1 1. EXECUTIVE SUMMARY: M/s. Ulikkal Stone Crusher had made an application for Granite building stones quarrying located in Sy. No. 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State. Over an extent of Ha. The location of the quarry is shown on the Key plan / Location plan enclosed vide Plate No 1 & 1A (Mining plan). The approved lease sketch is enclosed vide Plate No 2, 2A & 2B (Mining plan). Quarrying / mining plan is approved by the Geologist Dept of Mining & Geology, Govt of Kerala, Kannur. Vide Letter No DOC/M-3270/2007 dated A copy of approved letter is enclosed as Annexure-1. Quarry lease granted by the Department Mines & Geology for a period from to is enclosed as Annexure -2 (Mining Plan). DETAILS OF THE SITE ) 1 Details of area (with location map) : 2 District and state : Kannur, Kerala 3 Taluk / Mandal : Iritty 4 Village : Vayathur 5 Khasara No. / Plot No. / Block / : Sy.No. 28/1A2 Licence No etc 6 Lease Area (Hectares) : Ha 7 Whether the area is recorded to be in forest (please specify whether : No protected, reserved etc.,) 8 Ownership / Occupancy : Private Cadastral plan& Area survey plan showing the lease area is enclosed vide Plate No. 2, 2A & 2B (Mining Plan) Existence of public road/railway line, if any, nearby and approximate distance Nearest Port / Airport : The nearest railhead is at Kannur, which is at 60 km from the mine. Nearest airport Calicut (180km) Topo sheet No. : 48 P/12 & 48P/16 (work sheet No D 43 V12) Latitude Longitude N to N E to E

2 Accessibility: The said Granite Building Stone Quarry is located at 2.3 kms from the Kolithattu village in Iritty Taluk, Kannur District, Kerala State, which is located at about 20 Km North of Iritty town. Iritty is located at about 60 km East of Kannur Town. The location of this mining area is shown on the Administrative and key plan enclosed Vide Plate No -1 and 1A (Mining Plan) and infrastructure Plan vide Plate No. 12 (Mining Plan). Topography: The lease is located on the slope of the hillock gently dipping towards west. The highest elevation in this area is 567.2mRL and the lowest elevation is 490mRL. Brief Description of the Project: Geology: Regional Geology: Three main geological formations are recognised in Kerala namely, the Archaeans (oldest rocks), the Warkalli beds of Tertiary Age (Upper Miocene to Pliocene) and the recent deposits (quarternary). These have North-South alignment. Crystalline Rocks Dharwar formation: These occur in the Malabar area only. They are represented by garnetiferous-ferruginous quartzite, mica, talc, schist etc. and are found exposed in South-East Kannur and North West of Gudalur. Champion gneiss: They are seen in South and South-East Kannur and have gold bearing veins. Rocks appear to be of post peninsular age. Peninsular gneiss: This is one of the most widespread rock types found in Kerala. The important minerals that go to make up the rocks are quartz, Feldspars, biotite and garnite. In Cochin area, they form the most extensive rocks. The types present are biotite and hornblende gneiss. In Thiruvananthapuram area, the gneiss belongs to the peninsular suite and is made of quarts, orthoclase, mica and hornblende. Charnockite and leptynites are the most common gneisses in this area. Charnockite: A good portion of the Western Ghats is made up of this rock. In the Travancore area the rocks are well foliated and show intrusive relationship with peninsular gneiss. They are highly garnetiferous as compared to the charnokites of North Kerala, where garnet is absent. Closepet granite: Archaean intrusions of post charnockite age are found in the Malabar region. The two intrusions of biotite granite found in Kalpetta hills and Sultan's Battery, have strong resemblance to the Dornegneiss of Hazaribagh...2

3 Precambrian System Basic dykes: These rocks are fresh but fractured and mylonitised. They approach dolerite in composition and are found to occur in South Malabar area. The basic dykes of Cochin area are fine to medium grained and free form olivine. The more coarse grained crystalline phases are represented by gabbros. Several exposures of gabbros are found in Cochin area. Residual laterites: A narrow zone of lateritised rock exists to the west of crystalline rocks that constitute the eastern boundary of the State. The rock exposed on the surface in this zone is a type of laterite, which exhibits characteristics different from those of the laterite, which caps the Varkalai formation. The laterite preserves the structure of the parent rock and is less compact. Below the laterite layer is the kaolin layer, the depth of which to the undecomposed rock shows gradation. The warkalli formation: This represents the most conspicuous sedimentary bed occurring in Varkala. They are best exposed at Varkala in the cliffs near the seashore. They consist of clayey sandstone, white and variegated clay and carbonaceous clay containing thin lenses of lignite. Most of these areas are lateritised. Recent deposits: They are mainly developed in Northern parts of Quilon and are made up of sand and silt. The lacustrine deposits of the backwater tracts of Kerala, the mud banks of the coast of Alleppey and the marine beach deposits all along the sea shore of Kerala come under the group. From the economic point of view, the area is important as it contains valuable mineral sands. The lease area exhibit charnokites and intrusion of closepet granites. Local Geology: The most of the part of area is covered with top soil of about 0.2 to 0.5m thickness, where as granites are very well exposed in the old working pit. A geological plan showing the granites and soil cover and the geological sections showing subsurface geology is prepared on 1:1000 scale and enclosed vide Plate No 4 (Mining Plan). Table 01: Local Geology Soil Cover 0.2m to 1.5m Granite 30m (minimum)..3

