1 Winning Farm of Winchester Planning Board Presentation
2 Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner of Winchester along the Woburn Town line to the north and Lexington Town line to the west Bordered on three sides by land owned by the Town of Winchester and maintained as open space and by Thornberry Road residences along the fourth side Property Location
3 Past Permitting The subject parcel has been the site of several development proposals over the past 20+ years, most recently by Winning Farms, LLC as an assisted living facility. The property was originally approved by the Town for a large independent-living and assistantliving complex, pursuant to an Independent Elderly Housing Overlay District previously adopted for the property. After various iterations of plans and several years of litigation, the current owner (Winning Farm LLC) obtained approvals from various Town boards and commissions to construct an 88-unit independent-living/assisted-living complex. However, for various reasons, this facility was never built (although the access road (Gershon Way) was constructed along with some utility work and a sales office building. Current Permitting The Applicant has an agreement in place to purchase the subject property from Winning Farm LLC, subject to the issuance of permits and approvals to construct an age restricted residential community. At a Special Spring Town Meeting on June 6, 2016, after several months of presentations to various Town boards, agencies and residents, Winchester Town Meeting voted unanimously to include the subject property within the Attached Residential Cluster Development Overlay District (ARCDOD), in order to allow for the development of 29 cluster style residential dwelling units. Pursuant to a Development Agreement entered into by the Applicant with the Town of Winchester, the residential community would be subject to an age restriction (55 and over), and 2 of the dwelling units would be set aside as affordable, amongst other commitments and requirements. Permitting History
4 Thornberry Road Aerial of Project Site
5 Wetlands were delineated and then approved by the Conservation Commission on October 11, 2016 Work is proposed within the 100 foot wetland buffer and within the 25 foot wetland buffer in specific locations. A Notice of Intent was recently submitted to the Conservation Commission for approval. The Vernal Pool southwest of the site was certified by NHESP on July 21, Although the pool itself is not on the subject site, the 100 foot buffer does extend onto the western portion of the site. No work is proposed within this buffer though. Natural Resource Constraints
6 Community of 29 units within 7 duplex and 5 triplex buildings 20 foot wide new roadway extends from the existing Gershon Way and ends in teardrop-shaped cul-desac with two side drives. Two paths provide pedestrian circulation within the development and a third trail connects to existing walking paths on the Town-owned land and to the proposed Conservation Shelter. Winning Farm of Winchester Site Plan
7 Thornberry Road Gershon Way Building 3 Building 2 Building 1 Cross-Section of Winning Farm of Winchester
8 CLUSTER 1 DUPLEX Architecture of Winning Farm of Winchester
9 CLUSTER 2 3 UNIT CLUSTER Architecture of Winning Farm of Winchester
10 Architecture of Winning Farm of Winchester
11 Architecture of Winning Farm of Winchester
12 Architecture of Winning Farm of Winchester
13 Architecture of Winning Farm of Winchester
14 Perspective of Triplex Building Architecture of Winning Farm of Winchester
15 Perspective of Cul-De-Sac Architecture of Winning Farm of Winchester
16 Landscape Architecture
17 Typical Building Landscape Plan Landscape Architecture
18 Pedestrian access from unit to unit as well as public access to walking paths are primary features of the project. Blue lines show the primary concrete sidewalk system located at street level, but away from the road when practicable, to allow primary residential access between units. This sidewalk will be oriented toward the front doors of the units. Orange lines are less formal paths connecting rear outdoor living spaces of units and providing access along the Vernal Pool to the proposed Conservation Pavilion. Green lines are the existing trails in Townowned open space. Trail Network and Sidewalks
19 The project includes two different types of infiltrative systems. Systems located under roadways and driveways will be a chambered plastic infiltrator (StormTech) system that is surrounded by crushed stone. Systems located outside of vehicular travel areas and in rear yards will be stackable units that offer up to 94% void space (RainStore3 System). The result is that all roads and driveways will receive water quality treatment and the project will meet the rules and regulations of the Town of Winchester Stormwater Regulations as well as the MA Stormwater Standards. Stormwater Management
20 KEY Orange - Sanitary Sewer Blue Water Magenta Electric/ Telecommunications 8 CLDI Water Main under main travel way 4 Hydrants 1 ¼ Copper services to each individual unit 10 Gravity Sanitary Sewer to cul-de-sac Storage tank and pump chamber under cul-de-sac pumps to 3 force main Gravity discharge into Thornberry Road system 3.5 x2 Electric/ Telecomm. duct bank below ground Utilities
