1 I. General Urban Productive Safety Net Project (UPSNP) Plan 2. Bank s approval Date of the procurement Plan: February Date of General Notice: August 20, Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2017 II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for # Method Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) Above US$ 1,000,000 All 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. (Non- Services) Below US$ 1,000,000 All 2.. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable 4. Reference to (if any) Project Operational/ Manual: Urban Productive Safety Net Project Manual (PIM) issued in June 2016 and UPSNP procurement manual issued May Any Other Special Arrangements: Not Applicable 6. Summary of the Packages planned during the first 18 months after project effectiveness Packages Domestic Description Cost Preference Comments US$ million (yes/no) Ref. No. Summary of the ICB (Works) Review by Bank ( / ) April 27, 2017

2 Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (Non- Services) Yes No III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Review Threshold 1. Competitive Methods (Firms) Above US$ 500, Single Source (Firms) Above US$100, Individual Above US$ 200,000 Comment 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_or engineering services estimated to cost US$ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: Not Applicable 4. Consultancy Assignments with Methods and Time Schedule Ref. No. Description of Assignment Cost US$ million Package s Review by Bank ( / ) Comments Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods post IC April 27, 2017

3 Page 1 PROCUREMENT PLAN Ethiopia : Urban Productive Safety Net Project (UPSNP) General Information Country: Ethiopia Banks Approval Date of the Original Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P GPN Date: Project Name: Urban Productive Safety Net Project (UPSNP) Loan / Credit No: Executing Agency(ies): Ministry of Urban Development and Housing WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / DD/UJCFSA/UPSNP/W- SH/003/2017 / Construction of Warehouse Store for public work hand tools and materials 49, GOODS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / SH/008/17 / of Office Furniture (Swivel Chair for managerial & Experts, Table for experts, Guest Chair, File Cabinet, L-Shaped Table & White board) 58, Under SH/009/17 / of Vacuum Cleaner and Water cooler 2, SH/010/17 / of Cash safe Box-100kg MUDH/UFSJCA/UPSNPPA/G- SH/011/17 / of Leather Bag for Laptop & documents 1, NCB/004/17 / of Computers with all accessories (Lot 1), Office equipment (Lot 2) and Audiovisual equipment (Lot 3) Bids 319, NCB/001/17 / of public works hand tools (Lot 1), Bids waste collection & transporting wheel carts (Lot 2) and Gab ion in (lot 3) 995, SH/005/17 / of first Aid Kit for public work beneficiary or 93, SH/004/17 / of different Seedlings 4, SH/003/17 / of local made stand brooms for Public work activity 93, SH/002/17 / of Client Cards for UPSNP beneficiaries 42, SH/001/17 / of hand Gloves made of Leather for public work or beneficiaries. 98, NCB/005/2017 / of Computers and accessories Lot - 1 (Desktop & Laptop Computers, UPS, Heavy duty printers, External hard disk,...) AND Office electronics machine under Lot - 2 (Photocopiers, Scanners, LCD Projectors...) Bids 250, SH/012/2017 / of Office Furniture (High Back Swivel Chair, Office Table for experts, Box file Cabinet-Metal for record keeping,...) 27, SH/013/2017 / of Digital Photo Camera

4 Page 2 NCB/002/17 / locally made working cloth (Tuta) in Lot - 1, of locally made working leather shoes in Bids Lot - 2 and of protection materials like "eye glass made of plastic materials, mouse & nose dust protection masks" in Lot - 3 1,392, SH/006/17 / of Local made sunhat for PW 69, NCB/001/2017 / of Public Work Hand tools in Lot-1, of personal Safety materials for public work Bids activities in Lot-2, procurement of galvanized Gabion wire for soil & water conservation in Lot-3 1,370, SH/001/2017 / of Locally made hand push Carts 11, SH/002/2017 / of locally made stand brooms, locally made Hut for public work 13, SH/004/2017 / of First Aid kit for public work 3, SH/005/2017 / of Different seeds and seedligs 69, SH/006/2017 / of Client Identification cards 8, NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / MUDH/UJCFSA/UPSNP/NCS- DC/024/17 / For renting additional office space for UPSNP coordination Unit in the same building rented before for 12 months Direct Direct 24, CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Proposals / Minutes Proposal Negotiated Contract MUDH/UFSJCA/UPSNP/C- 021/17 / scoping study/assessment on people with special needs (Urban destitute) and service providers in 11 Cities 98, MUDH/UFSJCA/UPSNP/C- 022/17 / Baseline study-conduct baseline community report card (CRC) or Score (CSC) among beneficiaries. 50, /17 / Preparation of Livelihoods guidelines 2. Livelihood Services 150, /2017 / Organizational Capacity Assessment 25, MOLSA/UPSNP/C-026/2017 / Conduct need assessment for direct support to link with service providers 39, /2017 / Audit EFY 2009/10 in 11 UPSNP cities Least Cost 100, Under INDIVIDUAL CONSULTANTS Contract Type Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