4 Table No: 1.1: The Geological Resources Section No Area (m 2 ) Influence (m) Volume (m 3 ) Tonnage (T) BD 2.5T/m3 UNFC Total resources Table No 1.2: Granite Building Stone Reserves Section No Area (m 2 ) Influence (m) Volume (m 3 ) Tonnage (BD 2.5T/m3) UNFC Total reserves Mining: The Mining is proposed to be operated by developing benches of 5m height and 5m ultimate width by Opencast Semi-Mechanised Mining Method. The mechanised operation of mining includes excavators, tippers, rock breakers, Jack hammer drilling and blasting. The maximum production proposed is 117,650 tonnes per annum of Granite Building Stone. This Pre Feasibility Report is submitted for obtaining Environment Clearance as required under EIA notification-2006 for a max production capacity of 117,650 tonnes per annum, over an extent of Ha located at 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerals State of M/s. Ulikkal Stone Crusher...4

5 Table No. 1.3 Year-wise calculations of granite building stone production Year Section Area Influence Volume Total Tonnage (T) (m 2 ) (m) (m 3 ) Volume (BD 2.5T/m 3 ) Total Table No. 1.4 Year-wise generation of top soil / waste Year Section Area Influence Volume Total Tonnage (T) (m 2 ) (m) (m 3 ) Volume (BD 1.6T/m 3 ) Total The production & development plan is enclosed vide Plate No. 5A-5E (Mining Plan)..5

6 III. II. 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION: I. Identification of project and project proponent. In case of Mining project, a copy of mining lease/ letter of intent should be given. Building Stone Quarry is located at Survey No 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerala over an extent of Ha. The location of the quarry is shown on the Key plan / Location plan enclosed vide Plate No 1& 1A (Mining Plan). The approved lease sketch is enclosed vide Plate No 2, 2A& 2B(Mining Plan). Name & address of lessee : Mr K T Anas & M/s. Ulikkal Stone Crusher Registered Office Kolithattu Village, Iritty Taluk, Kannur District. Kerala State, India. Ph No. : Brief description of nature of the project The Granite Building Stone Quarry of M/s. Ulikkal Stone Crusher', over an extent of Ha is a granite building stone mining project. The granite building stone is the basic rock in this area to be excavated by quarrying. This Granite Building Stone quarry is proposed to be operated by Opencast Semi-Mechanized Quarrying Method. The mechanized operation of quarry shall use excavators, tippers, rock breakers, Jack hammer drilling and blasting. The excavated material shall be crushed in the crushers located outside the quarry lease area. The maximum production capacity proposed in this area is 117,650 tonnes per annum building stone of size -150mm. The quarrying operation shall provide 60 direct & equal number of indirect employment to local people. Need for the project and its importance to the country and or region. The basic objective of the project is to have effective utilization of granite stone as a building material in this region and state. The spur in infrastructure development and construction industry has enhanced the demand of granite building stone in last 10 years. Mainly infrastructure projects like roads, highways, railways, bridges, buildings, township, etc., have raised the demand of building material. Building stone quarry not only provides the building material but also employment and economic growth of the region that ultimately enhance the socio-economic status of the people of the region and the state. The mining activities shall provide..6

7 socio-economic benefits to the local population with direct & indirect employment opportunities. The project also contributes to the regional and financial benefits in the form of Royalty, Cess, Taxes, DMF etc. IV. Demand-Supply Gap. Granite Building stone is an important component of the construction activities for infrastructure development. The demand for granite building stone is increasing along with the increase in infrastructure and construction activities in Kerala. This quarry can produce max 117,650 tonnes of building stone annually and the demand of building stone by various industries can be partly fulfilled by this project. During last four years there is a sudden increase in the Real estate & Port development activities which has further enhanced the demand for building stone, hence, there is heavy requirement of granite building stone to meet the demand supply chain. V. Imports Vs Indigenous production The requirements of granite building stone in infrastructure industry is huge where as the prices of granite are relatively low. The import or export of the same is not feasible due to heavy transportation cost. The granite building stone of size -150mm shall be transported / sold to the crusher outside the quarry lease, where it shall be sized and sold to the local market for infrastructure development. VI. Export possibility. The price of the granite is very low and the transportation cost is very high. Hence there are no export possibilities of the same. VII. Domestic/Export markets. The granite building stone of size -150mm shall be transported / sold to the crusher outside the quarry lease, where it shall be sized and sold to the local market for infrastructure development, real estate builders, contractors, etc. and to the nearby vendors for government infrastructure projects. It is not viable to export this material. However, there is huge demand for the granite building stone in the domestic market. VIII. Employment Generation (Direct and Indirect) due to the project. As per the requirement of Mines Act, Mines manager, Mines Foreman, Mine mates, Blaster, shall be appointed to supervise the quarrying operations. The list of the staff and workmen those shall be employed in the quarry is given below...7

