan. Regional Geology: The quarry lease area constitutes a part of Granite and Granitic Gneissic terrain of Archean age. Pink and Grey Coloured Granites, Pink Alkali - Feldspar Granites are the important litho units in the area. Grano - Diorites with basic enclaves of Supra - Crystals like Horneblend Schists, Biotite Schists also occupy the area. These rock types are exhibiting various landforms like Domes, Inselbergs, Castle -Koppies, Whalebacks and Linear Ridges. Pink Alkali Feldspar is the most dominant rock type in the area with variations in grain size, scattered outcrops of Migmatites containing Neosomes of medium to Coarse -Grained Grey Alkali Feldspar Granites occurs at many places. A number of Quartz, Grey and Pink Pegmatites and Epidote Veins are criss crossing the host rock. Basic dykes of Dolerite, Gabbro & Pyroxenitic Composition traverse the granites in NW-SE, NNW-SSE, E-W & NE- SW directions. Thin veneer of alluvium is found limited to streams. 4

6 Local Geology: Regionally the area constitute a part of Peninsular Gneissic complex of Archean, and occupied by Porphyritic granite, white, grey and pink colour alaskitic granite, with patches of amphibolites, hornblend schist bonded magnetite quartzites as enclaves in both prophyritic and alaskitic granite. The major litho units are extensively invaded by younger quartz, pegmatite, epitode, calcite veins and also by dykes basic rocks. The porphyritic granite along with intermixing of pink alaskitic granitie forming as mounds, ridges and hillocks in the area; contact of the rocks clearly indicate intrusive relationship, young alaskites intruded into older porphyritic granite; which is locally showing poorly developed foliation trending NW - SE. The older basic enclaves of amphibolites hornblend schist shows signs of metasomatism in the form of flakes of biotitic. Number of acidic veins like pegmatite, quartz is traversing the porphyritic granite trending in NNE - SSW, NE - SW to NNW - SSE to NW - SE. Reserves: The Geometry of the Deposit: The geological traverses on the outcrops and the exploratory mining was facilitated to have shape and size of the deposit in quarry lease area. The black galaxy granite deposit is occurring as in the form of large boulders and sheets below ground level. Method of Estimation of Reserves: The deposit is exposed in 4 m below surface and hence cross sectional method is adopted for Estimation of Geological Reserves. 4 Sections A-A1 & D-D1 were drawn across the quarry lease area in the strike direction of the dyke to estimate the reserves. The cross sections were drawn perpendicular to the strike direction, the cross sectional area of the individual sections are calculated to arrive at sectional area multiplied by the appropriate sectional influence of 40 M (Average) to arrive the volume of rock mass. A conservative recovery of 30% rough blocks is considered in estimation. 5

7 Categorization of Reserves: As no detailed exploration is conducted by boreholes, only exposed resources are considered for Reserve Estimation upto RL 150 M. Hence, only G1 (Proved) scale category as (111) code is calculated. No resources are considered under G2 & G3 (Probable & Possible) scale of exploration. Hence, the exposed deposit is proved category of reserves as 111 coding (Proved) under UNFC guidelines. The deposit upto RL 150 is considered as Proved Reserves. Total Geological Reserves: Sections Litho-Unit Sectional Area Sectional Influence Volume Recovery 30% (M 2 ) (M) (M 3 ) (M 3 ) A - A1 Soil , Overburden Granite 1, , , B - B1 Soil , Overburden Granite 1, , , C - C1 Soil , Overburden Granite 1, , , D - D1 Soil , Overburden Granite 1, , , TOTAL PROVED RESERVES 3,18, , Reserves In UNFC Code: S. No. Category of UNFC Code Reserves in M 3 Reserves in Million M 3 Reserves 1 Proved , Probable 122 Nil Nil 3 Possible 333 Nil Nil 6

8 Reserves Blocked Under 7.5 M Buffer Zone: Sections Litho-Unit Sectional Area Sectional Influence Volume (M 2 ) (M) (M 3 ) A - A1 Soil , Overburden Granite , B - B1 Soil , Overburden Granite , C - C1 Soil , Overburden Granite , D - D1 Soil , Overburden Granite , TOTAL RESERVES BLOCKED 1,30, Reserves Blocked Under Safety Slopes: Sections Sectional Area Sectional Influence Volume (M 2 ) (M) (M 3 ) A - A , B - B , C - C , D - D , TOTAL RESERVES BLOCKED 94, Total Mineable Reserves: Considering the recovery of the dimensional stones from the quarry is around 30% and as the sheet exposed from the bottom of the QL area exhibit better quality, conservative estimation is made with 30% recovery. 7

