1 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 1 Patna Gulzarbagh 19 Bridge Repair & Rehabilitat of Mahatma Gandhi Setu (Job 019/BR/ ) % Freyssinet Prestressed conc. Co Yes EPS & CHB- 8 spans Removal of wearing coat & laying memberane & mastic- 46 spans BC- 1820m EPS andchb ed. Proposal of closure forwarded Ministry. 2 Patna Gulzarbagh 103 IRQP IRQP work in Km including 1 no. culvert & 1 no. HL RCC bridge in km 23rd (Jandaha - Baruna) of 103 (Job 103/BR/ ) % M/s Maruti Enterprises Yes (flank) BM-8.0 SDBC-8.0 HL RCC bridge - 1 Culvert Bridge work ed. 3 Patna Gulzarbagh 4 Patna Gulzarbagh 103 IRQP IRQP work in Km including 1 RCC culvert in 13th km & 1 HL RCC bridge in 9th km of 103 (Hajipur - Jandaha) (Job 103/BR/ ) 103 Bridge HL R.C.C Bridge in Km 45 Noon River (Job No-0103-BR ) PBFF % Siemens Corporat Yes BM-12.1 SDBC-12.1 RCC culvert -1 HL RCC bridge Ramakant Singh Yes Well Foundat Abutment-2 Pier Debarred Rescind Rescind removed vide CE Letter no dated Piling ed. 1 number pile cap ed. Rescined Please see on Sl. Revised of 5x24m HIGH Level RCC Bridge across river Noon in Place of Old Narrow and Damaged S.P. Bridge in Km 45 on 103 (Job 0103-BR ). 3054R&B Sanjay X 24 HL RCC bridge Cap of P3 is ed & P4 is in progress. 5 Patna Gulzarbagh 19 Bridge Dismantling & Reconstruct of reconstructio superstructure of pier no- P-44 of n upstream of Mahatma Gandhi Setu on 19 at Patna (Job no-019-br/ ) Pier P44of M.G. Setu On BOQ Rate Freyssinet Prestressed conc. Co Yes Dismantling and Re-Const. of P44 U/S Dismantiling work e. Proposal of closure forwarded Ministry. 6 Patna Gulzarbagh 103 Bridge HL R.C.C Bridge in Km 15 & 19 (Hajipur-Mushrigharari) under mode (Job no. 019/BR/ ) % Dayal Hi tech Engineers Pvt Const. of 2no. Of RCC Minor Bridge. Work Completed 7 Patna Gulzarbagh 19 Bridge External prestressing work of P10,P11,P12,P14,P15,P16,P18,P19, P20, P21 & P22 of D/S lane including Replacement of 42nos. Damaged CHB of U/S and D/S lane of Mahatma Gandhi Setu on 19 at Patna (Job no. 019/BR-16/ /S&R(B) M.G. Setu % Gamman India Yes EPS - 11 Spans CHB - 42 Joints Work Completed. 8 Patna Gulzarbagh 103 service road of service lane both side of existing 4-lane from KM 221(P) 222 (Dhenuki more zero mile of 19 (Job 019-BR /884) 9 Patna Gulzarbagh 19 Bridge Mahi Bridge (019-BR ) Balance work for construct of HL RCC Bridge over river Mahi (019-BR ) R&B % M/S Saran Yes = 2x1.2 km = 2x1.2 km = 2x1.2 km DBM = 2x1.2 km DC = 2x1.2 km Ramakant Singh A1-Comp P1-Comp P2-Part A2-Comp 2x1.4 2x1.4 2x1.4 1x1.4 & 1x1.0 DPR ed Work ed Rescind. Matter subjudice. 10 Patna Gulzarbagh 19 PR PR work in km km and approach of Jai Prava Setu on 19 in Bihar. (Job TA - 19 BR /1541) 3054R&B M/S Maa BC (30mm) km Work ed 11 Patna Gulzarbagh 103 PR PR work in km 45.0 km 58.0 of NH in Bihar (Job TA-103-BR /1542) 3054R&B Kushlya Estate Pvt BC (30mm)- 14 km Work ed 12 Patna Gulzarbagh 103 ROB of ROB & its approaches in lieu of existing level crossing (L.C A/3- E) at km. 12 on NH 103 in the State of Bihar. (Job NH103/Bihar(5)/ S&R(B) dt R&B On BOQ Rate Two years Tender awrded the Gawar Limited by the Departmental Tender Commeetee vide memo number 634 (E) dated Patna Gulzarbagh 19 ROB of ROB & its approaches in lieu of existing level crossing (L.C B/2- E) at km. 132 on NH 19 in the State of Bihar. (Job NH19/Bihar(16)/ S&R(B) dt R&B On BOQ Rate Two years Tender awrded the Gawar Limited by the Departmental Tender Commeetee vide memo number 632 (E) dated Patna Gulzarbagh 19 ROB of ROB & its approaches in lieu of existing level crossing (L.C A/3- E) at km. 135 on NH 19 in the State of Bihar. (Job NH19/Bihar(17)/ S&R(B) dt R&B % Two years Tender awrded the Dayal Hitech (JV) Patna by the Departmental Tender Commeetee vide memo number 792 (E) dated Patna Gulzarbagh 30 ROB of ROB & its approaches in lieu of existing level crossing (L.C A/3T) at km. 119 on NH 30 in the State of Bihar. (Job NH30/Bihar(6)/ S&R(B) R&B Dayal H-TECH (JV) LOA issued

2 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 16 Patna Gulzarbagh 19 Rectificat of Black spots Rectificat of Black spots BR- 17 on 19 in the state of Bihar. (Job No 19/31/107-BR RSCE-006) R&B Retender invited. Gulzarbagh Total 16 Nos #REF! #REF! #REF! Patna Patna(Mahatma Ghandhi Setu) 19 Bridge REPLAACEMENT OF SUPER- STRUCTUREOF exisiting5.575km long, 4 lane Mahatma Gandhi SETU OVER GANGA RIVER ON 19 FROM KM TO KM IN PATNA IN Bihar State,'' under MORT&H on mode. With approximate length of 5.575km AFCON S SIBMOST ( Joint Venture) Yes was executed. Appointed date was fixed on Rs payment as mobilisat advance. 18 Patna Patna(Mahatma Ghandhi Setu) 19 Bridge Extermal Prestressing work in span of Piers Nos. P1, P2, P4, P5, P6, P7, P8, P9 & P13 including replacement of 36 Nos. of CHB of D/S lane of Mahatma Gandhi Setu on 19 [(Jon no. NH - 19/Bihar(11)/ /022- S&R(B)] Patna Patna Total 2 Nos C/S of technical bid sent C.E., N.H. Wing, RCD, Bihar, Patna. 19 Patna Biharsharif 30A Electrical Shifting Shifting of Utilities (Electrical lines) in World Bank 30A between km 0 69 for rehabilitat and Upgrading 2- lane/2-lanes with paved shoulders configurat and strengthening under NHIIP Phase-I in the State of Bihar Utility shifting % Sri Mahavira Buildwell Pvt yes Electric pole- 542 Conducr- 72 km XLPE cable km & other related items Under progress. Electric rail pole 497 no. & Conducr- 63 km ed. Work be ed once 3 byepass are laid out at site. 20 Patna Biharsharif 30A W/S 21 Patna Biharsharif 30A Drain Rehabilitat and upgrading 2 lanes/2 lane with paved shoulders configurat and strengthening Fathua- Harnaut-Barh Sect (Km 0.00 Km 69.0) of 30A in the State of Bihar under Phase I of NHHP (Job no. NHIIP-BR ) of RCC Drain in KM- 41(P) & 42(P) (Harnaut Bazar) of N.H.30A under N.H.Divis, Biharsharif for the year NHIIP World Bank Mon Carlo & BEL(JV) % Shailendra Engicon Pvt yes = Km = Km = Km DBM = Km BC = Km CD = 176 Nos. Bypass-3no.(10.88KM) ROB-3no. Major Bridge-12no. Minor Bridge-16no. Culvert nos Yes (weekly) km -1.17km RCC-1.17km Major Bridge 3 Nos sub structure - ed 2 Nos pile work - in progresses Minor Bridge 4 Nos up slab - ed 8 Nos raft and wall - in progresses New culvert construct 28 Nos - ed widening culverts 30 nos - ed. 1 st mile sne likely be achieved. Work Completed Biharsharif Total 3 Nos Patna Biharsharif - II 110 Bridge of minor bridge in km 13 & 15 (Job no. 110/BR/ ) % Dayal Hi tech Engineers Pvt Yes Const. of dives - 2 Const. of Box Bridge-2 Const. of Minor Bri - 1 (including approaches) Work Completed. 23 Patna Biharsharif - II 110 Bridge of minor bridge in km 23 & 33 (Job no. 110/BR/ ) % Dayal Hightech Pvt Yes Const. of dives - 2 Const. of Bridge-2 Const. of approaches- 2 No Work Completed 24 Patna Biharsharif - II PR 25 Patna Biharsharif - II PR 26 Patna Biharsharif - II 110 PR 27 Biharsharif II Total Total Motihari 28B W/S P/R work in KM of NH P/R work in KM of NH P/R work in KM of NH 110 for the year of (Job 110-BR /1553) % 13.29% 13.27% Kauslya Estate Pvt Ltd Kauslya Estate Pvt Ltd Sree Ramjee Singh Pvt, Yes BC = 34 Km Work in progress Yes BC = Km 3.00 Work in progress Yes BC = 21 Km. Work in progress 5 Nos Nos W/S of existing Intermediate lane Double lane carriage way in KM of NH 28B, Under Special. (Chhapwa-Betiah sect) (job No-028B-BHR ) (spl-proj) % M/S Gangotri Enterprises Ltd Yes (inclusive of mob. & equipment adv.) DBM-25 BC-25 Minor bridge-1 centre marking & signage Debar vide E.E. Letter no Work terminated vide letter no. 220 dt LOA issued for balance work vide Divis Letter no dated Motihari W/S from km of NH 28B, for Balance work Under Special. (Chhapwa-Betiah sect) (job No-028B-BHR ) % JMC Pvt Yes WBM DBM BC Minor Bridge-1 Centre Marking & Sinage Work in progress 28 Motihari W/S W/S of Existing single lane double lane carriage way in Km of in the state of Bihar. (Chakia - Madhuban - Sheohar) (Job No- 104/BR/ ) % JKM Infra Yes DBM BC no. Box culvert ed & 4 Nos H/P culverts are in progress. Damage has been Imposed due slow progress