21 The existing +/- 24 foot wide Gershon Way narrows to a 20 foot width when entering the development. The roadway will be lined with Cape Cod berm as opposed to the granite curbing along Gershon Way. Vehicular traffic will be controlled by three stop signs shown on the plan. The project is designed so emergency vehicles can access all parts of the site. Visitor parking (18 spaces total) is provided throughout the site in permeable pocket lots off the roadway. 5 public parking spaces are provided for the recreational trail as you enter the site from Gershon Way. Traffic
22 END
23 UNIT 1 2,589 SF Architecture of Winning Farm of Winchester
24 UNIT 2 2,582 SF Architecture of Winning Farm of Winchester
25 UNIT 3 2,461 SF Architecture of Winning Farm of Winchester
26 UNIT 4 2,461 SF Architecture of Winning Farm of Winchester
TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT. 71 Mount Vernon Street. Winchester, MA 01890
BRIAN SZEKELY TOWN PLANNER Winchester Board of Selectmen 71 Mt. Vernon St. Winchester, MA 01890 TOWN OF WINCHESTER OFFICE OF THE PLANNING DEPARTMENT 71 Mount Vernon Street Winchester, MA 01890 August 11,
More informationTown of Windsor. Department of Public Works
Town of Windsor Department of Public Works 860.285.1855 TOWN OF WINDSOR PUBLIC WORKS SNOW REMOVAL PLAN In Windsor, as throughout the New England states, winter can bring a variety of weather conditions
More informationTREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 4B10 From: Date: Subject: Staff December 14, 2018 Council Meeting Local Government Comprehensive Plan Review
More informationZONING. 195 Attachment 1
ZONING 195 Attachment 1 Use Regulation Schedule Town of Chelmsford [Amended 10-16-2000 ATM by Art. 20; 5-3-2001 ATM by Art. 17; 10-15-2001 ATM by Art. 22; 4-29-2002 ATM by Art. 22; 10-24-2002 ATM by Art.
More informationUrban Planning Word Search Level 1
Urban Planning Word Search Level 1 B C P U E C O S Y S T E M P A R E U O E U R B A N P L A N N E R T N S T D H E C O U N T Y G E R E R D W R E N I C I T Y C O U N C I L A A A S U G G C I L A G P R I R
More information2267 N o r t h 1500 W C l i n t o n U T 84015
P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a
More informationCITY OF MINOT SNOW REMOVAL PLAN October 2018
CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationARTICLE 8. USES 8.0 GENERAL USE PERMISSION 8.1 USE MATRIX 8.2 PRINCIPAL USE STANDARDS 8.3 TEMPORARY USE STANDARDS
ARTICLE 8. USES 8.0 GENERAL USE PERMISSION 8.1 USE MATRIX 8.2 PRINCIPAL USE STANDARDS 8.3 TEMPORARY USE STANDARDS 8.0 GENERAL USE PERMISSION No structure or land may be used or occupied except in conformity
More informationBUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)
BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check
More informationSNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)
Mayor Dwayne D. Warren, Esq. And The Orange Municipal Council MOVING ORANGE FORWARD City Of Orange Township SNOW REMOVAL GUIDE Public Works Snow Removal Hotline: (973) 266-4030 My Orange Hotline: (973)
More informationTHE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution Snow Removal Policy
THE PARKE AT OCEAN PINES HOME OWNERS ASSOCIATION, INC. Policy Resolution 20141029 Snow Removal Policy THIS POLICY RESOLUTION 20141029, Snow Removal Policy is made, effective as of October 29, 2014 by THE
More informationCITY OF MINOT SNOW REMOVAL PLAN November 2017
CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationPW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works
Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees
More informationCLEARING THE WAY CAUTION. brampton.ca/snow
CLEARING THE WAY CAUTION brampton.ca/snow Who clears the roads? Not all roads in Brampton are the responsibility of the City of Brampton. The Region of Peel does winter maintenance on the major roads highlighted
More informationZoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag
The ordinance shall be known as the Zoning Ordinance of Wetumpka, Alabama, and the map herein referred to as the Zoning Map of Wetumpka, Alabama. The map and all explanatory matter thereon are hereby adopted
More informationKing City URA 6D Concept Plan
King City URA 6D Concept Plan King City s Evolution Among the fastest growing cities 2000 Census 1,949 2010 Census 3,111 60% increase 2016 Census estimate 3,817 23% increase Average annual rate 4.3% Surpassing
More informationTOWN OF GRAND FALLS WINDSOR
TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned
More informationRemote Sensing the Urban Landscape
Remote Sensing the Urban Landscape Urban landscape are composed of a diverse assemblage of materials (concrete, asphalt, metal, plastic, shingles, glass, water, grass, shrubbery, trees, and soil) arranged
More informationWORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING
WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING 1. Snow Removal Procedures Steven Lang 2. 2020 Budget Streets & Highways Tom Dankert
More informationCITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY
CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationWinter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works
Winter Weather Safety Tips From your friends at South Brunswick Township Department of Public Works South Brunswick Township Department of Public Works is committed to providing timely, efficient, and
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationof the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south.
