Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3

Size: px
Start display at page:

Download "Trainee Manual C02 CITY OF SASKATOON. Water and Sewer Section. Severe Storm Response Trainee Manual. Version # 1-0-3"

Transcription

1 Trainee Manual C02 CITY OF SASKATOON Water and Sewer Section Severe Storm Response Trainee Manual

2 CITY OF SASKATOON Severe Storm Response Trainee Manual City of Saskatoon

3 Severe Storm Response Trainees Manual Table of Contents INTRODUCTION... 1 PROCEDURAL OVERVIEW... 1 METHOD AND TECHNIQUES... 2 STORM EVENT... 5 CONFIRMED FLOODING REHABILITATION AND RECOVERY DOCUMENTATION FOLLOW UP REVIEW RESOURCES REQUIRED PEOPLE EQUIPMENT MATERIAL... 29

4 Introduction The objective of this manual is to train staff on how to respond to a severe storm event in a timely, effective and efficient manner while ensuring their safety. This province regularly experiences intense weather generated out of every day atmospheric activity. These intense weather systems have the ability to strike suddenly and without warning. The City of Saskatoon designs the storm sewer system for a storm intensity, which on average only occurs once in 2 years. The chance of a storm producing flooding (i.e. the storm sewer system has failed) can be estimated at 1 in 3 years. Procedural Overview Central Dispatch will contact the Manager On Call (Public Works) if there are reports of flooding. If required additional dispatch staff will be deployed. The Manager On Call (Public Works) will contact the Meteorological Services to advise them of the situation, to request the technical cause of event and a forecast regarding possible intensification of event. Staff must be deployed to the reported flooded locations and the known dangerous flooding locations. The staff responding to the flooding will communicate the conditions at flooded locations to the Manager On Call (Public Works). Flooded intersections, especially those with manhole lids off must be closed to traffic and monitored as often as possible until flooding subsides. Flooded intersection(s) must not be entered unless it is absolutely necessary. All Staff must take care and exercise extreme caution on streets and intersections and must wear the personal protective equipment required. The Manager On Call (Public Works) will approve requests for extra staff and equipment. If it is suspected that some one has fallen into the storm sewer, Fire and Protective Services must be notified immediately. After the immediate flooding safety concerns have been met, action must be taken to rectify any deficiencies caused by the flooding. Requests for staff and equipment should go through Central Dispatch to the Manager On Call (Public Works). The Manager On Call (Public Works) will organize remediation activities. A Preliminary Flood Response Form must be filled out for each flooded location. A staff member shall be appointed to facilitate follow up activities. Ensure all complaints, claims and paperwork is directed to the appointed staff member. The appointed staff member investigates the causes of flooding for each complaint and claim if required, organizes the data gathered during the storm event and completes required paper work. The appointed staff member updates the flood location tables and map, prepares a summary table of claims, complaints and other relevant data and forwards and/or files all information appropriately. The appointed staff member reviews the overall response to the storm event, determines if all emergency needs were met and identifies and requests resources that may be required to better respond to the future storm events. The appointed staff member updates the storm response procedure. All locations of flooding and/or manhole lids were blown off must be added to the Severe Storm Response Dangerous Intersections List. Copies of the Preliminary Flood Response Form must be forwarded to the Municipal Engineering, Planning and Design Manager or designate. 1

5 Method and Techniques For the safety of people and property, Environment Canada issues severe weather warnings, watches and advisories to the public via the media, weather outlets and Weather-radio Canada. Figure 1 - Weather Warning A WEATHER WATCH alerts you that conditions are favourable for the development of severe weather. Watch the skies and listen for updated watches and possibly weather warnings. Figure 2 - Storm Radar Image 2

6 A WEATHER WARNING alerts you that severe weather is occurring or that hazardous weather is highly probable. Figure 3 - Thunder Storm Severe thunderstorm or tornado warnings may be issued less than one hour in advance. Other weather warnings may be issued six to twelve hours in advance. Figure 4 - Tornado 3

7 A WEATHER ADVISORY means actual or expected weather conditions may cause a general inconvenience or concern, but do not pose a serious enough threat to warrant a weather warning. Figure 5 - Light Rain An advisory may also be used when conditions show signs of becoming favourable for severe weather, but the situation is not definite enough or too far in the future to justify a warning. Figure 6 - High Wind 4

8 Storm Event Most rainfall events do not produce enough rain to cause flooding. Unless flooding begins to occur, action should not be taken. Figure 7 - Rainfall During any rainfall, city employees should be alert to weather changes and the possibility of flooding. If the rainfall intensity increases dramatically, the section on confirmed flooding should be reviewed. Figure 8 - Heavy rain 5