5 Page 3 A/A 01/17 / Recruitment of Specialist for Addis Ababa City UJCFSA for three year (Sept Sept. 2020) on contractual bases Individual Open 27, Under HAWASA 02/17 / Recruitment of Expert for Hawasa City UPSNP for the period of three years contractual bases Individual D/DAWA 03/2017 / Recruitment of Expert for Dire Dawa City Administration UPSNP for the period three years contractual bases. Individual ADAMA / Recruitment of Experts for Adama city UPSNP for the period three years contractual bases. Individual DESSIE 05/2017 / Recruitment of Expert for Dessie City UPSNP for the period of three years (Sept Sept.2020) on contractual bases. Individual MEKELE 06/2017 / Recruitment of Expert for Mekele City UPSNP for the period of three years (Sept Sept. 2020) on contractual bases. Individual

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Urban Productive Safety Net Project (UPSNP) Procurement Plan Public Disclosure Authorized I. General Urban Productive Safety Net Project (UPSNP) Procurement Plan 2. Bank s approval Date of the procurement Plan: February 2016 3. Date of General Procurement Notice:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan for Eth Expressway Project ( P148850) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan for Eth Expressway Project ( P148850) 1. Bank s approval Date of the

More information

Procurement Plan for ETLP (P156590)

Procurement Plan for ETLP (P156590) I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered

More information

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan (Text in italic font is meant for instruction to staff and should be deleted in

More information

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan. Nepal Livestock Sector Innovation Project I. General Plan Nepal Livestock Sector Innovation Project 1. Bank s approval Date of the procurement Plan: February 14, 2018 2. Date of General Notice: 3. Period covered by this procurement plan: 18 months

More information

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project I. General Plan Mozambique: P125120 - Greater Maputo Water Supply Expansion Project 1. Bank s approval Date of the procurement Plan 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan September 28, 2015 2.

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 2. Bank s approval Date of the procurement Plan Original:

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017

More information

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT I. General PROCUREMENT PLAN YEAR 2016/2017

More information

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018 I. General Plan 1. Bank s approval Date of the procurement Plan. Original: 23 November 2016; Revision 2 of Updated Plan, 18 April 2017 2. Date of General Notice:. 3. Period covered by this procurement

More information

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073) I. General Liberia Additional REDD+ Readiness Preparation Support Plan (P124073) 1. Bank s approval Date of the procurement Plan: revised version on. 2. Date of General Notice: October 8, 2013 3. Period

More information

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan for Ghana Transport Sector Improvement Project (P151026) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan for Ghana Transport Sector Improvement Project (P151026) I. General 1. Bank s approval

More information

Procurement Plan. I. General

Procurement Plan. I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan [Original: July 2013]:

More information

Prior Review Thresholds

Prior Review Thresholds I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Type of Method Review Thresholds

More information

GEF Procurement Plan (WARFP LIBERIA)

GEF Procurement Plan (WARFP LIBERIA) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General GEF Plan (WARFP LIBERIA) 1. Bank s approval Date of the procurement Plan [Original: April 2016]: Updated

More information

Sample Procurement Plan

Sample Procurement Plan I. General Sample Plan PROJET DE RENFORCEMENT DE CAPACITE EN STATISTIQUE CREDIT V0450-001 1. Bank s approval Date of the procurement Plan: 21 avril 2017 2. Date of General Notice : 3. Period covered by

More information

UNITED REPUBLIC OF TANZANIA. Procurement Plan

UNITED REPUBLIC OF TANZANIA. Procurement Plan Public Disclosure Authorized General UNITED REPUBLIC OF TANZANIA Procurement Plan 1. Project information: Government of Tanzania. Southern Agricultural Growth Corridor of Tanzania (SAGCOT) P125728 2. Project

More information

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 I. GENERAL II. REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT

More information

Procurement Plan for Project of Integrated Urban and Tourism Development

Procurement Plan for Project of Integrated Urban and Tourism Development Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan for Project of Integrated Urban and Tourism Development I. General 1.

