1 Final Drainage Report Expo Rail Operations and Maintenance Facility Santa Monica, California Prepared for: Exposition Metro Line Construction Authority Prepared by: W2 Design, Inc. 50 S. De Lacey Avenue Suite 100 Pasadena, CA /28/2013

2 Expo Rail Operations and Maintenance Facility Final Drainage Report DELARATION OF RESPONSIBLE CHARGE I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT. THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. TONY K. WONG R.C.E DATE: 1/28/2013 Exposition Metro Line Construction Authority 1 W2 Design, Inc.

3 Expo Rail Operations and Maintenance Facility Final Drainage Report TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE OF THIS REPORT 3 PROJECT OVERVIEW... 3 PURPOSE OF PROJECT 3 SITE PLAN 4 PROJECT LOCATION 5 DESCRIPTION OF WATERSHED 5 FEMA 7 DESCRIPTION OF EXISTING SITE 8 HYDROLOGY... 9 METHODOLOGY 9 HYDROLOGIC CALCULATIONS 11 HYDRAULICS 16 SUMMARY 18 REFERENCES 19 APPENDICES A. PRE-DEVELOPMENT HYDROLOGY MAP 21 B. POST-DEVELOPMENT HYDROLOGY MAP 22 C. 50-YEAR, 24-HOUR ISOHYET BEVERLY HILLS 23 D. SANTA MONICA DRAINAGE MAP 24 E. STORM DRAIN DESIGN WORKSHEET Error! Bookmark not defined. F. LA COUNTY ALLOWABLE STORM WATER DISCHARGE 26 G. EXISTING 33-INCH STORM DRAIN AS-BUILT 27 H. STORM DRAIN PLAN AND PROFILES 28 TABLES TABLE 1 - DESIGN FREQUENCY FOR TYPE OF FACILITY TABLE 2 - PRE-DEVELOPMENT HYDROLOGY TABLE 3 - POST-DEVELOPMENT HYDROLOGY- INDIVIDUAL AREA METHOD FIGURES FIGURE 1 - SITE PLAN... 4 FIGURE 2 - USGS 7.5' QUADRANGLE - BEVERLY HILLS... 5 FIGURE 3 - WATERSHED AND RUNOFF PATH... 6 FIGURE 4 - FEMA FIRMETTE... 7 FIGURE 5 - EXISTING SITE... 8 FIGURE 6 - PRE-DEVELOPMENT HYDROLOGY FIGURE 7 - POST-DEVELOPMENT HYDROLOGY FIGURE 8-50-YR 24-HR ISOHYET Exposition Metro Line Construction Authority 2 W2 Design, Inc.

4 INTRODUCTION PURPOSE OF THIS REPORT Expo Rail Operations and Maintenance Facility Final Drainage Report This Drainage Report details the proposed management of storm water for the Exposition Light Rail Operations and Maintenance Facility, in Santa Monica. The capture, collection and conveyance of storm water designed in this report is intended to mitigate flooding and keep the facility running during storm events. Drainage has been designed so that water will not flow or back up into track structure or Buildings. This report and the design within are in accordance with Metro Design Criteria and Los Angeles County Standards. PROJECT OVERVIEW PURPOSE OF PROJECT This project is part of the planned project by Exposition Construction Authority (Expo) and Los Angeles County Metropolitan Transportation Authority (Metro) to bring rail service to the Exposition Transit Corridor. The project will construct a light rail operations and maintenance facility. This facility will be located on the west end of the corridor in the City of Santa Monica. The facility will provide essential maintenance and operational capabilities for the trains (See Figure 1). The trains are light rail trains powered by an overhead contact system (OCS). The maintenance facility will include a main building that will house offices and the main repair bays for the site. A secondary building will include the wheel truing and blow down operations. A third building, the wash bay, is the train washing facility. A fourth is the cleaning platform for the cleaning of the trains interiors. The facility will also include track storage for 40 train cars. In the early hours of the morning, trains will be dispatched for service and return late in the evening to the yard. Exposition Metro Line Construction Authority 3 W2 Design, Inc.

5 Expo Rail Operations and Maintenance Facility Final Drainage Report Exposition Metro Line Construction Authority 4 W2 Design, Inc.

6 PROJECT LOCATION Expo Rail Operations and Maintenance Facility Final Drainage Report The project is located at Stewart Street and Exposition Boulevard, in the City of Santa Monica, Los Angeles County. The main driveway will continue from the central part of the site out to Centinela Avenue through the existing EXPO rail right of way corridor. The main entrance driveway on Centinela Avenue will be located within the City of Los Angeles. The two cities, City of Santa Monica and City of Los Angeles, share a border along the westerly right of way of Centinela Drive. The project can be found within Beverly Hills USGS 7.5' quadrangle at N , W See Figure 2- USGS 7.5' Quadrangle - Beverly Hills. CITY OF SANTA MONICA PROJECT LOCATION CITY OF LOS ANGELES DESCRIPTION OF WATERSHED FIGURE 2 - USGS 7.5' QUADRANGLE - BEVERLY HILLS The project exists within the Sawtelle Channel Drainage Area of the Ballona Creek Sub-watershed (HUC ) which is within the Santa Monica Bay Hydrologic Unit (HUC ). The Ballona Creek Subwatershed is 81,979 acres. The existing drainage from the site is collected in a 24-inch storm drain in Exposition Boulevard and conveyed east to a 51-inch storm drain in Dorchester Avenue that continues south. From Dorchester, the line continues to a 78-inch storm drain in Virginia Avenue that proceeds east to Warwick Avenue. At Warwick Avenue, the Exposition Metro Line Construction Authority 5 W2 Design, Inc.

7 Expo Rail Operations and Maintenance Facility Final Drainage Report storm drain is a 7-foot by 5.83 foot box culvert that proceeds south to Pico Boulevard. At Pico Boulevard, the storm drain heads east to Centinela Avenue. The storm drain follows Centinela Avenue for one block to Pearl Street then proceeds east on Pearl Street. The storm drain proceeds to Sawtelle Channel then to the Sepulveda Channel. The Sepulveda Channel connects to the Ballona Creek Estuary. Ballona Creek outlets into the Pacific Ocean at Marina Del Rey. See Figure 3 Watershed and Runoff Path and Appendix D Santa Monica Drainage Map. PROJECT LOCATION DRAINAGE PATH FIGURE 3 - WATERSHED AND RUNOFF PATH Exposition Metro Line Construction Authority 6 W2 Design, Inc.

8 FEMA Expo Rail Operations and Maintenance Facility Final Drainage Report The Special Flood Hazard Areas (SFHA) for the City of Santa Monica are outlined in the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM), dated September 26, Upon reviewing Map No C1590F, the proposed site lies within FEMA zone designated as Zone X (unshaded). This area is of minimal flood hazard and outside the special flood hazard area. Zone X shaded has 0.2 percent annual chance to flood (500 year storm event). Zone X unshaded has less than a 0.2 percent annual chance to flood (500 year storm event )(see Figure 4 FEMA Firmette. ) PROJECT LOCATION FIGURE 4 - FEMA FIRMETTE Exposition Metro Line Construction Authority 7 W2 Design, Inc.

9 Expo Rail Operations and Maintenance Facility Final Drainage Report (E) CATCH BASIN (E)33 SD (E) Underground Infiltration Tank (E) POC (E) CURB INLETS (E) POC- Curb Outlet (E)24 SD (E) CURB INLETS FIGURE 5 - EXISTING SITE DESCRIPTION OF EXISTING SITE The existing site consists of 9.8 acres of light industrial buildings and parking areas. The site is completely developed, resulting in an existing area that is 93% impervious. The site drains to catch basins located throughout the parking areas. The existing Verizon site drainage connects via a 24 storm drain to the existing 33-inch storm drain that runs north-south approximately 15 feet east of the easterly property line within a drainage easement in the adjacent property (See Figure 5). The Santa Monica Community College Parking Lot drains to an underground infiltration basin that overflows to Exposition Boulevard through a sidewalk underdrain and flows to curb inlets in Exposition Boulevard at Yorkshire Avenue. The site is located on the 50-year 24-hour Isohyet hydrologic map 1-H1.17-Beverly Hills found in the LA County Hydrology Manual (see Figure 8 in). This map indicates that the site is located in soil zone 16 (Yolo Loam) with a 50-year 24- hour isohyet of 6.1 inches. Exposition Metro Line Construction Authority 8 W2 Design, Inc.

10 HYDROLOGY METHODOLOGY Expo Rail Operations and Maintenance Facility Final Drainage Report Stormwater runoff can be calculated using two primary methods per the Los Angeles County Hydrology Manual 2006(HM). One is the Rational Method and the other is the Modified Rational Method. Table provides a brief description of the uses and limitations of each method. 1 Method Rational Method Modified Rational (MODRAT) Use / Limitations Use: For drainage areas 40 acres or less; finds the peak flow rate for any frequency design storm Limitations: Does not create hydrographs or determine runoff volumes. Area limited to approximately 40 acres. Use: For any size watershed; for any combination of laterals; for any combination of developed and undeveloped drainage areas; to create hydrographs and runoff volumes at specified locations; to find peak subarea and mainline flow rates; recommended method for systems incorporating pumping or water impoundment. Limitations: Underestimates volumes in rural areas when interflow and baseflow add to the runoff volume. For this project the Modified Rational Method is used. The Modified Rational Method is defined by the equation Q=CIA. Where: Q = Runoff, cfs C = Runoff Coefficient I = Rainfall intensity, in/hr A = Watershed Area, acres Design Steps Using the Rational Method: 1) Determine Watershed Area: A watershed is defined as the surface area that contributes runoff to a common point. Use site specific topographic survey or USGS quadrangle maps 2) Determine Proposed Drainage: A preliminary grading and drainage plan is necessary to determine post-development conditions. If the site is large, it can be divided up into sub-watersheds. Plans will strategically locate drainage structures and piping. 3) Determine the Time of Concentration: The time of concentration (TC) is the time it takes for rain, in the most hydrologically remote part of the watershed, to reach the outlet. Using rainfall duration equal to the TC ensures that the runoff from the entire subarea is contributing flow at the 1 Table Taken from the The Los Angeles County Hydrology Manual Exposition Metro Line Construction Authority 9 W2 Design, Inc.

11 Expo Rail Operations and Maintenance Facility Final Drainage Report outlet. MODRAT requires a time of concentration in order to calculate intensities for use with the rational equation. The kinematic wave theory is a method accepted by Los Angeles County Public Works to calculate the time of concentration, T C. Use of the kinematic wave theory to calculate the T C requires separating the longest flow path into two parts: overland flow and conveyance flow. Equation demonstrates this: T C t o t c Where: T C = Time of concentration in minutes to tc = Overland flow travel time in minutes = Sum of all conveyance travel times in minutes Equation Conservation of mass and the momentum equation are used to determine the time associated with overland flow. Equations and are used to calculate overland flow time, to:..... Where: to = Overland flow travel time in minutes Equation Equation Lo = Overland flow length in feet no = Roughness for overland flow surface, dimensionless Ix = Rainfall excess in in/hr So = Slope of overland flow in ft/ft C = Runoff coefficient, ratio of runoff rate to rainfall intensity in in/in I = Rainfall intensity in in/hr The kinematic wave method requires evaluation of each subarea to determine the overland flow length and slope. The regression equation:..... Equation Equation Exposition Metro Line Construction Authority 10 W2 Design, Inc.

12 Expo Rail Operations and Maintenance Facility Final Drainage Report Equation Where: Tc = Time of concentration in minutes Cd = Developed runoff coefficient, ratio of runoff rate to rainfall intensity in in/in Cu = Undeveloped runoff coefficient, ratio of runoff rate to rainfall intensity in in/in IMP = Percent impervious, percent expressed as 0.0 to 1.0 I = Intensity in inches per hour for the duration given L = Longest flow path length from watershed boundary to outlet in feet S = Slope of longest flow path in ft/ft t = Time of concentration in minutes It = Intensity at time t in inches per hour I1440 = 24 hour average rainfall intensity in inches per hour The drainage design storm frequency per LACMTA ELRT Design Criteria is as follows: TABLE 1 - DESIGN FREQUENCY FOR TYPE OF FACILITY Storm Facility All culverts and drainage crossing the rail system where flooding could damage system Track roadbed (to top of subballast) Main storm drains Parking lots All longitudinal drains and subdrains that could flood the roadbed All sump condition areas All other areas Design Frequency 50-year 10-year 10-year 10-year 10-year 50-year 50-year HYDROLOGIC CALCULATIONS Pre-Development Peak runoff is calculated using the Modified Rational Method described above. The existing drainage area collects in an on-site storm drain system as shown on Pre-Development Site Plan. The existing watershed area is measured to be acres. This area includes the buffer area, which is 2.5 acres and will not be part of the final project. The buffer area is included in Areas 1 and 2 (See Pre- Development Hydrology Map in Appendices). Runoff from the 50-year storm Q=CIA = cfs Exposition Metro Line Construction Authority 11 W2 Design, Inc.

