PRE FEASIBILITY REPORT
|
|
- Linda O’Neal’
- 5 years ago
- Views:
Transcription
1 PRE FEASIBILITY REPORT TABLE OF CONTENTS
2 Sr. No. Content Page No. 1.0 Executive Summary Introduction of Project / Background Information Project Description Site Analysis Planning Brief Proposed Infrastructure Rehabilitation & Resettlement Plan Project Schedule Analysis of Proposal EXECUTIVE SUMMARY Particulars Project name Location Details Panri Quartz & Feldspar Near village Panri, Tehsil Deogarh and District Rajsamand, Raj 2
3 Total Lease area Hect. Mineable Reserves tonnes Capacity Proposed production 26,364 TPA (ROM) of Quartz & Feldspar. Life of Mine Year Estimated project cost 31 Lacs/- EMP Cost 50,000/- Power Requirement Required as per need Fuel Requirement 150 lits. /day DG Set Required as per need Highest and Lowest Elevation S. No. Particulars Elevation (mrl) 1. Highest Lowest 623 Land use The lease area is Govt. Land. Nearest habitation/ town Panri, 1.7 km in SE Nearest Airport Dabok Nearest Highway SH-33 Nearest Railway Station Power supply Nearest Telephone Nearest Dispensary and Govt. Hospital Educational facility Water demand and supply Nearest tourist places Defense installations Archeological Features Ecological sensitive zones Nearest streams/ rivers/ water bodies (from mine boundary) Seismic zone Kuwanthal -7.3 km Panri Panri Panri Panri 3.50 KLD, Source-open well None within the study area None within the study area None within the study area None within the study area. Seismic zone II. 2.0 INTRODUCTION OF PROJECT / BACKGROUND INFORMATION Mining project of Mineral Quartz & Feldspar with M.L. No- 116/2008. The project is located near village Panri, Tehsil Deogarh and District 3
4 Rajsamand, Raj. Lease area Hect. Proposed production 26,364 TPA (ROM) of Quartz, Feldspar. 2.1 Identification of the project and project proponent Name of the Project Name of the Lessee Location of the project Proposed Production Panri Quartz & Feldspar Mine m/s Swastic Minerals Near Village Panri, Tehsil Deogarh, Distt Rajsamand (Raj.), 26,364TPA (ROM)of Quartz, Feldspar Lease Area Hect. Mob. No Status of the Firm Partnership Ferm 2.2 Brief Description of nature of the project. Letter of Intent has been issued of Panri quart and feldspar mine in the favor of M/S Swastic minerals.( annexure 1) Nature of the Project Mining of Quartz & Feldspar is proposed in the lease area of ha. Near village Panri, Tehsil Deogarh, District Rajsamand, Rajasthan. Mining will be carried out by Opencast Semi-Mechanized method. Proposed production is 26,364 TPA (ROM) of Quartz & Feldspar. 2.3 Need For The Project And Its Importance To The Country: The Mining project falls in the area of the district Rajsamand, Rajasthan devoid of sufficient agriculture activities and other industrial growth. 4
5 The earning sources of the region are limited. The region has scarcity of water. Mineral wealth of the state Rajasthan provides the employment opportunity to the people of the state. Mining is one of the major core sector industries which play a crucial role in the process of country economic development. 2.4 Demands-Supply Demand of Quartz & Feldspar will be fulfilled by this project and following grade of Quartz & Feldspar is supplied to various end users. 2.5 Imports vs. Indigenous Production There will be no import for the project. There will be indigenous inputs in the entire mining activity. 2.6 Export Possibility The mining activity is not prospecting exports. 2.7 Domestic/Export Markets Lessee would like to sale out the mineral in domestic market as per requirement. No export is proposed. 2.8 Employment Generation (Direct or Indirect) The mining project will generate direct & indirect employment. About 20 people will get direct & indirect employment with allied and related industries, such as transportation, maintenance, etc. 3.0 PROJECT DESCRIPTION 3.1 Type of Project including interlinked and interdependent projects: The proposed project is mining unit of Quartz & Feldspar. It is proposed to 5
6 produce 26,364 TPA (ROM) Quartz & Feldspar. Lease area is situated at N/v Panri, Tehsil Deogarh & Dist. Rajsamand, Raj. No Interlinked or Interdependent project. 3.2 Location Village : Panri Tehsil : Deogarh District : Rajsamand State : Rajasthan The entire project area is Hectares. The lease area is Govt. Land. 3.3 Details of Alternate Site Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental Considerations Gone Into Should Be Highlighted: Mining is site specific project and limited to mineralized area. 3.4 Size/Magnitude of Operation: It is proposed to produce 26,364 TPA (ROM) of Quartz & Feldspar in the area of Hectares by open cast Semi- Mechanized method of mining. 3.5 Project Description with process details Proposed method of mining Panri quartz and feldspar applied mining lease to be developed by an open cast mining method of making benches of 3 m width & 3m height. the bench formed shall be in two slice of each 1.5 m height. It is evident that the mineral in the area is near the surface and there open cast mining is the obvious method of choice... Proposed Production 6