Page 312 of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south. (Code 1980, 26-133; Code 2003, 22-267) Secs. 46-310
More informationORANGE COUNTY TRAFFIC COMMITTEE. COMMITTEE REPORT OF: February 15, 2018 ITEM B. Establish Time Period Parking Restriction
ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 4 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Parking Greenwich Lane and its Cul de sacs; Anaheim Islands; TB 768 C6 West Island Neighbors
More informationFocused Traffic Analysis for the One Lincoln Park Project
September 15, 2015 Mr. Bill Johnson Coldwell Banker 511 Sir Francis Drake Boulevard Greenbrae, CA 94904 Focused Traffic Analysis for the One Lincoln Park Project Dear Mr. Johnson; As requested, W-Trans
More informationAPPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE
DEPARTMENT OF DEVELOPMENT & PLANNING 825 Ohio Avenue - Lynn Haven, FL 32444 (850) 265-2961 - (850) 265-3478 APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE Deadline to submit is 30 days
More information225 Bush Street Suite 1700 San Francisco, CA phone fax
225 Bush Street Suite 1700 San Francisco, CA 94104 415.896.5900 phone 415.896.0332 fax www.esassoc.com memorandum date July 29, 2009 to from subject Craig Nikitas, San Francisco Planning Department Daniel
More informationCITY OF EAGLE LAKE SNOW PLOWING POLICY
CITY OF EAGLE LAKE SNOW PLOWING POLICY 1. INTRODUCTION The City of Eagle Lake believes that it is in the best interest of the residents for the City to assume basic responsibility for control of snow,
More information2267 N o r t h 1500 W C l i n t o n U T 84015
P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a
More informationEngineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )
Engineer's Report for the Main Street Business Area Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year 2008-09) Prepared under the provisions of the Benefit Assessment Act of 1982
More informationZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg
ZONING DITRICT REGULATION Table 4-2 Permitted Uses by Zoning Districts Agricultural Uses Horticulture P P P P P P P P P 39.06.002a Crop Production P P P 39.06.002a Type I Animal Production Type II Animal
More informationCITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015
CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationRe: Draft OPA 320 Recommended Amendments to Various Neighbourhood Policies Statutory Public Meeting to be held on Monday 16 November 2015
PG8.5.5 ANALOGICA George S. Belza Partner 9 Madeline Road Toronto, Ontario Canada M2N 2S7 T: 416 223 9584 F: 416 223 5665 E: belana@axxent.ca E-Mailed to: pgmc@toronto.ca Wednesday 04 November 2015 Planning
More informationCONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.
NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationWE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be
Q30001.pptx WE, THE UNDERSIGNED qualified voters of the municipality of Sioux Falls, the state of South Dakota, petition that the following ordinance be submitted to the voters of that municipality for
More informationHALFF 16196? TRAFFIC MANAGEMENT PLAN. Richardson ISD Aikin Elementary School Dallas, Texas North Bowser Road Richardson, Texas 75081
30280 16196? TRAFFIC MANAGEMENT PLAN Exhibit 572B Aikin Elementary School Planned Development District No. 572 Approved City Plan Commission October20, 2016 July 12, 2016 Prepared for HALFF AVO 31586 PHO1
More informationKEY: R-1 Low Density Residential. R-2 Medium Density Residential. R-3 High Density Residential. S-C Service Commercial. D-C Downtown Commercial
KEY: R-1 Low Density Residential R-2 Medium Density Residential R-3 High Density Residential S-C Service Commercial D-C Downtown Commercial M-C Medical Commercial H-I Heavy Industrial PARKING MATRIX A
More informationPlanning & Zoning Commission
Request Applicant Owner Zoning Location Attachments Subdivision of 50.03 acres of previously unplatted property to create one lot for the construction of a K-6 th Grade Education Village for Dickinson
More informationProposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement
Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement The scope of work that follows incorporates and covers
More informationLong Term Plan What is planned for Murchison?