13 Expo Rail Operations and Maintenance Facility Final Drainage Report TABLE 2 - PRE-DEVELOPMENT HYDROLOGY Area # Area (ac) % Imp L (ft) S (ft/ft) Q ¾-IN (cfs) Storm Data ¾ - 2-yr 10-yr 25-yr 50-yr Vol (ac-ft) Q2 (cfs) Totals Vol (ac-ft) Q10 (cfs) Vol (ac-ft) Q25 (cfs) Vol (ac-ft) Q50 (cfs) Vol (ac-ft) Exposition Metro Line Construction Authority 12 W2 Design, Inc.

14 Expo Rail Operations and Maintenance Facility Post-Development Final Drainage Report Peak runoff is calculated using the Modified Rational Method. The postdevelopment peak flow was calculated using both by individual area and by incremental area methods. The post-development outfall (POC) is an existing connection of a 24 RCP pipe that ties into an existing 33 RCP storm drain that lies just east of the easterly property line(see Appendix B, Post-Development Hydrology Map). The post-development watershed is smaller than the predevelopment watershed because the buffer zone area 7 in the calculations is to be deeded to the City of Santa Monica for use as a City park. The net postdevelopment site is 9.70 acres (The buffer area is Area 7 shown in Table 3 and as shown in the Post-Development Hydrology Map in Appendix B). The peak runoff from this area will be collected and maintained in a separate project. Therefore it will be subtracted from the peak discharge from the site. The difference in pre and post-development hydrology is the additional pervious areas. The site will be largely ballasted track area. The site also has landscaping and pervious paver areas that add to the pervious surface on the site. Runoff from the 50-year storm Q=CIA = cfs Exposition Metro Line Construction Authority 13 W2 Design, Inc.

15 Expo Rail Operations and Maintenance Facility Final Drainage Report TABLE 3 - POST-DEVELOPMENT HYDROLOGY- INDIVIDUAL AREA METHOD Area # Area (ac) % Imp L (ft) S (ft/ft) Q ¾-IN (cfs) Storm Data ¾ - 2-yr 10-yr 25-yr 50-yr Vol (ac-ft) Totals Q2 (cfs) Vol (ac-ft) Q10 (cfs) Vol (ac-ft) Q25 (cfs) Vol (ac-ft) Q50 (cfs) Vol (ac-ft) Exposition Metro Line Construction Authority 14 W2 Design, Inc.

16 Expo Rail Operations and Maintenance Facility Final Drainage Report TABLE 4 - POST-DEVELOPMENT HYDROLOGY-INCREMENTAL AREA METHOD Area # Area (ac) % Imp L (ft) S (ft/ft) Q ¾-IN (cfs) Storm Data ¾ -in 2-yr 10-yr 25-yr 50-yr Totals Q2 (cfs) Vol Q10 (cfs) Vol Q25 (cfs) Vol Q50 (cfs) Vol Vol (acft) (acft) (acft) (acft) (acft) Exposition Metro Line Construction Authority 15 W2 Design, Inc.

17 HYDRAULICS Expo Rail Operations and Maintenance Facility Final Drainage Report DESIGN CRITERIA The design criteria used for the design of the Storm Drain System for the Exposition Maintenance Facility was Metro s Rail Design Criteria Section 3 Civil and the Los Angeles County Flood Control District Hydraulics Design Manual. Whenever the Metro s and the County design criteria were in conflict, the most conservative design values were used. The storm drain system consists of a series of storm drain pipe, inlets, and manholes that convey the site runoff into a storage tank. The system was design to drain the rail yard, parking lots, by-pass track and the Centinela Access Drive without disruption of facility operations. The storm drain pipe sizes were selected in accordance with the Metro Rail Design Criteria and the Los Angeles County District Hydraulic Design Manual. The design parameters used in the selection of storm drain pipe sizes, catch basins, underdrain pipes, and surface drainage are summarized below. Table 4 summarizes the design elements adopted in the storm drain design. TABLE 4 - STORM DRAIN DESIGN CRITERIA Design Element Main Line Catch Basin Connector Pipe/ Lateral Material Roughness (Manning's n) Manhole Spacing Metro Design Criteria Min Dia. 24" Min Slope.0025 Min Dim. 18" Min Slope.0030 RCP HDPE and PVC DIP RCP: HDPE: PVC: DIP: FT. The runoff in paved areas will be collected using inlets/catch basins located at low points. The drain inlets/catch basins were design to collect 100% of the design flow. The site does not have any on grade inlets/catch basins. The rail yard will be drained using an undertrain system consisting of 8 double wall perforated HDPE pipe. The minimum slope for subdrains is 0.5%. Cleanouts were provided at the terminus of each subdrain. The longest individual subdrain run is less than 300. Exposition Metro Line Construction Authority 16 W2 Design, Inc.

18 Expo Rail Operations and Maintenance Facility Final Drainage Report The minimum slope for surface drainage in plaza areas is 0.5% and the maximum is 2 %. Along the by-pass track the maximum cross fall is 5 %. The maximum water surface over drains is 0.5 inches. The maximum water velocity in plaza areas is 2 feet per second. The runoff in roadways areas will remain below the top of curb and will not exceed 0.5 inches in the travelway. TABLE 5 - SURFACE DRAINAGE CRITERIA Design Factors Metro Criteria Plaza Minimum Grade = 0.5% Maximum Grade = 0.5% Parking Lots Minimum Grade = 1 % Intercept every 75 ft or less Maximum Grade = 2 % Maximum gutter depth = 12 inches Roadway Water surface to remain below top of curb and no more than 0.5 deep in first lane (8 ft) of travel way. METHODOLOGY AND CALCULATIONS The hydraulic analysis and calculations were performed using Autodesk Storm and Sanitary Analysis Rational Method. Los Angeles County allows for the use of the Rational Method for smaller area less than 40 acres. The results are more conservative than the modified rational method. Calculations are shown in Appendix E. DESIGN APPROACH The site will be drained using a combination of two systems: a storm drain system and an underdrain system. The surface drainage in paved areas will be collected in catch basins at localized low points. The catch basins in parking lots and roadways will collect 100 percent of the design flow (Q50). The rail yard will be drained using an 8 perforated underdrain system. The underdrain system will be connected to 24 collector pipes that will convey the storm water to the projects storm water trunk line. All of the collector pipes and the trunk line pipes were designed for the 50 year design storm since sections will run under track. The entire storm runoff will be conveyed through the storm drain system into a cistern/ retention pond. Although the existing site has an infiltration basin the Geotechnical Report for the project states that percolation into the existing soils is neglible due the presence Exposition Metro Line Construction Authority 17 W2 Design, Inc.

19 Expo Rail Operations and Maintenance Facility Final Drainage Report of clayey soils. Nevertheless a cistern for rainwater harvesting is proposed to satisfy the City of Santa Monica s Urban Runoff Mitigation Plan which requires sites to infiltration, store for use onsite or pay an in-lieu of fee. For this reason a Cistern/ Retention pond is designed to capture and hold 800,000 gallons (107,000 Cubic Feet) of rain water. This volume exceeds the required storage volume of 104,000 gallons. The reason for the additional storage is to maximize the use of rain water on site. The benefits to the larger tank size are the USGBC LEED points and the hedging of future water cost increases. The collected rain water will be utilized onsite for Blow Down, Truck Wash, and Irrigation uses. The storage and reuse of storm water complies with Los Angeles County Public Health requirements. The Cistern/Retention Pond will have capacity to retain the 2 year storm or greater for most of the year. During the rainy season there is the possibility that the Cistern is full or nearly full when a design storm occurs. Therefore the storm drain system has been designed, assuming the Cistern Tank is full, so that the 50 year storm will be contained within the storm drain network without flooding of the rail yard or parking areas. The hydraulic grade line is predominantly kept within the pipes and always below the finish grade of the site at all locations for the 50 year event. Tail water effects were found to be minimal due in the existing 33-inch storm drain line because of the existing capacity of the pipe. During the 50-year 24- hour peak the 33-inch line will be using only 20% of its capacity before the Maintenance Facilities storm water is added to the line. The capacity of the 33- inch line is 46 CFS. This line historically served a much greater area to the north yet currently the line ends just north of the EXPO Rail right-of-way at a catch basin(see Area 9 of the Post-Development Hydrology Map in Appendix B also see Appendix G for as-built of existing 33-inch storm drain). SUMMARY The project meets and exceeds the Los Angeles County regulations for storm water runoff. In this area, the County will allow up to 1.7 cfs per acre to flow to a County MS4 storm drain (Appendix F). The existing site discharges 3.54 cfs per acre into the County maintained storm drain system. The project as currently designed will discharge 1.49 cfs per acre during the 50 year storm event. Design flow of 17 cfs and a design volume of 2.45 ac-ft from of all storm events will be conveyed to a retention pond that will be used as a cistern for storm water reuse (when the cistern is empty). Therefore, not only is there an overall reduction of runoff generated by the site, and 2.45 ac-ft will be retained and reused for irrigation and industrial water uses. The project will substantially reduce storm water runoff (20.52 cfs) from the existing condition (51.58 cfs). Exposition Metro Line Construction Authority 18 W2 Design, Inc.

20 Expo Rail Operations and Maintenance Facility Final Drainage Report REFERENCES Los Angeles County Hydrology Manual, County of Los Angeles, Department of Public Works, Flood Control Section, January Los Angeles County Hydraulics Manual, County of Los Angeles, Department of Public Works, Flood Control Section, March Metro Rail Design Criteria, Los Angeles County Metropolitan Transportation Authority (Metro), Revision 3, November 9, Exposition Metro Line Construction Authority 19 W2 Design, Inc.

21 Expo Rail Operations and Maintenance Facility APPENDICES Final Drainage Report Exposition Metro Line Construction Authority 20 W2 Design, Inc.

22 A. PRE-DEVELOPMENT HYDROLOGY MAP FIGURE 6 - PRE-DEVELOPMENT HYDROLOGY Exposition Metro Line Construction Authority 21 W2 Design, Inc.

23 B. POST-DEVELOPMENT HYDROLOGY MAP FIGURE 7 - POST-DEVELOPMENT HYDROLOGY Exposition Metro Line Construction Authority 22 W2 Design, Inc.

24 C. 50-YEAR, 24-HOUR ISOHYET BEVERLY HILLS FIGURE 8-50-YR 24-HR ISOHYET PROJECT SITE Exposition Metro Line Construction Authority 23 W2 Design, Inc.

25 D. SANTA MONICA DRAINAGE MAP FIGURE 9 - SANTA MONICA DRAINAGE MAP PROJECT SITE Exposition Metro Line Construction Authority 24 W2 Design, Inc.

26 E. HYDRAULIC CALCULATIONS Exposition Metro Line Construction Authority 25 W2 Design, Inc.

27 Project Description File Name... Expo 50 Year - 100pct.SPF Description... L:\eng\Expo Maintenance Facility \dwg\xSMEXPO-HYDROLOGY.dwg Project Options Flow Units... CFS Elevation Type... Elevation Hydrology Method... Rational Time of Concentration (TOC) Method... User-Defined Link Routing Method... Hydrodynamic Enable Overflow Ponding at Nodes... NO Skip Steady State Analysis Time Periods... YES Analysis Options Start Analysis On... Jan 24, :00:00 End Analysis On... Jan 25, :00:00 Start Reporting On... Jan 24, :00:00 Antecedent Dry Days... 0 days Runoff (Dry Weather) Time Step :00:00 days hh:mm:ss Runoff (Wet Weather) Time Step :05:00 days hh:mm:ss Reporting Time Step :05:00 days hh:mm:ss Routing Time Step seconds Number of Elements Rain Gages... Subbasins... Nodes... Junctions... Outfalls... Flow Diversions... Inlets... Storage Nodes... Links... Channels... Pipes... Pumps... Orifices... Weirs... Outlets... Pollutants... Land Uses... Qty Rainfall Details Rainfall Intensity in/hr

