1 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018
2 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses approximately 76 acres a replat of Block C, Replat of Seymour Subdivision (18 acres), and a replat of Lot 1, Block A, Frito Lay Subdivision No. 2 (58 acres). The 58 acre portion is in the south side of the plat, and it is currently undeveloped. There are no current plans or configurations for the development of this portion of the plat. The 18 acre portion is on the north side of the plat, and partially developed with a parking lot. There are plans for development of this portion of the plat. The project will be an addition to the west side of the existing Frito Lay facility south of I-335 (Kansas Turnpike) and southwest of the west termination of SW 42 nd Street. Initially, there are plans for a large warehouse, and ultimately there are plans for several warehouses and truck/trailer parking. The plat submission is accompanied by an application for A Planned Unit Development for Frito Lay Subdivision No. 3. This application shows the location of the initial warehouse addition, as well as the planned additions to the south. Also attached to this report is a schematic sketch of the planned build out. There is a stream on the site. It begins on the west side of the site, near the southeast corner of the 58 acre parcel. From there, it drains to the northwest, dividing the 18 acre parcel to the north from the 58 acre parcel to the south. Once the stream meets with the west line of the plat boundary, it orients north and runs along the west side of the 18 acre parcel. Land within the 18 acre parcel drains from east to west, and drains into the stream. Land within the 58 acre parcel drains to the north and northwest. Some of the runoff enters the same stream, although some exits the site along the west side of the proposed subdivision. The stream exits the plat near its northwest corner, and flows under I335 (Kansas Turnpike) in a large concrete box. For the south 58 acres, because this area drains towards a tributary of the Shunganunga Creek, it is anticipated that stormwater detention is required. And also, because the land is currently undeveloped, it is anticipated that stormwater quality measures will be required for any future development. The size and details of those features would be designed and submitted for review at the time of site plan development, if the 58 acre parcel were to be developed in the future. For the north 18 acres, the development plan is known. This portion of the site also drains towards the Shunganunga Creek and is partially undeveloped; and stormwater detention/stormwater quality is planned. This report will give further details on the size and configuration of those features. b. Excluding planned ROW, the tract is 17.1 acres in size. The planned warehouses cover 3.8 acres, and the planned pavement areas cover 5.7 acres for an overall future runoff factor of In the existing condition, 1.2 acres is paved, with a site runoff factor of 0.34.
3 II. Drainage Discussion a. The table below shows the Future vs Existing runoff conditions. FUTURE VS EXISTING Area c Tc k 100 I 2 I 10 I 100 Q 2 Q 10 Q 100 (ac) (min) (in/hr) (in/hr) (in/hr) (cfs) (cfs) (cfs) Existing Future Stormwater detention will be required to reduce the future flows. b. Attached to this report are two worksheets from the MARC Manual Worksheet 1A and Worksheet 2. Worksheet 1A assess the total disturbed area, total impervious in the existing and future condition, total treatment area, and required level of service. Worksheet 2 assesses the value rating of a planned extended dry detention facility, with a vegetated filter strip. The value rating provided by this BMP meets the level of service required on Worksheet 1A. c. Attached are floodrouting worksheets for the site 2, 10, and 100 year. The detention facility utilizes a small (6 ) orifice as the outlet structure. This small outlet allows the pond to take approximately 40 hours to fully drain, in order to qualify for extended dry detention as defined by the MARC Manual. The easterly side of the facility will utilize a vegetated filter strip for overland flows which enter the pond. The extended dry detention facility coupled with the vegetated filter strip should provide an adequate value rating to provide stormwater quality, as defined in the MARC Manual. The extremely long detention time results in very low outflow rates less than 2 cfs for the 100 year event. III. Conclusions a. Conclusion: The proposed development will not increase the total flow to the existing stream or box culvert under I-335. The extended detention and filter strip should provide the required stormwater quality. b. The person responsible for the maintenance of the pond will be the owner or owner s representative currently the facilities manage for the Frito Lay facility. The Parcel ID Numbers are and c. The development will encroach into an area designated as Zone A on FEMA Panel 20177C0302E. This area of the stream has not been subject to a detailed study, and no Floodway or Base Flood Elevations have been published on the map panel. Bartlett & West, Inc. has acquired the HECRAS Flood Model for this stream from the Kansas Department of Agriculture Division of Water Resources (DWR). It does include Approximate Base Flood Elevations (BFA). Prior to obtaining a building permit for a
4 building/parking lot that would include fill in the Zone A, the owner shall certify a No- Rise of these BFAs. It is anticipated that discharging fill on the easterly side of the stream will have to be accompanied by removal of material on the westerly side on the stream, in order to certify a No-Rise. The attached exhibit shows the approximate areas of encroachment into the Zone A, as well as the anticipated area of excavation on the westerly bank. The fill and cut areas will be re-modeled in the HECRAS flood model, and the revised model, along with No-Rise certification, will be submitted to DWR for approval/evaluation by FEMA, prior to obtaining a building permit. Steven E. LaCasse, P.E.