Long Term Plan 2018-2028 What is planned for Murchison? 1.0 Introduction The following information provides an overview of significant projects Council has planned for the Murchison settlement in the Long
More information73-2 have been satisfied; and
RESOLUTION NO. R- 86-104 W'dEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in Chapter 163 and Chapter 125, Florida Statutes, is authorized and empowered
More informationCommittee Meeting November 6, 2018
Committee Meeting November 6, 2018 Agenda Where we are in the process Land Use Plan Transportation Element Housing & Neighborhoods Elements Next Steps Schedule November 6: Plan Elements December: Plan
More informationAGENDA CLAYTON BOARD OF ADJUSTMENT
AGENDA CLAYTON BOARD OF ADJUSTMENT APRIL 15, 2015 6:00 P.M. CLAYTON TOWN HALL 111 East Second Street, Clayton NC I. ROLL CALL II. III. IV. ANNOUNCEMENT OF QUORUM / VOTING MEMBERS ADJUSTMENTS TO AGENDA
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationNATHAN HALE HIGH SCHOOL PARKING AND TRAFFIC ANALYSIS. Table of Contents
Parking and Traffic Analysis Seattle, WA Prepared for: URS Corporation 1501 4th Avenue, Suite 1400 Seattle, WA 98101-1616 Prepared by: Mirai Transportation Planning & Engineering 11410 NE 122nd Way, Suite
More informationHistoric Cultural Properties Inventory (HCPI) Base Form (FORM 1)
Historic Cultural Properties Inventory (HCPI) Base Form (FORM 1) Historic Preservation Division, New Mexico Office of Cultural Affairs For HPD Office use only: HCPI No. District No. NRHP: SRCP: Criteria:
More informationTrip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945
Trip Generation Study: A 7-Eleven Gas Station with a Convenience Store Land Use Code: 945 Introduction The Brigham Young University Institute of Transportation Engineers student chapter (BYU ITE) completed
More informationReed School/Westover Library U USE PERMIT AMENDMENT. Staff Presentation to the County Board November 17, 2018
Reed School/Westover Library U-3175-07-1 USE PERMIT AMENDMENT Staff Presentation to the County Board November 17, 2018 Site Location 2 Background 1644 N. McKinley Road 1938: Walter Reed Elementary School
More informationSNOW CONTROL OPERATIONS
SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow
More informationTOWN OF BASALT SNOW MANAGEMENT PLAN
TOWN OF BASALT SNOW MANAGEMENT PLAN Introduction Snow management in the Town of Basalt is the responsibility of the Department of Public Works. The overall goal is the restoration of clear, passable pavement
More informationTOWN OF WINDSOR SNOW CONTROL PLAN
TOWN OF WINDSOR SNOW CONTROL PLAN 2013-2014 Revised 10/30/13 WCS Page 1 TOWN OF WINDSOR SNOW CONTROL PLAN GOAL One of the primary goals of the Public Works Department is to provide for the safe and orderly
More informationCritical Area Mapping Update Project St. Mary s County Town Hall April 8th, :30 p.m.
Critical Area Mapping Update Project St. Mary s County Town Hall April 8th, 2019 6:30 p.m. Critical Area Commission for the Chesapeake and Atlantic Coastal Bays St. Mary s County What Is the Critical Area
More informationSection 8 - OFF- STREET PARKING AND LOADING
Section 8 - OFF- STREET PARKING AND LOADING 8.1 Purposes All "structures" and "uses" shall be provided with a sufficient amount of off-"street" "parking" and "loading spaces" for employees, residents,
More information[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek
Community Charrette LINC Dallas [Leveraging & Improving Neighborhood Connections] Area E Cedar Creek 06.02.12 LINC Workshop Area E Area E has the unique distinction of at-grade frontage to the Trinity
More informationCVS Derwood. Local Area Transportation Review
CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011
More informationKING GEORGE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
GIS REPORT 2016 KING GEORGE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Background The GIS (Geographic Information System) coordinator was hired in 2001 to develop a GIS for King George County. Prior to
More informationCity of Camrose Winter Road Maintenance Policy
City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.