More information

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Liberia Liberia Forest Sector Project Procurement Plan (P154114) Public Disclosure Authorized I. General Liberia Liberia Forest Sector Project Plan (P154114) Public Disclosure Authorized Public Disclosure Authorized 1. Bank s approval Date of the procurement Plan: revised

More information

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679) I. General Sample Plan Health System Reinforcement Project (P156679) 1. Bank s approval Date of the procurement Plan: March 29, 2017 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Project (NEWMAP) PROCUREMENT PLAN I. GENERAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project Information Country: Tanzania Project Name: Tanzania

More information

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679) I. General Sample Plan Health System Reinforcement Project (P156679) 1. Bank s approval Date of the procurement Plan: March 29, 2017 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

Prior Review Thresholds

Prior Review Thresholds Public Disclosure Authorized I. Goods and Works and non-consulting services. Review Thresholds Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: January 30, 2018 2.

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: OECS Countries, Caribbean Energy

More information

procurement Plan I. General

procurement Plan I. General I. General Sample Plan Pays Niger Emprunter Republique du Niger Denomination du projet Projet de Développement des Compétences pour la Croissance Références du don H840-NE Date of General Notice Dec 24,

More information

Sample Procurement Plan

Sample Procurement Plan Sample Plan I. General WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) APL2 Composante Mauritanie (P123093) 1. Bank s approval Date of the procurement Plan 20 janvier 2017 2. Date of

More information

Procurement Plan National Community Driven Development Project Department of Rural Development

Procurement Plan National Community Driven Development Project Department of Rural Development Public Disclosure Authorized I. General Procurement Plan National Community Driven Project Department of Rural Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1.

More information

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Bangladesh Weather and Climate Services Regional Project (BWCSRP) Bangladesh Weather and Climate Regional Project (BWCSRP) Type of Method RFB, RFP, Direct Contracting RFQ None Review Thresholds Review Thresholds ( Cost of the Contract/Package) >=US$ 10,000,000 Works

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project agency: [insert legal name] Date of the Plan: [insert date] Period covered by this Plan: [insert from to

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Plan Additional Financing for the Water Sector Capacity Building and Advisory Services

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan Template (For Contracts not yet initiated to be entered in STEP) 1. Project

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 21, 2017 2. Date

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Consultants: firms Consultants: individuals

Consultants: firms Consultants: individuals Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Threshold for HEQEP Project effective from 10 July 2017 Bank-financed all

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: January 30, 2018 2.

More information

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan: March 17, 2017 2. Date

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA I. General Plan 2. Bank s approval Date of the procurement Plan: March, 2017 3. Date of General Notice: June 14, 2013. 4. Period covered by this procurement plan: March 31 to Jan 2018. II. Goods, Works,

More information

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017

More information

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P150361 2. Project Agency: Ministry of Water and Irrigation Dar es Salaam

More information

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014 Public Disclosure Authorized I. General Procurement Plan Public Disclosure Authorized 1. Project Information: Third National Urban Water Sector Reform Project 2. 3. Bank s approval Date of the Procurement

More information

Procurement. International Competitive Bidding;

Procurement. International Competitive Bidding; Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. for the proposed project will be carried out in accordance with: World Bank s "Guidelines:

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project agency: [insert legal name] Date of the Plan: [insert date] Period covered by this Plan: [insert from to

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Niger, Niger, Solar Electricity Project (NESAP), P-160170 Project agency: ANPER and NIGELEC Date of the Plan: September 14, 2017 Period covered by this

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project information: Project ID: P075941 Sample Plan Borrower: The Republic

More information

Sample Procurement Plan

Sample Procurement Plan Sample Plan I. General WEST AFRICA REGIONAL COMMUNICATIONS INFRASTRUCTURE PROGRAM (WARCIP) APL2 Composante Mauritanie (P123093) 1. Bank s approval Date of the procurement Plan 20 janvier 2017 2. Date of

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Republic of Congo, Forest and Econ. Diversification Project, P124085 Project agency: Ministry of Forest Economy, Sustainable Development, and Environment

More information

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 2. Bank s approval Date of the procurement Plan: March 27,

More information

Procurement Plan. Procurement Method Prior Review Threshold Comments

Procurement Plan. Procurement Method Prior Review Threshold Comments Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Bank s approval Date of the procurement Plan Original: 05 March 2014, Revision 14 November

