1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan September 28, Date of General Notice: August 10, Period covered by this procurement plan: The procurement period of project covered from year June 2016 to December II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Method Review Threshold 1. ICB and LIB (Goods) All 2. NCB (Goods) Above 2,000, ICB (Works) All 4. NCB (Works) Above 10,000, Pre-qualification. Not applicable. Comments 3. Reference to (if any) Project Operational/ Manual: January 28, Any Other Special Arrangement: None 5. Summary of the Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Ref. Description Packages Domestic Review Comments No. Cost million Preference (yes/no) by Bank ( / ) 1 Summary of the No ICB (Works) 2 Summary of the NCB (Works) No / III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: March 29, 2017 Method Review Threshold Comments 1. Competitive Methods (Firms) Above 1,000, Single Source (Firms) For SSS, USD50,000 (Para 3.9 of Guidelines,

2 January 2011) and all other SSS contracts. 3. Individual Individuals USD 0.3 million; and for essential assignments (procurement / legal consultant). For SSS, USD20,000 (Para 5.6 of Guidelines, January 2011) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: Not applicable. 4. Consultancy Assignments with Methods and Time Schedule Ref. No. Description of Assignment Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Cost million Packages Review by Bank ( / ) Comments QCBS / CQS/IC March 29, 2017

3 Page 1 PROCUREMENT PLAN Vietnam : Can Tho Urban Development and Resilience General Information Country: Vietnam Banks Approval Date of the Original Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P GPN Date: Project Name: Can Tho Urban Development and Resilience Loan / Credit No:,, TF / A3723 Executing Agency(ies): Can Tho PMU for ODA funded Construction and Investment Projects WORKS Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CT3 PW 1 7 / Construction of tide sluice gates on route connection with Cach Mang Thang 8 Street to Provincial road 918 6,041, ,931, Under CT3 PW 2 1 / Construction of Quang Trung Bridge, module 2 and extension of the span of module 1 and reinforcement of existing bridge, lighting system and architecture rehabilitation of the Quang Trung Bridge, approach roads at the both sides of the Bridge 16,872, ,684, Signed CT3 PW 2 3 / Construction of the parallel road form Tran Hoang Na street to the IC3 intersection and approach road from intersection to the bus station including the intersection with NH1A 8,081, ,441, Signed CT3 PW 2 7 / Construction An Binh Resettlement Site for Phase 1 5,471, CT3 PW 2 2 / Construction of Tran Hoang Na road from Nguyen Van Cu road to Tran Hoang Na Bridge. 10,927, ,445, Signed CT3 PW 2 5 / Construction of Provincial road ,012, Canceled CT3 PW 2 6 / Construction of Provincial road 918: road from intersection of Vo Van Kiet Road to Provincial road 918 (Km Km ). 12,502, Under CT3 PW 1 1 / Construction of the Can Tho River Revetment from Km 0+00 to Km ,121, CT3 PW 1 2 / Construction of the Can Tho River Revetment, road at the rear of revetment from Km to Km ,319, CT3 PW 1 5 / Construction of Dau Sau Water Lock 6,659, CT3 PW 1 6 / Construction of tide sluice gates on route at the rear of Can Tho River revetment 2,385, CT3 PW 1 8 / Construction of Cai Khe Water Lock 12,768, CT3 PW 1 9 / Construction of Hang Bang Water Lock 6,762, CT3 PW 1 10 / Improving and upgrading the infrastructure of Hoang Quoc Viet Street 6,528, CT3 PW 1 11 / Improving Water Drainage system at Central area in Ninh Kieu District 7,812, CT3 PW 2 4 / Construction of Bridge over Can Tho River connection Tran Hoang Na Road with approaching road of Can Tho Bridge. Request for Bids Open - International 33,107, CT3 PW 2 5 / Construction of Provincial road 918: road from CMT8 Street to intersection of Vo Van Kiet Road (Km Km1+820). 9,243, CT3 PW 1 3 / Construction of the Can Tho River Revetment from km 3+00 to end of route 9,932,

4 Page 2 CT3 PW 1 4 / Construction of the park at the rear of Can Tho River Revetment 2,846, Canceled GOODS Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / NON CONSULTING SERVICES Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CONSULTING FIRMS Contract Type Amount () () Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract CT3 CS TV03 / Construction supervision and contract management for of Resettlement area phase 1 (CT3- PW-2.7) Open - National 175, CT3 CS TV01 / Construction management for packages under Component 1 (Can Tho River Revetment: CT3- PW-1.1, CT3-PW-1.2, CT3-PW- 1.3, CT3-PW-1.4, CT3-PW-1.5, CT3-PW-1.6, CT3-PW-1.8 and CT3-PW-1.9) Based Open - International 3,804, Under Review CT3 CS TV05 / Independent consultant for monitoring environment on project Under Open - National 200, CT3 CS TV07 / Independent for auditing Open - National 250, Under CT3 CS TV11 / Construction management for packages of Improving and upgrading the infrastructure of Hoang Quoc Viet Street and Improving Water Drainage system at Central area in Ninh Kieu District: CT3-PW-1.10, CT3- PW Open - National 295, CT3 CS TV12 / Assistant technical (TA) for doing Bidding documents and Bid evaluation for all packages under the procurement plan for the first 18 months and Bidding documents for Phase 2 Open - National 280, Under CT3 CS TV02 / Construction management for packages under Component 2 and tide sluice gates on route connection with Cach Mang Thang 8 Street to Provincial road 918 (CT3-PW-2.1, CT3-PW-2.2, CT3-PW-2.3, CT3-PW-2.4, CT3- PW-2.5 and CT3-P Based Under Open - International 3,381, ,824, CT3 CS TV06 / Independent consultant for resettlement supervision on project Open - National 150, CT3 CS TV13 / of communication on the project. Open - National 94, CT3-CS-TV08 / Establishing Flood Risk Management TF / A3723 Information System (FRMIS) for can Tho City Based Open - International 1,700, CT3-CS-TV10 / Spatial Planning Platform (SPP) TF / A3723 Based Open - International 1,634, CT3-CS-TV14 / Consultancy Service for the Design, Development and of Integrated Social Assistance (ISA) System Open - National 267,

5 Page 3 CT3 CS TV04 / Consulting service for monitoring and evaluation on implementation of project Consultancy Open - National 150, Canceled CT3-CS-TV09 / Sustainable Urban Public Transport & Central Area Traffic Management Study for Can Tho City Based Open - International 475, CT3-CS-TV15 / Consulting Service to carry out a Geo- Referenced Households Vulnerability Survey and data update against Flood in Can Tho City Based Open - National 295, INDIVIDUAL CONSULTANTS Contract Type Amount () () Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project I. General Plan Mozambique: P125120 - Greater Maputo Water Supply Expansion Project 1. Bank s approval Date of the procurement Plan 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

Procurement Plan for ETLP (P156590)

Procurement Plan for ETLP (P156590) I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered

More information

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan for Eth Expressway Project ( P148850) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan for Eth Expressway Project ( P148850) 1. Bank s approval Date of the

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:

More information

Prior Review Thresholds

Prior Review Thresholds I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Type of Method Review Thresholds

More information

Procurement Plan for Project of Integrated Urban and Tourism Development

Procurement Plan for Project of Integrated Urban and Tourism Development Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan for Project of Integrated Urban and Tourism Development I. General 1.

More information

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan I. General Urban Productive Safety Net Project (UPSNP) Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Notice: August 20, 2016 4. Period covered by this procurement

More information

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073) I. General Liberia Additional REDD+ Readiness Preparation Support Plan (P124073) 1. Bank s approval Date of the procurement Plan: revised version on. 2. Date of General Notice: October 8, 2013 3. Period

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan for Ghana Transport Sector Improvement Project (P151026) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan for Ghana Transport Sector Improvement Project (P151026) I. General 1. Bank s approval

More information

Procurement Plan. I. General

Procurement Plan. I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan [Original: July 2013]:

More information

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018 I. General Plan 1. Bank s approval Date of the procurement Plan. Original: 23 November 2016; Revision 2 of Updated Plan, 18 April 2017 2. Date of General Notice:. 3. Period covered by this procurement

More information

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 I. GENERAL II. REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT

More information

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan. Nepal Livestock Sector Innovation Project I. General Plan Nepal Livestock Sector Innovation Project 1. Bank s approval Date of the procurement Plan: February 14, 2018 2. Date of General Notice: 3. Period covered by this procurement plan: 18 months

More information

UNITED REPUBLIC OF TANZANIA. Procurement Plan

UNITED REPUBLIC OF TANZANIA. Procurement Plan Public Disclosure Authorized General UNITED REPUBLIC OF TANZANIA Procurement Plan 1. Project information: Government of Tanzania. Southern Agricultural Growth Corridor of Tanzania (SAGCOT) P125728 2. Project