7 (A) Weathered Pegmatite in Tones Per Year Production ROM Salable mineral tonnes feldspar 70 % tonnes Quartz 30 % tonnes 26, Source-Approved Mining Plan Ground Water Table Lowest LEVEL ULTIMATE DEPTH OF MINING WATER TABLE 633 mrl 625 mrl (8 m bgl) 603 mrl (30 m bgl) Proposed working will not intersect ground water. Extent of Mechanization: Machine No. Make HP/Capacity Compressor 1 local 75 CFM Jack hammer 1 local 32 mm 7
8 Dumper 1 Tata 10 tonnes Diesel pump 1 local 15 HP 3.6 Availability of water its source, energy/power requirement and source Total water requirement in the mine will be about 3.50 KLD for drinking, spraying and plantation. Water will be available through open well from village Panri and through water tankers. Detail of water requirement in KLD is given below: 1. Dust Suppression Drinking Green belt 1.00 Total 3.50 KLD Diesel for trucks/equipment about 150 Lt. per day is assumed to be consumed. Diesel will be brought from outside, from nearby diesel pumps. 3.7 Quantity of wastes to be generated (liquid and solid) and scheme for their management /disposal: Total 20% subgrade mineral (9958 tones) will be generate in next five year. 3.8 Resource Optimization/Recycling and Reuse Envisaged In the Project, If any, Should Be Briefly Outlet: N.A 3.9 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product. 8
9 The project will itself generate raw material i.e. Quartz & Feldspar and proposed production is 26,364TPA (ROM). Transportation of Quartz & Feldspar will be done by dumpers to the destination place Schematic Representations of The Feasibility Drawing Which Give Information Of EC Purpose: Application for prior Environmental Clearance (Form I & Pre-Feasibility Report Presentation for EC before SEAC Environmental Clearance Compliance of EC Condition Commencement of mining Operation Submission of Compliance report to concern authority Corrective measures to meet the norms in EC, if any 4.0 SITE ANALYSIS The lease area is for mineral Quartz & Feldspar which is suitable for use in Quartz & Feldspar Slabs/Tiles Flooring, Monuments and other construction works. The selected site has the following advantages. 1. The area chosen is not having habitation. 9
10 2. The site is well connected by road. 3. There are no industries near the site and there is no pollution. 4. No endangered species around the mine site. 5. Availability of labors from nearby villages. 6. Proximity to the market. 4.1 Connectivity: Connectivity details from Project Site Sr. No. Particulars Details 1. Road Connectivity The village Panri, nearest population center is 1.7 km away from the lease area. 2. Nearest Highway Sh Nearest Railway Station Kuwanthal -7.3 km away 4. Nearest Airport Dabok ( Udaipur ) 4.2. Land form, land use and land ownership The Lease area is Govt. Land. The highest and lowest point of the lease area are 633 mrl and 623 mrl respectively. Lease Area : Hect. Village : Panri Tehsil : Deogarh District : Rajsamand State : Rajasthan 10
11 4.3 Topography: The highest elevation of the area is 633 mrl and lowest is 623 mrl. There is no nallah flowing in the lease area. 4.4 Existing Land use Pattern The lease area is Govt. Land (4.4660Hect.). There is no village or hutments within the lease area. Existing land use pattern is given as below: Sr. No. Particulars Existing Land Use Pattern in Hect. A) Mining Activity 1 Pits - 2 Dumps - 3 Road - 4 Plantation - 5 Infrastructure - (office) 6 Top Soil storage - (temporary) 7 Mineral Storage - 8 Agricultural - Land B) Remaining virgin land Total area Existing Infrastructure Commensurate with the scale of mining operations, the requisite support facilities are proposed to be provided, which are adequate to meet the functional requirement of the mine. Site services such as mine office cum rest 11
12 shelter, first aid station, toilet etc are already available. Water available through bore well from village Panri and through open well. 4.6 Soil / rock classification Pegmatite: Pegmatite locating generally in the hilly ground where there is no sand or alluvium. Pegmatite exposures can be recognized by its white/ pink colour. Pegmatite bodies generally contain pockets of mineral like feldspar & Quartz in quantities which can be economically mined. General Geology : Geologically, Rajsamand district is comprised basement rocks of Mangalwar Complex of BhilwaraSupergroup, followed by Aravalli Supergroup, post- Aravalli intrusives, Delhi Supergroup of rocks, post-delhi intrusives and Recent alluvium. The stratigraphic succession of the rocks occuring in Rajsamand district is given below: Recent Alluvium, Tuffa etc. Intrusives Erinpura granite and gneisses. Kumbhalgarh Group Calc-gneisses, calc-schist, marble, Schist migmatites,gneisses, quartzites etc Delhi Supergroup 12
