1 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT Environmental Component Summary of Site Considerations Interpreted direction of vertical groundwater flow on-site and in Site-vicinity (i.e., area of groundwater recharge, transitional flow, or groundwater discharge): Based on the groundwater elevation data collected to date, vertical gradients at the Site are indicated to be typically weakly downward, or absent. The BR Site is not part of a regional groundwater recharge system to the basal glacial till and bedrock. The shallow overburden used locally for dug wells is recharged locally by precipitation; therefore development of the BR Site will not affect off-site groundwater availability. 3. SITE COMPARISON GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL 3. Comparison of Sites For the purpose of selecting the preferred Site based on the geology, hydrogeology and geotechnical disciplines, the assessment criteria is Which Site is preferred for protection of groundwater? The associated indicators considered are geological setting; type and thickness of natural on-site attenuation layer; presence and quality of groundwater resources on-site and in Site-vicinity; and, interpreted direction of vertical groundwater flow on-site and in Site-vicinity (i.e., area of groundwater recharge, transitional flow, or groundwater discharge). The technical factors considered in applying these indicators are associated with the geological and hydrogeological setting; the geotechnical characteristics are related to design of the facilities on the preferred Site. The BR Site is not part of a regional groundwater recharge system to the basal glacial till and bedrock. The shallow overburden used locally off-site for dug wells is recharged locally by precipitation; therefore development of the BR Site is not expected to affect off-site groundwater availability. The NRR Site is interpreted to be located within a large regional groundwater recharge area; however, in view of the relatively small portion of the recharge ridge area occupied by the Undertaking and the relatively low overall water demand, it is not expected there would be noticeable effects on off-site groundwater availability. The BR Site and its associated thick natural low permeability silty clay attenuation layer offers more favourable natural containment properties (i.e., natural backup to an engineered system, etc.) compared to the NRR Site in the unlikely event of an unmitigated release of leachate from the engineered containment components of the waste management facility. Based on the assessment criteria for the geology, hydrogeology and geotechnical disciplines and the associated indicators, the preferred site from the perspective of the protection of groundwater is clearly the BR Site. 3. Results of Site Comparison The preferred site based on the geology, hydrogeology and geotechnical disciplines is the BR Site. February 3 - DRAFT 53
2 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT REFERENCES Armstrong, D. K., and Sergerie, P., (3). Data for the Comparative Resource Evaluation of Selected Shale Units, Southern Ontario; Ontario Geological Survey, Open File Report 94, p. Charron, J.E. (978). Hydrochemical Study of Groundwater Flow in the Interstream Area between the Ottawa and St. Lawrence Rivers. Scientific Series N. 76, Environment Canada, Inland Waters Directorate, Water Resources Branch, Ottawa, Ontario. City of Ottawa. (3). The Official Plan Consolidation A, Component of Ottawa /, the City s Growth Management Strategy. Freeze, J.A. and Cherry, J.A. (979). Groundwater. New Jersey, Prentice-Hall Inc., 4. Golder Associates Ltd., (974a). Report to DeLeuw Cather, Canada Ltd., Subsurface Investigations, Proposed South-East City, Township of Gloucester, Regional Municipality of Ottawa-Carleton (Report No. 7398) [noted to be Volume 3 of the study]. Golder Associates Ltd., (974b). Report to DeLeuw Cather, Canada Ltd., Engineering Recommendations, South- East City, Regional Municipality of Ottawa-Carleton, Volume 4. (Report No ). Golder Associates Ltd. in association with Dillon Consulting, J. L. Richards and Assoc. Ltd and Agricultural Watersheds. (3). Renfrew County Mississippi Rideau Groundwater Study. September 3. Golder Associates Ltd. (9). Technical Study in Support of a Category 3 Permit to Take Water Application, Russell Quarry, Ottawa. March 9. Hvorslev, M.J. (95). Time lag and soil permeability in groundwater observation, U.S. Army Corps of Engr. Waterway Exp. Stat. Bull. 36, Vicksburg, Miss. Ministry of the Environment (MOE). (994). Water Management Policies, Guidelines, Provincial Water Quality Objectives of the Ministry of the Environment and Energy. Ontario Ministry of the Environment and Energy. July 994 (Reprinted 999). Ministry of the Environment Water (MOE). Water Well Information System (WWIS) (obtained from Golder MOE database). Ministry of Transportation (MTO). (968). Foundation Investigation Report, For Underpass Structure at the Crossing of Proposed Hwy. #47 and Boundary Road, Twp. of Gloucester, Co. of Carleton, District No. 9 (Ottawa), W.J. 68-F-33, W.P (GEOCRES No. 3G-37). June 968. Ministry of Transportation (MTO). (969). Foundation Investigation Report, For Proposed Crossing at Hwy. 47 and Regional Road 8 Relocation, Twp. of Cumberland, Co. of Russell, District No. 9 (Ottawa), W.J. 69-F-85, W.P (GEOCRES No. 3G-39). November 969. Mississippi-Rideau Source Protection Region. (). Assessment Report, Rideau Valley Source Protection Area. December 9,. Prescott Russell. (6). Official Plan Consolidated Version. May 6. February 3 - DRAFT 54
3 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT Raisin Region-South Nation Source Protection Region. (). Assessment Report, South Nation Source Protection Area. December. Water & Earth Sciences Associates (WESA). (986). Hydrogeology Data, Sites 3 and Phase I Report, Regional Municipality of Ottawa-Carleton. November 986. Water & Earth Sciences Associates (WESA) and Earthfx, (6). Preliminary Watershed Characterization for the Water Budget Conceptual Model, Raisin Region CA and South Nation Conservation Source Protection Partnership. April 6. Water & Earth Sciences Associates (WESA). (). Groundwater Vulnerability Analyses, Vars and Limoges Water Supplies. August. Williams, D.A. (99). Paleozoic Geology of the Ottawa-St. Lawrence Lowland, Southern Ontario; Ontario Geological Survey, Open File Report 577, 9p. February 3 - DRAFT 55
