1 Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 20-Jun-2017 ISR27942 Implementing Agencies: REPUBLIC OF CAMEROON, Republic of Cameroon Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:29-Sep-2015 Planned Mid Term Review Date:19-Feb-2018 Original Closing Date:30-Nov-2019 Project Development Objectives Effectiveness Date:01-Apr-2016 Actual Mid-Term Review Date:-- Revised Closing Date:30-Nov-2019 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The development objective of phase 3 (PNDP III) is to strengthen local public finance management and participatory development processes in communes for the delivery of quality and sustainable social and economic infrastructure. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component A: Local development support:(cost $46.77 M) Public Disclosure Authorized Component B: Support to the decentralization process:(cost $14.02 M) Component C: Coordination, management, monitoring and evaluation and communication:(cost $9.21 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating Substantial Substantial 6/20/2017 Page 1 of 11

2 Implementation Status and Key Decisions Overall, the PIU accelerated the implementation of activities, becoming one of the fastest disbursing project of the portfolio this FY. More specifically, the project supported the Communes to implement the micro-projects identified early on to support the emergency plan in vulnerable regions successfully, and the participatory development planning started in 99 communes. Finally, the policy dialogue on the institutionalization and mainstreaming of PNDP lessons went forward at the Minister level, with the launch of two studies to help the institutionalization objectives of phase 3. Comp. A: Local Development Support - Out of the 420 mature micro-projects (emergency plan) identified in January 2016, 286 are completed, 124 ongoing and 10 had not yet started because of procurement issues at the level of 2 Communes. All communes (360) have signed Grant Agreements with the PNDP clarifying the modalities of support from PNDP. The Local Development Plan participatory elaboration process for the first wave of Communes (99) has started at villages levels. The revised Local Development Plan participative methodology aiming at including Displaced populations and fostering locally-driven initiatives ('solutions endogenes') is being implemented. The revision of the methodology for urban local councils with MINHDU is still on-going. PNDP intervention strategy in Far North zones of insecurity is being implemented. So far, 2 Communes in the conflictaffected area are targeted for the first wave of Local Development Plan (Kousseri and Logone-Birni) and 43 micro-projects are being executed in 5 communes (including at the border with Nigeria). Comp. B: Support to Decentralization process. Progress is as follow: (a) the MINATD just sent draft ToR on Local PFM (esp. transfer system). Other studies will be drawn from the Decentralization Strategy that has been approved by the CND end of May (b) Continuous capacity-building to 329 local councils on the accounting software SIM_BA is on-going (every trimester and on-demand), and installation is being prepared for the remaining 31, the software designed in French is being translated in English for the English-Speaking region; an initial training for the Chambre des Comptes has been rolled out; (c) design and planning of training for local councils staff depend on the local council preliminary diagnosis (comp. A) and will be coordinated with other partners (FEICOM); (d) a Single Window for payment from the Communes has been designed and is being piloted in one district to shorten payments delays from a few weeks to a few days. Comp. C: Coordination, Management and M&E. The PIU is fully staffed and operational, and highly motivated. The Communication strategy has been finalized and is being implemented. The Call Center to manage Grievances (Doleances) is launched since June 07. The regional offices of PNDP successfully migrated to STEPS too. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Sustainability Substantial Substantial Substantial Fiduciary Substantial Substantial Substantial 6/20/2017 Page 2 of 11

3 Environment and Social Moderate Moderate Moderate Stakeholders Moderate Moderate Moderate Other Substantial Substantial Substantial Overall Substantial Substantial Substantial Results Project Development Objective Indicators Share of Public Investment Budget projects derived from Local Development Plans (Percentage, Custom) Value Date 01-Jan Sep Mar Nov-2019 Share of local councils which financial accounts are submitted to the Audit Bench (Chambre des Comptes) (Percentage, Custom) Value Date 31-Mar Sep Mar Jan-2019 Sub-projects with post-project community engagement or O&M arrangements (%) (Percentage, Custom) Value Date 29-Sep Sep Mar Nov-2019 Sub-projects that are expected to have a mechanism for post-completion operation (Number, Custom Supplement) Value /20/2017 Page 3 of 11

