Granite Building Stone Quarry of Sri. Sajan Mani.

Size: px
Start display at page:

Download "Granite Building Stone Quarry of Sri. Sajan Mani."

Transcription

1 1. EXECUTIVE SUMMARY: Sri. Sajan Mani had made an application for Granite building stone quarrying located in Sy. No. 2398, Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. Over an extent of (2.3991Acres). Letter of intent for said granite quarry (Sri. Sajan Mani) is issued vide Letter No. 2830/C2/TDO/2018 dated of Directorate of Mining & Geology, Thrissur. A copy of the Letter is enclosed as Annexure 1 (Mining Plan). The location of the quarry is shown on the Administrative / Key plan enclosed vide Plate No 1A / 10. The approved lease sketch is enclosed vide Plate No 1 (Mining Plan). Quarrying / Mining Plan is approved by The Geologist, Dept. of Mining & Geology, Thrissur. Vide Letter No. 532/C2/TDO/2019 Dated A copy of approved letter is enclosed as Annexure-10. DETAILS OF THE SITE ) 1 Details of area (with location map) : Survey Plan showing the lease area is enclosed vide Plate No. 1 (Mining Plan). 2 District and State : Thrissur, Kerala 3 Taluk / Mandal : Trissur 4 Village : Peechi 5 Khasara No. / Plot No. / Block / : Sy.No Licence No etc 6 Mining Lease Area (Hectares) : Ha 7 Whether the area is recorded to be in forest (please specify whether : No protected, reserved etc.,) 8 Ownership / Occupancy : Private Individual 9 10 Existence of public road/railway line, if any, nearby and approximate distance Nearest Port / Airport : The nearest rail head is 18.5 Kms from Thrissur and Airport is Cochin international which is 59.8 Kms from the mine. Topo sheet No. : C43K6 (58 B/6) (between) Latitude N to N Longitude E to E Accessibility: This granite building stone quarry is located at 0.85 Kms from Chuvannamannu Village in Thrissur Taluk, the quarry is located at about 18 Kms SE of Thrissur. The quarry can be reached via Melachira - Chuvannamannu Road. 1

2 The location of this mining area is shown on the Administrative and key plan enclosed Vide Plate No -1A and 10 and Infrastructure Plan vide Plate No. 11. Topography: The lease is located on the slope of the hillock gently dipping towards North. The highest elevation in this area is 90.0m above MSL and the lowest elevation is 25.0m. Brief Description of the Project: Geology: Regional Geology: The district can be broadly divided into four geological domains viz., the Peninsula Gneissic Complex in the north and central part, ii) the Migmatite Complex in the southcentral part, (iii) the Charnockite Group in the south and (iv) the Thrissur Group in the north. Thrissur Group of supracrustal rocks include garnet-sillimanite-biotite gneiss with or without graphite, kyanite-fuchsite-muscovite-quarts schist, hornblende-biotite schist and gneiss+garnet, amphibolite bands, quartz-sericite schist/quartz-mica schist and meta ultramafites, representing upper amphibolite to lower granulite facies metamorphism. These rocks are found as linear bands in the north. The main member of this group garnet-sillimanite-biotite gneiss+graphite occurs as large bodies north of Kabani river. Peninsular Gneissic Complex represented by hornblende-biotite gneiss and pink granite gneiss occupies a major part of the district. Charnockite Group comprises charnockite forming the hilly terrain in the south and southeast. Pyroxene Granulite and banded Magnetite Quartzite occur as narrow bands within charnockite. Migmatite Complex is represented by biotite-hornblende gneiss, occurring over a large area in the south-central part. The other member of this group, namely garnetiferous quartofeldspathic gneiss+sillimanite occur are narrow bands within the older charnockite. In the east, large bodies of intrusive pink granite occur near Kalpetta and Sultan Battery. Pegmatite veins are also associated with the granites. Dolerite and gabbro are intrusive into the older rocks. 2

3 Local Geology: The building stone granite are very well exposed in the old working pit, whereas part of area with lower elevation is covered by top soil of about 0 to 1.5m thickness. A Geological Plan showing the granite and soil cover are shown in surface geological plan & sections prepared on 1:1000 scale and enclosed vide Plate No 3 (Mining Plan). Table 01: Local Geology Soil Cover 0 to 1.5m Granite 55m(min. estimate) Table No: 1.1: The Geological Resources Section No Area (m2) Influence (m) Volume (m 3 ) Tonnage (T) BD 2.5T/m3 UNFC A-A' , , B-B' , , Total 258, , Table No 1.2: Granite Building Stone Mineable Reserves Section No Level Area (m2) Influence (m) Volume (m 3 ) Tonnage (T) BD 2.5T/m3 UNFC A-A' , , , , , , , , , , , , , , , , , , , , , , Total 74, , B-B' , , , , , , , , , , , , , , Total 14, , Total Reserves 89, ,23, Mining: 3

4 The Mining is proposed to be operated by developing benches of 5m height and 5m ultimate width by Opencast Semi-Mechanized Mining Method. The mechanized operation of mining includes excavators, tippers, rock breakers, Jack hammer drilling and blasting. The maximum production proposed is 75, Tonnes per annum of Granite Building Stone. This Pre Feasibility Report is submitted for obtaining Environment Clearance as required under EIA notification-2006/15 th January 2016 and for a max production capacity of 75, tonnes per annum, over an extent of (2.3991Acres) located at Sy.No in Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. in favor of Sri. Sajan Mani. Table No. 1.3 Year-wise calculations of granite building stone production Year Wise Sectio n No Level Area (m2) Influence (m) Volume (m 3 ) Tonnage (T) BD 2.5T/m3 I-Year A-A' , , , , , , , B-B' , Total 16, , II-Year A-A' , , , , , , B-B' , , , Total 20, , III-Year A-A' , , , , , , , , B-B' , , , , , , Total 30, , IV-Year A-A' , , , , , , B-B' , , , , Total 20, , V-Year A-A' , , Total 3, , Total Production for 5 Years 89, ,

5 Table No. 1.4 Year-wise generation of top soil / waste Year Wise Sectio n No Area (m2) Influence (m) Volume (m 3 ) I-Year II-Year III-Year IV-Year Plan). Tonnage (T) BD 1.6T/m3 A-A' , B-B' Total 1, A-A' B-B' Total , A-A' , B-B' Total 1, , B-B' Total Total waste 3, , The Production & Development Plan is enclosed vide Plate No. 4A to 4E (Mining 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION: I. Identification of project and project proponent. In case of Mining project, a copy of mining lease/ letter of intent should be given. Building Stone Quarry is located at Survey No 2398 in Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. over an extent of Ha. Letter of Intent (LOI) for said Granite Building Stone quarry of Sri. Sajan Mani is issued vide Letter No. 2830/C2/TDO/2018 dated of Directorate of Mining & Geology, Thiruvananthapuram. A copy of the Letter is enclosed as Annexure 1 (Mining Plan). The location of the quarry is shown on the Administrative / Key plan enclosed vide Plate No 1 & 1A (Mining Plan). The approved lease sketch is enclosed vide Plate No 1(Mining Plan). Name & address of lessee & Registered Office : Mr. Sajan Mani. Kaniyarkuzhiyil House, Karimkunam (P.O) Thodupuzha : Idukki, Ph No. :

6 II. Brief description of nature of the project The Granite Building Stone Quarry of Sri. Sajan Mani', over an extent of Ha. (2.3991Acres) is a granite building stone mining project. The granite building stone is the basic rock in this area to be excavated by quarrying. This Granite Building Stone quarry is proposed to be operated by Opencast Semi- Mechanized Quarrying Method. The mechanized operation of quarry shall use excavators, tippers, rock breakers, Jack hammer drilling and blasting. The excavated material shall be crushed in the crushers located outside the quarry lease area. The maximum production capacity proposed in this area is 75, tonnes per annum building stone of size 150mm to 250mm. However the average production per annum is 75, tonnes in the 1st five years plan period. The quarrying operation shall provide 21 direct & equal number of indirect employment to local people. III. Need for the project and its importance to the country and or region. The basic objective of the project is to have effective utilization of granite stone as a building material in this region and state. The spur in infrastructure development and construction industry has enhanced the demand of granite building stone in past few years. Mainly infrastructure projects like roads, highways, railways, bridges, buildings, township, Port Development, etc., have raised the demand of building material. Building stone quarry not only provides the building material but also employment and economic growth of the region that ultimately enhance the socio-economic status of the people of the region and the state. The mining activities shall provide socio-economic benefits to the local population with direct & indirect employment opportunities. The project also contributes to the regional and financial benefits in the form of Royalty, Cess, Taxes, DMF etc. IV. Demand-Supply Gap. Granite Building stone is an important component of the construction activities for infrastructure development. The demand for granite building stone is increasing along with the increase in infrastructure and construction activities in Kerala. This quarry can 6

7 produce max 75, tonnes of building stone annually and the demand of building stone by various industries can be partly fulfilled by this project. During last few years there is a sudden increase in the Real estate & Port development activities which has further enhanced the demand for building stone, hence, there is heavy requirement of granite building stone to meet the demand supply chain. V. Imports Vs Indigenous production The requirements of granite building stone in infrastructure industry is huge where as the prices of granite are relatively low. The import or export of the same is not feasible due to heavy transportation cost. The granite building stone of size 150mm to 250mm shall be transported / sold to the crusher outside the quarry lease, where it shall be sized and sold to the local market for infrastructure development. VI. Export possibility. The price of the granite is very low and the transportation cost is very high. Hence there are no export possibilities of the same. VII. Domestic/Export markets. The granite building stone of size 150mm to 250mm shall be transported / sold to the crusher outside the quarry lease, where it shall be sized and sold to the local market for infrastructure development, real estate builders, contractors, etc. and to the nearby vendors for government infrastructure projects. It is not viable to export this material. However, there is huge demand for the granite building stone in the domestic market. VIII. Employment Generation (Direct and Indirect) due to the project. As per the requirement of Mines Act, Mines manager, Mines Foreman, Mine mates, Blaster, shall be appointed to supervise the quarrying operations. The list of the staff and workmen those shall be employed in the quarry is given below. Sl. No Particulars No s 1 Highly Skilled 1 2 Skilled 2 3 Semi-skilled 8 4 Un-skilled 10 Total 21 Equal number or more indirect employment is anticipated due to this project. 3. PROJECT DESCRIPTION (i) Type of project including interlinked and interdependent projects, if any. 7

