Road Construction Department AT A GLANCE

Size: px
Start display at page:

Download "Road Construction Department AT A GLANCE"

Transcription

1 Road Construction Department AT A GLANCE

2 Road Network under RCD (in Km) Category Total Length Single lane Intermediate Lane 2-Lane More than 2 lane National Highways State Highways % % Major District Roads % Total Overall %

3 Sl. No. ACHIEVEMENT Name of Scheme Outlay (Crores) Expenditure (Crores) 1 Training Machine and equipment Bridge Major Roads Major Roads (SC Components) RIDF (NABARD) Bridge Mukhya Mantri Setu Nirman Yojana Central Road Fund (Central Share) Central Road Fund (Sate Share) ADB Project Indo-Nepal Boder Road Special Assistance (BRG-Road) LWE (Central Share) LWE (State Share) Total % Expenditure 99.20%

4 Sl. No. OUTLAY FOR Name of Scheme Outlay (Crores) 1 Training Machine and equipment State Plan (Bridge) RIDF (NABARD) State Plan (Major Roads) Mukhya Mantri Setu Nirman Yojana Central Road Fund (Central Share) ADB (Externally Funded Scheme) Indo-Nepal Border Road Major Roads (SC Component) Central Road Fund (State Share) LWE (Central Share) LWE (State Share) Total

5 NATIONAL HIGHWAYS Total length of NHs in Bihar : Kms. a) Length of NHs with RCD : Kms. b) Length of NHs with NHAI : Kms.

6 National Highways

7 National Highways STATUS Good Fair Bad Total Length (Km) NHs with RCD % missing link & 150 km has not been transferred to NH Wing NHs with NHAI Length (Km) % Note:- NH wise status are included in subsequent slides...

8 SL. No. Condition of NHs under N. H. Wing RCD NH No. Name of NH Length (In KM) Condition(In KM) Good Fair Bad Remarks 1 2C Dehri-Akbarpur- Jadunathpur-Jardag Road Km work in progress Bad 52 km Protected Forest and missing link UP Bihar - Manjhi- Chapra-Hazipur-Patna Rehabilitation of MG Setu in progress 3 28B Chapwa-Bettiah- New NH- Kushinagar Bad condition in Protected Forest 5 30A Fatuha-Chandi -Harnaut- Saksohra- Barh Work in progress under NHIIP Mokama -Lakhisarai- Bhagalpur-Kahalgaon- Mirzachouki Korha - Katihar-Pranpur- Lava W/S work in progress Work in progress Work in progress Work in progress

9 Condition of NHs under N. H. Wing RCD SL. NH No. Name of NH Length Condition(In KM) Remarks No. (In KM) Good Fair Bad 8 82 Gaya Hisua Rajgir laning by BSRDC Biharsharif 9 98 Patna(Anishabad)- Bhusaula-Naubatpr Work in progress under NHIIP Bihram-Mahablipur- Arwal-Aurangabad- Hariharganj Dobhi to Gosaidih W/S in progress Chapra- Baniyapur- Mohammadpur W/S in progress Hajipur-Jandaha- Mushrigharari New NH- 227 Chakia- Madhuban- Shivhar- Sitamarhi- Bithamore-Jainagar- Khutauna- Narahiya Work sanctioned in 14 km, and in tender process Work in progress Darbhanga-Aunsi-Jainagar Work in progress Birpur-Madhepura-Bihpur W/S work in progress under NHIIP is missing link in koshi river Biharsharif-Ekangarsarai- Jehanabad- Arwal Work in progress

10 SL. No. Condition of NHs under N. H. Wing RCD NH No. Name of NH Length (In KM) Condition(In KM) Good Fair Bad Remarks A Vishwanathpur Chowk on NH- 22 (Old NH No-77) connecting Koili and terminating at Nanpur on NH-527C in The State of Bihar PR work sanctioned A Ahmadabad - Manihari - Katihar - Purnea ( Extenstion from Katihar to Ahmadabad vide Gazette Notification No- 677 (E) Dt under Section-V) km is missing link The Highway Starting from its Junction with NH-33 (Old NH No-80) in the State of Bihar connecting Godda and terminating at Choupa More on NH-114A in the State of Jharkhand W/S work in progress Bhabua-Chand-Dharauli

11 SL. No A E NH No. Name of NH Length (In KM) The Highway starting from Supaul on NH-327 and terminating at Bhaptiahi on NH-27 (Old NH No-57) in the State of Bihar. Galgalia-Thakurganj - Bahadurganj - Araria - Raniganj - Bhargawan - Triveniganj - Pipra - Supaul - Bariyahi Condition(In KM) Good Fair Bad Remarks Work in progress in km 0.00 to 39.00, to 68.00, to & 194 to Bariyarpur - Kharagpur - Lakshimpur - Jamui - Chakai W/S work in progress in km 62 to 75 & 117 to A Barbigha-Khaira-Jhajha-Katoria- Banka-Dhaka more-panjwara A Pakaharauni-Madhubani-Rampatti- Jhanjarpur Gaya-Daudnagar-Nasariganj- Dumaraon Work in progress in km 180 to & tender invited in km 62 to & km 142 to In tender process in km 103 to 142 & 182 to 201 & work awarded in km 143 to km is missing link A UP boarder-mairawan-siwan- Chhapawa A UP boarder-rampur Bujurg-Mairawan Total= Total length 147 km Fair 138 km, Bad 9 Km Not transferred to NH Wing Total length 4.5 km, - Not transferred to NH Wing

12 SL. No. NH No. Name of Section Road Condition of NHs under NHAI Length (in Km) Condition(In KM) Good Fair Bad Remarks 1 2 Naubatpur to UP Bihar Border and Barachatti, Bihar Section lanning work in progress 2 19 Chhapra- Hajipur lanning work in progress A 6 31 Arrah - Patna Work awarded Patna - Bakhtiyarpur lanning work completed except service lane & ROB Mohania- Kochas-Arrah Bathna Kutti (UP Border) to Muzaffarpur lanning work completed Muzaffarpur - Musrigharari - Dalsinghsharai- Barauni Piprakothi to Raxaul (km 0 to ) W/S work in progress Debour - Rajouli - Nawada - Biharsharif - Harnout PR work to be sanctioned Bakhtiarpur Bakhtiyarpur-Mokama- Barauni(Zero Mile)-Begusarai Work in progress Khagaria Khagraia- Purnea Purnea - Dalkola Kishanganj- West Bengal Boarder lanning completed 7 57 Muzaffarpur-Purnea

13 SL. No. NH No Name of Section Hazipur - Ramdayalu(Muzaffarpur) Section Road Condition of NHs under NHAI Length (in Km) Condition(In KM) Good Fair Bad Muzaffarpur - Sonbarsa Section Hathidah - Munger Biharsharif- Barbigha- Sarmera - Mokama bypass Junction Patna - Gaya-Dobhi Section Remarks 4 lanning substantially completed except ROB, Muz. Bypass Work awarded for 2 lane with paved shoulder Work awarded Arrah - Buxar Work awarded Chapra - Gopalganj Work in progress Chapra - Rawaghat- Muzaffarpur Work in progress 15 57A Forbisganj-Jogbani Work in progress B Sabhaganj- Manihari Approach LA work in progress Munger at NH-33 old NH-80 Approach of Rail-cum B Khagaria NH-31 Road Bridge C Manjhalui-Charut Section DPR work in progress Maheshkhunt-Sonbarsa-Saharsa- After handing over to NHAI estimate for Madhepur-Murliganj-Purnea repair has been sent Total=

14 Approval status of In-principle declared NH No. of Roads - 34 nos. Length Km Status of DPR: Presentation for Alignment & Feasibility for 15 roads under NH In-Principle has been done in MoRT&H. DPR preparation in all 34 roads (1943 Km) is under process. It is likely to be submitted within a month. Out of 34 roads, 13 roads of length 577 Km are in PM Package & 1 road of length 92 Km is in Bharatmala.

15 Item NHAI RCD Total Total Cost (Rs. Cr.) Total No of Works Awarded works No In Bidding / Sanction stage Total amount of works Awarded / In Bidding / in Sanction (Cr.) In DPR stage Abstract of PM Package Amount (Cr.) No Amount (Cr.) No. (15260cr) 17 No. (10885cr) 23 No. (26145cr)

16 Sl. No. Project Name EAP ZONE :- 1 Km 0.0 km 69.6 of NH- 30A (Fatua Harnaut Barh section) Length (in km) Details of PM Package TPC (in crore) Projects under RCD Present Status Start Date & completion date km/71 km DBM has been done. Physical progress is 65%. Issues:- 3G of Ha submitted by RCD to Ministry. Work before schedule time. 2 Km 40 to 79.4 of NH 104 (Sheohar Sitamarhi section Start Date (Lot-I & Completion date (Lot-I Physical progress 16% (WMM km, DBM 3.20km, /28 km), Issue:- Termination of contract has been recommended to MoRT&H. Work front available :- 85%

17 Sl. No. Project Name EAP ZONE :- 3 Up-gradation (km 79.4 to km 156.5) of NH 104 of Sitamarhi Jainagar section Details of PM Package Length (in km) TPC (in crore) Present Status Start Date , & Completion date Physical progress of Lot II- 13% / 40% (DBM 9.50km / 76km) Issues:- Slow work by Contractor Compensation distribution in Madhubani district to be expedited (Disbursement of Rs cr out of Rs. 72 cr) Work front available = 87% 4 Up-gradation (km to ) of NH 104 of Jainagar Narahia section Start Date ) & Completion date ). Physical progress 18% / 40% (DBM 9.20km / 56.5km.) Issues:- Slow work by Contractor Issue:- Compensation distribution in Madhubani district to be expedited Work front available:- 80%