13 Gogunda Group Quartzites, interbedded schist with subordinate impure calcareous metasediments. Intrusives Synorogenic granite & gneisses, Rikhabdev. ultramafic suite. Jharol Group Phyllite,chlorite -schist, arnetmica schist, calc- schist with marble etc. Nathdwara Group intercalatry bands dolomite / calcitic marble. Phyllite, calcareous phyllite, of Aravalli Supergroup Bari Lake Group Meta volcanics, conglomerate, arkose, quartzite, phyllite, schist, dolomite etc. Rajsamand Group Phyllite, graywacke, mica-schist, quartzite, limestone and dolomite Debari Group Conglomerates, arkose, quartzite, phyllite, dolomite, limestone, chert & carbonaceous phyllites. 13
14 Undifferentiated granites, basic sills/ dykes. Pre- Aravallis Intrusives Unthala - Gingla granites. Mangalwar Complex Lasaria & Sarada Migmatites, composite gneisses, mica schist, etc. Local Geology : Geologically the lease area comprises of the belonging to B.G.C. bearing quartz, feldspar pegmatite and mica. The pegmatite generally occurs parallel to the strike of schist and gnesess while fue of pegmatite also occure obligue or with certain degree say 30 0 with the strike N50E or N80E. 4.7 CLIMATIC DATA FROM SECONDARY SOURCES The climate of the region is of semi arid type. The temperature reaches up to 45 0 to 48 0 C in summer & 5 0 to 10 0 C in winter season. The average rainfall of the region is about 450 mm per year. 4.8 SOCIAL INFRASTRUCTURE The infrastructure like, toilets, first aid stations etc. will be developed The nearest village is Panri, health & educational facilities (in the form of primary and secondary schools) are available there. Medical facilities, Primary Health Centre are there in the area, imparting services, for advance medical facilities. In each village one health worker has been appointed by the Govt. to provide primary health facilities. Village people are availing drinking water facilities generally from the hand pump, open well and tube well. The water supply is also supplied through tanker in few villages. During summer scarcity of water has been noticed. 14
15 Communication services like post office and telephones are available in the nearby village. Some of the villagers are having mobile phones. An occupational health unit will be organized and the proposed measures will be adopted: Pre & Periodical Medical Checkup program for all the workers. Compulsory medical checkup program and first-aid box with necessary equipment will be provided. Training for workers regarding occupational hazards. Safety equipment i.e. dusts mask, safety shoes, gloves etc. 5.0 PLANNING BRIEF 5.1 Planning Concept: It is a mining project of Quartz & Feldspar. The proposed production of is 26,364 TPA (ROM) of Quartz & Feldspar. Opencast Semi-Mechanized method of mining will be adopted and transportation of mineral shall be done through road by trucks. 5.2 Population Projection Man power requirement for mining is estimated to be 20 Nos. Most of the employees will be recruited from neighboring village. The laborers are provided along with tractor trolley by contractor or from nearby villages. So there will no permanently migration of people, hence there will be no population projection. 15
16 5.3 Land use Planning: Sr. No. Particulars Pre-Operational Operational A) Mining Activity 1 Pits Top soil dump Dumps Mineral stack Yard Infrastructure Plantation Agriculture Land Backfilled Area Water reservoir - - B) Rain Water Storage - - C) Remaining Virgin land Total area Assessment of Infrastructure Demand The basic infrastructures are proposed in the lease area like office, store, workshop and shelter for the workers. Water will be available through hand pump or through dug well from village Panri. Most workers will be from nearby villages so no accommodation at mine site will be required. Medical facilities will be provided to the employees. 5.5 Facilities Provided: Infrastructure The basic infrastructures are available in the lease area like office, store, workshop and shelter for the workers. Water will be available through tube well & dug well. Most workers will be from nearby villages so no accommodation at mine site will be required. 16
17 5.5.2 Landscaping and Green Belt Development S.No. Yr of plantation Survival rate Area to be covered in hect. per yer % % % % % Health and safety System During the opencast working, and allied activities, all the precautionary measures shall be taken into account as per MMR 1961 and MCDR 1988 for safety and security. Following Safety & security measures will be enforced; Moving front of the quarry shall have temporary fencing. Permanent fencing will be provided where quarry has reached the ultimate pit limit. Mine entrance will have a permanent check post and record shall be maintained of all persons / vehicles entering the mine area. Round the clock security arrangement shall be provided to prevent inadvertent entry of persons. 17