8 The building stone shall be produced by drilling and blasting, the blasted material shall be loaded using excavators and transported to the crushing and screen plant located outside the lease area for reducing it to the sizes acceptable to the market. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with Co-ordinates. The Granite building Stone Quarry of Sri. Sajan Mani' over an area of (2.3991Acres). is located in Survey No 2398 in Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. The corner points in latitude & longitude of the area is given below. Key Plan showing the general location is Enclosed as Plate No.1A (Mining Plan), Cadastral Plan & Infrastructure Plan showing Specific location enclosed as Plate No. 2B (Mining Plan) & Surface Plan Showing the project boundary & project site layout with Co-ordinates is enclosed as Plate No-2(Mining Plan). (iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. This is site specific project. Quarrying activities are carried out based on local geology and availability of the granite building stone at the specific site. B. P. No. Latitude Longitude 1 N-10 33'31.733" E-76 21'19.269" 2 N-10 33'32.432" E-76 21'19.533" 3 N-10 33'33.667" E-76 21'21.170" 4 N-10 33'35.454" E-76 21'20.676" 5 N-10 33'35.255" E-76 21'19.213" 6 N-10 33'35.196" E-76 21'18.179" 7 N-10 33'31.125" E-76 21'17.034" 8 N-10 33'31.177" E-76 21'17.868" 9 N-10 33'31.662" E-76 21'18.477" (iv) Size or magnitude of operation. Small scale operation within an area of Ha.(2.3991Acres), Maximum Production planned 75, Tonnes per Annum (TPA) of granite building stone with maximum output size of 150mm to 250mm. (v) Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given). The quarrying of granite building stone is proposed by opencast semi-mechanized quarrying method and the sequence of quarrying shall be as given under, 8

9 The top soil shall be removed and used in afforestation / Green belt / Safety barrier all along the periphery of the quarry lease area. After exposing the granites, drilling of small diameter holes of 33/48mm, shall be done by jack hammer. The blasting shall be carried out by conventional blasting material with proper burden & spacing. The Rock breakers shall be used to break the oversize boulders left after blasting. No secondary blasting like plaster shooting, pop blasting shall be undertaken at any time in the quarry. The blasted material and the broken material by rock breakers shall be loaded to the tippers by excavator and transported to the crushing and screening plant located outside the quarry lease area. Removal of Top Soil / Overburden Drilling and Blasting Excavation, loading and Transportation of 150mm to 250mm size boulders Haulage/ Dispatch to Crusher outside the lease Summary of the production and development is given in the table below Year Production (T) Top Soil (T) Total Handling (T) Ratio I-Year 38, , , :0.04 II-Year 51, , , :0.02 III-Year 75, , , :0.02 IV-Year 50, , :0.01 V-Year 8, , :0.00 Total 2,23, , ,29, :0.02 At conceptual stage there shall be single pit in this area with 11 benches of 5m height and 5m width. The pit at conceptual stage shall have 115m length and 86m width and it shall be developed up to 35m above MSL level. The overall pit slope shall be maintained at less than

10 The entire pit at the conceptual stage shall be converted into rain water pond. The pit shall be properly fenced with single opening for drawing the water. The pit shall also be developed for pisciculture with good local bio-diversified vegetation. Conceptual Plan & Sections are enclosed as Plate No.6 & Environment Plan is enclosed as Plate No.8 (Mining Plan). Totally 5, Tonnes top soil shall be recovered and 2,23, Tonnes granite building stone shall be generated in the first five years of the plan period. The top soil shall be stacked at the safety barrier area and shall be used for Afforestation/Green belt development. The Geological resources of granite building stone in this area are 6,45, Tonnes and mineral reserves are 2,23, Tonnes. In the first five years of plan period totally 2,23, Tonnes granite building stone / aggregate shall be quarried. The balance mineral reserves shall be quarried in the subsequent mining plan period. Considering the above the anticipated life of the mine is about 5 years. The production plan for 1st five years is given bellow, Year Production I-Year 38, II-Year 51, III-Year 75, IV-Year 50, V-Year 8, Total 2,23, The average production per annum in the 1st five years plan period is 44, tonnes. (vi) Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transports of raw Material and finished product. No raw materials are required for producing granite building stone, the final products shall be transported by 10 tonnes tippers to the crushing & screening plant located outside the lease area. (vii) Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. There shall not be any waste generation in the quarry process as all the byproducts can be utilized in the infrastructure market. 10

11 (viii) be given. Availability of water its source, Energy/ power requirement and source should Around 18 KLD of water is required for dust suppression, afforestation and domestic use, which shall be drawn from nearby old quarries / Rainwater harvesting pond. Requirement of water Purpose Qty Required m 3 /day Drinking water & Domestic 2 Afforestation 6 Dust suppression 10 Total 18 * The water for Plantation and dust suppression will not be required for 4-5 months in a year during monsoon and wet/ rainy days. All Excavators, Tippers, Compressors and all other equipments are self primed by diesel engines. No external power is require for the project. (ix) Quantity of wastes to be generated (liquid and solid) and scheme for their Management/ disposal. There shall not be any waste generation (liquid & Solid) during the course of production of the Granite building stones. Only the top soil shall be utilized for the development of the green belt in the 7.5 meters safety zone. (x) Schematic representations of the feasibility drawing which give information of the project Quarrying Operations Granite Quarry Top soil utilized for the development of the Green belt Drilling & Blasting Granite Transportation to Crusher Excavation Crushing & Screening Plant is located outside the mining lease area The Crushing & Screening Plant is proposed to be located Outside the Lease Area. 11

12 4. SITE ANALYSIS: (i) Connectivity. This granite building stone quarry is located at 0.85 Kms from Chuvannsmsnnu Village in Thrissur Taluk, the quarry is located at about 18 Kms SE of Thrissur town. The quarry can be reached via Melachira - Chuvannamannu Road. The Infrastructure Plan is enclose vide Plate No.11. (ii) Land Form, Land use and Land ownership. The Land Details & Possession certificate of Sri. Sajan Mani enclosed as Annexure- 5 (Mining plan). Present land use, land use at the end of progressive stage and the ultimate land use pattern. Particulars Land use pattern at present stage (Ha) Land use pattern (end of progressive stage) (Ha) Land use pattern at Conceptual stage (Ha) Area for mining / mining activities No Mining Area Area for Roads Area for Safety Barrier / Green belt Total Unused area Total Mining Lease Area (iii) Topography (along with map). The lease area is located on the slope of the hillock gently dipping towards North. The highest elevation in this area is 90.0m above MSL and the lowest elevation is 25.0m from MSL. Topo sheet no. C43K6 (58B/6) showing the topographical details in the radius of 5 Kms of the lease area is enclosed as Plate No-1A (Mining Plan) & Surface Plan of the Quarry lease enclosed vide Plate No.2(Mining Plan). (iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco 12

13 sensitive area, water bodies (distance from the HFL of the river). CRZ. In case of notified industrial area, a copy the Gazette notification should be given. Sri. Sajan Mani area is located on the slope of the hillock gently dipping towards N. The core zone area is privately owned land. It is not a forest land and there is no human habitation. Most of the area covered with rock formations over which thin vegetation exists. The core zone is partly disturbed due to quarrying. There is no forest land, no area under CRZ, No water bodies, and no Sanctuary in the core Zone. (v) Existing Infrastructure. Hospital School Church Mosque Temple National Highway State high way Major District Road (vi) Soil Classification: : Govt. Hospital,Pattikkad, 1.00 Kms, : A L P School,Chuvannamannu, 0.3 Kms : St. Joseph Nirmalagiri Catholic, Chuvannamannu, 0.75Km : Thanipadam Juma Masjid Panachery, 1.16 Kms : Kodungallur Kavu bhagavathy Temple, 4.09Kms : Salem Kochi Highway (NH-544), 0.85 Kms : Kodugallur _ Shornur Road, Km : Pathamakallu Road, 0.51Km There is a soil cover of 0 to 1.5m thickness on the granite in the quarry lease area. The soil is Lateritic soil, reddish in color and clay with loamy nature. (vii) Climatic data from Secondary Sources: Maximum & Minimum Temperature Relative Humidity Rainfall (viii) Social Infrastructure available: Hospital School Church Mosque Temple The maximum temperature ranges from 29.3 to 36.20C where as the minimum from 22.1 to 24.90C. The average annual maximum temperature is C and minimum temperature 23.30C. Generally March and April months are the hottest and November, December, January and February months are the coldest. The humidity is higher during monsoon months from June to October and is around 93% during morning hours and 76% during evening hours.. Annual Average mm, South West monsoon during June to Sept. contributes 71.24%. The rainfall increases from the coast to the eastern hilly regions. Thrissur District falls under wet type of climate. (Source: District Survey Report Thrissur) : Govt. Hospital,Pattikkad, 1.00 Kms : A L P School,Chuvannamannu, 0.3 Kms : St. Joseph Nirmalagiri Catholic Church, Chuvannamannu, 0.18Kms : Thanipadam Juma Masjid, Panachery, 1.16 Kms : Kodungallur Kavu Bhagavathy Temple, 4.1Kms 13

14 5. PLANNING BRIEF: i. Planning concept (type of industries, facilities, transportation etc) Town and Country planning/ Development authority Classification: This is a granite Building stone mining project. It is proposed to produce maximum 75, tonnes building stones in the 3rd year. However the average production per annum is 44, tonnes in the 1st five years plan period. The mined material will be transported by trucks to the crushing & screening plant located outside the quarry lease area by tippers of 10 tonnes capacity. Effective Environment Management will be carried out to control the pollution of Air, Water, Noise and Ground vibration. The Mining Plan for the operations in the quarry lease area is approved by the District Geologist, Department of Mining and Geology, Government of Kerala, Thrissur District, Kerala, vide Letter No. 532/C2/TDO/2019 Dated ii. Population Projection: There will not be any increase in population due to the project. The man power required shall be employed from the local areas. The drivers / truck operators also shall be engaged from local areas. Hence not much influx of population from outside is anticipated. iii. Land use planning (breakup along with green belt etc): Particulars Land use pattern at present stage (Ha) Land use pattern (end of progressive stage) (Ha) Land use pattern at Conceptual stage (Ha) Area for mining / mining activities Area for Roads Area for Safety Barrier / Green belt Total

15 Unused area Total Mining Lease Area iv. Assessment of Infrastructure demand (physical & social): All the manpower for the project shall be employed from the local area. Thus, there shall not be influx of people into the region; therefore, no increase in the population is envisaged during the period of the operations. The operations are also small scale. Hence, infrastructure demand both in the form of physical and social infrastructure, in terms of physical infrastructure will not be very demanding. However, the project would raise the economic status of the people in the region thus the social infrastructure like education, health and hygiene, sports, etc. would be quite demanding. The company thus commits to support the local community in the field of Health & Hygiene, Basic education, Education of girl child, Sports, renewable energy etc. thereby strengthening the social infrastructure of the region. 6. PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing Area): No Crushing or screening or processing is planned within the quarry lease area. The entire product from the mine will be transported to the Crushing & Screening plant located outside the lease area. Existing road shall be strengthened & made use for the transportation. As the mining equipment are all diesel powered there is no need for external power. The infrastructure facilities like Quarry office, site services, First Aid room, Rest shelter, and other statutory facilities, etc., shall be located in the close proximity of the quarry lease area. The man power requirement shall be employed from local area, no additional infrastructure is required. (ii) Residential Area (Non Processing Area): No additional residential area is required as the manpower for this project shall be employed from the nearby villages. 15

16 (iii) Green Belt: Ha area earmarked for safety barrier shall be developed as green belt by planting minimum but not limiting 450 local species. Till conceptual stage totally Ha area shall be covered under green belt. Apart from this Afforestation shall be done on the haulage road by planting 150 saplings. (iv) Social Infrastructure: The project shall generate 21 direct and Equal indirect employment to the local people. Hence, the activity will contribute to the improvement of income status of the local people. The quarry project will also improve infrastructure facilities, eventually leading to the overall development of the area, resulting in the improvement of standard of life of local population. The Project proponent undertakes to spend Rs 4.00 Lakhs per Annum, to take up CSR works in the surrounding villages in the sector of Healthcare, Sanitation, Education of Girl child, Sports, Environment, renewable energy, etc. (v) Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Water ways etc) This granite building stone quarry is located at 0.85 Kms from Chuvannamannu Village in Thrissur Taluk, the quarry is located at about 18 Kms SE of Thrissur. The quarry can be reached via Melachira - Chuvannamannu Road. The Infrastructure Plan is enclose vide Plate No.11. (vi) Drinking water Management (Source & Supply of Water): Drinking water shall be made available at all the times to the mine workers. This will be sourced by water tankers from the bore well outside the quarry lease area, A water purifier shall be installed to provide safe drinking water. (vii) Sewerage system: Not applicable, as no human settlement is proposed in the lease area. (viii) Industrial Waste Management: No industrial waste is going to generate at this quarry. (ix) Solid waste Management: 16

17 It is expected to recover 5, tonnes top soil during quarrying this area. This top soil shall be used in afforestation / Green belt / Safety barrier all along the periphery of the quarry lease area. No other waste is envisaged from the operations. Power Requirement & Supply / Source: As all the machinery are self-primed by diesel engines, no external power is required. REHABILITATION AND RESETTLEMENT (R*R) PLAN (i) Policy to be adopted (Central/ State) in respect of the project affected persons including home ousters, land ousters and land less laborers (a brief outline to be given): Not applicable since there is no rehabilitation and resettlement involved in this project. 7. PROJECT SCHEDULE & COST ESTIMATES i. Likely date of start of construction and likely date of completion (Time schedule for the project to be given): The Quarry will be commenced immediately after getting the statutory approvals from Government authorities. Total cost of the project is about Rs 79.0 lakhs. ii. Estimated project cost along with analysis in terms of Economic viability of the project. Considering the present domestic market conditions of the products, the appx. Cost of the project estimated is around Rs lakhs. The summary of the assets are given below. Mining machinery will be hired through contractors. Table No.F8.1: Capital Cost of the Project Sl No. 1 DESCRIPTION Excavator, Rock breaker, Tipper etc., Water Tanker, Jeep (Mobilization Charges) Capital investment Cost in lakh Rs Strengthening of Roads Temporary sheds, Rest shelters etc., Environmental Control Measures D.G.Set Mine Development Land Expenses Operational Exp

18 9 Miscellaneous 4.00 Total 79.0 Table No.F8.2: Operating Cost of the Project Sl.No. Details Cost 1 The estimated capital cost of the project Rs.79.0 Lakhs 2 Total pit head cost/tonne of stone Rs Royalty & Others related Cost per Tonne Rs Net production cost per Tonne (Pit Head) Rs Selling price per Tonne (Pit Head) Rs Gross Profit/ton Rs Gross Profit/annum for 75, tonnes Rs Lakhs The before the proposed project is financially viable. However, increase in prices of building stone in domestic market is further expected. 8. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) This project will be one of the major economic activities resulting in provide livelihood and have positive impact on socio-economic life of people living in nearby villages thereby contributing to the overall up gradation of living standards. The project also generates revenues to the state and central governments, by way of royalties, taxes, Cess, DMF, etc, The mining operations shall be providing employment to approximately 50 persons directly and equal persons indirectly. The company plans to provide good support to the local schools and provide scholarships for the High school Girl students. Health care, sanitation, sport facilities, etc shall be improved on account of the facilities being planned as part of the CSR works by the company. The mined out pit at the end of the mining operations will be developed into a pond for Pisciculture that could provide livelihood for a few villages. The water could be used for agriculture & various other purposes. 18

19 Conclusion: This upcoming project will meet the development needs of the region without causing any negative influence on the environment. It can be summarized that the development of the granite Building Stone quarry of the company will have a positive impact on the Socioeconomics and the Environment of the area and lead to overall Sustainable development of the region. Date: Place: Thrissur (Signature of Project Proponent Along with name and address) Sri. Sajan Mani, Kaniyarkuzhiyil House Karimkunam (P.O) Thodhupuzha Idukki,Ph No. : Cyriac Joseph, DMG/KERALA/RQP/15/2018 Global Environment & Mining Services, 394, HBR Layout, 5th Block, 5th Main, 1st Cross, 1st Stage 19

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher

Granite Building Stone Quarry of M/s Ulikkal Stone Crusher 1. EXECUTIVE SUMMARY: M/s. Ulikkal Stone Crusher had made an application for Granite building stones quarrying located in Sy. No. 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State.

More information

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz

More information

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District, 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone

More information

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty

More information

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE Village Ashapura Tehsil Nasirabad District Ajmer State Rajasthan Capacity 35945 TPA ROM (Max) Lease Area

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha) M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015 SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development

More information

Smt. M. Hari Chandana

Smt. M. Hari Chandana Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E) 1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 29 2.0 Introduction of Project / Background Information 30 3.0 Project Description 32 4.0 Site Analysis 39 5.0 Planning

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project / Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0 Planning

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

M/s.Harshad Granites,

M/s.Harshad Granites, FORM -1 M (I) Basic Information S.NO. Item Details (i) Name of the Mining Lease Site M/s.Harshad Granites, Irapuram Village, Kunnathundu Taluk, Ernakulam District (ii) Location/site Topo sheet : 58/B12

More information

Pre-Feasibility Report of Multi-Coloured Granite Quarry

Pre-Feasibility Report of Multi-Coloured Granite Quarry Pre-Feasibility Report of Multi-Coloured Granite Quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular

More information

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh 1) Executive Summary Project Name of Company / Mine Owner Location PRE FEASIBILITY REPORT Kuppli- Koyyam Mineral Sands Deposit-I, Pre-concentration Plant (PCP). M/s. Andhra Pradesh Mineral Development

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Stone/Sand/Bajri Mine (With ML Area of 1.9507 Ha) Kh. No. 5822/5771/1, 632/1, 922/1, 923/1, Chullah, Patwar Circle Chullah, Ladhbarol, Mandi Himachal Pradesh M/s Beas Valley

More information

M/s BENITA INDUSTRIES LIMITED

M/s BENITA INDUSTRIES LIMITED M/s BENITA INDUSTRIES LIMITED (Colour Granite Quarry 19.150 Ha.) Sy. No: 82-1 of Kambadur (V), Kambadur (M), Ananthapur District, Andhra Pradesh State. ENVIRONMENTAL MANAGEMENT PLAN 0 P a g e INDEX S.

More information

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist. MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Key Issue: Growth opportunities for Southern Hinterland

More information

about GCC

about GCC about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com

More information

INDEX. Environmental Management Plan

INDEX. Environmental Management Plan Environmental Management Plan M/s. N.V. Exports [Quarry Lease Area - 0.615 Ha.( 1.52 Acres)] Sy. No. : 11/1 Village : R.L. Puram Mandal : Chimakurthy District : Prakasam State : Andhra Pradesh ENVIRONMENTAL

More information

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE

IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE MINING PLAN FOR ROAD METAL & BUILDING STONE OVER AN EXTENT OF 1.894Hect. LOCATED IN SY. NO. 1385, CHINNATHIPPASAMUDRAMVILLAGE, MADANAPALLI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH STATE Introduction Sri.K.Venkataramana,

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

ENVIRONMENTAL MANAGEMENT (CLUSTER)

ENVIRONMENTAL MANAGEMENT (CLUSTER) /+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna

More information

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre 1. EXECUTIVE SUMMARY PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre Sarkandi, Tehsil and District - Fatehpur, Uttar Pradesh is the lessee

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

KRISHNA MERCHANTS PVT. LTD.

KRISHNA MERCHANTS PVT. LTD. (Color Granite Quarry lease area 15.00 Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 Flat # 7-3 Dhruvatara Apartments

More information

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1 Data Collection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Survey design 2 2.1 Information needed................................. 2 2.2 Study area.....................................

More information

Mineral ~ Granite Mining project ~ Category B2 Lease Area ~ 3.00 Ha. Near Village ~ Jotaya Tehsil ~ Sarwar District ~ Ajmer State ~ Rajasthan

Mineral ~ Granite Mining project ~ Category B2 Lease Area ~ 3.00 Ha. Near Village ~ Jotaya Tehsil ~ Sarwar District ~ Ajmer State ~ Rajasthan PREFEASIBILITY REPORT Mineral ~ Granite Mining project ~ Category B2 Lease Area ~ 3.00 Ha. Near Village ~ Jotaya Tehsil ~ Sarwar District ~ Ajmer State ~ Rajasthan PROJECT PROPONENT Sh. Vijay Kumar Soni

More information

Roadmap to Stability

Roadmap to Stability Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA 24 September 2014 BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA BMG Resources Limited (ASX: BMG) (BMG or the Company) is pleased to announce that it has entered

More information

Location of the Quarry

Location of the Quarry Pre-Feasibility Report of Black Granite (Dolerite) quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

Legal problems of environmental management. Spatial planning and space management. M. Gajewski 2014 / 2015

Legal problems of environmental management. Spatial planning and space management. M. Gajewski 2014 / 2015 Legal problems of environmental management Spatial planning and space management M. Gajewski 2014 / 2015 Course contents (in brief) Constitutional basis of the environment protection system. General principles

More information

Bishkek City Development Agency. Urban Planning Bishkek

Bishkek City Development Agency. Urban Planning Bishkek Bishkek City Development Agency Urban Planning Bishkek Bishkek City Development Agency Official name City budget Population Area GRP Import value Export value External trade turnover Foreign direct investments

More information

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Typical information required from the data collection can be grouped into four categories, enumerated as below. Chapter 6 Data Collection 6.1 Overview The four-stage modeling, an important tool for forecasting future demand and performance of a transportation system, was developed for evaluating large-scale infrastructure

More information

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare) QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT

More information

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-II (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-III LETTER OF INTENT Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

More information

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075 14647 State Route 511, Oberlin/Kipton, OH 44075 56 ACRES Vermilion Rd Gifford Rd Haigh Rd 44 Summary The Kipton sandstone quarry is included in 56 acre tract owned by Terry A. Johnson, of Huron, Ohio.

More information

Fossil Fuels Conference. 10 November The Limpopo Province A Hub for Sustainable Development

Fossil Fuels Conference. 10 November The Limpopo Province A Hub for Sustainable Development Fossil Fuels Conference 10 November 2015 The Limpopo Province A Hub for Sustainable Development AGENDA The Economic Impact of Mining at anational, Provincial and Local Level Mining as a Catalyst for Development

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

A Review of Concept of Peri-urban Area & Its Identification

A Review of Concept of Peri-urban Area & Its Identification A Review of Concept of Peri-urban Area & Its Identification Ar. Manita Saxena Research Scholar Department of Architecture and Planning M.A.N.I.T, Bhopal Dr. Supriya Vyas Assistant Professor, Department

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT ESTIMATED COST : Rs. 1392.42 Crores DESIGNED IRRIGATION : 40000 Ha. COST PER HACT. : Rs. 3.48 Lakhs ''EVERY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. INTRODUCTION Thiru S. Baskar Babu, S/o. Late Sri S. Selvaraj, No.2, First cross street, Anna Nagar, Nellithope S.O., Pondicherry has a mining lease area for the production of

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Pre-feasibility Report of Multi - Colour Granite Quarry

Pre-feasibility Report of Multi - Colour Granite Quarry Pre-feasibility Report of Multi - Colour Granite Quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular

More information

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011 MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest

More information

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0 1. EXECUTIVE SUMMARY The proposed project of 3.925 Ha (9.70 acre) areas is of stream bed sand mining and falls under Category- B2 as per EIA Notification 2006 of the Ministry of

More information

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. B.K.R. GRANITES 4.790 HA. BLACK GRANITE MINING COMP NO. 205 &215 RAGIMANUPENTA & PARADARAMI R.F., YADAMARRI (M) CHITTOOR (DT), ANDHRA PRADESH. Submitted by SV ENVIRO

More information

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses Act 67 / 68

More information

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 Our Business Agenda The Gloucester Coal 3 Ticks Rule Operations Profitability Growth Gloucester Coal delivers record profit, sales