3 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done Motihari Electrical Shifting Motihari 28B IRQP Erect,Transmiss and dismantling of Electrica Work in KM 0 40 of Km (Madanpur - Kushinagar) (Job no.-28b/br/ ) % Rana Yes km 0 27 Transformer -7nos. Rail pole-184no. PSC Pole nos km Transformer -12nos. Rail pole-234no. Km 0 27, work Complete under this divis. In km rail pole 230 Nos. & 6 Nos transformer Complete. Work in Progress. (Under NH Divis, ) On , C E has been directed send the proposal of Realignment MORTH 31 Motihari 28B W/S W/S of existing road two lane with paved shoulder from km of NH 28B on mode. (Job no.-28b/br/2013-) % Baba Hans Pvt ,,, DBM & BC - 15 KM Culvert-17no Work in progress. Calibrat of HMP under way. 230 Nos pole out of 270 Nos have already been shifted Motihari 28B W/S Motihari 28B Electrical Shifting W/S of existing road two lane with paved shoulder from km of NH 28B on mode. (Job no.-28b/br/ ) Erect,Transmiss and dismantling of Electrica Work in KM of % % Ujain Enjicon (Inida) Pvt. Ltd (JV) Rana ,, - 24 KM DBM, BC - 24 KM yes Transformer - 40 Nos Rail Pofe Nos Out of 32 nos culverts 18 culverts ed & 4 Box culvverts is in progress. Dimaged has been inposed due slow progress. Work in progress. 211 Nos pole out of 266 Nos have already been shifted Motihari 28B W/S Motihari 28A IRQP Motihari 28B ROB W/S of existing road two lane with paved shoulder from km of NH 28B on mode. (Job no.-28b/br/2013-) Resrat of existing road in Raxaul wn in km. 63(P) 67(P) of 2-lane ROB & their approaches in replacement of existing level crossing - T-50SPL at km. 91 of NH 28B in the State of Bihar NHAI % On BOQ rate Patel Engineerin Ltd Chanakya Technoes Pvt Yes Yes (Incld.Sec.a dv.),,, DBM & BC - 33 KM -3.9km BM-4.445km SDBC-4.445km H.M.P. yet come on site. Work in progress. 101 Nos poles out of 290 Nos have been already shifted Work ed. NHAI has not provided the tal fund yet. Finanical bid decis in progress 37 Motihari 28B ROB of ROB & its approaches in lieu of existing level crossing (L.C. - 55C/2E) at km. 94 on NH 28B in the State of Bihar Finanical bid decis in progress Motihari Total 11 Nos Gopalganj Total 0 Nos Chapra 101 W/S Chapra 101 PR KM Including CD work (Jalalpur - Sahajidpur - Baniyapur) (Job 101/BR/ ) PBFF P/R work in KM of NH % % Alectra Maa Yes BM SDBC CD- 31(HP-24nos., Box culvert-5nos. & RCC culvert- 2nos.) Pucca drain-5500 m Yes BC Work in progress. re inculding 9% Agency Charge Work ed & exipenditure including 9.5% agency charge. 40 Chapra 101 PR/IRQP PR/IRQP work in KM % Maa Yes BC Work ed & exipenditure including 9.5% agency charge. 41 Chapra 101 Bridge of HL RCC bridge in Km 56 (Job no BR ) % Dayal Hi-tech Engineer Pvt Yes HL RCC Minor Bridge 3x7.60m Box Culvert Work ed & exipenditure including 9.5% agency charge Chapra 101 Bridge Chapra 101 PR of HL RCC bridge (1x16m) in Km 25, 28 & 32 (Job no. 101/BR/ ) ( Mode) P/R work in KM of NH 101 for the year (Job TA-101- BR /1547) dt % % Dayal Hi-tech Engineer Pvt Yes HL Bridge 2x18m-1nos. Box Culvert 3x5m-1nos. 3x6m- 1nos. with Footpath = 20 km B.C = 20 km Work ed & exipenditure including 9.5% agency charge Tender awarded the Espan Infrastructure, Delhi. By the Departmental Tender Committee vide memo no. 794 dt Chapra Total 6 Nos Gaya 110 W/S Widening & Strengthening work in KM ( Job no. LWE/BR/ ) LWE % M/S J.S.R. Pvt (EOT) Yes in Flank BM-32.1 SDBC-32.1 RCC Slab culvert - 63 HPC- 27 nos. HL RCC Bridge Debarred Vide letter no-547 dt Terminated vide letter no. 359 dt Final measurement taken on Bridge-2(P)/5 Slab-39/63 HP-19/27