18 5.5.4 Disaster Management and Risk Assessment In spite of following all the precautionary measures and following all safety rules, regulations and procedures, in mining accidents cannot be ruled out completely. The Project Proponent will formulate a Disaster Management Plan with the approval of DGMS. Following are the accidents which can take place in mechanised opencast mining and measures proposed to be taken. Fall of human beings or fall of machines from benches/ dumps/haul roads. Due to drilling / blasting and handling of explosives. Fire & Explosion in machinery Emergency situation due to social reason such as public unrest, terrorism etc. Preventive Measures: Creating berm on the side of benches/ haul roads of height greater than or equal to ½ tyre radius. Minimum height of berm shall be 1.2 m and slope Minimum clearance of 1.5 m will be maintained between outer tyre and berm. All provisions of MMR 1961, conditions imposed in permission for Deep hole drilling and blasting and use of HEMM, and conditions of explosive license will be followed. Fire fighting equipment in the machinery/ workshop/ office will be maintained. Persons will be trained in the use of fire fighting equipment and mock rehearsal will be conducted. Training of security personnel. Procedures as laid down in Disaster Management Plan to be followed. Training; Persons will be trained in the following: Knowledge of Chemicals and use of protective equipment 18
19 Procedures for reporting emergencies. Location and use of fire fighting equipment Knowledge of alarm system and siren Evacuation procedures. Training in first aid as per Mines Rules 1955 Emergency Equipment & Facilities: Mobiles. Fire fighting equipment s Emergency medical supplies Other protective equipment s i.e. goggles, helmet, face shield, hand gloves, safety belts, barricade tape. First Aid station as per the provisions of Mines Rules PROPOSED INFRASTRUCTURE S.NO Details 1 Mining Area Hectares. 2 Residential Not Applicable Area 3 Connectivity The village Panri, nearest population center is 1.7 km away from the lease area. 4 Green Belt 25 plants per year shall be planted in the lease area at statutory barrier. 5 Water 3.50 KLD, Source: open well Management 6 Power N.A. Management 7 Waste Water Domestic and office effluent will be treated in individual septic tanks. 8 Solid Waste The waste dump generated will be stacked within the Management lease area. 9 Hazardous N.A. waste Management 10 Social Infrastructure Social Infrastructure is provided and if necessary other facilities will also be provided by mine s proponent. 19
20 7. REHABILITATION & RESETTLEMENTPLAN Since the project site is a waste land and there is no village or hutments within the lease area. R&R is not applicable to this project. 8. PROJECT SCHEDULE 8.1 Likely date of start of construction and likely date of completion (time schedule for the project to be given) The project activity will be started after getting the Environmental Clearance from SEAC, Jaipur. 8.2 Project Cost Estimation Estimated Project Cost with the proposed production is Rs. 31 Lacs/- (A) (B) Capital investment Site facilities & PPE = Rs 1.00 lac /- Machinery & Tools = Rs lac/- Financial assurance = Rs lac/- PMCP = Rs lac/- Social fund & activities = Rs lac/- EMP = Rs lac/- Miscellaneous = Rs. 60,000/- Labour = Rs. 30,000/_ Total cost = Rs /- (31 Lacs/-) Operational cost- The mineral Quartz & Feldspar will be mined from the lease area and the cost of per ton of mining will be approx. Rs. 200/- per tone. 8.3 Economic Viability The anticipated cost of mining is Rs. 200/- per ton. Average sale value is Rs. 20
21 /- per tone. Hence the project will be viable. 9. ANALYSIS OF PROPOSAL Project will create direct & indirect employment opportunities within the surrounding region. Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled & unskilled man-power surrounding the project site. In operation phase, the proposed project would require significant workforce of non-technical and technical persons. Migration of highly education and skilled experience will result in increase of literacy in the surrounding villages. In addition, the proposed expansion of project shall enhance the prospects of employment. Assessment of the potential socioeconomic benefits during mining focused primarily on work force requirements, acquisition of supplies, and the temporary increased demand for services related to the mining project like food, housing, communications, law enforcement, medical care, local transportation etc. Due to these, additional revenue to local suppliers for required products and services related to the construction and operation phases of the project will generate. Thus, mining activities will provide numerous new, although temporary, work opportunities for both skilled and unskilled labor, as well as contribute significantly to the local economy. Additional government revenue expected from royalty, taxes, duties and other fees. An added benefit to the proposed project will result in considerable growth of stimulating the industrial and commercial activities in the state. Small and medium scale industries may be further developed as a consequence ********
22 ANNEXURES 22
23 23 Annexure 1
24 24 Annexure 2
25 25
26 26 Annexure 3
27 27