4 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT ATTACHMENT TSD#-B- Records of Test Pits and Augerholes and Grain Size Distribution (NRR Site) February 3 - DRAFT
5 January Record of Augerholes and Test Pits AUGERHOLE (AH)/ TEST PIT (TP) NUMBER (ground surface elevation, masl) AH9- (8.6) AH9- (83.) AH9-3 (8.76) AH9-4 (84.5) AH9-5 (85.3) TP9- (87.36) TP9- (85.33) (mbgs) to to Dark brown TOPSOIL Grey brown SILTY CLAY with clayey silt and fine sand seams Red brown silty sand and gravel to sandy silt and gravel (GLACIAL TILL) Weathered red brown shale BEDROCK, effective auger refusal Water encountered at. mbgs Dark brown and red brown TOPSOIL Red brown SILTY SAND and SANDY SILT with gravel, some cobbles (GLACIAL TILL) Weathered red brown shale BEDROCK, effective auger refusal Water encountered at. mbgs Dark brown TOPSOIL Weathered red brown shale BEDROCK, effective auger refusal Augerhole dry to. mbgs Dark brown to red brown TOPSOIL Red brown SANDY SILT with gravel (completely weathered shale) Moderately weathered red brown and greenish grey shale (BEDROCK) Slightly weathered red brown shale BEDROCK Augerhole dry to.5 mbgs Dark brown TOPSOIL Red brown SANDY SILT with shaley gravel (completely weathered shale) Moderately to slightly weathered red brown shale (BEDROCK) Fresh shale BEDROCK Augerhole dry to.4 mbgs Dark brown TOPSOIL Red brown silty sand and gravel, some cobbles (GLACIAL TILL) Red and greenish grey shale BEDROCK Test pit dry at. mbgs Dark brown TOPSOIL Red brown, occasional green-grey pocket, SILTY CLAY with shaley gravel (completely weathered shale) Slightly weathered shale BEDROCK Water seepage at.5 mbgs 9% water content in sample collected from. mbgs Page of 4 DRAFT
6 January AUGERHOLE (AH)/ TEST PIT (TP) NUMBER (ground surface elevation, masl) TP9-3 (87.5) TP9-4 (84.69) TP9-5 (85.6) TP9-6 (85.8) TP9-7 (8.99) TP9-8 (8.7) (mbgs) Dark brown TOPSOIL Red brown, occasional green-grey pocket, SILTY CLAY with shaley gravel (completely weathered shale) Weathered shale (BEDROCK) Fresh red brown shale BEDROCK Water seepage at. mbgs 4.6% water content in sample collected from.5 mbgs Atterberg Limits: W L =. W P = N/P Dark brown TOPSOIL Red brown, occasional green-grey pocket, SILTY CLAY with shaley gravel (completely weathered shale) Weathered red brown and greenish grey shale (BEDROCK) Becoming fresh shale BEDROCK Test pit dry at. mbgs Dark brown TOPSOIL Red brown SANDY SILT and CLAYEY SILT with shaley gravel Grey brown and red brown silty sand and gravel and cobbles (GLACIAL TILL) Fresh shale BEDROCK (some green seams) Water seepage at.9 mbgs Dark brown TOPSOIL Red brown CLAYEY SILT with shaley gravel Highly weathered shale Moderately to slightly weathered red brown and green grey shale (BEDROCK) Fresh shale BEDROCK Water seepage at.3 mbgs 9.% water content in sample collected from.7-.8 mbgs Dark brown TOPSOIL and root material Red brown SILTY CLAY with shaley gravel (completely weathered shale) Weathered red brown and green grey shale (BEDROCK) Fresh shale BEDROCK Water seepage at. mbgs Dark brown TOPSOIL Red brown, SILTY CLAY, some shaley gravel (completely weathered shale) Highly to moderately weathered red brown shale (BEDROCK) Fresh shale BEDROCK Water seepage at.95 mbgs Page of 4 DRAFT
7 January AUGERHOLE (AH)/ TEST PIT (TP) NUMBER (ground surface elevation, masl) TP9-9 (8.93) TP9- (83.8) TP9- (8.8) TP9- (8.5) TP9-3 (77.7) TP9-4 (75.49) (mbgs) Red brown sandy silt and clayey silt with shaley gravel (FILL) Dark brown TOPSOIL Greenish grey CLAYEY SILT Red brown CLAYEY SILT with shaley gravel moderate to slightly weathered shale BEDROCK Test pit dry at 3. mbgs Dark brown TOPSOIL Red brown SANDY SILT and SILTY CLAY with shaley gravel (completely weathered shale) Moderately weathered shale (BEDROCK) Slightly weathered shale BEDROCK Test pit dry at. mbgs Dark brown TOPSOIL Red brown SILT with shaley gravel (completely weathered shale) Moderately weathered shale (BEDROCK) Slightly weathered to fresh with depth red brown shale BEDROCK Test pit dry at. mbgs Dark brown TOPSOIL and sod Red brown SILTY CLAY with shaley gravel (completely weathered shale) Red brown slightly weathered shale (BEDROCK) Fresh shale BEDROCK Test pit dry at. mbgs Dark brown TOPSOIL Red brown SILTY CLAY with shaley gravel (completely weathered shale) Moderately to slightly weathered with depth, red brown and greenish grey shale (BEDROCK) Fresh shale BEDROCK Water seepage at. mbgs and Water inflow at. mbgs Dark brown TOPSOIL with organics (wet) Yellow brown SILTY FINE SAND Grey brown and red brown silty clay (WEATHERED CRUST) Red brown and red grey sandy silt and gravel, some cobbles/boulders (GLACIAL TILL) Fresh green grey siltstone/limestone BEDROCK Water seepage at.7 mbgs Water inflow at. mbgs 5.7% water content in sample collected from mbgs Atterberg Limits: W L = 46.9 W P =.6 LI =. PI = 4.3 Page 3 of 4 DRAFT
8 January AUGERHOLE (AH)/ TEST PIT (TP) NUMBER (ground surface elevation, masl) TP9-5 (74.6) TP9-6 (74.88) (mbgs) Dark brown TOPSOIL (wet) Grey brown and red brown silty clay (WEATHERED CRUST) Grey SILTY CLAY Grey sandy silt with gravel (GLACIAL TILL) Some water seepage at.5 mbgs 36.4% water content in sample collected from.6 mbgs 36.3% water content in sample collected from. mbgs Atterberg Limits: W L = 5.5 W P = 5.7 LI =.4 PI = % water content in sample collected from.7 mbgs 69.% water content in sample collected from. mbgs 65.8% water content in sample collected from.7 mbgs 7.3% water content in sample collected from 3. mbgs 87.8% water content in sample collected from 4. mbgs Dark brown TOPSOIL Yellow brown silty fine sand Grey brown and red brown silty clay (WEATHERED CRUST) Grey SILTY CLAY Grey and red brown sandy silt and gravel, some cobbles (GLACIAL TILL) Some water at.5 mbgs and Water inflow at 3.5 mbgs Page 4 of 4 DRAFT