4 Submitted and provisally approved Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done Balance Work of Widening 2-Lane and Improvement of N.H.-110 Biharshariff (Telhara) - Jehanabad- Arwal (Kendui) Km In Bihar under LWE Scheme (Job - LWE-BR ) Waris Buildcon India Pvt Yes BM-5.3 SDBC-7.1 Bridge-5no. Slab-24no. HP-8no Km. 53 (Dardha) Bridge (Span: 7 X 24.00m) Foundat Work Completed, Sub-Structure:- A-2, P-1, P-2 P-3, P-4, P-5, P-6 Completed, Super Structure:- Span2, Span-6 & Span-7 Completed. 2. Km. 68 (Jahangirpur) Bridge (Span: 2 X 16.00m) Foundat Work Completed, Sub-Structure:- A-1, A-2 & P-1 Completed, Span-2 Completed. 3. Km. 48 (Kararua) Bridge (Span: 2 X 18.00m) Abutment- A-1, A-2 & Pier Pile Work Completed. A-1 Pile Cap Completed, A- 1 Shaft Work in progress. 4. Km. 63 (Nehalpur) Bridge (Span: 2 X 16.00m) Fondat- Pile Work A-1, A-2 & Pier work in Progress Culvert Completed & 15 Culvert in Progress. 45 Gaya 110 W/S Widening & Strengthening work in KM (Kendeu - Arwal) (Job no. 110/BR/ ) % M/s BLA Pvt Yes BM SDBC HPC - 26 no. RCC slab Culvert - 31 no. Minar Bridge - 03 no (HPC -26 Slab -26) Minor Bridge - 3 Debarred Vide C.E. N.H. letter no d t Bridge ed. 46 Gaya 110 Drain of RCC drain along Patna-Gaya railway line (west side) from Rajabajar railway underpass Daardha River and repair of road of Rajabajar railway underpass in Jahanabad in KM 56 of NH 110 (Job 110/BR/ /882) Drain % Krishlay Nirman & Co Yes Drain Work Completed. PCR ed S.E. vide divisal letter 527(E) dated Gaya 99 W/S Widening and Strengthening of existing road in 2 lane with paved shoulder in Km (Dobhi) (Gosaidih) of N.H.-99 in the State of Bihar (Job -99-BR /892) Waris Buildcon India Pvt Yes DBM BC Drain = 2.55 Km Slab = 15 Nos Numbers culvert Completed. 48 Gaya 110 RUB of Addital Road Under Bridge at Jehanabad in Km. 56 of N.H.-110 (at K.M. 46/13 in Patna-Gaya Line) Under N.H. Divis, Gaya For the year in the State of Bihar (estimated amount) Requested MORT&H for transfer this job Railways. Vide divisal Letter no. 864 (we) dated Gaya of PQC road in approach of integrated Check Post (Karmanasha) Mohania in Km. 860 of (estimated amount) Letter of Acceptance Issued Vide T.O. Letter -194 d & Issue of Notice Proceed with the Work Issued Vide T.O. Letter Dt Gaya 110 IRQP I.R.Q.P. Work in Km of N.H.-110 (Job -T.A BR /1544) (estimated amount) % Ravindra Kumar, Nasriganj, Danapur, Patna yes BM = 2 Km BC = 2 Km & Road furtinure Work Completed. 51 Gaya 2C W/S Widening 2 lane with paved shoulder from Km of N.H.-2C (Dehri-Banjari-Akbarpur Road) in the state of Bihar on mode under Annual Plan (Job - 02C-BR ) % M.G. Contracr Pvt., Puchculia, Hariyana LOA issued on & Appointed date issued on Gaya 110 Bridge of High Level Bridge at Km 38 (Bandhuganj) on 110 in the state of Bihar (Job - 110/Bihar(1B)/ S&R(B)] 5x30m Tender awarded in process. 53 Dehri on Sone Gaya Total 9 Nos Rehabilitat and upgrading 2 NHIIP % DRA-S&P(JV) Lane with Paved shoulder No lanes/2 lane with paved shoulders World Bank civil work 62.0km Culvert configurat and strengthening 1 No Anishabad-Aurangabad-Hariharganj M B Aurangabad 98 W/S Sect (Km 0.00 Km 62.00) of 98 in State of Bihar for Lot-I (Km 0.00 Km 62.00) under Phase I of NHHP (Job no. NHIIP-BR ) Completed H.P.- 50 Nos, Slab - 15 Nos. Box culvert - 1 Nos & Minor Bridge - 1 Nos In Progress Box culvert - 2 Nos H.P Nos Minor Bridge - 2 Nos 32 Nos not started 54 Dehri on Sone Aurangabad 98 W/S Rehabilitat and upgrading 2 NHIIP lanes/2 lane with paved shoulders World Bank configurat and strengthening Anishabad - Aurangabad - Hariharganj Sect (Km Km ) of 98 in State of Bihar for Lot-II (Km Km ) under Phase I of NHHP(Job no. NHIIP-BR ) civil work % Monte Carlo Submitte d Lane with Paved shoulder 62.0km Nos- Culvert 6 Nos M B Bridges/Culverrts (i) ed H.P Nos, Slab- 45 Nos. Box - 9 Nos. & M. Bridges - 7 Nos. (ii) in progress NIL Box culvert - all ed

5 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 55 Dehri on Sone Aurangabad Aurangabad Total Purnea Araria 98 Shifting Shifting of utilities (Electrical) in NH NHIIP 98 between KM for World Bank rehabilitat and upgrading 2 Lane /2 Lane with paved shoulder cconfigurat and strengthening under NHIIP phase i in the state of Bihar IRQP Mahavir Buildwell Pvt yes Rail pole (13m) Rail pole (10m) Nos I.R.Q.P. work in Km of N.H (E) Non-Plan % Kamac Engineers Yes DBM-3.00 BC % work has been ed work ed. 56 Purnea Araria W/S W/S with paved shoulder work in km (Job no.-327e/br/ ) % KamecEngineers Pvt Yes ,, - 7 KM DBM, BC - 7 KM % work ed. 57 Purnea Araria W/S W/S with paved shoulder work in km (Job no.-327e/br/ ) NH % M/S Singh- NICC(JV) Yes ,, - 17 KM DBM, BC - 17 KM % work ed. 58 Purnea Araria Upgradat of KM 99 To KM 112 NH - 327E natal highway standard on mode ( Job - 327/BR/ /881) Plan % M/S Singh- NICC(JV) Yes ,, - 14 KM DBM, BC - 14 KM Work in progress 60 Purnea Araria W/S Strngthenening & Widening of KM KM of NH Plan % M/S Top Line Infra s Pvt Yes ,,, DBM, BC KM Drain Drain 5500 m Pile 52 pile out of 52 Work in progress Araria Total 4 Nos Purnea Purnea 81 W/S KM exiting single lane double lane (Maniya - Lawa) Job no-081/brh ) (spl-proj) % BLA-S&P(JV) (EOT) Yes DBM BC Box culvert 16 no. minor bridge 5no numbers culvert ed. 5 numbers Bridge work ed. Rest work in progress. 62 Purnea Purnea 81 Bridge HL Bridge In km 33rd (3X24 mtr) (Katihar-Pranpur) Korha-Katihar-Pranpur (Job 081/BR/2007/734) Ashok Kumar Chaudhary Yes HLRCC Bridge (3x24m) Pile-40 Pile cap-4 work rescind vide Lt no dt /40 Piles e Purnea Purnea 81 Bridge HL Bridge In km 33rd (3X24 mtr) (Katihar-Pranpur) Korha-Katihar-Pranpur (Job 081/BR/2007/734) (TS) % Sri Ram Enterprises, No Pile - 40 Pile cap - 4 Abutment - 2 Pier - 2 Bridge ed & protect work in progress. 63 Purnea Purnea 81 Bridge HL Bridge In km 36th (2X24mtr) (Katihar- Pranpur) Korha-Katihar-Pranpur (Job 081/BR/2007/735) Naresh Kr. Mandal No HLRCC Bridge (2x24m) Pile-30 Pile cap-3 work rescind vide Lt no dt /30 pile, 1 pile cap e, 1 abt. Cap progress. 64 Purnea Purnea 81 Bridge HL Bridge In km 36th (2X24mtr) (Katihar- Pranpur) Korha-Katihar-Pranpur (Job 081/BR/2007/735) Purnea Purnea 107 Bridge HL RCC bridge in km 148 across Kusaha River (7x21m) (Job no.- 107/BR/ ) 65 Purnea Purnea 31 Check Post of PQC road at Dalkola Check Post % % % Sri Ram Enterprises, Maa Rajeshwari M/S Ravindra Kumar No Pile - 30 Pile cap - 3 Abutment - 2 Pier - 2 Work ed NO HL RCC Bridge (7x21m) A1 & A2 (29.5m) P1 P6 (30m) Work ed DLC & PQC Km Road work ed. 66 Purnea Purnea 131A IRQP IRQP work in Km of 131A for the Year Job no. TA- 131A - BR / % JMC Pvt. Chitr - AP BM-14.15km BC-14.15km Road work ed 67 Purnea Purnea 131A PR PR work in km of 131A (Manihari-Katihar stretch) for the year (Job 131A-BR /1555) dt % six months Tender award ed the JMC Pvt. By the departmental tener committee vide memo no. 795 dt Purnea Purnea 81 Road Strngthenening & Widening of 2-lane with paved shoulder from KM 0.0 KM (Korha-Katihar Sect) of NH 81 (Job 081-BR /895) dated Mode % less eighteen months Tender award ed the Baba Hans Pvt. By the departmental tener committee vide memo no dt Purnea Purnea 131A Repair Estimate for repair Km of 131A (Amdabad- Manihari-Katihar stretch) Tender award in process. Financial bid opened 70 Purnea Purnea 81 ROB of two lane ROB in lew of level crossing KK-4A of Km 31 on f Work award Narayan Das, Katihar 71 Purnea Purnea 81 ROB of two lane ROB in lew of level crossing KK-4A of Km 48 on f % Dayal Hitech Baba Hans (JV) Work in progress 72 Purnea Purnea 131A ROB of two lane ROB in lew of level crossing KT-2-2/B of Km 46 on f 131A Finanical bid ed vide S.E.'s letter no 1007 dated