9 Total Geological Reserves = 3,18, M 3 Proved Reserves: Reserves Blocked under 7.5 M Buffer Zone = 1,30, M 3 Reserves Blocked under Safety slopes = 94, M 3 Total Reserves Blocked = 2,25, M 3 Reserves available for Exploitation = 92, M 3 Extraction of Market Grade 30% Recovery (Proved) = 27, M 3 Life of the Mine = 27, M 3 / 4, M 3 = 6.55 OR SAY 7.00 YEARS Method of Mining (Open Cast other than fully Mechanized / Semi Mechanized): The Black Galaxy Granite in the quarry lease area is exposed sub-surface. (Hence, it is proposed to mine sheet by open cast, semi-mechanized methods, by developing the benches of 6 M height in 2 phases of 3 M each). Wire Saw cutting will be deployed based on the favourable conditions. The development of benches in the sheet rock will be 60 safety slopes. The separation of blocks from the mother rock will be carried out by drilling, wedge cutting, blasting and excavation will be done by the machinery. The secondary splitting, dressing of blocks will be done manually. Therefore, mining operations have to be carried out in this area in 2 stages. 1) Development 2) Production Stage - 1 The sheet will be subjected to drilling, blasting and splitting from mother rock. Rock Splitting / Wedging: Thus 20' x 20' to 40' x 20' to 40' mass will be separated from mother rock by drilling the slotter holes on both sides of the mass and a top hole intersecting these two holes and wiresaw rope is passed through and cutting is done horizontally and vertically and by this there will be mass opening on all the sides from the mother mass Stage - 2 After removal of weathered and under sized boulders. 8

10 The large boulders will be subject to splitting into required sizes of blocks by using Jack Hammers by drilling series of deep holes at right angles at regular intervals, later by inserting feather and wedges in these holes and hammering with sledge hammer will release the blocks. The boulders will be splited to the required sizes with drilling and if required by using chemical compound at the source only. The boulders separated will be brought to the dressing yard for dressing. If the boulders, which fit into the required market grade size will be transformed into cuboids. Secondary Splitting: After separation from the mother rock, it is properly checked by washing with water to identify defects and cracks. Based on this observation, the size is decided and the blocks are marked and separated by drilling and wedging. The separated pieces will be examined for defects and lines, then the block or blocks are marked in clear area and holes are drilled along the line of marking, with the help of feathers and wedges and the waste portions are separated forming rectangular blocks. Any bulges will be removed by drilling and wedging making it perfect blocks. A perfect block is that all the sides shall make with each other 90. Dressing: Dressing of dimensional rough blocks for export: Dressing is final phase of mining operation, wherein the secondary rough blocks are squared into regular perfect rectangular sizes, thereby avoiding uneven bulge or cavities and other defects. Jackhammers with compressor, feather end wedges and sledgehammers are equipments generally used for dressing the block. Dressing of rough blocks for domestic processing plant: Dressing by means of squaring and splitting will be done for rough blocks of the size varying between 120 x 90 x 80 Cm and 300 x 200 x 190 Cm. Drilling & Blasting Drill hole pattern for smooth blasting: Holes of 3 M depth will be drilled in a single row with spacing of less than 0.3 M and burden of 1.6 M or more shall be maintained uniformly. This arrangement will yield rock size of 3 M x 2 M cross section. A bench height of 3.5 M will be tackled. 9

11 Drilling Parameters : i) Drill Hole Diameter 32 MM up to 3 M long. ii) Depth and Inclination of Drill Hole: Generally drilled vertically in an alignment. However in primary cutting in the absence of sheet joints horizontal holes also are drilled to develop bottom level. iii) Spacing and Burden The spacing shall be about 0.1 M to 0.3 M from hole to hole and burden goes up to 1.6 M for the splitting of the rock. iv) Stemming & Charging of Bore Hole Gun Powder is used. The blast hole will be charged with 150 Grams of explosives by stemming with smooth strand. v) Explosive Type For primary blasts pre-splitting 8-10 inches spacing 32 mm dia. Jackhammer holes perfectly aligned along the desired plane are drilled. They are charged with gun powder and detonating cord or gelatins with detonating cord with sufficiently packed stemming column that gives a cut plane along the desired one. (Nitrate Mixture & Detonators are used). Production Proposed for the five years: The applicant proposes to take up quarrying operations between the Sections A-A1 to D-D1 in the grids N & E The mining operations will be initiated from West of the quarry lease area. The mining advance Eastwards. 1 st Year In the first year mining will be initiated from West of the quarry lease applied area between the grids N & E covering an area of 3, M 2 a bench of 6 M height will be formed. The mining advances Eastwards. An area of 3, M 2 will be excavated producing 20, M 3 of Rock Mass, 30% (6, M 3 ) of Market Grade Rough Blocks and 70% (14, M 3 ) of Waste Rock will be generated. 2 nd Year In the second year mining will continue below 1 st year workings between the grids N & E covering an area of 2, M 2 a bench of 6 M height will be formed. 10