28 Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 {Watersheds}.A : :05:00 2 {Watersheds}.A : :05:00 3 {Watersheds}.A : :05:00 4 {Watersheds}.A : :05:00 5 {Watersheds}.A : :05:00 6 {Watersheds}.A : :05:00 7 {Watersheds}.A : :05:00 8 {Watersheds}.A : :05:00 9 {Watersheds}.A : :05:00 10 {Watersheds}.A : :05:00 11 {Watersheds}.A : :05:00 12 {Watersheds}.A : :05:00 13 {Watersheds}.A : :05:00 14 {Watersheds}.B : :05:00 15 {Watersheds}.B : :05:00 16 {Watersheds}.B : :05:00 17 {Watersheds}.B : :05:00 18 {Watersheds}.B : :05:00 19 {Watersheds}.B : :05:00 20 {Watersheds}.C : :05:00 21 {Watersheds}.C : :05:00 22 {Watersheds}.C : :05:00 23 {Watersheds}.C : :05:00 24 {Watersheds}.C : :05:00 25 {Watersheds}.C : :05:00 26 {Watersheds}.C : :05:00 27 {Watersheds}.C : :05:00 28 {Watersheds}.C : :05:00 29 {Watersheds}.C : :05:00 30 {Watersheds}.C : :05:00 31 {Watersheds}.C : :05:00 32 {Watersheds}.C : :05:00 33 {Watersheds}.D : :05:00 34 {Watersheds}.D : :05:00 35 {Watersheds}.D : :05:00 36 {Watersheds}.D : :05:00 37 {Watersheds}.D : :05:00 38 {Watersheds}.D : :05:00 39 {Watersheds}.D : :05:00 40 {Watersheds}.D : :05:00 41 {Watersheds}.D : :05:00 42 {Watersheds}.D : :05:00 43 {Watersheds}.D : :05:00 44 {Watersheds}.D : :05:00 45 {Watersheds}.D : :05:00 46 {Watersheds}.D : :05:00 47 {Watersheds}.D : :05:00 48 {Watersheds}.E : :05:00 49 {Watersheds}.E : :07:00 50 {Watersheds}.E : :05:00 51 {Watersheds}.F : :07:00 52 {Watersheds}.G : :07:00 53 {Watersheds}.H : :05:00 54 {Watersheds}.H : :05:00 55 {Watersheds}.H : :05:00 56 {Watersheds}.H : :05:00 57 {Watersheds}.I : :05:00 58 {Watersheds}.I : :05:00 59 {Watersheds}.I : :05:00 60 {Watersheds}.I : :05:00 61 {Watersheds}.I : :05:00 62 {Watersheds}.I : :05:00 63 {Watersheds}.I : :05:00 64 {Watersheds}.I : :05:00 65 {Watersheds}.I : :05:00 66 {Watersheds}.I : :05:00 67 {Watersheds}.J : :05:00 68 {Watersheds}.J : :05:00 69 {Watersheds}.K : :05:00 70 Sub :05:00 71 Sub :05:00 72 Sub :05:00 73 Sub :05:00 74 Sub :05:00 75 Sub :05:00 76 Sub :05:00 77 Sub :05:00 78 Sub :18:00 79 Sub :05:00 80 Sub :05:00 81 Sub :05:00 82 Sub :06:00

29 Subbasin Summary SN Subbasin Area Weighted Total Total Total Peak Time of ID Runoff Rainfall Runoff Runoff Runoff Concentration Coefficient Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 83 Sub :05:00

30 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Elevation Elevation Attained Depth Attained (ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) 1 (P)-STORM DRAIN - Under Drains (31) ((P)-STORM DRAIN - Under Drains) Junction (P)-STORM DRAIN - Under Drains (32) ((P)-STORM DRAIN - Under Drains) Junction (P)-STORM DRAIN - Under Drains (58) ((P)-STORM DRAIN - Under Drains) Junction (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) Junction (P)-STORM DRAIN - Under Drains (87) ((P)-STORM DRAIN - Under Drains) Junction Jun-03 Junction Jun-04 Junction Jun-09 Junction Jun-16 Junction NS-01 ((P)-STORM DRAIN) Junction NS-02 ((P)-STORM DRAIN) Junction NS-13 ((P)-STORM DRAIN) Junction NS-15 ((P)-STORM DRAIN) Junction NS-17 ((P)-STORM DRAIN) Junction NS-18 ((P)-STORM DRAIN) Junction NS-19 ((P)-STORM DRAIN) Junction NS-21 ((P)-STORM DRAIN) Junction NS-22 ((P)-STORM DRAIN) Junction NS-23 ((P)-STORM DRAIN) Junction NS-25 ((P)-STORM DRAIN) Junction NS-26 ((P)-STORM DRAIN) Junction NS-27 ((P)-STORM DRAIN) Junction NS-28 ((P)-STORM DRAIN) Junction NS-30 ((P)-STORM DRAIN) Junction NS-50 ((P)-STORM DRAIN) Junction NS-51 ((P)-STORM DRAIN) Junction NS-52 ((P)-STORM DRAIN) Junction NS-53 ((P)-STORM DRAIN) Junction NS-54 ((P)-STORM DRAIN) Junction NS-55 ((P)-STORM DRAIN) Junction NS-56 ((P)-STORM DRAIN) Junction NS-57 ((P)-STORM DRAIN) Junction NS-58 ((P)-STORM DRAIN) Junction NS-59 ((P)-STORM DRAIN) Junction NS-60 ((P)-STORM DRAIN) Junction NS-61 ((P)-STORM DRAIN) Junction NS-62 ((P)-STORM DRAIN) Junction POC-01 ((P)-STORM DRAIN) Junction POC-03 ((P)-STORM DRAIN) Junction POC-05 ((P)-STORM DRAIN) Junction POC-07 ((P)-STORM DRAIN) Junction POC-08 ((P)-STORM DRAIN) Junction POC-09 ((P)-STORM DRAIN) Junction POC-10 ((P)-STORM DRAIN) Junction POC-12 ((P)-STORM DRAIN) Junction SDAD-01 ((P)-STORM DRAIN) Junction SDAD-02 ((P)-STORM DRAIN) Junction SDAD-03 ((P)-STORM DRAIN) Junction SDAD-04 ((P)-STORM DRAIN) Junction SDAD-05 ((P)-STORM DRAIN) Junction SDAD-06 ((P)-STORM DRAIN) Junction SDAD-07 ((P)-STORM DRAIN) Junction SDAD-08 ((P)-STORM DRAIN) Junction SDAD-09 ((P)-STORM DRAIN) Junction SDAD-10 ((P)-STORM DRAIN) Junction SDAD-11 ((P)-STORM DRAIN) Junction SDAD-12 ((P)-STORM DRAIN) Junction SDAD-15 ((P)-STORM DRAIN) Junction SDAD-16 ((P)-STORM DRAIN) Junction SDAD-17 ((P)-STORM DRAIN) Junction SDAD-18 ((P)-STORM DRAIN) Junction SDAD-19 ((P)-STORM DRAIN) Junction SDAD-20 ((P)-STORM DRAIN) Junction SDAD-21 ((P)-STORM DRAIN) Junction SDAD-22 ((P)-STORM DRAIN) Junction SDAD-23 ((P)-STORM DRAIN) Junction SDAD-24 ((P)-STORM DRAIN) Junction SDAD-25 ((P)-STORM DRAIN) Junction SDAD-26 ((P)-STORM DRAIN) Junction SDAD-27 ((P)-STORM DRAIN) Junction SDAD-28 ((P)-STORM DRAIN) Junction SDCB-01 ((P)-STORM DRAIN) Junction SDCB-02 ((P)-STORM DRAIN) Junction SDCB-20 ((P)-STORM DRAIN) Junction SDCB-23 ((P)-STORM DRAIN) Junction SDCB-31 ((P)-STORM DRAIN) Junction SDCB-38 ((P)-STORM DRAIN) Junction SDCB-39 ((P)-STORM DRAIN) Junction SDCB-40 ((P)-STORM DRAIN) Junction SDCB-65 ((P)-STORM DRAIN) Junction SDCB-80 ((P)-STORM DRAIN) Junction

31 Min Time of Total Total Time Freeboard Peak Flooded Flooded Attained Flooding Volume Occurrence (ft) (days hh:mm) (ac-in) (min) : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

32 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Elevation Elevation Attained Depth Attained (ft) (ft) (ft) (ft) (ft²) (cfs) (ft) (ft) 82 SDCB-81 ((P)-STORM DRAIN) Junction SDCB-82 ((P)-STORM DRAIN) Junction SDCB-83 ((P)-STORM DRAIN) Junction SDCB-84 ((P)-STORM DRAIN) Junction SDCB-86 ((P)-STORM DRAIN) Junction SDCB-88 ((P)-STORM DRAIN) Junction SDCB-89 ((P)-STORM DRAIN) Junction SDCO-01 ((P)-STORM DRAIN) Junction SDCO-02 ((P)-STORM DRAIN) Junction SDCO-03 ((P)-STORM DRAIN) Junction SDJS-01 ((P)-STORM DRAIN) Junction SDMH-01 ((P)-STORM DRAIN) Junction SDMH-02 ((P)-STORM DRAIN) Junction SDMH-03 ((P)-STORM DRAIN) Junction SDMH-05 ((P)-STORM DRAIN) Junction SDMH-06 ((P)-STORM DRAIN) Junction SDMH-07 ((P)-STORM DRAIN) Junction SDMH-09 ((P)-STORM DRAIN) Junction SDMH-10 ((P)-STORM DRAIN) Junction SDMH-11 ((P)-STORM DRAIN) Junction SDMH-12 ((P)-STORM DRAIN) Junction SDMH-13 ((P)-STORM DRAIN) Junction SDMH-14 ((P)-STORM DRAIN) Junction SDMH-15 ((P)-STORM DRAIN) Junction SDMH-16 ((P)-STORM DRAIN) Junction SDMH-17 ((P)-STORM DRAIN) Junction SDMH-18 ((P)-STORM DRAIN) Junction SDMH-19 ((P)-STORM DRAIN) Junction SDMH-20 ((P)-STORM DRAIN) Junction SDMH-21 ((P)-STORM DRAIN) Junction SDMH-22 ((P)-STORM DRAIN) Junction SDMH-23 ((P)-STORM DRAIN) Junction SDMH-24 ((P)-STORM DRAIN) Junction SDMH-25 ((P)-STORM DRAIN) Junction SDMH-27 ((P)-STORM DRAIN) Junction SDMH-28 ((P)-STORM DRAIN) Junction SDMH-29 ((P)-STORM DRAIN) Junction SDMH-31 ((P)-STORM DRAIN) Junction Jun-05 Outfall

33 Min Time of Total Total Time Freeboard Peak Flooded Flooded Attained Flooding Volume Occurrence (ft) (days hh:mm) (ac-in) (min) : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