6 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 73 Purnea Purnea 131A ROB of two lane ROB in lew of level crossing KB-/1B of Km 49 on f 131A Approved Drawing has been received from Chief Engineer, North Frontier Railway. Sanct of DPR awaited 74 Purnea Purnea 107 PR PR work in km of 107 for the year ( Job 107-BR /1554) dt % six month Tender awarded the M/S H.S. Mehta Infra Pvt Ltd Ajmer (Rajsthan) Departmental Tender Committee vide memo no. 635 dt Purnea Total 14 Nos Purnea Madhepura 107 Bridge 76 Purnea Madhepura 106 Electrical Shifting of HL Bridge at 41st km (Job No- 107/BR/ ) Shifting of Utilities (Electrical) in 106 between km for rehabilitat and Upgrading 2- lane/2-lanes with paved shoulders configurat and strengthening under NHIIP Phase-I in the State of Bihar (RW/NH/2013/18/03/2010 SP/(B/3)/P World Bank Utility shifting (Revised) (Rev.) At B.O.Q. Rate 1.254% Vishal Sri Mahavir Buildwell Pvt Yes Lt HL RCC Bridge & Approach (3 Span) 3x18.4M Yes Shifting of Utilities (Electrical) from km Work ed. Work in progress 77 Purnea Madhepura W/S Upgardat (2-lane with paved shoulder) of the km Km (12Km) (Job no.327 E-BR/ ) % Baba Hans. Pvt Yes E/w, DBM, BC Nos slab culvert & 3 Nos Hume pipe widening done. 5 Nos Hume pipe fresh construct done. In one Minor Bridge boulder pitching done. In 2 RCC causeway & 1 H L Bridge expens joint done. Work in progress. 78 Purnea Madhepura 106 W/S Rehabilitat and upgrading 2 NHIIP lanes/2 lane with paved shoulders World Bank configurat and strengthening Birpur-Bihpur Sect (Km 0.00 Km 106) of 106 in the State of Bihar under Phase I of NHHP (Job no. NHIIP-BR ) M/S IL&FS Engineering & Hydrabad = 106 km = 106 Km WBM = 106 km BM = 106 km SDBC = 106 km km clearing & Giving Km sub grade ed. Rest work in progress. 79 Purnea Madhepura 106 Shifting of Utilities (Water Supply World Bank pipe lines and hand pumps) in 106 between Km (Birpur) Utility Km 106 (Udakishunganj) for shifting rehabilitat & upgrading 2 Lane/2 Lanes with paved shoulder configurat and strengthening under NHIIP Phase I for the year Job no. NHIIP-BR (Rev ) % M/s Alam Works & Company, Madhepura Nos. of Hand-pump Lt. 445 Shinking and loying km water pipe line KM water pipe line shifted and 138 no. hand pump e. 80 Purnea Madhepura 107 PR 81 Purnea Madhepura 107 PR 82 Purnea Madhepura 107 PR P.R. Work in km 97 km 99 of NH for the year (TA-107-BR /1529) P.R. Work in km 50(P) km 73(P) of NH for the year P.R. Work in km 40(P) km 45(P) of NH for the year PR PR PR % % % M/s Udaykant Jha Shiv Krishna Builder Pvt. Ratan Kumar Singh Yes cu. m cu. m. BM M3(2.0 KM) BC M3 (2.0 KM) Road Marking - 400M2 (2 km) Yes scarfying M M3, BM M3, BC M2 (23Km),Road marking M2 (23Km), M Yes M3, BM M3, BC M2 (5.0Km),Road marking M2 (5.0Km), M m Work ed Work ed Work ed Purnea Madhepura 106 PR of Passing Zone from KM 106(Uda-Kishunganj) KM 124(Fulaut) of NH for the year % M/S Narsingh s Yes KM Premix Carpet 18.0 KM Work in Progress 84 Purnea Madhepura 327(A) Strngthenening & Widening of 2-lane with paved shoulder from KM 0.0 KM of NH 327(A) (327(A)-BR /888) Baba Hans E/w 25.0 KM, 25.0KM DBM, BC 25.0KM Work in Progress 85 Purnea Madhepura 106 Tree Cutting Carriage of tree after cutting, NPV and compensary a forestat for Rehabilitat and upgrading 2 lanes/2 lane with paved shoulders configurat and strengthening of Birpur-Bihpur Sect (Km 0.00 Km 106) of 106 in the State of Bihar under Phase I of NHHP (Job no. NHIIP-BR ) Forest Deptt, Bihar NVPA, CA & Handling Charge payment Madhepura Total 11 Nos Electrical Shifting Electrical utilities shifting work under NHIIP phase I in KM of NH 104 for the year NHIIP % Rana Const. Kadam Kuan, Patna yes Rail Pole -84Nos. PSC Pole-24Nos. Dismentaling-7.00km Work ed 87 Rehabilitat and uprading 2 NHIIP lanes/2 with paved shoulders World Bank configurat and Strengthening Sheohar--Jainagar - Narhaia Sect of from Km in the state of Bihar under phase-i of NHIIP (Package SP/C/1Group C) ) Lot-I SHIL-RCM JV Yes Km Km & Culvert = 10 Nos Nos H.P. & 3 Nos Box work of 1 no. Hume pipe culvert & 1 Nos Box Culvert & 2 Nos Minor Bridge are in progress

7 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 88 Rehabilitat and uprading 2 lanes/2 with paved shoulders configurat and Strengthening Sheohar--Jainagar - Narhaia Sect of from Km in the state of Bihar under phase-i of NHIIP (Package SP/C/1Group C) Lot-II SHIL-RCM JV No E/w-14.5 Km, - 8 Km, Culvert - 14 Nos & Minor Bridge Nos. Box & 5 Nos H.P. 4 nos. HP culvert & 2 Nos Box Culvert &. 2 Nos Minor Bridge are in progress 89 Rehabilitat and uprading 2 lanes/2 with paved shoulders configurat and Strengthening Sheohar--Jainagar - Narhaia Sect of from Km in the state of Bihar under phase-i of NHIIP (Package SP/C/1Group C) Lot-III BSCPL Hyderabad Yes , Km, Culvert - 14 Nos. & Minor Bridge - 3 Nos Nos. H.P. 1 nos. HP culvert & 2 Nos Box Culvert are in progress & precasting of 115 segments is in progress. 2 Nos Minor Bridge are in progress 90 Shifting of Utilities (Electrical) in World Bank between km for Utility rehabilitat and Upgrading 2- shifting lane/2-lanes with paved shoulders configurat and strengthening under NHIIP Phase-I in the State of Bihar % Mangalam Planner & Pvt Yes PSC Pole no. Rail Pole-42fit long Nos Rail Pole-33fit long- 25no. PSC Pole -437 Nos out of 437 Nos. Rail Pole -42' long Nos out of 2562 Nos. 33' long - 20Nos. Out of 25 Nos 58.1 km pole shifted A PR P.R. Work in km 0 km of NH - 122A for the year (TA-122A-BR /1526) Widening and Strengthening of existing single lane double lane carriage way in km 0 t0 40 of NH 104 Central % Sri Ashok Kumar Singh JKM Infra, New Delhi No (Pots) (Pots) BUSG MSS yes Nos/ 730m (one side) (Flank) (Pots) (Pots) (BUSG) (MSS) Work ed Out of 40 km, 13 km ( from km 27 40) in this divis. 36 Numbers Pile cap of P2 and shaft of A1 and P1 ed., A2 is in progress. For expenditure - Nodal is NH Divis, Motihari 93 Cutting of trees & transportat of cut wood forest depot from km of NH 104 under Non protected forest for the year Md Mohiddin Khan, yes 1823 Nos limited from Km Trees cut Nos. work in progress. Balance work awarded civil contracr of NHIP. 94 Cutting of trees & transportat of cut wood forest depot from km of NH 104 under protected forest for the year Sree S. N. Singh Yes 1051 Nos. colosed and work awarded civil contracr of NHIP Total 9 Nos Jaynagar 105 W/S KM 0-28 (Dharbhanga-Pokharauni sect) under special package (JOB 105/BHR ) (Spl Proj) M/S Gangotari Enterprises Yes Km KM KM DBM KM BC KM Box culvert-22 Minor Bridge Rescined work vide letter no. 573 dt Status quo on as per interim judgement of honourable sub judge 1, Patna. Counter-affidavit filed in court of sub judge 1, Patna, next hearing on Balance work of W/S of existing single lane double lane in km of N.H.105 (Job -105-BH /028) % AARPEE s Pvt yes Km, Km, Km, DBM Km, BC Km Box Culvert - 22 (14 Partially) Minor Bridge - 2 (1 No Parially) Road is moterable Work in progress. 96 Jaynagar 105 W/S KM existing single lane Two lane under special package (Job No-105/BHR ) (Spl Proj) M/S Gangotary Enterprises Yes Km KM KM DBM KM BC KM Box culvert-33 Minor Bridge no. Box Culvert in progress one minar Bridge in progress Rescined work vide letter no. 574 dt Status quo on as per interim judgement of honourable sub judge 1, Patna. Counter-affidavit filed in court of sub judge 1, Patna, next hearing on Retender for balance work invited. Financial bid ed. 97 Jaynagar 105 Bridge KM existing single lane Two lane under special package (Job No-105/BHR ) of 2x8.00m (eff span) High Level RCC Bridge in Km 5 of 105 (-Jainagar Sect) (105-BR ) (Spl Proj) % R.P. Infra M/S Brajendra Kumar KM KM KM DBM KM BC KM Box Culvert- 33 No (11 partly) Minor Bridge-9 (1 no. Partly) Yes Yes RCC 2x8.0m A1, A2 & P Road is moterable Work in progress. Agency debarred vide lt. no.1204 dt Bridge & Railing e. work rescinded. Lt dt Re sent for balance work