9 GRAIN SIZE DISTRIBUTION PERCENT FINER THAN GRAIN SIZE, mm Cobble coarse fine coarse medium fine Size GRAVEL SIZE SAND SIZE SILT AND CLAY Test Pit Sample Depth 9-3. Created by: CW Project: Golder Associates Checked by: CNM
10 GRAIN SIZE DISTRIBUTION PERCENT FINER THAN GRAIN SIZE, mm Cobble coarse fine coarse medium fine Size GRAVEL SIZE SAND SIZE SILT AND CLAY Test Pit Sample Depth Created by: CW Project: Golder Associates Checked by: CNM
11 GRAIN SIZE DISTRIBUTION PERCENT FINER THAN GRAIN SIZE, mm Cobble coarse fine coarse medium fine Size GRAVEL SIZE SAND SIZE SILT AND CLAY Test Pit Sample Depth 9-5. Created by: CW Project: Golder Associates Checked by: CNM
12 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT ATTACHMENT TSD#-B- Borehole/Drillhole Logs and MOE Water Well Records TSD#-B-- NRR Site TSD#-B-- BR Site February 3 - DRAFT
13 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT ATTACHMENT TSD#-B-- Borehole/Drillhole Logs and MOE Water Well Records (NRR Site) February 3 - DRAFT
14 DRAFT
15 DRAFT
16 DRAFT
17 DRAFT
18 DRAFT
19 DRAFT
20 DRAFT
21 DRAFT
22 DRAFT
23 DRAFT
24 DRAFT
25 DRAFT
26 DRAFT
27 DRAFT
28 DRAFT
29 DRAFT
30 DRAFT
31 DRAFT
32 DRAFT
33 DRAFT
34 DRAFT
35 DRAFT
36 DRAFT
37 DRAFT
38 DRAFT
39 APPENDIX TSD#-B COMPARATIVE EVALUATION OF ALTERNATIVE SITES GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL COMPONENT ATTACHMENT TSD#-B-- CPT Logs, Borehole Logs and Grain Size Distribution (BR Site) February 3 - DRAFT
40 Golder Associates Ottawa, ON Project: CRRRC EA Eastern Ontario Location: Boundary Road Site CPT: -- Rev Total depth: 4.38 m, Date: /4/ Surface Elevation: m Coords: X: , Y:3.87 Cone Type: cm, (39) Cone Operator: Golder (D. Grylls) Norm. Norm. cone cone resistance Norm. Norm. friction ratio ratio Norm. Norm. pore pore pressure ratio ratio SBTn SBTn Index Index Norm. Norm. Soil Soil Behaviour Type Type Clay & silty clay Clay & silty clay Organic soil Clay Organic soil Organic soil Organic soil Silty sand & sandy silt Organic soil Clay & silty clay Organic soil Clay Organic soil Clay Organic soil Depth Depth Depth Depth Depth Clay Organic soil QtN Fr (%) Bq.5 7 Ic SBTn (Robertson 99) 8 SBTn legend. Sensitive fine grained. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay 5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand 9. Very stiff fine grained CPeT-IT v CPTU data presentation & interpretation software - Report created on: //3, 3::9 PM Project file: N:\Active\\5 Ottawa\-5-45 Boundary Road Ottawa\Boundary Road Project Rev.cpt
41 Golder Associates Ottawa, ON Project: CRRRC EA Eastern Ontario Location: Boundary Road Site CPT: -- Rev Total depth: 5.4 m, Date: // Surface Elevation: 77. m Coords: X: , Y: Cone Type: cm, u, (39) Cone Operator: Golder (D. Grylls) Norm. Norm. cone cone resistance 3 4 Norm. Norm. friction ratio ratio 3 4 Norm. Norm. pore pore pressure ratio ratio SBTn SBTn Index Index Norm. Norm. Soil Soil Behaviour Type Type Clay & silty clay Clay Clay & silty clay Clay 3 Organic soil Organic soil 4 Silty sand & sandy silt Clay Organic soil Silty sand & sandy silt Clay Clay Organic soil Organic soil Clay Depth Depth Depth Depth Depth Clay Organic soil Clay QtN Fr (%) Bq.5 7 Ic SBTn (Robertson 99) 8 SBTn legend. Sensitive fine grained. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay 5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand 9. Very stiff fine grained CPeT-IT v CPTU data presentation & interpretation software - Report created on: //3, 3:5:4 PM Project file: N:\Active\\5 Ottawa\-5-45 Boundary Road Ottawa\Boundary Road Project Rev.cpt
42 Golder Associates Ottawa, ON Project: CRRRC EA Eastern Ontario Location: Boundary Road Site CPT: -3- Rev Total depth: 4.76 m, Date: /9/ Surface Elevation: 76.6 m Coords: X: , Y:575.7 Cone Type: cm, u, (39) Cone Operator: Golder (D. Grylls) Norm. Norm. cone cone resistance DRILL OUT Norm. Norm. friction ratio ratio DRILL OUT Norm. Norm. pore pore pressure ratio ratio DRILL OUT SBTn SBTn Index Index Norm. Norm. Soil Soil Behaviour Type Type DRILL OUT Clay & silty clay Sand & silty sand Silty sand & sandy silt Clay Clay & silty clay Clay & silty clay Clay Clay Clay Depth Depth Depth Depth Depth Clay QtN Fr (%) Bq.5 7 Ic SBTn (Robertson 99) 8 SBTn legend. Sensitive fine grained. Organic material 3. Clay to silty clay 4. Clayey silt to silty clay 5. Silty sand to sandy silt 6. Clean sand to silty sand 7. Gravely sand to sand 8. Very stiff sand to clayey sand 9. Very stiff fine grained CPeT-IT v CPTU data presentation & interpretation software - Report created on: //3, 3:: PM Project file: N:\Active\\5 Ottawa\-5-45 Boundary Road Ottawa\Boundary Road Project Rev.cpt
43 PROJECT: LOCATION: N ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: -- BORING DATE: November 3-4, SHEET OF PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE Power Auger BORING METHOD mm Diam. (Hollow Stem) GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY Grey CLAYEY SILT, some sand Soft grey to red grey CLAY to SILTY CLAY, with silt seams STRATA PLOT SAMPLES NUMBER 3 TYPE DO DO DO BLOWS/.3m 3 4 DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING MH PIEZOMETER OR STANDPIPE INSTALLATION Grey silt layer from 3.7 m to 3.76 m 5 6 Grey SANDY SILT, with black staining Grey SILT, some clay Soft to firm red grey CLAY to SILTY CLAY, with black staining and sandy silt and sand seams - Grey sandy silt layer from 5.8 m to 5.3 m Grey silt layer from 7.6 m to 7.4 m 8 Electric Nilcon 9 - Grey clayey silt layer from 8.94 m to 9.7 m OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Stiff grey and red CLAY to SILTY CLAY, with black staining CONTINUED NEXT PAGE >39 LOGGED: CHECKED: DG SAT
44 PROJECT: LOCATION: N ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: -- BORING DATE: November 3-4, SHEET OF PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD SOIL PROFILE STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION CONTINUED FROM PREVIOUS PAGE --- Stiff grey and red CLAY to SILTY CLAY, with black staining > Electric Nilcon >64 3 Stiff to very stiff grey CLAY to SILTY CLAY, with black staining OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 End of Borehole Note:. Soil stratigraphy inferred from various soil sampling methods and CPT.. Vane pushed to 7 m depth. Rod friction too high to carry out test LOGGED: CHECKED: DG SAT