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Niger, Niger, Solar Electricity Project (NESAP), P-160170 Project agency: ANPER and NIGELEC Date of the Plan: September 14, 2017 Period covered by this

More information

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description* Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UPDATED PROCUREMENT PLAN FOR WORKS DATE SUBMITTED: 23 JAN 2015 COUNTRY: COORDINATING

More information

Procurement Plan. I. General

Procurement Plan. I. General I. General Plan 1. Bank s approval Date of the procurement Plan: January 21, 2016. 2. Date of General Notice: September 28, 2016. 3. Period covered by this procurement plan: January 2016 to June 2017 II.

More information

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP losure uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized Number Project Description Estimated Cost (US$ million) Selection Method Bank (Prior / Finalizatio n

More information

Actual Amount (US$) Process Status. Pending Interventions.

Actual Amount (US$) Process Status. Pending Interventions. Page 1 PROCUREMENT PLAN Sri Lanka : Sri Lanka Strategic Cities Development Project General Information Country: Sri Lanka Banks Approval Date of the Original Plan: 2016-08-24 Revised Plan Date(s): (comma

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power

More information

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Implementation Status & Results Mozambique Cities and Climate Change (P123201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Cities and Climate Change (P123201) Operation Name: Cities and Climate Change (P123201)

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized SOUTH ASIA India Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 13-May-2016 ISR23158 Implementing Agencies: Rural

More information

Procurement Plan. I. General

Procurement Plan. I. General I. General Plan 1. Bank s approval Date of the procurement Plan: January 21, 2016. 2. Date of General Notice: September 28, 2016. 3. Period covered by this procurement plan: January 2016 to June 2017 II.

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134) Operation Name: Strengthening

More information

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484)

Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin BN-National Community Driven Development Project (P081484) Operation Name: BN-National Community

More information

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Niger : Projet Eau et Assainissement en Milieu Urbain (PEAMU) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General AugustJuly 928,

More information

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

The World Bank Ethiopia Geothermal Sector Development Project (P133613) Public Disclosure Authorized AFRICA Ethiopia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 13-Mar-2018 ISR31676 Implementing Agencies: Ethiopian

More information

Textual Procurement Plan

Textual Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Textual Procurement Plan (This is only a sample with the minimum content that is required

More information

The World Bank Decentralized Community Driven Services Project (P117764)

The World Bank Decentralized Community Driven Services Project (P117764) Public Disclosure Authorized AFRICA Benin Social Protection Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 6 ARCHIVED on 12-Jun-2015 ISR19748 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Belize Municipal Development (P111928) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Belize Municipal Development (P111928) Operation

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project agency: Ministry of Public Works and Natural Resources, Directorate General

More information

Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667)

Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin BJ-Youth Employment (FY14) (P132667) Operation

More information

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018 Public Disclosure Authorized SOUTH ASIA India Water Global Practice Requesting Unit: SACIN Responsible Unit: GWA06 IBRD/IDA Program-for-Results FY 2014 Team Leader(s): Raghava Neti Seq No: 8 ARCHIVED on

More information

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975) Operation

More information

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965) Public Disclosure Authorized AFRICA Uganda Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 5 ARCHIVED on 29-Jan-2018 ISR31243 Implementing Agencies: The

More information

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Operation Name: BR

More information

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chad Urban Development Project (P072030) Operation Name: Urban Development Project (P072030) Project

More information

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies

POLICY: FI/PL/03 Issued on August 5, Fee Policy for GEF Partner Agencies POLICY: FI/PL/03 Issued on August 5, 2012 Fee Policy for GEF Partner Agencies Summary: The proposed Agency fee structure in this paper is the decision of the GEF Council from its meeting of June 2012.

More information

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965) Public Disclosure Authorized AFRICA Uganda Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 2 ARCHIVED on 08-Apr-2016 ISR23131 Implementing Agencies: Office

More information

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553) Operation Name: BR

More information

Sample Procurement Plan

Sample Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only

More information

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

More information

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

More information

Procurement Plan. I. General

Procurement Plan. I. General Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan [Original: October 2012]:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 3 ARCHIVED on 29-Jun-2016 ISR24379

More information

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583) SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 22-Apr-2016 ISR23210 Implementing Agencies: Directorate General, Ministry of Food Key

More information

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030) Operation Name:

More information