8 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done Jaynagar 105 Bridge of 2x8.00m (eff span) High Level RCC Bridge in Km 5 of 105 (-Jainagar Sect) (105-BR ) FDR M/S Bikram Kumar Raut No B/W M3, RCC - M M3, Prestressed Cemenrt concrete M3, RCC - M M3,, RCC - M M3, RCC Railing M, Weep hole Nos., Cement paint- 120 M2, Joint filter M, Boulder pitching M3, M3, M3, M3, Open Graded Premix M2 Work in progress. 98 Jaynagar 105 Bridge of 3x8.00m (eff span) High Level RCC Bridge in Km 7 of Jainagar Sect) (105-BR ) M/S Brajendra Kumar Yes RCC 3x8.0m A1, A2, P1 & P2 Foundat work ed. Substructure work 45% ed Agency Debarred vide letter no.1204 dt Rescinded vide Lt 769 Dt of 3x8.00m (eff span) High Level RCC Bridge in Km 7 of Jainagar Sect) OR Kamac Engineers Pvt Work in progress 99 Jaynagar 105 Bridge of 3x8.00m (eff span) High Level RCC Bridge in Km 8 of Jainagar Sect) (105-BR ) M/S Brajendra Kumar Yes RCC 3x8.0m One abutment and pier ed up cap beam. One abutment 75% ed. Agency Debarred vide letter no.1204 dt Rescinded vide Lt 766 Dt Jaynagar of 3x8.00m (eff span) High Level RCC Bridge in Km 8 of Jainagar Sect) (105-BR ) % Sanjay Bhai, Yes Balance work of A1,A2 & P1,P2 Work in progress 3 deck slab e and approach road work in progress. Notice for debar vide Divisal letter no. 334 dt Jaynagar 527A W/S W/S of exiisting road in 2 lane with paved shoulder from Poukharauni Chowk Junct with 57 near Jhanjarpur (km ) of 527A in the State of Bihar on item rate basis (Job 527A -BR /893) SVSVS Private Limited Yes,,, DBM & BC - 28 KM Culvert-15no Work in progress. 101 Jaynagar Total 6 Nos Bridge HL RCC Bridge In km 94 near Ghorghat over Mani river (Job no. 080-BR/ ) R & Design C & C Yes A m p m p m A m SS P1-pier shaft ed pier cap reniforcement work in progress P2-pier shaft ed A2-well foundat casted m work in progress Bridge of 4x30.0m (eff span) High Level RCC Bridge PSC Girder across Champa Nala in Km 123 of 80 (080-BR ) On BOQ rate Satya Sai Yes A1-32m p1-34m p2-34m p3-34m A2-32m SS A1-29.5m, P1-29.9m, P2-29.8m(tilt & Shift), P3-34.0m, A2-31.9m Agency debarred vide Lt.63 dt work rescinded. NIT for retender sent PRD of balance work 2 lane PSC High level RCC Bridge aceoss river Champa in KM of NH Dayal Hitech Private, Patna numbers pile ed out of 12 numbers Bridge of 4x30.0m (eff span) High Level RCC Bridge PSC Girder across river Vena in Km (080-BR ) Job no On BOQ rate M/S Rungta Enterprises Yes A1-32m p1-34m p2-34m p3-34m A2-32m Agency debarred vide Lt.64 dt Work rescined. A M (Hammer Head Casted), P M (Hammer Head Casted), P (Hammer Head Casted), P M (Hammer Head Shifted), A m (Hammer Head Casted.) of balance work 2 lane PSC High level RCC Bridge across river Vena in KM of NH Dayal Hitech Private, Patna numbers pile ed out of 12numbers Bypass 80 W/S of bypass from km 124/ /200 (Design chainage & length km) (Job /BR/ ) KM (-Pirpaiti Sect) (Job 080-BR ) () % G R Infraprojects Limited , DBM, BC HPC-30, Boxcell-05, Box Type Minor Bridge- 05, T-Beam Minor Bridge- 04, Mejor Bridge-01, VUP-02, ROB-03, Fly Over-01, Toll Plaza- 01, Truck Laybye-01, Bus Bays D.K. construct Yes BM-13.4 SDBC CD HPC Culvet, 5 Box Culvet, 05 Box Type Minor Bridge, 02 VUP Complete In Mejor Bridge-01 (80% sub Str comp), ROB-03 (sub str of 02 Comp), Fly Over-01 (sub str Comp), in Rest Work in Progress. 28 P.S.C Girder and 8 R.C.C Girder Complete Agency debarred vide Lt. no dt Resciend vide Lt dt Retender invited on

9 Percentage / Complet Submitt not N.H. Divis NH Work Stretch/Sect Head & Contracr re r e Financial Status as up Physical Status as up imposed Target work be done 80 widening & strengthing Remaning work in KM (-Pirpaiti Sect) (Job 080-BR ) Widening & strengthing of road crust in km in BGP- Mirzachauki sect of 80 (Job No % S & P Infrastructure Developer Pvt. Ltd Baba s Pvt No BM SDBC CD ,,, DBM, BC = 14 km fore closure Work in progress IRQP IRQP work in km (Job no. 080/BR/ ) % S & P Infrastructure Developer Pvt. Ltd No DBM BC Work Completed PR PR work in K.M of NH - 80 (Job TA-80-BR /1537) % Baba s Pvt BC Work Completed W/S Strengthenening & Widening of 2- lane with paved shoulder from KM of (Job No - TA BR /887) % M/S Dayanand Dayanand Prasad Sinha & Co Yes ,, DBM & BC in all 9.33 km Box Culvert Road work ed. T-junct & drain work in progress W/S W/S and of Cement Concrete Pavement from km of NH 80 for the year (Job no 840) % Badal yuvraj construct Pvt km BM-4.55km SDBC-4.55km Road work ed on Due stay in CWJC no. 9147/16 no work under DLP is being done by contracr. On the C E has been directed act for declarat nul and void the order of EE regarding for closure PR PR Work in Km of % M/S Niranjan Sharma SDBC=13.30 Km (30mm) BM = 10% profile correct Im rest work in progress. Total 10 Nos Khagaria 107 Bridge Reconstruct of the affected span of B.P. Mandal setu (Dumari Ghat) by Cable Stayed Extradosed superstructure in KM 16 of 107 Turnkey basis (Design & Build) (Job no.- 107/BR/ ) % M/s S.P. Singhla Const. Pvt (EOT vide Engineer in Chief, RCD, Bihar, Patna's Letter No 6062(E) dated ) Yes Mobilillizat of side 2. Dismentlling of existing structure. 3. Submiss of Design, Drawing & Approval. 4. Well foundat 5. Sub structure 6. super structure up Bearing level 7. Gantry Erect 8. Casting of super structure. 1. of Bridge = m 2. Reconstruct port = 290 m 3. of Well = 2 4. Dia of Well = 9.5 m 5. Depth of Well = m 6. Sinking of Well Foundat NP1 ed & NP2 ed 7. Casting of well foundat NP1 & NP2 ed in all respect. 8. Botm Pluging NP1 & NP2 ed 9. Well cap casting of NP1 ed 10. Well cap casting of NP12 ed 11. Pier Casting NP2 (60000x2900x4000) mm = 4.00 m ed. 12. Pier Casting NP2 (60000x2900x4000) mm = 4.00 m 13. Pier Cap of NP1 ed 14. Casting of pylon NP1 one side (1st lift) = (2.9mx2.0mx2.5m) 112 Khagaria 107 PR PR Work in Km of NH 107 for the year ( Job No TA-107-BR /1549) % S.K. Lahariasarai yes Pot repair & profile correct. BC = 15 km 5.50 Work in progress 113 Khagaria 107 PR PR Work in Km of NH 107 for the year ( Job No TA-107-BR /1550) % Shiv Krishna Builder Pvt yes Pot repair & profile correct. BC = 15.3 km 5.60 Work in progress 114 Khagaria 107 Bridge Maintanence of R.C.C. HLB Apporach in Km 03, 06, 07 & 08 of 107 for the year x260m = 1040 m % Sri Sunil Kumar Singh, M M M M3 Work ed 115 Khagaria Total 4 Nos IRQP in KM of NH % M/s Niranjan Work Completed Sharma DBM IRQP BC-19.6 Marking IRQP/PR IRQP/PR IRQP/PR IRQP/PR in KM of NH % bal Krishan Bhaliya Const. Pvt. IRQP in KM of NH % IRQP in KM of NH % Sudesh Kumar Singh & Co. Const. Pvt (including variat 42.85) BC Marking DBM-6.00 BC-9.75 C/L & E/L bal Krishan Bhaliya Const. Pvt Work Completed Work Completed BC C/L & E/L Work Completed PR Km of % bal Krishan Bhaliya Const. Pvt BC= 11 km = 11 km C/L & E/L = 11 Km Work Completed & PR Km of NH 333 & of NH % Sudesh Kumar Singh & Co. Const. Pvt BC= 12 km = 12 km C/L & E/L = 112Km Work in progress.