28 Annexure 4 THE BUDGETARY BREAKUP AND DETAILS OF FACILITY PROVIDED FOR THE ENTREPRENEUR SOCIAL RESPONSIBILITY (ESR). Name of the Project: Panri Quartz & Feldspar, M.L. No- 116/2008, Near Village Panri, Tehsil- Deogarh & Distt Rajsamand, Rajasthan, Mining area Hect. Sr. Facility Provided Total amount per No. year 1 Training Programme 10,000/- 2 Washroom for girls 10,000/- 3 Health Camp 20,000/- 4 Miscellaneous 10,000/- TOTAL 50,000/- (Signature of the lessee) M/s SWASTIC MINERAL 28
29 29 Annexure 5
30 30
31 31
32 32
33 33 Annexure 6
34 34
35 35 Annexure 7
PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh
PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 29 2.0 Introduction of Project / Background Information 30 3.0 Project Description 32 4.0 Site Analysis 39 5.0 Planning
More informationKurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,
1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone
More informationMCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)
::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with
More informationPRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE
PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE Village Ashapura Tehsil Nasirabad District Ajmer State Rajasthan Capacity 35945 TPA ROM (Max) Lease Area
More informationFOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund
Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...
More informationAPPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.
More informationANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1
ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction
More informationPRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)
PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty
More informationMCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total
More informationTABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.
TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.
More informationOf Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates
1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM
More informationAPPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director
More informationWHAT IS MINERAL EXPLORATION?
INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching
More informationJAI MAA SHARDA STONE CRUSHING
JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation
More informationMINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988
MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationTable 1.1 Salient Features of the Mine Site & Surrounding Details
1.0 EXECUTIVE SUMMARY This is a new mining lease allotted by Auction. LOI of Sand Stone Plot. No.- 31, located near Village- Deriya & Pabunagar, Tehsil-Balesar District Jodhpur (Rajasthan) over an area
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village
More informationFOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 33 2.0 Introduction of Project / Background Information 35 3.0 Project Description 38 4.0 Site Analysis 47 5.0 Planning
More informationabout GCC
about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com
More informationMineral ~ Granite Mining project ~ Category B2 Lease Area ~ 3.00 Ha. Near Village ~ Jotaya Tehsil ~ Sarwar District ~ Ajmer State ~ Rajasthan
PREFEASIBILITY REPORT Mineral ~ Granite Mining project ~ Category B2 Lease Area ~ 3.00 Ha. Near Village ~ Jotaya Tehsil ~ Sarwar District ~ Ajmer State ~ Rajasthan PROJECT PROPONENT Sh. Vijay Kumar Soni
More informationMAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation
MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration
More informationMCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest
More informationThe following Environmental Management Programme (EMP) was also approved in terms of the issuing of the above-mentioned mining right:
1. INTRODUCTION Belfast Silica Mine is located on the Remaining Extent of Portion 1 of the farm Klipfontein 385 JS, which is situated approximately 8 km north west of Belfast and Siyathuthuka (Figure 2.1).
More informationS.No. Particulars Details 1. Plot. No Name of Mineral Sand Stone 3. Khasra Nos. Details of village wise Khasra details are as: Name of Village
1.0 EXECUTIVE SUMMARY This is a new mining lease allotted by Auction. LOI of Sand Stone Plot. No.- 65, located near Village Deriya & Pabunagar Tehsil-Balesar, District Jodhpur (Rajasthan) over an area
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY The proposed Granite Mine (Minor Mineral) of Lessee Sh. Devendra Singh S/o Sh. Kailash Singh is situated near village Mungeriya, Tehsil - Shiv, District - Barmer, Rajasthan over an
More informationTypical information required from the data collection can be grouped into four categories, enumerated as below.
Chapter 6 Data Collection 6.1 Overview The four-stage modeling, an important tool for forecasting future demand and performance of a transportation system, was developed for evaluating large-scale infrastructure
More informationEMP. In respect of. Cluster of Two Mines (Cluster area Ha)
M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster
More informationGranite Building Stone Quarry of Sri. Sajan Mani.