8 Sl. No Particulars No s 1 Highly Skilled 4 2 Skilled 24 3 Semi-skilled 12 4 Un-skilled 20 Total PROJECT DESCRIPTION (i) Type of project including interlinked and interdependent projects, if any. The building stone shall be produced by drilling and blasting, the blasted material shall be loaded using excavators and transported to the crushing and screen plant located outside the lease area for reducing it to the sizes acceptable to the market. (ii) Location (map showing general location, specific location, and project boundary & project site layout) with Co-ordinates. The Granite building Stone Quarry of M/s. Ulikkal Stone Crusher' over an area of Ha. Is located in Survey No 28/1A2 in Vayathur Village, Iritty taluk, Kannur District, Kerala. The latitude & longitude of the area is given below. Latitude N to N Longitude E to E Key Plan showing the general location is Enclosed as Plate No.1A (Mining Plan), Cadastral Plan & Infrastructure Plan showing Specific location enclosed as Plate No. 2, 2A & 2B (Mining Plan) & Surface Plan Showing the project boundary & project site layout with Coordinates is enclosed as Plate No-3(Mining Plan). (iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. This is site specific project. Quarrying activities are carried out based on local geology and availability of the granite building stone in the specific site. (iv)size or magnitude of operation. Small scale operation within an area of Ha, Maximum Production planned 117,650 Tonnes per Annum (TPA) of granite building stone with maximum output size of minus150mm...8

9 (v) Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given). The quarrying of granite building stone is proposed by opencast semi-mechanized quarrying method and the sequence of quarrying shall be as given under, The top soil shall be removed and used in afforestation / Green belt / Safety barrier all along the periphery of the quarry lease area. After exposing the granites, drilling of small diameter holes of 48mm, shall be done by jack hammer. The blasting shall be carried out by permitted blasting material with proper burden & spacing. The Rock breakers shall be used to break the oversize boulders left after blasting. No secondary blasting like plaster shooting, pop blasting shall be undertaken at any time in the quarry. The blasted material and the broken material by rock breakers shall be loaded to the tippers by excavator and transported to the crushing and screening plant located outside the quarry lease area. Removal of Top Soil / Overburden Drilling and Blasting Excavation, loading and Transportation of - 150mm size boulders Haulage/ Dispatch to Crusher outside the lease Summary of the production and development is given in the table below Top Soil (T) Total Handling (T) Year Production (T) Ratio : : :0.01 Total :

10 At conceptual stage there shall be single pit in this area with 15 benches of 5m height and 5m width. The pit at conceptual stage shall have 276m length and 42m & 100m width and it shall be developed upto 490mRL level. The individual bench slope shall be maintained to 80 0 where as overall pit slope shall be The entire pit at the conceptual stage shall be converted into rain water pond. The pit shall be properly fenced with single opening for drawing the water. The pit shall also be developed for pisciculture. Conceptual plan & Sections are enclosed as Plate No.7 & Environment plan is enclosed as Plate No.8 (Mining Plan). Totally 2130 Tonnes top soil shall be recovered and 210,335Tonnes granite building stone shall be mined during this plan period. The top soil shall be stacked at the safety barrier area and shall be used for Afforestation/Green belt development. The Geological resources of granite building stone in this area are Tonnes and mineral reserves are Tonnes. In these last three years of plan period totally Tonnes granite building stone shall be quarried. The balance mineral reserves tonnes shall be quarried in next seven year period. Hence the anticipated age of the mine is years which may increase/deceased depending on the market conditions and technological advancement in future. (vi) Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transports of raw Material and finished product. No raw materials are required for producing granite building stone, the final products shall be transported by 10/25 tonne tippers to the crushing & screening plant located outside the lease area. (vii) Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined. There shall not be any waste generation in the quarry process as all the byproducts have utilization in the infrastructure market. (viii) Availability of water its source, Energy/ power requirement and source should be given. Ground water is the major source of water. Around 37 KLD of water is required for dust suppression, afforestation and domestic use, which shall be drawn from nearby bore wells & old quarries...10