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report Construction of 2x2 Lane Bridge with footpath across river Ganga between Sultanganj (Bhagalpur ) and Aguwani Ghat 17177. (Khagaria ) 1.42.56.2 including navigational span 8797 (S) 89.68 43.56 8.6 dated

More information

Road Construction Department AT A GLANCE

Road Construction Department AT A GLANCE Road Construction Department AT A GLANCE 25.05.2018 Road Network under RCD (in Km) Category Total Length Single lane Intermediate Lane 2-Lane More than 2 lane National Highways State Highways 4917.19 729.21

More information

DISTRICTWISE ACHIEVEMENT OF CMHM

DISTRICTWISE ACHIEVEMENT OF CMHM DISTRICTWISE ACHIEVEMENT OF CMHM - 2016-17 Districtwise and Achievement under CMHM Fin. Year 2016-17 (Phy. in Hect./Nos., Fin. in Lakh Rs.) Sl. Districts Name Phy Fund Available in 2016-17 Achievement

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

भ रत सरक र GOVERNMENT OF INDIA. Precipitation/TS Forecast For Districts of BIHAR भ रत म सम वज ञ न वभ ग

भ रत सरक र GOVERNMENT OF INDIA. Precipitation/TS Forecast For Districts of BIHAR भ रत म सम वज ञ न वभ ग भ रत सरक र GOVERNMENT OF INDIA भ रत म सम वज ञ न वभ ग म सम वज ञ न क दर, अ नस ब द, पटन बह र, पन क ड- 800002 INDIA METEOROLOGICAL DEPARTMENT METEOROLOGICAL CENTRE, ANISHABAD, PATNA, BIHAR PIN CODE800002 द

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

National Highways Authority of India. (Ministry of Road, Transport & Highways) Government of India

National Highways Authority of India. (Ministry of Road, Transport & Highways) Government of India National Highways Authority of India (Ministry of Road, Transport & Highways) Government of India Four/Six laning of Aunta - Simaria (Ganga Bridge with approach roads) section of NH 31 from KM 197.900

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B )

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) Sl. 1 2 Description of Work Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary

More information

MONTHLY PROGRESS REPORT FOR THE MONTH OF APRIL ( SEC - A & SEC - B) Specifica tions

MONTHLY PROGRESS REPORT FOR THE MONTH OF APRIL ( SEC - A & SEC - B) Specifica tions Client Independent Engineer Concessionaire EPC Contractor Sub Contractor Sl No. 1 EARTH WORK : OGL : NATIONAL HIGHWAYS AUTHORITY OF INDIA : CDM SMITH Inc JV with WILBUR SMITH ASSOCIATES Pvt Ltd. : HK TOLL

More information

Outline. Introduction. Introduction Accident Damage. Introduction Act of God Damage NATIONAL HIGH PERFORMANCE CONCRETE FOLLOW UP SURVEY RESULTS BY:

Outline. Introduction. Introduction Accident Damage. Introduction Act of God Damage NATIONAL HIGH PERFORMANCE CONCRETE FOLLOW UP SURVEY RESULTS BY: BY: NATIONAL FOLLOW UP SURVEY RESULTS Louis N. Triandafilou, P.E. FHWA Resource Center Baltimore Senior Structural Engineer CLAUDE S. NAPIER, Jr., P.E. FHWA Virginia Division Bridge Engineer Outline HPC

More information

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY SURVEY, DETAILED PROJECT REPORT OF EXISTING TWO LANE PLUS SHOULDER TO (4LANING OF TALWANDI

More information

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026) Operation Name: GH:Sustainable Rural Water

More information

Climate Change in Bihar, India:A Case Study

Climate Change in Bihar, India:A Case Study Climate Change in Bihar, India:A Case Study L. B. Roy 1, M. Bhushan 2, R. Kumar 2 1,2 Civil Engineering Department, National Institute of Technology Patna Patna-800005, Bihar, India 1 lbroy@nitp.ac.in

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Due to the above development proposal we propose to start the project at Km instead of Km

Due to the above development proposal we propose to start the project at Km instead of Km Development Proposals compatibility with the existing pavement, ROW and utilities. The general considerations followed for fixing the proposed horizontal alignment are as follows: Maximum utilization of

More information

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

Winter Maintenance on Provincial Highways

Winter Maintenance on Provincial Highways Winter Maintenance on Provincial Highways Thunder Bay District Municipal League Wayne Prystanski, A/Regional Director, Northwestern Region February 27, 2015 Outline 1. AMC s in NW Region 2. Winter Maintenance

More information

ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS

ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS ROAD INFORMATION SYSTEM FOR MAINTENANCE MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS Need for GIS Voluminous/ Manual Data Vs Digital Need for GIS CE - C&B (North) KPWD Secretary Office CE - C&B (South) Dispersed

More information

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana 113 Dated: 30 June 2018 To, The Director (IA Division, Non-Coal Mining), Ministry of Environment, Forest and Climate Change (MoEF&CC) Indira Paryavaran

More information

Fee Notification Published in Gazette of India vide S.O. No (E) dated

Fee Notification Published in Gazette of India vide S.O. No (E) dated / NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU. BHOPAL Name of work: Four Laning of Obedullaganj Betul section of NH69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 (approx. length 121.36 km) (excluding

More information

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT

3 DESCRIPTION OF THE PROPOSED DEVELOPMENT 3 DESCRIPTION OF THE PROPOSED DEVELOPMENT As described in Chapter 2, the Preferred Option for the Bandon River (Bandon) Drainage Scheme comprises a combination of flood defences and dredging. The proposed

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

1. ARRANGEMENT. a. Frame A1-P3. L 1 = 20 m H = 5.23 m L 2 = 20 m H 1 = 8.29 m L 3 = 20 m H 2 = 8.29 m H 3 = 8.39 m. b. Frame P3-P6

1. ARRANGEMENT. a. Frame A1-P3. L 1 = 20 m H = 5.23 m L 2 = 20 m H 1 = 8.29 m L 3 = 20 m H 2 = 8.29 m H 3 = 8.39 m. b. Frame P3-P6 Page 3 Page 4 Substructure Design. ARRANGEMENT a. Frame A-P3 L = 20 m H = 5.23 m L 2 = 20 m H = 8.29 m L 3 = 20 m H 2 = 8.29 m H 3 = 8.39 m b. Frame P3-P6 L = 25 m H 3 = 8.39 m L 2 = 3 m H 4 = 8.5 m L

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Fish Pond. Old Secretariate. Shaheed Smarak