9 On confirmation of a severe storm event, a Public Works Manager should contact the meteorological services (Environment Canada or The Weather Network ) to: advise of the situation; determine technical cause of event; and request a forecast regarding possible intensification of event. Figure 9 - Weather In a heavy rainfall the supervisory staff will make the decision whether to send staff to check on the areas prone to flooding. Figure 10 - Heavy Rain 6

10 If staff is sent to check for flooding the applicable manager should be notified. Central Dispatch should be notified of all flooded locations. Figure 11 - Flooded Intersection If Central Dispatch is alerted to a possible flooded location by, the general public, a City of Saskatoon staff member must be sent to investigate. Figure 12 - Flooded Street 7

11 During heavy rains and hail, visibility will be reduced. Care must be taken when driving and working in traffic. Figure 13 - Driving in Heavy rain With heavy rain, land slippage may be a concern. Keep away from steep slopes and retaining walls during severe storms. Figure 14 - Landslide 8

12 Report any land slippage to Central Dispatch or if it is on private property, to the property owner. Figure 15 - Landslide While the City employee travels to the possible flooded location, they must look out for broken trees blocking traffic. If broken trees are found, Central Dispatch must be notified. Figure 16 - Tree Blocking Roadway 9

13 Broken trees may prevent road access to emergency vehicles and personnel. Plans should be made to cut the trees and clear debris from the road as soon as possible. Figure 17 - Broken Tree Confirmed Flooding If flooding has been confirmed, the locations in WS-C02 Severe Storm Response Dangerous Intersections List #: WS-C02.03 must be checked. WS-C02 Severe Storm Response Dangerous Intersections List #: WS-C02.03 Extremely Dangerous Flooding Locations Priori Intersection Problem ty 1 Idylwyld -Circle Dr. under the overpass on Severe Ponding Idylwyld, and The West bank ramp down on to Idylwyld south bound th and Idylwyld under the overpass Severe Ponding 3 33rd St. between Ave. K to L. Severe Ponding and loss of 4 33 rd and Circle Dr. overpass Severe Ponding 5 Rusholm Rd. by E.D.Feehan School Severe Ponding and loss of 6 Laurier- Conf. Dr. and Bennett-Conf. Dr. Severe Ponding and loss of 7 Louise- East place (Preston from Louise to Taylor) Severe Ponding and loss of 8 Cherry St. Severe Ponding and loss of 9 George Rd.- Wedge Rd. Severe Ponding and loss of 10 Taylor-Broadway Severe Ponding and loss of 11 Cascade between William and Broadway Severe Ponding and loss of 12 Cascade-Dufferin Severe Ponding and loss of 13 Lansdowne Ave. and 1 st St. East Severe Ponding and loss of 14 Taylor St. and Coy Ave. Severe Ponding and loss of 15 Idylwyld Dr. North, South of Northridge Dr. (50m North of lift station) Severe Ponding and loss of Figure 18 - Dangerous Intersection 10

14 Both the 19 th St. & Idylwyld Dr. and the Circle Dr. & Idylwyld Dr. underpasses should be closely monitored or closed. Figure 19 - Flooded Underpass The Utility Services Department, wastewater treatment plant control room, has monitors for the Circle Dr and Idylwyld Dr. underpass lift station. If any flooding is observed the treatment plant control room must be notified. Figure 20 - COS Wastewater Treatment Plant 11

15 Fire and Protective Services and Police Services should be notified if flooding is observed at any of the underpasses. Figure 21 - Flooded Underpass Flooded intersections should be closed to traffic and monitored until the flooding has subsided. Figure 22 - Road Closed 12

16 Flooded intersections may contain hidden hazards such as open manholes. In severe storm events the storm sewer system may surcharge and push the manhole lid off. Figure 23 - Manhole It is difficult to see an open manhole in a flooded intersection; therefore people may inadvertently step or drive into one. Figure 24 - Flooded Road 13

17 It is next to impossible to rescue someone from the storm sewer system. If an individual falls into an open manhole during a rainstorm, they will most likely drown before they can be rescued. Figure 25 - Storm Water Overflow It is extremely important that intersections that may or do have manhole lids off are closed to all traffic. Figure 26 - Diverting Traffic 14

18 The Sign Shop, or Police Services, can assist in closing an intersection. Central Dispatch will forward the requests for assistance. Figure 27 - Police Closing a Road If staff are unable to contact Central Dispatch, they are encouraged to contact whomever they need for assistance. Figure 28 - Installing Sandbags 15

19 Staff must stay at the flooded intersection to stop pedestrians and monitor the flooding until the appropriate road closure has been erected. Figure 29 - Storm Damage to Power Line Rehabilitation and Recovery After the immediate flooding safety concerns have been met, action should be taken to rectify any problems caused by the flooding. Figure 30 - Broken Tree 16

20 If the flooding is due to a blockage, the storm sewer may require flushing. Figure 31 - Blocked Storm Sewer Sewer Vac-trucks may be required to clear debris from catch basins and catch basin leads. Figure 32 Vac-Truck 17