18 Sl. No. Project Name EAP ZONE :- 5 Up-gradation of (km 0-106) Birpur Bihpur section of NH-106 Details of PM Package Length (in km) TPC (in crore) Present Status Start Date & completion date Progress is 11% / 20%. (DBM 4.50 km/106km) Issues :- Revised 3G from Madhepura and Supaul district submitted to MoRT&H. 6 Four Laning of (km 0.00 to Km ) on NH-82. (Gaya Hisua Rajgir Nalanda Biharshrif section) JICA Loan Assistance (BSRDCL) Date of commencement is & Completion date is Progress 23%, (DBM 18km/93km) Issues:- Revised Cost Estimate submitted to MoRT&H. Total=

19 BRIDGE ZONE :- Sl. No. Project Name 7 Construction and rehabilitation of MG Setu of NH-19 8 ROB in Km 12 of NH-103 (Bidupur) 9 ROB in Km 132 of NH-19 (Majhanpura) 10 ROB in Km 135 of NH-19 (Simaria) Details of PM Package Length TPC (in km) (in crore) Present Status Work in progress. Dismantling of 29 nos. of span completed. Dismantling of 8 nos. Pier head completed Work awarded/not Started. L/A under process, 3D submitted. 1 Work awarded/not Started. 70% land available. For rest 3D submitted. 1 Work awarded / Not started.. L/A under process, 3D approved. 11 ROB in Km 119 of NH-30 (Ara) 1 Work is in progress. Foundation work completed. 12 ROB in Km 11 of NH- 327E(Thakurganj 13 ROB in Km 100 of NH-327E (Araria) 1 Work is in progress. Foundation completed. Forest clearance under process. 1 Work awarded / Not started. L/A is in process under perpetual lease. 14 ROB in Km 31 of NH-81 (Mania, 1 Work Started., Foundation under progress. L/A, Katihar) Forest clearance under process. 15 ROB in Km 48 of NH-81 (Pranpu) 1 Work is in progress. Foundation completed. 16 ROB in Km 46 of NH-131A (Sarifganj) 17 ROB in Km of NH-101 (Chapra) 1 Total= Work Started. Forest clearance under process. Work awarded/not Started. Forest clearance under process.

20 Details of PM Package PROJECT IN BIDDING / SANCTION STAGE Sl. No. Project Name 18 Bridge Over river Kosi at Fulaut on NH-106 Length (in km) TPC (in crore) Sanction Stage Present Status 19 4 Lane bridge over river Ganga parallel to existing MG Setu Bridge at Patna on NH ROB in Km 91 of NH- 28B(Bagha) Sanction / DPR Stage Tender received. Technical Bid under evaluation. 21 ROB in Km 94 of NH- 28B (Bagha) Tender received. Technical Bid under evaluation. Total=

21 Details of PM Package IN PRINCIPLE NH CATEGORY Sl. No. Project Name 22 Panduka Bridge on river Sone at Srinagar Length (in km) TPC (in crore) Present Status Sanction / DPR Stage Total=

22 Details of PM Package PROJECT ZONE :- Sl. Length TPC Project Name No. (in km) (in crore) Present Status 23 Widening to 2-lane with paved shoulder from km to km ofnh- 28B (Betia Misraulia section) Start Date & completion date DBM completed in 15km. BC km, Service Road both side GSB - 3 km, WMM km, DBM km, BC km 24 Widening to 2 Lane with Paved Shoulder from km 65 to 97 of NH-28B (Parsoni Bagaha section) 25 Construction of Bhagalpur Bypass of NH Start Date & completion date WMM both side (8.5 km) and DBM completed in 3.35 km done. Work progress is about 25% Start Date & completion date Work is in progress km DBM, BC Km Physical progress is 80%. Issue:- L/A for 155m under process. 3D is to be submitted.

23 Details of PM Package PROJECT ZONE :- Sl. Length Project Name No. (in km) 26 Widening to 2 Lane with Paved Shoulder from km to of NH-133 (Pirpainti Barahat section) 27 Widening to 2 Lane with Paved Shoulder from km to of NH- 327A (Supaul Bhaptiyahi section) 28 Widening to four lane with service lane from Km to Km of NH-327E (Araria Town portion) TPC (in crore) Present Status Road Work completed and Junction improvement work to be done. Issue:- Encroachment in Pirpainti more to be removed Start Date & completion date WMM completed in 24 km and DBM in 24 km done. Work progress on scheduled time Start Date , scheduled completion date Main carriageway has been completed & likely to be completed by Physical progress is about 82%. Service lane completed. 29 Widening to 2 Lane with Paved Shoulder from km to of NH-99 (Dobhi to Jharkhand border) Work is in progress km DBM, BC km has been completed. Physical progress is 90%. Start Date & completion date

24 PROJECT ZONE :- Sl. Project Name No. 30 Widening & strengthening from km 167 to 180 of NH-80 (Ramjanipur Pirpainti) 31 Widening to 2 Lane with Paved Shoulder from km to of NH-81 (Gerabari Katihar section) 32 Widening to 2 Lane with Paved Shoulder from km to 40 of NH-2C. (Dehri Akbarpur section) 33 NH-333 from km 62 to 75 (Gidhaur - Section) 34 NH-327E from km 56 to 68 (Bahadurganj Araria section) 35 NH-327E from km 75 to 93 (Bahadurganj Araria section) 36 NH-327E:- from km 0 to 39 (Galgalia Bahadurganj section) Details of PM Package Length TPC (in km) (in crore) Present Status Start Date & completion date Physical progress is 80%. 12 km DBM, BC - 12 km completed Start date Completion date E/W 16 km, GSB 7 km completed. Stage-I Forest clearance obtained Work awarded and GSB completed in 15 km, PQC 5.50 km, BC km, WMM - 7 km Stage-I Forest clearance obtained Work is in progress. Date of completion Stage-I forest clearance obtained Work under progress. Date of completion GSB 5 Km, WMM 3 Km, DBM 2 km completed Work under progress. Date of completion GSB 12 Km, WMM 5.50 km, DBM 4.50 completed Work under progress. GSB 15 km, WMM 13.5 km, DBM 10 km completed. Forest clearance for tree cutting under process. Total=

25 Details of PM Package PROJECTS IN BIDDING / SANCTION STAGE Sl. No. Project Name Length (in km) TPC (in crore) Present Status 37 Bhatia Chakai section Work awarded. Agreement under process. from km 115 to 141 of NH Technical Bid under evaluation. Araria Raniganj JBC Canaal section from km 112 to 136 of NH 327E 39 Gaya to Goh section NH Technical Bid under evaluation Nasriganj to Bikramganj section of NH Technical Bid under evaluation. 41 Varuna Bridge Sanction / DPR Stage Mushrigharari section of NH 103 Total=

26 Details of PM Package New NH Category Sl. No Project Name Bhabhua to UP Border section of NH 219 Bikramganj Dumraon section of NH 120 Barbigha Shekhpura Jamui Jhaja Simultalla Banka Panjwara section of NH 333A Bariyarpur Jamui Bhatia section of NH 333 Length (in km) TPC (in crore) Present Status Sanction / DPR Stage Sanction / DPR Stage Sanction / DPR Stage Sanction / DPR Stage 46 JBC Canal section to Supaul of DPR sent to MoRT&H NH 327E Total= G. Total=

27 In Principle NH Category Sl. No. Project Name Details of PM Package Length (in km) TPC (in crore) Present Status 47 Buxar Chausa - Mohania 64 Sanction / DPR Stage 48 Hajipur Mahnar - Bachwara 75 Sanction / DPR Stage Govidpur Fatehpur Narhat 50 Sanction / DPR Stage 49 - Sirdalla 50 Belaganj Rajgir 75 Sanction / DPR Stage Bhagalpur Dhaka more 62 Sanction / DPR Stage 51 Hansdiha Chatarwa Dhanha Bansi 46 Sanction / DPR Stage 52 Padrauna Chharatpur Japla Sanction / DPR Stage 53 Navinagar Barun 54 Rosera - Darbhanga 55 Sanction / DPR Stage 55 Mehsi Jhapaha vide Tetaria 50 Sanction / DPR Stage 56 Siwan-Maharajganj-Janta 35 Sanction / DPR Stage Bazar 57 Shrawan-Chakai 18 Sanction / DPR Stage 58 Saraigarh(327A)- Lalganj- 10 Sanction / DPR Stage Ganpatganj Total=

28 Details of PM Package PROJECTS UNDER NHAI Sl. No. Project Name Length (in km) TPC (in crore) 59 2L with PS Biharsharif - Barbigha Mokama laning of Patna Koilwar Section of NH laning of Koilwar Bhojpur Section of NH 30 & NH Present Status Work started on 06th Oct Schedule completion date Work front available 45.1km Physical progress %, Financial progress 16.1% 3A/3D Ha, 3G-56.22Ha Land available 43.59% 3D-165.6Ha, 3G-165.6Ha Total land available % Work started on 04th July 2017 Schedule completion date Physical progress- 13%, Financial progress 6% 3A/3D/3G done Ha 62 4 laning of Bhojpur Buxar section of NH Total land available 58.68% Appointed date A/3D/3G done Ha Physical & Financial progress 0.0%

29 PROJECTS UNDER NHAI Sl. No. Project Name laning of Bakhtiyarpur Mokama Section of NH-31 Details of PM Package Length (in km) TPC (in crore) lane of Simaria Khagaria on NH NHDP Phase III 65 2 laning with PS of Gopalganj Chhapra Section NH laning with PS of Chhapra Rewaghat Muzaffarpur, NH laning of Forbesganj Jogbani Section of NH 57A 68 4 laning of Patna Gaya Dobhi Section of NH 83 with JICA ODA loan assistance Present Status Work started on Schedule completion date Work is under progress. 3A-239.4Ha, 3D-235Ha, 3G-234.7Ha Work started on , Schedule completion date Physical progress %, Land required 1 Ha Work started on , Scheduled completion date Anticipated completion date Physical progress 71.62% 3A Ha/3D 174.5Ha/3G-136Ha Work started on Scheduled completion date , Likely completion date Physical progress 97.98% Work started on Schedule Date of Completion Physical progress %, Financial 18.22%, LA pending. Work started on Schedule Date of Completion Physical progress- 6.73%, E/W Km, GSB Km, WMM km, DBM km completd. 3A/3D/3G done -707Ha