45 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: November 5-9, SHEET OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY Grey CLAYEY SILT, some sand Soft grey to red grey CLAY to SILTY CLAY, with silt seams STRATA PLOT SAMPLES NUMBER TYPE 73 TP BLOWS/.3m PH DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 4 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Protective Casing Grey silt layer from 3.7 m to 3.76 m 5 6 Grey SANDY SILT, with black staining Grey SILT, some clay Soft to firm red grey CLAY to SILTY CLAY, with black staining and sandy silt and sand seams - Grey sandy silt layer from 5.8 m to 5.3 m TP PH 7 8 Wash Boring HW Casing - Grey silt layer from 7.6 m to 7.4 m 76 mm Diam. PVC Casing Bentonite-Cement Grout 9 - Grey clayey silt layer from 8.94 m to 9.7 m 3 73 TP PH OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Stiff grey and red CLAY to SILTY CLAY, with black staining CONTINUED NEXT PAGE TP PH LOGGED: CHECKED: DG SAT
46 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: November 5-9, SHEET OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD SOIL PROFILE STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION CONTINUED FROM PREVIOUS PAGE --- Stiff grey and red CLAY to SILTY CLAY, with black staining TP PH TP PH 3 Wash Boring HW Casing Stiff to very stiff grey CLAY to SILTY CLAY, with black staining mm Diam. PVC Casing Bentonite-Cement Grout DO DO WH WR 6 9 DO WR OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE 3 4 DO DO DO DO DO WR WR WR WR WR LOGGED: CHECKED: DG SAT
47 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: November 5-9, SHEET 3 OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD SOIL PROFILE STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION CONTINUED FROM PREVIOUS PAGE --- Stiff to very stiff grey CLAY to SILTY CLAY, with black staining 4 WR DO 3 5 DO WR 6 DO WR 3 7 DO WR 33 8 DO WR 34 9 DO WR DO WR Wash Boring HW Casing Dense to very dense grey SILTY SAND, some gravel, trace clay, with cobbles and boulders (GLACIAL TILL) DO DO WR DO DO DO DO HQ RC > DD MH 76 mm Diam. PVC Casing Bentonite-Cement Grout 39 8 DO > OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Borehole continued on RECORD OF DRILLHOLE --3 Note:. Soil stratigraphy inferred from various soil sampling methods and CPT.. Different stratigraphy relative to borehole LOGGED: CHECKED: DG SAT
48 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3 DRILLING DATE: November 5-9, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES BEDROCK SURFACE CARLSBAD FORMATION,.6 m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds JN,, JN,, 4 JN,, Rotary Drill HQ Core 76 mm Diam. PVC Casing Bentonite-Cement Grout JN,, JN,, JN,, CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE VN,, JN,, JN,, JN,, LOGGED: DG CHECKED: SAT
49 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3 DRILLING DATE: November 5-9, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES --- CONTINUED FROM PREVIOUS PAGE --- CARLSBAD FORMATION,.6 m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds JN,, JN,, Rotary Drill HQ Core mm Diam. PVC Casing Bentonite-Cement Grout JN,, CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE LOGGED: CHECKED: DG SAT
50 PROJECT: LOCATION: N 3.44 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3 DRILLING DATE: November 5-9, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET 3 OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES --- CONTINUED FROM PREVIOUS PAGE --- CARLSBAD FORMATION,.6 m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds Rotary Drill HQ Core 76 mm Diam. PVC Casing Bentonite-Cement Grout 4 46 JN,, VN,, CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : End of Drillhole JN,, JN,, LOGGED: CHECKED: DG SAT
51 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --3- BORING DATE: November 3, SHEET OF 3 SCALE BORING METHOD GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY Grey CLAYEY SILT, some sand Soft grey to red grey CLAY to SILTY CLAY, with silt seams STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Protective Casing MON. WELL Grey silt layer from 3.7 m to 3.76 m 5 6 Grey SANDY SILT, with black staining Grey SILT, some clay Soft to firm red grey CLAY to SILTY CLAY, with black staining and sandy silt and sand seams - Grey sandy silt layer from 5.8 m to 5.3 m Rotary Drill HQ Core - Grey silt layer from 7.6 m to 7.4 m Bentonite-Cement Grout Grey clayey silt layer from 8.94 m to 9.7 m OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Stiff grey and red CLAY to SILTY CLAY, with black staining CONTINUED NEXT PAGE LOGGED: CHECKED: DG SAT
52 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --3- BORING DATE: November 3, SHEET OF 3 SCALE 5 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Stiff grey and red CLAY to SILTY CLAY, with black staining STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION MON. WELL Rotary Drill HQ Core Stiff to very stiff grey CLAY to SILTY CLAY, with black staining Bentonite-Cement Grout OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE LOGGED: CHECKED: DG SAT
53 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --3- BORING DATE: November 3, SHEET 3 OF 3 SCALE 3 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Stiff to very stiff grey CLAY to SILTY CLAY, with black staining STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION MON. WELL Rotary Drill HQ Core Bentonite-Cement Grout 36 Dense to very dense grey SILTY SAND, some gravel, trace clay, with cobbles and boulders (GLACIAL TILL) Borehole continued on RECORD OF DRILLHOLE --3. Note:. Soil stratigraphy inferred from various soil sampling methods and CPT.. Different stratigraphy relative to borehole OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 LOGGED: CHECKED: DG SAT