4 Eligible 31 new Local Councils that have prepared Local Development Plans of a quality acceptable of the association (Number, Custom) Value Date 29-Sep Sep Mar Nov-2019 Comments Those LDP are underway but not completed yet. Direct project beneficiaries (Number, Custom) Value , ,300, Date 29-Sep Sep Mar Nov-2019 Female beneficiaries (Percentage, Custom Supplement) Value Beneficiaries that feel project investments reflected their needs (percentage) (Percentage, Custom) 6/20/2017 Page 4 of 11

5 Value Date 29-Sep Sep Mar Nov-2019 Comments survey will be done for the MTR Beneficiaries that feel project inv. reflected their needs - female (number) (Number, Custom Supplement) Value , Total beneficiaries - female (number) (Number, Custom Supplement) Value , Total beneficiaries - male (number) (Number, Custom Supplement) Value , Beneficiaries that feel project inv. reflected their needs - male (number) (Number, Custom Supplement) Value , /20/2017 Page 5 of 11

6 Overall Comments Intermediate Results Indicators Subprojects that have implemented the required environmental and social risk mitigation measures and are functional (Percentage, Custom) Value Improved community water points constructed or rehabilitated under the project (Number, Custom) Value 1, , , , Roads rehabilitated, Rural (Kilometers, Custom) Value /20/2017 Page 6 of 11

7 Classrooms built and/or rehabilitated (Number, Custom) Value , , Health facilities constructed, renovated or equipped (Number, Custom) Value Rural markets constructed under the project (Number, Custom) Value Community storage facilities constructed under the project (Number, Custom) Value /20/2017 Page 7 of 11

8 Communes benefiting from the project grant (Number, Custom) Value Commune's land use plans prepared (Number, Custom) Value Communes with a public information and citizen control mechanism of grant management in place and operational (Number, Custom) Value Communes publishing their Simplified Budget (Number, Custom) Value /20/2017 Page 8 of 11

9 Number of beneficiaries trained (Number, Custom) Value 1, , , , of which female (Number, Custom Breakdown) Value External financial audit report are produced on time and without any reservations (Yes/No, Custom) Value Y Y Y Y Date 15-Jun Sep Mar Nov-2019 One technical audit on the quality of achievements is carried out randomly each year (Yes/No, Custom) Value Y Y Y Y Date 15-Jun Sep Mar Nov /20/2017 Page 9 of 11

10 biannual monitoring / evaluation reports are produced within agreed timeframes (Yes/No, Custom) Value Y Y Y Y Date 15-Jun Sep Mar Nov-2019 Grievances registered related to delivery of project benefits addressed (%) (Percentage, Custom) Value Date 15-Jun Sep Mar Nov-2019 Communes with investment procedures manual - including planning, budgeting, contracting and financial management (Number, Custom) Value Date 15-Jun Sep Mar Nov-2019 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IDA Effective XDR % Key Dates (by loan) 6/20/2017 Page 10 of 11

11 Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IDA Effective 29-Sep Feb Apr Nov Nov-2019 Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/20/2017 Page 11 of 11

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Community Development Program Support Project-Phase III (P144637) Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 21-Dec-2017 ISR30226

More information

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Community Development Program Support Project-Phase III (P144637) Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 27-Jun-2018 ISR33107

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2014 Seq No: 7 ARCHIVED on 30-Jun-2017 ISR28723 Implementing

More information

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Earthquake Housing Reconstruction Project (P155969) Public Disclosure Authorized SOUTH ASIA Nepal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 18-Nov-2015 ISR20331

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Nigeria Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 30-Jun-2017 ISR28944 Implementing Agencies: Federal Ministry

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Albania Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 16-Aug-2017

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Guinea Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 01-Nov-2017 ISR30006 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 19-Dec-2017

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Mali Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 11 ARCHIVED on 10-Feb-2016 ISR22432 Implementing Agencies: Eenrgie du Mali

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA South Sudan Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 11-Feb-2015 ISR18127 Implementing

More information

Urban Water Supply Project (P156739)

Urban Water Supply Project (P156739) AFRICA Cote d'ivoire Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 04-Oct-2018 ISR33891 Implementing Agencies: Republic of Cote d'ivoire, Cellule de Coordination

More information

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Mali Reconstruction and Economic Recovery (P144442) Public Disclosure Authorized AFRICA Mali Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 19-Dec-2017 ISR30326 Implementing

