1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UPDATED PROCUREMENT PLAN FOR WORKS DATE SUBMITTED: 23 JAN 2015 COUNTRY: COORDINATING AGENCY: PROJECT NAME CREDIT NO.: PROJECT ID: IMPLEMENTING AGENCY: GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS Serial No. Component Description* List of Contracts 1 3A Route Improvement under UTP -Amasaman to Kwame Nkrumah Circle plus Depots/Workshops (LOT 1) -TYPE B 3 3A Norm Duration of Proc Steps 2 3A Route Improvement under UTP -Kwame Nkrumah Circle to CMB (LOT 2)- TYPE B Route Improvement under UTP -Supply and Install Traffic Signals (LOT 3) -TYPE B
2 Total Cost Note Exchange Rate (Average Interbank) - 31/07/14 $1.00 = Ghs3.0337
3 B Package Number Lot Number Lumpsum or Bill of Quantities Procurement Method DUR/IDA/UTP/NCB/W/Lot 1/ BOQ NCB DUR/IDA/UTP/NCB/W/Lot 2/ BOQ NCB DUR/IDA/UTP/NCB/W/Lot 3/ BOQ NCB
4
5 Basic Data P Estimated Amount in US $ Pre-or Post Qualification Prior or Post Review Plan vs. Actual Invitation for Prequalification of contractors If Prequalification Plan add 7-13 wks Actual 4,000, Post Post Plan N/A 2,224, Actual 4,000, Post Post Plan N/A 2,517, Actual 6,000, Post Post Plan N/A Actual
6 14,000, Plan 4,742, Actual
7 Pre-qualification Process Draft Bid Documents, including specs and quantities, draft SPN Submission of Prequalification evaluation Report No- Objection Date Prep & Submission by Ex Agency No-objection Date 4-7 wks wks N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 11-Jun-14 N/A N/A 29-Jan-15 N/A N/A
8
9 If Post-Review, No-objection Dates are not needed Spec Proc Notice Advert Bidding Period On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing-Opening Plan vs. Actual wks wks 6 to Plan Actual 18-Apr Apr May-14 Plan 18-Jun Jun Jul-14 Actual 18-Apr Apr May-14 Plan 18-Jun Jun Jul-14 Actual 5-Feb-15 5-Feb-15 5-Mar-15 Plan Actual
10 Plan Actual
11 Bid Evaluation Submission Bid Eval Rpt No-objection Date Contract Amount in US$ 12 wks wks N/A N/A N/A N/A 2,224, N/A N/A N/A N/A 2,517, Mar-15 N/A N/A
12
13 Contract Finalization Date of Contract Award Publication of Award Date Contract Signature Plan vs. Actual 1 wk 1-2 wks wks Plan Actual 4-Aug Aug Aug-14 Plan 18-Aug Aug-14 4-Aug Aug Aug-14 Plan 18-Aug Aug Mar Mar Mar-15
14 Plan Actual
15 Contract Implementation Commencement Date Mobilization Advance Payment Substantial Completion Final Acceptance 4 wks 1-Sep Sep Dec Dec-14 8-Sep-14 5-Feb-15 1-Sep Sep Dec Dec-14 8-Sep-14 5-Feb Mar Apr-15 8-Jun-15 5-Dec-15
16
17 Final Cost in US$ Results (i) To improve mobility in the selected Metropolitan, Municipal and District Assemblies through a combination of traffic engineering measures, management improvements, regulation of urban passenger transport and implementation of a Bus Rapid Transit (BRT) system; and (ii) To promote a shift to a more environmentally sustainable transport modes and lower transport-related GHG emissions along the Pilot BRT corridor in Accra.
18
19
20
21 UPDATED PROCUREMENT PLAN FOR GOODS DATE SUBMITTED: 23 JAN 2015 COUNTRY: GHANA COORDINATING AGENCY: MINISTRY OF ROADS AND HIGHWAYS PROJECT NAME URBAN TRANSPORT PROJECT CREDIT NO.: 4334-GH PROJECT ID: P IMPLEMENTING AGENCY: DEPARTMENT OF URBAN ROADS S/No. Component Description* OFFICE EQUIPMENT Norm Duration of Proc Steps List of Contracts Supply of Office Equipment For: 1 Photocopiers: Heavy Duty (6Nr.) 2 Photocopiers: Light Duty(10Nr.) 3 Shredder (8 No.) 4 Scanner (5 No.)
22 5 Laptop Computers(10Nr.) 6 Desktop Computers - 24"- and peripherals (5 No.) 7 Desktop Computers - 17"- and peripherals (10 No.) 8 1G A3/A4 Printers (4no Coloured ) 9 Printers (10no Black and White) 10 Softwares (Design Application & Anti-Virus) 11 Surveying equipment-levelling Instrument(5 No.) 12 Precimeters (12 No.) 13 Furniture (Various)- 2No.
23 Furniture (Various)- 2No. STATIONERY Supply of Stationery for 14 Office Statinery (Various) Total Cost
24 Package Number Lot Number Estimated Amount in US $ 1 23, DUR/IDA/UTP/NCB/G-1/OFF.EQP. 2 19, , ,966.67
25 2 13, , , DUR/IDA/UTP/NCB/G-2/OFF.EQP. 5 7, , , , DUR/IDA/UTP/NCB/G-3/OFF.EQP. 2 3, DUR/IDA/UTP/NCB/G-4/OFF.EQP. 1 8,306.69
26 DUR/IDA/UTP/NCB/G-4/OFF.EQP. 1 DUR/IDA/UTP/NCB/G- 5/STATiIONERY 1 15, ,012.12
27 BASIC DATA Procurement Method Pre-or Post Qualification Prior or Post Review Plan vs. Actual If Prequalification add 7-13 wks Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual
28 Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan Actual Shopping Post Qualification Post Review Plan
29 Actual Shopping Post Qualification Post Review Plan Actual Plan Actual Plan Actual
30 Draft Bid Documents, including specs and quantities, draft SPN If Post-Review, No-objection Dates are not needed Spec Proc Notice Advert Bidding Prep & Submission by Ex Agency No-objection Date On-line UNDB Gateway Nat Press Bid Invitation Date 4-7 wks wks wks 6 to 10-Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb-2015
31 10-Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb Feb-2015 N/A N/A 17-Feb-2015
32 10-Feb-2015 N/A N/A 17-Feb-2015
33 d g Period Bid Evaluation Bid Closing-Opening Complete Bid Eval Rpt No-objection Date Plan vs. Actual 12 wks 2-4 wks wks Plan Actual Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual
34 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan Actual 24-Feb Mar-2015 N/A Plan
35 Actual 24-Feb Mar-2015 N/A Plan Actual Plan Actual Plan Actual
36 Contract Finalization Contract Amount in US$'000 Date Contract Award Publication of Award Date Contract Signature 1 wk wks 17-Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar-2015
37 17-Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar Mar-2015
38 17-Mar Mar Mar-2015
39 Contract Implementation Opening of Let of Credit Arrival of Goods Inspection Final Acceptance N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015
40 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015 N/A 15-May May-2015
41 2-May Jun Jun-2015
42 Contract Start Date 15-Apr Apr Apr Apr-2015
43 15-Apr Apr Apr Apr Apr Apr Apr Apr Apr-2015
44 15-Apr-2015
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192 DISBURSEMENT PLAN 2015 DATE SUBMITTED: 23 JAN 2015 COUNTRY: GHANA COORDINATING AGENCY: MINISTRY OF ROA PROJECT NAME URBAN TRANSPOR CREDIT NO.: 4334-GH PROJECT ID: P IMPLEMENTING AGENCY: DEPARTMENT OF U Total contract amount Supply of Equipment, Goods and Services Procurement of Office Equipment & Goods 120, BRT Studies, Training and Tours 100, Type B Bus Infrastructure Route Improvement under UTP -Amasaman to Kwame Nkrumah Circle plus Depots/Workshops (LOT 1) 2,224, Route Improvement under UTP -Kwame Nkrumah Circle to CMB (LOT 2) 2,517, Route Improvement under UTP -Supply and Install Traffic Signals (LOT 3) -TYPE B 6,000, Consultancy Services Construction Supervision of Bus Priority Measures and Infrastructure for Amasaman - CMB Corridor Ph I 415, Interbank Exc Rate Rate Euro 1: GHC USD 1: GHC
193 ADS AND HIGHWAYS RT PROJECT URBAN ROADS UTP DISBURSMENT PLAN ANTICIPATED DISB Disbursements as of 31/12/ Jan 15-Feb 15-Mar 15-Apr 15-May 40, , , , , , , , , ,176, , , , ,000, ,500, ,500, , , , , Goods , , , Works 1,053, ,053, ,053, ,500, ,500, Consultancy 32, , , Non Total 1,086, ,086, ,126, ,540, ,540,000.00
194 15 BURSEMENTS 15-Jun 15-Jul 15-Aug 15-Sep 15-Oct 15-Nov 15-Dec
195 GHANA PROCUREMENT HUB 2014 CONTRACT DATA Name of PIU Works ICB NCB Others Total Prior Review Contracts Total Post Review Contracts # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) Department of Urban Roads None None 3 10,743 None None None None 3 10,743
196 GHANA PROCUREMENT HUB 2014 CONTRACT DATA Goods Name of PIU ICB NCB Others Total Prior Review Contracts Total Post Review Contracts # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) # of Contracts Value ($'000) Department of Urban Roads None None None None None None
197 GHANA PROCUREMENT HUB 2014 CONTRACT DATA Consultancy Name of PIU Total Prior Review Contracts Total Post Review Contracts # of Contracts Value ($'000) # of Contracts Value ($'000) Department of Urban Roads None None
198 Country/Organisation : Ghana/ Department of Urban Roads Programme/Project : Urban Transport Project Loan : IDA & AFD CO-FUNDING Work Plan for Activity Procurement of Consultant for Detail design and supervision of Bus Priority Measures and Infrastructure Detail Design of Phase 1 Works: Bus Shelters and lay-bys, Amasaman Terminal, Ofankor Terminal, Achimota Terminal, Depot & Maintenance Facilities and Bus Shelter, Contra Flow at Kwame Nkrumah Avenue (South Liberia -Tudu Road) and Tudu Terminal Procurement of Phase 1 Works Construction of Phase 1 Works Dec. 13 Jan. 14 Feb.14 Mar.14 Apr. 14 May.14 Jun Detail Design of Phase 2 Works: Bus Priority Infrastructure, Aveno-Circle, Abeka (9th Street to Abeka Jn) and Amasaman Depot and Maintenance Facility Route Improvement under UTP -Supply and Install Traffic Signals (LOT 3) -TYPE B Construction of Phase 2 Works: Relocation of Utilities Only Procurement of Phase 2 Works (To be Funded by AFD) Construction of Phase 2 Works (To Be Funded By AFD) in 2015 Procurement of Traffic Management Works (Batch 1 Lot 1&3 and Batch 2)(To be Funded by AFD) Construction of Traffic Management Works - Batch 1 Lot 1 Construction of Traffic Management Works - Batch 1 Lot 3 Construction of Traffic Management Works - Batch 2 NB Activities No.s 1-5 are funded from UTP component no.3 (Development of a BRT system) Activities No.s 6-12 are funded from UTP component No. 2 (Traffic engineering, management, and s
199 Jul. 14 Aug. 14 Sept. 14 Oct. 14 Nov.14 Dec.14 Jan. 15 Feb.15 Mar.15 Apr. 15 safety)
200 May.15 Jun. 15 Jul. 15 Aug. 15 Sept. 15 Oct. 15 Nov.15 Dec.15
201 Country/Organisation:Ghana / Department of Urban Roads Project/Programme: Urban Transport Project Credit #: IDA Summary of Budget No Description Supply of Goods Total Budget Allocation (A+B+C) (US$) 1 Procurement of Office Equipment and Goods 120, Subtotal 120, Type B Route Infrastructure Route Improvement under UTP -Amasaman to Kwame Nkrumah Circle plus Depots/Workshops (LOT 1) -TYPE B 2,224, Route Improvement under UTP -Kwame Nkrumah Circle to CMB (LOT 2)- TYPE B 2,517, Route Improvement under UTP -Relocation of Utilities - Water (LOT 3) Route Improvement under UTP -Relocation of Utilities - Electricity (LOT 4) Route Improvement under UTP -Relocation of Utilities - Telecom (LOT 5) Route Improvement under UTP -Amasaman to Kwame Nkrumah Circle plus Depots/Workshops Route Improvement under UTP -Kwame Nkrumah Circle to CMB (PH II) Route Improvement under UTP -Supply and Install Traffic Signals 6,000, , , , ,000, ,000, Subtotal 22,742, Traffic Engineering Management & Safety Construction of Traffic Management Works - Batch 1 Lot 1 6,758, Construction of Traffic Management Works - Batch 1 Lot 3 828, Construction of Traffic Management Works - Batch 2 2,392,170.50
202 Subtotal 9,979, Consultancy Services, Training and Workshops 4 Construction Supervision of Bus Priority Measures and Infrastructure for Amasaman - CMB Corridor Ph I Construction Supervision of Phase 2 Works: Bus Priority Infrastructure, Aveno-Circle, Abeka (9th Street to Abeka Jn) and Amasaman Depot and Maintenance Facility Supervision of Traffic Management Works (Batch 1 and Batch 2) 415, , , BRT Studies and Training Tours 100, Subtotal 1,393, GRAND TOTAL 34,235, Interbank Exc Rate Rate Euro 1: GHC USD 1: GHC
203 BUDGET PLAN Budget Allocations (US$) IDA (A) AFD (B) GEF (D) Total Amount Disbursed at Dec , , ,224, , ,517, ,176, , , , ,000, ,000, ,000, ,742, ,000, ,581, ,758, , , , ,392, ,365.93
204 9,979, ,353, , , , , , , , , ,378, ,857, ,252,556.38
205 Amount Available (US$) Budget for 2015 Deficit/Surplus 120, , , , ,819, ,819, ,341, ,341, , , , , , , ,000, ,000, ,000, ,000, ,000, ,000, ,160, ,160, ,806, ,806, , , ,083, ,083,804.57
206 8,626, ,626, , , , , , , , , ,075, ,075, ,982, ,982,578.70
Procurement Plan for Eth Expressway Project ( P148850)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan for Eth Expressway Project ( P148850) 1. Bank s approval Date of the
More informationProcurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan (Text in italic font is meant for instruction to staff and should be deleted in
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only
More informationGAMINGRE 8/1/ of 7
FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95
More informationKENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT I. General PROCUREMENT PLAN YEAR 2016/2017
More informationThe World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)
Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang
More informationImplementation Status & Results Belize Municipal Development (P111928)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Belize Municipal Development (P111928) Operation
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 28-Dec-2016 ISR26429 Implementing Agencies: Hanoi
More informationProcurement Plan Template (For Contracts not yet initiated to be entered in STEP)
Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania
More informationThe World Bank Ho Chi Minh City Green Transport Development (P126507)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 25-Dec-2017 ISR31002 Implementing Agencies:
More informationProcurement Plan for Ghana Transport Sector Improvement Project (P151026)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan for Ghana Transport Sector Improvement Project (P151026) I. General 1. Bank s approval
More informationUNITED REPUBLIC OF TANZANIA. Procurement Plan
Public Disclosure Authorized General UNITED REPUBLIC OF TANZANIA Procurement Plan 1. Project information: Government of Tanzania. Southern Agricultural Growth Corridor of Tanzania (SAGCOT) P125728 2. Project
More informationProcurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:
More informationProcurement Plan for ETLP (P156590)
I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered
More informationPrior Review Thresholds
Public Disclosure Authorized I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines
More informationImplementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384) Operation Name: Danang Sustainable
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 25-Aug-2016 ISR24487 Implementing Agencies:
More informationProcurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan September 28, 2015 2.
More informationLiberia Liberia Forest Sector Project Procurement Plan (P154114)
Public Disclosure Authorized I. General Liberia Liberia Forest Sector Project Plan (P154114) Public Disclosure Authorized Public Disclosure Authorized 1. Bank s approval Date of the procurement Plan: revised
More informationUrban Productive Safety Net Project (UPSNP) Procurement Plan
I. General Urban Productive Safety Net Project (UPSNP) Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Notice: August 20, 2016 4. Period covered by this procurement
More informationThe Project s Development Objective (PDO) is to promote environmentally sustainable urban transport in India and to improve the usage of
Public Disclosure Authorized SOUTH ASIA India Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 18 ARCHIVED on 01-Mar-2017 ISR26438 Implementing Agencies: Public Disclosure
More informationProcurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable
I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project
More informationSelection Method. Financing Share. Bid document submis-sion. Bank Review
re uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Plan / ctual Goods HRYN (Page 1) Procurement Plan as of date in file name Procurement Ref. # Type-Category
More informationProcurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on
More informationProcurement Plan for Project of Integrated Urban and Tourism Development
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan for Project of Integrated Urban and Tourism Development I. General 1.