11 Requirement of water (ix) (x) Purpose Qty Required m 3 /day Drinking water & Domestic 2 Afforestation 5 Dust suppression 30 Total 37 * The water for Plantation and dust suppression will not be required for 4-5 months in a year during monsoon and wet/ rainy days. ** As all the equipment are self primed with diesel powered engines no source of external power is required for the project. Quantity of wastes to be generated (liquid and solid) and scheme for their Management/ disposal. There shall not be any waste generation (liquid & Solid) during the course of production of the Granite building stones. Only the top soil & over burden shall be utilized for the development of the green bed in the 7.5 meters safety zone. Schematic representations of the feasibility drawing which give information of the project Quarrying Operations Granite Quarry Drilling & Blasting Granite Transportation to Crusher Excavation Crushing & Screening at Plant Top soil & over burden waste utilized for the development of the Green belt Consumers Stockyard The Crushing & Screening Plant is proposed to be located Outside the Lease Area. 4. SITE ANALYSIS: (i) Connectivity. The said Granite Building Stone Quarry is located at 2.3 kms from the Kolithattu village in Iritty Taluk, Kannur District, Kerala State, which is located at about 20 Km North of Iritty town. Iritty is located at about 60 km East of Kannur Town...11

12 (ii) Land Form, Land use and Land ownership. The proposed lease area is private land belonging to Mr. K T Anas. The consent letter of the land owner to M/s. Ulikkal Stone Crusher is enclosed as Annexure- 5(Mining plan). Present land use, land use at the end of 5th year and the ultimate land use pattern. Particulars Area for mining / mining activities Land use pattern at present stage (Ha) Land use pattern (end of five years of mining plan period) (Ha) Land use pattern at Conceptual stage (Ha) Area for Roads Area for Safety Barrier / Green belt Dump Afforestation on Dump Total Unused area Total Lease area (iii) Topography (along with map). The lease is located on the slope of the hillock gently dipping towards west. The highest elevation in this area is 567.2mRL and the lowest elevation is 490mRL. Topo sheet no. 48P/12 showing the topographical details in the buffer zone of the lease area is enclosed as Plate No-1A (Mining Plan). (iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive area, water bodies (distance from the HFL of the river). CRZ. In case of notified industrial area, a copy the Gazette notification should be given. This M/s. Ulikkal Stone Crusher area is located on the slope of the hillock gently dipping towards west. The core zone area is completely privately owned land. It is not a forest land and there is no human habitation. Most of the area covered with rock formations over which thin vegetation exists. The core zone is partly disturbed due to quarrying. There is no forest land, no area under CRZ, No water bodies, and no Sanctuary in the core zone...12

13 (v) Existing Infrastructure. Govt hospital : Iritty, 20km School : Kolothattu, 2km. Police Station : Ulikkal, 15Km Fire Brigade : Mattanur, 34 Km National Highway : Kannur,60Km State Highway : Kannur,60Km Major District Road : Kavanoor 5Km (vi) Soil Classification: There is a soil cover of 20cm to 50cm thickness on the granite in the quarry lease area. The soil is Lateritic soil, reddish in color and clay with loamy nature. (vii) Climatic data from Secondary Sources: Maximum & Minimum Temperature Relative Humidity Rainfall Wind Velocity & Direction C - Maximum temperature (during summer) C Minimum temperature during December. Up to per cent - This place experiences high relative humidity, during the Southwest monsoon period. (June September). Annual Average 3438mm south west monsoon during June to September contributes 70% of rainfall Wind speed ranges from 2.1 to 3.3 km per hour with mean speed of 2.6 km/hr. The wind speed is high during the period from March to June. Low during September to December (viii) Social Infrastructure available: Hospital: Iritty, 20Km School : Kolothattu, 2km. Church : St. Mary s Chruch 3.5km Mosque : Kolothattu-2km Temple : Kolothattu, 5km..13

14 iii. 5. PLANNING BRIEF: i. Planning concept (type of industries, facilities, transportation etc) Town and Country ii. planning/ Development authority Classification: This is a granite Building stone mining project. It is proposed to produce maximum 117,650 tonnes building stones per annum. The mined material will be transported by trucks to the crushing & screening plant located outside the quarry lease area by tippers of 10tonnes capacity. Effective Environment Management will be carried out to control the pollution of Air, Water, Noise and Ground vibration. The Mining Plan for the operations in the quarry lease area is approved by the District Geologist, Department of Mining and Geology Government of Kerala, Kannur District, Kerala, vide Letter No.DOC/M-3270/2007 dated Population Projection: There will not be any increase in population due to the project. The man power required shall employed from the local areas. The drivers / truck operators also shall be engaged from local areas. Hence not much influx of population from outside is anticipated. Land use planning (breakup along with green belt etc): Land use Land use pattern Land use Particulars pattern at (end of five years pattern at present stage of mining plan Conceptual (Ha) period) (Ha) stage (Ha) Area for mining / mining activities Area for Roads Area for Safety Barrier / Green belt Dump Afforestation on Dump Total Unused area Total Lease area iv. Assessment of Infrastructure demand (physical & social): All the manpower for the project shall be employed from the local area. Thus, there shall not be influx of people into the region; therefore, no increase in the population is envisaged during the period of the operations. The operations are also small scale. Hence, infrastructure demand both in the form of physical and social infrastructure, in terms of physical infrastructure will not be very demanding...14