More information

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591) Public Disclosure Authorized EAST ASIA AND PACIFIC Cambodia Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 17-Jun-2017 ISR28362 Implementing Agencies: Ministry

More information

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965) Public Disclosure Authorized AFRICA Uganda Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 08-Apr-2016 ISR23131 Implementing Agencies: Office

More information

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Zambia Water Resources Development Project (P114949) Public Disclosure Authorized AFRICA Zambia Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 8 ARCHIVED on 13-Jan-2018 ISR28939 Implementing Agencies: Republic of Zambia, Ministry

More information

The World Bank Decentralized Community Driven Services Project (P117764)

The World Bank Decentralized Community Driven Services Project (P117764) Public Disclosure Authorized AFRICA Benin Social Protection Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 6 ARCHIVED on 12-Jun-2015 ISR19748 Implementing Agencies: Public Disclosure Authorized

More information

The World Bank BiH Floods Emergency Recovery Project (P151157)

The World Bank BiH Floods Emergency Recovery Project (P151157) EUROPE AND CENTRAL ASIA Bosnia and Herzegovina Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 22-Jun-2016 ISR22737

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Mali Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 10 ARCHIVED on 29-Jun-2015 ISR20110 Implementing Agencies: Eenrgie du Mali (EDM-SA) Public Disclosure

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 22 ARCHIVED on 27-Apr-2018 ISR32244 Implementing Agencies: Poverty Alleviation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016

More information

The World Bank TOGO Community Development and Safety Nets Project (P127200)

The World Bank TOGO Community Development and Safety Nets Project (P127200) Public Disclosure Authorized AFRICA Togo Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 16-Sep-2016 ISR25166 Implementing Agencies: Technical

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 03-Nov-2016 ISR25240 Implementing

More information

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 18-Jul-2018 ISR33480 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 21-Mar-2018 ISR31666 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 18-Jun-2018

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 29-Dec-2017 ISR30320 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738) Public Disclosure Authorized AFRICA Benin Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 04-Dec-2017 ISR30468 Implementing Agencies: The Republic of Benin, Agence

More information

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965) Public Disclosure Authorized AFRICA Uganda Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 29-Jan-2018 ISR31243 Implementing Agencies: The

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Guinea Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 14-Apr-2018 ISR31899 Implementing Agencies: Ministry of Energy and Hydraulics

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 13-Oct-2017 ISR29718 Implementing Agencies:

More information

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019) Public Disclosure Authorized SOUTH ASIA Sri Lanka Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 10-Sep-2017 ISR29482 Implementing Agencies: Ministry of

More information

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Earthquake Housing Reconstruction Project (P155969) Public Disclosure Authorized SOUTH ASIA Nepal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 07-Dec-2017 ISR28840

More information

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

The World Bank Senegal Tourism and Enterprise Development Project (P146469) Public Disclosure Authorized AFRICA Senegal Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 03-Nov-2017 ISR29333 Implementing Agencies: Republic

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social Protection & Labor Global Practice Recipient Executed Activities Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 14-Jul-2018

More information

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590) Public Disclosure Authorized AFRICA Uganda Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 18-Dec-2017 ISR30767 Implementing Agencies: REPUBLIC OF UGANDA,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Mongolia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 18-Dec-2017 ISR30626 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

The World Bank Regional Infrastructure Development Fund (P154947)

The World Bank Regional Infrastructure Development Fund (P154947) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 06-Dec-2017

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Uzbekistan Water Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 12-Jan-2018 ISR30728 Implementing Agencies: Ministry of Agriculture and Water

More information

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279) Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 22-Jun-2017 ISR28689 Implementing Agencies: Ministry

More information

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Zambia Water Resources Development Project (P114949) Public Disclosure Authorized AFRICA Zambia Water Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 25-Jun-2018 ISR32561 Implementing Agencies: Republic of Zambia, Ministry

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 27-Jan-2017 ISR26127 Implementing Agencies:

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Water Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 21-Dec-2017 ISR30930 Implementing Agencies: Department

More information

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank Greater Maputo Water Supply Expansion Project (P125120) Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 28-Dec-2017 ISR29769 Implementing Agencies: Water Supply Investment

More information

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583) SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 22-Apr-2016 ISR23210 Implementing Agencies: Directorate General, Ministry of Food Key