21 Sweeper trucks will be required to remove debris from flooded streets. Figure 33 - Street Sweeper The Parks Branch will remove broken trees and tree branches. Requests for broken tree removal should go through Central Dispatch. Figure 34 - Wood Chipper 18

22 Electrical Systems Branch or SaskPower will repair broken and downed power lights/lines. Figure 35 - Repairing Power Requests for equipment and staff should go through Central Dispatch and have the approval of a Manager and/or Supervisor. Figure 36 - Approval 19

23 Documentation The job number and the location number for that specific storm must be used for all activities required due to the storm event. Personnel, equipment and materials used for each storm event will be documented this way Year 2004 Number of Storm Events in the Given Year Figure 37 Location Number A Preliminary Flood Response Form #: WS- C02.04 should be filled out for each location where surface flooding occurred and a City of Saskatoon employee responded. Preliminary Flood Response Form #: WS-C02.04 Name: Date: Time: Location of Flooding: Time for Flood to Subside: Type of Catch Basin (Describe the shape and size of grate and frame): Did come off? : If they did, how many and which ones (include GIS #): Severity of Flood: Estimate area covered by flood water, in terms of number of properties affected: Sketch the general lay out of the flooded intersection, and show the high water mark: Figure 38 - Preliminary Flood Response Form 20

24 All paper work should be filed appropriately. Figure 39 Filing 21

25 Follow Up The Public Works Manager(s) and applicable staff will arrange a meeting and appoint a staff member to facilitate all follow up activities for this particular storm. Depending on the severity of the storm the appointed staff member may need to fully investigate the storm event or simply record flooded locations. Figure 40 - Meeting General drainage complaints are to be handled by Infrastructure Services, Municipal Engineering Branch. Figure 41 - Flooded Home 22

26 The appointed staff member would have all complaints, claims and paper work directed to them. If no paperwork is forthcoming, they may need to talk to the Central Dispatch staff and the Roadways Section s Superintendents to get information on any flooding. Figure 42 - In Box The information gathered from the storm event will be organized, and a summary will be prepared. Figure 43 - Report 23

27 New flooded locations (if any) will be added to the WS-C02 Severe Storm Response Dangerous Intersections List #: WS-C If a dangerous intersection is checked during a sever storm event and no flooding has been observed, then the intersection can be removed from the from the list WS-C02 Severe Storm Response Dangerous Intersections List #: WS-C02.03 Extremely Dangerous Flooding Locations Priori Intersection Problem ty 1 Idylwyld -Circle Dr. under the overpass on Severe Ponding Idylwyld, and The West bank ramp down on to Idylwyld south bound th and Idylwyld under the overpass Severe Ponding 3 33rd St. between Ave. K to L. Severe Ponding and loss of 4 33 rd and Circle Dr. overpass Severe Ponding 5 Rusholm Rd. by E.D.Feehan School Severe Ponding and loss of 6 Laurier- Conf. Dr. and Bennett-Conf. Dr. Severe Ponding and loss of 7 Louise- East place (Preston from Louise to Taylor) Severe Ponding and loss of 8 Cherry St. Severe Ponding and loss of 9 George Rd.- Wedge Rd. Severe Ponding and loss of 10 Taylor-Broadway Severe Ponding and loss of 11 Cascade between William and Broadway Severe Ponding and loss of 12 Cascade-Dufferin Severe Ponding and loss of 13 Lansdowne Ave. and 1 st St. East Severe Ponding and loss of 14 Taylor St. and Coy Ave. Severe Ponding and loss of 15 Idylwyld Dr. North, South of Northridge Dr. (50m North of lift station) Severe Ponding and loss of Figure 44 - Dangerous Intersections Information regarding flooding will be forwarded to the Municipal Engineering Branch, Design and Planning Manager, or their designate. Figure 45 Mail 24

28 The location number used during the storm event must be closed after all remediation activities are complete. A new location number must be initiated. The location numbering is modified as shown in Figure 46 - Location Numbering The staff member appointed to facilitate follow up activities will close the old location number and open a new one Year 2004 Number of Storm Events in the Given Year Figure 46 - Location Numbering Review The Staff member appointed to facilitate all follow up activities shall also review the over all response to the storm event. The Severe Storm Standard Operating Procedure will be updated with the required changes. CITY OF SASKATOON Water and Sewer Section C02 Severe Storm Response Figure 47 - Severe Storm Response Title Page 25

29 Determine if all emergency needs have been met. If the emergency needs were not met, solutions must be found. Figure 48 - Sandbags Once any response deficiencies are identified, the requested resources will be ordered. Figure 49 - Preparing Sandbags 26

30 Resources Required People (Public Works) Manager on Call (Public Works) Dispatch Personnel Wastewater Supervisor Labourer Staff Member Appointed to Facilitate Follow up Activities 27

31 Equipment Figure 50 - Vac-Truck Figure 51 - Sewer Bypass Pump Figure 52 - Wood Chipper Figure 53 - Traffic Control Devices 28

32 Material Figure 54 Sandbags 29

33 Index E Environment Canada , 9 F Fire and Protection services ( ), 11 H heavy rainfall, 5 I investigate, 6, 21 L land slippage, 7, 8 S severe storm, 2 storm, 2, 9, 16, 21, 24 Street Sweeper, 17 T The Weather Network , 9 trees, 8, 9 V Vac-trucks, 17 W WEATHER ADVISORY, 3 WEATHER WARNING, 2 WEATHER WATCH, 2 30

Severe Storm Response Version # 1-0-1

Severe Storm Response Version # 1-0-1 Severe Storm Response Version # 1-0-1 Weather Warnings Environment Canada issues severe weather warnings, watches and advisories Weather Watch Severe weather may develop. Weather Warning Severe weather

More information

Dunn County Snow Removal Policy

Dunn County Snow Removal Policy Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES Page 1 of 5 Volume: Operation Section: 20.00 Number: 20.09 Subject: Weather Watches, Warnings, Advisory s and Spotter Activation Date Issued: 28 March

More information

TOWN OF GRAND FALLS WINDSOR

TOWN OF GRAND FALLS WINDSOR TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that:

While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that: While all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that: Produces hail at least three-quarters of an inch in diameter. Has winds of 58 miles

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM Purpose: The Public Transportation Department and contracted provider will provide safe transportation for AnchorRIDES customers and employees during severe weather or emergency conditions. AnchorRIDES

More information

Severe Weather Hazards Are Real

Severe Weather Hazards Are Real Severe Weather Hazards Are Real In the past 10 years, more than 40 people have died and dozens more injured as a result of weatherrelated events in Minnesota (not including motor vehicles.) The top severe

More information

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT Presentation Overview Review of Flash Flooding and Flooding from High Lake Levels (August 20 th -Present) Lake Level Information Damages FEMA How

More information

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016 ! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

General. High Winds. High winds are a common hazard in the UAE.

General. High Winds. High winds are a common hazard in the UAE. General guidance for employers and workers in inclement weather conditions Date: March 2017 OSHAD 2017 This document is and shall remain the property of OSHAD. The document may only be used for the purposes

More information

RESOLUTION NO INTRODUCTION

RESOLUTION NO INTRODUCTION RESOLUTION NO. 0824 A RESOLUTION TO ESTABLISH THIS CITY S SNOW AND ICE CONTROL POLICY DURING WINTER MONTHS, SPECIFICALLY DEFINED AS NOVEMBER THROUGH MARCH. BE IT RESOLVED BY THE CITY COUNCIL OF SOLON,

More information

Flood Scenario Worksheet

Flood Scenario Worksheet Flood Scenario Worksheet Scenario adapted from: http://www.epa.gov/watersecurity/tools/trainingcd/simple/source/scenario-8/ssc8-0.pdf Simple Tabletop Exercise, Interdependency Natural Disaster Scenario,

More information

Town of Oconomowoc Snow & Ice Control Policy

Town of Oconomowoc Snow & Ice Control Policy Town of Oconomowoc Snow & Ice Control Policy Introduction The purpose of this policy is to provide a detailed overview of the Town s snow & ice control operations including its goals and objectives. All

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

Tornado Preparedness. Monthly Safety Meeting

Tornado Preparedness. Monthly Safety Meeting Tornado Preparedness Monthly Safety Meeting Introduction Tornadoes can occur anywhere and at any time during the year. In an average year, 800 tornadoes are reported throughout the nation. The most violent

More information

1 IA 1 Severe Weather (Including. Landslides)

1 IA 1 Severe Weather (Including. Landslides) 1 IA 1 Severe Weather (Including Landslides) THIS PAGE LEFT BLANK INTENTIONALLY 1 Purpose The purpose of this annex is to provide a framework of coordination among agencies to help ensure the safety of

More information

Snow Plow Safety Quick Reference Guide

Snow Plow Safety Quick Reference Guide PUBLIC WORKS INITIATIVE Snow Plow Safety Quick Reference Guide INTRODUCTION This quick reference guide highlights snow removal/snow plow safety practices. Its purpose is to help prevent personal injury

More information

ICE STORM! a mini tabletop exercise for home care agencies

ICE STORM! a mini tabletop exercise for home care agencies 1 ICE STORM! a mini tabletop exercise for home care agencies HCA Education and Research Winter 2010 2011 2 What is a tabletop exercise? People come together to review and discuss a hypothetical emergency

More information

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016. Town of Havana, Fl. Response to Review of Electric Utility Hurricane Preparedness and Restoration Actions- Applies only to Hermine and Irma. Maria and Nate posed no serious threat to Havana. Staging for

More information

Severe Thunderstorms

Severe Thunderstorms Severe Thunderstorms Severe Thunderstorms Explain that, while all thunderstorms are dangerous, the National Weather Service (NWS) defines a severe thunderstorm as one that: Display Slide Th-0 Produces

More information

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution Resolution Number: 112612(2) Resolution Title: Snow Policy Signed: 11/26/12 DAVIS COUNTY Snow Policy Resolution A RESOLUTION TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW

More information

WINTER STORM Annex II

WINTER STORM Annex II WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works Winter Weather Safety Tips From your friends at South Brunswick Township Department of Public Works South Brunswick Township Department of Public Works is committed to providing timely, efficient, and

More information

Denton County SKYWARN Guidelines

Denton County SKYWARN Guidelines Emergency traffic, tornadic activity or weather that is an imminent threat to life and/or property has top priority. Repeater Operations during a Skywarn Net: NOTE: When the repeater announces WEATHER

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Procedure Procedure: Emergency Weather Plan - Events Department/Division: Section: Date Originated: Culture & Recreation April 30, 2013 Approval: Approval: Date Revised: Reference: HUR130-016

More information

Comprehensive Emergency Management Plan

Comprehensive Emergency Management Plan Comprehensive Emergency Management Plan Section 6- Severe Weather/Wildfire Annex Blank Intentionally 2 CEMP Annex 6 11 Severe Weather / Wildfire Annex I. PURPOSE This plan outlines the procedures to be

More information

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017 I hereby certify that this

More information

Annex B Natural No-Notice Event

Annex B Natural No-Notice Event Annex B Natural No-Notice Event Version: 1.0 Effective: 10/01/2015 Revision Date: 10/01/2015 Approved By: John Pitcher Purpose The purpose of Natural No-Notice Event Annex is to ensure the safety of BHCC

More information

IN VEHICLES: Do not try to outrun a tornado. Abandon your vehicle and hide in a nearby ditch or depression and cover your head.

IN VEHICLES: Do not try to outrun a tornado. Abandon your vehicle and hide in a nearby ditch or depression and cover your head. TORNADO SAFETY TORNADO! The very word strikes fear in many people. While a tornado is perhaps nature's most destructive storm, deaths and injuries can be prevented. By following Tornado Safety Rules, lives

More information

Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown

Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown Whether you are driving or walking, if you come to a flooded road, Turn Around Don't Drown You will not know the depth of the water nor will you know the condition of the road under the water. Many people

More information

Tornadoes. Be able to define what a tornado is. Be able to list several facts about tornadoes.

Tornadoes. Be able to define what a tornado is. Be able to list several facts about tornadoes. Tornadoes Be able to define what a tornado is. Be able to list several facts about tornadoes. 1. Where do tornadoes most U.S. is # 1 occur in the world? Tornadoes are most common in Tornado Alley. Tornado

More information

Tornadoes pose a high risk because the low atmospheric pressure, combined with high wind velocity, can:

Tornadoes pose a high risk because the low atmospheric pressure, combined with high wind velocity, can: Tornadoes are powerful, circular windstorms that may be accompanied by winds in excess of 200 miles per hour. Tornadoes typically develop during severe thunderstorms and may range in width from several

More information

The Leader in Landscape Solutions

The Leader in Landscape Solutions The Leader in Landscape Solutions Emergency Action Plan Hurricane Preparedness Go To Mainscape.com For More Information! Purpose: To provide the Federation at Kings Point and their residents an informative

More information

SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE

SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE SEVERE WEATHER EMERGENCY RESPONSE PROCEDURE ALGORITHM Staff Member becomes aware of Severe Weather Assess Threat Imminent Tornado Strike NO Notify Supervisor

More information

Tahlequah Public Schools Inclement Weather Transportation Plan

Tahlequah Public Schools Inclement Weather Transportation Plan Tahlequah Public Schools Inclement Weather Transportation Plan Inclement Weather with Ice and Snow From time to time throughout the school year, weather may force a change in the District s normal operating

More information

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS

UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS UNIVERSITY OF WISCONSIN-PARKSIDE TORNADO WARNINGS AND ALERT POLICY ADMINISTRATIVE POLICY NUMBER 39 TABLE OF CONTENTS Page 1. PURPOSE 2 2. DEFINITIONS 2 3. GENERAL OVERVIEW 2 4. SPECIFIC PROCEDURES 3 4.1

More information

SNOW CONTROL OPERATIONS

SNOW CONTROL OPERATIONS SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow

More information

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN

OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN OXFORD HEIGHTS SUBDIVISION EMERGENCY EVACUATION PLAN March 27, 2007 Oxford Heights Overview and Historical Conditions Oxford Heights is a medium sized community located on the southern side of Elizabeth

More information

TORNADOES. DISPLAY VISUAL A Tornado Is... Tornadoes can: Rip trees apart. Destroy buildings. Uproot structures and objects.

TORNADOES. DISPLAY VISUAL A Tornado Is... Tornadoes can: Rip trees apart. Destroy buildings. Uproot structures and objects. TORNADOES Introduce tornadoes by explaining what a tornado is. DISPLAY VISUAL A Tornado Is... A powerful, circular windstorm that may be accompanied by winds in excess of 250 miles per hour. Tell the participants

More information

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10

New Pig Corporation newpig.com HOT-HOGS Page 1 of 10 Develop a Disaster Preparedness Plan Assess your risks of natural and manmade disasters Purchase adequate insurance and ensure that you have the types of coverage you may need Keep employee contact information

More information

Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer

Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer Page 1 of 5 Retired: Revised: Approved by: A. Cherrie Epps, Ph.D., President and Chief Executive Officer Subject: Office of General Counsel/Compliance - Inclement Weather and Emergency Closing Policy PURPOSE:

More information

ADMINISTRATIVE PROCEDURES

ADMINISTRATIVE PROCEDURES PROCEDURES NO: A-AD-109-14 ADMINISTRATIVE PROCEDURES SUBJECT: A. Communications For the purpose of communicating the policies, regulations, administrative procedures, and parental expectations of Transportation

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE TITLE: NUMBER: ISSUER: School Procedures During Inclement Weather Conditions REF-5706.2 Earl R. Perkins, Assistant Superintendent School Operations Thelma Meléndez de Santa Ana, Ph.D. Chief Executive Officer

More information

COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES

COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES Tornadoes are powerful, circular windstorms that may be accompanied by winds in excess of 200 miles per hour. Tornadoes typically develop during severe thunderstorms and may range in width from several

More information

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY AN ORDINANCE REPEALING ESTABLISHING THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW AND ICE AND MAINTENANCE OF IOWA COUNTY S SECONDARY

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES PARATRANSIT SYSTEM Purpose: The Public Transportation Department (PTD) and AnchorRIDES paratransit contractor will provide transportation in as safe a manner as effectively possible. Paratransit vehicles primarily operate

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

ROLLING RIVER SCHOOL DIVISION POLICY

ROLLING RIVER SCHOOL DIVISION POLICY ROLLING RIVER SCHOOL DIVISION POLICY Transportation Storm EBCD/P The School Division is responsible for the safe transportation of students on school buses. The Division shall exercise due care and caution

More information

Policy and Procedure for Emergency Planning

Policy and Procedure for Emergency Planning Viera Children s Academy 3395 Viera Boulevard Viera, Florida 32940 (321) 4332330 (321) 4332331 fax Policy and Procedure for Emergency Planning Director Signature Date Purpose: To ensure that in the event

More information

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014 Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)

More information

THE IMPACT OF WEATHER

THE IMPACT OF WEATHER The United States is the most severe weather prone country in the world. Each year, people in this country cope with an average of 10,000 thunderstorms, 5,000 floods, 1,200 tornadoes and two landfalling

More information

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms

Inclement Weather Preparedness. Tornadoes and Severe Thunderstorms Inclement Weather Preparedness Tornadoes and Severe Thunderstorms Let s find out How do we prepare ahead of time? What is the difference between a watch and a warning? What are the severe weather communications

More information

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION 1 SNOW CONTROL OPERATIONS The following are the standard operating procedures f snow removal operations. 1. Plowing operations

More information

Tornadoes. Tornadoes COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES

Tornadoes. Tornadoes COMMUNITY EMERGENCY RESPONSE TEAM TORNADOES Tornadoes Tornadoes Tell the participants that tornadoes are powerful, circular windstorms that may be accompanied by winds in excess of 200 miles per hour. Tornadoes typically develop during severe thunderstorms

More information

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3 Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages: 8-112 Winter Storm Response Plan-ERP CLEA# Approved Date: Feb. 1998 GLECP # Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages: 8-112.1 Overview The dangers of winter storms

More information

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently

More information

City of Punta Gorda Community Emergency Management Plan 2013

City of Punta Gorda Community Emergency Management Plan 2013 City of Punta Gorda Community Emergency Management Plan 2013 Hurricane Andrew- August 24, 1992 Category 5 hurricane. The second-most-destructive hurricane in U.S. history. The first named storm of the

More information

TORNADO PREPAREDNESS AND INFORMATION MANUAL

TORNADO PREPAREDNESS AND INFORMATION MANUAL TORNADO PREPAREDNESS AND INFORMATION MANUAL What is a Tornado? A tornado is defined as a violently rotating column of air extending from a thunderstorm to the ground. The most violent tornadoes are capable

More information

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots SNOW AND ICE CONTROL SERVICES - (4) SEPARATE DEPARTMENTS SCHEDULE C REQUEST FOR PROPOSAL 2244 Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots 1.0 General

More information

THE SKYWARN NET SCRIPT FOLLOWS SEVERE STORM-SUMMER

THE SKYWARN NET SCRIPT FOLLOWS SEVERE STORM-SUMMER WATCH mode READ EVERY 15 MINUTES on 146.94 Repeater Is the frequency in use? (to break into a conversation, use the Proword SKYWARN ) National Weather Service San Antonio/Austin. All SKYWARN spotters are

More information

City of Rhinelander Snow and Ice Policy

City of Rhinelander Snow and Ice Policy City of Rhinelander Snow and Ice Policy General: Policy: Procedure: The ability to react promptly and decisively to varying winter weather conditions with regard to snow removal and ice control on city

More information

Chancellor s Memorandum CM-64 Tornado Policy

Chancellor s Memorandum CM-64 Tornado Policy Chancellor s Memorandum CM-64 Tornado Policy To: Vice Chancellors, Deans, Administrative Staff, and Department Heads. From: LSU Health Sciences Center New Orleans Chancellor July 11, 2017 Revised on September

More information

University of Oklahoma Emergency Response Plan for INSERT EVENT NAME HERE.

University of Oklahoma Emergency Response Plan for INSERT EVENT NAME HERE. University of Oklahoma Emergency Response Plan for INSERT EVENT NAME HERE. Time/Date of Event: INSERT BOTH START & END TIME/DATE HERE. Location of Event: LIST ALL LOCATIONS HERE OF EVENT, INCLUDING ADDRESS.

More information

TORNADO/high winds *

TORNADO/high winds * TORNADO/high winds * WATCH Bring people inside. Secure outside objects. Clear window ledges & wall hangings Close drapes Protect windows Assemble and check supplies Call in applicable staff Pre-Storm:

More information

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart)

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart) Table G - 6. Actions Identified by the () (From Master Action Chart) Multi-Hazard Plan, 2017 Action Comments 5 All-Hazards Local Planning & Regulations Update the Operations Plan on an annual basis. Work

More information

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. OTHER TOPICS Index No. X-1 PROCEDURES MEMORANDUM TO: FROM: SUBJECT: MCC Students and Staff Office of the President Temporary College Closure Due to Inclement Weather or Other Adverse Conditions. DATE:

More information

Municipal Act, 2001 Loi de 2001 sur les municipalités

Municipal Act, 2001 Loi de 2001 sur les municipalités Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From January 25, 2013 to the e-laws currency date.

More information

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Alexander Chung, M.Sc. Candidate C-Change Student Research Associate May 2013 The Community of Little Anse Coastal community

More information

City of Laramie, Wyoming SNOW AND ICE POLICY

City of Laramie, Wyoming SNOW AND ICE POLICY City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and

More information

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program: Education:

Information Reception: Decision Support Standards: Public Notification Plan: Protection Program:  Education: The National Weather Service (NWS) has implemented a voluntary recognition program to help large outdoor venues, including those on university campuses, better protect staff and patrons from the dangers

More information

Paul Rooney 5/31/16 Paul Rooney Assistant Vice President of Operations Valencia College

Paul Rooney 5/31/16 Paul Rooney Assistant Vice President of Operations Valencia College Section: VSP 2 Valencia Security Policy Title: Severe Weather Policy Date: May 24, 2016 Page Number: 1 of 9 SEVERE WEATHER POLICY Security Department Valencia College REVIEWED BY: Robert Pigman Bill Macauley

More information

Use of big data, crowdsourcing and GIS in assessment of weather-related impact

Use of big data, crowdsourcing and GIS in assessment of weather-related impact Use of big data, crowdsourcing and GIS in assessment of weather-related impact HK (Photo courtesy : GFS) PAN Chi-kin, Hong Kong Observatory (Photo courtesy : Roy Liu/China Daily) November 2017, KMA/WMO

More information

CAIRNS AIRPORT CYCLONE PLAN

CAIRNS AIRPORT CYCLONE PLAN CAIRNS AIRPORT CYCLONE PLAN Reference No: 2046 SO Version 5 25 th October 2017 2046_SO_CairnsAirportCyclonePlan_V5_Effectivedate_25/10/2017_Reviewdate_25/10/2018 Page 1 of 10 Document Control Reference

More information

Safety Issue: Types of weather emergencies and natural. Weather Emergencies

Safety Issue: Types of weather emergencies and natural. Weather Emergencies Overview Safety Issue: Rapid and effective response to weather emergencies and other natural disasters whether during or after work hours takes forethought and careful planning. Types of weather emergencies

More information

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018 1 PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018

More information

How to Prepare for a Tornado

How to Prepare for a Tornado Tornadoes Tornadoes How to Prepare for a Tornado Special Precautions for Mobile Home Dwellers What to Do During a Tornado Warning Responses After a Tornado Inspecting Buildings for Hidden Wind Damage Special