More information

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan (Text in italic font is meant for instruction to staff and should be deleted in

More information

Sample Procurement Plan

Sample Procurement Plan I. General Sample Plan PROJET DE RENFORCEMENT DE CAPACITE EN STATISTIQUE CREDIT V0450-001 1. Bank s approval Date of the procurement Plan: 21 avril 2017 2. Date of General Notice : 3. Period covered by

More information

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT I. General PROCUREMENT PLAN YEAR 2016/2017

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Liberia Liberia Forest Sector Project Procurement Plan (P154114) Public Disclosure Authorized I. General Liberia Liberia Forest Sector Project Plan (P154114) Public Disclosure Authorized Public Disclosure Authorized 1. Bank s approval Date of the procurement Plan: revised

More information

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679) I. General Sample Plan Health System Reinforcement Project (P156679) 1. Bank s approval Date of the procurement Plan: March 29, 2017 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

GEF Procurement Plan (WARFP LIBERIA)

GEF Procurement Plan (WARFP LIBERIA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General GEF Plan (WARFP LIBERIA) 1. Bank s approval Date of the procurement Plan [Original: April 2016]: Updated

More information

Sample Procurement Plan

Sample Procurement Plan Sample Plan I. General WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) APL2 Composante Mauritanie (P123093) 1. Bank s approval Date of the procurement Plan 20 janvier 2017 2. Date of

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project agency: [insert legal name] Date of the Plan: [insert date] Period covered by this Plan: [insert from to

More information

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679) I. General Sample Plan Health System Reinforcement Project (P156679) 1. Bank s approval Date of the procurement Plan: March 29, 2017 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

procurement Plan I. General

procurement Plan I. General I. General Sample Plan Pays Niger Emprunter Republique du Niger Denomination du projet Projet de Développement des Compétences pour la Croissance Références du don H840-NE Date of General Notice Dec 24,

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan Public Disclosure Authorized I. General Urban Productive Safety Net Project (UPSNP) Procurement Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Procurement Notice:

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: OECS Countries, Caribbean Energy

More information

Prior Review Thresholds

Prior Review Thresholds Public Disclosure Authorized I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: January 30, 2018 2.

More information

Textual Procurement Plan

Textual Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Textual Procurement Plan (This is only a sample with the minimum content that is required

More information

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014 Public Disclosure Authorized I. General Procurement Plan Public Disclosure Authorized 1. Project Information: Third National Urban Water Sector Reform Project 2. 3. Bank s approval Date of the Procurement

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384) Operation Name: Danang Sustainable

More information

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Implementation Status & Results Mozambique Cities and Climate Change (P123201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Cities and Climate Change (P123201) Operation Name: Cities and Climate Change (P123201)

More information

Consultants: firms Consultants: individuals

Consultants: firms Consultants: individuals Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all

More information

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Project (NEWMAP) PROCUREMENT PLAN I. GENERAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

The World Bank Can Tho Urban Development and Resilience (P152851)

The World Bank Can Tho Urban Development and Resilience (P152851) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 30-Jul-2018

More information

Actual Amount (US$) Process Status. Pending Interventions.

Actual Amount (US$) Process Status. Pending Interventions. Page 1 PROCUREMENT PLAN Sri Lanka : Sri Lanka Strategic Cities Development Project General Information Country: Sri Lanka Banks Approval Date of the Original Plan: 2016-08-24 Revised Plan Date(s): (comma

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA I. General Plan 2. Bank s approval Date of the procurement Plan: March, 2017 3. Date of General Notice: June 14, 2013. 4. Period covered by this procurement plan: March 31 to Jan 2018. II. Goods, Works,

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 21, 2017 2. Date

More information

Procurement Plan. I. General

Procurement Plan. I. General I. General Plan 1. Bank s approval Date of the procurement Plan: January 21, 2016. 2. Date of General Notice: September 28, 2016. 3. Period covered by this procurement plan: January 2016 to June 2017 II.

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: January 30, 2018 2.