More informationSample Procurement Plan
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:
More informationImplementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ghana Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 06-Jun-2018 ISR32572 Implementing Agencies: GWCL /PIU, Republic of Ghana,
More informationProcurement. International Competitive Bidding;
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. for the proposed project will be carried out in accordance with: World Bank s "Guidelines:
More informationGEF Procurement Plan (WARFP LIBERIA)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General GEF Plan (WARFP LIBERIA) 1. Bank s approval Date of the procurement Plan [Original: April 2016]: Updated
More informationPublic Disclosure Copy
EUROPE AND CENTRAL ASIA Bulgaria Water Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 07-Feb-2016 ISR22610 Implementing Agencies: Ministry of Regional Development and
More informationImplementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) Operation Name:
More informationConsultants: firms Consultants: individuals
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all
More informationPublic Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)
Public Disclosure Authorized AFRICA Uganda Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 18-Dec-2017 ISR30767 Implementing Agencies: REPUBLIC OF UGANDA,
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 27-Dec-2017 ISR30480 Implementing Agencies:
More informationEthiopia: Transport Systems Improvement Project (TRANSIP) (P151819)
Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 23-Nov-2018 ISR34538 Implementing Agencies:
More informationThe World Bank Bangladesh Modern Food Storage Facilities Project (P120583)
Public Disclosure Authorized SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 10-Nov-2017 ISR28544 Implementing Agencies: Government
More informationThe World Bank Community Development Program Support Project-Phase III (P144637)
Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 21-Dec-2017 ISR30226
More informationImplementation Status & Results Chad Urban Development Project (P072030)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project
More informationSri Lanka Strategic Cities Development Project (P130548)
SOUTH ASIA Sri Lanka Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 21-Dec-2018 ISR35436 Implementing Agencies:
More informationPublic Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)
Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 11-Dec-2015 ISR21753 Implementing Agencies:
More informationThe World Bank Caribbean Regional Communications Infrastructure Program (P114963)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Caribbean Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 9 ARCHIVED on 25-Jan-2017 ISR26209 Implementing Agencies:
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 16-May-2016 ISR23432 Implementing Agencies:
More informationProcurement Plan. Nepal Livestock Sector Innovation Project
I. General Plan Nepal Livestock Sector Innovation Project 1. Bank s approval Date of the procurement Plan: February 14, 2018 2. Date of General Notice: 3. Period covered by this procurement plan: 18 months
More informationThe World Bank Bangladesh Modern Food Storage Facilities Project (P120583)
SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 22-Apr-2016 ISR23210 Implementing Agencies: Directorate General, Ministry of Food Key
More informationFEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN
Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Project (NEWMAP) PROCUREMENT PLAN I. GENERAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure
More informationUrban Productive Safety Net Project (UPSNP) Procurement Plan
Public Disclosure Authorized I. General Urban Productive Safety Net Project (UPSNP) Procurement Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Procurement Notice:
More informationImplementation Status & Results Chad Urban Development Project (P072030)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project
More informationThe World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)
Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 25-May-2018 ISR32324 Implementing Agencies:
More informationWB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP
losure uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Number Project Description Estimated Cost (US$ million) Selection Method Bank (Prior / Finalizatio n
More informationProcurement Plan Template (For Contracts not yet initiated to be entered in STEP)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project
More informationPrior Review Thresholds
I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Type of Method Review Thresholds
More informationThe World Bank Cities and Climate Change (P123201)
Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 13 ARCHIVED on 17-May-2018 ISR31517
More informationThe World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)
Public Disclosure Authorized SOUTH ASIA India Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 13-May-2016 ISR23158 Implementing Agencies: Rural
More informationImplementation Status & Results Mekong Mekong Integrated Water Resources Management (P104806)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mekong Mekong Integrated Water Resources Management (P104806) Operation Name: Mekong Integrated
More informationImplementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Operation Name: China: Anhui
More informationPPA PROCUREMENT PLAN (Textual Part)
PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]
More informationPublic Disclosure Copy
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 01-Jun-2018 ISR31660
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized AFRICA Mali Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 21 ARCHIVED on 13-Jan-2015 ISR17735 Implementing Agencies: Public
More informationImplementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026) Operation Name: GH:Sustainable Rural Water
More informationPublic Disclosure Copy
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA South Asia Transport & ICT Global Practice IBRD/IDA Investment Project Financing
More informationPublic Disclosure Copy
Public Disclosure Authorized SOUTH ASIA Nepal Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 23 ARCHIVED on 26-Jul-2018 ISR33099 Implementing Agencies: Poverty Alleviation
More informationPublic Disclosure Copy
Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016
More informationThe World Bank Competitiveness and Enterprise Development Project (CEDP) (P130471)
Public Disclosure Authorized AFRICA Uganda Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 10 ARCHIVED on 29-Sep-2017 ISR29438 Implementing Agencies: Government
More informationREPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 I. GENERAL II. REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT
More informationThe World Bank Decentralized Community Driven Services Project (P117764)
Public Disclosure Authorized AFRICA Benin Social Protection Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 6 ARCHIVED on 12-Jun-2015 ISR19748 Implementing Agencies: Public Disclosure Authorized
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Ghana Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 24-Feb-2018 ISR31557 Implementing Agencies:
More informationThe World Bank Mali Reconstruction and Economic Recovery (P144442)
Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2014 Seq No: 7 ARCHIVED on 30-Jun-2017 ISR28723 Implementing
More informationThe World Bank China Wuhan Second Urban Transport (P112838)
EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 7 ARCHIVED on 28-Jun-2015 ISR18605 Implementing Agencies: Wuhan Urban Construction Utilization of
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 16-Jul-2018 ISR32389 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates
AFRICA Africa Environment Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 9 ARCHIVED on 22-Nov-2014 ISR16750 Implementing Agencies: Lake Victoria Basin Commission Key Dates Key Project
More informationThe World Bank Transport Connectivity and Asset Management Project (P132833)
Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 23-Mar-2018 ISR30586 Implementing Agencies:
More informationImplementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power
More informationThe World Bank Community Development Program Support Project-Phase III (P144637)
Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 20-Jun-2017 ISR27942
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 22-Jun-2016 ISR23891 Implementing Agencies:
More informationThe World Bank Haiti Business Development and Investment Project (P123974)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 9 ARCHIVED on 29-Dec-2016 ISR26542 Implementing
More informationPublic Disclosure Copy
Public Disclosure Authorized SOUTH ASIA Nepal Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 22 ARCHIVED on 27-Apr-2018 ISR32244 Implementing Agencies: Poverty Alleviation
More informationThe World Bank Bangladesh Weather and Climate Services Regional Project (P150220)
Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 01-Dec-2017 ISR30351
More informationThe World Bank OECS Regional Tourism Competitiveness (P152117)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN OECS Countries Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 28-Jan-2018
More informationThe World Bank China: Qinghai Xining Urban Transport Project (P127867)
Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2016 ISR24068 Implementing Agencies:
More informationPPA PROCUREMENT PLAN (Textual Part)
PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]
More informationLiberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)
I. General Liberia Additional REDD+ Readiness Preparation Support Plan (P124073) 1. Bank s approval Date of the procurement Plan: revised version on. 2. Date of General Notice: October 8, 2013 3. Period
More informationBangladesh Weather and Climate Services Regional Project (BWCSRP)
Bangladesh Weather and Climate Regional Project (BWCSRP) Type of Method RFB, RFP, Direct Contracting RFQ None Review Thresholds Review Thresholds ( Cost of the Contract/Package) >=US$ 10,000,000 Works
More informationThe World Bank Third National Urban Water Sector Reform Project (P123513)
Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,
More informationSÃO PAULO METRO LINE 4 (PHASE 2) (P106390)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 13 ARCHIVED on 08-Jun-2016 ISR23671 Implementing Agencies:
More informationThe World Bank Community Development Program Support Project-Phase III (P144637)
Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 27-Jun-2018 ISR33107
More informationThe World Bank Haiti Business Development and Investment Project (P123974)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 10 ARCHIVED on 06-Jul-2017 ISR27112 Implementing
More informationSOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 03-Mar-2017 ISR26764 Implementing Agencies: Public
More informationPublic Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070)
Public Disclosure Authorized AFRICA Sierra Leone Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Jun-2016 ISR24052 Implementing Agencies:
More informationAFCC2/RI-South West Indian Ocean Fisheries Governance and Shared Growth Project 1 (P132123)
Public Disclosure Authorized AFRICA Africa Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 10-Jul-2018 ISR32754 Implementing Agencies:
More informationThe World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004)
Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No:
More informationPPA PROCUREMENT PLAN (Textual Part)
PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]
More informationMalawi Education Sector Improvement Project (MESIP) (P154185)
Public Disclosure Authorized AFRICA Malawi Education Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 5 ARCHIVED on 13-Nov-2018 ISR34470 Implementing Agencies:
More informationThe World Bank Ethiopia Geothermal Sector Development Project (P133613)
Public Disclosure Authorized AFRICA Ethiopia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 13-Mar-2018 ISR31676 Implementing Agencies: Ethiopian
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates
Public Disclosure Copy AFRICA Africa Environment & Natural Resources Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 11 ARCHIVED on 18-Dec-2015 ISR21679 Implementing Agencies: Ministry
More informationThe World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Copy AFRICA South Sudan Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 11-Feb-2015 ISR18127 Implementing
More informationPublic Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)
Public Disclosure Authorized AFRICA Somalia Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 29-Nov-2016 ISR25649 Implementing
More information