Fish Pond. Old Secretariate. Shaheed Smarak Fish Pond Old Secretariate Shaheed Smarak HOW SATELLITE SCANS EARTH. Rajbhawan area viewed by IKONOS 1 meter sensor Very high resolution (40 cm) Orbi-Image data Higher the resolution better the geometric

More information

Appin Colliery - Longwall 705

Appin Colliery - Longwall 705 REPORT: END OF PANEL SUBSIDENCE MONITORING REPORT BHP BILLITON ILLAWARRA COAL: Appin Colliery - Longwall 705 End of Panel Subsidence Monitoring Report for Appin Longwall 705 MSEC JUNE 2014 REPORT NUMBER:

More information

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS STRUCTURAL ENGINEERING FIRM TO PERFORM A STRUCTURAL EVALUATION OF THE MARKET STREET PARKADE FACILITY REFERENCE RFP 14-148 Addendum Issued: August 22, 2014 ADDENDUM No. 2 Page 1 of

More information

Bridge deck modelling and design process for bridges

Bridge deck modelling and design process for bridges EU-Russia Regulatory Dialogue Construction Sector Subgroup 1 Bridge deck modelling and design process for bridges Application to a composite twin-girder bridge according to Eurocode 4 Laurence Davaine

More information

Parts List, Wiring Diagrams

Parts List, Wiring Diagrams Parts List, Wiring Diagrams PAE180-300 SERIES PACKAGE AIR CONDITIONER UNITS TABLE OF CONTENTS PARTS LIST----------- 2-11 PARTS DRAWING----- 12-34 WIRING DIAGRAMS--- 35-48 Printed in U.S.A. 7/28/08 KEY

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Community and Infrastructure Services Committee

Community and Infrastructure Services Committee REPORT TO: DATE OF MEETING: November 7, 2016 Community and Infrastructure Services Committee SUBMITTED BY: Cynthia Fletcher, Interim Executive Director INS 519-741- PREPARED BY: WARD(S) INVOLVED: 2600

More information

A.2 AASHTO Type IV, LRFD Specifications

A.2 AASHTO Type IV, LRFD Specifications A.2 AASHTO Type IV, LRFD Specifications A.2.1 INTRODUCTION A.2.2 DESIGN PARAMETERS 1'-5.0" Detailed example showing sample calculations for design of typical Interior AASHTO Type IV prestressed concrete

More information

Bridge Risk Modeling

Bridge Risk Modeling time good Bridge Risk Modeling Current Florida DOT Research condition bad Paul D. Thompson, Consultant Background Research team Florida State University John Sobanjo (PI) Paul D. Thompson (co-pi) Florida

More information

FIXED BEAMS CONTINUOUS BEAMS

FIXED BEAMS CONTINUOUS BEAMS FIXED BEAMS CONTINUOUS BEAMS INTRODUCTION A beam carried over more than two supports is known as a continuous beam. Railway bridges are common examples of continuous beams. But the beams in railway bridges

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

Design of a Balanced-Cantilever Bridge

Design of a Balanced-Cantilever Bridge Design of a Balanced-Cantilever Bridge CL (Bridge is symmetric about CL) 0.8 L 0.2 L 0.6 L 0.2 L 0.8 L L = 80 ft Bridge Span = 2.6 L = 2.6 80 = 208 Bridge Width = 30 No. of girders = 6, Width of each girder

More information

Dr. Hatem ElBehairy. Cairo University BMS - Dr. Hatem ElBehairy 1

Dr. Hatem ElBehairy. Cairo University BMS - Dr. Hatem ElBehairy 1 Bridge Management Systems Dr. Hatem ElBehairy 13.10.2015 Cairo University BMS - Dr. Hatem ElBehairy 1 Infrastructure Asset Management Infrastructure asset management is the integrated, multi- disciplinary

More information

APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS

APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS APPENDIX D SUMMARY OF EXISTING SIMPLIFIED METHODS D-1 An extensive literature search revealed many methods for the calculation of live load distribution factors. This appendix will discuss, in detail,

More information

Severe Storm Response Version # 1-0-1

Severe Storm Response Version # 1-0-1 Severe Storm Response Version # 1-0-1 Weather Warnings Environment Canada issues severe weather warnings, watches and advisories Weather Watch Severe weather may develop. Weather Warning Severe weather

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module-5 LECTURE-

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure Engineering Vulnerability

More information

Innovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure

Innovated Technological Trends in Highways. Flood Modelling & Evaluation of Impacts on Infrastructure Innovated Technological Trends in Highways Flood Modelling & Evaluation of Impacts on Infrastructure Dr. Waheed Uddin Professor and Director CAIT University of Mississippi Contributions from: CAIT and

More information

Bridge Construction: Reducing Disaster Risk

Bridge Construction: Reducing Disaster Risk JAMMU-UDHAMPUR RAIL LINK Bridge Construction: Reducing Disaster Risk PROF MAHESH TANDON MANAGING DIRECTOR, TANDON CONSULTANTS PVT LTD GUEST PROFESSOR @ GANDHINAGAR FORMER DISTINGUISHED VISITING PROFESSOR

More information

SECURITIES AND EXCHANGE COMMISSION FORM 10-D. Filing Date: Period of Report: SEC Accession No

SECURITIES AND EXCHANGE COMMISSION FORM 10-D. Filing Date: Period of Report: SEC Accession No SECURITIES AND EXCHANGE COMMISSION FORM 10-D Periodic distribution reports by Asset-Backed issuers pursuant to Rule 13a-17 or 15d-17 Filing Date: 2007-12-06 Period of Report: 2007-11-26 SEC Accession No.

More information

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-II (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-III LETTER OF INTENT Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

More information

Page:25 CHAPTER - 3 Project Road Description

Page:25 CHAPTER - 3 Project Road Description Page:25 CHAPTER - 3 Project Road Description Page:26 CHAPTER 3 : PROJECT ROAD DESCRIPTION 3.1 Background Seppa, the district headquarters of East Kameng district, is connected to the outside world by a

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Survey Questionnaire Compilation & Analysis of Feedback Co-deployment of OFC along the RoW of Highways

Survey Questionnaire Compilation & Analysis of Feedback Co-deployment of OFC along the RoW of Highways Survey Questionnaire Compilation & Analysis of Feedback Co-deployment of OFC along the RoW of Highways Part of thestudy Co-deployment of Fibre Optic Cables Survey to Gather Information about Status & Practices

More information

Ref: SEL letter No. SEUSPV/CNINH-16/IFJTech/2016/62/2338 dated

Ref: SEL letter No. SEUSPV/CNINH-16/IFJTech/2016/62/2338 dated Si.- hapuri exp :;ssw&.y _:~.~SC Ltr No: SEIJSPV, C:-Jt:\1-I-16/IEIT ech/2016/62' 1248 Date: 2gth June 2016 To The Team Leader, JCT& SNC-Lavalin N, SarojiniNilayam, 151 Lane Annavarappadu, Ongole - 523001.

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA India Water Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 30-Dec-2014 ISR17699 Implementing Agencies: National Mission for Clean

More information

Best Practices and Techniques for Clearing Intersection Layouts

Best Practices and Techniques for Clearing Intersection Layouts Research for winter highway maintenance Manual of Best Practices and Techniques for Clearing Intersection Layouts Prepared by: Yan Qi (Southern Illinois University Edwardsville) Dave Bergner (Monte Vista

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting

Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH. Public Kick-off Meeting Feasibility Study for Potential Removal of McLane & Goldman Dams Souhegan River, Milford, NH Public Kick-off Meeting Mark Wamser Gomez and Sullivan Engineers, P.C. 603-428-4960 Aug 16, 2010 Agenda Opening

More information

DESIGN OF CABLE STAYED PEDESTRIAN BRIDGE

DESIGN OF CABLE STAYED PEDESTRIAN BRIDGE DESIGN OF CABLE STAYED PEDESTRIAN BRIDGE T.Nelson ponnu durai 1 Dr. P.Asha and R.Vinoth kumar 3 1 Final Year P.G Structural, St. Peter s University HOD CIVIL Department St. Peter s University 3 Assistant

More information

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3

Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3 Trainee Manual C02 CITY OF SASKATOON Water and Sewer Section Severe Storm Response Trainee Manual CITY OF SASKATOON Severe Storm Response Trainee Manual City of Saskatoon Severe Storm Response Trainees

More information

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY M. Jovanović 1, R. Kapor, B. Zindović University of Belgrade Faculty of Civil Engineering E-mail:

More information

2059-PUBLIC WORKS (ESTABLISHMENT)

2059-PUBLIC WORKS (ESTABLISHMENT) Sr. No. STATEMENT SHOWING OBJECT HEAD WISE BUDGET ALLOTMENT / EXPENDITURE FOR THE MONTH OF 5/2016 DURING THE YEAR 2016-2017 OFFICE OF THE ENGINEER IN CHIEF HARYANA, P.W.D. (B&R). (Rs. in lacs) Major Head

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P. 1. Introduction M/s Welspun Energy Uttar Pradesh Ltd. (WEUPL) is putting up 1320 MW (2 x 660 MW) coal fired

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:

More information

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan September 28, 2015 2.