12 The mining advances Eastwards. An area of 2, M 2 will be excavated producing 17, M 3 of Rock Mass, 30% (5, M 3 ) of Market Grade Rough Blocks and 70% (11, M 3 ) of Waste Rock will be generated. 3 rd Year In the third year the mining will continue below 2 nd year workings covering an area of 2, M 2 between the grids N & E with an average bench of 6 M height will be formed. The mining advances Eastwards. An area of 2, M 2 will be excavated producing 13, M 3 of Rock Mass, 30% (4, M 3 ) of Market Grade Rough Blocks and 70% (9, M 3 ) of Waste Rock will be generated. 4 th Year In the fourth year the mining will continue below 3 rd year workings covering an area of 1, M 2 between the grids N & E with an average bench of 6 M height will be formed. The mining advances Eastwards. An area of 1, M 2 will be excavated producing 11, M 3 of Rock Mass, 30% (3, M 3 ) of Market Grade Rough Blocks and 70% (7, M 3 ) of Waste Rock will be generated. 5 th Year In the fifth year the mining will continue below 4 th year workings covering an area of 1, M 2 between the grids N & E with an average bench of 6 M height will be formed. The mining advances Eastwards. An area of 1, M 2 will be excavated producing 8, M 3 of Rock Mass, 30% (2, M 3 ) of Market Grade Rough Blocks and 70% (5, M 3 ) of Waste Rock will be generated. The year wise production proposed is shown in the following table. YEAR WISE PRODUCTION FOR 5 YEARS Year Area (M 2 ) Bench Height Volume 30% 70% (M) (M 3 ) (M 3 ) (M 3 ) 1 st 3, , , , , , , ,

13 3 rd 2, , , , th 1, , , , th 1, , , , TOTAL 70, , , AVERAGE 14, , , Machinery: The will be the machinery will be used in QL area. S.NO. MACHINERY BUCKET CAPACITY NO'S 1. Hydraulic Excavator 1.50 M Jack Hammers Dumpers 35 MT 2 4. Compressor 600 Cft 1 5. Wire Saw & Slotter Sets Pumps 60 Hp 2 Organizational Chart: The following will be the Man Power requirement: S.NO. MAN POWER NO'S 1. Mines Manager 1 2. Asst. Managers 1 3. Mine Foreman 1 4. Engineers 1 5. Mine Mate Cum Blaster 2 6. Mine Supervisors 2 7. Excavator / Loader Operators 3 8. Dumper Operators 2 9. Wire Saw / Slotter Operators 2 12

14 10. Compressor Operators Mechanics / Welders etc Helpers Semi Skilled Workers 10 TOTAL 29 13

15 4.0. ENVIRONMENTAL MANAGEMENT PLAN AIR ENVIRONMENT The pollutant emitted from quarrying activity will be dust; and major sources of dust will be due to Quarrying operations and vehicular movement. The following measures will be adopted in quarrying to eliminate the fugitive dust emission. PROPOSED MITIGATION MEASURES Wet drilling. Water sprinkling on Quarry haul roads & approach road for dust suppression. The dust rising due to drilling will be controlled by covering the drill rods with cloth, dust extractors will also be employed. WATER ENVIRONMENT WATER REQUIREMENT The Granite Quarrying activity requires 4.0 KLD of water. Water required will be sourced from bore well. The following is breakup of it. S. NO. ITEM WATER REQUIREMENT IN KLD 1. For Dust Suppression in QL area For Dust Suppression in approach road For Domestic Use For Drilling and identification of cracks For plantation in Ml area For plantation in approach road 0.1 Total 4.0 WASTE WATER The wastewater generated during identification of defects/cracks in granite blocks will be recycled back. The only source of waste water generation will be sanitary waste water of 0.56 KLD, which will be treated in septic tank followed by subsurface dispersion. No further processing of Colour Granite is envisaged. It will be directly sold to outside parties. 14