More information

Brief Summary. Production = 4,00,000 TPA

Brief Summary. Production = 4,00,000 TPA S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *1391603277* GEOGRAPHY 0460/23 Paper 2 May/June 2015 Candidates answer on the Question Paper. Additional

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT PRE-FEASIBILTY REPORT 1.0 INTRODUCTION OF THE MINING ACTIVITY V.Moideen for M/s V.K.M STONE CRUSHER is proposing a (Building Stone) Quarry with Lease at Re-Survey No. 103/2of Kannamangalam Village, Thirurangadi

More information

C O N T E N T S. 1 Introduction 7. 2 General 8. 3 Location and accessibility 9. 4 Geology, Exploration & Reserves Mining 19.

C O N T E N T S. 1 Introduction 7. 2 General 8. 3 Location and accessibility 9. 4 Geology, Exploration & Reserves Mining 19. 111 112 113 C O N T E N T S Sl.No. Description Page No. 1 Introduction 7 2 General 8 3 Location and accessibility 9 4 Geology, Exploration & Reserves 11 5 Mining 19 6 Blasting 20 7 Mines Drainage 21 8

More information

Georeferencing and Satellite Image Support: Lessons learned, Challenges and Opportunities

Georeferencing and Satellite Image Support: Lessons learned, Challenges and Opportunities Georeferencing and Satellite Image Support: Lessons learned, Challenges and Opportunities Shirish Ravan shirish.ravan@unoosa.org UN-SPIDER United Nations Office for Outer Space Affairs (UNOOSA) UN-SPIDER

More information

BRITISH VIRGIN ISLANDS SECTORAL GROSS DOMESTIC PRODUCT MARKET PRICES (current prices) (US$M)

BRITISH VIRGIN ISLANDS SECTORAL GROSS DOMESTIC PRODUCT MARKET PRICES (current prices) (US$M) SECTORAL GROSS DOMESTIC PRODUCT MARKET PRICES (current prices) Sector 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000r 2001r 2002r 2003r 2004r 2005e Agriculture, Hunting & Forestry 1.36 1.50 1.63 1.77

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale

More information

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses.

More information

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION:

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION: 1. EXECUTIVE SUMMARY The proposed mining project is located near Mauza & Mohal Lodhwan/Pail, Tehsil Nurpur, District Kangra, Himachal Pradesh. The proposed project is of sand, stone and bajri mining having

More information

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL Land Restoration / Reclamation Monitoring of more than 5 million cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2013 Ashoka & Piparwar

More information

Thoughts toward autonomous land development. Introduction

Thoughts toward autonomous land development. Introduction Thoughts toward autonomous land development Spatial Transformation of Regular grid Irrigation Frameworks Bangkok and Cairo A Work in Progress Information based on student workshop June 2009 and earlier

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of GRAVEL & BUILDING STONE QUARRY For Sri Prathipati. Ram Prasad 1.235 HA GRAVEL & BUILDING STONE QUARRY SY. NO. 860, Vedurupavuluru (V), Gannavaram(M), Krishna(DT), ANDHRA

More information

Table 1.1 Salient Features of the Mine Site & Surrounding Details

Table 1.1 Salient Features of the Mine Site & Surrounding Details 1.0 EXECUTIVE SUMMARY This is a new mining lease allotted by Auction. LOI of Sand Stone Plot. No.- 31, located near Village- Deriya & Pabunagar, Tehsil-Balesar District Jodhpur (Rajasthan) over an area

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT PRE-FEASIBILTY REPORT 1.0 INTRODUCTION OF THE MINING ACTIVITY Muhammed Ibrahim is proposing a Granite (Building Stone) Quarry with Lease at Re-Survey No. Q02-1065/pt of Melmuri Village, Ernad Taluk, Malappuram

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

The National Spatial Strategy

The National Spatial Strategy Purpose of this Consultation Paper This paper seeks the views of a wide range of bodies, interests and members of the public on the issues which the National Spatial Strategy should address. These views

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION 013 GEOGRAPHY (For Both School and Private Candidates) TIME: 3 Hours Thursday, 9 th October

More information

Geoscientific Instrumentation in River Valley Projects

Geoscientific Instrumentation in River Valley Projects J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Submission By M/s PIONEER TOR STEEL MILLS PVT LIMITED FOR LATERITE [ROM]-11,19,144.60 TPA@67% PRODUCTION-7,49,826.88 TPA Extent-9.813 Hect. Sy. No. 396 / P, Bheemanpally[V],

More information

THE IMPACT OF LANDSLIDE AREAS ON MUNICIPAL SPATIAL PLANNING

THE IMPACT OF LANDSLIDE AREAS ON MUNICIPAL SPATIAL PLANNING THE IMPACT OF LANDSLIDE AREAS ON MUNICIPAL SPATIAL PLANNING Jarosław Bydłosz, PhD Faculty of Mining Surveying and Environmental Engineering AGH University of Science and Technology e-mail: bydlosz@agh.edu.pl

More information