GILAS SUBDIVISION DUNDALK, ON PRE-SERVICING REPORT DECEMBER 2016

Size: px
Start display at page:

Download "GILAS SUBDIVISION DUNDALK, ON PRE-SERVICING REPORT DECEMBER 2016"

Transcription

1 GILAS SUBDIVISION DUNDALK, ON PRE-SERVICING REPORT DECEMBER 216 Prepared for: Cuesta Planning Consultants Inc. 978First Avenue West Owen Sound, Ontario N4K 4K5 Prepared by: DARRYL M. ROBINS CONSULTING INC Highway 6 Miller Lake, Ontario NH 1Z Tel: dmrc@dmrconsulting.ca Project No. M1313

2 GILAS SUBDIVISION DUNDALK, ON PRE-SERVICING REPORT Prepared for: Cuesta Planning Consultants Inc. 978First Avenue West Owen Sound, Ontario N4K 4K5 Prepared by: DARRYL M. ROBINS CONSULTING INC Highway 6 Miller Lake, Ontario NH 1Z

3 Gilas Subdivision December 216 Pre-Servicing Report M1313 Table of Contents 1. INTRODUCTION Background Purpose of Report EXISTING CONDITIONS General Topography Geology/s LOT LAYOUT WATER SUPPLY REQUIREMENTS SANITARY SERVICING ROADWAY SERVICING STORMWATER MANAGEMENT Existing Drainage Proposed Stormwater Works Quality Controls Quantity Controls LOT GRADING UTILITY SERVICING Hydro Other Utilities CONCLUSIONS RECOMMENDATIONS REFERENCES DARRYL M. ROBINS CONSULTING INC. Pg. 1

4 Gilas Subdivision December 216 Pre-Servicing Report M1313 Figures Figure No. 1 Location Plan Figure No. 2 Street Road Cross Section Figure No. 3 Lane Cross Section Figure No. 4 Pre- Development Drainage s Figure No. 5 Post Development Drainage s Tables Table Summary of SWMP Constraints Table Pre-Development Flows Table Post Development Flows Drawings 21T-16 Draft Plan of Subdivision M1313-SS Site Servicing Plan M1313-SWM Storm water Management Plan Appendices Appendix A Triton Engineering Reserve Capacity Calculations Appendix B Sanitary Sewer Design Sheets Appendix C Stormwater Calculations CD: PDF of all Drawings Stormwater Modelling Files DARRYL M. ROBINS CONSULTING INC. Pg. 2

5 Gilas Subdivision December 216 Pre-Servicing Report M INTRODUCTION 1.1 Background Darryl M. Robins Consulting Inc. has been retained by Cuesta Planning Consultants (Cuesta) on behalf of the Developer Mr. Stan Gilas to prepare a Pre-Servicing report for the development of a residential subdivision at the property located in Dundalk, Township of Southgate (Proton) and legally described as Part Lot 227, Concession 2 SWTSR, Township of Southgate (Proton), Dundalk Settlement. The proposed development would consist of 16 detached residential dwellings, 4 semi-detached dwellings (8 units), 8 four-plex buildings (32 units), 1 triplex (3 units) and 5 townhouse blocks (3 units). The total number of units within the development is 89. The proposed lot fabric is displayed on the Draft Plan of Subdivision, prepared by Cuesta (Dwg. No 21T-16). 1.2 Purpose of Report The purpose of this report is to present a preliminary assessment of the subject development s ability to provide: (i) A potable water supply of sufficient quantity and quality for the proposed development; (ii) A suitable environment for the sewage servicing of the proposed development; (iii) Suitable accessibility in terms of road servicing; (iv) Suitable stormwater management to ensure runoff is of a controlled quantity and a suitable quality; and (v) Suitable Utilities (Hydro, telephone, gas, etc.). 2. EXISTING CONDITIONS 2.1 General The proposed development is an 8.46 ha parcel located on the northeast side of Dundalk, at the north end of Bradley Street at Part Lot 227, Concession 2 SWTSR, Township of Southgate (Proton), Dundalk Settlement. The existing use of the subject property is vacant and contains farmland and mixed bush. The eastern portion of the property is zoned Environmental Protection. The property is bounded by residential properties to the south and farmland to the north, west and east. Please refer to the enclosed Location Plan (Figure No. 1) for the location of the subject property. The residential development to the south is zoned as Residential (R1, R2). The lands to the west are zoned Residential (R1 & R3) and Open Space (OS). The lands to the east are zoned Environmental Protection (EP) and Restricted Agricultural (A2). The lands to the north are designated as Restricted Agricultural (A2). DARRYL M. ROBINS CONSULTING INC. Pg. 3

6

7 Gilas Subdivision December 216 Pre-Servicing Report M Topography The topography of the site varies on the east and west side. The east side of the site is relatively flat but trends downward from the north to the south with a slope of approximately.5%. The western side of the property has a more significant slope from north to south at approximately 2.4%. 2.3 Geology/s The soils map entitled s of Grey County South Sheet - Ontario, Agriculture Canada, 1981; identifies that the site is composed of Listowel silt loam. "Listowel soil is comprised of medium textured limestone till, with the soil profile described as: 4 inches dark grey loam, over 7-9 inches yellow-brown horizon over 4-6 inches brown mottled clay, over yellow-brown calcareous till. Listowel soils generally have imperfect drainage with the topography and surface stoniness described as: smooth, gently sloping to smooth, steeply sloping, slightly stony. 3. LOT LAYOUT Cuesta Planning generated the lot fabric. Planning Report. Please refer to the Draft Plan of Subdivision and Cuesta s 4. WATER SUPPLY REQUIREMENTS The existing subdivision located south-east of the proposed development are serviced by municipal watermains. It is proposed to extend the existing 15mm watermain from Bradley Street to the proposed subdivision. A 15mm diameter PVC (DR 18) watermain is proposed within the new subdivision. The Township of Southgate s 215 Annual Report for Dundalk s Waterworks identified that the average day flow was 518m 3 /day and the maximum day flow was 1,695m 3 /day. The design capacity of Dundalk Waterworks is 2,819m 3 /day. The estimated water demands for the proposed development are calculated below: Total Number of People for Gilas Subdivision is estimated as follows: 16 Detached lots x 3 people per lot = 48 persons 4 Semi-Detached (2 units) lots x 3 people per lot = 24 persons 1 Triplex (3 units) lots x 2.5 people per lot = 8 persons 8 Fourplex (4 units) lots x 2.5 people per lot = 8 persons DARRYL M. ROBINS CONSULTING INC. Pg. 4

8 Gilas Subdivision December 216 Pre-Servicing Report M Townhouse units x 2.5 people per lot = 75 persons The total number of people anticipated in Gilas subdivision is 235. Maximum Day Factor = 2.5 (As Per Table 3-1 of the MOE s Design Guidelines for Drinking-Water Systems, for a population between 1,1 and 2, for a drinking water system) Gilas Subdivision Water Demand (Maximum Day Flow) = 235 persons x 45L /day x 2.5 = 264,375L/day = 264.4m 3 /day. The estimated Maximum Day Demand for the Dundalk Waterworks is expected at 1,959.4m 3 /day when the proposed development proceeds; therefore, there should be sufficient design capacity at the existing water works facility to accommodate the proposed development. Triton Engineering completed a review for reserve capacity for the water works. The Town of Southgate s reserve capacity calculation was based on firm capacity rather than design capacity. Firm capacity was defined as the system s capacity with the largest water source out of service. Based on the firm capacity and other developments with committed capacity (draft plan approved developments), Triton determined that there is not currently sufficient reserve capacity to accommodate the Gilas Subdivision, at this time. It was noted that the Township of Southgate are in the process of completing a municipal class EA to increase the reserve capacity for the Township s water supply. It is anticipated that the new well could be online by 218 or 219. Please refer to the dated June 8, 216 and the Reserve Capacity Report prepared by Triton Engineering in Appendix A. 5. SANITARY SERVICING An existing 2 mm diameter sanitary sewer is located on Bradley Street and terminates at a maintenance hole in the cul-de-sac. Only 2.2m of cover is available over the existing sanitary sewer. It is proposed to extend the sanitary sewer from the existing maintenance hole in the Bradley Street cul-de-sac to Gila s Subdivision. The proposed subdivision would be serviced by a 2 mm diameter PVC (DR 35) sanitary sewer with a.4% slope. Refer to appendix B for the sanitary sewer design sheet. Fill will be required to provide the 2.4m cover over the sanitary sewers. The Township of Southgate s 215 Annual report for the Dundalk Wastewater Treatment Plant indicates that the average day influent flow is 728m 3 /day, the effluent average daily flow is 1,181m 3 /day and the maximum daily flow was 2,458m 3 /day. The design capacity of the Dundalk Wastewater Treatment Plant is 1,832m 3 /day. The estimated sewage flows for the proposed development are calculated below: The estimated number of people in Gilas Subdivision is 235. The average daily flow = 235 people x 4L/day = 94,L/day= 94m 3 /day. DARRYL M. ROBINS CONSULTING INC. Pg. 5