16 NOISE ENVIRONMENT The main source of noise generation will be vehicular movement and the drilling of boreholes. In the Quarry lease area silent blasting will be done by using Chemical Compound. The following will be noise control measure: The machinery will be maintained properly to reduce the noise. The protective noise reducing gear like earplugs. Plantation. SOLID WASTE During mining in next 5 years a total of 49, M 3 of waste will be generated and dumped at the dumping yard, on an average of 9, M 3 per annum Average waste generation per Annum will be m 3. Total Waste generation for in Lease Period (20 Years) x 20 = Cum The lesse is holding a quarry lease along the Southern boundary of the QL area over an extent of 2.65 Hectares in Sy. No's 11 / 2 & 11 / 4 (P). The waste generated will be hauled to the quarry lease area and dumped on the existing dumps. GREEN BELT DEVELOPMENT The plantation will be taken up in the Buffer zone of the QL area and along the approach road. In buffer zone 120 saplings will be planted and 20 sapling will be planted in approach road. The sapling to be planted will be Neem, Mango, Kanuga etc., PLANTATION COST DETAILS: Cost of garden soil+ compost for filling cum : Rs. 100 Cost of sapling : Rs. 60 Total capital cost per sapling : Rs. 160 Total plantation area proposed : 150 m x 7.5m No of 10 m spacing in each row : 60 nos. 15

17 No. Of Rows : 2 Total no. Of Plants : 60 x 2 = 120 nos. Total capital cost for plantation in QL area : 160 x 120 : Rs 19,200 Length of approach road to QL area to be developed with plantation : 100 m Total length for avenue plantation on both sides of approach road : 200 m Number of plants to be planted : 20 Cost per sapling with garden soil & compost : Rs 160 Total cost for avenue plantation :160 X 20 : Rs 3200 /- No. of Tree Guards required : 20 nos. Cost per each Tree Guard : Rs. 200 /- Total cost for Tree guards : 20 x 200 = Rs. 4,000 TOTAL COST FOR PLANTATION : Rs : Rs. 26,400 /- OCCUPATIONAL HEALTH & BUDGET: Dust masks (to reduce 29 nos.) will be provided for control of dust. Ear plugs (29 nos.) will be provided to employees to reduce the Noise impact.. Health check-up will be carried out for all employees in an external hospital yearly once and medical records will be maintained Rs. 3000/- per person/year will be allocated employee occupation health. So total budget for occupation health will be 29 x 3000=Rs.87,000/- Periodicity of health checkups done for yearly for workers working in Quarry. Blood test (once in a year) Urine test (once in a year) Complete Physical examination (once in a year) X-ray of chest (once in a year) 16

18 Lung/Pulmonary function test (once in a year) Sputum Examination (once in a year) COST FOR ENVIRONEMTAL MAGEMENT: S. NO. DESCRIPTION ITEM CAPITAL COST IN RS. RECURRING COST IN RS. 1 Air pollution Dust masks 30 nos. Nil 8,700 Cloth for drillers- 3 nos. 1 Nil 300 m each Gunny bags for covering Nil 1,000 the surface of jack hammer holes Dust Suppression Nil 27,000 Plantation in Quarry lease 26,400 8,400 area and buffer zone 2 Noise pollution Maintenance of machinery Nil 20,000 suitably Ear plugs (29 nos.) Nil 7,250 3 Environmental monitoring Ambient Air Quality monitoring (PM 10 & PM 2.5 ) Nil 48,000 Noise level 4 Occupational health Nil 87,000 Total 26,400 2,07,650 17

M/s BENITA INDUSTRIES LIMITED

M/s BENITA INDUSTRIES LIMITED M/s BENITA INDUSTRIES LIMITED (Colour Granite Quarry 19.150 Ha.) Sy. No: 82-1 of Kambadur (V), Kambadur (M), Ananthapur District, Andhra Pradesh State. ENVIRONMENTAL MANAGEMENT PLAN 0 P a g e INDEX S.

More information

KRISHNA MERCHANTS PVT. LTD.

KRISHNA MERCHANTS PVT. LTD. (Color Granite Quarry lease area 15.00 Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 Flat # 7-3 Dhruvatara Apartments

More information

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

Smt. M. Hari Chandana

Smt. M. Hari Chandana Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY

More information

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District, 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Submission By M/s PIONEER TOR STEEL MILLS PVT LIMITED FOR LATERITE [ROM]-11,19,144.60 TPA@67% PRODUCTION-7,49,826.88 TPA Extent-9.813 Hect. Sy. No. 396 / P, Bheemanpally[V],

More information

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz

More information

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist. MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares

More information

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha) M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster

More information

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State

Over an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State SECOND SCHEME OF QUARRYING FOR BLACK GRANITE Extent : 1.36 Hectares 2019 SECOND SCHEME OF QUARRYING FOR BLACK GRANITE (Under Rule 7 B of TSMMC Rules, 1966) INCLUDING PROGRESSIVE QUARRY CLOSURE PLAN (Under