15 However, the project would raise the economic status of the people in the region thus the social infrastructure like education, health and hygiene, sports, etc. would be quite demanding. The company thus commits to support the local community in the field of Health & Hygiene, Basic education, Education of girl child, Sports, renewable energy etc. thereby strengthening the social infrastructure of the region. 6. PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing Area): No Crushing or screening or processing is planned within the quarry lease area. The entire product from the mine will be transported to the Crushing & Screening plant located outside the lease area. Existing road shall be strengthened & made use for the transportation. As the mining equipment are all diesel powered there is no need for external power. The infrastructure facilities like Quarry office, site services, First Aid room, Rest shelter, and other statutory facilities, etc., shall be located in the close proximity of the quarry lease area. The man power requirement shall be employed from local area, no additional infrastructure is required. (ii) Residential Area (Non Processing Area): No additional residential area is required as the manpower for this project shall be employed from the nearby villages. (iii) Green Belt: About 450 plants shall be planted in green belt area (0.6559Ha) and another 200 sapling shall be planted all along the haulage road. (iv) Social Infrastructure: The project shall generate 60 direct and Equal indirect employment to the local people. Hence, the activity will contribute to the improvement of income status of the local people. The quarry project will also improve infrastructure facilities, eventually leading to the overall development of the area, resulting in the improvement of standard of life of local population. The Project proponent undertakes to spend Rs 5 Lakhs per Annum, to take up CSR works in the surrounding villages in the sector of Healthcare, Sanitation, Education of Girl child, Sports, renewable energy etc. The project proponent as already carried out the following CSR activities...15

16 Sl.No CSR Activates done by the Project Proponent 1. Play ground development done for kolithattu school 2. Study aid for schools 3. Scholarship for SSLC and PUC students 4. Medical aid & medical camp for villages 5. Maintenance work for the village road 6. Traveling aid for the School Childers & vehicles Provided (v) Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Water ways etc) The said Granite Building Stone Quarry is located at 2.3 kms from the Kolithattu village in Iritty Taluk, Kannur District, Kerala State, which is located at about 20 Km North of Iritty town. Iritty is located at about 60 km East of Kannur Town. The infrastructure plan is enclosed as Plate No. 12 (vi) Drinking water Management (Source & Supply of Water): Drinking water shall be made available at all the times to the mine workers. This will be sourced by water tankers from the bore well outside the quarry lease area, a water purifier shall be installed to provide safe drinking water. (vii) Sewerage system: Not applicable, as no human settlement is proposed in the lease area. (viii) Industrial Waste Management: No industrial waste is going to be generated at this quarry (ix) Solid waste Management: It is expected to recover 2130 tonnes top soil during quarrying this area. This top soil shall be used in afforestation / Green belt / Safety barrier all along the periphery of the quarry lease area. No other waste is envisaged from the operations. Power Requirement & Supply / Source: As all the mandatory are self primed by diesel engines, no external power is required...16

17 7. REHABILITATION AND RESETTLEMENT (R*R) PLAN (i) Policy to be adopted (Central/ State) in respect of the project affected persons including home ousters, land ousters and land less laborers (a brief outline to be given): Not applicable since there is no rehabilitation and resettlement involved in this project. 8. Project schedule & Cost Estimates i. Likely date of start of construction and likely date of completion (Time schedule for the project to be given): The Quarry will be commenced immediately after getting the statutory approvals from Government authorities. Total cost of the project is about Rs 200 lakhs. ii. Estimated project cost along with analysis in terms of Economic viability of the project. Considering the present domestic market conditions of the products, the appx. Cost of the project estimated is around Rs 200 lakhs. The summary of the assets are given below. Mining machinery will be hired through contractors. Table No.F8.1: Capital Cost of the Project Sl No. DESCRIPTION Capital investment Cost in lakh Rs. 1 Water Tanker (1 No.) Jeep (1 No.) Excavator and Rock breaker Strengthening of Roads Temporary sheds, Rest shelters etc., Environmental control measures D.G.Set Mine Development Land Expenses Operational Exp Miscellaneous 9.00 Total Table No.F8.2: Operating Cost of the Project Sl.No. Details Cost 1 The estimated capital cost of the project Rs Lakhs 2 Total pit head cost/tonne of stone Rs Royalty & Others related Cost per Tonne Rs Net production cost per Tonne (Pit Head) Rs Selling price per Tonne (Pit Head) Rs Gross Profit/ton Rs.75/- 7 Gross profit/annum for 1,17,650 tonnes Rs lakhs..17

18

Granite Building Stone Quarry of Sri. Sajan Mani.