More information

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Belize Municipal Development (P111928) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Belize Municipal Development (P111928) Operation

More information

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan Additional Financing for the Water Sector Capacity Building and Advisory Services

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Niger, Niger, Solar Electricity Project (NESAP), P-160170 Project agency: ANPER and NIGELEC Date of the Plan: September 14, 2017 Period covered by this

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Dominica Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Niger, Niger, Solar Electricity Project (NESAP), P-160170 Project agency: ANPER and NIGELEC Date of the Plan: September 14, 2017 Period covered by this

More information

Procurement Plan. I. General

Procurement Plan. I. General I. General Plan 1. Bank s approval Date of the procurement Plan: January 21, 2016. 2. Date of General Notice: September 28, 2016. 3. Period covered by this procurement plan: January 2016 to June 2017 II.

More information

Sample Procurement Plan

Sample Procurement Plan Sample Plan I. General WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) APL2 Composante Mauritanie (P123093) 1. Bank s approval Date of the procurement Plan 20 janvier 2017 2. Date of

More information

Procurement Plan. Procurement Method Prior Review Threshold Comments

Procurement Plan. Procurement Method Prior Review Threshold Comments Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original: 05 March 2014, Revision 14 November

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Procurement Plan National Community Driven Development Project Department of Rural Development

Procurement Plan National Community Driven Development Project Department of Rural Development Public Disclosure Authorized I. General Procurement Plan National Community Driven Project Department of Rural Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1.

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Republic of Congo, Forest and Econ. Diversification Project, P124085 Project agency: Ministry of Forest Economy, Sustainable Development, and Environment

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project agency: [insert legal name] Date of the Plan: [insert date] Period covered by this Plan: [insert from to

More information

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

More information

Cities and Climate Change (P123201)

Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 14 ARCHIVED on 04-Nov-2018 ISR33750

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power

More information

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Operation Name: BR

More information

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project

More information

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 22-Dec-2017 ISR30831 Implementing Agencies: Socialist

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 16-May-2016 ISR23432 Implementing Agencies:

More information

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Bangladesh Weather and Climate Services Regional Project (BWCSRP) Bangladesh Weather and Climate Regional Project (BWCSRP) Type of Method RFB, RFP, Direct Contracting RFQ None Review Thresholds Review Thresholds ( Cost of the Contract/Package) >=US$ 10,000,000 Works

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 03-Nov-2016 ISR25240 Implementing

More information

The World Bank Cities and Climate Change (P123201)

The World Bank Cities and Climate Change (P123201) Public Disclosure Authorized AFRICA Mozambique Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 13 ARCHIVED on 17-May-2018 ISR31517

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy AFRICA South Sudan Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2013 Seq No: 4 ARCHIVED on 11-Feb-2015 ISR18127 Implementing

More information

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

The World Bank Ethiopia Geothermal Sector Development Project (P133613) Public Disclosure Authorized AFRICA Ethiopia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 13-Mar-2018 ISR31676 Implementing Agencies: Ethiopian

More information

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) Operation Name:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Ecuador Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 25-Aug-2016 ISR24487 Implementing Agencies:

More information

Punjab Cities Program (P156972)

Punjab Cities Program (P156972) Public Disclosure Authorized SOUTH ASIA Pakistan Social, Urban, Rural and Resilience Global Practice Global Practice Requesting Unit: SACPK Responsible Unit: GSU12 IBRD/IDA Program-for-Results Financing

More information

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421) Operation Name: China: Anhui

More information

Sri Lanka Strategic Cities Development Project (P130548)

Sri Lanka Strategic Cities Development Project (P130548) SOUTH ASIA Sri Lanka Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 21-Dec-2018 ISR35436 Implementing Agencies:

More information

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project

More information

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Iraq Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 27-May-2016

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project information: Project ID: P075941 Sample Plan Borrower: The Republic

More information

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134) Operation Name: Strengthening

More information

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 09-Dec-2014 ISR17411 Implementing Agencies: Heilongjiang

More information

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT 1 Phnom Penh Can Tho City HCM City EAST SEA 2 1 3 Highest Water Level WATER LEVEL RAISE IN CAN THO DURING LAST 40 YEARS 4 2 Land subsidence a threat that

More information

Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam

Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam (State-Funded Landslide Project SFLP) Dr. Eng. Le Quoc Hung Add: 67 Chien Thang Street, Ha Dong District,

More information

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Indonesia National Slum Upgrading Project (P154782) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 04-Apr-2018

More information

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Belize Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 7 ARCHIVED on 19-Dec-2017

More information

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank China: Qinghai Xining Urban Transport Project (P127867) Public Disclosure Authorized EAST ASIA AND PACIFIC China Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 27-Jun-2016 ISR24068 Implementing Agencies:

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 23-Mar-2018 ISR30586 Implementing Agencies:

More information