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

TABLE 1.1: Salient features of the project Black Granite Mine of M/s. Shashi Granites

TABLE 1.1: Salient features of the project Black Granite Mine of M/s. Shashi Granites 1. EXECUTIVE SUMMARY 1.1 Introduction M/s. Shashi Granites, is having quarry lease area for Black Granite mine over an extent of 1.0 Hectares at Survey No. 249/4, Chinthapally(V), Kuravi(M), Mahabubabad

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. B.K.R. GRANITES 4.790 HA. BLACK GRANITE MINING COMP NO. 205 &215 RAGIMANUPENTA & PARADARAMI R.F., YADAMARRI (M) CHITTOOR (DT), ANDHRA PRADESH. Submitted by SV ENVIRO

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

ENVIRONMENTAL MANAGEMENT (CLUSTER)

ENVIRONMENTAL MANAGEMENT (CLUSTER) /+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN M/s. RADHAKRISHNA MICA MINING COMPANY [QL area - 13.27 Ha.(32.8 Acres)] Sy. Nos.1134/2, 1135/1A, 1136/1, 1137/1, 1138, 1139 & 1141, Griddaluru Village, Sydapuram Mandal, SPSR Nellore District ENVIRONMENTAL

More information

lit)'*'" m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated:

lit)'*' m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated: Lr.No.233 /QlzOrL GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOGY D Dated: 7.03.2018 From Sri G. Shivaji, M.Sc., Tech.,, Asst. Director of Mines and Geology (FACJ, Srikakulam. To The SEIAA Govt.

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha ENVIRONMENTAL MANAGEMENT PLAN FOR CLUSTER MINES For M/s VIGNESHWARA MINES & MINERALS RAVALUDIKI DOLOMITE & STEATITE MINE Production : Dolomite-4500 TPA, High Grade Steatite-3375, Low Grade Steatite-2250

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of GRAVEL & BUILDING STONE QUARRY For Sri Prathipati. Ram Prasad 1.235 HA GRAVEL & BUILDING STONE QUARRY SY. NO. 860, Vedurupavuluru (V), Gannavaram(M), Krishna(DT), ANDHRA

More information

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE Village Ashapura Tehsil Nasirabad District Ajmer State Rajasthan Capacity 35945 TPA ROM (Max) Lease Area

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S. 1. INTRODUCTION 1.1 INTRODUCTION M/s.SRI SAI MINES & MINERALS was granted Mining lease for Quartz & Feldspar in Survey Number 3.30 over an extent of 3.30 Hect. In sy No. 326 & 330 Budharam village, Gopalpet

More information

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala

More information

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E) 1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2014 15 TO 2018 19) (FOR THE ENSUING BALANCE 2 YEARS

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES &MANAGEMENT HYDROGEOMORPHOLOGY OF CHEVELLA BASIN, RANGA REDDY DISTRICT, TELANGANA STATE Penumaka Ramesh* 1 & Podila Sankara Pitchaiah 2 * 1&2 Department of

More information

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE MINING PLAN FOR ROAD METAL & BUILDING STONE OVER AN EXTENT OF 1.894Hect. LOCATED IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE Introduction Sri.K.Venkataramana,

More information

Appendix D Rock Blasting Report

Appendix D Rock Blasting Report Appendix D Rock Blasting Report 02-2500-01 May 20, 2005 Frank Arciero Jr. Fallingstar Homes 27231 Burbank Foothill Ranch, California 92610 Subject: ANTICIPATED ROCK EXCAVATION FRAZIER PARK ESTATES DEVELOPMENT

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

Geological Studies in the Larsemann Hills, Ingrid Chirstensen Coast, East Antarctica

Geological Studies in the Larsemann Hills, Ingrid Chirstensen Coast, East Antarctica 363 Twenty Fourth Indian Antarctic Expedition 2003-2005 Ministry of Earth Sciences, Technical Publication No. 22, pp 363-367 Geological Studies in the Larsemann Hills, Ingrid Chirstensen Coast, East Antarctica

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

1. INTRODUCTION. EMP Report For Colour Granite Mine of Ha, located in Nellipudi Village, Gangavaram Mandal, East Godavari District, A.P.

1. INTRODUCTION. EMP Report For Colour Granite Mine of Ha, located in Nellipudi Village, Gangavaram Mandal, East Godavari District, A.P. 1. INTRODUCTION 1.1 INTRODUCTION M/S MARS GRANITES was granted a quarry lease over an extent of 1.520 Ha in Sy No: 486/1 & 488/1, Nellipudi Village, Gangavaram Mandal, East Godavari District in the State

More information

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For MINING PLAN (QUARRYING OPERATIONS) FOR ROAD METAL & BUILDING STONE Over an extent of 2.000 Hectares in Sy. No. 134 Routhusuramala (V), Thottambedu (M), Chittoor District Andhra Pradesh State (FOR THE PLAN

More information

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

Granite Building Stone Quarry of Sri. Sajan Mani.

Granite Building Stone Quarry of Sri. Sajan Mani. 1. EXECUTIVE SUMMARY: Sri. Sajan Mani had made an application for Granite building stone quarrying located in Sy. No. 2398, Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. Over an extent

More information

The mining plan for the above quarry lease was approved on Copy of the approved mining plan is enclosed as Annexure III.

The mining plan for the above quarry lease was approved on Copy of the approved mining plan is enclosed as Annexure III. 1.0 EXECUTIVE SUMMARY M/s. Bhargavi Granites was granted a prospective license for Color Granite over an extent of 1.820 Ha in Survey No: 319 of Byripuram Village, Kanchili Mandal, for a period of 2 years

More information

MINING PLAN FOR QUARTZ & FELDSPAR

MINING PLAN FOR QUARTZ & FELDSPAR MINING PLAN FOR QUARTZ & FELDSPAR Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / Page 1 INCLUDING PROGRESSIVE MINE CLOSURE PLAN (Under Amended Rule 7 A (1) of APMMC Rules, 1966 & Rule 7 A (3)

More information

An Overview of Graphite Projects from Asia to Africa. Dr Mike Cunningham SRK Consulting (Australasia) Pty. Ltd.

An Overview of Graphite Projects from Asia to Africa. Dr Mike Cunningham SRK Consulting (Australasia) Pty. Ltd. An Overview of Graphite Projects from Asia to Africa Dr Mike Cunningham SRK Consulting (Australasia) Pty. Ltd. Acknowledgements PT. Granfindo Nusantara RS Mines Pty Ltd Geological Survey and Mining Bureau

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

Cluster Environmental Management Plan (13.0 Ha Ha = 15.0 Ha)

Cluster Environmental Management Plan (13.0 Ha Ha = 15.0 Ha) (13.0 Ha + 2.0 Ha = 15.0 Ha) On Quarrying of Colour Granite Of M/s. Sri.Gandi Suryanarayana Colour Granite At Survey No. 171 of Gudem (V), Tekkali (M), Srikakulam District, Andhra Pradesh SUBMITTED TO

More information

Research and Reviews: Journal of Ecology and Environmental Sciences

Research and Reviews: Journal of Ecology and Environmental Sciences Research and Reviews: Journal of Ecology and Environmental Sciences e-issn: 2347-7830 Quality Assessment of Quartz in Kukatpally, Ranga Reddy District, Telangana, India. J Vijay Kumar and B Linda Prabhakar

More information

Evaluation of Structural Geology of Jabal Omar

Evaluation of Structural Geology of Jabal Omar International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 11, Issue 01 (January 2015), PP.67-72 Dafalla Siddig Dafalla * and Ibrahim Abdel

More information

GEOLOGIC ASSESSMENT / QUARRY PLAN REVIEW BLACK GOLD GRANITE QUARRY DEVELOPMENT

GEOLOGIC ASSESSMENT / QUARRY PLAN REVIEW BLACK GOLD GRANITE QUARRY DEVELOPMENT GEOLOGIC ASSESSMENT / QUARRY PLAN REVIEW BLACK GOLD GRANITE QUARRY DEVELOPMENT GARIBALDI RESOURCES CORP. BLACK GOLD GRANITE CLAIMS GREENWOOD MINING DIVISION GRAND FORKS, B.C., CANADA NTS 82 E/7 E UTM (Zone

More information

Result of Field Geological Survey and Ground Truth for the Analysis Date: 2007/7/5 Location (UTM) Elev Geological Unit Point No. NT-02 VSW Index 260,7

Result of Field Geological Survey and Ground Truth for the Analysis Date: 2007/7/5 Location (UTM) Elev Geological Unit Point No. NT-02 VSW Index 260,7 Date: Point No. 2007/7/5 NT-01 Result of Field Geological Survey and Ground Truth for the Analysis Location (UTM) Topography of granite hill in flat land Lithology: Medium grained hornblende granite. Topography:

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

Study on Bromide in Groundwater in Parts of Nalgonda District, Andhra Pradesh

Study on Bromide in Groundwater in Parts of Nalgonda District, Andhra Pradesh e-journal Earth Science India, Vol. 3 (I), January, 2010, pp.73-80 http://www.earthscienceindia.info/; ISSN: 0974 8350 Study on Bromide in Groundwater in Parts of Nalgonda District, Andhra Pradesh K. Brindha

More information

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015 SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development

More information

Resource and Reserve estimation for a marble quarry using quality indicators

Resource and Reserve estimation for a marble quarry using quality indicators http://dx.doi.org/10.17159/2411-9717/2018/v118n1a5 Resource and Reserve estimation for a marble quarry using quality indicators by I. Kapageridis* and C. Albanopoulos The use of standard estimation and

More information

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH Prof.P.Jagadeesara Rao Department of Geo-Engineering and Centre for Remote Sensing, College

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

For personal use only

For personal use only AVZ Minerals Limited 19 September 2016 ACQUISITION OF MANONO EXTENSION LITHIUM, TIN AND TANTALUM PROJECT IN THE DEMOCRATIC REPUBLIC OF CONGO Company to acquire, subject to due diligence, the Manono Extension

More information

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting

Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting By Pradeep K Singh Chief Scientist & Professor, Academy of Scientific & Innovative Research CSIR Central Institute of Mining

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) ASX/MEDIA RELEASE 27 November 2008 Highlights Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) Indicated and Inferred resources total 970,000 ounces at 1.9 using 1 cut-off (15.7 million

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction Sri K. Ravi Shankar filed an application to Department of Mines and Geology for grant of Quarry lease for Colour Granite in Sy. No. 100, Odulapalle Village,

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

EXECUTIVE SUMMARY INTRODUCTION

EXECUTIVE SUMMARY INTRODUCTION EXECUTIVE SUMMARY INTRODUCTION M/s Mysore Minerals Limited is a Government of Karnataka undertaking established in the year 1966 with main objective of systematic mining and planned development of mineral

More information

UNFC COAL MINES CASE STUDIES

UNFC COAL MINES CASE STUDIES UNFC COAL MINES CASE STUDIES Format for Collecting Information Block Geological Reserve in the block Geological Reserve Considered Extractable Reserve Balance Extractable Reserve Econ /Not Econ F1 F2 G1

More information

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher 1. EXECUTIVE SUMMARY: M/s. Ulikkal Stone Crusher had made an application for Granite building stones quarrying located in Sy. No. 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State.

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY 2013 GEOLOGICAL ASSESSMENT REPORT ON THE SHERIDAN HILL PROPERTY NEW WESTMINSTER MINING DIVISION BRITISH COLUMBIA NTS 092G07 49 16 31 NORTH LATITUDE, 122 39 48 WEST LONGITUDE PREPARED FOR Sheridan Hill

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

ASSESSMENT WORK REPORT ONTARIO MINING CLAIM TB THUNDER BAY MINING DIVSISION ONTARIO, CANADA. Report written by R.A. HIETAPAKKA for G.L.

ASSESSMENT WORK REPORT ONTARIO MINING CLAIM TB THUNDER BAY MINING DIVSISION ONTARIO, CANADA. Report written by R.A. HIETAPAKKA for G.L. 2.56189 2015 ASSESSMENT WORK REPORT ONTARIO MINING CLAIM TB3007723 THUNDER BAY MINING DIVSISION ONTARIO, CANADA PROwN ;1,AL RECORDING OFF'CE SUDBURY RE'''TIVED AUG 2 0 2015 AM. P.M. 718191/011412111213141516_

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30

More information

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES John Seitz, RA, LEED AP Assistant Adjunct Professor Professor Paul C. King, RA, AIA, ARA Assistant Professor Geology Geology is the scientific study of the structure and composition of the earth s surface

More information

Appendix 11. Geology. of the. I60 area

Appendix 11. Geology. of the. I60 area Appendix 11 Geology of the I60 area 1. Locality The locality of the I60 area is as follows; Northwestern corner; UTM_EW 530513, UTM_NS 7345741 Southwestern corner; UTM_EW 530418, UTM_NS 7301454 Northeastern

More information

DIMENSIONAL STONE QUARRYING AND RECOVERY PERCENTAGE

DIMENSIONAL STONE QUARRYING AND RECOVERY PERCENTAGE DIMENSIONAL STONE QUARRYING AND RECOVERY PERCENTAGE By A. Rajan Babu Principal Scientist, Centre for Testing Services & HOD, Dimensional Stone Technology, National Institute of Rock Mechanics, KGF 563

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

APPENDIX 2 Table 2. Sample descriptions

APPENDIX 2 Table 2. Sample descriptions Table 2. descriptions 225 Felsic gneiss, fine-grained and very light-gray. From the upper part of the lower of the two layers, which connect. 226 Amphibolite, even-grained, fine-grained, medium-gray, little

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

Early Exploration Plan Activity Information

Early Exploration Plan Activity Information Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of

More information

Report. Mining Claim SO Butt Township. District of Nipissing. Southern Ontario Mining District. Richard Keevil ~ Geologist. August 29,2006.