9 Gilas Subdivision December 216 Pre-Servicing Report M1313 The maximum daily flow = 94,L/day x 3.6 = 338,4L/day= 338.4m 3 /day. The estimated average daily sanitary flow for Dundalk s wastewater treatment plant will be 822m 3 /day when the proposed development proceeds; therefore it is understood that there is sufficient design capacity at the Dundalk Wastewater Treatment Plant (1,832m 3 /day). Triton Engineering completed a review for reserve capacity for the sewage treatment facility. It was noted that there is limited uncommitted reserve capacity available. But, the Township is currently reviewing options to increase the sewage treatment reserve capacity. Please refer to the dated June 8, 216 and the Reserve Capacity Report prepared by Triton Engineering in Appendix A. 6. ROADWAY SERVICING Access to the proposed development will be provided via Bradley Street from the south-east. A future access is also proposed between Block 17 and Lot 2, to provide a link between the subject property and the neighbouring property to the west. Please refer to the Draft Plan of Subdivision Drawing. The proposed roadway will meet components of the Township s standards for urban roads with an 8m wide asphalt surface, curb and gutter, sidewalk and street lights. The proposed Right of Way is only 18m in width. Please refer to Figure 2 for a road cross-section of the proposed streets. A lane is proposed at the rear side of the townhouse blocks, linking Street A to Street B. Please refer to Figure 3 for the cross section of the proposed Lane. All the proposed lots of this proposed development have frontage on the proposed Street network, which will receive full-season maintenance by the Township of Southgate Given the low density residential nature of the proposed development a traffic impact study is not required. 7. STORMWATER MANAGEMENT 7.1 Existing Drainage The subject subdivision lands are affected by two (2) sub-watersheds which include external drainage areas. Please refer to Figure No. 4 Pre-Development Drainage s to view the pre-development drainage areas. The drainage areas / sub-watersheds are described as follows: DARRYL M. ROBINS CONSULTING INC. Pg. 6

10

11

12 Gilas Subdivision December 216 Pre-Servicing Report M includes lands predominately on the southwest side of the site; it is made up of primarily grass fields and farmland. 1 drains via surface flow to the local low area at the south side of the property. 2 includes lands along the North eastern side of the site composed of grasses and shrubbery while the furthest extents of the proposed development are wetland marsh area. 2 drains via overland surface flow to the Municipal ditch. 7.2 Proposed Stormwater Works The natural lay of the site currently results in surface water being directed to two areas; to the southeast and northeast. However, based on the condition of the Bradley Street storm system and the lack of an appropriate outlet at the existing local low point at the southwest side of the development, stormwater should be directed toward the northeast to the municipal drain. The roads will be graded where practical to allow overland flow to be directed towards the stormwater management facility, which will be located at the northeast corner of the development. Please refer to the preliminary stormwater management facility. Fill will be required to grade the roads to ensure that stormwater will be directed towards the stormwater management facility in the northeast corner of the site. It is proposed to install storm sewers to discharge the stormwater to the proposed stormwater management facility located adjacent to the municipal drain. The proposed stormwater management facility will provide quantity and quality controls for the development. Treated stormwater will discharge from the stormwater management facility to the municipal drain. 7.3 Quality Controls The Grand River Conservation Authority has advised that Normal level quality controls are required Selection of Stormwater Treatment Facility In selecting a suitable stormwater management facility for this project, we have reviewed the constraints for stormwater management facilities in conjunction with Table 4.1 Physical Constraints of SWMP Types of the MOE s Stormwater Management Planning & Design Manual. A summary is provided below see Table 3. DARRYL M. ROBINS CONSULTING INC. Pg. 7

13 Grassed Swale Reduced Lot Grading Pervious Pipes Infiltration Trench Pond Gilas Subdivision December 216 Pre-Servicing Report M1313 Table 7.3.1: Summary of SWMP Constraints SWMP Constraint Requirement Achieved Topography < 5% Y s None Y Bedrock None Y Groundwater None Y <2 Ha N TBC = To be confirmed Topography < 5% Y s > 15mm/hr TBC Bedrock none Y Groundwater none Y none Y Topography none Y s > 15mm / hr TBC Bedrock > 1m below bottom Y Groundwater > 1m below bottom TBC none Y Topography none Y s >15mm / hr TBC Bedrock > 1m below bottom Y Groundwater > 1m below bottom TBC < 2 ha Y Topography None Y s None Y Bedrock None Y Groundwater None Y >5 ha Y A stormwater management pond appears to be the most appropriate method for providing quality controls. The detailed design of the stormwater management facility (pond) will be completed with the Stormwater Management Report. DARRYL M. ROBINS CONSULTING INC. Pg. 8

14 Gilas Subdivision December 216 Pre-Servicing Report M Quantity Controls It was understood that stormwater quantity controls are required for the proposed development. Post development flows will be controlled to pre-development levels. Autodesk s Storm & Sanitary Analysis modelling software was used to model the pre-development and post development conditions. The SCS method was the Hydrology method used in the storm modelling and a 6 hour storm was run using rainfall data for Mount Forest from Environment Canada. The pre-development drainage area is noted on Figure 4. Please refer to the stormwater calculations for the pre-development flows in Appendix C. A summary of the pre-development flows generated for the 2, 5, 1, 25, 5 and 1 year design storms at the subject site is provided below. The Pre-Development flows at the outlets are provided in Table Table 7.4.1: Pre-Development Flows 2 Year Storm 5 Year Storm Design Flow (m 3 /s) 1 Year Storm 25 Year Storm 5 Year Storm 1 Year Storm Total A summary of the Post Development Flows at the outlets is provided in Table Please refer to the Post Development Drawing. Table 7.4.2: Post Development Flows Outlets 2 Year Storm 5 Year Storm Design Flow (m 3 /s) 25 Year Storm 1 Year Storm 5 Year Storm 1 Year Storm Out_South(1) Out_Drain(2) Out_Drain(3) Out_Drain(4) Out_Bradley System The post development flows of the overall site (system) have been controlled to the pre-development flows. The detailed design of the stormwater management facility will be completed with the Stormwater Management Report. DARRYL M. ROBINS CONSULTING INC. Pg. 9

15

16

17 Gilas Subdivision December 216 Pre-Servicing Report M LOT GRADING The grading of the site will be in general conformance to the Township s standards. The lot grading will ensure a minimum of 2% slope is provided away from the proposed building envelopes. Minimum grading slopes will be achieved wherever possible to improve stormwater quantity and quality control. 9. UTILITY SERVICING 9.1 Hydro Hydro One is the electrical service provider for the subject property. Existing electrical services are located in Bradly Street. Electrical services shall be provided to meet the Township standards and Hydro One requirements. Hydro One shall complete the design for electrical servicing supply for the subdivision. Hydro One has advised that there may be associated costs with expansion work for the connection to that Gilas subdivision. 9.2 Other Utilities Bell Canada is the telephone service provider for the area and has indicated no issues with servicing the proposed subdivision. Fiber to the home can be provided at no cost to the developer. Enbridge Gas is the natural gas provider for the area. 9.3 Street lights The Street lighting design shall conform to municipal standards. 1. CONCLUSIONS Based on the findings of this report, the following conclusions are made: 1. Water servicing is available from the existing 15mm dia. watermain on Bradley Street. 2. Sanitary Servicing is available from the existing 2mm diameter sanitary sewer. 3. Stormwater management measures to address runoff quantity and quality concerns can be successfully implemented subject to the final design. 4. The servicing requirement of the proposed development should not exceed the carrying capacity of the natural local environment. DARRYL M. ROBINS CONSULTING INC. Pg. 1

18

19 Gilas Subdivision December 216 Pre-Servicing Report M1313 Appendix A Triton Engineering Reserve Capacity Calculations DARRYL M. ROBINS CONSULTING INC.

20 From: To: Cc: Subject: Date: Attachments: Ray Kirtz Laura Swanson "Milliner,Dave"; "Ellis,Jim"; "Cuesta Cuesta Planning"; Christine Furlong RE: Gilas Subdivision June :24:59 AM FinalDundalkResCap Report 216.pdf Hi Laura: Please find attached the current Reserve Capacity (RC) Calculations. Based on these, there is not sufficient water supply uncommitted RC for further development beyond current allocations at this time. The Township is currently working through a Water Class EA with the goal of establishing a new municipal well by 218/219 which will increase RC for water supply. With respect to sewage treatment, there is limited uncommitted RC. The Township is currently reviewing options to increase sewage treatment RC and has commenced a Class EA related to wastewater treatment capacity as well. With respect to review of servicing capabilities/constraints for this site, the Township will need to provide authorization to Triton for these works to be completed. I trust this information provides the background required. /Ray From: Laura Swanson [mailto:lswanson@dmrconsulting.ca] Sent: June :54 AM To: Ray Kirtz Cc: 'Milliner,Dave'; 'Ellis,Jim'; planning@southgate.ca; 'Cuesta Cuesta Planning'; Christine Furlong Subject: RE: Gilas Subdivision Good morning Ray, As requested previously, could you please review the Bradley Street Storm Sewer System in detail to confirm the available capacity and SWM requirements for this development? (We requested information about the capacity of the Bradley Street Storm Sewer on April 11, 216, August 6, 214 and on June 19, 214. We have not received a response to date). We have completed calculations for the proposed development to review the available capacity at the water and wastewater treatment plants. The calculations are attached for reference. We do not have the luxury of knowing the status of other developments in Dundalk and as such, we cannot comment on the reserve capacity. We expect that the Town s consultant should have information relating to reserve capacity for the water treatment plant and the wastewater treatment plant. We are formally requesting that the Town or the Town s Engineering Consultant confirm if reserve capacity is available for the proposed development for water and sanitary services. On June 16, 214 we contacted Christine Furlong to ensure that the water and sanitary sewer systems can