1. EXECUTIVE SUMMARY: Sri. Sajan Mani had made an application for Granite building stone quarrying located in Sy. No. 2398, Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. Over an extent
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District
More informationPRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre
1. EXECUTIVE SUMMARY PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre Sarkandi, Tehsil and District - Fatehpur, Uttar Pradesh is the lessee
More informationSitaram Soni Applicant
Date: To, The Members Secretary, District Level Environmental Impact Assessment Committee, Pali (Raj.). Subject : Regarding Environmental clearance of Gudha Quartz & Feldspar Applied area Near village
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30
More informationData Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1
Data Collection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Survey design 2 2.1 Information needed................................. 2 2.2 Study area.....................................
More informationGranite Building Stone Quarry of M/s Ulikkal Stone Crusher
1. EXECUTIVE SUMMARY: M/s. Ulikkal Stone Crusher had made an application for Granite building stones quarrying located in Sy. No. 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State.
More informationLessee M/s Ambaji Minerals Post- Chikla, Ambaji , State- Gujarat
MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN (UNDER RULE OF MARBLE DEVELOPMENT & CONSERVATION 2002) OF CHIKLA MARBLE MINE (S. No. 88/P) FOR Mineral- Marble, Lease Area- 4.0469 Hect. Near Village Chikla,
More informationC h a p t e r 5 : W o r k p l a c e H a z a r d o u s M a t e r i a l s I n f o r m a t i o n S y s t e m ( W H M I S )
C h a p t e r 5 : W o r k p l a c e H a z a r d o u s M a t e r i a l s I n f o r m a t i o n S y s t e m ( W H M I S ) Overview WHMIS is a provincial legislative response to provincial employees and employers
More informationTABLE 1.1: Salient features of the project Black Granite Mine of M/s. Shashi Granites
1. EXECUTIVE SUMMARY 1.1 Introduction M/s. Shashi Granites, is having quarry lease area for Black Granite mine over an extent of 1.0 Hectares at Survey No. 249/4, Chinthapally(V), Kuravi(M), Mahabubabad
More informationNZQA unit standard New US6 to replace and version 1 Page 1 of 5
Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able
More informationSRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:
MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE
More informationList of Legislative Regulations Dealing with Nuclear Energy and Ionizing Radiation and Related Documents
List of Legislative Regulations Dealing with Nuclear Energy and Ionizing Radiation and Related Documents as on 18 June 2001 I. Atomic Act and Related Implementing Regulations a) Atomic Act 1. Act No. 18/1997
More informationSouth Carolina Standards & Learning Science Grade: 1 - Adopted: 2014
Main Criteria: South Carolina Standards & Learning Secondary Criteria: Subjects: Science, Social Studies Grade: 1 Correlation Options: Show Correlated South Carolina Standards & Learning Science Grade:
More informationChemical Health and Safety General Program
Chemical Health and Safety General Program I. Objective To establish minimum requirements for storage, handling and use of chemicals. II. Scope This process applies to employees and operations involved
More informationLABORATORY MANAGEMENT PLAN (LMP) TABLE OF CONTENTS 4. UNIVERSITY OF PITTSBURGH LMP PART I CHEMICAL WASTE REMOVAL FROM LABORATORIES...
Page 1 of 9 (LMP) TABLE OF CONTENTS 1. INTRODUCTION...2 2. APPLICABILITY...2 3. LMP REQUIREMENTS...3 3.1 PART I: ENFORCEABLE REQUIREMENTS...3 3.2 PART II: NON-ENFORCEABLE REQUIREMENTS...4 4. UNIVERSITY
More informationLegal problems of environmental management. Spatial planning and space management. M. Gajewski 2014 / 2015
Legal problems of environmental management Spatial planning and space management M. Gajewski 2014 / 2015 Course contents (in brief) Constitutional basis of the environment protection system. General principles
More informationBishkek City Development Agency. Urban Planning Bishkek
Bishkek City Development Agency Urban Planning Bishkek Bishkek City Development Agency Official name City budget Population Area GRP Import value Export value External trade turnover Foreign direct investments
More informationCOMMUNITY SERVICE AREA
INSTITUTE FOR TRIBAL ENVIRONMENTAL PROFESSIONALS Tribal Waste and Response Assistance Program (TWRAP) Developing and Implementing a Tribal Integrated Solid Waste Management Plan April 12-14, 2016 Palm
More information1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.
1. INTRODUCTION 1.1 INTRODUCTION M/s.SRI SAI MINES & MINERALS was granted Mining lease for Quartz & Feldspar in Survey Number 3.30 over an extent of 3.30 Hect. In sy No. 326 & 330 Budharam village, Gopalpet
More informationProbe Metals Continues to Expand Gold Zones At Val-d Or East
NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned
More informationKRISHNA MERCHANTS PVT. LTD.