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Trade & Competitiveness Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq

More information

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Public Disclosure Authorized AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power Integration AFRICA Africa Energy & Extractives Global Practice IBRD/IDA Investment

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Rwanda Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 15-Oct-2017 ISR29580 Implementing

More information

The World Bank Integrated Forest Ecosystem Management (P151102)

The World Bank Integrated Forest Ecosystem Management (P151102) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Kyrgyz Republic Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 08-May-2017 ISR27969

More information

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on

More information

SUSTAINABLE CITIES (P128605)

SUSTAINABLE CITIES (P128605) EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 26-Sep-2017 ISR29555 Implementing

More information

Key Dates. Project Development Objectives. Components. Overall Ratings

Key Dates. Project Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Water Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 20-Jun-2018 ISR33067 Implementing Agencies: Department

More information

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA India Social, Urban, Rural and Resilience Global Practice Global Practice

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 23 ARCHIVED on 26-Jul-2018 ISR33099 Implementing Agencies: Poverty Alleviation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 16 ARCHIVED on 26-Jun-2018 ISR33043 Implementing Agencies:

More information

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019) Public Disclosure Authorized SOUTH ASIA Sri Lanka Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 09-Jan-2018 ISR31203 Implementing Agencies: Ministry of

More information

Sri Lanka Strategic Cities Development Project (P130548)

Sri Lanka Strategic Cities Development Project (P130548) SOUTH ASIA Sri Lanka Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 21-Dec-2018 ISR35436 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Rwanda Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 07-May-2018 ISR32125 Implementing

More information

The World Bank Can Tho Urban Development and Resilience (P152851)

The World Bank Can Tho Urban Development and Resilience (P152851) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 30-Jul-2018

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 16-Jul-2018 ISR32389 Implementing Agencies:

More information

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank OECS Regional Tourism Competitiveness (P152117) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN OECS Countries Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 2 ARCHIVED on 28-Jan-2018

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized SOUTH ASIA India Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 13-May-2016 ISR23158 Implementing Agencies: Rural

More information

West Bank and Gaza: Finance for Jobs (P151089)

West Bank and Gaza: Finance for Jobs (P151089) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Finance & Markets Global Practice Special Financing Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 21-Nov-2017 ISR29815

More information

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451) Public Disclosure Authorized AFRICA Zambia Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 04-Sep-2015 ISR20625 Implementing Agencies: Ministry

More information

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180) Public Disclosure Authorized AFRICA Sierra Leone Energy & Extractives Global Practice Recipient Executed Activities Specific Investment Loan FY 2013 Seq No: 5 ARCHIVED on 15-Apr-2016 ISR23021 Implementing

More information

PAMSIMAS Support Trust Fund (P116236)

PAMSIMAS Support Trust Fund (P116236) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Water Global Practice Recipient Executed Activities Specific Investment Loan FY 2010 Seq No: 8 ARCHIVED on 17-Dec-2015 ISR22003 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 28-Dec-2017 ISR30636

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Bulgaria Water Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 07-Feb-2016 ISR22610 Implementing Agencies: Ministry of Regional Development and

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 14 ARCHIVED on 27-Dec-2017 ISR31097 Implementing Agencies: Republic of Indonesia,

More information

The World Bank Cusco Regional Development (P117318)

The World Bank Cusco Regional Development (P117318) LATIN AMERICA AND CARIBBEAN Peru Urban Development Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 27-Jan-2015 ISR16645 Implementing Agencies: Cusco Regional Government

More information

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156) Public Disclosure Authorized AFRICA Swaziland Health, Nutrition and Population Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 17-Jun-2015 ISR19302 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized AFRICA Uganda Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 16-Nov-2015 ISR21261 Implementing Agencies: Ministry

More information

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715)

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715) Public Disclosure Authorized EAST ASIA AND PACIFIC Cambodia Education Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 3 ARCHIVED on 30-May-2015 ISR18803 Implementing

More information

The World Bank Third National Urban Water Sector Reform Project (P123513)

The World Bank Third National Urban Water Sector Reform Project (P123513) Public Disclosure Authorized AFRICA Nigeria Water Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2017 ISR28879 Implementing Agencies: Federal Republic of Nigeria,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 18-Jan-2018 ISR29499 Implementing Agencies:

More information

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 01-Dec-2017 ISR30351

More information

The World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004)

The World Bank Education Infrastructure for Resilience (EU Facility for SuTP) (P162004) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2017 Seq No:

More information

The World Bank Uganda Energy for Rural Transformation III (P133312)

The World Bank Uganda Energy for Rural Transformation III (P133312) Public Disclosure Authorized AFRICA Uganda Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 19-Jul-2017 ISR28421 Implementing Agencies: Ministry

More information

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819) Public Disclosure Authorized AFRICA Ethiopia Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 25-May-2018 ISR32324 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Chad Agriculture Global Practice IBRD/IDA Emergency Recovery Loan FY 2012 Seq No: 10 ARCHIVED on 25-Apr-2017 ISR27559 Implementing Agencies: Public

More information

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Local and Regional Competitiveness Project (P154263) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Finance, Competitiveness and Innovation Global Practice Recipient Executed Activities Investment Project Financing

More information

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395) Public Disclosure Authorized SOUTH ASIA India Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 02-Dec-2017 ISR29908

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 17-Mar-2016 ISR21556 Implementing Agencies: National Mission for Clean

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 13 ARCHIVED on 20-Mar-2017 ISR27142 Implementing Agencies: Public Disclosure Authorized

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Nigeria Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 03-Jan-2017 ISR26446 Implementing Agencies: FEDERAL MINISTRY

More information

SUSTAINABLE CITIES (P128605)

SUSTAINABLE CITIES (P128605) EUROPE AND CENTRAL ASIA Turkey Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 02-Oct-2018 ISR34183 Implementing

More information

The World Bank Nigeria - State Education Program Investment Project (P122124)

The World Bank Nigeria - State Education Program Investment Project (P122124) Public Disclosure Authorized AFRICA Nigeria Education Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 6 ARCHIVED on 03-Nov-2016 ISR23707 Implementing Agencies: Federal Ministry of Education,

More information

Public Disclosure Copy. Implementation Status & Results Report DJ-Rural Community Development and Water Mobilization Project (PRODERMO) (P117355)

Public Disclosure Copy. Implementation Status & Results Report DJ-Rural Community Development and Water Mobilization Project (PRODERMO) (P117355) Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Djibouti Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 13 ARCHIVED on 17-Jan-2018 ISR31070 Implementing Agencies:

More information

The World Bank Livestock Sector Development Support Project (P159476)

The World Bank Livestock Sector Development Support Project (P159476) Public Disclosure Authorized AFRICA Burkina Faso Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 2 ARCHIVED on 04-May-2018 ISR32278 Implementing Agencies: Ministry of

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA South Sudan Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 8 ARCHIVED on 26-Jun-2017 ISR28873 Implementing Agencies:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 29-Jun-2016 ISR24379

More information

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683) AFRICA Zambia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 26-Nov-2018 ISR34605 Implementing Agencies: Ministry of Mines and Mineral

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Congo, Democratic Republic of Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 11 ARCHIVED on 21-Dec-2015 ISR21627 Implementing Agencies:

More information

The World Bank Health System Performance Reinforcement Project (P156679)

The World Bank Health System Performance Reinforcement Project (P156679) Public Disclosure Authorized AFRICA Cameroon Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 14-Apr-2017 ISR27518 Implementing Agencies:

More information

Cities and Climate Change (P123201)

Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 14 ARCHIVED on 04-Nov-2018 ISR33750

More information

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070)

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070) Public Disclosure Authorized AFRICA Sierra Leone Education Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 4 ARCHIVED on 27-Jun-2016 ISR24052 Implementing Agencies:

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 23-Mar-2018 ISR30586 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523)

Public Disclosure Copy. Implementation Status & Results Report Tanzania: Resilient Natural Resource Management for Tourism and Growth (P150523) Public Disclosure Authorized AFRICA Tanzania Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 05-Dec-2017 ISR30455 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates AFRICA Africa Environment Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 9 ARCHIVED on 22-Nov-2014 ISR16750 Implementing Agencies: Lake Victoria Basin Commission Key Dates Key Project

More information

Second Tamil Nadu Road Sector Project (P143751)

Second Tamil Nadu Road Sector Project (P143751) Public Disclosure Authorized SOUTH ASIA India Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 08-Feb-2018 ISR31260 Implementing Agencies:

More information