30 PROJECTS UNDER NHAI Sl. No. Project Name 69 New 4 laned bridge across river Ganga at Mokama on NH Bridge at Munger (approach road to be constructed and balance amount to be released) 71 Development to 2-laned with PS of & Maheshkhut- Saharsa- Purnia 72 section of NH- 107 (in two packages) 73 Bridge on river Ganga connecting Manihari in Bihar to Sahibganj in Jharkhand (NH-131B & 131 A) 74 Development of Manjholi choraut Section of NH-527 C 75 Construction of 2 nd Elevated Flyove parallel (LCW) in Kishanganj town on NH-31 Details of PM Package Length (in km) TPC (in crore) Present Status Appointed date to be fixed. 3A-58.68Ha/3D-44.12Ha/3G Ha Appointed date to be fixed. 3A/3D-65.4Ha/3G -23.6Ha Appointed date to be fixed. 3A/3D-197.6Ha/3G-13.5Ha Bid received. LOA issued on laning of Narenpur Purnea Section of NH 133A /6 laning of Patna Ring Road Bid received and under evaluation 3A-212Ha/3D-108Ha/3G -0.0Ha LOA issued to BRPNNL by NHAI SFC pending for want of availability of required land. 3A-141Ha/3D-101Ha/3G done - 0.0Ha DPR preparation under process by consultant.

31 Details of PM Package PROJECTS UNDER NHAI Sl. No. Project Name 78 4 laning of Munger Mirzachowki Section Length (in km) TPC Present Status (in crore) DPR finalization under process. 3A under process. Land to be acquired 668.9Ha in 123 village 79 Roads connecting Raxaul and Sonbarsa (Parallel to indo Nepal Border) DPR of Raxaul Sonbarsa dropped Chakia- Bargainia Connectivity 80 Ramupr Khajuriya-Kesariya end of NH DPR of Chakia Bairgania completed 3a published. 3A under process. DPR in 3 packages done Final DPR under approval. CALA nomination received 3a under process.

32 Details of PM Package PROJECTS UNDER NHAI Sl. No. Project Name 81 Uchhait Bhagawati Sthaan (Umgaon) - Basopatti-Benipatti-Rahika- Madhubani-Rampatti-Awam-Laufa- Bheja-New proposed bridge over river Kosi-Mehsi- Tarasthaan- Bangaon- Bariyahi Saharsa connecting NH- 327A (22 kms out of 180km are parts of National Highways No. 527A, 327E & 107. Length (in km) TPC (in crore) Present Status Draft DPR for entire stretch in 4 packages submitted by DPR consultant in NHAI HQ. 82 Ram-Janki Marg as already declared recently part of which falls in Bihar from UP Bihar Border to Siwan Madhubani-Sitamarhi-Indo-Nepal Border Final DPR done in two packages 1st package of Siwan - Masharakh and 2nd Package Mashrakh - Chakia under approval. Tender for 2 nd package is to be done in July, Total=

33 Rehabilitation of M.G. Setu Progress till date : Dismantling of Median Span 1 37 & 39 completed and Span 40 in progress. Dismantling of Foot Path and Hand Rail Span 1-37, completed & Span 42 in progress. Dismantling of Segment Span 1-29 completed, Span in progress. Dismantling of Pier Head Pier No. 1-6, 8 & 26 completed and Pier No in progress. Shifting of debris material for Span 1-28 completed & Span 29 in progress. Modification of Pier Cap Pier No. 2-3 completed & Pier No. 4-6 in progress. Weathering Steel MT of material has been manufactured at ESSAR. Weathering Steel MT of material dispatched to Texmaco, Kolkata and 2289 MT of weathering dispatched to Atmatsco, Bhilai. Fabrication work still not started.

34 ISSUES Issues related to MoRTH 1) Approval & Sanction of DPR for construction of 4-lane bridge parallel to existing Vikramshila Setu and declaration of Bhagalpur Navgachia as new NH. 2) Bidding of Phulaut Bridge over river Koshi on NH-106 to be done. 3) New bridge parallel to MG Setu, Patna be sanctioned soon. 4) Work of MG Setu is very slow. Erection work be started soon. 5) Munger Bhagalpur Mirzachouki Section of NH-80 has been entrusted to NHAI & DPR on Green field alignment is under process. Maintenance of existing NH-80 be done by MoRTH as this stretch is very important & lifeline of this area. Estimates submitted for different stretches should be approved at the earliest. 6) Revision of estimate of NH-82 Gaya Biharsharif is pending. 7) Balance portion of NH-30, from Mithapur to Anisabad in Patna be taken over by NHAI for maintenance. 8) Approval of LA proposal of 155 m in Bhagalpur bypass and proposal of RE wall to be approved.

35 Issues related to MoRTH ISSUES 9) Elevated corridor at Rajgir on NH-82 may be considered for approval. 10) Annual Action Plan ( ) submitted by State Govt. needs approval of MORT&H. 11) 14 nos. of PR works to be tendered - pending for clarity on DLP. 12) LA & Supervision charges (i) Administrative Cost for LA to be reduced to 2.5% (ii) (iii) Undisbursed amount of compensation may be permitted to deposit in LARR Authority. Supervision charges for electrical utility shifting to be reduced to 2.5%.

36 Issues related to NHAI ISSUES 1) Work for Dumariaghat Bridge on NH-28 near Gopalganj to be restarted. 2) Repair and maintenance of Ara- Mohania Section of NH-30. 3) DPR of New Bridge parallel to J.P. Setu, Patna over proposed Patna Ring Road be finalized soon to start bidding process. 4) DPR of Indo Nepal Border road under Bharatmala. 5) Four Laning of Ara Sasaram Road. DPR to be finalized soon. 6) Elevated road on Patna Koilwar section of NH-30 (Shivala - Bihta) to be started. 7) Balance length of Patna - Koilwar to be reviewed early and work to be started. 8) Proper maintenance of NH-19, NH-83 & NH-80. 9) Condition of NH-107 to be improved and progress of work to be expedited. 10) Feasibility of Extension of Patna Buxar to Gazipur be expedited. 11) DPR for Patna Ring Road to be finalized and early steps for construction to be taken in the portion where land is available. 12) DPR of roads under Bharatmala Pariyojna to be expedited. 13) Proposal & DPR for additional bridge parallel to Dumari Ghat bridge on NH- 107 be prepared soon. 14) Chapra Bypass & Sumerpatti Bridge on NH-19 to be completed on priority.

37 State Highways

38 State Highways STATUS Good Fair Bad Total Length (Km) % (Length wise) Note:- SH wise status are included in subsequent slides...

39 State Highways S. No. SH No. Stretch of State Highway Length Condition of the Road (in Km) (Km) GOOD FAIR BAD Remarks 1 1 Sadikpur- Pabhera Masaurhi lane proposed under CRF 2 2 Bihta - Pali - Arwal lane OPRMC 3 4 Daniawan - Hilsa - Ekangarsarai - Islampur - Khijarsarai - Gaya lane CMBD/OPRMC 4 8 Hisua - Nawada - Lakhisarai lane OPRMC 5 12 Ara - Piro - Bikram - Nokha lane OPRMC Sasaram 6 13 Buxar - Chausa lane CMBD 7 14 Chausa - Ramnagar - Mohania - Bhabhua lane CMBD/OPRMC 8 15 Dehri - Nasriganj - Vikramganj lane CMBD Dinara 9 16 Dehri - Tilauthu - Akbarpur lane OPRMC Banjari Sasaram - Kargahar - Kochas - Chausa lane CMBD/OPRMC Shekhpura - Lakhisarai - Jamui lane OPRMC Bhagalpur - Dhakamore - Barahat - Hansdiha Dakamore - Katoria - Belhar - Tarapur - Sultanganj lane CMBD/OPRMC lane CMBD/OPRMC

40 S. No. SH No. Stretch of State Highway Length (Km) Condition of the Road (in Km) GOOD FAIR BAD Remarks Bhagalpur - Amarpur - Banka - Katoria lane OPRMC 1.5 lane CMBD Sarfara - Barharia - Siwan lane OPRMC Mairwa Guthani Hajipur - Mahua - Tajpur lane OPRMC Samastipur Musari - Gharari - Pandasarai - Mabbi - Laheria Sarai lane OPRMC Darbhanga - Sakari - Jhanjharpur lane OPRMC - Khutauna - Laukaha Sitamarhi - Pupari - Benipatti - Rahika - Madhubani - Rampatti lane OPRMC 1.5 lane CMBD Jhanjharpur Chapra - Salempur lane OPRMC Bettiah - Areraj - Motihari - Dhaka - Belwaghat - Masaudha lane / IRQP sanctioned Sheohar - Sitamarhi Begusarai - Manjhaul - Rosera - Samastipur lane CMBD/ OPRMC Darbhanga - Benipur - Biraul lane OPRMC Kusheshwar Asthan Saharsa - Purnea lane OPRMC

41 S. No. SH No. Stretch of State Highway Udakishunganj - Chousa Laua Lagam Vijayghat Length (Km) Condition of the Road (in Km) GOOD FAIR BAD Remarks Existing Single lane Tendered for 2 lane with paved shoulder Sonbarsa - Saurbazar - Baijnathpur lane OPRMC Purnea - Araria - Forbesganj Single / 1.5 lane/2 lane OPRMC Purnea - Katihar lane OPRMC Bagaha - Balmikinagar lane OPRMC Purnea - Dhamdaha - Rupauli lane OPRMC Chandpur Saharsa - Bangaon - Supaul lane OPRMC Singheshwar Asthan Kudra - Chenari - Shivsagar lane OPRMC Sheoganj - Rafiganj - Goh - Upahara - Deokund- Baidarabad lane BSRDCL Dumaria - Imamganj - Sherghati - Karmain - Mathurapur - Guraru - Ahiapur - Tekari - Mau - Kurtha - Kinjar - Pali - Rani Talab lane BSRDC Gaya - Fatehpur - Sirdala - Rajauli lane Jehanabad - Ghoshi - Islampur lane Rajgir - Giriyak, Parwatipur Siwan - Basantpur - Masharakh - Taraiya - Amnour - Sonho- Parsa - Shitalpur lane