Report. Mining Claim SO Butt Township. District of Nipissing. Southern Ontario Mining District. Richard Keevil ~ Geologist. August 29,2006. Report On Mining Claim SO 1077365 Butt Township District of Nipissing Southern Ontario Mining District ~ "'_I ""'..1 D I..:"'.U&O... ~u ~]. Richard Keevil ~ Geologist August 29,2006. Richard R. Keevil,

More information

NZQA unit standard New US6 to replace and version 1 Page 1 of 5

NZQA unit standard New US6 to replace and version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 29 2.0 Introduction of Project / Background Information 30 3.0 Project Description 32 4.0 Site Analysis 39 5.0 Planning

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Fragmentation Management for the Downstream Value Chain. Scott G. Giltner

Fragmentation Management for the Downstream Value Chain. Scott G. Giltner Fragmentation Management for the Downstream Value Chain Scott G. Giltner Topics to be Covered The purpose of drilling & blasting in producing crushed stone Relative cost of drilling & blasting vs. other

More information

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Lecture - 01 Rock Cycle Good morning. I welcome you to this

More information

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants

WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants WEIR INTERNATIONAL, INC. Mining, Geology and Energy Consultants Introduction to Coal Mining History of Coal in the United States Coal was one of man s earliest sources of heat and light Coal was first

More information

CHAPTER 3.3: METAMORPHIC ROCKS

CHAPTER 3.3: METAMORPHIC ROCKS CHAPTER 3.3: METAMORPHIC ROCKS Introduction Metamorphism - the process of changes in texture and mineralogy of pre-existing rock due to changes in temperature and/or pressure. Metamorphic means change

More information

HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS

HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS HANSON S RIBBLESDALE WORKS, CLITHEROE BACKGROUND INFORMATION QUESTIONS ANSWERS BACKGROUND INFORMATION THE COMPANY The cement works are in Clitheroe. Hanson Cement owns the cement works. The cement works

More information

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

International Journal of Modern Trends in Engineering and Research   e-issn No.: , Date: April, 2016 International Journal of Modern Trends in Engineering and Research www.ijmter.com e-issn No.:2349-9745, Date: 28-30 April, 2016 Landslide Hazard Management Maps for Settlements in Yelwandi River Basin,

More information

UNDERGROUND BLASTING. There are two reasons to go underground and excavate:

UNDERGROUND BLASTING. There are two reasons to go underground and excavate: UNDERGROUND BLASTING TUNNELING There are two reasons to go underground and excavate: i. to use the excavated space, e.g. for storage, transport etc. ii. to use the excavated material, e.g. mining and quarrying

More information

Managing Muckpile Fragmentation. Scott G. Giltner

Managing Muckpile Fragmentation. Scott G. Giltner Managing Muckpile Fragmentation Scott G. Giltner Topics to be Covered The purpose of drilling & blasting in producing crushed stone Relative cost of drilling & blasting vs other quarrying activities Cost/production

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. INTRODUCTION Thiru S. Baskar Babu, S/o. Late Sri S. Selvaraj, No.2, First cross street, Anna Nagar, Nellithope S.O., Pondicherry has a mining lease area for the production of

More information

Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya

Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya IEM-GSM Oktoberforum 2005: Case Histories in Engineering Geology and Geotechnical Engineering,, 4 th Oct. 2005, Petaling Jaya DISCONTINUITIES STUDY AND ROCK SLOPES STABILITY ANALYSIS FOR ROCK MASS AT DAMANSARA

More information

EXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU

EXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU SCHEME OF MINING FOR BLACK GRANITE QUARRY EXTENT : 1.14.0HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU (UNDER RULE 12 OF GCDR 1999) LESSEE m/s.

More information

LAB 1: ORIENTATION OF LINES AND PLANES

LAB 1: ORIENTATION OF LINES AND PLANES LAB 1: ORIENTATION OF LINES AND PLANES Read the introductory section, chapter 1, pages 1-3, of the manual by Rowland et al (2007) and make sure you understand the concepts of bearing, strike, dip, trend,

More information