More informationDRAFT. Draft. 2 Analysis Exhibits
2.0 Analysis Exhibits This document builds on the technical background report. Augmenting the technical background report and presented on the following pages are several new or updated maps including:
More informationKING GEORGE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT
GIS REPORT 2017 KING GEORGE COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Background The GIS (Geographic Information System) manager was hired in 2001 to develop a GIS for King George County. Prior to 2001,
More informationAPPENDIX I - AREA PLANS
ROUTE 37 WEST LAND USE PLAN ROUTE 37 WEST LAND USE PLAN Recent land use decisions and development trends have drawn attention to the land within the Route 37 western by-pass area between Route 50 and
More informationSTORMWATER REPORT FRITO LAY SUBDIVISION NO. 3
STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses
More informationCOUNCIL POLICY BACKGROUND
COUNCIL POLICY Policy Title: Snow and Ice Control Policy Policy Number: TP004 Report Number: TTP2003-39, C2007-44, LPT2011-57 Approved by: City Council Effective Date: Interim policy approved 2009 December
More informationMEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT. Hutson, Chair Dillard Alberty Iski, D.A. Charney, Vice Chair Butler West, Co.
COUNTY BOARD OF ADJUSTMENT MINUTES of Meeting No. 319 Tuesday, December 19, 2006, 1:30 p.m. County Commission Room Room 119 County Administration Building MEMBERS PRESENT MEMBERS ABSENT STAFF PRESENT OTHERS
More informationPresented by: Bryan Bloch GIS Specialist DNREC Division of Watershed Stewardship
Presented by: Bryan Bloch GIS Specialist DNREC Division of Watershed Stewardship Bryan Hall, AICP Sussex County Circuit Rider Planner, Office of State Planning Coordination, OMB November 19, 2012 UD Sustainable
More informationCUSTER COUNTY SNOW REMOVAL PROCEDURES
CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial
More informationTown of Georgetown Founded Incorporated 1912
SPECIFICATION FOR SNOW REMOVAL & ICE CONTROL 7.1 Kilometers of Undesignated Streets Season 2017-18 SNOW REMOVAL 1. Snow removal to be carried out before regular business hours to allow normal movement
More informationBACKGROUND AND PROJECT DESCRIPTION
June 7, 2017 Applicant: Murdock Builders Location: Approximately 600 West 1200 North Prepared by: Brian Tucker Public Hearing Item: Yes Zone: A-2, RA-2 ATTACHMENTS 1. Findings for Decision. 2. Resolution
More informationCITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised
CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY Revised 12-7-17 In order for a snow and ice removal program to be effective, a written policy must be established. This policy will guide personnel of the Street
More informationUA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation
#1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1
More informationORDINANCE NO
ORDINANCE NO. 174421 VAN NUYS CENTRAL BUSINESS DISTRICT COMMUNITY DESIGN OVERLAY PERMANENT [Q] CONDITIONS ORDINANCE An ordinance AMENDING Section 12.04 of the Los Angeles Municipal Code by amending the
More informationTAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT
LAWRENCE SIGN CODE BOARD OF APPEALS AGENDA JULY 5, 2018 6:35 P.M., CITY COMMISSION MEETING ROOM, FIRST FLOOR OF CITY HALL, SIXTH AND MASSACHUSETTS STREET, LAWRENCE, KANSAS CALL THE MEETING TO ORDER TAKE
More informationGoodlette/Pine Ridge Commercial Infill Subdistrict. Exhibit IV.B Amendment Language. Revise the FUTURE LAND USE ELEMENT
Revise the FUTURE LAND USE ELEMENT TABLE OF CONTENTS * FUTURE LAND USE MAP SERIES * Future Land Use Map * Mixed Use & Interchange Activity Centers Maps * Properties Consistent by Policy (5.9, 5.10, 5.11,
More informationWELCOME Lake Wabukayne OPEN HOUSE
WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive
More informationAPPENDIX 1 LITTLE EGYPT FROM THE AIR
APPENDIX 1 LITTLE EGYPT FROM THE AIR FIGURE 1. In this 1930 City of Dallas aerial photo, the land surrounding Little Egypt is seen as cultivated fields and agricultural structures. The Hill property is
More informationMap Reading 101: Using and Reading Maps and Plans
Map Reading 101: Using and Reading Maps and Plans A Key Skill for Land Use Commissioners Paula Stahl, LLA, ASLA, AICP Land Use Educator Green Valley Institute Land Use Academy 1 How most of us react to
More informationNORTH HUNTINGDON TOWNSHIP PLANNING COMMISSION REGULAR MEETING Monday, May 1, 7:00 P.M Center Highway, North Huntingdon, PA 15642
NORTH HUNTINGDON TOWNSHIP PLANNING COMMISSION REGULAR MEETING Monday, May 1, 2017 @ 7:00 P.M. 11279 Center Highway, North Huntingdon, PA 15642 CALL TO ORDER Mr. Chapman called the meeting to order at 7:00
More informationPlanning Commission Staff Report