42 S. No. SH No. Stretch of State Highway Hajipur - Vaishali - Deoria - Sahebganj - Kesaria - Khajuria - Areraj Darbhanga - Kamtaul - Basaitha - Madhwapur Kursela - Pothia - Falka - Mirganj - Sarsi - Kala Balua - Raniganj - Saifganj - Farbesganj Bihta - Naubatpur - Neva - Dumari - Beldarichak - Kansari - Daniawan & Chand - Noorsarai - Bhagan Bigaha -Rahui - Bind - Gopalbad - Sarmera Length (Km) Condition of the Road (in Km) GOOD FAIR BAD lane lane lane Remarks laning work in progress Bhabhua - Adhaura Sakkadi - Chandi - Sandesh - Sahar BSRDC - work in - Bihar - Danwar - Nasriganj progress Kadirganj - Roh - Kauakol - Khaira - Sono Tendered for 2 lane with paved shoulder Bagi - Bardiha - Barbigha Under BSRDC Ghogha - Sanhaula - Dhoraiya - Panjwara - Barahat Tendered for 2 lane with paved shoulder Akbarpur - Shahkund - Amarpur Tendered for 2 lane with paved shoulder Saraiya - Jaitpur - Motipur under BSRDC

43 S. No. SH No. Stretch of State Highway Runnisaidpur - Nanpur - Pupri - Sursand - Parihar - Bhiswa NH-103 (Baruna Pul) - Rasiyari Length (Km) Condition of the Road (in Km) GOOD FAIR BAD Remarks Under construction by BSRDC do Siwan - Siswan Under BSRDC Mohammadpur - Rajpatti - Mashrakh - Khaira - Chapra Balua - Jadia - Mirganj - Murliganj - Udakishunganj Under BSRDC Under construction by BSRDC Saraigarh - Parwaha NH declared. Bad portion is missing link Hajipur - Bachhwara Single/2 lane CMBD/OPRMC Mansi - Hardi Chaughra Alignment under process with Km missing link Manjhi - Barauli Single lane

44 S. No. SH No. Stretch of State Highway Bishanpur - Ghoghrahachatti Length (Km) Condition of the Road (in Km) GOOD FAIR BAD Remarks Katihar - Balrampur Baisi - Bahadurganj Bandhuganj - Rohini Single/1.5 lane CMBD Amba - Gaya Single lane Bihia - Bihta Tendered Manjhway - Govindpur Dighwara - Semri Single lane/cmbd Bettia - Lauria Road Didarganj Fatuha- Bakhtiyarpur lane CMBD Total

45 Major District Roads Good (Km) Fair (Km) Bad (Km) Total Length (Km) % Length maintained under OPRMC Km Length under different ongoing schemes Km (under CMBD, CRF, NABARD, Plan etc.) Length proposed under different schemes Km Road length not covered under any scheme Km Km Length of roads (110 nos) notified for transfer to RCD but yet to be upgraded as per IRC Standard Km

46 Output & Performance based Road Maintenance Contract (OPRMC) at a Glance Description Road network length Initial Status as per AA Current Status 9064 Km 8039 Km No. of packages Remarks Deletion for widening/ strengthening/ transferred to NH Chhapra (40) rescinded and Hajipur (41) under litigation AA Amount Crore Crore -- Agreement Amount Crore Crore -- Date of Start Dec Contract Period 5 Years ( Upto Dec 2018) -- Expenditure upto April 2018 PM (Periodic Maintenance) Status upto April Crore 89 % 6230 km out of 6807 km 92 %

47 Public Grievance Status( since till date) Description Total Complaints Disposed Pending Percentage Disposal RCD (excluding OPRMC) % OPRMC % Others (Related to other departments) %

48 Measures taken for effective monitoring of OPRMC Public Awareness for Complains/Suggestion Through Hoardings Print & Electronic Media Online Monitoring system for Inspection & Reporting by field officers. GPS installed on all Road Ambulances and monitored by Vehicle Tracking System. Call Recording and SMS integrated into RMPGRS. Voice recording for improving quality of Grievance Handling. Special Inspection Drive for proof checking of performances of Divisions and Contractors. Video evidencing of OPRMC roads on random basis.

49 Special Inspection Drive (under OPRMC) Special Independent Inspection Drive conducted to ascertain ground status of every km of 8039 km of roads in Reports were received online. Major findings: i Kms of OPRMC road crust were found maintained out of 8039 Kms. (93.4% of road length) ii. Total 568 pots were found in rest 530 Kms of the stretch pots/km] iii. In 75 % road stretch, shoulder condition was found satisfactory. iv. Other parameters such as Road safety, Drain clearance/ Culvert maintenance requires more attention. Contractors and Work Divisions identified where performance of OPRMC was found unsatisfactory, department has initiated action against such Contractors and Engineers.

50 Salient Features: Next phase of OPRMC (Phase-II) Next phase to start in DEC Maintenance period 7 years. To include all roads of RCD : Length approx km. Maintenance plan prepared road wise. DPR preparation under process. Package size km ; Costing cr approx. Maintenance cost Rs Lakh per Km per year Total cost of maintenance per year Rs crores Periodic Renewal every four (4) years on each road. Administrative Approval to be obtained division wise. Emphasis on Road Safety in IR & MI.

51 Central Road Fund Total 100 schemes sanctioned out of which 81 schemes have been completed and 19 schemes are in progress. Total accrual till Cr Total amount of schemes sanctioned till date Cr Amount released till Cr Amount utilized till Cr

52 Status of ROB Under Tripartite Agreement between Railway, State Govt. and IRCON, IRCON has taken up construction of 34 ROBs, out of which 30 have been completed and 4 are under progress. State Government has conveyed its consent for construction of 47 ROBs. Railway is preparing GAD and DPR for construction of ROBs. Railway has provided another list of 48 level crossings and requested consent of State Government for 50% cost share. Feasibility Report of these level crossing is under process in RCD. Tripartite MOU to be signed among GoB, Railways and MORT&H

53 Status of Projects funded under RIDF TOTAL PROJECTS SANCTIONED : 326nos. (RIDF-XIV to XXIII) Bridge Projects : 258 nos. Road Projects : 68nos. TOTAL PROJECTS COMPLETED : 164nos. Bridge Projects : 138 nos. Road Projects : 26 nos. PROJECTS SUBMITTED TO NABARD IN UNDER RIDF- XXIV No. of Road Schemes : = 43 nos (724 Km) Estimated Cost : = Cr. No. of Bridge Schemes : 1 no. (9.09 Cr) Status of Approval: Approval awaited from NABARD

54 Indo-Nepal Border Road Project Total Length Km Cost of construction shared by GoI Cr. Share of State Govt Cr. [LA Cr nos Bridges Cr] Original amount of A/A Cr 1 st Revised A/A amount Cr Note:- Rs crores for construction 121 bridges sanctioned under NABARD of State Plan Status of Execution : Total Contract - 8 nos, Under litigation 4 nos. Under progress 4 nos. (1 package substantially completed in Araria) Km Black Top Road completed. Land to be acquired Km.

55 To be Acquired (Mauza) Acquired (Mauza) Status of LA : District Indo-Nepal Border Road Project To be Acquired (Acre) Acquired (Acre) Amt. deposited with DLAO Balance Mauza/ Area to be Acquired Mauza (Nos) (2-4) Area (Acre) (3-5) Balance Amt. with DLAO (6-15) Bettiah Motihari Sitamarhi Madhubani Supaul Araria Kishanganj Kishanganj (Araria Portion) Total Total amount required for LA deposited to DLAOs.

56 ROAD CONNECTIVITY PROJECT FOR LEFT WING EXTREMISM AFFECTED AREAS (RCPLWEA) UNDER PMGSY

57 Approved Schemes by MoRD Sl. No. Districts. No. of Road Length as per DPR (Km) 1. Aurangabad Gaya Jamui Banka Muzaffarpur Total Sl. No. Districts. No. of Bridge Length as per DPR (mtr.) 1 Muzaffarpur

58 Schemes yet to be Approved by MoRD Sl. No. Districts. No. of Bridge 1. Aurangabad 8 2. Gaya 3 3. Jamui 0 4. Banka Muzaffarpur 15 Total 41

59 Sl. no. Schemes yet to be Approved by MoRD District Name of Road Length of Road (in Km) Muzaffarpur Basghatta Chowk to Pupri via Pahsoul, Jajuaar Muzaffarpur Aurai - Jale Road Muzaffarpur Turki (NH-77) to Saraiya (NH-102) Banka English more - Punasia via Jethaur Nath Road Gaya Belaganj (NH-83) to Panchanpur via Singhaul Road Gaya NH-83 to Tikari via Belhari Road Gaya Gaya - Nalanda Road to Bairaka via Harli (Near Mayapur) Saraia, Budhgharaia, Pale, Hudrahi, Gharaia, Kobva Road Gaya Chakand - Presheela - Kujapi Road Jamui Baisakitand (NH- 333) Simultala (NH- 333 A) Road Aurgangabad Obra - Bel - Barahi Road Aurgangabad Beri - Kalali to Bhadwa via Pirthu, Bishambharpur, Karwa, Kharaukhar, Gothani Road 12 Aurgangabad Dihara to Obra Road Aurgangabad Deo More to Kataki via Maharana Pratap College Deo Road via Goujraya 14 Banka Shambhuganj-Asharganj Road 8.30 Grand Total:

60 Status of Tender Sl. No. Districts. No. of Road Length as per DPR (Km) Status of tender 1. Aurangabad Tender invited & Tech Bid Opened. 2. Gaya Tender invited Tech Bid opened for 9 Roads 3. Jamui Tender invited 4. Banka Tender invited & Tech Bid Opened for 6 Roads 5. Muzaffarpur Tender invited for 4 Roads & rest 19 Roads tender is in process. Total Sl. No. Districts. Name of Bridge Length as per DPR (mtr.) Status of tender 1 Muzaffarpur HL RCC Bridge in 26th Km over River Bagmati Tender invited.