(Color Granite Quarry lease area 15.00 Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 Flat # 7-3 Dhruvatara Apartments
More informationCHEMICAL SAFETY. 2.1 DOE O 231.1, Environment, Safety, and Health Reporting
Chemical Safety Page 1 of 9 1.0 Objective The objective of this surveillance is to ensure that practices for handling, using and storing dangerous or toxic chemicals provide effective protection of the
More informationTABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)
1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,
More informationLaboratory Chemical Safety. Pathology Training
Laboratory Chemical Safety Pathology Training Objectives Explain the OSHA standard for chemical safety as it relates to laboratory workers Explain Chemical labeling requirements Explain the NFPA diamond
More informationInitial Borehole Drilling in the Hornepayne and Manitouwadge Area
MAY 2017 PRELIMINARY ASSESSMENT OF POTENTIAL SUITABILITY Initial Borehole Drilling in the Hornepayne and Manitouwadge Area In 2010, the Nuclear Waste Management Organization (NWMO) began technical and
More informationSnow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014
Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)
More informationHAZARD COMMUNICATION PROGRAM 2015 UPDATE GHS AWARENESS TRAINING CSULB COE
HAZARD COMMUNICATION PROGRAM 2015 UPDATE GHS AWARENESS TRAINING CSULB COE HAZARD COMMUNICATION 2015 UPDATE GHS Globally Harmonized System of Classification and Labeling of Chemicals GHS WHAT IT IS OR IS
More informationSmt. M. Hari Chandana
Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY
More informationLessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.
MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares
More informationCONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11
Part NO. CONTENTS CHAPTER I Flow Diagram for Rule 20, 21, 28, 30, 35, 45, 49, 50, 51 and 62 of MCDR 2017 1.1 Flow Diagram for Notice of opening of mine under Rule 20, PAGE NO. 1 MCDR 2017 1.2 Flow diagram
More informationRADIATION SAFETY GUIDELINES FOR NON-USERS
RADIATION SAFETY GUIDELINES FOR NON-USERS This is a Read and Sign Awareness Training document. You should read and sign this document if you: 1. DO NOT work directly with radioactive materials, but 2.
More informationEMVEST ASSET MANAGEMENT PTY LIMITED. Investment Proposal. Matuba Estate Chokwe District Mozambique
EMVEST ASSET MANAGEMENT PTY LIMITED Investment Proposal Matuba Estate Chokwe District Mozambique 20 July 2009 PROJECT SUMMARY Project Name: EMVEST LIMOPO Lda (MATUBA), District Chokwe, Province of Gaza.
More informationGlobal Harmonization and Hazard Communication
Global Harmonization and Hazard Communication HAZARD COMMUNICATION Major changes to the Hazard Communication Standard Hazard classification: Chemical manufacturers and importers are required to determine
More informationOpportunities and challenges of HCMC in the process of development
Opportunities and challenges of HCMC in the process of development Lê Văn Thành HIDS HCMC, Sept. 16-17, 2009 Contents The city starting point Achievement and difficulties Development perspective and goals
More informationHazard Communication
Hazard Communication For Company: Address: LC-1009 Rev. 06/16 Page 1 Hazard Communication Program Ref: OSHA 1910.1200 Approved by: Title: Ranking Official's Signature Date: Hazard Communication Coordinator
More informationModule - 3 GIS MAPPING, MIS AND GIS UNDER RAY
Module - 3 1 GIS MAPPING, MIS AND GIS MIS INTEGRATION UNDER RAY Role of GIS & MIS under RAY Under the scheme, two step implementation strategy has been adopted i.e. preparation of SFCPoAs on whole city
More informationHealth, Safety, Security and Environment
Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no
More informationProbe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.
NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over
More informationPennsylvania Core and Academic Standards Science Grade: 3 - Adopted: Biological Sciences. Organisms and Cells
Main Criteria: Pennsylvania Core and Academic Standards Secondary Criteria: Subjects: Science, Social Studies Grade: 3 Correlation Options: Show Correlated SUBJECT / / PA.3.1. 3.1.A. DESCRIPTOR / 3.1.3.A2.
More informationStoring, using and disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements
Storing, using disposing of unsealed radioactive substances in a Type C Laboratory: Extract of regulatory requirements Radiation Protection Control (Ionising Radiation) Regulations 2000 Requirements for
More informationC. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana
C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited
More informationD D Matyanga Mineral Economist and Technical Advisor
D D Matyanga Mineral Economist and Technical Advisor } Coal resources in Zimbabwe } Coal production historical perspective } Future of coal production } Significance of coal to the Economy Employment Exports
More informationInitial Borehole Drilling and Testing in or Near Ignace
JUNE 2016 PRELIMINARY ASSESSMENT OF POTENTIAL SUITABILITY Initial Borehole Drilling and Testing in or Near Ignace DRAFT FOR DISCUSSION WITH COMMUNITIES In 2010, the Nuclear Waste Management Organization
More informationClimate Resilience Decision Making Framework in the Caribbean. A case of Spatial Data Management
Climate Resilience Decision Making Framework in the Caribbean A case of Spatial Data Management Bishwa Pandey Sr. Data Management Specialist The World Bank Background The mission of The World Bank s Latin
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationDRAFT PROGRAM Registration of participants, welcome coffee, exhibition tour
DRAFT PROGRAM 20 Feb 2018 09.00-10.00 Registration of participants, welcome coffee, exhibition tour 10.00 12.00 ROUND TABLE: INTERNATIONAL COOPERATION IN THE ARCTIC PROJECTS: CHALLENGES AND OPPORTUNITIES
More informationSt. Mary s County Comprehensive Zoning Ordinance. Article 5. REGULATION OF USES. Schedule 50.4 Use Classifications. Legend
St. Mary s County Comprehensive Zoning Ordinance Article 5. REGULATION OF USES Schedule 50.4 Use Classifications Legend P Use is permitted in accordance with Chapter 51 General Standards L Use is permitted
More informationRoadmap to Stability
Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to
More informationHAZARD COMMUNICATION PROGRAM
HAZARD COMMUNICATION PROGRAM 5460 Created 1/30/10 Contents 1.0 SCOPE AND APPLICATION... 1 2.0 PURPOSE... 2 3.0 SAFETY DATA SHEETS (SDS)... 2 4.0 CONTAINER LABELS... 3 5.0 RECEIPT OF CHEMICALS... 6 6.0
More informationENVIRONMENTAL MANAGEMENT (CLUSTER)
/+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna
More informationModeling evacuation plan problems
Chapter 7 Modeling evacuation plan problems In Section 3.1 we reviewed the recommendations that the UNESCO presented in [30] to develop volcanic emergency plans. In [18] is presented the state of art of
More informationTOWN OF JAMESTOWN TOWN COUNCIL RECOMMENDED BUDGET 2014/2015
70001.000 COUNCIL GENERAL GOVERNMENT.101 Salaries (5) 10,455.62 11,300.00 11,300.00 11,300.00 11,300.00.302 Fees & Supplies 632.78 1,500.00 1,500.00 1,500.00 1,500.00.305 Advertising 0.00 2,500.00 2,500.00
More informationProbe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East
NEWS RELEASE 11/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Highlights: Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East Near-surface intercept grading 3.2 g/t Au over 45.5
More informationRegulations concerning protection of Bjørnøya Nature Reserve in Svalbard
Regulations concerning protection of Bjørnøya Nature Reserve in Svalbard Laid down by the Royal Decree of 16 August 2002 pursuant to sections 12 and 17 of the Act of 15 June 2001 No. 79 relating to the
More informationGIS Geographical Information Systems. GIS Management
GIS Geographical Information Systems GIS Management Difficulties on establishing a GIS Funding GIS Determining Project Standards Data Gathering Map Development Recruiting GIS Professionals Educating Staff
More informationPRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh
1) Executive Summary Project Name of Company / Mine Owner Location PRE FEASIBILITY REPORT Kuppli- Koyyam Mineral Sands Deposit-I, Pre-concentration Plant (PCP). M/s. Andhra Pradesh Mineral Development
More informationChapter 10 Human Settlement Geography Book 1 Class 12
CHAPTER 10 HUMAN SETTLEMENTS 1. RURAL, SUB URBAN AND URBAN SETTLEMENTS: This classification is common worldwide but the criteria differ from country to country. 5. Criteria for classification differs from
More informationHAZARD COMMUNICATION SAFETY PROGRAM
Hazard Communication Program HAZARD COMMUNICATION SAFETY PROGRAM 1. Purpose. To provide an effective, written hazard communication program in compliance with company, State and Federal regulatory requirements.
More informationPre-Feasibility Report of Multi-Coloured Granite Quarry
Pre-Feasibility Report of Multi-Coloured Granite Quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular
More informationProbe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres
NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres
More informationSocial Studies Grade 2 - Building a Society
Social Studies Grade 2 - Building a Society Description The second grade curriculum provides students with a broad view of the political units around them, specifically their town, state, and country.
More informationTown of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY
Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish
More informationFossil Fuels Conference. 10 November The Limpopo Province A Hub for Sustainable Development
Fossil Fuels Conference 10 November 2015 The Limpopo Province A Hub for Sustainable Development AGENDA The Economic Impact of Mining at anational, Provincial and Local Level Mining as a Catalyst for Development
More information