34 Link Summary SN Element Element From ID Type (Inlet) Node 1 {(P)-STORM DRAIN - Under Drains}.8 inch HDPE Pipe (P)-STORM DRAIN - Under Drains - (51) ((P)-STORM DRAIN - Under Drains) Pipe (P)-STORM DRAIN - Under Drains (87) ((P)-STORM DRAIN - Under Drains) 2 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (113) ((P)-STORM DRAIN) Pipe SDCB-53 ((P)-STORM DRAIN) 3 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (119) ((P)-STORM DRAIN) Pipe Inlet-12 4 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (127) ((P)-STORM DRAIN) Pipe SDCB-47 ((P)-STORM DRAIN) 5 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (128) ((P)-STORM DRAIN) Pipe SDCB-46 ((P)-STORM DRAIN) 6 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (168) ((P)-STORM DRAIN) Pipe SDCB-51 ((P)-STORM DRAIN) 7 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (180) ((P)-STORM DRAIN) Pipe SDCB-03 ((P)-STORM DRAIN) 8 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (181) ((P)-STORM DRAIN) Pipe SDCB-05 ((P)-STORM DRAIN) 9 {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (250) ((P)-STORM DRAIN) Pipe Inlet {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (109) ((P)-STORM DRAIN) Pipe SDCB-52 ((P)-STORM DRAIN) 11 {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (111) ((P)-STORM DRAIN) Pipe SDCB-56 ((P)-STORM DRAIN) 12 {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (204) ((P)-STORM DRAIN) Pipe SDCB-16 ((P)-STORM DRAIN) 13 {(P)-STORM DRAIN}.3 inch HDPE Pipe (P)-STORM DRAIN - (212) ((P)-STORM DRAIN) Pipe POC-10 ((P)-STORM DRAIN) 14 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (206) ((P)-STORM DRAIN) Pipe NS-60 ((P)-STORM DRAIN) 15 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (207) ((P)-STORM DRAIN) Pipe NS-61 ((P)-STORM DRAIN) 16 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (244) ((P)-STORM DRAIN) Pipe SDAD-17 ((P)-STORM DRAIN) 17 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (245) ((P)-STORM DRAIN) Pipe SDAD-18 ((P)-STORM DRAIN) 18 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (246) ((P)-STORM DRAIN) Pipe SDAD-19 ((P)-STORM DRAIN) 19 {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (247) ((P)-STORM DRAIN) Pipe SDAD-20 ((P)-STORM DRAIN) 20 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (158) ((P)-STORM DRAIN) Pipe SDAD-15 ((P)-STORM DRAIN) 21 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (202) ((P)-STORM DRAIN) Pipe NS-51 ((P)-STORM DRAIN) 22 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (203) ((P)-STORM DRAIN) Pipe POC-09 ((P)-STORM DRAIN) 23 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (205) ((P)-STORM DRAIN) Pipe NS-59 ((P)-STORM DRAIN) 24 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) ((P)-STORM DRAIN) Pipe NS-57 ((P)-STORM DRAIN) 25 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) (1) ((P)-STORM DRAIN) Pipe NS-58 ((P)-STORM DRAIN) 26 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (219) ((P)-STORM DRAIN) Pipe SDCB-61 ((P)-STORM DRAIN) 27 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (220) ((P)-STORM DRAIN) Pipe SDCB-62 ((P)-STORM DRAIN) 28 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (221) ((P)-STORM DRAIN) Pipe SDAD-16 ((P)-STORM DRAIN) 29 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (223) ((P)-STORM DRAIN) Pipe SDAD-01 ((P)-STORM DRAIN) 30 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (224) ((P)-STORM DRAIN) Pipe SDAD-02 ((P)-STORM DRAIN) 31 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) ((P)-STORM DRAIN) Pipe SDAD-03 ((P)-STORM DRAIN) 32 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) (1) ((P)-STORM DRAIN) Pipe SDAD-04 ((P)-STORM DRAIN) 33 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (226) ((P)-STORM DRAIN) Pipe SDAD-05 ((P)-STORM DRAIN) 34 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (227) ((P)-STORM DRAIN) Pipe SDAD-06 ((P)-STORM DRAIN) 35 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (228) ((P)-STORM DRAIN) Pipe SDAD-07 ((P)-STORM DRAIN) 36 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (229) ((P)-STORM DRAIN) Pipe SDAD-08 ((P)-STORM DRAIN) 37 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (230) ((P)-STORM DRAIN) Pipe SDAD-09 ((P)-STORM DRAIN) 38 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (231) ((P)-STORM DRAIN) Pipe SDAD-10 ((P)-STORM DRAIN) 39 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (232) ((P)-STORM DRAIN) Pipe SDAD-11 ((P)-STORM DRAIN) 40 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (234) ((P)-STORM DRAIN) Pipe SDAD-21 ((P)-STORM DRAIN) 41 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) ((P)-STORM DRAIN) Pipe SDAD-22 ((P)-STORM DRAIN) 42 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) (1) ((P)-STORM DRAIN) Pipe SDAD-23 ((P)-STORM DRAIN) 43 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (236) ((P)-STORM DRAIN) Pipe SDAD-24 ((P)-STORM DRAIN) 44 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) ((P)-STORM DRAIN) Pipe SDAD-26 ((P)-STORM DRAIN) 45 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) (1) ((P)-STORM DRAIN) Pipe SDAD-27 ((P)-STORM DRAIN) 46 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (240) ((P)-STORM DRAIN) Pipe SDAD-28 ((P)-STORM DRAIN) 47 {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (248) ((P)-STORM DRAIN) Pipe NS-62 ((P)-STORM DRAIN) 48 {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (200) ((P)-STORM DRAIN) Pipe SDCO-01 ((P)-STORM DRAIN) 49 {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) ((P)-STORM DRAIN) Pipe SDCB-80 ((P)-STORM DRAIN) 50 {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) (1) ((P)-STORM DRAIN) Pipe SDCB-81 ((P)-STORM DRAIN) 51 {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) ((P)-STORM DRAIN) Pipe Jun {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) (1) ((P)-STORM DRAIN) Pipe SDCB-86 ((P)-STORM DRAIN) 53 {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (211) ((P)-STORM DRAIN) Pipe SDCB-87 ((P)-STORM DRAIN) 54 {(P)-STORM DRAIN}.A-01_1 ((P)-STORM DRAIN) Pipe SDCB-01 ((P)-STORM DRAIN) 55 {(P)-STORM DRAIN}.A-01_2 ((P)-STORM DRAIN) Pipe NS-55 ((P)-STORM DRAIN) 56 {(P)-STORM DRAIN}.A-02 ((P)-STORM DRAIN) Pipe SDCB-02 ((P)-STORM DRAIN) 57 {(P)-STORM DRAIN}.A-04 ((P)-STORM DRAIN) Pipe NS-01 ((P)-STORM DRAIN) 58 {(P)-STORM DRAIN}.A-06 ((P)-STORM DRAIN) Pipe NS-02 ((P)-STORM DRAIN)

35 To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) Calculated SDMH-10 ((P)-STORM DRAIN) Calculated NS-17 ((P)-STORM DRAIN) Calculated SDMH-13 ((P)-STORM DRAIN) Calculated SDMH-14 ((P)-STORM DRAIN) Calculated SDMH-31 ((P)-STORM DRAIN) Calculated NS-01 ((P)-STORM DRAIN) SURCHARGED NS-02 ((P)-STORM DRAIN) SURCHARGED NS-28 ((P)-STORM DRAIN) SURCHARGED NS-13 ((P)-STORM DRAIN) Calculated NS-15 ((P)-STORM DRAIN) Calculated SDMH-20 ((P)-STORM DRAIN) Calculated NS-27 ((P)-STORM DRAIN) Calculated NS-59 ((P)-STORM DRAIN) Calculated NS-60 ((P)-STORM DRAIN) Calculated NS-58 ((P)-STORM DRAIN) Calculated NS-59 ((P)-STORM DRAIN) Calculated NS-60 ((P)-STORM DRAIN) Calculated NS-61 ((P)-STORM DRAIN) Calculated NS-21 ((P)-STORM DRAIN) Calculated NS-50 ((P)-STORM DRAIN) SURCHARGED NS-51 ((P)-STORM DRAIN) SURCHARGED NS-58 ((P)-STORM DRAIN) Calculated SDAD-16 ((P)-STORM DRAIN) Calculated NS-57 ((P)-STORM DRAIN) Calculated SDCB-60 ((P)-STORM DRAIN) Calculated NS-23 ((P)-STORM DRAIN) Calculated NS-21 ((P)-STORM DRAIN) Calculated SDAD-02 ((P)-STORM DRAIN) Calculated SDAD-03 ((P)-STORM DRAIN) Calculated NS-26 ((P)-STORM DRAIN) Calculated NS-26 ((P)-STORM DRAIN) Calculated SDAD-04 ((P)-STORM DRAIN) Calculated SDAD-05 ((P)-STORM DRAIN) Calculated SDAD-06 ((P)-STORM DRAIN) Calculated SDAD-07 ((P)-STORM DRAIN) Calculated SDAD-08 ((P)-STORM DRAIN) Calculated SDAD-09 ((P)-STORM DRAIN) Calculated SDAD-12 ((P)-STORM DRAIN) Calculated SDAD-22 ((P)-STORM DRAIN) Calculated NS-54 ((P)-STORM DRAIN) Calculated NS-54 ((P)-STORM DRAIN) Calculated SDAD-23 ((P)-STORM DRAIN) Calculated NS-62 ((P)-STORM DRAIN) Calculated NS-62 ((P)-STORM DRAIN) Calculated SDAD-27 ((P)-STORM DRAIN) Calculated SDCB-47 ((P)-STORM DRAIN) Calculated SDCB-32 ((P)-STORM DRAIN) Calculated SDCO-01 ((P)-STORM DRAIN) Calculated SDCB-80 ((P)-STORM DRAIN) Calculated SDCB-31 ((P)-STORM DRAIN) Calculated SDCB-87 ((P)-STORM DRAIN) Calculated NS-56 ((P)-STORM DRAIN) Calculated Inlet SURCHARGED SDCB-02 ((P)-STORM DRAIN) SURCHARGED SDMH-01 ((P)-STORM DRAIN) SURCHARGED SDMH-24 ((P)-STORM DRAIN) SURCHARGED SDMH-25 ((P)-STORM DRAIN) SURCHARGED

36 Link Summary SN Element Element From ID Type (Inlet) Node 59 {(P)-STORM DRAIN}.A-07 Pipe SDMH-25 ((P)-STORM DRAIN) 60 {(P)-STORM DRAIN}.A-08 ((P)-STORM DRAIN) Pipe NS-03 ((P)-STORM DRAIN) 61 {(P)-STORM DRAIN}.A-09 Pipe SDMH-02 ((P)-STORM DRAIN) 62 {(P)-STORM DRAIN}.A-11 Pipe NS-05 ((P)-STORM DRAIN) 63 {(P)-STORM DRAIN}.A-12 Pipe NS-06 ((P)-STORM DRAIN) 64 {(P)-STORM DRAIN}.A-13 Pipe SDMH-03 ((P)-STORM DRAIN) 65 {(P)-STORM DRAIN}.A-16 ((P)-STORM DRAIN) Pipe SDMH-04 ((P)-STORM DRAIN) 66 {(P)-STORM DRAIN}.A Pipe SDMH-05 ((P)-STORM DRAIN) 67 {(P)-STORM DRAIN}.A-18 Pipe SDMH-23 ((P)-STORM DRAIN) 68 {(P)-STORM DRAIN}.A-19 Pipe SDJS-01 ((P)-STORM DRAIN) 69 {(P)-STORM DRAIN}.A-21 ((P)-STORM DRAIN) Pipe SDMH-17 ((P)-STORM DRAIN) 70 {(P)-STORM DRAIN}.BLD_F-01 ((P)-STORM DRAIN) Pipe SDCB-85 ((P)-STORM DRAIN) 71 {(P)-STORM DRAIN}.BLD_F-02 ((P)-STORM DRAIN) Pipe SDCB-84 ((P)-STORM DRAIN) 72 {(P)-STORM DRAIN}.BLD_F-03 ((P)-STORM DRAIN) Pipe NS-23 ((P)-STORM DRAIN) 73 {(P)-STORM DRAIN}.BLDG_C-01 ((P)-STORM DRAIN) Pipe SDCB-88 ((P)-STORM DRAIN) 74 {(P)-STORM DRAIN}.BLDG_C-04 ((P)-STORM DRAIN) Pipe SDCB-89 ((P)-STORM DRAIN) 75 {(P)-STORM DRAIN}.C-01 ((P)-STORM DRAIN) Pipe SDMH-19 ((P)-STORM DRAIN) 76 {(P)-STORM DRAIN}.C-02 ((P)-STORM DRAIN) Pipe SDMH-06 ((P)-STORM DRAIN) 77 {(P)-STORM DRAIN}.C-03 ((P)-STORM DRAIN) Pipe SDMH-20 ((P)-STORM DRAIN) 78 {(P)-STORM DRAIN}.C-04 ((P)-STORM DRAIN) Pipe SDMH-21 ((P)-STORM DRAIN) 79 {(P)-STORM DRAIN}.C-05 ((P)-STORM DRAIN) Pipe SDMH-22 ((P)-STORM DRAIN) 80 {(P)-STORM DRAIN}.C-10 ((P)-STORM DRAIN) Pipe POC-05 ((P)-STORM DRAIN) 81 {(P)-STORM DRAIN}.C-11 ((P)-STORM DRAIN) Pipe NS-56 ((P)-STORM DRAIN) 82 {(P)-STORM DRAIN}.D-01 ((P)-STORM DRAIN) Pipe SDCB-13 ((P)-STORM DRAIN) 83 {(P)-STORM DRAIN}.D-02 ((P)-STORM DRAIN) Pipe SDMH-26 ((P)-STORM DRAIN) 84 {(P)-STORM DRAIN}.D-04 ((P)-STORM DRAIN) Pipe NS-22 ((P)-STORM DRAIN) 85 {(P)-STORM DRAIN}.D-05 ((P)-STORM DRAIN) Pipe SDCB-60 ((P)-STORM DRAIN) 86 {(P)-STORM DRAIN}.D-06 ((P)-STORM DRAIN) Pipe SDCB-24 ((P)-STORM DRAIN) 87 {(P)-STORM DRAIN}.D-07 ((P)-STORM DRAIN) Pipe SDCB-25 ((P)-STORM DRAIN) 88 {(P)-STORM DRAIN}.D1-02 ((P)-STORM DRAIN) Pipe SDCB-22 ((P)-STORM DRAIN) 89 {(P)-STORM DRAIN}.D1-03 ((P)-STORM DRAIN) Pipe SDCB-21 ((P)-STORM DRAIN) 90 {(P)-STORM DRAIN}.D1-1 ((P)-STORM DRAIN) Pipe SDCB-23 ((P)-STORM DRAIN) 91 {(P)-STORM DRAIN}.E-01 ((P)-STORM DRAIN) Pipe SDCB-32 ((P)-STORM DRAIN) 92 {(P)-STORM DRAIN}.E-03 ((P)-STORM DRAIN) Pipe NS-50 ((P)-STORM DRAIN) 93 {(P)-STORM DRAIN}.E-04 ((P)-STORM DRAIN) Pipe NS-28 ((P)-STORM DRAIN) 94 {(P)-STORM DRAIN}.G-01 ((P)-STORM DRAIN) Pipe SDMH-09 ((P)-STORM DRAIN) 95 {(P)-STORM DRAIN}.G-02 ((P)-STORM DRAIN) Pipe NS-53 ((P)-STORM DRAIN) 96 {(P)-STORM DRAIN}.H_LAT-01 ((P)-STORM DRAIN) Pipe SDCB-43 ((P)-STORM DRAIN) 97 {(P)-STORM DRAIN}.H_LAT-02 ((P)-STORM DRAIN) Pipe SDCB-44 ((P)-STORM DRAIN) 98 {(P)-STORM DRAIN}.H_LAT-03 ((P)-STORM DRAIN) Pipe SDCB-45 ((P)-STORM DRAIN) 99 {(P)-STORM DRAIN}.H-01 ((P)-STORM DRAIN) Pipe SDMH-12 ((P)-STORM DRAIN) 100 {(P)-STORM DRAIN}.H-02 ((P)-STORM DRAIN) Pipe NS-19 ((P)-STORM DRAIN) 101 {(P)-STORM DRAIN}.H-03 ((P)-STORM DRAIN) Pipe SDMH-15 ((P)-STORM DRAIN) 102 {(P)-STORM DRAIN}.H-04 ((P)-STORM DRAIN) Pipe SDMH-27 ((P)-STORM DRAIN) 103 {(P)-STORM DRAIN}.H-05 ((P)-STORM DRAIN) Pipe SDMH-28 ((P)-STORM DRAIN) 104 {(P)-STORM DRAIN}.H-05 (1) ((P)-STORM DRAIN) Pipe SDMH-14 ((P)-STORM DRAIN) 105 {(P)-STORM DRAIN}.H-06 ((P)-STORM DRAIN) Pipe SDMH-29 ((P)-STORM DRAIN) 106 {(P)-STORM DRAIN}.H-07 ((P)-STORM DRAIN) Pipe SDMH-13 ((P)-STORM DRAIN) 107 {(P)-STORM DRAIN}.I-01 ((P)-STORM DRAIN) Pipe SDCB-48 ((P)-STORM DRAIN) 108 {(P)-STORM DRAIN}.I-02 ((P)-STORM DRAIN) Pipe SDCB-49 ((P)-STORM DRAIN) 109 {(P)-STORM DRAIN}.I-03 ((P)-STORM DRAIN) Pipe SDCB-50 ((P)-STORM DRAIN) 110 {(P)-STORM DRAIN}.I-04 ((P)-STORM DRAIN) Pipe SDMH-31 ((P)-STORM DRAIN) 111 {(P)-STORM DRAIN}.I-05 ((P)-STORM DRAIN) Pipe NS-13 ((P)-STORM DRAIN) 112 {(P)-STORM DRAIN}.I-07 ((P)-STORM DRAIN) Pipe SDMH-10 ((P)-STORM DRAIN) 113 {(P)-STORM DRAIN}.I-10 ((P)-STORM DRAIN) Pipe NS-17 ((P)-STORM DRAIN) 114 {(P)-STORM DRAIN}.I-11 ((P)-STORM DRAIN) Pipe NS-18 ((P)-STORM DRAIN) 115 {(P)-STORM DRAIN}.J-01 ((P)-STORM DRAIN) Pipe SDCB-18 ((P)-STORM DRAIN) 116 {(P)-STORM DRAIN}.J-02 ((P)-STORM DRAIN) Pipe SDCB-19 ((P)-STORM DRAIN)

37 To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) NS-03 ((P)-STORM DRAIN) SURCHARGED SDMH-02 ((P)-STORM DRAIN) SURCHARGED Inlet SURCHARGED NS-06 ((P)-STORM DRAIN) SURCHARGED SDMH-03 ((P)-STORM DRAIN) SURCHARGED NS-07 ((P)-STORM DRAIN) SURCHARGED SDMH-05 ((P)-STORM DRAIN) SURCHARGED Jun SURCHARGED SDJS-01 ((P)-STORM DRAIN) SURCHARGED SDMH-16 ((P)-STORM DRAIN) Calculated SDMH-18 ((P)-STORM DRAIN) SURCHARGED SDCB-84 ((P)-STORM DRAIN) Calculated NS-23 ((P)-STORM DRAIN) Calculated NS-22 ((P)-STORM DRAIN) Calculated NS-52 ((P)-STORM DRAIN) Calculated NS-53 ((P)-STORM DRAIN) Calculated SDMH-06 ((P)-STORM DRAIN) Calculated SDMH-20 ((P)-STORM DRAIN) Calculated SDMH-21 ((P)-STORM DRAIN) Calculated SDMH-22 ((P)-STORM DRAIN) Calculated SDMH-23 ((P)-STORM DRAIN) Calculated NS-56 ((P)-STORM DRAIN) Calculated SDMH-19 ((P)-STORM DRAIN) Calculated SDMH-26 ((P)-STORM DRAIN) Calculated SDMH-07 ((P)-STORM DRAIN) Calculated SDMH-07 ((P)-STORM DRAIN) Calculated NS-22 ((P)-STORM DRAIN) Calculated SDCB-60 ((P)-STORM DRAIN) Calculated SDCB-24 ((P)-STORM DRAIN) SURCHARGED SDCB-23 ((P)-STORM DRAIN) Calculated SDCB-22 ((P)-STORM DRAIN) Calculated SDMH-26 ((P)-STORM DRAIN) Calculated SDMH-07 ((P)-STORM DRAIN) Calculated NS-28 ((P)-STORM DRAIN) SURCHARGED SDMH-24 ((P)-STORM DRAIN) SURCHARGED NS-53 ((P)-STORM DRAIN) Calculated SDMH-03 ((P)-STORM DRAIN) Calculated SDMH-12 ((P)-STORM DRAIN) Calculated NS-19 ((P)-STORM DRAIN) Calculated SDMH-27 ((P)-STORM DRAIN) Calculated SDMH-05 ((P)-STORM DRAIN) Calculated SDMH-12 ((P)-STORM DRAIN) Calculated NS-19 ((P)-STORM DRAIN) Calculated SDMH-15 ((P)-STORM DRAIN) Calculated SDMH-27 ((P)-STORM DRAIN) Calculated SDMH-28 ((P)-STORM DRAIN) Calculated SDMH-14 ((P)-STORM DRAIN) Calculated SDMH-29 ((P)-STORM DRAIN) Calculated SDCB-49 ((P)-STORM DRAIN) Calculated SDCB-50 ((P)-STORM DRAIN) Calculated SDCB-51 ((P)-STORM DRAIN) Calculated NS-13 ((P)-STORM DRAIN) Calculated SDMH-10 ((P)-STORM DRAIN) Calculated NS-15 ((P)-STORM DRAIN) Calculated NS-18 ((P)-STORM DRAIN) Calculated SDMH-11 ((P)-STORM DRAIN) Calculated SDCB-20 ((P)-STORM DRAIN) Calculated SDCB-20 ((P)-STORM DRAIN) Calculated

38 Link Summary SN Element Element From ID Type (Inlet) Node 117 {(P)-STORM DRAIN}.K-01 ((P)-STORM DRAIN) Pipe SDCB-17 ((P)-STORM DRAIN) 118 {(P)-STORM DRAIN}.K-02 ((P)-STORM DRAIN) Pipe NS-54 ((P)-STORM DRAIN) 119 {(P)-STORM DRAIN}.K-03 ((P)-STORM DRAIN) Pipe SDCB-20 ((P)-STORM DRAIN) 120 {(P)-STORM DRAIN}.K-04 ((P)-STORM DRAIN) Pipe SDAD-25 ((P)-STORM DRAIN) 121 {(P)-STORM DRAIN}.SD-B-B1 6''_4 ((P)-STORM DRAIN) Pipe NS-30 ((P)-STORM DRAIN) 122 {(P)-STORM DRAIN}.SD-B-B1 6''_5 ((P)-STORM DRAIN) Pipe SDCB-65 ((P)-STORM DRAIN) 123 {(P)-STORM DRAIN}.SD-B-B1 6''_5 (1) ((P)-STORM DRAIN) Pipe POC-12 ((P)-STORM DRAIN) 124 {(P)-STORM DRAIN}.SD-B-B2 6''_5 ((P)-STORM DRAIN) Pipe POC-07 ((P)-STORM DRAIN) 125 {(P)-STORM DRAIN}.SD-C 8 1 ((P)-STORM DRAIN) Pipe SDCO-02 ((P)-STORM DRAIN) 126 {(P)-STORM DRAIN}.SD-C 8 2 (1) ((P)-STORM DRAIN) Pipe SDCO-03 ((P)-STORM DRAIN) 127 {(P)-STORM DRAIN}.SD-C 8''_3 ((P)-STORM DRAIN) Pipe SDCB-82 ((P)-STORM DRAIN) 128 {(P)-STORM DRAIN}.SD-C 8''_4 ((P)-STORM DRAIN) Pipe SDCB-83 ((P)-STORM DRAIN) 129 {(P)-STORM DRAIN}.SD-C 8''_5 (1) ((P)-STORM DRAIN) Pipe NS-21 ((P)-STORM DRAIN) 130 {(P)-STORM DRAIN}.SD-C 8''_5 (1) (1) ((P)-STORM DRAIN) Pipe NS-27 ((P)-STORM DRAIN) 131 {(P)-STORM DRAIN}.SD-C-B1 8''_2 ((P)-STORM DRAIN) Pipe SDCB-70 ((P)-STORM DRAIN) 132 {(P)-STORM DRAIN}.SD-C-B1 8''_3 ((P)-STORM DRAIN) Pipe NS-25 ((P)-STORM DRAIN) 133 {(P)-STORM DRAIN}.SD-C-B1 8''_4 ((P)-STORM DRAIN) Pipe SDCB-40 ((P)-STORM DRAIN) 134 {(P)-STORM DRAIN}.SD-C-B1 8''_5 ((P)-STORM DRAIN) Pipe SDCB-39 ((P)-STORM DRAIN) 135 {(P)-STORM DRAIN}.SD-C-B1 8''_6 ((P)-STORM DRAIN) Pipe SDCB-38 ((P)-STORM DRAIN) 136 {(P)-STORM DRAIN}.SD-C-B3 6''_9 ((P)-STORM DRAIN) Pipe POC-03 ((P)-STORM DRAIN) 137 {(P)-STORM DRAIN}.SD-D-B1 8''_6 ((P)-STORM DRAIN) Pipe POC-08 ((P)-STORM DRAIN) 138 {(P)-STORM DRAIN}.SD-D-B3 8''_8 ((P)-STORM DRAIN) Pipe SDCB-30 ((P)-STORM DRAIN) 139 {(P)-STORM DRAIN}.SD-D-B3 8''_9 ((P)-STORM DRAIN) Pipe POC-01 ((P)-STORM DRAIN) 140 {(P)-STORM DRAIN}.SD-D-B4 8''_10 ((P)-STORM DRAIN) Pipe SDCB-29 ((P)-STORM DRAIN) 141 {(P)-STORM DRAIN}.SD-D-B5 8''_12 ((P)-STORM DRAIN) Pipe SDCB-27 ((P)-STORM DRAIN) 142 {(P)-STORM DRAIN}.SD-D-B5 8''_13 ((P)-STORM DRAIN) Pipe SDCB-28 ((P)-STORM DRAIN) 143 {(P)-STORM DRAIN}.SD-D-B5 8''_14 ((P)-STORM DRAIN) Pipe SDCB-31 ((P)-STORM DRAIN) 144 {(P)-STORM DRAIN}.SD-D-B6 8''_15 ((P)-STORM DRAIN) Pipe SDCB-26 ((P)-STORM DRAIN) 145 A-05 Pipe SDMH-24 ((P)-STORM DRAIN) 146 A-10 Pipe Inlet A-14 Pipe NS-07 ((P)-STORM DRAIN) 148 A-15 Pipe Inlet A Pipe Jun A-20 Pipe SDMH-16 ((P)-STORM DRAIN) 151 E-02 Pipe SDMH-07 ((P)-STORM DRAIN) 152 EX 24 Pipe SDMH-18 ((P)-STORM DRAIN) 153 EX Pipe Jun EX Pipe Jun Link-03 Pipe SDMH-11 ((P)-STORM DRAIN) 156 Link-05 Pipe Inlet Link-06 Pipe Inlet Link-13 Pipe SDCB Link-17 Pipe SDMH-01 ((P)-STORM DRAIN) 160 Link-30 Pipe NS-52 ((P)-STORM DRAIN) 161 Link-31 Pipe (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) 162 Link-33 Pipe (P)-STORM DRAIN - Under Drains (31) ((P)-STORM DRAIN - Under Drains) 163 Link-34 Pipe (P)-STORM DRAIN - Under Drains (32) ((P)-STORM DRAIN - Under Drains) 164 Link-38 Pipe NS-26 ((P)-STORM DRAIN) 165 Link-39 Pipe Inlet Link-42 Pipe (P)-STORM DRAIN - Under Drains (58) ((P)-STORM DRAIN - Under Drains) 167 Link-43 Pipe SDAD-12 ((P)-STORM DRAIN) 168 Link-47 Pipe NS-15 ((P)-STORM DRAIN) 169 Link-48 Pipe SDCB-57 ((P)-STORM DRAIN) 170 Link-49 Pipe Jun-16

39 To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) SDMH-21 ((P)-STORM DRAIN) Calculated SDMH-21 ((P)-STORM DRAIN) Calculated NS-54 ((P)-STORM DRAIN) Calculated SDCB-20 ((P)-STORM DRAIN) Calculated SDCB-01 ((P)-STORM DRAIN) Calculated NS-30 ((P)-STORM DRAIN) Calculated SDCB-65 ((P)-STORM DRAIN) Calculated NS-30 ((P)-STORM DRAIN) Calculated SDCB-81 ((P)-STORM DRAIN) Calculated SDCB-82 ((P)-STORM DRAIN) Calculated SDCB-83 ((P)-STORM DRAIN) Calculated NS-21 ((P)-STORM DRAIN) Calculated NS-27 ((P)-STORM DRAIN) Calculated SDMH-06 ((P)-STORM DRAIN) Calculated SDMH-19 ((P)-STORM DRAIN) Calculated SDCB-70 ((P)-STORM DRAIN) Calculated NS-25 ((P)-STORM DRAIN) Calculated SDCB-40 ((P)-STORM DRAIN) Calculated SDCB-39 ((P)-STORM DRAIN) Calculated SDCB-40 ((P)-STORM DRAIN) Calculated SDCB-22 ((P)-STORM DRAIN) Calculated SDCB-25 ((P)-STORM DRAIN) SURCHARGED SDCB-30 ((P)-STORM DRAIN) SURCHARGED SDCB-25 ((P)-STORM DRAIN) Calculated SDCB-24 ((P)-STORM DRAIN) Calculated SDCB-27 ((P)-STORM DRAIN) SURCHARGED SDCB-28 ((P)-STORM DRAIN) SURCHARGED SDCB-24 ((P)-STORM DRAIN) Calculated NS-02 ((P)-STORM DRAIN) SURCHARGED NS-05 ((P)-STORM DRAIN) SURCHARGED Inlet SURCHARGED SDMH-04 ((P)-STORM DRAIN) SURCHARGED SDMH-23 ((P)-STORM DRAIN) SURCHARGED SDMH-17 ((P)-STORM DRAIN) Calculated NS-50 ((P)-STORM DRAIN) SURCHARGED Jun Calculated Jun Calculated Jun Calculated SDMH-04 ((P)-STORM DRAIN) Calculated Inlet SURCHARGED NS-55 ((P)-STORM DRAIN) SURCHARGED NS-18 ((P)-STORM DRAIN) Calculated NS-01 ((P)-STORM DRAIN) SURCHARGED (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) Calculated SDMH-02 ((P)-STORM DRAIN) Calculated (P)-STORM DRAIN - Under Drains (32) ((P)-STORM DRAIN - Under Drains) Calculated NS-52 ((P)-STORM DRAIN) Calculated Inlet Calculated Inlet SURCHARGED SDMH-05 ((P)-STORM DRAIN) Calculated NS-55 ((P)-STORM DRAIN) Calculated Jun Calculated Jun Calculated NS-17 ((P)-STORM DRAIN) Calculated

40 Inlet Summary SN Element Inlet Manufacturer Inlet Number of Catchbasin Max (Rim) Initial Ponded Peak Peak Flow Peak Flow Inlet Allowable Max Gutter Max Gutter ID Manufacturer Part Location Inlets Invert Elevation Water Area Flow Intercepted Bypassing Efficiency Spread Spread Water Elev. Number Elevation Elevation by Inlet during Peak during Peak during Peak Inlet Flow Flow Flow (ft) (ft) (ft) (ft²) (cfs) (cfs) (cfs) (%) (ft) (ft) (ft) 1 Inlet-01 CALTRANS G1 On Sag N/A N/A N/A Inlet-02 CALTRANS G1 On Sag N/A N/A N/A Inlet-03 CALTRANS G1 On Sag N/A N/A N/A Inlet-05 CALTRANS G1 On Sag N/A N/A N/A Inlet-09 CALTRANS G1 On Sag N/A N/A N/A Inlet-12 FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A Inlet-15 CALTRANS G1 On Sag N/A N/A N/A Jun-01 CALTRANS G1 On Sag N/A N/A N/A NS-03 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A NS-05 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A NS-06 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A NS-07 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-03 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-05 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-13 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-16 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-17 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-18 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-19 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-21 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-22 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-24 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-25 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-26 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-27 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-28 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-29 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-30 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-32 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-43 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-44 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-45 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-46 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-47 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-48 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-49 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-50 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-51 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-52 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-53 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDCB-56 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-57 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-59 CALTRANS G1 On Sag N/A N/A N/A SDCB-60 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-61 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-62 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-70 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-85 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag N/A N/A N/A SDCB-87 ((P)-STORM DRAIN) CALTRANS Slotted Drain On Sag N/A N/A N/A SDMH-04 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A SDMH-26 ((P)-STORM DRAIN) CALTRANS G1 On Sag N/A N/A N/A

41 Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded ID Elevation (Max) (Max) Water Water Elevation Depth Area Elevation Offset Elevation Depth (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) 1 (P)-STORM DRAIN - Under Drains (31) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (32) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (58) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (87) ((P)-STORM DRAIN - Under Drains) Jun Jun Jun Jun NS-01 ((P)-STORM DRAIN) NS-02 ((P)-STORM DRAIN) NS-13 ((P)-STORM DRAIN) NS-15 ((P)-STORM DRAIN) NS-17 ((P)-STORM DRAIN) NS-18 ((P)-STORM DRAIN) NS-19 ((P)-STORM DRAIN) NS-21 ((P)-STORM DRAIN) NS-22 ((P)-STORM DRAIN) NS-23 ((P)-STORM DRAIN) NS-25 ((P)-STORM DRAIN) NS-26 ((P)-STORM DRAIN) NS-27 ((P)-STORM DRAIN) NS-28 ((P)-STORM DRAIN) NS-30 ((P)-STORM DRAIN) NS-50 ((P)-STORM DRAIN) NS-51 ((P)-STORM DRAIN) NS-52 ((P)-STORM DRAIN) NS-53 ((P)-STORM DRAIN) NS-54 ((P)-STORM DRAIN) NS-55 ((P)-STORM DRAIN) NS-56 ((P)-STORM DRAIN) NS-57 ((P)-STORM DRAIN) NS-58 ((P)-STORM DRAIN) NS-59 ((P)-STORM DRAIN) NS-60 ((P)-STORM DRAIN) NS-61 ((P)-STORM DRAIN) NS-62 ((P)-STORM DRAIN) POC-01 ((P)-STORM DRAIN) POC-03 ((P)-STORM DRAIN) POC-05 ((P)-STORM DRAIN) POC-07 ((P)-STORM DRAIN) POC-08 ((P)-STORM DRAIN) POC-09 ((P)-STORM DRAIN) POC-10 ((P)-STORM DRAIN) POC-12 ((P)-STORM DRAIN) SDAD-01 ((P)-STORM DRAIN) SDAD-02 ((P)-STORM DRAIN) SDAD-03 ((P)-STORM DRAIN) SDAD-04 ((P)-STORM DRAIN) SDAD-05 ((P)-STORM DRAIN) SDAD-06 ((P)-STORM DRAIN) SDAD-07 ((P)-STORM DRAIN) SDAD-08 ((P)-STORM DRAIN) SDAD-09 ((P)-STORM DRAIN) SDAD-10 ((P)-STORM DRAIN) SDAD-11 ((P)-STORM DRAIN) SDAD-12 ((P)-STORM DRAIN) SDAD-15 ((P)-STORM DRAIN) SDAD-16 ((P)-STORM DRAIN) SDAD-17 ((P)-STORM DRAIN) SDAD-18 ((P)-STORM DRAIN) SDAD-19 ((P)-STORM DRAIN) SDAD-20 ((P)-STORM DRAIN) SDAD-21 ((P)-STORM DRAIN) SDAD-22 ((P)-STORM DRAIN) SDAD-23 ((P)-STORM DRAIN) SDAD-24 ((P)-STORM DRAIN) SDAD-25 ((P)-STORM DRAIN) SDAD-26 ((P)-STORM DRAIN) SDAD-27 ((P)-STORM DRAIN) SDAD-28 ((P)-STORM DRAIN) SDCB-01 ((P)-STORM DRAIN) SDCB-02 ((P)-STORM DRAIN) SDCB-20 ((P)-STORM DRAIN) SDCB-23 ((P)-STORM DRAIN) SDCB-31 ((P)-STORM DRAIN) SDCB-38 ((P)-STORM DRAIN) SDCB-39 ((P)-STORM DRAIN) SDCB-40 ((P)-STORM DRAIN) SDCB-65 ((P)-STORM DRAIN) SDCB-80 ((P)-STORM DRAIN) SDCB-81 ((P)-STORM DRAIN)

42 Minimum Pipe Cover (in)

43 Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded ID Elevation (Max) (Max) Water Water Elevation Depth Area Elevation Offset Elevation Depth (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft²) 83 SDCB-82 ((P)-STORM DRAIN) SDCB-83 ((P)-STORM DRAIN) SDCB-84 ((P)-STORM DRAIN) SDCB-86 ((P)-STORM DRAIN) SDCB-88 ((P)-STORM DRAIN) SDCB-89 ((P)-STORM DRAIN) SDCO-01 ((P)-STORM DRAIN) SDCO-02 ((P)-STORM DRAIN) SDCO-03 ((P)-STORM DRAIN) SDJS-01 ((P)-STORM DRAIN) SDMH-01 ((P)-STORM DRAIN) SDMH-02 ((P)-STORM DRAIN) SDMH-03 ((P)-STORM DRAIN) SDMH-05 ((P)-STORM DRAIN) SDMH-06 ((P)-STORM DRAIN) SDMH-07 ((P)-STORM DRAIN) SDMH-09 ((P)-STORM DRAIN) SDMH-10 ((P)-STORM DRAIN) SDMH-11 ((P)-STORM DRAIN) SDMH-12 ((P)-STORM DRAIN) SDMH-13 ((P)-STORM DRAIN) SDMH-14 ((P)-STORM DRAIN) SDMH-15 ((P)-STORM DRAIN) SDMH-16 ((P)-STORM DRAIN) SDMH-17 ((P)-STORM DRAIN) SDMH-18 ((P)-STORM DRAIN) SDMH-19 ((P)-STORM DRAIN) SDMH-20 ((P)-STORM DRAIN) SDMH-21 ((P)-STORM DRAIN) SDMH-22 ((P)-STORM DRAIN) SDMH-23 ((P)-STORM DRAIN) SDMH-24 ((P)-STORM DRAIN) SDMH-25 ((P)-STORM DRAIN) SDMH-27 ((P)-STORM DRAIN) SDMH-28 ((P)-STORM DRAIN) SDMH-29 ((P)-STORM DRAIN) SDMH-31 ((P)-STORM DRAIN)

44 Minimum Pipe Cover (in)

45 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Inflow Attained Attained Depth Attained Attained Attained Attained (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) 1 (P)-STORM DRAIN - Under Drains (31) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (32) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (58) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (84) ((P)-STORM DRAIN - Under Drains) (P)-STORM DRAIN - Under Drains (87) ((P)-STORM DRAIN - Under Drains) Jun Jun Jun Jun NS-01 ((P)-STORM DRAIN) NS-02 ((P)-STORM DRAIN) NS-13 ((P)-STORM DRAIN) NS-15 ((P)-STORM DRAIN) NS-17 ((P)-STORM DRAIN) NS-18 ((P)-STORM DRAIN) NS-19 ((P)-STORM DRAIN) NS-21 ((P)-STORM DRAIN) NS-22 ((P)-STORM DRAIN) NS-23 ((P)-STORM DRAIN) NS-25 ((P)-STORM DRAIN) NS-26 ((P)-STORM DRAIN) NS-27 ((P)-STORM DRAIN) NS-28 ((P)-STORM DRAIN) NS-30 ((P)-STORM DRAIN) NS-50 ((P)-STORM DRAIN) NS-51 ((P)-STORM DRAIN) NS-52 ((P)-STORM DRAIN) NS-53 ((P)-STORM DRAIN) NS-54 ((P)-STORM DRAIN) NS-55 ((P)-STORM DRAIN) NS-56 ((P)-STORM DRAIN) NS-57 ((P)-STORM DRAIN) NS-58 ((P)-STORM DRAIN) NS-59 ((P)-STORM DRAIN) NS-60 ((P)-STORM DRAIN) NS-61 ((P)-STORM DRAIN) NS-62 ((P)-STORM DRAIN) POC-01 ((P)-STORM DRAIN) POC-03 ((P)-STORM DRAIN) POC-05 ((P)-STORM DRAIN) POC-07 ((P)-STORM DRAIN) POC-08 ((P)-STORM DRAIN) POC-09 ((P)-STORM DRAIN) POC-10 ((P)-STORM DRAIN) POC-12 ((P)-STORM DRAIN) SDAD-01 ((P)-STORM DRAIN) SDAD-02 ((P)-STORM DRAIN) SDAD-03 ((P)-STORM DRAIN) SDAD-04 ((P)-STORM DRAIN) SDAD-05 ((P)-STORM DRAIN) SDAD-06 ((P)-STORM DRAIN) SDAD-07 ((P)-STORM DRAIN) SDAD-08 ((P)-STORM DRAIN) SDAD-09 ((P)-STORM DRAIN) SDAD-10 ((P)-STORM DRAIN) SDAD-11 ((P)-STORM DRAIN) SDAD-12 ((P)-STORM DRAIN) SDAD-15 ((P)-STORM DRAIN) SDAD-16 ((P)-STORM DRAIN) SDAD-17 ((P)-STORM DRAIN) SDAD-18 ((P)-STORM DRAIN) SDAD-19 ((P)-STORM DRAIN) SDAD-20 ((P)-STORM DRAIN) SDAD-21 ((P)-STORM DRAIN) SDAD-22 ((P)-STORM DRAIN) SDAD-23 ((P)-STORM DRAIN) SDAD-24 ((P)-STORM DRAIN) SDAD-25 ((P)-STORM DRAIN) SDAD-26 ((P)-STORM DRAIN) SDAD-27 ((P)-STORM DRAIN) SDAD-28 ((P)-STORM DRAIN) SDCB-01 ((P)-STORM DRAIN) SDCB-02 ((P)-STORM DRAIN) SDCB-20 ((P)-STORM DRAIN) SDCB-23 ((P)-STORM DRAIN) SDCB-31 ((P)-STORM DRAIN) SDCB-38 ((P)-STORM DRAIN) SDCB-39 ((P)-STORM DRAIN) SDCB-40 ((P)-STORM DRAIN) SDCB-65 ((P)-STORM DRAIN) SDCB-80 ((P)-STORM DRAIN)