Granite Building Stone Quarry of Sri. Sajan Mani. 1. EXECUTIVE SUMMARY: Sri. Sajan Mani had made an application for Granite building stone quarrying located in Sy. No. 2398, Peechi Village, Thrissur Taluk, Thrissur District, Kerala State. Over an extent

More information

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz

More information

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District, 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone

More information

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty

More information

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE Village Ashapura Tehsil Nasirabad District Ajmer State Rajasthan Capacity 35945 TPA ROM (Max) Lease Area

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 2006 and specifically in circular No J-11013/41/2006-IA.II (I) dated 30

More information

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates 1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area applied for quarrying of Steatite Stone (soap stone) by Sri. Mohammad Akramis situated in survey no. No. 402of 1-30 Acres of Karigala

More information

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

EMP. In respect of. Cluster of Two Mines (Cluster area Ha) M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075 14647 State Route 511, Oberlin/Kipton, OH 44075 56 ACRES Vermilion Rd Gifford Rd Haigh Rd 44 Summary The Kipton sandstone quarry is included in 56 acre tract owned by Terry A. Johnson, of Huron, Ohio.

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities Key Issue: Growth opportunities for Southern Hinterland

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS Introduction... 1 Scope of Services... 1 Project Location and Description... 1 Geologic Setting... 1 Regional Geology... 1 Site

More information

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015

SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015 SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development

More information

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E) 1. EXECUTIVE SUMMARY 1.1 Introduction The proposed mining lease area of Black Granite over an extent of 1.205 Ha. is located in Sy. No. 99/1B of Gurijepalli Village, Santhamaguluru Mandal, Prakasam District,

More information

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1

Data Collection. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1 Data Collection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Survey design 2 2.1 Information needed................................. 2 2.2 Study area.....................................

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 29 2.0 Introduction of Project / Background Information 30 3.0 Project Description 32 4.0 Site Analysis 39 5.0 Planning

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 25 2.0 Introduction of Project / Background Information 26 3.0 Project Description 28 4.0 Site Analysis 33 5.0 Planning

More information

C O N T E N T S. 1 Introduction 7. 2 General 8. 3 Location and accessibility 9. 4 Geology, Exploration & Reserves Mining 19.

C O N T E N T S. 1 Introduction 7. 2 General 8. 3 Location and accessibility 9. 4 Geology, Exploration & Reserves Mining 19. 111 112 113 C O N T E N T S Sl.No. Description Page No. 1 Introduction 7 2 General 8 3 Location and accessibility 9 4 Geology, Exploration & Reserves 11 5 Mining 19 6 Blasting 20 7 Mines Drainage 21 8

More information

M/s.Harshad Granites,

M/s.Harshad Granites, FORM -1 M (I) Basic Information S.NO. Item Details (i) Name of the Mining Lease Site M/s.Harshad Granites, Irapuram Village, Kunnathundu Taluk, Ernakulam District (ii) Location/site Topo sheet : 58/B12

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

KRISHNA MERCHANTS PVT. LTD.

KRISHNA MERCHANTS PVT. LTD. (Color Granite Quarry lease area 15.00 Ha. Sy. No.1) ADDUKONDA VILLAGE TEKKALI MANDAL SRIKAKULAM DISTRICT ANDHRA PRADESH ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 Flat # 7-3 Dhruvatara Apartments

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Smt. M. Hari Chandana

Smt. M. Hari Chandana Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY

More information

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Stone/Sand/Bajri Mine (With ML Area of 1.9507 Ha) Kh. No. 5822/5771/1, 632/1, 922/1, 923/1, Chullah, Patwar Circle Chullah, Ladhbarol, Mandi Himachal Pradesh M/s Beas Valley

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011 MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest

More information

Typical information required from the data collection can be grouped into four categories, enumerated as below.

Typical information required from the data collection can be grouped into four categories, enumerated as below. Chapter 6 Data Collection 6.1 Overview The four-stage modeling, an important tool for forecasting future demand and performance of a transportation system, was developed for evaluating large-scale infrastructure

More information

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist. MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares

More information

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh

PRE FEASIBILITY REPORT. Kuppilli, Koyyam, Dharmavaram, Village Bonthalakoduru villages Mandal Etcherla District Srikakulam State Andhra Pradesh 1) Executive Summary Project Name of Company / Mine Owner Location PRE FEASIBILITY REPORT Kuppli- Koyyam Mineral Sands Deposit-I, Pre-concentration Plant (PCP). M/s. Andhra Pradesh Mineral Development

More information

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur

Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Soil Mechanics/Geotechnical Engineering I Prof. Dilip Kumar Baidya Department of Civil Engineering Indian Institute of Technology, Kharagpur Lecture - 01 Rock Cycle Good morning. I welcome you to this

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

Pre-Feasibility Report of Multi-Coloured Granite Quarry

Pre-Feasibility Report of Multi-Coloured Granite Quarry Pre-Feasibility Report of Multi-Coloured Granite Quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in circular

More information

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-II (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-III LETTER OF INTENT Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

More information

Answers. Rocks. Year 8 Science Chapter 8

Answers. Rocks. Year 8 Science Chapter 8 Answers Rocks Year 8 Science Chapter 8 p171 1 Rocks are made up of minerals such as quartz, feldspars, micas, and calcite. Different rocks are made up of different combinations of minerals. 2 Igneous,

More information

Initial Borehole Drilling and Testing in Central Huron,

Initial Borehole Drilling and Testing in Central Huron, JULY 2016 PRELIMINARY ASSESSMENT OF POTENTIAL SUITABILITY Initial Borehole Drilling and Testing in Central Huron, Huron-Kinloss and South Bruce DRAFT FOR DISCUSSION WITH COMMUNITIES In 2012, at the request

More information

about GCC

about GCC about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com

More information

Bishkek City Development Agency. Urban Planning Bishkek

Bishkek City Development Agency. Urban Planning Bishkek Bishkek City Development Agency Urban Planning Bishkek Bishkek City Development Agency Official name City budget Population Area GRP Import value Export value External trade turnover Foreign direct investments

More information

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education *9751541575* GEOGRAPHY 0460/23 Paper 2 October/November 2011 Candidates answer on the Question

More information

LECTURE NOTE ENGINEERING SURVEYING

LECTURE NOTE ENGINEERING SURVEYING LECTURE NOTE ENGINEERING SURVEYING LECTURE 1 Introduction: Surveying is defined as taking a general view of, by observation and measurement determining the boundaries, size, position, quantity, condition,

More information

Initial Borehole Drilling and Testing in or Near Ignace

Initial Borehole Drilling and Testing in or Near Ignace JUNE 2016 PRELIMINARY ASSESSMENT OF POTENTIAL SUITABILITY Initial Borehole Drilling and Testing in or Near Ignace DRAFT FOR DISCUSSION WITH COMMUNITIES In 2010, the Nuclear Waste Management Organization

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre 1. EXECUTIVE SUMMARY PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre Sarkandi, Tehsil and District - Fatehpur, Uttar Pradesh is the lessee

More information

ENVIRONMENTAL MANAGEMENT (CLUSTER)

ENVIRONMENTAL MANAGEMENT (CLUSTER) /+ ENVIRONMENTAL MANAGEMENT (CLUSTER) PLAN Of M/s. APARNA ENTERPRISES LIMITED MINING OF QUARTZ & FELDSPAR OVER AN EXTENT: 2.720 HA Mine Address: Sy. No.119 & 126/3 Khambhampadu (V), A.konduru (M) Krishna

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT PRE-FEASIBILTY REPORT 1.0 INTRODUCTION OF THE MINING ACTIVITY V.Moideen for M/s V.K.M STONE CRUSHER is proposing a (Building Stone) Quarry with Lease at Re-Survey No. 103/2of Kannamangalam Village, Thirurangadi

More information

The National Spatial Strategy

The National Spatial Strategy Purpose of this Consultation Paper This paper seeks the views of a wide range of bodies, interests and members of the public on the issues which the National Spatial Strategy should address. These views

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

D D Matyanga Mineral Economist and Technical Advisor

D D Matyanga Mineral Economist and Technical Advisor D D Matyanga Mineral Economist and Technical Advisor } Coal resources in Zimbabwe } Coal production historical perspective } Future of coal production } Significance of coal to the Economy Employment Exports

More information

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana

C. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited

More information

M/s BENITA INDUSTRIES LIMITED

M/s BENITA INDUSTRIES LIMITED M/s BENITA INDUSTRIES LIMITED (Colour Granite Quarry 19.150 Ha.) Sy. No: 82-1 of Kambadur (V), Kambadur (M), Ananthapur District, Andhra Pradesh State. ENVIRONMENTAL MANAGEMENT PLAN 0 P a g e INDEX S.

More information

Location of the Quarry

Location of the Quarry Pre-Feasibility Report of Black Granite (Dolerite) quarry (Under the Guidelines of Ministry of Environment and Forest in terms of the provisions of EIA notification 20051, 52 & 127 and specifically in

More information

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT 2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter

More information

For personal use only

For personal use only AVZ Minerals Limited 19 September 2016 ACQUISITION OF MANONO EXTENSION LITHIUM, TIN AND TANTALUM PROJECT IN THE DEMOCRATIC REPUBLIC OF CONGO Company to acquire, subject to due diligence, the Manono Extension

More information

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses Act 67 / 68

More information

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area

Initial Borehole Drilling in the Hornepayne and Manitouwadge Area MAY 2017 PRELIMINARY ASSESSMENT OF POTENTIAL SUITABILITY Initial Borehole Drilling in the Hornepayne and Manitouwadge Area In 2010, the Nuclear Waste Management Organization (NWMO) began technical and

More information

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA 24 September 2014 BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA BMG Resources Limited (ASX: BMG) (BMG or the Company) is pleased to announce that it has entered

More information

LAB 2 IDENTIFYING MATERIALS FOR MAKING SOILS: ROCK AND PARENT MATERIALS

LAB 2 IDENTIFYING MATERIALS FOR MAKING SOILS: ROCK AND PARENT MATERIALS LAB 2 IDENTIFYING MATERIALS FOR MAKING SOILS: ROCK AND PARENT MATERIALS Learning outcomes The student is able to: 1. understand and identify rocks 2. understand and identify parent materials 3. recognize

More information

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare) QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT

More information

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION:

2 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION: 1. EXECUTIVE SUMMARY The proposed mining project is located near Mauza & Mohal Lodhwan/Pail, Tehsil Nurpur, District Kangra, Himachal Pradesh. The proposed project is of sand, stone and bajri mining having

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0 1. EXECUTIVE SUMMARY The proposed project of 3.925 Ha (9.70 acre) areas is of stream bed sand mining and falls under Category- B2 as per EIA Notification 2006 of the Ministry of

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT PRE-FEASIBILTY REPORT 1.0 INTRODUCTION OF THE MINING ACTIVITY Muhammed Ibrahim is proposing a Granite (Building Stone) Quarry with Lease at Re-Survey No. Q02-1065/pt of Melmuri Village, Ernad Taluk, Malappuram

More information

Practice Test Rocks and Minerals. Name. Page 1

Practice Test Rocks and Minerals. Name. Page 1 Name Practice Test Rocks and Minerals 1. Which rock would be the best source of the mineral garnet? A) basalt B) limestone C) schist D) slate 2. Which mineral is mined for its iron content? A) hematite

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION

THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION THE UNITED REPUBLIC OF TANZANIA NATIONAL EXAMINATIONS COUNCIL CERTIFICATE OF SECONDARY EDUCATION EXAMINATION 013 GEOGRAPHY (For Both School and Private Candidates) TIME: 3 Hours Thursday, 9 th October

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

Brief Summary. Production = 4,00,000 TPA

Brief Summary. Production = 4,00,000 TPA S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity

More information

Roadmap to Stability

Roadmap to Stability Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to

More information

Hope Brook gold mine, NL - Copper, then switched to gold

Hope Brook gold mine, NL - Copper, then switched to gold Chapter 12 : Mining in NL Defined as the extraction of valuable minerals from Earth from an ore body, vein, or seam. A mineral is any chemical substance arranged in some crystalline structure. - must have

More information

Legal problems of environmental management. Spatial planning and space management. M. Gajewski 2014 / 2015

Legal problems of environmental management. Spatial planning and space management. M. Gajewski 2014 / 2015 Legal problems of environmental management Spatial planning and space management M. Gajewski 2014 / 2015 Course contents (in brief) Constitutional basis of the environment protection system. General principles

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

Chapter 10. Chapter Rocks and the Rock Cycle. Rocks. Section 1 Rocks and the Rock Cycle

Chapter 10. Chapter Rocks and the Rock Cycle. Rocks. Section 1 Rocks and the Rock Cycle Chapter 10 Rocks 1 Chapter 10 Section 1 Rocks and the Rock Cycle 2 10.1 Rocks and the Rock Cycle Magma is the parent material for all rocks. Once the magma cools and hardens, many changes can occur. Geology:

More information

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)

Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses.

More information

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES John Seitz, RA, LEED AP Assistant Adjunct Professor Professor Paul C. King, RA, AIA, ARA Assistant Professor Geology Geology is the scientific study of the structure and composition of the earth s surface

More information

CARTER METALLURGICAL COAL PROJECT. Endurance Gold Corporation (EDG)

CARTER METALLURGICAL COAL PROJECT. Endurance Gold Corporation (EDG) CARTER METALLURGICAL COAL PROJECT McDOWELL COUNTY, WEST VIRGINIA Endurance Gold Corporation (EDG) Endurance Resources Inc. (ERI) Prepared by: Duncan McIvor, President and CEO Endurance Gold Corporation

More information

Geography Policy 2014

Geography Policy 2014 Geography Policy 2014 DEFINITION Geography education should inspire in pupils a curiosity and fascination about the world and its people that will remain with them for the rest of their lives. Teaching

More information