61 Status of Mega Projects implemented by Bihar Rajya Pul Nirman Nigam Ltd.

62 Name of Project Construction of Bridge over river Ganga between Arrah (NH- 30) and Chhapra (NH-19) via Babura Doriganj in dist of Bhojpur and Saran of Bihar. Description of Project Administrative Approval Agreement Amount RCC High Level Bridge, Bridge length 4 Km, width 4 lane with footpath (20.50 mt), Approach Road 16km. Rs Cr. Vide RCD Letter No 7414(S) Dated 31.03,2010 (Revise Estimate for Rs Cr. Submitted to RCD) Rs Cr. Date of Start Date of Completion (as per EOT) Date of Completion Contractor Supervision Consultant Bridge Inaugurated on and opened for Light Traffic. Heavy Vehicles allowed since last week of August SDB-SPS(JV) AECOM-TES (JV) Physical Progress Issues Foundation Sub Structure Super Structure Approach 1-Land Acquisition for 2.5 Km Green Field connectivity with NH % 100% 100% 75% 2-L.A. Issue in second lane of road in Bhojpur Distt & Guide Bund in Saran Distt

63 Bridge over river Ganga between Arrah (NH-30) and Chhapra (NH-19)

64 Name of Project Description of Project Construction of Northern Approach (Sonpur Side) of Rail cum Road Bridge over river Ganga near Digha Ghat Patna. RCC / Composite Elevated structure with Approach Road. Length : 2.56 Km (1 st Phase) Km (2 nd Phase) = Total Km. Administrative Approval Rs Cr. Vide RCD Letter No 7175 (S) Dated Agreement Amount Rs Cr. (1 st Phase) Date of Start Date of Completion (1 st Phase) (as per agreement) Expected Date of Completion st Phase Inaugurated on and Traffic opened 2 nd Phase to be completed by June 2019 Contractor Remarks M/s S.P. Singla Construction Pvt. Ltd. 2 nd Phase : Tender Awarded., Work and Land Acquisition in Progress. Physical Progress (1 st Phase) Issues Foundation Sub Structure Super Structure Approach L.A. for 2 nd phase in 100% 100% 100% 100% Saran Distt.

65 Northern Approach (Sonpur Side) of Rail cum Road Bridge over river Ganga near Digha Ghat Patna.

66 Name of Project Description of Project Construction of Flyover (2x2 lane, carriageway 5.5 m wide) from Mithapur ROB to Chiraiyatand Flyover via Station Road And Extension of Chiraiyatand Flyover (1x2 Lane, Carriageway 7.5 m wide) up to Gandhi Maidan in Exhibition Road RCC / Composite Fly Over. Administrative Approval Rs Cr. Vide RCD Letter No 100 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per EOT) Date of Completion Inaugurated on & Traffic opened. Contractor Supervision Consultant M/S S.P. Singla Construction Pvt. Ltd. STUP in Association with Transtek. (Agreement closed in Dec ) Physical Progress Foundation Sub Structure Super Structure Approach 100% 100% 100% 100% Issues -

67 Mithapur ROB to Chiraiyatand Flyover via Station Road

68 Name of Project Description of Project Construction of High Level Bridge on Sone River Connecting Daudnagar and Nasriganj including Approach Roads in District Aurangabad and Rohtas, Bihar RCC HL Bridge, Bridge Length -2.9 KM. Width - 4 Lane, Minor Bridge - 4 Nos.,Trumpet Interchange -1 No., Hume Pipe Culvert -23 Nos., Vehicular Underpass-5 Nos., Approach Km. Administrative Approval Rs Cr. Vide RCD Letter No (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per EOT) Expected Date of Completion (Bridge shall be completed by Dec & Traffic can be opened through Barun Daudnagar Road in Daudnagar Side and RWD Road in Nasriganj Side) Contractor Supervision Consultant Hindustan Construction Co. STUP in Association with Transtek (Agreement closed in Dec ) Physical Progress Issues Foundation Sub Structure Super Structure Approach L.A.in Aurangabad 100% 100% 95% 30% and Rohtas Distt.

69 Bridge over river Sone connecting Daudnagar and Nasriganj

70 Bridge over river Sone connecting Daudnagar and Nasriganj

71 Name of Project Description of Project Construction of Km (Approx) long extended portion of Approach road of Baluaha Ghat Kosi Bridge between Baluahaghat to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga. Major Bridge 2 Nos, Minor Bridge 11 Nos, Box Culvert 21 Nos, Approach Road Km with Guide Bund Administrative Approval Rs Cr. Vide RCD Letter No 1704 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per EOT) Expected Date of Completion Contractor Supervision Consultant Gammon India Ltd. AECOM India Pvt Ltd. Physical Progress Issues Foundation Sub Structure Super Structure Approach L.A. in Darbhanga and 100% 100% 98% 76% Saharsa Distt.

72 Extended portion of Approach road of Baluaha Ghat Kosi Bridge between Baluahaghat to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga.

73 Name of Project Description of Project Construction of 2x2 Lane Bridge with footpath across river Ganga between Sultanganj (Bhagalpur District) and Aguwani Ghat (Khagaria District) including navigational span of cable stayed and approaches (Connecting NH31 and NH80) in the state of Bihar on EPC mode RCC HL Bridge, Bridge length Km, width 8.5mX2, Footpath 2X1.5m, Approach 4Km Sultanganj Side & 16Km Aguani Side. Administrative Approval Rs Cr. Vide RCD Letter No 8797 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion( as per Agreement) EPC Contractor Supervision Consultant M/S S.P. Singla Construction Pvt. Ltd. Studio De Miranda in JV with Rodic Consultant Pvt Ltd Physical Progress Issues Foundation Sub Structure Super Structure Approach L.A. in Khagaria and 88.26% 43.00% Bhagalpur Distt.

74 Bridge over river Ganga between Sultanganj (Bhagalpur District) and Aguwani Ghat (Khagaria District)

75 Name of Project Construction of H.L P.S.C cast in situ bridge over river Gandak in between Sattarghat and Faizullahpur in District Motihari (Bihar) Description of Project RCC HL Bridge, Bridge Length Km, Width 12m, Approach Km. Administrative Approval Rs Cr. Vide RCD Letter No 4156 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per EOT) Expected Date of Completion Contractor Supervision Consultant Vasishta Construction Pvt Ltd. Hydrabad VKS Infratech, New Delhi Physical Progress Issues Foundation Sub Structure Super Structure Approach LA Issue in East Champaran and 95% 76% 49% 54% Gopalganj Distt

76 Bridge over river Gandak in between Sattarghat and Faizullahpur in District Motihari (Bihar)

77 Name of Project Description of Project Construction of High Level Bridge across river Gandak at Bangra ghat including 19 Km. length of Approach Road connecting Muzaffarpur & Saran District of North Bihar RCC HL Bridge, Bridge Length Km, Width m, Length of Guide Bund Km, Approach Road -19 Km, Administrative Approval Rs Cr. Vide RCD Letter No 8795 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per EOT) Expected Date of Completion Contractor M/s S.P. Singla Construction Pvt. Ltd. Supervision Consultant AECOM-VIS (JV) Physical Progress Issues Foundation Sub Structure Super Structure Approach LA Issue in Mujaffarpur, Gopalganj 87.20% 64.10% 29.24% 21.60% & Saran Distt.

78 Bridge across river Gandak at Bangra Ghat P-03

79 Name of Project Description of Project Construction of Lohia Path Chakra with Swap and grade separated U-Turn based multi sectional interchange, multiple Underpasses, Flyover, elevated section using U- Girders & extra dosed cable stayed structures at Bailey Road, Patna Extra Dosed Cable Stayed Bridge at Daroga Rai Path Integral Spine Beam Bridge Near Lalit Bhawan Junction Extra Dosed Cable Stayed Bridge Near BPSC Office Administrative Approval Rs Cr. Vide RCD Letter No 7192 (S) Dated Agreement Amount Rs Cr. Date of Start Date of Completion (as per Agreement) Expected Date of Completion (as per EOT) Contractor Concept, Design & Supervision Physical Progress M/S S.P. Singla Construction Pvt. Ltd. Foundation Sub Structure Super Structure Approach Foundation for Innovation & Technology Transfer, IIT, Delhi 69% 17% - -

80 R-05 Underpass water proofing work in progress to (Circular Road) R-05 Underpass Crash Barrier reinforcement binding work is in progress to (Near Lalit Bhawan)

81 Lohia Path Chakra

82 Bihar Rajya Pul Nirman Nigam Ltd Mukhya Mantri Setu Nirman Yojna Total Sanctioned Schemes Nos Amount in Cr. Nos Completed Schemes Amount in Cr. Ongoing Schemes Nos Amount in Cr

83 Status of Mega Projects implemented by Bihar State Road Development Corporation

84 ADB ASSISTED COMPLETED PROJECTS BSHP PHASE-I ( ) SH No. Name of Road Length (km) Status 68 SHIVGUNJ-BAIDRABAD Substantially Completed 69 DUMARIA-RANI TALAB Substantially Completed 70 GAYA-RAJAULI Completed 71 JEHANABAD-SHAHPUR Completed 73 SIWAN-SHITALPUR Completed 74 HAJIPUR - ARERAJ Completed 75 DARBHANGA MADHWAPUR Completed 76 ARARIA BHAPTIYAHI Completed 77 KURSELA - FORBESGANJ Completed Substantially Completed SH-68: 2 Br. Superstructures remaining, SH-69: Approach Road in km 8 & 22 and Superstruture work in Km 10 & 119 remaining.