54 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3- DRILLING DATE: November 3, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES BEDROCK SURFACE CARLSBAD FORMATION, m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds JN,, Peltonite Seal MON. WELL JN,, Silica Sand JN,, Rotary Drill HQ Core JN,, JN,, 4 mm Diam. PVC # Slot Screen JN,, CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE JN,, JN,, JN,, JN,, LOGGED: DG CHECKED: SAT
55 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3- DRILLING DATE: November 3, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES --- CONTINUED FROM PREVIOUS PAGE --- CARLSBAD FORMATION, m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds. MON. WELL JN,, Rotary Drill HQ Core mm Diam. PVC # Slot Screen JN,, CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE JN,, LOGGED: CHECKED: DG SAT
56 PROJECT: LOCATION: N 3.53 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3- DRILLING DATE: November 3, DRILL RIG: CME 8 DRILLING CONTRACTOR: Marathon Drilling SHEET 3 OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % --- CONTINUED FROM PREVIOUS PAGE --- CARLSBAD FORMATION, m to m Fresh, very thinly to thinly interbedded sequence of dark grey to black slake susceptible SHALE, CALCAREOUS SHALE, SHALEY LIMESTONE and LIMESTONE with occasional bioclastic limestone beds JN,, mm Diam. PVC # Slot Screen Rotary Drill HQ Core 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES 44 MON. WELL JN,, 4 JN,, 45 Silica Sand CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : End of Drillhole LOGGED: CHECKED: DG SAT
57 PROJECT: LOCATION: N 99.8 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --4 BORING DATE: November 6, SHEET OF 3 SCALE BORING METHOD GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY Grey CLAYEY SILT, some sand Soft grey to red grey CLAY to SILTY CLAY, with silt seams STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Protective Casing Bentonite Seal 'B' 'A' Grey silt layer from 3.7 m to 3.76 m 5 6 Grey SANDY SILT, with black staining Grey SILT, some clay Soft to firm red grey CLAY to SILTY CLAY, with black staining and sandy silt and sand seams - Grey sandy silt layer from 5.8 m to 5.3 m Wash Boring HW Casing - Grey silt layer from 7.6 m to 7.4 m Bentonite-Cement Grout 9 - Grey clayey silt layer from 8.94 m to 9.7 m OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Stiff grey and red CLAY to SILTY CLAY, with black staining CONTINUED NEXT PAGE LOGGED: CHECKED: DG SAT
58 PROJECT: LOCATION: N 99.8 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --4 BORING DATE: November 6, SHEET OF 3 SCALE 5 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Stiff grey and red CLAY to SILTY CLAY, with black staining STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION 'B' 'A' Bentonite-Cement Grout 3 Wash Boring HW Casing Stiff to very stiff grey CLAY to SILTY CLAY, with black staining Peltonite OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE Silica Sand 5 mm Diam. PVC # Slot Screen 'B' LOGGED: DG CHECKED: SAT
59 PROJECT: LOCATION: N 99.8 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --4 BORING DATE: November 6, SHEET 3 OF 3 SCALE 3 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Stiff to very stiff grey CLAY to SILTY CLAY, with black staining STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING Silica Sand PIEZOMETER OR STANDPIPE INSTALLATION 'B' 'A' 3 3 Bentonite Seal Wash Boring HW Casing Peltonite 36 Dense to very dense grey SILTY SAND, some gravel, trace clay, with cobbles and boulders (GLACIAL TILL) Silica Sand mm Diam. PVC # Slot Screen 'A' 39 Silica Sand End of Borehole Peltonite 4 Note:. Soil stratigraphy inferred from various soil sampling methods and CPT.. Different stratigraphy relative to borehole --7. OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 LOGGED: CHECKED: DG SAT
60 PROJECT: LOCATION: N 3.64 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --5 BORING DATE: November 9, SHEET OF SCALE BORING METHOD GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY Grey CLAYEY SILT, some sand Soft grey to red grey CLAY to SILTY CLAY, with silt seams STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Protective Casing Bentonite Seal 'B' 'A' Grey silt layer from 3.7 m to 3.76 m Silica Sand 5 6 Grey SANDY SILT, with black staining Grey SILT, some clay Soft to firm red grey CLAY to SILTY CLAY, with black staining and sandy silt and sand seams - Grey sandy silt layer from 5.8 m to 5.3 m mm Diam. PVC # Slot Screen 'B' Silica Sand 7 8 Power Auger mm Diam. (Hollow Stem) - Grey silt layer from 7.6 m to 7.4 m 9 - Grey clayey silt layer from 8.94 m to 9.7 m Bentonite Seal OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 Stiff grey and red CLAY to SILTY CLAY, with black staining CONTINUED NEXT PAGE Silica Sand 5 mm Diam. PVC # Slot Screen 'A' LOGGED: DG CHECKED: SAT
61 PROJECT: LOCATION: N 3.64 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --5 BORING DATE: November 9, SHEET OF SCALE 5 BORING METHOD End of Borehole SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING Silica Sand PIEZOMETER OR STANDPIPE INSTALLATION 'B' 'A' 6 Note: Soil stratigraphy inferred from various soil sampling methods and CPT OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 LOGGED: CHECKED: DG SAT
62 PROJECT: LOCATION: N ;E INCLINATION: -9 AZIMUTH: --- RECORD OF BOREHOLE: --6 BORING DATE: November 9, SHEET OF SCALE Power Auger BORING METHOD mm Diam. (HS) GROUND SURFACE SOIL PROFILE TOPSOIL Very loose brown SILTY SAND to SAND, some silt and clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Grey brown SAND, some silt, trace clay Stiff red brown SILTY CLAY, with sand seams (Weathered Crust) Soft grey to red grey SILTY CLAY End of Borehole STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING Protective Casing Bentonite Seal Silica Sand PIEZOMETER OR STANDPIPE INSTALLATION mm Diam. PVC # Slot Screen MON. WELL Note: Soil stratigraphy inferred from various soil sampling methods and CPT OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 LOGGED: CHECKED: DG SAT