46 Time of Time of Total Total Time Max HGL Peak Flooded Flooded Occurrence Flooding Volume Occurrence (days hh:mm) (days hh:mm) (ac-in) (min) 0 00: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

47 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Inflow Attained Attained Depth Attained Attained Attained Attained (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) 82 SDCB-81 ((P)-STORM DRAIN) SDCB-82 ((P)-STORM DRAIN) SDCB-83 ((P)-STORM DRAIN) SDCB-84 ((P)-STORM DRAIN) SDCB-86 ((P)-STORM DRAIN) SDCB-88 ((P)-STORM DRAIN) SDCB-89 ((P)-STORM DRAIN) SDCO-01 ((P)-STORM DRAIN) SDCO-02 ((P)-STORM DRAIN) SDCO-03 ((P)-STORM DRAIN) SDJS-01 ((P)-STORM DRAIN) SDMH-01 ((P)-STORM DRAIN) SDMH-02 ((P)-STORM DRAIN) SDMH-03 ((P)-STORM DRAIN) SDMH-05 ((P)-STORM DRAIN) SDMH-06 ((P)-STORM DRAIN) SDMH-07 ((P)-STORM DRAIN) SDMH-09 ((P)-STORM DRAIN) SDMH-10 ((P)-STORM DRAIN) SDMH-11 ((P)-STORM DRAIN) SDMH-12 ((P)-STORM DRAIN) SDMH-13 ((P)-STORM DRAIN) SDMH-14 ((P)-STORM DRAIN) SDMH-15 ((P)-STORM DRAIN) SDMH-16 ((P)-STORM DRAIN) SDMH-17 ((P)-STORM DRAIN) SDMH-18 ((P)-STORM DRAIN) SDMH-19 ((P)-STORM DRAIN) SDMH-20 ((P)-STORM DRAIN) SDMH-21 ((P)-STORM DRAIN) SDMH-22 ((P)-STORM DRAIN) SDMH-23 ((P)-STORM DRAIN) SDMH-24 ((P)-STORM DRAIN) SDMH-25 ((P)-STORM DRAIN) SDMH-27 ((P)-STORM DRAIN) SDMH-28 ((P)-STORM DRAIN) SDMH-29 ((P)-STORM DRAIN) SDMH-31 ((P)-STORM DRAIN)

48 Time of Time of Total Total Time Max HGL Peak Flooded Flooded Occurrence Flooding Volume Occurrence (days hh:mm) (days hh:mm) (ac-in) (min) 0 00: : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

49 Pipe Input SN Element Length Inlet Inlet Outlet ID Invert Invert Invert Elevation Offset Elevation (ft) (ft) (ft) (ft) 1 {(P)-STORM DRAIN - Under Drains}.8 inch HDPE Pipe (P)-STORM DRAIN - Under Drains - (51) ((P)-STORM DRAIN - Under Drains) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (113) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (119) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (127) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (128) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (168) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (180) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (181) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (250) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (109) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (111) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (204) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.3 inch HDPE Pipe (P)-STORM DRAIN - (212) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (206) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (207) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (244) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (245) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (246) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (247) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (158) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (202) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (203) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (205) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (219) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (220) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (221) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (223) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (224) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (226) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (227) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (228) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (229) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (230) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (231) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (232) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (234) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (236) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (240) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (248) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (200) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (211) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A-01_1 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A-01_2 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A-06 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A-08 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A-16 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A {(P)-STORM DRAIN}.A-21 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.BLD_F-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.BLD_F-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.BLD_F-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.BLDG_C-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.BLDG_C-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-05 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-10 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.C-11 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D-01 ((P)-STORM DRAIN)

50 Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Offset Height (ft) (ft) (%) (in) (in) (cfs) CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No 1

51 Pipe Input SN Element Length Inlet Inlet Outlet ID Invert Invert Invert Elevation Offset Elevation (ft) (ft) (ft) (ft) 83 {(P)-STORM DRAIN}.D-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D-05 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D-06 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D-07 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D1-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D1-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.D1-1 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.E-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.E-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.E-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.G-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.G-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H_LAT-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H_LAT-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H_LAT-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-05 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-05 (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-06 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.H-07 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-05 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-07 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-10 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.I-11 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.J-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.J-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.K-01 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.K-02 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.K-03 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.K-04 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-B-B1 6''_4 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-B-B1 6''_5 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-B-B1 6''_5 (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-B-B2 6''_5 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8 1 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8 2 (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8''_3 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8''_4 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8''_5 (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C 8''_5 (1) (1) ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B1 8''_2 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B1 8''_3 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B1 8''_4 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B1 8''_5 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B1 8''_6 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-C-B3 6''_9 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B1 8''_6 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B3 8''_8 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B3 8''_9 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B4 8''_10 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B5 8''_12 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B5 8''_13 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B5 8''_14 ((P)-STORM DRAIN) {(P)-STORM DRAIN}.SD-D-B6 8''_15 ((P)-STORM DRAIN) A A A A A A E EX EX EX Link Link Link Link Link Link Link Link Link Link

52 Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Offset Height (ft) (ft) (%) (in) (in) (cfs) CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No 1

53 Pipe Input SN Element Length Inlet Inlet Outlet ID Invert Invert Invert Elevation Offset Elevation (ft) (ft) (ft) (ft) 165 Link Link Link Link Link Link

54 Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. of Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Offset Height (ft) (ft) (%) (in) (in) (cfs) CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No CIRCULAR No 1

55 Pipe Results SN Element Peak Time of Design Flow ID Flow Peak Flow Capacity Occurrence (cfs) (days hh:mm) (cfs) 1 {(P)-STORM DRAIN - Under Drains}.8 inch HDPE Pipe (P)-STORM DRAIN - Under Drains - (51) ((P)-STORM DRAIN - Under Drains) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (113) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (119) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (127) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (128) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (168) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (180) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (181) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.12 inch HDPE Pipe (P)-STORM DRAIN - (250) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (109) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (111) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.18 inch HDPE Pipe (P)-STORM DRAIN - (204) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.3 inch HDPE Pipe (P)-STORM DRAIN - (212) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (206) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (207) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (244) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (245) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (246) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.4 inch HDPE Pipe (P)-STORM DRAIN - (247) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (158) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (202) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (203) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (205) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (209) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (219) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (220) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (221) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (223) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (224) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (225) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (226) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (227) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (228) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (229) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (230) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (231) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (232) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (234) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (235) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (236) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (239) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (240) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.6 inch HDPE Pipe (P)-STORM DRAIN - (248) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (200) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (201) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (208) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.8 inch HDPE Pipe (P)-STORM DRAIN - (211) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A-01_1 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A-01_2 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A-06 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A-08 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A-16 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A : {(P)-STORM DRAIN}.A-21 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.BLD_F-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.BLD_F-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.BLD_F-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.BLDG_C-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.BLDG_C-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-05 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-10 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.C-11 ((P)-STORM DRAIN) :

56 Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Ratio Total Depth Ratio (ft/sec) (min) (ft) (min) Calculated Calculated Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED SURCHARGED Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED Calculated SURCHARGED Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated

57 Pipe Results SN Element Peak Time of Design Flow ID Flow Peak Flow Capacity Occurrence (cfs) (days hh:mm) (cfs) 82 {(P)-STORM DRAIN}.D-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D-05 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D-06 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D-07 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D1-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D1-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.D1-1 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.E-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.E-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.E-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.G-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.G-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H_LAT-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H_LAT-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H_LAT-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-05 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-05 (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-06 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.H-07 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-05 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-07 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-10 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.I-11 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.J-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.J-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.K-01 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.K-02 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.K-03 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.K-04 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-B-B1 6''_4 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-B-B1 6''_5 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-B-B1 6''_5 (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-B-B2 6''_5 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8 1 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8 2 (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8''_3 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8''_4 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8''_5 (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C 8''_5 (1) (1) ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B1 8''_2 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B1 8''_3 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B1 8''_4 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B1 8''_5 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B1 8''_6 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-C-B3 6''_9 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B1 8''_6 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B3 8''_8 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B3 8''_9 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B4 8''_10 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B5 8''_12 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B5 8''_13 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B5 8''_14 ((P)-STORM DRAIN) : {(P)-STORM DRAIN}.SD-D-B6 8''_15 ((P)-STORM DRAIN) : A : A : A : A : A : A : E : EX : EX : EX : Link : Link : Link : Link : Link : Link : Link : Link :

58 Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Ratio Total Depth Ratio (ft/sec) (min) (ft) (min) Calculated Calculated Calculated Calculated Calculated SURCHARGED Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED Calculated Calculated SURCHARGED SURCHARGED Calculated SURCHARGED SURCHARGED SURCHARGED SURCHARGED SURCHARGED Calculated SURCHARGED Calculated Calculated Calculated Calculated SURCHARGED SURCHARGED Calculated SURCHARGED Calculated Calculated Calculated

59 Pipe Results SN Element Peak Time of Design Flow ID Flow Peak Flow Capacity Occurrence (cfs) (days hh:mm) (cfs) 163 Link : Link : Link : Link : Link : Link : Link : Link :

60 Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Ratio Total Depth Ratio (ft/sec) (min) (ft) (min) Calculated Calculated SURCHARGED Calculated Calculated Calculated Calculated Calculated

61 Inlet Input SN Element Inlet Manufacturer Inlet Number of Catchbasin Max (Rim) Inlet Initial Initial Ponded Grate ID Manufacturer Part Location Inlets Invert Elevation Depth Water Water Area Clogging Number Elevation Elevation Depth Factor (ft) (ft) (ft) (ft) (ft) (ft²) (%) 1 Inlet-01 CALTRANS G1 On Sag Inlet-02 CALTRANS G1 On Sag Inlet-03 CALTRANS G1 On Sag Inlet-05 CALTRANS G1 On Sag Inlet-09 CALTRANS G1 On Sag Inlet-12 FHWA HEC-22 GENERIC N/A On Sag Inlet-15 CALTRANS G1 On Sag Jun-01 CALTRANS G1 On Sag NS-03 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag NS-05 ((P)-STORM DRAIN) CALTRANS G1 On Sag NS-06 ((P)-STORM DRAIN) CALTRANS G1 On Sag NS-07 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-03 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-05 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-13 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-16 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-17 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-18 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-19 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-21 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-22 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-24 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-25 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-26 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-27 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-28 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-29 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-30 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-32 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-43 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-44 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-45 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-46 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-47 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-48 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-49 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-50 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-51 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-52 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-53 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDCB-56 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-57 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-59 CALTRANS G1 On Sag SDCB-60 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-61 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-62 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-70 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-85 ((P)-STORM DRAIN) FHWA HEC-22 GENERIC N/A On Sag SDCB-87 ((P)-STORM DRAIN) CALTRANS Slotted Drain On Sag SDMH-04 ((P)-STORM DRAIN) CALTRANS G1 On Sag SDMH-26 ((P)-STORM DRAIN) CALTRANS G1 On Sag

62 Roadway & Gutter Input SN Element Roadway Roadway Roadway Gutter Gutter Gutter Allowable ID Longitudinal Cross Manning's Cross Width Depression Spread Slope Slope Roughness Slope (ft/ft) (ft/ft) (ft/ft) (ft) (in) (ft) 1 Inlet-01 N/A Inlet-02 N/A Inlet-03 N/A Inlet-05 N/A Inlet-09 N/A Inlet-12 N/A Inlet-15 N/A Jun-01 N/A NS-03 ((P)-STORM DRAIN) N/A NS-05 ((P)-STORM DRAIN) N/A NS-06 ((P)-STORM DRAIN) N/A NS-07 ((P)-STORM DRAIN) N/A SDCB-03 ((P)-STORM DRAIN) N/A SDCB-05 ((P)-STORM DRAIN) N/A SDCB-13 ((P)-STORM DRAIN) N/A SDCB-16 ((P)-STORM DRAIN) N/A SDCB-17 ((P)-STORM DRAIN) N/A SDCB-18 ((P)-STORM DRAIN) N/A SDCB-19 ((P)-STORM DRAIN) N/A SDCB-21 ((P)-STORM DRAIN) N/A SDCB-22 ((P)-STORM DRAIN) N/A SDCB-24 ((P)-STORM DRAIN) N/A SDCB-25 ((P)-STORM DRAIN) N/A SDCB-26 ((P)-STORM DRAIN) N/A SDCB-27 ((P)-STORM DRAIN) N/A SDCB-28 ((P)-STORM DRAIN) N/A SDCB-29 ((P)-STORM DRAIN) N/A SDCB-30 ((P)-STORM DRAIN) N/A SDCB-32 ((P)-STORM DRAIN) N/A SDCB-43 ((P)-STORM DRAIN) N/A SDCB-44 ((P)-STORM DRAIN) N/A SDCB-45 ((P)-STORM DRAIN) N/A SDCB-46 ((P)-STORM DRAIN) N/A SDCB-47 ((P)-STORM DRAIN) N/A SDCB-48 ((P)-STORM DRAIN) N/A SDCB-49 ((P)-STORM DRAIN) N/A SDCB-50 ((P)-STORM DRAIN) N/A SDCB-51 ((P)-STORM DRAIN) N/A SDCB-52 ((P)-STORM DRAIN) N/A SDCB-53 ((P)-STORM DRAIN) N/A SDCB-56 ((P)-STORM DRAIN) N/A SDCB-57 ((P)-STORM DRAIN) N/A SDCB-59 N/A SDCB-60 ((P)-STORM DRAIN) N/A SDCB-61 ((P)-STORM DRAIN) N/A SDCB-62 ((P)-STORM DRAIN) N/A SDCB-70 ((P)-STORM DRAIN) N/A SDCB-85 ((P)-STORM DRAIN) N/A SDCB-87 ((P)-STORM DRAIN) N/A SDMH-04 ((P)-STORM DRAIN) N/A SDMH-26 ((P)-STORM DRAIN) N/A

63 Inlet Results SN Element Peak Peak Peak Flow Peak Flow Inlet Max Gutter Max Gutter Max Gutter Time of Total Total Time ID Flow Lateral Intercepted Bypassing Efficiency Spread Water Elev. Water Depth Max Depth Flooded Flooded Inflow by Inlet during Peak during Peak during Peak during Peak Occurrence Volume Inlet Flow Flow Flow Flow (cfs) (cfs) (cfs) (cfs) (%) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Inlet N/A N/A N/A : Inlet N/A N/A N/A : Inlet N/A N/A N/A : Inlet N/A N/A N/A : Inlet N/A N/A N/A : Inlet N/A N/A N/A : Inlet N/A N/A N/A : Jun N/A N/A N/A : NS-03 ((P)-STORM DRAIN) N/A N/A N/A : NS-05 ((P)-STORM DRAIN) N/A N/A N/A : NS-06 ((P)-STORM DRAIN) N/A N/A N/A : NS-07 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-03 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-05 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-13 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-16 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-17 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-18 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-19 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-21 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-22 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-24 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-25 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-26 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-27 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-28 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-29 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-30 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-32 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-43 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-44 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-45 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-46 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-47 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-48 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-49 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-50 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-51 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-52 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-53 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-56 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-57 ((P)-STORM DRAIN) N/A N/A N/A : SDCB N/A N/A N/A : SDCB-60 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-61 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-62 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-70 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-85 ((P)-STORM DRAIN) N/A N/A N/A : SDCB-87 ((P)-STORM DRAIN) N/A N/A N/A : SDMH-04 ((P)-STORM DRAIN) N/A N/A N/A : SDMH-26 ((P)-STORM DRAIN) N/A N/A N/A :

64 F. LA COUNTY ALLOWABLE STORM WATER DISCHARGE Exposition Metro Line Construction Authority 26 W2 Design, Inc.

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Hydrology and Hydraulics Design Report. Background Summary

Hydrology and Hydraulics Design Report. Background Summary To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Chapter 5 CALIBRATION AND VERIFICATION

Chapter 5 CALIBRATION AND VERIFICATION Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905

More information

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO 88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

Appendix C Fluvial Flood Hazards

Appendix C Fluvial Flood Hazards Appendix C Fluvial Flood Hazards Sea Level Rise Vulnerability Assessment and Adaptation Project March 2019 Contents Contents... i Figures... i Tables... i Definitions, Acronyms, & Abbreviations... ii

More information

Basic Hydraulics June 2007

Basic Hydraulics  June 2007 Basic Hydraulics www.concrete-pipe.org June 2007 2007 Overview Open Channel Flow Manning Equation Basic Culvert Design Sanitary Sewer Design Flow, Velocity Stormwater Sewer Design Flow, Velocity 2 Open

More information

FHWA - HIGHWAY HYDROLOGY

FHWA - HIGHWAY HYDROLOGY The unit peak discharge is computed with Equation 5.6 by interpolating c 0, c, and c Table 5.5 using a type II distribution. The peak discharge is also calculated as follows. from Variable SI Unit U Unit.5444

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT 154 A HYDROLOGC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY N QUEENS, NY Monica Tsang-Rakovan, Kevin J. Phillips, Khalid Bajwa, John Ferrelli, Fanning, Phillips and Molnar Fanning,

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

STORMWATER DESIGN CALCULATIONS

STORMWATER DESIGN CALCULATIONS STORMWATER DESIGN CALCULATIONS REF : C7011-2390 AT 19a-23 MEMORIAL AVENUE BLACKWALL FOR MR KERR Contents 1.0 Detention System Requirements 1.1 Storage-Area calcs. 1.2 Data Files for Pre & Post Developed

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT. February 2017

Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT. February 2017 Wal-mart Store #6746-00 Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT February 2017 CPH Project No. W13900 1031-C W. 23rd Street Panama City, FL 32405 Phone

More information

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015 CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1 ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015 AGENCY: City of Perris PROJECT: Flood Control Maintenance District No. 1 TO: City Council

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

Section 3.0 Existing Systems Hydrology and Hydraulics

Section 3.0 Existing Systems Hydrology and Hydraulics Section 3.0 Existing Systems Hydrology and Hydraulics This chapter summarizes the results and methodology of MACTEC s evaluation of the existing drainage systems and lakes for the City of Maitland, Florida.

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

Drainage Study for Civic Center Way

Drainage Study for Civic Center Way Drainage Study for 23401 Civic Center Way P.C.C.E. INC. CIVIL ENGINEERING AND DESIGN Drainage Study for 23401 Civic Center Way WHOLE FOODS AT THE PARK Prepared by: P.C.C.E. INC STEPHEN R. SMITH, P.E. 23801

More information

3.11 Floodplains Existing Conditions

3.11 Floodplains Existing Conditions Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales

More information

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011 CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1 ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011 AGENCY: City of Perris PROJECT: Flood Control Maintenance District No. 1 TO: City Council

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT

Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Pequabuck River Flooding Study and Flood Mitigation Plan The City of Bristol and Towns of Plainville and Plymouth, CT Raymond Rogozinski and Maged Aboelata The City of Bristol and Towns of Plainville and

More information

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4 These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary

More information

DRAINAGE CALCULATIONS

DRAINAGE CALCULATIONS DRAINAGE CALCULATIONS NW 8 th Street and NW 8 th Terrace Roadway and Drainage Improvements City of Miami Project B-30745 And NW 14 th Court Roadway and Drainage Improvements City of Miami Project B-30746

More information

Bushkill Creek 3 rd Street Dam Removal Analysis

Bushkill Creek 3 rd Street Dam Removal Analysis Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents

More information

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017 SERVICING BRIEF & STORMWATER MANAGEMENT REPORT 2980 Colonial Road Sarsfield (Ottawa), Ontario Report No. 16033 June 15, 2017 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading &

More information

12 SWAT USER S MANUAL, VERSION 98.1

12 SWAT USER S MANUAL, VERSION 98.1 12 SWAT USER S MANUAL, VERSION 98.1 CANOPY STORAGE. Canopy storage is the water intercepted by vegetative surfaces (the canopy) where it is held and made available for evaporation. When using the curve

More information

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado PRELIMINARY DRAINAGE REPORT Strategic Land Solutions, Inc. JN: 16-002-15 Report Date/History: July

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

Appendix B Equations and Examples

Appendix B Equations and Examples Equations and Examples Purpose The purpose of this appendix is to provide background equations and example problems for clarity of calculations used throughout the manual. This appendix is divided into

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

FUNCTIONAL SERVICING REPORT AND SWM REPORT

FUNCTIONAL SERVICING REPORT AND SWM REPORT FUNCTIONAL SERVICING REPORT AND SWM REPORT 104 WHITE CRESCENT CITY OF BARRIE, COUNTY OF SIMCOE December 2018 18058 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. SUPPORTING DOCUMENTS... 4 3. DESIGN POPULATION...

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

Appendix D. Model Setup, Calibration, and Validation

Appendix D. Model Setup, Calibration, and Validation . Model Setup, Calibration, and Validation Lower Grand River Watershed TMDL January 1 1. Model Selection and Setup The Loading Simulation Program in C++ (LSPC) was selected to address the modeling needs

More information

Workshop: Build a Basic HEC-HMS Model from Scratch

Workshop: Build a Basic HEC-HMS Model from Scratch Workshop: Build a Basic HEC-HMS Model from Scratch This workshop is designed to help new users of HEC-HMS learn how to apply the software. Not all the capabilities in HEC-HMS are demonstrated in the workshop

More information

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00'

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00' DAVID NOEL KELLY CIVIL David Noel Kelly 2014.07.22 10:24:14-04'00' TABLE OF CONTENTS Stormwater Management Summary Checklist for Stormwater Report Illicit Discharge Statement Runoff Summary Existing Conditions

More information

Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Flood Technical Committee Where the Rain Falls Matters I-30 versus I-20 I-20 Backwater and Tributary Floods (Localized) 2016 Flood

More information

WELCOME Lake Wabukayne OPEN HOUSE

WELCOME Lake Wabukayne OPEN HOUSE WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

Relationship between rainfall and beach bacterial concentrations on Santa Monica Bay beaches

Relationship between rainfall and beach bacterial concentrations on Santa Monica Bay beaches 85 IWA Publishing 2003 Journal of Water and Health 01.2 2003 Relationship between rainfall and beach bacterial concentrations on Santa Monica Bay beaches Drew Ackerman and Stephen B. Weisberg ABSTRACT

More information

Urban Hydrology for Small Watersheds

Urban Hydrology for Small Watersheds United States Department of Agriculture Natural Resources Conservation Service Conservation Engineering Division Urban Hydrology for Small Watersheds TR-55 Technical Release 55 June 1986 To show bookmarks

More information

Phillips Ditch Drainage Study

Phillips Ditch Drainage Study Phillips Ditch Drainage Study By: David L. McCormick, PE, D. WRE McCormick Engineering, LLC For: St. Joseph County, Indiana Revision Date: March 29, 2017 Table of Contents 1. INTRODUCTION... 1 1.1. Review

More information

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC

L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING. PREPARED BY: LandC, etc, LLC L OWER N OOKSACK R IVER P ROJECT: A LTERNATIVES A NALYSIS A PPENDIX A: H YDRAULIC M ODELING PREPARED BY: LandC, etc, LLC TABLE OF CONTENTS 1 Introduction... 1 2 Methods... 1 2.1 Hydraulic Model... 1 2.2

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS New England East-West Solution (NEEWS) Greater Springfield Reliability

More information

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study 2016/2017 Results & 2017/2018 Plan May 2, 2018 Angel Mejia, P.E., Project Manager Oliver Pohl, P.E., Sr. Project Engineer Nicole Kwan, P.E.,

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Determination of Urban Runoff Using ILLUDAS and GIS

Determination of Urban Runoff Using ILLUDAS and GIS Texas A&M University Department of Civil Engineering Instructor: Dr. Francisco Olivera CVEN689 Applications of GIS to Civil Engineering Determination of Urban Runoff Using ILLUDAS and GIS Tae Jin Kim 03.

More information

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collection... 2 Treatment... 3 Storage... 3 Disposal... 4 Soils...

More information

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain?

Dealing with Zone A Flood Zones. Topics of Discussion. What is a Zone A Floodplain? Dealing with Zone A Flood Zones Topics of Discussion Overview of Zone A Floodplains Permitting Development in Zone A Floodplains Estimating Flood Elevations in Zone A Flood Insurance Implications Letters

More information

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan

Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan Appendix K.2: Sediment Management Excerpt from South Orange County Hydromodification Management Plan 4 Sediment Supply Management Requirements Permit Order R9-2013-0001 as amended by Order No. R9-2015-0001Section

More information

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids Concrete Sustainability Conference April 14 th 2010, Tempe, AZ Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological l Performance and Suspended Solids Discharge Luis A. Mata,

More information

Monitoring Considerations and Costs

Monitoring Considerations and Costs Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.

More information

STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA

STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA The City of Committed to Total Service Excellence STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA April 2015 Revised

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough

D.M. Wills Associates Limited PARTNERS IN ENGINEERING. Stormwater Management Report. City of Peterborough Stormwater Management Report City of Peterborough P-20-12 Parkway Corridor Class Environmental Assessment Jackson Park Parkhill Road West to Chemong Road D.M. Wills Project No. 12-5061 D.M. Wills Associates

More information