21 accommodate the proposed development. We understood from subsequent s that there was only issues with the sanitary system, but this was actually due to errors in the flow data from 213. It was understood that the Town was consulting with the MOE regarding this matter. We had requested that the Town (or their consultant) advise us of the outcome of the review. We never received a response. The project subsequently went on hold. I have attached a chain of s with dates ranging from April 3 June 19, 214. It was anticipated that there should be sufficient capacity assuming the erroneous data could be excluded. Can you please advise on the status of the consultation with the MOE? We are formally requesting that the Town (or the Town s consultant) confirm if the existing watermains and sanitary sewers have capacity to accommodate the proposed development. No master servicing plans have been provided to us to date. So, we have not been able to review this ourselves. Kind Regards, Laura Swanson, P.Eng. DARRYL M. ROBINS CONSULTING INC Highway No. 6 Miller Lake, ON NH 1Z From: Ray Kirtz [mailto:rkirtz@tritoneng.on.ca] Sent: May :4 AM To: Laura Swanson Cc: Milliner,Dave; Ellis,Jim; planning@southgate.ca Subject: RE: Gilas Subdivision Hi Laura: I have contacted the Township regarding this development. They have suggested that you contact the developer from the neighbouring development (White Rose Subdivision, Domenic De Palma ( dd@whiterosepark.com) regarding details of their design. We would have to review the Bradley Street Storm Sewer System in detail to confirm available capacity and SWM requirements for this development. However, sewage treatment and water supply reserve capacity for this development are likely to be more significant concerns. It is my understanding that this issue has been discussed with Cuesta Planning. Without these the development may be premature. /Ray From: Laura Swanson [mailto:lswanson@dmrconsulting.ca] Sent: May :3 AM To: Ray Kirtz Cc: 'Cuesta Cuesta Planning' Subject: RE: Gilas Subdivision

22 Hi Ray, I am just following up to your from April 14, 216. Our records indicate that we have not received any information about the capacity of the Bradley Street Storm Sewer System yet. We were also looking for information about the proposed outlet for the neighbouring subdivision / development. Could you please forward any information that is available? Kind Regards, Laura Swanson, P.Eng. DARRYL M. ROBINS CONSULTING INC Highway No. 6 Miller Lake, ON NH 1Z From: Ray Kirtz [mailto:rkirtz@tritoneng.on.ca] Sent: April :56 AM To: Laura Swanson Subject: RE: Gilas Subdivision Hi Laura: I was away last week so I m still playing catch-up. I will pull the file and review the items you have requested, and response as soon as possible. In the interim we would suggest that you or the ecologist contact the GRCA staff, possibly meet them on site, to confirm the wetland boundary if it has not been done so recently. /Ray From: Laura Swanson [mailto:lswanson@dmrconsulting.ca] Sent: April :15 PM To: Ray Kirtz Cc: Christine Furlong; 'Cuesta Cuesta Planning' Subject: Gilas Subdivision Good afternoon, In August 214, we inquired about the capacity of the Bradley Street Storm Sewer System. Our records indicate that we never received a response. We suspect the reason for the lack of a response may because, Triton Engineering had requested confirmation regarding proposed lot fabric with respect to the wetland limit. Our client (Cuesta Planning) has directed us to proceed with preparing a pre-servicing report for the proposed

23 Draft Plan of Subdivision (attached). Our understanding is that the ecologist has confirmed that the lot fabric is acceptable (but the cul-de-sac at the end of Street A will be changed to a hammer-head). Can you please advise us about the capacity of the Bradley Street Storm Sewer System (and downstream system)? Has the design of the development to the southwest been finalized yet? It is noted that the Retention Pond is proposed at the southeast corner of the neighbouring development. We may want to connect an outlet from the local low point in the southern corner of Gilas Subdivision to the outlet from the neighbouring subdivision (or the EP area). Could any details / drawings be provided for the storm outlet of the neighbouring development? Kind Regards, Laura Swanson, P.Eng. DARRYL M. ROBINS CONSULTING INC Highway No. 6 Miller Lake, ON NH 1Z Virus-free. Virus-free. Virus-free.

24 15 Queen Street, West Unit 14 Fergus Ontario N1M 1S6 Tel:(519) Fax:(519) ORANGEVILLE FERGUS GRAVENHURST March 9, 216 Township of Southgate R.R. # Grey Road 9 DUNDALK, Ontario NC 1B Attention: Jim Ellis Public Works Manager RE: TOWNSHIP OF SOUTHGATE DUNDALK WATER AND SEWAGE TREATMENT SYSTEMS RESERVE HYDRAULIC CAPACITY OUR FILE: A416(16) R4 Dear Sir: The attached tables outline the 216 reserve capacity calculations for the water supply and sewage treatment systems in Dundalk. The reserve capacities have been calculated in accordance with Ministry of Environment and Climate Change (MOECC) guidelines. Four new residential units were constructed in Dundalk in The three (3) year average maximum day flow of the water system increased from 91 m /d to 973 m /d over the past year. This increase can be attributed to the need for residents to continuously run water in their homes to prevent their water services from freezing during the winter of 215. The 216 uncommitted reserve capacity of the water system is 1,26 equivalent residential units (ERU s) based on the system s available capacity and -52 ERU s based on firm capacity and existing draft plan approved/committed development. Firm capacity is defined as the system capacity with the largest water source out of service. Please refer to Tables 1 and 3 for the water system capacity calculations. Utilizing firm capacity in these calculations, ensures that the system will have adequate water supply should one of the wells/treatment facilities become inoperable due to contamination, pump failure, etc. Table 2 summarizes the sewage treatment reserve capacity calculations for 216. The three year annual 3 3 average day flow decreased from 1,171 m /d to 1,68 m /d. The calculation uses adjusted flow rates for 213 and 215 due to issues related to erroneous influent flow meter readings. The 216 reserve capacity is 33 equivalent residential units which is higher than the 215 reserve capacity of 186 units.

25 It is important to note that the Flato East and North development proposals, which include an estimated 763 units, will further reduce water supply and wastewater treatment reserve capacity. Following Council s review and adoption of the attached report, we would recommend that a copy of the report be forwarded to the MOECC District Office in Owen Sound and the Grey County Planning Department. We trust you will find the enclosed to be in order. Should you have any questions, please do not hesitate to contact this office. Yours very truly, TRITON ENGINEERING SERVICES LIMITED Christine Furlong Christine M. Furlong, P. Eng. CMF cc: Dave Millner, Township of Southgate Clinton Stredwick, Township of Southgate CBO, Township of Southgate -2-

26 TABLE 1 A416(16)R4 TOWNSHIP OF SOUTHGATE 216 RESERVE CAPACITY - DUNDALK WATER SYSTEM DESCRIPTION 216 Available Capacity 216 Firm Capacity Design capacity -- W ell D3 (1,182 m /d) and D4 (1,637 m /d) 2,819 1, Maximum Day Flow* (m /d) (Average for 213, 214 and 215) 3 3. Reserve capacity (m /d) (1) - (2) Population served** 1,794 1, Serviced households.*** Maximum Day Per Capita Flow (m /day) (2) (4) 7. Additional Population (3) (6) 8. Persons Per Residential Unit (4) (5) 9. Additional Equivalent Residential Units that can be Served (7) (8) Com m itted Developm ent Equivalent Residential Units (Table 3) Uncom m itted Reserve Capacity Equivalent Residential Units (9) - (1) * Average of 213 (867 m /d), 214 (915 m /d) and 215 (1136 m /d) = 973 m /d ** Population served estim ated from total residential water custom ers 78 x 2.3 Persons Per Residential Unit ( new services in no new units built on new services in 213 or units built in 215 = 78 units) *** Serviced households inform ation provided by the Township of Southgate for 212, 213, 214 and 215. (There were 7 new single fam ily dwelling services for water and sewage added in 212, no new units built on new services in 213 or 214 and 4 units built in 215 = 78 units.)

27 TABLE 2 A416(16)R4 TOWNSHIP OF SOUTHGATE 216 RESERVE CAPACITY DUNDALK SEWAGE TREATMENT FACILITY DESCRIPTION Design Capacity of Sewage Treatment Facility (m /d) 1, Average Day Flow* (m /d) (adjusted) (adjusted) (Average for 213, 214 and 215 ) 3 3. Reserve capacity (m /d) (1) - (2) 1,68 4. Population served** 1, Serviced households.*** Maximum Day Per Capita Flow (m /d) (2) (4) 7. Additional Population (3) (6) 8. Persons Per Equivalent Residential Unit (4) (5) 9. Additional Equivalent Residential Units that can be Served (7) (8) Committed Development Equivalent Residential Units (Table 3) Uncommitted Equivalent Residential Units Reserve Capacity (9) - (1) 123 (adjusted) 3 3 (adjusted) 3 * Average of 213 (1,333 m /d), 214 (996 m /d) and 215 (874 m /d) = 1,68 3 m /d ** Population served estimated from total residential sewer customers (731) x 2.3 Persons Per Residential Unit *** Serviced households information provided by the Township of Southgate for 212, 213, 214 and 215. ( units added in 212, no new units built on new services in 213 or 214 and 4 units in 215.)

28 TABLE 3 A416(16)R4 TOWNSHIP OF SOUTHGATE SUMMARY OF COMMITTED DEVELOPMENT REGISTERED/UNBUILT UNITS REM AINING AT THE END OF 214 UNITS BUILT IN 215 REM AINING UNITS AT THE END OF 215 SUB-TOTAL DRAFT PLAN APPROVED OR UNITS COM M ITTED BY RESOLUTION Braem ore Heights Subdivision 3 Cedar Point (Heritage Estates) 66 Dundalk Retirem ent Hom e (PIPE) 61 Victoria Square/Anthony Reale/Flato W est 6 SUB-TOTAL INFILL LOTS 7 4 SUB-TOTAL 3 TOTAL COM M ITTED UNITS 22

29 Gilas Subdivision December 216 Pre-Servicing Report M1313 Appendix B Sanitary Sewer Design Sheets DARRYL M. ROBINS CONSULTING INC.

30 SANITARY SEWER DESIGN SHEET DUNDALK SUBDIVISION M1313 GILAS DUNDALK Designed By: LAS Checked By: DMR DARRYL M. ROBINS CONSULTING INC. LOCATION DEVELOPMENT Peak Pop Flow PROPOSED SEWER Manholes Populaton Population Ext. Flow Des Flow Land Land Factor Length Pipe Dia. Pipe Slope Max Flow Street From To No. Units Accu Qp (L/s) Qi (L/s) Qd (L/s) Type A (m3/s) V (m/s) (Ha) Acc.(Ha) M (m) (mm) (%) Bradley Street (Street 'A') EX PVC Bradley Street (Street 'A') PVC Bradley Street (Street 'A') PVC Bradley Street (Street 'A') PVC Bradley Street (Street 'A') PVC Street 'B' PVC Street 'B' PVC Street 'B' PVC n.13 density 3 people/unit q (ave. Daily per capita flow) 4 l/d/person Qp=Qa*Pop*PF I (unit of Peak Ex Flow).26 L/Has Qd=Qp+Qi M calculated using the Harmon Method 23/8/216

31 Gilas Subdivision December 216 Pre-Servicing Report M1313 Appendix C Stormwater Calculations DARRYL M. ROBINS CONSULTING INC.

32 STORM SEWER DESIGN SHEET DARRYL M. ROBINS CONSULTING INC. Project: Gilas Subdivision Design Frequency: 5 Year No.: 1132 Rainfall Station: Mount Forest Designed By: M C Date: 23-Aug-16 Design `n' :.13 Checked By: LAS Date: 23-Aug-16 Location Drainage Pipe Selection Q Velocity Pipe Time of From To C AC Cum Runoff I Q Slope % Dia. Full % Full Actual Length Flow MH,CB MH,CB Name ha AC TC 5 YR m³/s mm m³/s Flow m/s m/s m min Section Name Etc... Street A CB1 CBMH CB3 CBMH CBMH2 CBMH CB5 CBMH CBMH6 CBMH CBMH4 CBMH CB16 CBMH CBMH17 CBMH CBMH15 CBMH CB14 CBMH CBMH13 STMH CB1 STMH STMH2 STMH Gilas Drive CB11 STMH CBMH12 CBMH CB19 CBMH CBMH18 CBMH CB8 CBMH CBMH9 CBMH CBMH7 POND POND DITCH N/A 15. N/A A B 5 year Storm

33 idf_v2-3_214_12_21_614_on_614554_mount_forest_(aut).txt Environment Canada/Environnement Canada Short Duration Rainfall Intensity-Duration-Frequency Data Données sur l'intensité, la durée et la fréquence des chutes de pluie de courte durée Gumbel - Method of moments/méthode des moments 214/12/21 ================================================================================ MOUNT FOREST (AUT) ON Latitude: 43 59'N Longitude: 8 45'W Elevation/Altitude: 414 m Years/Années : # Years/Années : 3 ================================================================================ Table 1 : Annual Maximum (mm)/maximum annuel (mm) Year 5 min 1 min 15 min 3 min 1 h 2 h 6 h 12 h 24 h Année # Yrs Années Mean Moyenne Page 1

34 idf_v2-3_214_12_21_614_on_614554_mount_forest_(aut).txt Std. Dev Écart-type Skew Dissymétrie Kurtosis *-99.9 Indicates Missing Data/Données manquantes Table 2a : Return Period Rainfall Amounts (mm) Quantité de pluie (mm) par période de retour Duration/Durée #Years yr/ans yr/ans yr/ans yr/ans yr/ans yr/ans Années 5 min min min min h h h h h Table 2b : Return Period Rainfall Rates (mm/h) - 95% Confidence limits Intensité de la pluie (mm/h) par période de retour - Limites de confiance de 95% Duration/Durée #Years yr/ans yr/ans yr/ans yr/ans yr/ans yr/ans Années 5 min / / / / / / min / / / / / / min / / / / / / min /- 4. +/ /- 9. +/ / / h / /- 5. +/ /- 9. +/ / h / / / /- 5. +/- 6. +/ h /-.6 +/ / /- 2. +/ / h /-.4 +/-.6 +/-.8 +/ / / h /-.2 +/-.4 +/-.5 +/-.6 +/-.8 +/-.9 3 Table 3 : Interpolation Equation / Équation d'interpolation: R = A*T^B R = Interpolated Rainfall rate (mm/h)/intensité interpolée de la pluie (mm/h) Page 2

35 idf_v2-3_214_12_21_614_on_614554_mount_forest_(aut).txt RR = Rainfall rate (mm/h) / Intensité de la pluie (mm/h) T = Rainfall duration (h) / Durée de la pluie (h) Statistics/Statistiques yr/ans yr/ans yr/ans yr/ans yr/ans yr/ans Mean of RR/Moyenne de RR Std. Dev. /Écart-type (RR) Std. Error/Erreur-type Coefficient (A) Exponent/Exposant (B) Mean % Error/% erreur moyenne Page 3

36

37 Gilas Subdivision December 216 Pre-Servicing Report M1313 Pre-Development DARRYL M. ROBINS CONSULTING INC.

38

39 Gilas Subdivision Stormwater Calculations M1313 CN Calculations Pre-Development 1: CN (m 2 ): CN*A Cultivated Land(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Total CN : CN (m 2 ): CN*A Cultivated Land(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Wood&grass combination(good)(group C) Total CN : CN (m 2 ): CN*A Cultivated Land(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Wood&grass combination(good)(group C) Total CN 72.6 DARRYL M. ROBINS CONSULTING INC.

40 Gilas Subdivision Stormwater Calculations M1313 Pre Development Time of Concentration Calculation SubCatchment (ha) Slope (%) Length (m) Tc (min) Tc(hr) PRE Total 35.3 Calculated using the Bransby William Formula DARRYL M. ROBINS CONSULTING INC.

41 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 2-Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 2-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

42 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

43 Analysis began on: Tue Aug 23 1:2: Analysis ended on: Tue Aug 23 1:2: Total elapsed time: ::1

44 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 5-Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 5-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

45 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

46 Analysis began on: Tue Aug 23 1:23:5 216 Analysis ended on: Tue Aug 23 1:23:5 216 Total elapsed time: < 1 sec

47 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 1-Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 1-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

48 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

49 Analysis began on: Tue Aug 23 1:23: Analysis ended on: Tue Aug 23 1:23: Total elapsed time: < 1 sec

50 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 25-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

51 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

52 Analysis began on: Tue Aug 23 1:25: Analysis ended on: Tue Aug 23 1:25: Total elapsed time: < 1 sec

53 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 5-Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 5-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

54 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

55 Analysis began on: Tue Aug 23 1:26: Analysis ended on: Tue Aug 23 1:26: Total elapsed time: < 1 sec

56 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 1-Year-Pre Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Storage Node Exfiltration.. Constant rate, free surface area Starting Date... MAR :: Ending Date... MAR :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins... 3 Number of nodes... 2 Number of links... Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 1-Year CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Out_Drain(2) OUTFALL Out_South(1) OUTFALL ********** Volume Depth Runoff Quantity Continuity hectare-m mm **********

57 Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume..... Continuity Error (%).... ********** Composite Curve Number Computations Report ********** Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good 3.8 B 61. 1/4 acre lots, 38% impervious.7 B 75. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good.28 B 83. Pasture, grassland, or range, Good 1.4 B 61. 1/4 acre lots, 38% impervious.8 B 75. Woods & grass combination, Good 1.2 B 58. Composite & Weighted CN Subbasin /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :12: :11: :36:38 --

58 Analysis began on: Tue Aug 23 1:26: Analysis ended on: Tue Aug 23 1:26: Total elapsed time: ::1

59 Gilas Subdivision December 216 Pre-Servicing Report M1313 Post Development DARRYL M. ROBINS CONSULTING INC.

60

61 Gilas Subdivision Stormwater Calculations M1313 CN Calculations Post-Development 1: CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN 84. 3: CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN 81. 4: CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN 84.5 DARRYL M. ROBINS CONSULTING INC.

62 Gilas Subdivision Stormwater Calculations M1313 7: CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Grass Cover (Good)(Group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) /8 acre<residential Lot 1/4 acre((group B) Total CN 78.4 DARRYL M. ROBINS CONSULTING INC.

63 Gilas Subdivision Stormwater Calculations M : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) /4 acre <Residential Lot 1/3 acre(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) /4 acre <Residential Lot 1/3 acre(group B) /3 acre <Residential Lot 1/2 acre(group B) /2 acre <Residential Lot 1 acre(group B) DARRYL M. ROBINS CONSULTING INC.

64 Gilas Subdivision Stormwater Calculations M1313 Total CN CN (m 2 ): CN*A Residential Lot ( 1/8 acre)(group B) /8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Total CN CN (m 2 ): CN*A Cultivated Land(Good)(Group B) Pasture, grassland, or range(good)(gourp B) Total CN CN (m 2 ): CN*A Cultivated Land(Good)(Group B) Total CN CN (m 2 ): CN*A 1/8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Grass Cover (Good)(Group B) Total CN : CN (m 2 ): CN*A Road Allowance(Good)(Group B) Residential Lot ( 1/8 acre)(group B) Total CN 84. DARRYL M. ROBINS CONSULTING INC.

65 Gilas Subdivision Stormwater Calculations M : CN (m 2 ): CN*A Road Allowance(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Total CN : CN (m 2 ): CN*A Cultivated Land(Good)(Group B) /8 acre<residential Lot 1/4 acre((group B) Pasture, grassland, or range(good)(gourp B) Wood&grass combination(good)(group C) Total CN 72.6 DARRYL M. ROBINS CONSULTING INC.

66 Gilas Subdivision Stormwater Calculations M1313 Time of Concentration Calculation Post Development SubCatchment (ha) Slope (%) Length (m) Tc (min) Tc(hr) Calculated using the Bransby William Formula DARRYL M. ROBINS CONSULTING INC.

67 Gilas Subdivision Stormwater Calculations M1313 Pipe and Structures FROM TO Slope (m/m) Length (m) Inlet Pipe Top Elev.(m) Outlet Pipe Top Elev.(m) Inlet Invert Elev.(m) Outlet Invert Elev.(m) Inlet Rim Elev.(m) Outlet Rim Elev.(m) Inlet Cover (m) Outlet Cover (m) Pipe Diameter (m) Section Name Etc... Street A CB1 CBMH CB3 CBMH CBMH2 CBMH CB5 CBMH CBMH6 CBMH CBMH4 CBMH CB16 CBMH CBMH17 CBMH CBMH15 CBMH CB14 CBMH CBMH13 STMH CB1 STMH STMH2 CBMH Gilas Drive CB11 CBMH CBMH12 CBMH CB19 CBMH CBMH18 CBMH CB8 CBMH CBMH9 CBMH CBMH7 POND N/A 1.8 N/A.6 POND DITCH N/A N/A N/A N/A N/A N/A.3 Pond Dimension Base Length (m) 32. Base Width (m) 25. Top of Bank Length (m 41.2 Top of Bank Width (m) 34.2 Height(m) 1.15 H:V 4:1 Ponded (m 2 ) Top of Bank Elev.(m) Base Elev.(m)

68 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 2-Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 5 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

69 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

70 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

71 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

72 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

73 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

74 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

75 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

76 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

77 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

78 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice : :: Junction_Weir : :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) : :: Out_Drain(4) : :: Out_South(1) : :: Pond : :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..7 6:. Junction_Weir JUNCTION.. :. Out_Bradley OUTFALL.5.5 2:3. Out_Drain(2) OUTFALL :4. Out_Drain(3) OUTFALL..7 6:. Out_Drain(4) OUTFALL.. :. Out_South(1) OUTFALL.4.4 2:4. Pond STORAGE :53. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :35 CB :35 CB :38 CB :41 CB :5 CB :36 CB :35 CB :35 CB :34 CBMH :45 CBMH :41

79 CBMH :39 CBMH :53 CBMH :51 CBMH :39 CBMH :42 CBMH :35 CBMH :51 CBMH :51 STMH :44 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

80 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4)... Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 3: Calculated

81 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 4: Calculated A-BYPASS-4 CHANNEL 2: > CAPACITY A-BYPASS-5 CHANNEL 2: FLOODED A-BYPASS-6 CHANNEL 3: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 4: Calculated G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 6: Calculated Spillway_1 CHANNEL : Calculated Orifice ORIFICE 6:.7 1. Weir_1 WEIR :..

82 Highest Flow Instability Indexes Link G-BYPASS-2 (13) Link A-BYPASS-7 (3) Link A-BYPASS-5 (3) Analysis began on: Thu Aug 25 8:22: Analysis ended on: Thu Aug 25 8:22: Total elapsed time: ::1

83 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 5-Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 5 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

84 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

85 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

86 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

87 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

88 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

89 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

90 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

91 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

92 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

93 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice : :: Junction_Weir : :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) : :: Out_Drain(4) : :: Out_South(1) : :: Pond : :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..7 6:. Junction_Weir JUNCTION.. :. Out_Bradley OUTFALL.5.5 2:3. Out_Drain(2) OUTFALL :4. Out_Drain(3) OUTFALL..7 6:. Out_Drain(4) OUTFALL.. :. Out_South(1) OUTFALL.4.4 2:4. Pond STORAGE :53. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :35 CB :35 CB :38 CB :41 CB :5 CB :36 CB :35 CB :35 CB :34 CBMH :45 CBMH :41

94 CBMH :39 CBMH :53 CBMH :51 CBMH :39 CBMH :42 CBMH :35 CBMH :51 CBMH :51 STMH :44 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

95 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4)... Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 3: Calculated

96 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 4: Calculated A-BYPASS-4 CHANNEL 2: > CAPACITY A-BYPASS-5 CHANNEL 2: FLOODED A-BYPASS-6 CHANNEL 3: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 4: Calculated G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 6: Calculated Spillway_1 CHANNEL : Calculated Orifice ORIFICE 6:.7 1. Weir_1 WEIR :..

97 Highest Flow Instability Indexes Link G-BYPASS-2 (13) Link A-BYPASS-7 (3) Link A-BYPASS-5 (3) Analysis began on: Thu Aug 25 8:3: Analysis ended on: Thu Aug 25 8:3: Total elapsed time: < 1 sec

98 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 1-Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 1 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

99 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

100 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

101 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

102 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

103 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

104 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

105 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

106 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

107 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

108 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice : :: Junction_Weir : :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) : :: Out_Drain(4) : :: Out_South(1) : :: Pond : :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..9 6:. Junction_Weir JUNCTION..5 6:. Out_Bradley OUTFALL.7.7 2:3. Out_Drain(2) OUTFALL :. Out_Drain(3) OUTFALL..9 6:. Out_Drain(4) OUTFALL..4 6:. Out_South(1) OUTFALL.7.7 2:39. Pond STORAGE :5. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :32 CB :35 CB :38 CB :41 CB :47 CB :35 CB :31 CB :35 CB :32 CBMH :44 CBMH :39

109 CBMH :37 CBMH :5 CBMH :49 CBMH :38 CBMH :41 CBMH :36 CBMH :49 CBMH :49 STMH :44 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

110 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4) Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 3: Calculated

111 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 3: Calculated A-BYPASS-4 CHANNEL 2: > CAPACITY A-BYPASS-5 CHANNEL 2: FLOODED A-BYPASS-6 CHANNEL 3: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 3: Calculated G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 6: Calculated Spillway_1 CHANNEL 6: Calculated Orifice ORIFICE 6:.9 1. Weir_1 WEIR 6:.5.28

112 Highest Flow Instability Indexes Link G-BYPASS-2 (2) Link A-BYPASS-1 (3) Link A-BYPASS-5 (3) Link A-BYPASS-4 (3) Link A-BYPASS-7 (2) Analysis began on: Thu Aug 25 8:31: Analysis ended on: Thu Aug 25 8:31: Total elapsed time: ::1

113 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 25 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

114 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

115 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

116 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

117 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

118 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

119 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

120 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

121 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

122 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

123 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice : :: Junction_Weir : :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) : :: Out_Drain(4) : :: Out_South(1) : :: Pond : :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..9 6:. Junction_Weir JUNCTION..31 6:. Out_Bradley OUTFALL.1.1 2:3. Out_Drain(2) OUTFALL :54. Out_Drain(3) OUTFALL..9 6:. Out_Drain(4) OUTFALL..31 6:. Out_South(1) OUTFALL :35. Pond STORAGE :48. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :31 CB :34 CB :37 CB :4 CB :45 CB :35 CB :29 CB :34 CB :32 CBMH :44 CBMH :39

124 CBMH :38 CBMH :48 CBMH :48 CBMH :38 CBMH :4 CBMH :39 CBMH :47 CBMH :49 STMH :43 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

125 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4) Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 3: FLOODED

126 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 3: > CAPACITY A-BYPASS-4 CHANNEL 2: Calculated A-BYPASS-5 CHANNEL 2: FLOODED A-BYPASS-6 CHANNEL 2: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 2: > CAPACITY G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 6: Calculated Spillway_1 CHANNEL 6: Calculated Orifice ORIFICE 6:.9 1. Weir_1 WEIR 6:.31.61

127 Highest Flow Instability Indexes All links are stable. Analysis began on: Thu Aug 25 8:25: Analysis ended on: Thu Aug 25 8:26: 216 Total elapsed time: ::1

128 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 5-Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 5 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

129 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

130 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

131 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

132 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

133 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

134 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

135 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

136 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

137 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

138 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice : :: Junction_Weir :59 :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) : :: Out_Drain(4) : :: Out_South(1) : :: Pond :57 :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..1 4:58. Junction_Weir JUNCTION..46 4:57. Out_Bradley OUTFALL :29. Out_Drain(2) OUTFALL :55. Out_Drain(3) OUTFALL..1 5:. Out_Drain(4) OUTFALL..46 5:. Out_South(1) OUTFALL :35. Pond STORAGE :47. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :31 CB :33 CB :36 CB :8 CB :45 CB :34 CB :4 CB :34 CB :32 CBMH :43 CBMH :39

139 CBMH :38 CBMH :47 CBMH :47 CBMH :37 CBMH :39 CBMH :39 CBMH :46 CBMH :46 STMH :43 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

140 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4) Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 2: FLOODED

141 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 3: > CAPACITY A-BYPASS-4 CHANNEL 2: Calculated A-BYPASS-5 CHANNEL 2:8 > FLOODED A-BYPASS-6 CHANNEL 2: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 2: > CAPACITY G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 5: Calculated Spillway_1 CHANNEL 5: Calculated Orifice ORIFICE 4: Weir_1 WEIR 4:

142 Highest Flow Instability Indexes Link G-BYPASS-2 (27) Link A-BYPASS-1 (14) Link G-BYPASS-1 (1) Link A-BYPASS-3 (6) Link A-BYPASS-4 (4) Analysis began on: Thu Aug 25 8:27: Analysis ended on: Thu Aug 25 8:27: Total elapsed time: < 1 sec

143 Autodesk Storm and Sanitary Analysis Version (Build 1) - *** Project Description *** File Name... 1-Year-Post Storm(23th Aug-216).SPF Analysis Options Flow Units... cms Subbasin Hydrograph Method. SCS TR-2 Time of Concentration... User-Defined Link Routing Method... Hydrodynamic Storage Node Exfiltration.. None Starting Date... AUG :: Ending Date... AUG :: Report Time Step... :5: ************* Element Count ************* Number of rain gages... 1 Number of subbasins Number of nodes Number of links Raingage Summary Gage Data Data Recording ID Source Type Interval Gage-1 1 Year Storm CUMULATIVE 6. min Subbasin Summary Subbasin Total ID hectares

144 ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Inflow m m m² Junction_Orifice JUNCTION Junction_Weir JUNCTION Out_Bradley OUTFALL Out_Drain(2) OUTFALL Out_Drain(3) OUTFALL Out_Drain(4) OUTFALL Out_South(1) OUTFALL Pond STORAGE ************* Inlet Summary ************* Inlet Inlet Manufacturer Inlet Number Catchbasin Inlet Ponded Initial Grate ID Manufacturer Part Location of Invert Rim Water Clogging Number Inlets Elevation Elevation Elevation Factor m m m² m % Bradley_CB FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB1 FHWA HEC-22 GENERIC N/A On Sag CB11 FHWA HEC-22 GENERIC N/A On Sag CB14 FHWA HEC-22 GENERIC N/A On Grade CB16 FHWA HEC-22 GENERIC N/A On Grade CB19 FHWA HEC-22 GENERIC N/A On Grade CB3 FHWA HEC-22 GENERIC N/A On Grade CB5 FHWA HEC-22 GENERIC N/A On Sag CB8 FHWA HEC-22 GENERIC N/A On Sag CBMH12 FHWA HEC-22 GENERIC N/A On Sag CBMH13 FHWA HEC-22 GENERIC N/A On Grade CBMH15 FHWA HEC-22 GENERIC N/A On Sag

145 CBMH17 FHWA HEC-22 GENERIC N/A On Grade CBMH18 FHWA HEC-22 GENERIC N/A On Grade CBMH2 FHWA HEC-22 GENERIC N/A On Grade CBMH4 FHWA HEC-22 GENERIC N/A On Grade CBMH6 FHWA HEC-22 GENERIC N/A On Sag CBMH7 FHWA HEC-22 GENERIC N/A On Sag CBMH9 FHWA HEC-22 GENERIC N/A On Sag STMH2 FHWA HEC-22 GENERIC N/A On Sag ********** Roadway and Gutter Summary ********** Inlet Roadway Roadway Roadway Gutter Gutter Gutter ID Longitudinal Cross Manning's Cross Width Depression Slope Slope Roughness Slope m/m m/m m/m m cm Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH STMH ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type m % Roughness ---- A-BYPASS-1 CBMH2 CBMH4 CHANNEL A-BYPASS-2 CB3 CB5 CONDUIT A-BYPASS-3 CBMH4 CBMH7 CHANNEL A-BYPASS-4 CBMH17 CBMH15 CHANNEL A-BYPASS-5 CB16 CB14 CHANNEL A-BYPASS-6 CBMH13 CB1 CHANNEL A-BYPASS-7 CB14 CB11 CHANNEL A-STM-1 CB1 CBMH2 CONDUIT A-STM-1 CB14 CBMH13 CONDUIT A-STM-11 CBMH13 STMH2 CONDUIT A-STM-12 CB1 STMH2 CONDUIT A-STM-13 STMH2 CBMH12 CONDUIT

146 A-STM-2 CB3 CBMH2 CONDUIT A-STM-3 CBMH2 CBMH4 CONDUIT A-STM-4 CB5 CBMH6 CONDUIT A-STM-5 CBMH6 CBMH4 CONDUIT A-STM-6 CBMH4 CBMH7 CONDUIT A-STM-7 CB16 CBMH17 CONDUIT A-STM-8 CBMH17 CBMH15 CONDUIT A-STM-9 CBMH15 CBMH13 CONDUIT G-BYPASS-1 CBMH18 CBMH7 CHANNEL G-BYPASS-2 CB19 CB8 CHANNEL G-STM-1 CB11 CBMH12 CONDUIT G-STM-2 CBMH12 CBMH18 CONDUIT G-STM-3 CB19 CBMH18 CONDUIT G-STM-4 CBMH18 CBMH9 CONDUIT G-STM-5 CB8 CBMH9 CONDUIT G-STM-6 CBMH9 CBMH7 CONDUIT Link-3 Bradley_CB Out_Bradley CONDUIT POND_1 CBMH7 Pond CONDUIT Pond_Outlet_1 Junction_OrificeOut_Drain(3) CONDUIT Spillway_1 Junction_Weir Out_Drain(4) CHANNEL Orifice Pond Junction_OrificeORIFICE Weir_1 Pond Junction_Weir WEIR ***** Cross Section Summary ***** Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Radius Capacity m m m² m cms A-BYPASS-1 IRREGULAR A-BYPASS-2 CIRCULAR A-BYPASS-3 IRREGULAR A-BYPASS-4 IRREGULAR A-BYPASS-5 IRREGULAR A-BYPASS-6 IRREGULAR A-BYPASS-7 IRREGULAR A-STM-1 CIRCULAR A-STM-1 CIRCULAR A-STM-11 CIRCULAR A-STM-12 CIRCULAR A-STM-13 CIRCULAR A-STM-2 CIRCULAR A-STM-3 CIRCULAR A-STM-4 CIRCULAR

147 .6 A-STM-5 CIRCULAR A-STM-6 CIRCULAR A-STM-7 CIRCULAR A-STM-8 CIRCULAR A-STM-9 CIRCULAR G-BYPASS-1 IRREGULAR G-BYPASS-2 IRREGULAR G-STM-1 CIRCULAR G-STM-2 CIRCULAR G-STM-3 CIRCULAR G-STM-4 CIRCULAR G-STM-5 CIRCULAR G-STM-6 CIRCULAR Link-3 CIRCULAR POND_1 CIRCULAR Pond_Outlet_1 CIRCULAR Spillway_1 RECT_OPEN Transect Summary Transect 6.1 : Hrad: Width:

148 ********** Volume Depth Runoff Quantity Continuity hectare-m mm ********** Total Precipitation Surface Runoff Continuity Error (%) ********** Volume Volume Flow Routing Continuity hectare-m Mliters ********** External Inflow..... External Outflow Initial Stored Volume..... Final Stored Volume Continuity Error (%) ********** Composite Curve Number Computations Report ********** Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.14 B 83. 1/4 acre lots, 38% impervious.54 B 75. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/8 acre lots, 65% impervious.9 B 85. Composite & Weighted CN Subbasin 3 /Surface Description (ha) Group CN Road_Allowance.6 B 83. 1/4 acre lots, 38% impervious.2 B 75. Composite & Weighted CN Subbasin 4 /Surface Description (ha) Group CN

149 Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.19 B 85. Composite & Weighted CN Subbasin 5 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.14 B 75. Composite & Weighted CN Subbasin 6 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.11 B 85. Composite & Weighted CN Subbasin 7 /Surface Description (ha) Group CN -.3 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 8 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.16 B 75. Pasture, grassland, or range, Good.1 B 61. Composite & Weighted CN Subbasin 9 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/4 acre lots, 38% impervious.15 B 75. Composite & Weighted CN Subbasin 1 /Surface Description (ha) Group CN Road_Allowance.2 B 83. Composite & Weighted CN Subbasin 11

150 /Surface Description (ha) Group CN Road_Allowance.9 B 83. 1/4 acre lots, 38% impervious.12 B 75. Composite & Weighted CN Subbasin 12 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.3 B 85. 1/4 acre lots, 38% impervious.11 B 75. Composite & Weighted CN Subbasin 13 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 14 /Surface Description (ha) Group CN Road_Allowance.3 B 83. 1/8 acre lots, 65% impervious. B 85. 1/3 acre lots, 3% impervious.2 B 72. Composite & Weighted CN Subbasin 15 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.21 B 85. Composite & Weighted CN Subbasin 16 /Surface Description (ha) Group CN Road_Allowance.5 B 83. 1/8 acre lots, 65% impervious.13 B 85. Composite & Weighted CN Subbasin 17 /Surface Description (ha) Group CN

151 Road_Allowance.4 B 83. 1/8 acre lots, 65% impervious.2 B 85. Composite & Weighted CN Subbasin 18 /Surface Description (ha) Group CN Road_Allowance.11 B 83. 1/8 acre lots, 65% impervious.1 B 85. 1/3 acre lots, 3% impervious.8 B 72. 1/2 acre lots, 25% impervious.19 B 7. 1 acre lots, 2% impervious.23 B 68. Composite & Weighted CN Subbasin 19 /Surface Description (ha) Group CN 1/8 acre lots, 65% impervious.8 B 85. 1/4 acre lots, 38% impervious.25 B 75. Pasture, grassland, or range, Good.22 B 61. Composite & Weighted CN Subbasin 2 /Surface Description (ha) Group CN Fallow, crop residue, Good.48 B 83. Pasture, grassland, or range, Good.29 B 61. Composite & Weighted CN Subbasin 21 /Surface Description (ha) Group CN Fallow, crop residue, Good.26 B 83. Composite & Weighted CN Subbasin 22 /Surface Description (ha) Group CN Pasture, grassland, or range, Good.54 B 61. 1/4 acre lots, 38% impervious.1 B 75. Composite & Weighted CN Subbasin 23 /Surface Description (ha) Group CN Road_Allowance.1 B 83. 1/4 acre lots, 38% impervious.15 B 75. 1/4 acre lots, 38% impervious.25 A 61. Composite & Weighted CN

152 Subbasin 24 /Surface Description (ha) Group CN Road_Allowance.7 B 83. 1/8 acre lots, 65% impervious.7 B 85. Composite & Weighted CN Subbasin 25 /Surface Description (ha) Group CN Road_Allowance.4 B 83. 1/4 acre lots, 38% impervious.19 B 75. Composite & Weighted CN Subbasin 26 /Surface Description (ha) Group CN Fallow, crop residue, Good 16.4 B 83. Pasture, grassland, or range, Good 4.69 B 61. Woods & grass combination, Good 7.75 B 58. 1/4 acre lots, 38% impervious.21 B 75. Composite & Weighted CN ******* Subbasin Runoff Summary ******* -- Subbasin Total Total Peak Weighted Time of ID Precip Runoff Runoff Curve Concentration mm mm cms Number days hh:mm:ss :9: :7: :6: :6: :5: :7: :7: :5: :9: :2: :5: :3: :2: :3: :6: :4: :3: :22: :1: :19: :5: :11: :1: :3: :6:12

153 :36:38 -- ** Node Depth Summary ** - Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded m m m days hh:mm ha-mm minutes hh:mm:ss - Junction_Orifice :37 :: Junction_Weir :37 :: Out_Bradley : :: Out_Drain(2) : :: Out_Drain(3) :37 :: Out_Drain(4) :37 :: Out_South(1) : :: Pond :35 :: * Node Flow Summary * Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cms cms days hh:mm cms days hh:mm Junction_Orifice JUNCTION..1 4:35. Junction_Weir JUNCTION..66 4:35. Out_Bradley OUTFALL :29. Out_Drain(2) OUTFALL :54. Out_Drain(3) OUTFALL..1 4:37. Out_Drain(4) OUTFALL..66 4:37. Out_South(1) OUTFALL :34. Pond STORAGE :47. *** Inlet Depth Summary *** --- Inlet Max Gutter Max Gutter Max Gutter Time of ID Spread Water Elev Water Depth Maximum during during during Depth Peak Flow Peak Flow Peak Flow Occurrence m m m days hh:mm --- Bradley_CB : CB :31 CB :35 CB :36 CB :38 CB :44 CB :49 CB :37 CB :34 CB :31 CBMH :42 CBMH :39

154 CBMH :38 CBMH :46 CBMH :45 CBMH :38 CBMH :39 CBMH :38 CBMH :46 CBMH :44 STMH :41 ** Inlet Flow Summary ** Inlet Peak Peak Peak Peak Inlet Total Total ID Flow Lateral Flow Flow Efficiency Flooding Time Flow Intercepted Bypassing during Flooded by Inlet Inlet Peak Flow cms cms cms cms % ha-mm minutes Bradley_CB CB CB CB CB CB CB CB CB CB CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH CBMH

155 CBMH STMH **** Storage Node Summary **** Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1 m³ (%) days hh:mm 1 m³ (%) cms cmm hh:mm:ss 1 m³ Pond : ::. ******* Outfall Loading Summary ******* Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cms cms Out_Bradley Out_Drain(2) Out_Drain(3) Out_Drain(4) Out_South(1) System * Link Flow Summary * Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm m/sec cms cms Flow Depth minutes A-BYPASS-1 CHANNEL 5: FLOODED

156 A-BYPASS-2 CONDUIT 2: Calculated A-BYPASS-3 CHANNEL 5: > CAPACITY A-BYPASS-4 CHANNEL 2: > CAPACITY A-BYPASS-5 CHANNEL 2: FLOODED A-BYPASS-6 CHANNEL 2: Calculated A-BYPASS-7 CHANNEL 2: > CAPACITY A-STM-1 CONDUIT 2: Calculated A-STM-1 CONDUIT 2: Calculated A-STM-11 CONDUIT 2: Calculated A-STM-12 CONDUIT 2: Calculated A-STM-13 CONDUIT 2: Calculated A-STM-2 CONDUIT 2: Calculated A-STM-3 CONDUIT 2: Calculated A-STM-4 CONDUIT 2: Calculated A-STM-5 CONDUIT 2: Calculated A-STM-6 CONDUIT 2: Calculated A-STM-7 CONDUIT 2: Calculated A-STM-8 CONDUIT 2: Calculated A-STM-9 CONDUIT 2: Calculated G-BYPASS-1 CHANNEL 2: > CAPACITY G-BYPASS-2 CHANNEL 2: > CAPACITY G-STM-1 CONDUIT 2: Calculated G-STM-2 CONDUIT 2: Calculated G-STM-3 CONDUIT 2: Calculated G-STM-4 CONDUIT 2: Calculated G-STM-5 CONDUIT 2: Calculated G-STM-6 CONDUIT 2: Calculated Link-3 CONDUIT : Calculated POND_1 CONDUIT 2: Calculated Pond_Outlet_1 CONDUIT 4: Calculated Spillway_1 CHANNEL 4: Calculated Orifice ORIFICE 4: Weir_1 WEIR 4:

157 Highest Flow Instability Indexes Link G-BYPASS-2 (34) Link A-BYPASS-1 (18) Link G-BYPASS-1 (13) Link A-BYPASS-3 (1) Link A-BYPASS-4 (4) Analysis began on: Thu Aug 25 8:27: Analysis ended on: Thu Aug 25 8:27: Total elapsed time: ::1

158

159 Gilas Subdivision M Year Stage Storage Discharge Table Time (min) Time (hrs) Depth (m) Volume (m³) Outflow (cms)

160 Gilas Subdivision M Year Stage Storage Discharge Table Time (min) Time (hrs) Depth (m) Volume (m³) Outflow (cms)

161

162 Gilas Subdivision M Year Stage - Storage - Discharge Table Time (min) Time (hrs) Depth (m) Volume (m³) Outflow (cms) Year Stage - Storage - Discharge Table

163 Gilas Subdivision M1313 Time (min) Time (hrs) Depth (m) Volume (m³) Outflow (cms)

164 Gilas Subdivision December 216 Pre-Servicing Report M1313 Drawings DARRYL M. ROBINS CONSULTING INC.

165

166 WI LS ON CR ES. SUBJECT SITE PIN EC T. BRA DLE Y ST REY GRE Y ST. N OSP DOY ART. ST. N EME SIA ST. N LE S T. LEGEND EXISTING PROPERTY LINE PROPOSED PROPERTY LINE PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER SANITARY MANHOLE STORM CATCH BASIN MANHOLE CATCH BASIN EXSITING HYDRO POLE FIRE HYDRANT VALVES TOPOGRAPHIC SURVEY COMPLETED BY SMC GEOMATICS IN 213 KEY PLAN IMAGE OBTAINED FROM GREY COUNTY MAPPING. SPILLWAY (OVERFLOW) CAUTION: THE POSITION OF POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND ABOVE GROUND UTILITIES AND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS, AND, WHERE SHOWN, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING WORK, THE CONTRACTOR SHALL INFORM HIMSELF OF THE EXACT LOCATION OF ALL SUCH UTILITIES AND STRUCTURES, AND SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. HYDRO POLE TO BE RELOCATED DATE REVISION / ISSUE SEAL NOT VALID UNLESS SIGNED AND DATED POND OUTLET DARRYL M. ROBINS CONSULTING INC Highway No. 6, General Delivery Miller Lake, Ontario NH 1Z Phone / Fax: dmrc@dmrconsulting.ca SERVICING PLAN DUNDALK SUBDIVISION BRADLEY STREET DUNDALK, ON CLIENT: CUESTA PLANNING APPROVED: DESIGN: LAS DRAWN: DESIGN ENGINEER DRAWING NO.: LAS CHECK: LAS SCALE: 1:75 DATE: mm/dd/yy 8/24/16 PROJECT NO.: M SS

167 WI LS ON CR ES. SUBJECT SITE PIN EC T. BRA REFER TO THE PRE-DEVELOPMENT PLAN FOR THE FULL LIMITS OF THIS DRAINAGE AREA DLE Y ST REY GRE Y ST. N OSP DOY ART. ST. N EME SIA ST. N LE S T. LEGEND PROPOSED PROPERTY LINE ROAD CENTER LINE EXISTING PROPERTY LINE POST DEVELOPMENT DRAINAGE AREA LIMIT PROPOSED STORM SEWER EXISTING CONTOUR LINE DIRECTIONAL FLOW ARROW PROPOSED CATCH BASIN MANHOLE PROPOSED CATCH BASIN DRAINAGE AREA IDENTIFICATION NO. 5 CURVE NUMBER (CN).5 45 DRAINAGE AREA (Ha) TOPOGRAPHIC SURVEY COMPLETED BY SMC GEOMATICS IN 213. KEY PLAN IMAGE OBTAINED FROM GREY COUNTY MAPPING. CAUTION: THE POSITION OF POLE LINES, CONDUITS, WATERMAINS, SEWERS AND OTHER UNDERGROUND AND ABOVE GROUND UTILITIES AND STRUCTURES IS NOT NECESSARILY SHOWN ON THE CONTRACT DRAWINGS, AND, WHERE SHOWN, THE ACCURACY OF THE POSITION OF SUCH UTILITIES AND STRUCTURES IS NOT GUARANTEED. BEFORE STARTING WORK, THE CONTRACTOR SHALL INFORM HIMSELF OF THE EXACT LOCATION OF ALL SUCH UTILITIES AND STRUCTURES, AND SHALL ASSUME ALL LIABILITY FOR DAMAGE TO THEM. DATE REVISION / ISSUE SEAL NOT VALID UNLESS SIGNED AND DATED DARRYL M. ROBINS CONSULTING INC Highway No. 6, General Delivery Miller Lake, Ontario NH 1Z Phone / Fax: dmrc@dmrconsulting.ca STORMWATER MANAGEMENT PLAN DUNDALK SUBDIVISION BRADLEY STREET DUNDALK, ON CLIENT: CUESTA PLANNING APPROVED: DESIGN: LAS DRAWN: DESIGN ENGINEER DRAWING NO.: MC CHECK: LAS SCALE: 1:75 DATE: mm/dd/yy 8/24/16 PROJECT NO.: M1313 M1313-SWM

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017 SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &

More information

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Table 1 - Infiltration Rates

Table 1 - Infiltration Rates Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

SHADOW STUDY REPORT REGARDING

SHADOW STUDY REPORT REGARDING SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

FUNCTIONAL SERVICING REPORT AND SWM REPORT

FUNCTIONAL SERVICING REPORT AND SWM REPORT FUNCTIONAL SERVICING REPORT AND SWM REPORT 104 WHITE CRESCENT CITY OF BARRIE, COUNTY OF SIMCOE December 2018 18058 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. SUPPORTING DOCUMENTS... 4 3. DESIGN POPULATION...

More information

Villages at Riverdale Thornton, CO

Villages at Riverdale Thornton, CO FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

Jp2g Consultants Inc.

Jp2g Consultants Inc. Jp2g Consultants Inc. ENGINEERS PLANNERS PROJECT MANAGERS 1150 Morrison Drive, Suite 410 Ottawa, ON K2H 8S9 T 613-828-7800, F 613-828-2600, www.jp2g.com September 20, 2018 City of Ottawa Development Review

More information

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate. Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting

More information

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough Stormwater Management Report City of Peterborough P-20-12 Parkway Corridor Class Environmental Assessment Jackson Park Parkhill Road West to Chemong Road D.M. Wills Project No. 12-5061 D.M. Wills Associates

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10 TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

WELCOME Lake Wabukayne OPEN HOUSE

WELCOME Lake Wabukayne OPEN HOUSE WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015 Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015 Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study

More information

STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA

STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA The City of Committed to Total Service Excellence STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA April 2015 Revised

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 Appendix C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014 CONTENTS List of Figures-... 3 List of Tables... 4 Introduction... 1 Application of the Lubbock Travel Demand

More information

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr. May 22, 2008 Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR 72032 RE: Royal Oaks Vista Subdivision Site AFIN: 12-00272 NPDES Permit No.: ARR150472 Dear Mr. Tyler: On March 26, 2008, I performed

More information

WEST NORRITON TOWNSHIP

WEST NORRITON TOWNSHIP WEST NORRITON TOWNSHIP SANITARY SEWER SYSTEM INFLOW AND INFILTRATION STUDY November 2013 Rettew Associates, Inc. 3020 Columbia Avenue Lancaster, PA 17603 RECOMMENDATIONS The top four priorities for inflow

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS New England East-West Solution (NEEWS) Greater Springfield Reliability

More information

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637

December 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 December 16, 2015 Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 RE: Response to SWFWMD Supplemental Information Request Dear Mr.

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

Storm and Runoff Calculation Standard Review Snowmelt and Climate Change

Storm and Runoff Calculation Standard Review Snowmelt and Climate Change Storm and Runoff Calculation Standard Review Snowmelt and Climate Change Presented by Don Moss, M.Eng., P.Eng. and Jim Hartman, P.Eng. Greenland International Consulting Ltd. Map from Google Maps TOBM

More information

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR

2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING. Master Plan Addendum. Union County B&V PROJECT NO PREPARED FOR Black & Veatch Holding Company 2017. All rights reserved. 2018 FINAL TOWN OF WAXHAW WASTEWATER SYSTEM PLANNING Master Plan Addendum B&V PROJECT NO. 195982 PREPARED FOR Union County 7 MARCH 2018 Table of

More information

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

Winning Farm of Winchester

Winning Farm of Winchester Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner

More information

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014.

SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM DRAFT. MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS. February 11, 2014. SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street, Suite 200 Orem,

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY, UTAH SPRINGVILLE CITY, UTAH PRESSURE IRRIGATION SYSTEM MASTER PLAN & CAPITAL FACILITIES PLAN For the WEST FIELDS February 11, 2014 Adopted May 20, 2014 Prepared by: J-U-B ENGINEERS, INC. 240 West Center Street,

More information

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario Roadway Traffic Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Traffic Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

FINAL UTILITY REPORT Creekside Thornton, CO

FINAL UTILITY REPORT Creekside Thornton, CO FINAL UTILITY REPORT Creekside Thornton, CO March 4, 216 Revised: June 27, 216 JN: 1539 Prepared for: HW Sodbusters, LLC 2733 E. Parleys Way, Suite 3 Salt Lake City, UT 8419 P: 81.485.777 Prepared by:

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT Technical briefs are short summaries of the models used in the project aimed at nontechnical readers. The aim of the PES India

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

Estimating Sewage System Flows

Estimating Sewage System Flows 9 Estimating Sewage System Flows DWSD Wholesale Sewer Rates 201 In this module, you will learn the sources of dry and wet weather flows and how these flows are estimated. Three different tools are used

More information

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California Introduction Beginning in 1999, the University of California,

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1

More information

APPENDIX IV MODELLING

APPENDIX IV MODELLING APPENDIX IV MODELLING Kingston Transportation Master Plan Final Report, July 2004 Appendix IV: Modelling i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 OBJECTIVE... 1 3.0 URBAN TRANSPORTATION MODELLING

More information

City of Camrose Winter Road Maintenance Policy

City of Camrose Winter Road Maintenance Policy City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. Gates TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: Gates Road Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction Stormwater

More information

October 16, Dear Mr. Hawkins:

October 16, Dear Mr. Hawkins: IBI GROUP 101 410 Albert Street Waterloo ON N2L 3V3 Canada tel 519 585 2255 fax 519 585 2269 October 16, 2017 Mr. Trevor Hawkins Manager of Applications and Implementation Integrated Planning and Public

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

STORMWATER DESIGN CALCULATIONS

STORMWATER DESIGN CALCULATIONS STORMWATER DESIGN CALCULATIONS REF : C7011-2390 AT 19a-23 MEMORIAL AVENUE BLACKWALL FOR MR KERR Contents 1.0 Detention System Requirements 1.1 Storage-Area calcs. 1.2 Data Files for Pre & Post Developed

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How

More information

DRAFT. REVISED Draft. Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6

DRAFT. REVISED Draft. Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6 REVISED Draft Paso Robles Subbasin Groundwater Sustainability Plan Chapter 6 Prepared for the Paso Robles Subbasin Cooperative Committee and the Groundwater Sustainability Agencies February 14, 2019 Paso

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

2267 N o r t h 1500 W C l i n t o n U T 84015

2267 N o r t h 1500 W C l i n t o n U T 84015 P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a

More information

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA

CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA Location and Acreage Approximately 1,863 acres of land in San Patricio County, located in the ETJ northwest of the existing City Limits. Metes and

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

12 SWAT USER S MANUAL, VERSION 98.1

12 SWAT USER S MANUAL, VERSION 98.1 12 SWAT USER S MANUAL, VERSION 98.1 CANOPY STORAGE. Canopy storage is the water intercepted by vegetative surfaces (the canopy) where it is held and made available for evaporation. When using the curve

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE

APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE DEPARTMENT OF DEVELOPMENT & PLANNING 825 Ohio Avenue - Lynn Haven, FL 32444 (850) 265-2961 - (850) 265-3478 APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE Deadline to submit is 30 days

More information

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For

TRAFFIC IMPACT STUDY. Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) For TRAFFIC IMPACT STUDY For Platte Canyon Villas Arapahoe County, Colorado (Arapahoe County Case Number: Z16-001) February 2015 Revised: August 2015 April 2016 July 2016 September 2016 Prepared for: KB Home

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

JUNE 2004 Flood hydrology of the Waiwhetu Stream

JUNE 2004 Flood hydrology of the Waiwhetu Stream JUNE 2004 Flood hydrology of the Waiwhetu Stream Laura Watts Resource Investigations Contents 1. Introduction 1 2. Catchment description 2 3. Data availability and quality 3 3.1 Rainfall data 3 3.2 Water

More information