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

Procurement Plan for ETLP (P156590)

Procurement Plan for ETLP (P156590) I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

Actual Amount (US$) Process Status. Pending Interventions.

Actual Amount (US$) Process Status. Pending Interventions. Page 1 PROCUREMENT PLAN Sri Lanka : Sri Lanka Strategic Cities Development Project General Information Country: Sri Lanka Banks Approval Date of the Original Plan: 2016-08-24 Revised Plan Date(s): (comma

More information

Preferred practice on semi-integral abutment layout falls in the following order:

Preferred practice on semi-integral abutment layout falls in the following order: GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of semi-integral abutments. For general requirements and guidelines on

More information

MIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS

MIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS Paul D. Thompson 0 0 MIGRATION PROBABILITY MATRIX FOR BRIDGE ELEMENT DETERIORATION MODELS Paul D. Thompson Consultant 0 NE th Place, Bellevue, WA 00 USA Tel: --; Fax: --; Email: pdt@pdth.com Word count:,

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation

Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation Journal of Applied Science and Engineering, Vol. 18, No. 2, pp. 187 193 (2015) DOI: 10.6180/jase.2015.18.2.12 Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation Zhong-Bo

More information

Monmouthshire County Council Review of Landslips within the County December February 2014

Monmouthshire County Council Review of Landslips within the County December February 2014 Monmouthshire County Council Review of Landslips within the County December 2013- February 2014 Introduction The County of Monmouthshire suffered a period of extreme weather between December 2013 and February

More information

SECTION AGGREGATE OR GRANULAR SUBBASE

SECTION AGGREGATE OR GRANULAR SUBBASE SECTION 02230 AGGREGATE OR GRANULAR SUBBASE PART 1 GENERAL 1.01 SECTION INCLUDES A. Aggregate or granular subbase as shown on the drawings. 1.02 RELATED SECTIONS A. Section 01400 Quality Requirements.

More information

Development of Temperature Gradient Frequency Distribution for Kenyan Cement Concrete Pavement: Case Study of Mbagathi Way, Nairobi.

Development of Temperature Gradient Frequency Distribution for Kenyan Cement Concrete Pavement: Case Study of Mbagathi Way, Nairobi. Development of Temperature Gradient Frequency Distribution for Kenyan Cement Concrete Pavement: Case Study of Mbagathi Way, Nairobi. Patrick Jangaya 1*, Lambert Houben 2, Cox Sitters 1 1. Department of

More information

AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS

AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS By Toorak Zokaie, 1 Member, ASCE ABSTRACT: The live load distribution factors contained in the AASHTO-LRFD Bridge Design Specification present a major

More information

Introduction to The Design Example and EN Basis of Design

Introduction to The Design Example and EN Basis of Design EUROCODES Bridges: Background and applications St Petersburg April 2011 1 Introduction to The Design Example and EN 1990 - Basis of Design Professor Steve Denton Engineering Director, Parsons Brinckerhoff

More information

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT

STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT STREET LIGHTING AUSTIN ENERGY ILLUMINATION DEPARTMENT http://www.austinenergy.com/ Physical Address: 4411 Meinardus Drive Austin, Texas 78744 Hours of Operation: Monday Friday 6am to 3pm Key Contact: Joyce

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Rodless cylinders Series 1600

Rodless cylinders Series 1600 Rodless cylinders Series 00 Basic version 0.Ø.stroke.0.M Max. stroke mt.) AL AI RA RB AF TC AM L LA+stroke AH TD AE TA RV Possibility of a single feed cylinder head AI AP AB AC AD TD TE TB AG RT Left head

More information

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309 PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM SITE NUMBER GP-4a LEGAL DESCRIPTION LSD 12-10-78-4-W6M SITE NAME Burnt River Bridge - West Approach Slide HIGHWAY & KM Hwy 49:06

More information

Request for bridge scour analysis for complex pier foundations

Request for bridge scour analysis for complex pier foundations Technical Memorandum To: Theresa Maahs-Henderson, Stantec Dale Grove, Stantec Keith Farquhar, HNTB Corporation From: Hugh Zeng, P.E. & Mark Abrahams, HZ United, LLC Date: 03/22/2016 RE: Request for bridge

More information

CE415L Applied Fluid Mechanics Laboratory

CE415L Applied Fluid Mechanics Laboratory Applied Fluid Mechanics Laboratory Learning Objective Following completion of this experiment and the analysis of the data, you should be able to 1. generalize results of introducing changes to a natural

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

Puerto Rico Transportation Asset Management Plan

Puerto Rico Transportation Asset Management Plan Puerto Rico Transportation Asset Management Plan PR-TAMP April 12, 2018 April 12, 2018 The Project Team Gordon Proctor Shobna Varma Jose Carro, P.E. Zaida Rico, P.E., Ph.D. gordon@proctorassociates.com

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA South Asia Transport & ICT Global Practice IBRD/IDA Investment Project Financing

More information

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272)

The World Bank Emergency 2007 Cyclone Recovery and Restoration Project (P111272) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Emergency Recovery Loan FY 2009 Seq No: 17 ARCHIVED on 19-Jun-2017 ISR27863

More information

Notice of Strata Committee Meeting. Strata Plan Name Mirage Apartments Address 1-29 Bunn Street PYRMONT NSW 2009

Notice of Strata Committee Meeting. Strata Plan Name Mirage Apartments Address 1-29 Bunn Street PYRMONT NSW 2009 Notice of Strata Committee Meeting Strata Plan 54229 Name Mirage Apartments Address PYRMONT NSW 2009 Meeting Date Tuesday, 30 May 2017 Time 6:30 PM Venue Boardroom, Novotel Darling Harbour Address 100

More information

Public Company, Limited by Shares

Public Company, Limited by Shares METAL COATINGS (INDIA) LIMITED Registered office: 912, Hemkunt Chambers, 89, Nehru Place, New Delhi 110 019 CIN: L74899DL1994PLC063387, Tel: 011-41808125 E-mail id: info@mcilindia.net, Website: www.mcil.net

More information

Request for Empanelment

Request for Empanelment Request for Empanelment (Empanelment is method/procedure/way to seek technical & financial or financial quotation from eligible firm/organization/academic institute to short list eligible contender for

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Professional Agreement Invoice and Progress Report

Professional Agreement Invoice and Progress Report ITD 0771 (Rev. 10-06) itd.idaho.gov Professional Agreement Invoice and Progress Report Idaho Transportation Department This page must be filled out monthly by the Consultant and forwarded to the Agreement

More information

Tom Blackman Project Lead. Mékell Mikell Communications Representative

Tom Blackman Project Lead. Mékell Mikell Communications Representative Sediment Cleanup Middle River Complex, 2016-17 Season 1 Project Photo Tour Updated November 15, 2016 Tom Blackman Project Lead Mékell Mikell Communications Representative 1 Sediment Cleanup - Season 1

More information

Implementation Status & Results Africa RCIP3 - Regional Communications Infrastructure Program - Phase 3 (P111432)

Implementation Status & Results Africa RCIP3 - Regional Communications Infrastructure Program - Phase 3 (P111432) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa RCIP3 - Regional Communications Infrastructure Program - Phase 3 (P111432) Operation Name:

More information

DESIGN OF STORAGE AND MATERIAL HANDLING SYSTEM FOR PIPE INDUSTRY A CASE STUDY

DESIGN OF STORAGE AND MATERIAL HANDLING SYSTEM FOR PIPE INDUSTRY A CASE STUDY DESIGN OF STORAGE AND MATERIAL HANDLING SYSTEM FOR PIPE INDUSTRY A CASE STUDY Mr.S.S.Chougule 1, Mr.A.S.Chavan 2, Miss.S.M.Bhujbal 3, Mr.K.S.Falke 4 Prof.R.R.Joshi 5, Prof.M.B.Tandle 6 1,2,3,4 Student,

More information

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project

More information