Planning Commission Staff Report April 7, 2016 PROJECT: Dutch Bros Coffee at Sheldon FILE: EG-15-042 REQUEST: Conditional Use Permit (CUP) and Major Design Review Amendment (DR) LOCATION: 8821, 8829, 8835,
More informationPhilip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division
Date June 3, 2015 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division Stacy Bradley,
More informationTOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES
TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter
More informationAUTHORITY: Town Council POLICY NUMBER:
TOWN OF RAINBOW LAKE POLICY TITLE: Town Snow Clearing Policy AUTHORITY: Town Council POLICY NUMBER: 2009-04 APPROVAL DATE: EFFECTIVE DATE: Policy Statement: The purpose of this policy is to regulate a
More informationSnow and Ice Removal
Policy # 6.6 Procedure # - Replaces 5.10 & 5.10A Revises - Date Approved February 10, 2014 Method of Approval Resolution #17 1. PRINCIPLES The City of Dauphin desires to maintain the City streets, lanes,
More informationFigure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area
Figure 8.2a Variation of suburban character, transit access and pedestrian accessibility by TAZ label in the study area Figure 8.2b Variation of suburban character, commercial residential balance and mix
More informationSNOW CREW CALL IN SHEET
Western State Colorado University Snow Removal The purpose of the Campus Snow Removal Information is to educate the campus, community as to the standard operating procedures used in the control of winter
More informationCity of Rhinelander Snow and Ice Policy
City of Rhinelander Snow and Ice Policy General: Policy: Procedure: The ability to react promptly and decisively to varying winter weather conditions with regard to snow removal and ice control on city
More informationWaikato District Plan. Plan Change document
Waikato District Plan Plan Change 17 Ngaruawahia and Surrounding Villages Stage One Proposed Rezoning Plan Change document Throughout this document text OR maps referred to in the text underlined in red
More informationCITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3
Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION
More informationOXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN
OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth
More informationCOUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)
COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA 95403 (707) 565-1900 FAX (707) 565-1103 DATE : TO: FROM: SUBJECT: July 21, 2009 at 2:30 p.m. Board of Supervisors
More informationGIS Monroe Geographic Information System March 14, 2018
GIS Monroe Geographic Information System March 14, 2018 Goals Maintain Enterprise/County-wide geo-database Increase spatial accuracy of data Build and acquire more data layers Increase use of GIS; as another
More informationSTATE OF VERMONT SUPERIOR COURT ENVIRONMENTAL DIVISION Environmental Division Unit Docket No Vtec
STATE OF VERMONT SUPERIOR COURT ENVIRONMENTAL DIVISION Environmental Division Unit Docket No. 41-4-17 Vtec Island Arts CU DECISION ON THE MERITS Decision on the Merits The Champlain Island Celebration
More informationAPPENDIX I: Traffic Forecasting Model and Assumptions
APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan.
More informationHow the Federal Government Uses GIS to Solve Problems. Mark McCart GeoBase Program Administrator Whiteman AFB
How the Federal Government Uses GIS to Solve Problems Mark McCart GeoBase Program Administrator Whiteman AFB Northeast Regional GIS Workshop Hannibal, Missouri 22-MAY-2014 Items to be Covered GeoBase Program
More informationNoise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario
Noise Feasibility Study Proposed Residential Development (Infill) 747 Liverpool Road Pickering, Ontario Prepared for: Madison Liverpool Limited 369 Rimrock Road Toronto, Ontario, M3J 3G2 Prepared by Victor
More informationTown of Davie B-2 (Community Business) Zoning:
Town of Davie B-2 (Community Business) Zoning: Commercial Conservation Districts: These districts are intended to preserve the character of existing nonresidential or commercial areas, neighborhoods and
More informationCITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC
PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC-15-0005 I. GENERAL INFORMATION A. APPLICANT: City of Papillion 122 East Third St. Papillion, NE 68046 B. LEGAL DESCRIPTION: See
More informationSHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP 6 Storey Condominium Louis Saint Laurent Ave & Leger Way Milton, Ontario
SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP 6 Storey Condominium Louis Saint Laurent Ave & Leger Way Milton, Ontario KNY FILE # 15145 Prepared by: Brad Ferguson & Wayne Harrison KNYMH INC.
More informationH IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016
! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient
More information