5 SCHEMATIC SITE LAYOUT
6 WORKSHEET 1A FRITO LAY SUBDIVISION NO. 3 Proposed Building Addition and Parking Existing Parking Building and Parking % APWA / MARC BMP Manual 4-17 October 2012
7 WORKSHEET 2 Bartlett & West Project: FRITO LAY N0. 3 Project No: Date: 5/4/2018 WORKSHEET 2: DEVELOP MITIGATION PACKAGE(S) THAT MEET THE REQUIRED LS 1. Required LS (From Worksheet 1 or 1A, as Appropriate) 87.8 Note: Various BMPs may alter CN of proposed development and LS; recalculate both if applicable. 2. Proposed BMP Option Package No. 1 Proposed Site Area = 17.1 ac. Cover/BMP Description Area 1 - Vegetated Filer Strip and Extended Dry Detention VR from Table 2 or Table Treatment Area (acres) (Treatment Area x VR) Total Treatment Area 2 Total LS Refer to Mitigation Instructions and Tables 2 and 3 as appropriate when determining VR. Total treatment area cannot exceed 100 percent of the actual site area. Meets Required LS (Yes/No)? YES (If No, or if additional options area being tested, proceed below.)
8 FLOODROUTING 2 YEAR STORAGE ROUTING TABLES wo # LOCATION: Frito Lay No. 3 BY: SEL ORIFICE (in): 6.00 STORM (yr): 2 Tc (hrs): dt (hrs) Qp: STORAGE - OUTFLOW RELATIONSHIP Surface Ele. Head Discharge (cfs) Storage (ac ft) 2s/dt (cfs) 2s/dt + O (cfs) STORAGE - INDICATION ROUTING TABLE t/tp Q/Qp Time (hrs) Inflow (cfs) 2s/dt - O (cfs) 2s/dt + O (cfs) Outflow (cfs)
9 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E Peak Outflow (cfs): 1.0 Surface Elevation (ft): Storage (ac ft):
10 FLOODROUTING 10 YEAR STORAGE ROUTING TABLES wo # LOCATION: Frito Lay No. 3 BY: SEL ORIFICE (in): 6.00 STORM (yr): 10 Tc (hrs): dt (hrs) Qp: STORAGE - OUTFLOW RELATIONSHIP Surface Ele. Head Discharge (cfs) Storage (ac ft) 2s/dt (cfs) 2s/dt + O (cfs) STORAGE - INDICATION ROUTING TABLE t/tp Q/Qp Time (hrs) Inflow (cfs) 2s/dt - O (cfs) 2s/dt + O (cfs) Outflow (cfs)
11 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E Peak Outflow (cfs): 1.3 Surface Elevation (ft): Storage (ac ft):
12 FLOODROUTING 100 YEAR STORAGE ROUTING TABLES wo # LOCATION: Frito Lay No. 3 BY: SEL ORIFICE (in): 6.00 STORM (yr): 100 Tc (hrs): dt (hrs) Qp: STORAGE - OUTFLOW RELATIONSHIP Surface Ele. Head Discharge (cfs) Storage (ac ft) 2s/dt (cfs) 2s/dt + O (cfs) STORAGE - INDICATION ROUTING TABLE t/tp Q/Qp Time (hrs) Inflow (cfs) 2s/dt - O (cfs) 2s/dt + O (cfs) Outflow (cfs)
13 E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E Peak Outflow (cfs): 1.7 Surface Elevation (ft): Storage (ac ft):
14 18 ACRE PARCEL STORM WATER EASEMENT POND TOP ELEVATION= FLOW TOWARDS STREAM BORROW AREA DRAINAGE EXHIBIT FRITO LAY SUB. NO.3 TOPEKA, KS Drawing Name: W:\Proj\15000\15400\ \Documents\Reports\Drainage\Drainage Exhibit.dwg Layout Name: Layout1 Plotted By: RCP00722 Plotted on: 5/4/ :00:54 AM INLET WITH 6" ORIFICE Z MA ON P# E A 20 PE 17 R 7C FIR 03 M 02 E FLOW TOWARDS STREAM 58 ACRE PARCEL 0 400' SCALE: 1" = 400' FLOW OFFSITE DESIGNED BY: SEL DRAWN BY: RCP APPROVED BY: SEL PROJ NO: SCALE: AS NOTED DATE: MAY 2018 SHEET NUMBER 1 OF 1
Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)
Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread
More informationARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS
ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example
More informationWATER MANAGEMENT REPORT FOR PAGE ESTATES
WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationCity of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design
City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area
More informationDRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE
More informationUTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO
UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215
More informationBRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT
BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital
More informationSTORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect
STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)
More informationPARADIGM ODP FORT COLLINS, CO 80525
DRAINAGE REPORT PARADIGM ODP FORT COLLINS, CO 80525 Prepared For: Paradigm Properties, LLC 2186 Knoll Drive Ventura, CA 93003 Prepared By Coffey Engineering & Surveying 4045 St. Cloud Drive, Suite 180
More informationCity of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229
More informationWoodford County Erosion Prevention Plan and Permit. Application #
Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationHydrology and Hydraulics Design Report. Background Summary
To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics
More informationSeptember 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report
September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationSection 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationPreliminary Hydraulic Report
Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This
More informationHydrology Study Report
Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology
More informationCITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC
PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC-15-0005 I. GENERAL INFORMATION A. APPLICANT: City of Papillion 122 East Third St. Papillion, NE 68046 B. LEGAL DESCRIPTION: See
More informationTemplate for Sediment and Erosion Control Plan General Instructions. Section Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationD. B. G R A Y E N G I N E E R I N G I N C.
STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R
More information3.11 Floodplains Existing Conditions
Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales
More informationAdvanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS
Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.
More informationContinuing Education Course #101 Drainage Design with WinTR-55
1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the
More informationAPPENDIX B DRAINAGE REPORT
APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,
More informationStormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO
88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,
More informationHOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:
HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI Project No.
More informationChapter 10 - Sacramento Method Examples
Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer
More informationINTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS
INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic
More informationEROSION CONTROL NARRATIVE
EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment
More informationTemplate for Sediment and Erosion Control Plan General Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationFINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO
FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905
More informationSediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids
Concrete Sustainability Conference April 14 th 2010, Tempe, AZ Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological l Performance and Suspended Solids Discharge Luis A. Mata,
More informationCITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015
CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1 ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015 AGENCY: City of Perris PROJECT: Flood Control Maintenance District No. 1 TO: City Council
More informationCoal Combustion Residuals Unit Inflow Design Flood Control System Plan
Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:
More informationWQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4
These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationMIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:
MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite
More informationHYDROLOGY REPORT Tentative Tract No. 5978
ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618
More informationHISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)
HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:
More informationCITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011
CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1 ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011 AGENCY: City of Perris PROJECT: Flood Control Maintenance District No. 1 TO: City Council
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
Gates TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: Gates Road Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction Stormwater
More informationProclaiming Certain Lands as Reservation for the Confederated Tribes of the
This document is scheduled to be published in the Federal Register on 11/05/2018 and available online at https://federalregister.gov/d/2018-24174, and on govinfo.gov [4337-15] DEPARTMENT OF THE INTERIOR
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationCONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.
NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July
More informationPENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:
More informationAPPENDIX B WORKSHEETS & EXHIBITS
APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions
More informationDecember 16, Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637
December 16, 2015 Mr. Lee Hughes Southwest Florida Water Management District Tampa Service Office 7601 Highway 301 North Tampa, FL 33637 RE: Response to SWFWMD Supplemental Information Request Dear Mr.
More informationFinal Drainage Report
Final Drainage Report Expo Rail Operations and Maintenance Facility Santa Monica, California Prepared for: Exposition Metro Line Construction Authority Prepared by: W2 Design, Inc. 50 S. De Lacey Avenue
More informationSediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources
Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable
More informationThe effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design
Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention
More informationDAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00'
DAVID NOEL KELLY CIVIL David Noel Kelly 2014.07.22 10:24:14-04'00' TABLE OF CONTENTS Stormwater Management Summary Checklist for Stormwater Report Illicit Discharge Statement Runoff Summary Existing Conditions
More informationTechnical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:
Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management
More informationSubmitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226
RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin
More informationAppendix E Guidance for Shallow Flooding Analyses and Mapping
Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding
More informationMonitoring Considerations and Costs
Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
Gates TETRA TECH, INC. By: RH Date: 11/11/2016 Subject: Gates Road Checked By: JB Date: 11/13/2016 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationYELLOWSTONE RIVER FLOOD STUDY REPORT TEXT
YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294
More informationSTORMWATER DESIGN CALCULATIONS
STORMWATER DESIGN CALCULATIONS REF : C7011-2390 AT 19a-23 MEMORIAL AVENUE BLACKWALL FOR MR KERR Contents 1.0 Detention System Requirements 1.1 Storage-Area calcs. 1.2 Data Files for Pre & Post Developed
More informationCaledon Villas Corporation
Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential
More informationThis site will utilize an infiltration berm to manage the two-year/24-hour volume increase.
High Street TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: High Street Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction
More informationRock & Aggregate Drop Inlet Protection
Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils
More informationStage Discharge Tabulation for Only Orifice Flow
Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6
More informationAPPENDIX A: EROSION & SEDIMENT CONTROL FORMS
APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL
More informationSummary of Legal Descriptions
Perimeter Descriptions Bounds Descriptions - perimeter descriptions without a direction of travel. Metes Descriptions - perimeter descriptions with a direction of travel described by a series of measurements.
More informationSERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017
SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &
More informationLOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationWATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO
WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO PROJECT NO. 181710214 Prepared for: CPR ENTITLEMENTS 31 N. TEJON, SUITE 500 COLORADO SPRINGS, CO 80903 719.377.0244 Prepared by: STANTEC
More informationVillages at Riverdale Thornton, CO
FINAL UTILITY REPORT Villages at Riverdale Thornton, CO October 14, 216 Revised: March 29, 217 JN: 1539 Prepared for: PCS Group, Inc. 11 16 th Street #3 B-18 Denver, CO 8265 P: 33.531.495 Prepared by:
More informationDrainage Analysis. Appendix F
Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection
More informationSediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.
Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff
More informationProject Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details
Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow
More information73-2 have been satisfied; and
RESOLUTION NO. R- 86-104 W'dEREAS, the Board of County Commissioners, as the governing body, pursuant to the authority vested in Chapter 163 and Chapter 125, Florida Statutes, is authorized and empowered
More informationWELCOME Lake Wabukayne OPEN HOUSE
WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive
More information2267 N o r t h 1500 W C l i n t o n U T 84015
P l a n n i n g C o m m i s s i o n M e m b e r s C h a i r J a c o b B r i g g s V i c e C h a i r G a r y T y l e r T o n y T h o m p s o n J o l e n e C r e s s a l l A n d y H a l e D e r e c k B a
More informationPRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK
PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation
More informationSAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION
DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS
More informationD.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough
Stormwater Management Report City of Peterborough P-20-12 Parkway Corridor Class Environmental Assessment Jackson Park Parkhill Road West to Chemong Road D.M. Wills Project No. 12-5061 D.M. Wills Associates
More informationLOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON
LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,
More informationExhibit A Description of Services Section 37 Floodplain Storage Design
Exhibit A Description of Services Section 37 Floodplain Storage Design Singhofen & Associates, Inc. (SAI, Consultant) is pleased to present this scope of services to the City of Palm Coast Engineering
More informationSTORMWATER MANAGEMENT REPORT
STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900
More informationSTREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX
STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,
More informationChapter 7 Mudflow Analysis
Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain
More informationTable of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti
Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collection... 2 Treatment... 3 Storage... 3 Disposal... 4 Soils...
More informationAPPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE
APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different
More informationMap Reading 101: Using and Reading Maps and Plans
Map Reading 101: Using and Reading Maps and Plans A Key Skill for Land Use Commissioners Paula Stahl, LLA, ASLA, AICP Land Use Educator Green Valley Institute Land Use Academy 1 How most of us react to
More informationEastlake Assited Living & Memory Care
UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.
More informationPreliminary BMP Calculations
Preliminary BMP Calculations 1 Preliminary BMP Calculations 2 Ohio Department of Transportation 1 Preliminary BMP Calculations 3 Draw drainage basin boundary perpendicular to contours Look for conveyance
More informationBACKGROUND AND PROJECT DESCRIPTION
June 7, 2017 Applicant: Murdock Builders Location: Approximately 600 West 1200 North Prepared by: Brian Tucker Public Hearing Item: Yes Zone: A-2, RA-2 ATTACHMENTS 1. Findings for Decision. 2. Resolution
More information3301 East 120 th Avenue Assited Living & Memory Care
UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite
More informationVILLAGE OF ORLAND PARK
14700 Ravinia Avenue Orland Park, IL 60462 www.orland-park.il.us Ordinance No: File Number: 2013-0239 AN ORDINANCE PROPOSING THE ESTABLISHMENT OF SPECIAL SERVICE AREA NUMBER 2 IN THE, AND PROVIDING FOR
More informationSuitable Applications Sediment traps should be considered for use:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationVILLAGE OF ORLAND PARK
14700 Ravinia Avenue Orland Park, IL 60462 www.orland-park.il.us Ordinance No: File Number: 2013-0373 AN ORDINANCE ESTABLISHING SPECIAL SERVICE AREA NUMBER 3 STATE OF ILLINOIS, COUNTIES OF COOK AND WILL
More informationFINAL UTILITY REPORT Creekside Thornton, CO
FINAL UTILITY REPORT Creekside Thornton, CO March 4, 216 Revised: June 27, 216 JN: 1539 Prepared for: HW Sodbusters, LLC 2733 E. Parleys Way, Suite 3 Salt Lake City, UT 8419 P: 81.485.777 Prepared by:
More information******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF
Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow
More informationFor Sale on Bids. Open House By Appointment
For Sale on Bids Written Bid Deadline: Friday, September 7, by 12:00 P.M. Noon 52+/- Acres & Storage Facility Grand Forks, ND Property Location: Conveniently located off Interstate 29 and North Washington
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012
STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction
More informationCITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA
CITY OF PORTLAND, TEXAS SERVICE PLAN FOR ANNEXATION AREA Location and Acreage Approximately 1,863 acres of land in San Patricio County, located in the ETJ northwest of the existing City Limits. Metes and
More information