85 BSHP PHASE-II ( ) SH No. 78 Name of Road BIHTA - DANIYAWAN CHANDI - SARMERA ADB ASSISTED PROJECTS Length (km) Completion Date Status km Completed 81 SAKKADI - SAHAR - NASARIGANJ km Completed 89 SIWAN-SISWAN Completed 90 MOHAMMADPUR- KARANKUDARIYA -CHHAPRA Completed 91 BIRPUR-UDAKISHANGANJ km Completed 83 BAGHI - BARBIGHA km Completed 86 SARAIYA MOTIPUR km Completed 87 RUNNISAIDPUR - BHISHWA km Completed 88 BARUNA BRIDGE - RASIYARI km Completed PROJECTS UNDER CONSIDERATION SH Length Name of Road No. (km) 58 UDAKISHANGANJ-BHATGWA ROAD KADIRGANJ-KHAIRA ROAD GHOGHA-PANJWARA ROAD AKBARNAGAR-AMARPUR ROAD BEHEA-JAGDISHPUR PIRO BIHTA ROAD BETTIAH-NARKATIAGANJ-BIKHNA THORI ROAD 71.6 Status Date of Bidding is Except SH-105 for which DPR preparation is in Progress.

86 (SH-78, BIHTA - DANIYAWAN CHANDI - SARMERA) CONTRACTOR PACKAGE-1 M/s BSCPL Infrastructure Ltd., Hyderabad PACKAGE-2 M/s BSCPL Infrastructure Ltd., Hyderabad CONTRACT LENGTH km 47.5 km CONTRACT AMOUNT Cr Cr. DATE OF COMMENCEMENT DATE OF COMPLETION FINANCIAL PROGRESS 26.86% 31.02% WORK COMPLETION 8.85 km (upto DBM) by Previous Contractor km (upto DBM) by Previous Contractor PHYSICAL PROGRESS % % EMBANKMENT km km SUB GRADE km km GSB km km WMM km km DBM BC - -

87 (SH-78, BIHTA - DANIYAWAN CHANDI - SARMERA)

88 PPP ON-GOING GREENFIELD BRIDGE ACROSS GANGA CONNECTING BAKHTIYARPUR TO TAJPUR

89 CONCESSIONAIRE CONCESSION PERIOD MAIN BRIDGE LENGTH APPROACH ROAD M/s Navayuga Jahnavi Toll Bridge Pvt. Ltd. 30 Years including 4.5 years Const. period km km APPOINTED DATE COMPLETION DATE VGF GoI VGF GoB Cr Cr. FINANCIAL PROGRESS (w.r.t Total Fin Pkg.) Rs Cr. (54.41 %) PHYSICAL PROGRESS (w.r.t EPC) Rs Cr. (49.71%) FEATURES GREENFIELD BRIDGE BAKHTIYARPUR TO TAJPUR Major Bridges 03, ROB 02, Grade Separator-03, VUP- 16, Service Road (km)-10.05, Toll Plaza- 01 MAIN BRIDGE: Foundation Piles 270/272 (Nos.), Pile Caps 41/46 (Nos.), Sub-structure- 30.3/46 (Nos.), Segment Casting- 338/1722 (Nos.), Super-Structure launching Span 1/45 (Nos.). HIGHWAY : Road Embankment 21.6/45.75 (km).

90 MAJOR BRIDGE :- 01 completed out of 4 Nos. ROBs :- 02 ( 1 no. in progress up to Sub structure). GRADE SEPARATOR : 03 ( 1 no. in progress up to Sub structure). VUPs :- 10 ( 4 no. completed, 1 in progress, 5 nos. not started due to LA). PUPs : 6 ( 3 no. completed, 1 is going to start, 2 nos. not started due to LA).

91 GREENFIELD BRIDGE BAKHTIYARPUR TO TAJPUR

92 EPC ON-GOING PROJECTS ELEVATED CORRIDOR PROJECT PATNA (L km)

93 ELEVATED CORRIDOR PROJECT PATNA (L km) ADMINISTRATIVE APPROVAL AGREEMENT AMOUNT (WORK) NAME OF THE CONTRACTOR AUTHORITY ENGINEER MAJOR CROSSINGS CONNECTIVITY Crores. (including NHAI Leftover) Rs Crores. M/s Gammon Engineers & Contractors Pvt. Ltd. M/s AECOM-Rodic Consultants Pvt. Ltd. (JV) Bailey Road, Ashok Rajpath With NH-30, NH-98, Ganga Path & NH-19 AGREEMENT DATE APPOINTED DATE COMPLETION DATE FINANCIAL PROGRESS Crores PHYSICAL PROGRESS: Pile 3046/3046 (Nos.), Pile Cap 682/683 (Nos.), Pier 680/683 (Nos.), Pier Cap 675/683 (Nos.), I-Girder Casting 3800/4074 (span), I- Girder Erection 3766/4074 (span), Deck Slab 665/679 (span)

94 ELEVATED CORRIDOR PROJECT PATNA (L km)

95 CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL- CUM-ROAD BRIDGE FROM AIIMS TO DIGHA (NHAI LEFTOVER PORTION) TOTAL LENGTH KM

96 CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL- CUM-ROAD BRIDGE FROM AIIMS TO DIGHA (NHAI LEFTOVER PORTION) TOTAL LENGTH KM ADMINISTRATIVE APPROVAL AGREEMENT AMOUNT (WORK) NAME OF THE CONTRACTOR AUTHORITY ENGINEER MAJOR CROSSINGS CONNECTIVITY Crores. (including NHAI Leftover) Rs Crores. M/s Gammon Engineers & Contractors Pvt. Ltd. M/s AECOM-Rodic Consultants Pvt. Ltd. (JV) Bailey Road, Ashok Rajpath Bankipur-Danapur Road & South Side of ROB AGREEMENT DATE COMPLETION DATE FINANCIAL PROGRESS Crores PHYSICAL PROGRESS: Earthwork 9067/ 9205 (m), Granular Sub-Base 9067 / 9205 (m), WMM 9067 /9205 (m), DBM 8120 / 9205 (m), BC 8120 / 9205 (m) Flyover:- Pile 14 / 16 (Nos.), Pile Cap 14 /16 (Nos.), Pier 14 /16(Nos.) J.P.Setu connectivity work already completed.

97 CONSTRUCTION OF SOUTH SIDE APPROACH ROAD, 2 LANE WITH PAVED SHOULDER OF DIGHA RAIL- CUM-ROAD BRIDGE FROM AIIMS TO DIGHA (NHAI LEFTOVER PORTION) TOTAL LENGTH KM

98 GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length km)

99 ADMINISTRATIVE APPROVAL AGREEMENT AMOUNT NAME OF THE CONTRACTOR GANGA PATH (Length km) Rs Crore Rs Crore M/s Navayuga Engineering Co. Ltd. AGREEMENT DATE APPOINTED DATE MODIFIED COMPLETION DATE EOT under process for FINANCIAL PROGRESS 24.64% (Rs Crores ) up to March 18 FEATURES Length of Elevated Structure km, Embankment length 8.8 km, Service Road 8.2 km., Vehicular Underpass 13, Grade Separator interchange 01, ROB 01, Culverts 13, FOB 08 (both side), Toll Plaza 02, Pedestrian Walkways- 05 km. (river side), Truck laybys 01, Bus laybys / Shelter 16, Re-creation area 07, Toll Plaza - 07 (including connecting road), Connecting Road 07 (LCT Ghat, A.N. Sinha Institute, PMCH, Krishna Ghat, Kangan Ghat, Gaighat, Patna Ghat) PHYSICAL PROGRESS Pile- 397/762, Pile Cap- 74/163, Pier 71/163, Pier Cap- 71/163, Segment Casting- 694/2431, Launching of Segment- 31. Earth work- 2 Km (in progress)/8.8 km

100 GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA Near Kurji Ghat-LCT Ghat Jack-up Barge Collectrate Ghat Near LCT Ghat

101 SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length km, Approach Length- 13 km)

102 SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length km, Approach Length- 13 km) Length of the Project : Km. includes 9.76 Km. long Main Bridge Start Point : Kachchi Dargah at NH-30 in Patna District End Point : Bidupur at NH-103 in Vaishali District Total Project Cost : INR Cr. ADB Assistance : INR Cr. Balance Amount (GOB ) : INR Cr. Name of Civil Contractor : M/s Daewoo & L&T (JV) Name of Authority Engineer : AECOM & RODIC (JV) A/A for the Project : Rs Cr. on A/A for Land Acquisition : Rs Cr. on Contract Amount : Rs Crores NGO : CITIZEN foundation Agreement Date / Appointment Date : / Completion Period / Date of Completion : 4 years / Features :- Major junctions 06, Grade Separator 01, 2-lane loop- 04, RAMPS 08, Flyover- 02, Viaduct 06, Rotary 02, Toll Plaza 01, Truck lay-byes, Bus-byes and Bus-Shelter, Museum, Traffic Aid Posts, Vehicle Rescue Posts, Telecom System, Intelligent Traffic System, Weigh-in-motion Bridge PHYSICAL PROGRESS of Main Ganga Bridge Well Curb- 32/67 no., Well Steining / M, Well Sinking /3390 M LA Status : acre out of 313 acre land acquired and balance is under process.

103 SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length km, Approach Length- 13 km)

104 4-LANING OF NH-82 (GAYA - HISUA - RAJGIR -NALANDA - BIHARSHARIF SECTION) under JICA Length Project Sanctioned Amount- JICA Finance Portion (Project cost and Consultancy cost) Balance Amount to be Budgeted by MoRTH, GoI (R&R, LA, Utility shifting & Local Taxes.) : Km. : INR Cr. : INR Cr. : INR Cr. Name of Civil Contractor : Gayatri Projects Ltd., Hyderabad Date of Agreement : Amount of Agreement : INR Crore Date of Commencement : Date of Completion : ( 3 years) STATUS : Work in progress Financial Progress : % Up to date Physical Progress : % Unencumbered Length : Km C & G / 50, Embankment 21.58/50, Sub-grade 19.36/50, GSB 16.85/50, WMM /50, DBM /50, BC (Overlay) -5.9/50(all in km) H.P Culvert 54/105, 5 in progress, Box Culvert 62/118, 15 in progress, Minor Bridge- 17/33, 4 in progress, major Bridge All 6 are in progress, ROBout of 4 nos. 1 in Progress.

105 4-LANING OF NH-82 (GAYA - HISUA - RAJGIR -NALANDA - BIHARSHARIF SECTION)

DISTRICTWISE ACHIEVEMENT OF CMHM

DISTRICTWISE ACHIEVEMENT OF CMHM DISTRICTWISE ACHIEVEMENT OF CMHM - 2016-17 Districtwise and Achievement under CMHM Fin. Year 2016-17 (Phy. in Hect./Nos., Fin. in Lakh Rs.) Sl. Districts Name Phy Fund Available in 2016-17 Achievement

More information

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report Construction of 2x2 Lane Bridge with footpath across river Ganga between Sultanganj (Bhagalpur ) and Aguwani Ghat 17177. (Khagaria ) 1.42.56.2 including navigational span 8797 (S) 89.68 43.56 8.6 dated

More information

भ रत सरक र GOVERNMENT OF INDIA. Precipitation/TS Forecast For Districts of BIHAR भ रत म सम वज ञ न वभ ग

भ रत सरक र GOVERNMENT OF INDIA. Precipitation/TS Forecast For Districts of BIHAR भ रत म सम वज ञ न वभ ग भ रत सरक र GOVERNMENT OF INDIA भ रत म सम वज ञ न वभ ग म सम वज ञ न क दर, अ नस ब द, पटन बह र, पन क ड- 800002 INDIA METEOROLOGICAL DEPARTMENT METEOROLOGICAL CENTRE, ANISHABAD, PATNA, BIHAR PIN CODE800002 द

More information

Climate Change in Bihar, India:A Case Study

Climate Change in Bihar, India:A Case Study Climate Change in Bihar, India:A Case Study L. B. Roy 1, M. Bhushan 2, R. Kumar 2 1,2 Civil Engineering Department, National Institute of Technology Patna Patna-800005, Bihar, India 1 lbroy@nitp.ac.in

More information

ROAD CONSTRUCTION DEPARTMENT, BIHAR PROGRESS REPORT OF ONGOING SCHEMES (INCLUDING STATUS OF REMAINING STRETCHES) FOR THE YEAR

ROAD CONSTRUCTION DEPARTMENT, BIHAR PROGRESS REPORT OF ONGOING SCHEMES (INCLUDING STATUS OF REMAINING STRETCHES) FOR THE YEAR Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re 01.04.13 r e Financial Status as up 31.03.2017 Physical Status as up 31.03.2017 imposed Target work be done 1 Patna Gulzarbagh

More information

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included)

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) Integrated Diseases Surveillance ProGRAMME Monthly Communicable Disease Surveillance Report Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) MONTH: Mar 2018

More information

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included)

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) Integrated Diseases Surveillance ProGRAMME Monthly Communicable Disease Surveillance Report Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) MONTH: May 2018

More information

Road Statistics. Nature of work [W/S, Strength, IRQP, PR,OR. More than 7.0m width. Chainage

Road Statistics. Nature of work [W/S, Strength, IRQP, PR,OR. More than 7.0m width. Chainage Statistics (M) Condition Wing Circle Division Name of Single -3.75m. - 5.50m. Two - 7.0m. (M) road road. Fld1 Fld2 Fld3 Fld4 Fld5 Fld6 Fld7 Fld8 Fld9 Fld10 Fld11 Fld12 Fld13 Fld14 Fld15 Fld16 Fld17 Fld18

More information

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included)

Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) Integrated Diseases Surveillance Project Monthly Communicable Disease Surveillance Report Monthly Communicable Disease Surveillance Report (Summary of reporting % for P, L, S included) MONTH: JUNE 2014

More information

National Highways Authority of India. (Ministry of Road, Transport & Highways) Government of India

National Highways Authority of India. (Ministry of Road, Transport & Highways) Government of India National Highways Authority of India (Ministry of Road, Transport & Highways) Government of India Four/Six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH 31 from KM 197.900

More information

Flood Management Improvement Support Centre

Flood Management Improvement Support Centre fmisc Bihar Flood Management Improvement Support Centre FLOOD REPORT 2011 Water Resources Department Government of Bihar Towards a Culture of Preparedness for Better Flood Management For official use only

More information

fmisc Bihar Flood Management Improvement Support Centre Flood Report 2012 Towards a Culture of Preparedness for Better Flood Management

fmisc Bihar Flood Management Improvement Support Centre Flood Report 2012 Towards a Culture of Preparedness for Better Flood Management fmisc Bihar Flood Management Improvement Support Centre Towards a Culture of Preparedness for Better Flood Management Flood Report 2012 Water Resources Department Government of Bihar For official use only

More information

ACKNOWLEDGEMENT. (Ajit Kumar Samaiyar) Joint Director FMISC, Patna

ACKNOWLEDGEMENT. (Ajit Kumar Samaiyar) Joint Director FMISC, Patna ACKNOWLEDGEMENT Once again, like previous years the end of the season Flood Report, 2013 is ready for publication and I feel gratified to acknowledge the untiring and meticulous effort put forth by FMISC

More information

DAMAGE SCENARIO UNDER HYPOTHETICAL RECURRENCE OF 1934 EARTHQUAKE INTENSITIES IN VARIOUS DISTRICTS IN BIHAR

DAMAGE SCENARIO UNDER HYPOTHETICAL RECURRENCE OF 1934 EARTHQUAKE INTENSITIES IN VARIOUS DISTRICTS IN BIHAR DAMAGE SCENARIO UNDER HYPOTHETICAL RECURRENCE OF 1934 EARTHQUAKE INTENSITIES IN VARIOUS DISTRICTS IN BIHAR Authored by: Dr. Anand S. Arya, FNA, FNAE Professor Emeritus, Deptt. of Earthquake Engg., I.I.T.

More information

Fee Notification Published in Gazette of India vide S.O. No (E) dated

Fee Notification Published in Gazette of India vide S.O. No (E) dated / NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU. BHOPAL Name of work: Four Laning of Obedullaganj Betul section of NH69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 (approx. length 121.36 km) (excluding

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized SOUTH ASIA India Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 13-May-2016 ISR23158 Implementing Agencies: Rural

More information

ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS

ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS Need for GIS Voluminous/ Manual Data Vs Digital Need for GIS CE - C&B (North) KPWD Secretary Office CE - C&B (South) Dispersed

More information

Urbanisation in Bihar: Need to Break Stigma

Urbanisation in Bihar: Need to Break Stigma Urbanisation in Bihar: Need to Break Stigma Rajnish KUMAR 1 and Milap PUNIA 1 Abstract: Bihar is one of the lowest urbanised states of India. The scope of urban development in the state is enormous due

More information

COLD STORAGES OF BIHAR

COLD STORAGES OF BIHAR COLD STORAGES OF BIHAR As On Aug-2017 Sl. of Name and address of cold storage with contact License Non- Non- 1 1 Kissan Seva (P) Ltd., Musallahpur Bazar, 277/07 448.12 1523.60 0.00 448.12 Private Non-

More information

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY SURVEY, DETAILED PROJECT REPORT OF EXISTING TWO LANE PLUS SHOULDER TO (4LANING OF TALWANDI

More information

The World Bank Second Rural Transport Improvement Project (P123828)

The World Bank Second Rural Transport Improvement Project (P123828) Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 8 ARCHIVED on 16-Dec-2015 ISR21928 Implementing Agencies: Public Disclosure

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

Flood Management Improvement Support Center (FMISC) Water Resources Department Government of Bihar

Flood Management Improvement Support Center (FMISC) Water Resources Department Government of Bihar fmis Bihar Flood Management Improvement Support Center (FMISC) Water Resources Department Government of BiharB 1.0 Purpose And Overview of Annual Report This Report of 2010 Flood, is the fourth report

More information

COLD STORAGES OF BIHAR (As on : )

COLD STORAGES OF BIHAR (As on : ) Name and address of cold storage with contact License 2010 2011 2012 1 1. Patna 1 Kissan Seva (P) Ltd., Musallahpur Bazar, (M-9973437661) 277/07 463.00 1523.60/4 0.00 463.00 Private 2 2 Bajrangwali, Nasriganj,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA South Asia Transport & ICT Global Practice IBRD/IDA Investment Project Financing

More information

Indian Minerals Yearbook 2013

Indian Minerals Yearbook 2013 Indian Minerals Yearbook 2013 (Part- I) 52 nd Edition STATE REVIEWS (Bihar) (FINAL RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR 440 001 PHONE/FAX

More information

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study.

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study. 2 Road Network 2.1 Existing Road Network The existing transport network in National Capital Region is radial in nature. It comprises of expressways, national highways, state highways, major district and

More information

*** The following Notification shall be published in an extra-ordinary issue of the Andhra Pradesh Gazette dt

*** The following Notification shall be published in an extra-ordinary issue of the Andhra Pradesh Gazette dt GOVERNMENT OF ANDHRA PRADESH ABSTRACT Mines and Minerals Punitive Measures to control Illegal Mining and Transportation of Minor Minerals Amendments to A.P. Minor Mineral Concession Rules, 1966 - Orders

More information

Fish Pond. Old Secretariate. Shaheed Smarak

Fish Pond. Old Secretariate. Shaheed Smarak Fish Pond Old Secretariate Shaheed Smarak HOW SATELLITE SCANS EARTH. Rajbhawan area viewed by IKONOS 1 meter sensor Very high resolution (40 cm) Orbi-Image data Higher the resolution better the geometric

More information

Winter Maintenance on Provincial Highways

Winter Maintenance on Provincial Highways Winter Maintenance on Provincial Highways Thunder Bay District Municipal League Wayne Prystanski, A/Regional Director, Northwestern Region February 27, 2015 Outline 1. AMC s in NW Region 2. Winter Maintenance

More information

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 27-Jun-2016 ISR23590 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 30-Dec-2014 ISR17699 Implementing Agencies: National Mission for Clean

More information

2059-PUBLIC WORKS (ESTABLISHMENT)

2059-PUBLIC WORKS (ESTABLISHMENT) Sr. No. STATEMENT SHOWING OBJECT HEAD WISE BUDGET ALLOTMENT / EXPENDITURE FOR THE MONTH OF 5/2016 DURING THE YEAR 2016-2017 OFFICE OF THE ENGINEER IN CHIEF HARYANA, P.W.D. (B&R). (Rs. in lacs) Major Head

More information

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Operation Name: China: Anhui

More information

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026) Operation Name: GH:Sustainable Rural Water

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Preface. I hope all the stakeholders will find this report very useful.

Preface. I hope all the stakeholders will find this report very useful. Preface It is my pleasure to present Flood Report 2009 prepared by the Flood Management Information System Cell. This is the third annual report since its inception in the year 2007. Flood Management Information

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 23-Mar-2018 ISR30586 Implementing Agencies:

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

COUNCIL POLICY MANUAL

COUNCIL POLICY MANUAL COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs

More information

Second Tamil Nadu Road Sector Project (P143751)

Second Tamil Nadu Road Sector Project (P143751) Public Disclosure Authorized SOUTH ASIA India Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 08-Feb-2018 ISR31260 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA South Asia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 01-Jun-2015 ISR18947 Implementing Agencies: Key Dates Key Project Dates Board Approval

More information

Spatio-temporal variation of rainfall over Bihar State, India

Spatio-temporal variation of rainfall over Bihar State, India DOI: 10.2478/jwld-2018-0018 Polish Academy of Sciences (PAN), Committee on Agronomic Sciences JOURNAL OF WATER AND LAND DEVELOPMENT Section of Land Reclamation and Environmental Engineering in Agriculture,

More information

Due to the above development proposal we propose to start the project at Km instead of Km

Due to the above development proposal we propose to start the project at Km instead of Km Development Proposals compatibility with the existing pavement, ROW and utilities. The general considerations followed for fixing the proposed horizontal alignment are as follows: Maximum utilization of

More information

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384) Operation Name: Danang Sustainable

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 29-Jun-2016 ISR24379

More information

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583) Public Disclosure Authorized SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 10-Nov-2017 ISR28544 Implementing Agencies: Government

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893) Operation Name:

More information

Consultants: firms Consultants: individuals

Consultants: firms Consultants: individuals Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Belize Municipal Development (P111928) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Belize Municipal Development (P111928) Operation

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description* Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UPDATED PROCUREMENT PLAN FOR WORKS DATE SUBMITTED: 23 JAN 2015 COUNTRY: COORDINATING

More information

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819) Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 23-Nov-2018 ISR34538 Implementing Agencies:

More information

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325) Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 5 ARCHIVED on 23-Jun-2016 ISR24264 Implementing Agencies: Public Disclosure Authorized Program

More information

The World Bank China Wuhan Second Urban Transport (P112838)

The World Bank China Wuhan Second Urban Transport (P112838) EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 7 ARCHIVED on 28-Jun-2015 ISR18605 Implementing Agencies: Wuhan Urban Construction Utilization of

More information

NEWS RELEASE. Province boosts winter highway safety measures

NEWS RELEASE. Province boosts winter highway safety measures For Immediate Release 2018TRAN0045-000567 April 4, 2018 NEWS RELEASE Province boosts winter highway safety measures VICTORIA Following an intense winter, the is undertaking several improvements to make

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204)

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204) Operation Name: ELETROBRAS Distribution

More information

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) Operation Name:

More information

The Project s Development Objective (PDO) is to promote environmentally sustainable urban transport in India and to improve the usage of

The Project s Development Objective (PDO) is to promote environmentally sustainable urban transport in India and to improve the usage of Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 18 ARCHIVED on 01-Mar-2017 ISR26438 Implementing Agencies: Public Disclosure

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information

Brief Summary. Production = 4,00,000 TPA

Brief Summary. Production = 4,00,000 TPA S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016

More information

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-II (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-III LETTER OF INTENT Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

CHAPTER 5 PLAN OUTLAYS

CHAPTER 5 PLAN OUTLAYS Five Year Plan CHAPTER 5 PLAN OUTLAYS A&N Islands was given the status of a Union Territory on 1 st November, 1956. Till then it was a part D state and was borne on the Budget of the Union Home Ministry.

More information

CENTRAL PLAN SCHEME MONITORING SYSTEM

CENTRAL PLAN SCHEME MONITORING SYSTEM CENTRAL PLAN SCHEME MONITORING SYSTEM ACHIEVEMENTS AND FUTURE PLAN CONTROLLER GENERAL OF ACCOUNTS MINISTRY OF FINANCE GOVERNMENT OF INDIA 1 MARCH, 2012 LET THE WHOLE WORLD HEAR IT LOUD AND CLEAR, INDIA

More information

The World Bank Southern Africa Trade and Transport Facilitation Project (P120370)

The World Bank Southern Africa Trade and Transport Facilitation Project (P120370) Public Disclosure Authorized AFRICA Africa Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 9 ARCHIVED on 18-Apr-2017 ISR26888 Implementing Agencies: Public Disclosure Authorized

More information

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan for Ghana Transport Sector Improvement Project (P151026) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan for Ghana Transport Sector Improvement Project (P151026) I. General 1. Bank s approval

More information

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395) Public Disclosure Authorized SOUTH ASIA India Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 02-Dec-2017 ISR29908

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania

More information

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819) Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 25-May-2018 ISR32324 Implementing Agencies:

More information

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018 Public Disclosure Authorized SOUTH ASIA India Water Global Practice Requesting Unit: SACIN Responsible Unit: GWA06 IBRD/IDA Program-for-Results FY 2014 Team Leader(s): Raghava Neti Seq No: 8 ARCHIVED on

More information

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Third National Urban Water Sector Reform Project (P123513) Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

Punjab Cities Program (P156972)

Punjab Cities Program (P156972) Public Disclosure Authorized SOUTH ASIA Pakistan Social, Urban, Rural and Resilience Global Practice Global Practice Requesting Unit: SACPK Responsible Unit: GSU12 IBRD/IDA Program-for-Results Financing

More information

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana 113 Dated: 30 June 2018 To, The Director (IA Division, Non-Coal Mining), Ministry of Environment, Forest and Climate Change (MoEF&CC) Indira Paryavaran

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Ayeyarwady Integrated River Basin Management Project (P146482)

Ayeyarwady Integrated River Basin Management Project (P146482) EAST ASIA AND PACIFIC Myanmar Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 19-Dec-2018 ISR35167 Implementing Agencies: Republic of the Union of Myanmar, Directorate

More information

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 11-Dec-2015 ISR21753 Implementing Agencies:

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 22-Dec-2017 ISR30831 Implementing Agencies: Socialist

More information

AUTHORITY: Town Council POLICY NUMBER:

AUTHORITY: Town Council POLICY NUMBER: TOWN OF RAINBOW LAKE POLICY TITLE: Town Snow Clearing Policy AUTHORITY: Town Council POLICY NUMBER: 2009-04 APPROVAL DATE: EFFECTIVE DATE: Policy Statement: The purpose of this policy is to regulate a

More information

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590) Public Disclosure Authorized AFRICA Uganda Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 18-Dec-2017 ISR30767 Implementing Agencies: REPUBLIC OF UGANDA,

More information

Part 1: Weather Forecast Severe Weather Warnings (Source: IMD, Date: 1 st September, 2008)

Part 1: Weather Forecast Severe Weather Warnings (Source: IMD, Date: 1 st September, 2008) Sphere India Unified Response Strategy Situation report (India Floods 2008) 01 st September 2008 Part 1: Weather Forecast Severe Weather Warnings (Source: IMD, Date: 1 st September, 2008) HEAVY RAINFALL

More information

Gramin Krishi Mausam Sewa: Current Status and Future Plan. Anand Sharma Regional Coordinator/ Sc-F, Agromet Advisory Services Division

Gramin Krishi Mausam Sewa: Current Status and Future Plan. Anand Sharma Regional Coordinator/ Sc-F, Agromet Advisory Services Division Gramin Krishi Mausam Sewa: Current Status and Future Plan Anand Sharma Regional Coordinator/ Sc-F, Agromet Advisory Services Division Outline Weather observation network Weather forecasting Forecast Skill

More information

Municipal Act, 2001 Loi de 2001 sur les municipalités

Municipal Act, 2001 Loi de 2001 sur les municipalités Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From January 25, 2013 to the e-laws currency date.

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

ftefair vrxitur 124-wrg f4srpr ittw Og/05/ ' A- I tr--rftr-+-rtr oiraci cr%aturr

ftefair vrxitur 124-wrg f4srpr ittw Og/05/ ' A- I tr--rftr-+-rtr oiraci cr%aturr ftefair vrxitur 124-wrg f4srpr 73" 75* treft, ittw g/05/13 gireao-1p="4-r0 (Cth-1-4.TrIT)- 35/2012 trat gr, SIT c-ei,p)1 Sell 441 chi, T-1,1441,4u1, c1-1,, rkfatzit, 3rTitzrr, ''c'1, 70, I6 ti1, Trevr,

More information

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683) AFRICA Zambia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 26-Nov-2018 ISR34605 Implementing Agencies: Ministry of Mines and Mineral

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible

More information

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS Lecturer PhD. eng. MAGDOLNA EVA KONCSAG, 1 Decembrie 1918 University of Alba Iulia, Romania ABSTRACT.

More information