More information

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish

More information

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT STORM RAINFALL AND RADAR IMAGERY Total rainfall 4.99 inches 2.74 inches between 5:40 and 7:10, then a lull until 9:30 2.04 inches between 9:30

More information

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION INTRODUCTION Floods are one of the most common hazards in the United States. A flood occurs any time a body of water rises to cover what is usually dry land. Flood effects can be local, impacting a neighborhood

More information

SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES. Plan/Event Information for:

SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES. Plan/Event Information for: SEVERE WEATHER PLAN FOR SPECIAL EVENTS or VENUES Plan/Event Information for: Dates of Event/Site (Enter On-going for a plan) CONTACT INFORMATION: Name: Phone: Email: I. GENERAL A. This severe weather plan

More information

SNOW AND ICE REMOVAL. Policy i

SNOW AND ICE REMOVAL. Policy i Table of Contents SNOW AND ICE REMOVAL Policy 828.1 PURPOSE... 1.2 APPLICABILITY... 1.4 GENERAL POLICIES... 1 4.1 WEATHER MONITORING... 1 4.2 EQUIPMENT PREPARATION... 2 4.3 EMPLOYEE NOTIFICATION AND SHIFTS...

More information

FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION TO LOCATE POSSIBLE THREATS TO LIFE AND PROPERTY. And

FANNIN COUNTY A.R.E.S. and R.A.C.E.S. Reference Manual SKYWARN MISSION TO LOCATE POSSIBLE THREATS TO LIFE AND PROPERTY. And FANNIN COUNTY A.R.E.S. and R.A.C.E.S. STORM COWBOY Reference Manual SKYWARN MISSION TO LOCATE POSSIBLE THREATS TO LIFE AND PROPERTY And PROVIDE INFORMATION FROM WHICH WARNINGS CAN ISSUED TABLE OF CONTENTS

More information

Landslide Mitigation (BYUI)

Landslide Mitigation (BYUI) Landslide Mitigation (BYUI) The general principle behind landslide mitigation is stabilization. Slopes that are too steep are shallowed or strengthened. Loose rocks can be bolted or cemented into place.

More information

Extreme Weather and Risks to Infrastructure. Heather Auld & Neil Comer Risk Sciences International

Extreme Weather and Risks to Infrastructure. Heather Auld & Neil Comer Risk Sciences International Extreme Weather and Risks to Infrastructure Heather Auld & Neil Comer Risk Sciences International The Science is Valid and the Evidence grows Stronger AGREE Climate Change Disagree More Intense Rainfall

More information

John A. Carlson Snow and Ice Removal

John A. Carlson Snow and Ice Removal John A. Carlson Snow and Ice Removal A. Introduction 1. The purpose of the Snow and Ice Removal Operation Plan is to provide all personnel who are involved in snow and ice removal a single source document,

More information

Actions SLT Staff Students, Parents/Carers Ensure all. with caution in all. gritted.

Actions SLT Staff Students, Parents/Carers Ensure all. with caution in all. gritted. CODE 1 BASED ON WETAHER FORECAST TEMPERATURES BELOW -3 / LIGHT SNOW OR FREEZING RAIN FORECAST PAVOL TO CALL PAUL AT 07.00 AND BRIEF ON STATUS OF SITE. NO ACTION IF SITE ACCESSIBLE AND SAFE. Code 1 conditions

More information

SITUATION REPORT. Hurricane Nate. Operational Period: October 8, to October 9,

SITUATION REPORT. Hurricane Nate. Operational Period: October 8, to October 9, SITUATION REPORT Hurricane Nate Operational Period: October 8, 2017 0800 to October 9, 2017 0759 CURRENT SITUATION 2:00 p.m. Briefing Hurricane Nate WEATHER SUMMARY All watches and warnings discontinued.

More information

CHALLENGE #1: ROAD CONDITIONS

CHALLENGE #1: ROAD CONDITIONS CHALLENGE #1: ROAD CONDITIONS Your forward collision warning system may struggle on wet or icy roads because it is not able to adjust for road conditions. Wet or slick roads may increase your stopping

More information

Understand FORWARD COLLISION WARNING WHAT IS IT? HOW DOES IT WORK? HOW TO USE IT?

Understand FORWARD COLLISION WARNING WHAT IS IT? HOW DOES IT WORK? HOW TO USE IT? Understand WHAT IS IT? Forward collision warning systems warn you of an impending collision by detecting stopped or slowly moved vehicles ahead of your vehicle. Forward collision warning use radar, lasers,

More information

Severe Weather Policy (Snow & Ice) Seek Ye First the Kingdom of God...

Severe Weather Policy (Snow & Ice) Seek Ye First the Kingdom of God... Severe Weather Policy (Snow & Ice) Seek Ye First the Kingdom of God... Matthew 6.33 At St Patrick's Catholic College all members of our school community are valued and we fully respect our responsibility

More information