63 PROJECT: LOCATION: N 9.4 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: -- BORING DATE: December 9, SHEET OF PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE Power Auger BORING METHOD mm Diam. (Hollow Stem) GROUND SURFACE SOIL PROFILE TOPSOIL/PEAT Very loose to loose grey brown SILTY SAND Red brown SILTY CLAY, with sand seams (Weathered Crust) CLAY to SILTY CLAY STRATA PLOT SAMPLES NUMBER 3 TYPE DO DO DO BLOWS/.3m 6 WH DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION 3 4 Grey brown SANDY SILT, trace to some clay Firm red grey SILTY CLAY, with sand seams - Sand layer from.4 m to.46 m Grey SAND, some silt, trace clay, with black staining Soft to firm red grey CLAY to SILTY CLAY, with silt seams Grey silt layer from 4.47 m to 4. m Electric Nilcon - Silt layer from 6.53 m to 6.6 m - Silt layer from 6.65 m to 6.68 m SILTY SAND, trace clay, with black staining Grey CLAYEY SILT Soft to firm red grey to grey CLAY to SILTY CLAY, with black staining and silt seams OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE LOGGED: CHECKED: DG SAT
64 PROJECT: LOCATION: N 9.4 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: -- BORING DATE: December 9, SHEET OF PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD SOIL PROFILE STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION CONTINUED FROM PREVIOUS PAGE --- Soft to firm red grey to grey CLAY to SILTY CLAY, with black staining and silt seams 6 7 Firm to stiff grey CLAY to SILTY CLAY, with black staining Electric Nilcon > Very stiff dark grey CLAY to SILTY CLAY, with black staining OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 End of Borehole Note:. Soil stratigraphy inferred from various soil sampling methods and CPT.. Vane pushed to 6.75 m depth LOGGED: CHECKED: DG SAT
65 PROJECT: LOCATION: N 94.5 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: January 7-4, 3 SHEET OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE BORING METHOD GROUND SURFACE SOIL PROFILE TOPSOIL/PEAT Very loose to loose grey brown SILTY SAND STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION Protective Casing MON. WELL Red brown SILTY CLAY, with sand seams (Weathered Crust) CLAY to SILTY CLAY Grey brown SANDY SILT, trace to some clay Firm red grey SILTY CLAY, with sand seams - Sand layer from.4 m to.46 m Grey SAND, some silt, trace clay, with black staining Soft to firm red grey CLAY to SILTY CLAY, with silt seams Grey silt layer from 4.47 m to 4. m 73 TP PH Wash Boring HW Casing - Silt layer from 6.53 m to 6.6 m - Silt layer from 6.65 m to 6.68 m SILTY SAND, trace clay, with black staining Grey CLAYEY SILT Soft to firm red grey to grey CLAY to SILTY CLAY, with black staining and silt seams Bentonite-Cement Grout 73 TP PH TP PH OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE 4 73 TP PH LOGGED: CHECKED: DG SAT
66 PROJECT: LOCATION: N 94.5 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: January 7-4, 3 SHEET OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE 5 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Soft to firm red grey to grey CLAY to SILTY CLAY, with black staining and silt seams STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION MON. WELL 6 7 Firm to stiff grey CLAY to SILTY CLAY, with black staining TP PH Wash Boring HW Casing Bentonite-Cement Grout TP PH 5 6 Very stiff dark grey CLAY to SILTY CLAY, with black staining OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 CONTINUED NEXT PAGE 7 DO 4 LOGGED: CHECKED: DG SAT
67 PROJECT: LOCATION: N 94.5 ;E INCLINATION: -9 AZIMUTH: --- SAMPLER HAMMER, 64kg; DROP, 7mm RECORD OF BOREHOLE: --3 BORING DATE: January 7-4, 3 SHEET 3 OF 3 PENETRATION TEST HAMMER, 64kg; DROP, 7mm SCALE 3 BORING METHOD SOIL PROFILE --- CONTINUED FROM PREVIOUS PAGE --- Very stiff dark grey CLAY to SILTY CLAY, with black staining STRATA PLOT SAMPLES NUMBER TYPE BLOWS/.3m DYNAMIC PENETRATION RESISTANCE, BLOWS/.3m 8 SHEAR STRENGTH Cu, kpa nat V. rem V. 8 Q - U - HYDRAULIC CONDUCTIVITY, k, cm/s WATER CONTENT PERCENT Wp W Wl 8 ADDITIONAL LAB. TESTING PIEZOMETER OR STANDPIPE INSTALLATION MON. WELL TP PH Wash Boring HW Casing Grey brown SILTY SAND Grey SANDY SILT Dark grey and brown SILTY CLAY Compact to very dense grey SAND and SILT, some gravel, trace clay (GLACIAL TILL) DO DO DO 7 6 Bentonite-Cement Grout 36 DO Borehole continued on RECORD OF DRILLHOLE --3. Peltonite Note: Soil stratigraphy inferred from various soil sampling methods and CPT OLRT-SOIL 45.GPJ GAL-MIS.GDT /3/3 JM SCALE : 75 LOGGED: CHECKED: DG SAT
68 PROJECT: LOCATION: N 94.5 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3 DRILLING DATE: January 7-4, 3 DRILL RIG: CME 55 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES 37 BEDROCK SURFACE CARLSBAD FORMATION, m to 4.95 m Fresh, medium grey, fine to medium grained crystalline, non-porous, thinly to medium bedded LIMESTONE with fine argillaceous partings, occasional bioclastic and lithoclastic beds and black slake susceptible shale partings.5-5. cm thick. Shale and calcareous shale comprises approximately % of section JN,, BD,, BD,, Peltonite MON. WELL BD,, BD,, Silica Sand BD,, 37.5 BD,, Rotary Drill HQ Core JN,, BD,, 63 mm Diam. PVC # Slot Screen CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE JN,, BD,, BD,, LOGGED: DG CHECKED: SAT
69 PROJECT: LOCATION: N 94.5 ;E INCLINATION: -9 AZIMUTH: --- RECORD OF DRILLHOLE: --3 DRILLING DATE: January 7-4, 3 DRILL RIG: CME 55 DRILLING CONTRACTOR: Marathon Drilling SHEET OF 3 SCALE DRILLING RECORD SYMBOLIC LOG RUN No. FLUSH RETURN JN - Joint FLT - Fault SH - Shear VN - Vein CJ - Conjugate RECOVERY TOTAL CORE % 8 SOLID CORE % 8 R.Q.D. % 8 BD- Bedding FO- Foliation CO- Contact OR- Orthogonal CL - Clean FRACT. INDEX DIP w.r.t. PER CORE.5m AXIS PL - Planar CU- Curved UN- Undulating ST - Stepped IR - Irregular DISCONTINUITY DATA TYPE AND SURFACE PO- Polished BR - Broken Rock K - Slickensided NOTE: For additional SM- Smooth abbreviations refer to list RO- Rough of abbreviations & MB- Mechanical Break symbols. Jcon Jr HYDRAULIC CONDUCTIVITY K, cm/sec Ja WEATH- ERING INDEX W W W3 W4 W5 W6 NOTES CONTINUED FROM PREVIOUS PAGE --- CARLSBAD FORMATION, m to 4.95 m Fresh, medium grey, fine to medium grained crystalline, non-porous, thinly to medium bedded LIMESTONE with fine argillaceous partings, occasional bioclastic and lithoclastic beds and black slake susceptible shale partings.5-5. cm thick. Shale and calcareous shale comprises approximately % of section BD,, JN,, MON. WELL JN,, Rotary Drill HQ Core BD,, 63 mm Diam. PVC # Slot Screen CRRRC-ROCK 45.GPJ GAL-MISS.GDT /3/3 JM SCALE : CONTINUED NEXT PAGE JN,, BD,, JN,, LOGGED: CHECKED: DG SAT
VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE
VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPT CAPITAL REGION RESOURCE RECOVERY CENTRE APPENDIX A Borehole Records December Report No. //vol III LIST OF ABBREVIATIONS The abbreviations coonly employed
More informationGeneral. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation
DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM
More informationTECHNICAL SUPPORT DOCUMENT # 1 COMPARATIVE EVALUATION OF ALTERNATIVE SITES APPENDIX TSD#1-H. Design & Operations Component
TECHNICAL SUPPORT DOCUMENT # 1 COMPARATIVE EVALUATION OF ALTERNATIVE SITES APPENDIX TSD#1-H Design & Operations Component February 2013 February 2013 Design & Operations Component Appendix TSD#1-H COMPARATIVE
More informationDescription of Project and Site
DATE May, 0 PROJECT No. 09 TO Bob Wingate, P.Eng. IBI Group FROM Stephen Dunlop, P.Eng. EMAIL stdunlop@golder.com PRELIMINARY GEOTECHNICAL AND HYDROGEOLOGICAL INVESTIGATION (REV.) PROPOSED STORMWATER MANAGEMENT
More informationAPPENDIX A. Borehole Logs Explanation of Terms and Symbols
APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation
More informationProject: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major
More informationHydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)
TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top
More informationAPPENDIX C HYDROGEOLOGIC INVESTIGATION
Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT
More informationpatersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01
patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade
More informationAPPENDIX C. Borehole Data
APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL
More informationDepth (ft) USCS Soil Description TOPSOIL & FOREST DUFF
Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,
More informationAppendix A. Producer Statement Advisory Note
Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer
More informationBoreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.
Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground
More informationLake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council
Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole
More informationLEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road
LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION
More informationGeotechnical Data Report
Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road
More informationHydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.
February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION
More informationGEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane
May, 0 GEOTECHNICAL INVESTIGATION Proposed Douglas Street Bus Lane Submitted to: Greg Smith P.Eng. Senior Transportation Engineer Urban Systems Ltd. 0- Homer Street Vancouver, BC V6B W9 REPORT Report Number:
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More information10. GEOTECHNICAL EXPLORATION PROGRAM
Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in
More informationChapter 12 Subsurface Exploration
Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface
More informationThe process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper
More informationpatersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.
Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson
More informationB-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.
N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232
More informationENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods
ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design
More informationGotechnical Investigations and Sampling
Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of
More informationTerraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing
Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront
More informationAPPENDIX A GEOTECHNICAL REPORT
The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE
More informationSOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More informationDRILL HOLE # BH-BGC13-FN-01
DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,
More informationField Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:
March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin
More informationUAS Student Residence
General Notes, Abbreviations and Symbols C100 MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101 MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102 DEPTH(FT.) 5 FROZEN
More informationDATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS
DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,
More informationSLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO
SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900
More informationGeotechnical Investigation
Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro
More informationGroundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.
Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting
More informationSoil Behaviour Type from the CPT: an update
Soil Behaviour Type from the CPT: an update P.K. Robertson Gregg Drilling & Testing Inc., Signal Hill, California, USA ABSTRACT: One of the most common applications of CPT results is to evaluate soil type
More informationLog of Monitoring Well D58B
Project: Motiva - Monitoring Well and Soil Boring Data Project Location: Delaware City Refinery Project Number: 20240412.W1000 Log of Monitoring Well D58B Sheet 1 of 7 Date(s) Drilled Drilling Method Drill
More informationAppendix J. Geological Investigation
Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF
More informationGEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.
Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,
More informationPreliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky
Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation
More informationReference No S072 APRIL 2012
A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION
More informationProject No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD
Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationPRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts
More informationREPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:
REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED
More informationSUMMARY REPORT ON GROUND INVESTIGATIONS AT WALSHESTOWN PIT CO. KILDARE. Submitted to:
Golder Associates Ireland Town Centre House, Dublin Road, Naas, Co. Kildare, Ireland Tel: [353] (0)45 874411 Fax: [353] (0)45 874549 E-mail: info@golder.ie http://www.golder.com SUMMARY REPORT ON GROUND
More informationATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY
ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com
More informationADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON
F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared
More informationCivil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx
2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt
More informationSite Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE
August 14, 2017 Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE Gregory.Raines@Stantec.com Develop Preliminary Geologic / Geotech Conceptual Model for the Project
More informationCPT: Geopractica Contracting (Pty) Ltd Total depth: m, Date:
The plot below presents the cross correlation coeficient between the raw qc and fs values (as measured on the field). X axes presents the lag distance (one lag is the distance between two sucessive CPT
More informationGZA GeoEnvironmental, Inc.
GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring
More informationMinnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)
This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was
More information16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN
16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested
More informationFrom - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00
Závěrka 12,Praha 6,169 00 Log of Boring BH1 Project ID: 2018_A-017 Annex no.: A.1G Drilling equipment: Hütte 202 TF Location: Prague 12 Overall depth: 2 m Borehole position: Date start: 22.11.2017 Foreman:
More informationGeotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario
Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to:
More informationPLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.
611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po
More informationCONQUEST ENGINEERING LTD.
CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7
More informationSafe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal
Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along
More informationAppendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING
Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation
More informationPhoto 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking
More informationpatersongroup memorandum 1.0 Field Investigation consulting engineers
consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential
More informationREPORT OF SUBSURFACE EXPLORATION
REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON
More informationGeotechnical Engineering Report
Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.
More information3.0 SUMMARY OF FINDINGS
AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,
More informationA. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1
Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating
More informationGeology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.
Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating
More informationReport of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011
11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -
More informationpatersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive
patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse
More informationLEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW
PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES
More informationCone Penetration Testing in Geotechnical Practice
Cone Penetration Testing in Geotechnical Practice Table Of Contents: LIST OF CONTENTS v (4) PREFACE ix (2) ACKNOWLEDGEMENTS xi (1) SYMBOL LIST xii (4) CONVERSION FACTORS xvi (6) GLOSSARY xxii 1. INTRODUCTION
More informationUnderground Risk Management Course Marina Del Rey, California November, Geotechnical Data Reports. Greg Raines, PE
Underground Risk Management Course Marina Del Rey, California November, 2018 Geotechnical Data Reports Greg Raines, PE Gregory.Raines@Stantec.com Introduction What is a Geotechnical Data Report? The GDR
More informationFINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL. File No:
FINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL File No: 6847 Prepared for: Harbourside Engineering Consultants 9 Waverly Road, Suite Dartmouth
More informationLEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW
PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.
More informationREPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report
REPORT Housing Re-Zone Middle Road and Iona Road - Geotechnical Investigation Report Prepared for Hastings istrict Council Prepared by Tonkin & Taylor Ltd ate April 06 Job Number 464.000 istribution: Hastings
More informationIN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION
IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity
More informationREPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION
June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION Site Plan Application Pace Redevelopment Stouffville, Ontario Submitted to: Mr. Terry Chapman Pace Savings & Credit Union Limited 8111 Jane Street, Unit
More informationCPT Data Interpretation Theory Manual
CPT Data Interpretation Theory Manual 2016 Rocscience Inc. Table of Contents 1 Introduction... 3 2 Soil Parameter Interpretation... 5 3 Soil Profiling... 11 3.1 Non-Normalized SBT Charts... 11 3.2 Normalized
More informationAppendix 1 MONITORING BORE LOGS
Appendix 1 MONITORING BORE LOGS Level 2, Mallon St, Bowen Hills, Queensland GCQ-MB1 GDA94 Z6 ~62m AHD 8 Aug 212 467 me, 688923 mn Lithologic Description GCQ-MB1 Bore Description TOPSOIL: silty sand, dark
More informationSITE INVESTIGATION 1
SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.
More informationSCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a
Lecture-5 Soil Exploration Dr. Attaullah Shah 1 Today s Lecture Purpose of Soil Exploration Different methods 1. Test trenches and Pits 2. Auger and Wash Boring 3. Rotary Drilling 4. Geophysical Methods
More informationTechnical Memorandum. Soil Borings
Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:
More informationCITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014
CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a
More informationAN EMPLOYEE OWNED COMPANY
CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection
More informationSlope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02
REPORT August 2014 REPORT ON Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Submitted to: DCR Phoenix Homes 18 Bentley Avenue Ottawa, Ontario K2E 6T8 Report
More informationGeotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project
TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482
More informationSuperficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m):
Superficial Geology Superficial Deposits are the youngest geological deposits formed during the most recent period of geological time, the Quaternary, which extends back about 1.8 million years from the
More informationDATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter
ATTACHMENT 2 Page 1 of 1 B1 0 1 2 FILL, Dry; brownish red; clayey silt and gravel; ~30% gravel size fragments of dark grey microcrystalline (aphanetic), extrusive, igneous, rock 3 B1-4a 1100 B1-4b-duplicate
More informationSoil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.
Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive
More informationMinnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)
This Cone Penetration Test (CPT) Sounding follows ASTM D 778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was
More informationEarthquake Commission. Darfield Earthquake Recovery Geotechnical Factual Report Avondale
REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report Avondale REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report Avondale Report prepared
More informationPierce County Department of Planning and Land Services Development Engineering Section
Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT
More informationHydrogeological Investigation and Modelling Study - Proposed Crains Pit and Quarry Township of Goulbourn, City of Ottawa, Ontario
Hydrogeological Investigation and Modelling Study - Proposed Crains Pit and Quarry Township of Goulbourn, City of Ottawa, Ontario Revision: 0 (Final) Prepared for: Crains Construction Ltd. 1800 Maberly-Elphin
More informationAppendix D: Subsurface Investigation
Independent Expert Engineering Investigation and Review Panel Report on Mount Polley Tailings Storage Facility Breach Appendix D: Subsurface Investigation January 30, 2015 Report on Mount Polley Tailings
More informationDecember 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.
December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset
More informationREPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs
REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual