1 GEOTECHNICAL ENGINEERING SERVICES REPORT STATE HIGHWAY 48 BRIDGE 'A' OVER INTERSTATE 4 OKFUSKEE COUNTY, OKLAHOMA STATE JOB PIECE No. 2755(4) Prepared For: Oklahoma Department of Transportation Prepared By: EST, Inc. Approved by: Alseny Diop, P.E. Sr. Geotechnical Engineer EST PROJECT NUMBER April 2, 215

2 GEOTECHNICAL ENGINEERING SERVICES REPORT STATE HIGHWAY 48 BRIDGE 'A' OVER INTERSTATE 4 OKFUSKEE COUNTY, OKLAHOMA STATE JOB PIECE No. 2755(4) EST, Inc th Avenue NW, Suite 244, Norman, OK 7369 (45) Certificate of Authority Number 3639, Renewal Date 6/3/216 EST PROJECT NUMBER April 2, 215 Alseny Diop, P.E. Sr. Geotechnical Engineer Eric Agossou, E.I. Project Manager

3 Comprehensive Engineering Services th Avenue NW, Suite 224 Norman, Oklahoma 7369 P (45) F (45) TABLE OF CONTENTS 1. Executive Summary Project Description Subsurface Exploration Subsurface Conditions Site Geology Soil Conditions Seismic Classification/ Spectral Accelerations Groundwater Laboratory Evaluation Evaluation and Recommendations Driven Pile Foundations Drilled Shafts General Appendix A Boring Location Plan Appendix B Foundation Boring Logs Appendix C Boring Logs Appendix D General Notes, Boring Log Acronym Library, General Notes for Rock Classification Colorado Oklahoma Texas

4 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, Executive Summary The geotechnical engineering services are complete for the proposed Bridge A along State Highway 48 over Interstate 4 in Okfuskee County, Oklahoma. This report describes the subsurface conditions encountered in the borings, furnishes the laboratory data acquired, and provides geotechnical recommendations for the design and construction of the proposed bridge. Exploration of the subsurface materials at the project site consisted of six (6) structural borings drilled to depths ranging from 16 to 129 feet below the existing ground surface elevation. Samples obtained from the borings were brought to our laboratory for further evaluation and testing. Groundwater was encountered in the borings at depths ranging from 34 to 65 feet below existing grades. The final boring logs and a diagram showing the approximate locations of the borings are included in this report. The Engineer s evaluation and laboratory test results indicate the subsurface materials generally consist of cohesive and cohesionless overburden soils over shale, sandstone or an interbedding of these rock formations. 2. Project Description We understand that the proposed project consists of constructing a new, approximately 268 feet- 1 inches long, four-span, bridge. The proposed project is located along State Highway 48 over Interstate 4 in Okfuskee County, Oklahoma. The General Plan and Elevation sheet provided indicates that the abutments and wing walls will be supported on HP 1 X 42 driven piles, and the approach embankments to the bridge would require less than 5 feet of fill to meet the proposed finish grade elevation. At the time of our fieldwork, the existing highways and bridge were operational. 2. Subsurface Exploration The subsurface exploration was performed between December 29, 214 and January 26, 215. The exploration consisted of six (6) structural borings drilled to depths of approximately 16 to 129 feet below existing grades. The borings were located in the field by EST personnel using the preliminary plans provided. The approximate locations of the borings have been identified and are shown on the boring location plan included in Appendix A of this report. The surface elevations near the boring locations were determined by EST Survey Personnel. The borings were advanced with a CME-55 rotary drill rig using hollow stem augers in the overburden soil and a rock bit in the bedrock. Representative soil samples were obtained using the standard penetration test (SPT) sampling procedures in general accordance with ASTM Specification D In boring B-3A, the sedimentary rock cores were obtained using the EST, Inc. 1

5 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 wire-line coring techniques in general accordance with ASTM Specification D-2113 and AASHTO Specification T-255. The SPT process requires a split-barrel (two-piece) sampling tube be used to obtain soil samples. A 2-inch outside diameter sampling tube is hammered into the bottom of the boring with a 14- pound weight falling 3 inches. The number of blows required to advance the tube the last 12 inches of an -inch sampling interval or portion thereof, is recorded as the standard penetration resistance value, N. The in-situ relative density of granular soils, the consistency of cohesive soils, and the hardness of weathered bedrock can be estimated from the N value. The uncorrected N values recorded for each test are shown on the attached boring logs at their relative sampling depths. In addition, the hardness of portions of the bedrock was evaluated using the Texas Highway Department cone penetration () test. The is a standard test developed by the Texas Highway Department to evaluate the strength and hardness of subsurface bearing materials for bridge foundations. The process requires use of a solid steel 3-inch diameter cone of standard dimensions attached to the drill rod. The cone is hammered at the bottom of the boring with a 14-pound weight falling 3-inches. After the cone is seated with 1 blows, the penetrations for two 5-blow intervals are recorded. If the number of blows to advance the cone six inches is less than 5, then the number of blows for the 6-inch interval is recorded. If the amount of penetration is less than 6 inches for 5 blows, the amount of penetration is recorded for the 5 blows. The number of blows with penetrations recorded for each test is shown on the attached boring logs at their relative test depths. A CME automatic drive hammer was used to advance the split-barrel sampler and. A greater mechanical efficiency is achieved with the automatic drive hammer when compared to a conventional safety drive hammer operated with a cathead and rope. The effect of this higher efficiency on the N values has been considered in our interpretation and analysis of the subsurface information provided with this report. As part of the drilling operations, the engineer prepared field boring logs. The engineer examined the samples retrieved during drilling operations and recorded a material description on the field boring logs. The split-barrel samples were packaged in plastic bags to reduce moisture loss, tagged for identification and transported to our laboratory for further evaluation. The field boring logs also include visual classifications of the auger sample materials encountered during drilling and the engineer s interpretation of the subsurface conditions between split-barrel samples. This report contains the final boring logs that represent modifications based on laboratory test results of the soil samples. EST, Inc. 2

6 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, Subsurface Conditions 4.1 Site Geology The subject bridge is situated in a geologic area best described as being part of the Coffeyville Unit (Pcf), the Seminole Unit (Psl) or a combination of the two with Terrace Deposits. Based on the subsurface materials encountered during our explorations, we anticipate the most likely unit to be encountered may be the Coffeyville. However, according to published materials (Engineering Classification of Geologic Materials, Division Three, 1969, Oklahoma Highway Department), descriptions of both units are summarized below: The Coffeyville Unit consists of two sandstone members, two or more shale members, and a basal limestone member (DeNay) which is present in southern Seminole County. The sandstone members are soft to moderately hard, range from 5 to 4 feet thick, are thin-bedded to massive, and are generally buff to brown but may locally contain red and yellow colors. The shales are soft, yellowish brown to dark gray and occur in sequences up to 2 feet thick. The total thickness of the Coffeyville Unit is irregular and varies from 15 to 26 feet. Topographically, the sandstone members generally cap prominent eastward facing scarps with long westward dip slopes. The shales generally underlie valleys and steep slopes of scarps that are capped by the sandstone members. The Seminole Unit (Psl) consists of conglomerate, sandstone and shale. The conglomerates and sandstones are most prominent in southeastern Seminole County where they comprise most of the unit. The division of the sandstones northward results in at least three moderately soft sandstone members and three shale members in Okfuskee County. Here, the basal sandstone is conglomeratic and varies from 4 to 17 feet in thickness. The shale sequences thicken up to 14 feet. The total thickness of this unit thins to about 27 feet in Okfuskee County. Topographically, the sandstones and conglomerates cap prominent tree covered scarps. The shales generally underlie the valleys and the ridges which are capped by sandstones. Terrace deposits consist of sand, silt, clay, gravel, and/or combinations of these. Terrace materials occur adjacent to or near streams at higher elevations than the flood plain (bottom land). The engineering properties of the unconsolidated materials are normally the same as the C horizon of the overlying soil. EST, Inc. 3

7 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, Soil Conditions The near surface cohesive soils were found to be very soft to very hard in consistency. Cohesionless soils were generally very loose to very dense in relative density. The sedimentary bedrock encountered exhibited SPT refusal (i.e. 5 blows for 6 inches or less of penetration) at depths indicated in the boring logs and as shown in Table I below: Boring No. B-1 B-2 B-3 B-3A B-4 B-5 TABLE I Station and Offset , Left of CL Survey , Right of CL Survey , 21.5 Left of CL Survey , 21.5 Left of CL Survey , Right of CL Survey , 23.5 Left of CL Survey Surface Elevation (feet) Top of Rock Top of Rock Elevation Depth (feet) (feet) Seismic Classification/ Spectral Accelerations Based on the subsurface materials encountered during our investigation and Table entitled Site Class Definitions in the 29 International Building Code, the seismic site class is D. This site class should be used when designing the foundation systems for this bridge. The following geotechnical parameters estimated based on the 29 AASHTO Guide Specifications for LRFD Seismic Bridge Design can be used; however, we recommend the latest edition of the AASHTO Guide Specifications for LRFD Seismic Bridge Design be reviewed prior to using these parameters. EST, Inc. 4

8 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 TABLE II Seismic Site Class ( Table of the 29 IBC) D Estimated Site Coordinates Latitude o N Longitude o W PGA peak seismic ground acceleration coefficient on rock.57g A S peak seismic ground acceleration coefficient modified by short-period site factor.91g S S horizontal response spectral acceleration coefficient at.2-s period on rock.122g S DS horizontal response spectral acceleration coefficient at.2-s period modified by short-period site factor.196g S 1 horizontal response spectral acceleration coefficient at 1.-s period on rock.41g S D1 horizontal response spectral acceleration coefficient at 1.-s period modified by long-period site factor.99g The following adjustment factors were used for a seismic site class D : TABLE III Seismic Site Class D Adjustment Factors PGA.1 F PGA 1.6 F a 1.6 F v 2.4 Seismic Design Category A 4.4 Groundwater Groundwater was encountered in the borings at depths ranging from 34 to 65 feet below existing grades. Once bedrock was encountered, a rock bit with water to wash and stabilize the borings was used to advance the borings to the required rock testing depths. As a result, water level observations are based on observation of the augered materials while drilling and the field Engineer s judgment of the samples retrieved during drilling operations. EST, Inc. 5

9 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Groundwater level fluctuations and perched water conditions may occur due to seasonal variations in the amount of rainfall and other factors such as drainage characteristics. The possibility of groundwater level fluctuations should be considered during the preparation of construction plans. After completion, the borings were abandoned in accordance with the Oklahoma Water Resources Board (OW) requirements. 5. Laboratory Evaluation All samples obtained from the project site were transferred to our laboratory for processing and testing. Laboratory tests were performed on the soil samples in agreement with the applicable ASTM test procedures. Laboratory testing included estimation of the natural moisture content (ASTM D2266), Atterberg limits (ASTM D43) and sieve analysis (ASTM D2487). The test results can be found in the appropriate column of the boring logs included in appendix C of this report. 6. Evaluation and Recommendations Steel H-piles can be used to support the abutments of the proposed four-span bridge. Drilled, cast-in-place concrete piers can be used for the interior spans. More detailed recommendations concerning end bearing and frictional resistance values are provided in the following sections. 6.1 Driven Pile Foundations The proposed bridge abutments can be supported using steel H-piles. Driven piles will develop their capacity from a combination of end bearing and frictional resistance in the bedrock. Because of the relatively high driving forces required to penetrate the bedrock, we recommend using low displacement piles such as H-piles. Piles should be spaced at minimum center-tocenter distances equal to 2.5 times the maximum pile width or 3 inches, whichever is greater. The estimated combined capacities at different elevations for the HP 1X42 driven piles are shown in Tables IVA & IVB. It is important to note that variations in the overburden soils and in the depth and quality of the bedrock will occur with distance away from the soil borings. Therefore, we recommend the piles be driven until twice the design requirement is obtained in accordance with the appropriate procedure. An appropriate pile driving formula, wave equation analysis, static load test, or dynamic load test should be used during pile driving to determine that satisfactory resistance is obtained. Driven piles constructed as recommended are expected to have negligible long-term settlements. EST, Inc. 6

10 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE IVA Boring No.1 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for Steel H Piles 1X42 End Bearing Q pall (tons) Skin Friction T all (tons) Q pall +T all FS of 3 (tons) Elevation (feet) * *The top 5 feet should be neglected EST, Inc. 7

11 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE IVB Boring No.5 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for Steel H Piles 1X42 End Bearing Q pall (tons) Skin Friction T all (tons) Q pall +T all FS of 3 (tons) Elevation (feet) * *The top 5 feet should be neglected 6.2 Drilled Shafts The proposed 48-inch and 6-inch diameter piers can be used to support the interior spans of the bridge. Tables VA, VB and VC provide the allowable end bearing pressure and allowable side friction for the drilled piers near the boring locations. Excavation of the overburden soils can be accomplished using an earth auger. However, rock teeth will be required to penetrate the bedrock. EST, Inc. 8

12 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Based on the soil conditions observed in the test borings, we anticipate that casing will be required to prevent caving of the soils encountered at the site. The drilled piers, and all materials and construction procedures shall be in accordance with the Oklahoma Department of Transportation (ODOT), 29 Standard Specification for Highway Construction and the latest special provisions adopted by ODOT to supplement the Standard Specifications. To facilitate pier construction, concrete should be on-site and ready for placement as pier excavations are completed. Drilled shaft excavations should not be allowed to remain open for more than 4 hours. Drilled shafts constructed as recommended are expected to have less than ½- inch long-term settlement. TABLE VA Boring No.2 Depth (feet) State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) * *The top 5 feet should be neglected EST, Inc. 9

13 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE VB Boring No.3 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) * *The top 5 feet should be neglected EST, Inc. 1

14 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Depth (feet) TABLE VC Boring No.4 State Highway 48 Bridge A Over Interstate 4 Estimated Soil Allowable Load Capacity Variation with Depth for 48 and 6 Drilled Piers R R = qp R p + qs R s Elevation (feet) 48 Inch Piers 6 Inch Piers R p (tons) R s (tons) R R (tons) R p (tons) R s (tons) R R (tons) * EST, Inc. 11

15 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, General This report was prepared for the Oklahoma Department of Transportation in reference to the four-span bridge over Interstate 4 (Bridge A ), along State Highway 48 in Okfuskee County, Oklahoma. This report provides geotechnical evaluation based on the subsurface conditions encountered in the borings. The scope of services contained in this report does not include any environmental assessment or identification of contaminated or hazardous materials. Any statements in this report or in the boring logs concerning suspicious odors, colors, irregular textures or abnormal conditions are for informational purpose only and have not been verified by the engineer or testing. Subsurface conditions may vary between borings. Therefore, we recommend EST be retained to provide construction testing and inspection. If variations appear during construction, it may be necessary to revise the recommendations contained in this report. However, EST warrants that the findings contained herein have been made with generally accepted professional geotechnical practices in the local area. No other warranties are implied or expressed. EST, Inc. 12

16 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Appendix A Boring Location Plan EST, Inc.

17 ,... N I") Borln B-G1 STA , 21.82' Left of CL.Survey Borln B-G3 STA , 21.5' Left of CL Survey Borln B-G3A STA , 21.5' Left of CL.Survey Borln B-G5 STA , 23.5' Left of CL.Survey \ -..., ----::::.._ 1;( I.;~ //; 1 ;11! "" ~ : _.//I( 1'11 ' ' ' : 3 " S..._..._....--;:J/./l) / r/l1j l/ B-G2.J& " /~; ' :: - ~ ::/:!.J/ 1 ;, /l j l 93. -~ ~;.?~-:;!/; 1/1 il,i 93~ ~/ /_,- t j//1 OJ //_,.-;:;.;:.2 ' JI ~ :::./_,- / / / _...,..-./ I ,,/;:.;:.;:-;.--;. ~ \, / / /::::: ' -- -~/ / //// / --~ - 93ci ---9 Jr o-,~' / ~;!Pef..~o,'C..~ ce;:.1 // //?J?..or1~~~~o-,i"'>~il /// - r. \ ~)' --. ~ Borin B-2 STA , 37.29' Right of CL. Survey I I I OJ "' ;, ~ I I ~ I I \ I I ~ I I I I & fj ~ I ~ Borin B-G4 STA , 21.95' Right of CL Survey ~ w 1-- <( 1-- (/) et: w 1-- z - et: w > <( ~ w C> ēt: CD co ~ I :::c (/) <( :."!!: r--.. :::c ~ <( _J ~~ :g ::E ~ " >- a:: N 1-- (.!) z z!! ::::> z (.) j:: CD w (.) ~..., ~ g w (/) (.!) 1-- ::::> L... z <( ii: 1-- ~ (/) Ill DATE 4/2/215 SCALE NOT TO SCALE PROJECT NUMBER 64246

18 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Appendix B Foundation Boring Logs EST, Inc.

19 BORING NO. B-1 STATION 511'55.75, 21.82' LEFT OF CL. Sl.11VEY <DRILLED DECEt.llER 29 AND DECEt.llER 3, 214> SURF ACE ELEVA HON APPROXIMATELY 11" OF ASPHALT PAVEfv'ENT LOOSE TO MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT M:DIL.M DENSE, LIGHT BROWN, SIL TY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, SIL TY SAND M:DIL.M DENSE, RED-BROWN, SIL TY SAND M:DIL.M DENSE, RED-BROWN, POORLY GRADED SAMJ WITH Sil T DENSE, RED-BROWN, SIL TY SAM> LOOSE, RED-BROWN, SIL TY SAND DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT VERY DENSE, LIGHT BROWN, POORLY GRADED SAMJ WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF TO VERY STIFF, Plff'LE-GRAY, Sil T WITH SAMJ VERY SOFT, BROWN, SANDY SILT M::DILM DENSE, DARK BROWN, SIL TY SAND WITH TRACES OF RIVER GRAVEL SOFT TO MODERATELY HARD, OLIVE-GREEN, WEATHERED SHALE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE !' :<!. ~~~:~ 'SJ. ~~~:~ B46.19 B37.69 BOTTOM OF BORING - B ; N = S: MC= 6.1% ; Pl = NP; #2 = BA%; RECOVERY = 12"' ss-2; N = 14: MC= 7.1'1 ; Pl = NP; #2 = B.'1; RECOVERY = "' ; N = 17". MC = 6.8% ; Pl = NP; #2 = 13.7%; RECOVERY = 14" ; N = S: MC = 4.8% ; Pl = NP; #2 = 5.3%; RECOVERY = 16'' ; N = 32: MC = 11.8% ; Pl = NP; #2 = 9.2%; RECOVERY = 1 a ; N = 25: MC = 1'1 LL= NP; Pl= NP; #2 = 17.1%; RECOVERY= " ;N = 25: MC= 11% ; Pl = NP; #2 = 232%; RECOVERY = " ; N = 22: MC = 14.8% ; Pl = NP; #2 = 22.7'%; RECOVERY = " B ; N = 21: MC = 5.5'1 ; Pl = NP; #2 = 5.3%; RECOVERY = 1 B"' B ; N = 25: MC = 15.B% ; Pl = NP; #2 = 13.3%; RECOVERY = " BB ; N = B: MC= 16.7% ; Pl = NP; #2 = 33.9%; RECOVERY = " BB ; N = 27". MC =.3% ; Pl = NP; #2 = 9.5%; RECOVERY = 1 B"' B ; N = 34: MC= 17.2% ; Pl = NP; #2 = 1.6'%; RECOVERY = " B ; N = 74: MC= 17.2% ; Pl = NP; #2 = 7A%; RECOVERY = "' B ; N = 44: MC= 1a1% ; Pl = NP; #2 = 5.6'1; RECOVERY = 1 B"' B ; N = 2: MC= 17% ; Pl = NP; #2 = 72.5'%; RECOVERY = " B ; N = : MC = 2.B% ; Pl = NP; #2 = 67.7%; RECOVERY = " B ; N = 16: MC = 16.6% ; Pl = NP; #2 = 4.4'%; RECOVERY = " B ; N = 15/6.'~ 5/6.'~ 5/.25'~ MC = 2.3% LL= 32; Pl= 15; #2 = 71.'1; RECOVERY= 12"' ; = 5/.38'~ 5/.3B'" B ; = 5/1.19'~ 5/.63'" B ; = 5/.63'~ 5/.3B'" B ; = 5/1.13'~ 5/.5'" B ; = 5/.88'~ 5/.3B'" B ; = 5/.5'~ 5/.5'" B ; = 5/.81'~ 5/.5'" MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE TO DENSE, LIGHT BROWN, SIL TY SAND MEDIUM DENSE, YELLOW-BROWN, SIL TY SAND LOOSE, YELLOW-BROWN, SIL TY SAND BORING NO. B-2 STATION 512'27.93, 37.29' RIGHT OF CL. SURVEY <DRILLED DECEMBER AND JANUARY 5, 215> SURFACE ELEVATION B 915.6B 95.6B B9.6B BB5.6B VERY DENSE TO DENSE, YELLOW-BROWN, SIL TY SAND 'Sj_ B79.6B DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF, GRAY, SANDY LEAN CLAY VERY LOOSE TO LOOSE, GRAY, SILTY SAND WITH GRAVEL POORLY CEti.ENTED, OLIVE-BROWN, WEATHERED SANDSTONE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE HARD, GRAY, WEATHERED SHALE B75.6B B65.6B B6.6B B55.6B B47.6B B37.6B B2B.6B BOTTOM OF BORING B ; N = 11: MC = 14'% ; Pl = NP; #2 = 11.2%; RECOVERY = "' ; N = 14: MC = 162'% ; Pl = NP; #2 = 1 B.2t.; RECOVERY = 14"' 9B ; N = 26: MC = 1.5'1 ; Pl = NP; #2 = 2.6'%; RECOVERY = 1 B"' ; N = 15: MC = 14.6'% ; Pl = NP; #2 = 25.'1; RECOVERY = 6" B9B ; N = 13: MC = BA'l. ; Pl = NP; #2 = 15. 7"; RECOVERY = 1 B"' B ; N = 2: MC = 16.5% ; Pl = NP; #2 = 26.2%; RECOVERY = 1 B"' BBB ; N = S: MC= 17'1 ; Pl = NP; #2 = 33.6'%; RECOVERY = 1 B"' BB B; N = 54: MC = 16.5'% ; Pl = NP; #2 = 1 B.2t.; RECOVERY = 1 B"' B7B ; N = 47". MC = 15.6% ; Pl = NP; #2 = 16. 7"; RECOVERY = "' B : N = 4B: MC = 16.B% ; Pl = NP; #2 = BAX; RECOVERY = " B6B ; N = 43: MC= 17.5% ; Pl = NP; #2 = 5.9%; RECOVERY = 1 B" B ; N = 15; RECOVERY= O" B5B ; N = 13: MC= 1a6% LL = 3; Pl = 11; #2 = 64.5'1; RECOVERY = 1 B" B ; N = 3; RECOVERY = a B4B ; N = 4/6."; 716."; 5/6.'~ MC = 15.6'1 ; Pl = NP; #2 = 33.B%; RECOVERY = 6" B ; = 5/1.63'~ 5/1.5" B ; = 5/1.13"~ 5/25" B ; = 5/.63"~ 5/.5" B ; = 5/1,13'~ 5/.75" B ; = 5/.63"~ 51.BB" B ; = 5/.38"~ 5/25" B ; = 5/.38"~ 5/.3B" SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION 4.1 OF THE GEOTECHNICAL REPORT. EXCAVATION CONSIDERATION & RIPPABILITY SEIIC CLA AND SPECTRAL RESPONSE ACCELERATIONS SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF Tl-ESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, Tl BORINGS WERE SITE CLA ''D"' ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE ROOS RANGED FROM '1 TO B3% AM> Tl UNCONFl~D COMPREIVE SEIIC CATEGORY A STRENGT (UCS) RANGED FROM 229 KSF TO B46 KSF. BASED ON Tl-ESE VALUES, WE EXPECT THE BEDROCK AT THE PRQ..ECT SITE WILL BE READILY RIPPABLE WITH REGlA.AR EXCAVATION EQUIPMENT. s,,.1969 s,,.999 LEGEND = SPLIT SPOON SAMPLER DCD N = NUMBER OF BLOWS PER 12 INCHES ucs MC = MOISTURE CONTENT DD LL = LIQUID LIMIT ROD Pl = PLASTICITY INDEX 'SJ. #2 = PERCENT PAING #2 SIEVE!'. = TEXAS COM: PENETROMETER :<!. = DIAMOND CORE BARREL DRILLING = UNCONFl~D COMPREIVE STRENGTH = DRY DENSITY = ROCK QUALITY DESIGNATION = WATER LEVEL WHILE DRILLING OR SAMPLING = WATER LEVEL AFTER DRILLING = WATER LEVEL 24 HOURS AFTER DRILLING NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF THE GEOTECHNICAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT Tl TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN Tl COMPLETE GEOTECHNICAL REPORT CONTACT Tl BRIDGE DIVISION OF Tl OKLAHOMA DEPARTMENT OF TRANSPORTATION AT <45l STATE HIGHWAY 4B OVER INTERSTATE 4 BRIDGE "A' FOUNDATION BORING LOGS CSHEET NO. 1 OF 3l OKFUSKEE COUNTY STATE.JOB NO. 2755(4) Sl-EET NO. 1

20 BORING NO. B-3 STATION 513<JB.29, 21.5' LEFT OF CL. Sl.11VEY <DRILLED JANUARY 6, 215l SURFACE ELEVATION BORING NO. B-3A STATION , 21.5' LEFT OF CL. SURVEY <DRILLED JANUARY 12, 215l SURFACE ELEVATION ti.edil.m DENSE, LIGHT BROWN, SIL TY SAND ti.edil.m DENSE, LIGHT BROWN, POORLY GRADED SAMJ WITH SILT ti.edil.m DENSE, LIGHT BROWN, SIL TY SAND ti.edil.m STIFF, RED-BROWN, SANDY SILTY CLAY ti.edilia DENSE, RED-BROWN, SIL TY SAND DENSE TO ti.edium DENSE, RED-BROWN, POORLY GRADED SAND WITH Siil T ti.edil.m STIFF, RED-BROWN, SANDY SILT STIFF, RED-BROWN, SANDY LEAN CLAY STIFF, BROWN, SANDY SILT STIFF, GRAY, LEAN CLAY ($HALEY) CEti.ENTED, BROWN, WEATHERED SANDSTONE WITH SHALE SEAMS HARD, GRAY, WEATl RED SHALE WITH SANDSTONE SEAMS HARD, CEMENTED, INTEEDDED SHALE AND SANDSTONE BOTTOM OF BORING ) ) ) ;N = 14: MC= 9.6X ; Pl = NP; #2 = 3.X; RECOVERY = 6" ; N = 21: MC = 1.4X ; Pl = NP; #2 = 37.7X; RECOVERY = " ;N = 21: MC= 11.1X ; Pl = NP; #2 = 252X; RECOVERY = 6" ; N = 16: MC = 1 O'I LL= NP; Pl= NP; #2 = 12X; RECOVERY= " ;N = 16: MC= 14.7X LL= NP; Pl= NP; #2 = 14.7X; RECOVERY= " ; N = 7: MC = 16.5X LL = 23; Pl = 7; #2 = 52.9X; RECOVERY = 12" ; N = 14: MC = 17.6X ; Pl = NP; #2 = 17.8X; RECOVERY = " 8S ; N = 21: MC = 16'% ; Pl = NP; #2 = 12.3X; RECOVERY = " ; N = 43: MC = 17.3X LL= NP; Pl= NP; #2 = 1.5X; RECOVERY= " ; N = 21: MC=.7X ; Pl = NP; #2 = 9.7%; RECOVERY = " ; N = 17: MC =.6X ; Pl = NP; #2 = 7.9'%; RECOVERY = " ; N = 7: MC = 221 ; Pl = NP; #2 = 7.X; RECOVERY = " ; N = 14: MC= 2.7% LL = 26; Pl = 8; #2 = 59.5%; RECOVERY = " BROWN, SIL TY SAND LIGHT BROWN, POORLY GRADED SAND WITH SILT LIGHT BROWN, SIL TY SAND RED-BROWN, SAM>Y SIL TY CLAY RED-BROWN, SIL TY SAND RED-BROWN, POORLY GRADED SAND WITH Siil T RED-BROWN, SAM>Y SILT RED-BROWN, SAM>Y LEAN CLAY ; N = 13: MC=.7X ; Pl = NP; #2 = 54.9X; RECOVERY = 6" BROWN, SANDY SILT ; N = 42/6.'~ 17/6.'~ 5/2.'~ MC= 17.3X GRAY, LEAN CLAY CSHALEYJ LL= 38; Pl= ; #2 = 91.91; RECOVERY= 14" ; = 5/125'~ 5/.75" ; = 5/.75'~ 5/.63" CE...rNTED, BROWN, WEATHERED SANDSTOt SHALE SEAMS OPEN JOINTS C1 "- 8"J ; = 5/.75'~ 5/.5'" !: ; N = 25/6.'~ 5/1.5"; RECOVERY = 3'" DCD-1; UCS = 846, PSF; DD = 134. PCF; ROD = ; = 5/.94'~ 5/.75'" HARD, GRAY, WEATtERED SHALE WITH SANDSTOt SEAMS OPEN JOINTS (1 "- 8") DCD-3; ROD = OX ; = 5/.75'~ 5/.5" DCD-4; ROD = OX ; = 51.15'~ 5/.25" HARD, CEMENTED, INTEEDDED SHALE AND SANDSTONE OPEN JOINTS C1 "- 8") DCD-5; ROD = 43' ; = 5/.75'~ 5/.75'" BOTTOM OF BORING DCD-6; UCS = 229, PSF; DD = 149. PCF; ROD = 83X DCD-2; ROD = 33'% SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION <!1.1 OF THE GEOTECHNICAL REPORT. N MC LL Pl EXCAVATION CONSIDERATION & RIPPABILITY SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF TtESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, TtE BORINGS WERE ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE RODS RANGED FROM O'I TO 831 AM> TtE UNCONFlt D COMPREIVE STRENGT CUCSJ RANGED FROM 229 KSF TO 846 KSF. BASED ON TtESE VALUES, WE EXPECT THE BEDROCK AT THE PRO..ECT SITE Will BE READILY RIPPABLE WITH REGlA.AR EXCAVATION EQUIPMENT. LEGEND = SPLIT SPOON SAMPLER DCD = DIAMOND CORE BARREL DRILLING = NUMBER OF BLOWS PER 12 INCHES ucs = UNCONFlt D COMPREIVE STRENGTH = MOISTURE CONTENT DD = DRY DENSITY = LIQUID LIMIT ROD = ROCK QUALITY DESIGNATION = PLASTICITY INDEX 'Sl. = WATER LEVEL WHILE DRILLING OR SAMPLING #2 = PERCENT PAING #2 SIEVE.!'. = WATER LEVEL AFTER DRILLING = TEXAS cot PENETROMETER :<I. = WATER LEVEL 24 HOURS AFTER DRILLING SEIIC CLA ANO SPECTRAL RESPONSE ACCELERATIONS SITE CLA SEIIC CATEGORY "D" A s s,,.999 NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF TtE GEOTECl-f..llCAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT TtE TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN TtE COMPLETE GEOTECHNICAL REPORT CONTACT TtE BRIDGE DIVISION OF TtE OKLAHOMA DEPARTMENT OF TRANSPORTATION AT < STATE HIGHWAY 48 OVER INTERSTATE 4 OKFUSKEE COUNTY BRIDGE.A. FOUNDATION BORING LOGS CSHEET NO. 2 OF 3l STATE JOB NO. 2755(4) StEET NO. 2

21 BROWN, SIL TY SAND LIGHT BROWN, SIL TY SAND ORANGE-BROWN, SIL TY SAND ORANGE BROWN, CLAYEY SAND LIGHT BROWN, SIL TY SAND RED-BROWN, SIL TY SAtt> LIGHT BROWN, CLAYEY SAND RED-BROWN, LEAN CLAY WITH SAND DARK GRAY, LEAN CLAY CEt.::NTED, BROWN, WEATHERED SANDSTONE BORING NO. B-4 BORING NO. B-5 STATION , 21.95' RIGHT OF CL. SURVEY CDRILLED JANUARY 21, 215> 51.ffACE ELEVATION - 9<! YI <! ; N = 5/1.5"; RECOVERY = O" ; = 5/.25'~ 5/.13" ; = 5/.5'~ 5/.38" ; = 5/.25'~ 5/.13" SlffACE ELEVATION - 9<!12.11 APPROXIMATELY 11" OF ASPHALT PAVEM::NT LOOSE, BROWN, SIL TY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT t.::dilia DENSE, LIGHT BROWN, SIL TY SAND LOOSE TO MEDILlv'I DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT CAUGER SAMPLE TAKEN AT 25 FEETl DENSE, LIGHT BROWN, Sil TY SAND ~Dll..M DENSE, ORANGE-BROWN, Sil TY SAND LOOSE, ORANGE BROWN, CLAYEY SAND ~Dll..M DENSE, LIGHT BROWN, Sil TY CLAYEY SAND VERY DENSE TO DENSE, LIGHT BROWN, SILTY SAND ~Dll..M STIFF TO STIFF, RED-BROWN, LEAN CLAY WITH SAND STIFF, DARK GRAY, LEAN CLAY VERY HARO, DARK GRAY, LEAN CLAY CSHALEY> SOFT TO MODERATELY HARD, GRAY, WEATHERED SHALE HARD, GRAY, WEATtERED SHALE STATION 514<49.81, 23.5' LEFT OF CL. SURVEY CDRILLED JANUARY 26, 215> ~ 93o!l ;N = 7: MC= 7.3X LL = tt='; Pl = tt='; #2 = 1 BAX; RECOVERY = 12" ; N = 8: MC = 6.3X LL = tt='; Pl = tt='; #2 = 6.6X; RECOVERY = 12" ;N=: MC= 8.2X LL= tt='; Pl = tt='; #2 = 19.7X; RECOVERY= " ;N=1: MC= 5.6X LL = tt='; Pl = tt='; #2 = a.ox; RECOVERY = 15" ;N=23: MC= 7.1X LL = tt='; Pl = tf'; #2 = 7.6X; RECOVERY = O" ;N=46: MC= 9.4X LL = tt='; Pl = tt='; #2 = 26.1 X; RECOVERY = 16" ; N = 28: MC= 12.1X LL = tf'; Pl = tf'; #2 = 2.6X; RECOVERY = 16" B;N=: MC= 1.8X LL = tf'; Pl = tf'; #2 = 12.9X; RECOVERY = 16" ;N=12: MC= 13.3X LL = tf'; Pl = tf'; #2 = 29.5X; RECOVERY = " ;N=8: MC= 15.7X LL = 22; Pl = 9; #2 = 39.6X; RECOVERY = " ss-11; N = : MC= 14.9X LL = 21; Pl = 6; #2 = 27.9%; RECOVERY = 9" aa ss-12; N = 56: MC= 16.n LL = tt='; Pl = tt='; #2 = 14.22:; RECOVERY = " ; N = 38: MC= 17.7t. LL= tf'; Pl = tf'; #2 = 13.7X; RECOVERY= " ;N = 7: MC= 2.3X LL = 29; Pl = 13; #2 = 71.9X; RECOVERY = 14" ; N = 11: MC= LL = 29; Pl = 13; #2 = 79.92:; RECOVERY = " ; N = 17: MC= 19.5X LL = 27; Pl = 9; #2 = 85.4X; RECOVERY = " ; N = 7CJ. MC= 17.2X LL = 43; Pl = 22; #2 = 92.3X; RECOVERY = " ; N = 47/6.'~ 5/4,75'': MC = 16.32: LL = 45; Pl = 23; #2 = 92.62:; RECOVERY = 11" ; = 5/3.'~ 5/3.13" ; N = 34/6.'~ 5/4.5": MC= 16.8X LL = 47; Pl = 23; #2 = 98.4X; RECOVERY = 1" ; = 5/1.13'~ 5/1.'' ; = 5/.63'~ 5/.63" ; = 5/.13'~ 5/.25" ; = 5/.5'~ 5/.5'' ; = 5/.63'~ 5/25" ; = 5/.75'~ 5/.75" HARD, GRAY, WEATHERED SHALE ; = 5/. 75 ~ 5/25" BOTTOM OF BORING ; = 5/.5'~ 5/.38" ; = 5/.75'~ 5/.38" BOTTOM OF BORING ; = 5/.38'~ 5/.19" EXCAVATION CONSIDERATION & RIPPABILITY SEIIC CLA AND SPECTRAL RESPONSE ACCELERATIONS SITE GEOLOGY FOR THE SITE GEOLOGY, SEE SECTION <!1.1 OF THE GEOTECHNICAL REPORT. N MC LL Pl SEDIPtlENT ARY BEDROCK CONSISTING OF SAM> TONE, SHALE OR INTEEDDINGS OF TtESE SHOULD BE EXPECTED AT THIS SITE. AS PART OF THE SCOPE OF OLR SERVICES, TtE BORINGS WERE ADVANCED USING A DIAMOND BIT CORE BARREL. THE CORED ROCK CONSISTED OF SANDSTONE WITH SHALE INTEEDDINGS. THE RODS RANGED FROM OX TO 83X AM> TtE UNCONFl~D COMPREIVE STRENGT (UCS) RANGED FROM 229 KSF TO 846 KSF. BASED ON TtESE VALUES, WE EXPECT THE BEDROCK AT THE PRO..ECT SITE Will BE READILY RIPPABLE WITH REGlA.AR EXCAVATION EQUIPMENT. LEGEND = SPLIT SPOON SAMPLER DCD = DIAMOND CORE BARREL DRILLING = NUMBER OF BLOWS PER 12 INCHES ucs = UNCONFl~D COMPREIVE STRENGTH = MOISTURE CONTENT DD = DRY DENSITY = LIQUID LIMIT ROD = ROCK QUALITY DESIGNATION = PLASTICITY INDEX YI. = WATER LEVEL WHILE DRILLING OR SAMPLING #2 = PERCENT PAING #2 SIEVE.!'. = WATER LEVEL AFTER DRILLING = TEXAS COM: PENETROMETER :<I. = WATER LEVEL 24 HOURS AFTER DRILLING SITE CLA SEIIC CATEGORY ''O" A s,,,.1969 s,,.999 NOTE: FOR MORE INFORMATION ON THIS TABLE, SEE SECTION 4.3 OF THE GEOTECHNICAL REPORT NOTE: WATER LEVEL ELEVATIONS SHOWN WERE OBTAINED AT TtE TIME THE BORINGS WERE DRILLED AND MAY FLUCTUATE TtflOUGHOUT THE YEAR. TO OBTAIN TtE COMPLETE GEOTECHNICAL REPORT CONTACT TtE BRIDGE DIVISION OF TtE OKLAHOMA DEPARTMENT OF TRANSPORTATION AT C45l STATE HIGHWAY 48 OVER INTERSTATE 4 OKFUSKEE COUNTY BRIDGE 'A' FOUNDATION BORING LOGS CSHEET NO. 3 OF 3l STATE.JOB NO. 2755(4) StEET NO. 3

22 State Highway 48 Bridge 'A' over Interstate 4 EST Project Number: Okfuskee County, Oklahoma April 2, 215 Appendix C Boring Logs EST, Inc.

23 BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No (4) SAMPLES PAGE 1 OF 3 TESTS GRAPHICS LOG LAYER / MATERIAL DESCRIPTION Station= , 21.82' Lt of CL. Survey Surface Elev. = feet Vegetation Thickness : N/A APPROXIMATELY 11" El. = OF ASPHALT PAVEMENT DEPTH, FT. USCS SYMBOL NUMBER TYPE RECOVERY, IN. SPT- N BLOWS / FT. MOISTURE, % DRY DENSITY, PCF UNCONFINED STRENGTH, PSF LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE L:\GEOTECH\215 GEOTECH PROJECTS\ STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE REMARKS: LOOSE TO MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, SILTY SAND LOOSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT El. = El. = El. = 9.69 DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT El. = DENSE, LIGHT BROWN, SILTY SAND El. = MEDIUM DENSE, RED-BROWN, SILTY SAND El. = MEDIUM DENSE, RED-BROWN, POORLY GRADED SAND WITH SILT SP- SP- SP- SP- SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER 321 S. Berry Road Norman, OK 7372 (OFF.) (45) (FAX) (45) WATER LEVEL OBSERVATIONS 59 Ft-WD 48 Ft-24Hrs. AB Ft-AB RIG CME-55 APPROVED BORING STARTED BORING COMPLETED A.D. 12/29/14 12/3/14 FOREMAN R.J. JOB# #2 = 8.4% -#2 = 8.% -#2 = 13.7% -#2 = 5.3% -#2 = 9.2% -#2 = 17.1% -#2 = 23.2% -#2 = 22.7%

24 BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No (4) SAMPLES PAGE 2 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\ STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG REMARKS: Station= , 21.82' Lt of CL. Survey (Continued) LAYER / MATERIAL DESCRIPTION MEDIUM DENSE, RED-BROWN, POORLY GRADED SAND WITH SILT (continued) El. = DENSE, RED-BROWN, SILTY SAND LOOSE, RED-BROWN, SILTY SAND DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT VERY DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF TO VERY STIFF, PURPLE-GRAY, SILT WITH SAND El. = VERY SOFT, BROWN, SANDY SILT 321 S. Berry Road Norman, OK 7372 (OFF.) (45) (FAX) (45) El. = El. = El. = El. = El. = El. = Ft-WD DEPTH, FT Ft-24Hrs. AB USCS SYMBOL SP- SP- SP- SP- SP- ML ML NUMBER Ft-AB TYPE RECOVERY, IN. RIG SPT- N BLOWS / FT. CME-55 APPROVED MOISTURE, % BORING STARTED BORING COMPLETED A.D. DRY DENSITY, PCF 12/29/14 UNCONFINED STRENGTH, PSF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS /3/14 FOREMAN R.J. JOB# LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 = 5.3% -#2 = 13.3% -#2 = 33.9% -#2 = 9.5% -#2 = 1.6% -#2 = 7.4% -#2 = 5.6% -#2 = 72.5% -#2 = 67.7%

25 BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-1 ENGINEER: EST, Inc. PROJECT: State Job No (4) SAMPLES PAGE 3 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\ STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG Station= , 21.82' Lt of CL. Survey (Continued) REMARKS: LAYER / MATERIAL DESCRIPTION MEDIUM DENSE, DARK BROWN, SILTY SAND WITH TRACES OF RIVER GRAVEL SOFT TO MODERATELY HARD, OLIVE-GREEN, WEATHERED SHALE MODERATELY HARD TO HARD, GRAY, WEATHERED SHALE Bottom of Boring at feet 321 S. Berry Road Norman, OK 7372 (OFF.) (45) (FAX) (45) El. = El. = El. = Ft-WD DEPTH, FT Ft-24Hrs. AB USCS SYMBOL NUMBER TYPE RECOVERY, IN. 12 SPT- N BLOWS / FT. MOISTURE, % BORING STARTED BORING COMPLETED RIG CME-55 APPROVED A.D. DRY DENSITY, PCF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS 41 Ft-AB 16 15/6." 5/6." 5/.25" 5/.38" 5/.38" 5/1.19" 5/.63" 5/.63" 5/.38" 5/1.13" 5/.5" 5/.88" 5/.38" 5/.5" 5/.5" 5/.81" 5/.5" 12/29/14 FOREMAN JOB# UNCONFINED STRENGTH, PSF 12/3/ LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 = 4.4% LL = 32 PL = 17 PI = 15 -#2 = 71.% R.J.

26 BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-2 ENGINEER: EST, Inc. PROJECT: State Job No (4) SAMPLES PAGE 1 OF 3 TESTS GRAPHICS LOG LAYER / MATERIAL DESCRIPTION Station= , 37.29' Rt of CL. Survey Surface Elev. = feet Vegetation Thickness : 4" Grass DEPTH, FT. USCS SYMBOL NUMBER TYPE RECOVERY, IN. SPT- N BLOWS / FT. MOISTURE, % DRY DENSITY, PCF UNCONFINED STRENGTH, PSF LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE L:\GEOTECH\215 GEOTECH PROJECTS\ STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE REMARKS: MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE TO DENSE, LIGHT BROWN, SILTY SAND MEDIUM DENSE, YELLOW-BROWN, SILTY SAND LOOSE, YELLOW-BROWN, SILTY SAND El. = VERY DENSE TO DENSE, YELLOW-BROWN, SILTY SAND 321 S. Berry Road Norman, OK 7372 (OFF.) (45) (FAX) (45) El. = El. = El. = Ft-WD N/A-24Hrs. AB SP N/A-AB RIG SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS CME BORING STARTED BORING COMPLETED APPROVED A.D. 12/31/14 JOB# 1/5/15 FOREMAN #2 = 11.2% -#2 =.2% -#2 = 2.6% -#2 = 25.% -#2 = 15.7% -#2 = 26.2% -#2 = 33.6% R.J.

27 BORING LOG CLIENT: Oklahoma Department of Transportation LOCATION: SH-48, Bridge over I-4, Okfuskee County, Oklahoma BORING NO. B-2 ENGINEER: EST, Inc. PROJECT: State Job No (4) SAMPLES PAGE 2 OF 3 TESTS L:\GEOTECH\215 GEOTECH PROJECTS\ STATEHIGHWAY48\BRIDGE\GINT-BRIDGE\64246-BRIDGE.GPJ FIRE GRAPHICS LOG Station= , 37.29' Rt of CL. Survey (Continued) REMARKS: LAYER / MATERIAL DESCRIPTION VERY DENSE TO DENSE, YELLOW-BROWN, SILTY SAND (continued) DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT MEDIUM DENSE, LIGHT BROWN, POORLY GRADED SAND WITH SILT STIFF, GRAY, SANDY LEAN CLAY VERY LOOSE TO LOOSE, GRAY, SILTY SAND WITH GRAVEL POORLY CEMENTED, OLIVE-BROWN, WEATHERED SANDSTONE 321 S. Berry Road Norman, OK 7372 (OFF.) (45) (FAX) (45) El. = El. = El. = El. = El. = Ft-WD DEPTH, FT N/A-24Hrs. AB USCS SYMBOL SP- SP- CL NUMBER N/A-AB RECOVERY, IN. RIG 6 SPT- N BLOWS / FT BORING COMPLETED CME-55 APPROVED MOISTURE, % BORING STARTED A.D. DRY DENSITY, PCF 12/31/14 JOB# UNCONFINED STRENGTH, PSF SOIL AND ROCK CLAIFICATIONS ARE FROM DISTUED SAMPLES. CORE SAMPLES AND FURTHER LABORATORY TESTING MAY REVEAL OTHER ROCK AND/OR SOIL TYPES. THE STRATIFICATION SHOWN IN THE SOIL AND ROCK ABOVE IS AN ESTIMATION OF IN-SITU CONDITIONS. THEREFORE, THE NATURAL TRANSITION BETWEEN SOIL AND ROCK TYPES MAY BE GRADUAL. * ESTIMATED FROM POCKET PENETROMETER WATER LEVEL OBSERVATIONS TYPE /6." 7/6." 5/6." 5/1.63" 5/1.5" 1/5/15 FOREMAN LIMITS (LL) (PL) INDEXES (PI) #2 SIEVE -#2 =.2% -#2 = 16.7% -#2 = 8.4% -#2 = 5.9% LL = 3 PL = 19 PI = 11 -#2 = 64.5% -#2 = 33.8% R.J.

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

GEOTECHNICAL ENGINEERING SERVICES REPORT

GEOTECHNICAL ENGINEERING SERVICES REPORT GEOTECHNICAL ENGINEERING SERVICES REPORT HARPER ROAD BRIDGE OVER POLECAT CREEK APPROXIMATELY ~ MILE EAST OF THE INTERSECTION OF HARPER ROAD AND COUNTY ROAD N31 GRANT COUNTY, OKLAHOMA STATE JOB No. 28412(4)

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

APPENDIX C HYDROGEOLOGIC INVESTIGATION

APPENDIX C HYDROGEOLOGIC INVESTIGATION Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,

More information

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr. December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON

More information

B-1 SURFACE ELEVATION

B-1 SURFACE ELEVATION 5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0 VC 605'-0 VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE INDEX TO PLANS SHEET. 2'-" VC 6'-" VC BB EB 1 1 1 1 1 TV - " TV CONDUITS (COX E 8 - " ELECTRIC CONDUITS (SDG & E T - " TELEPHONE CONDUITS 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET. 2.

More information

AN EMPLOYEE OWNED COMPANY

AN EMPLOYEE OWNED COMPANY CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection

More information

ENGINEERING ASSOCIATES

ENGINEERING ASSOCIATES July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9

More information

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012 FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO December 12, 2012 Prepared For: AMEC Environment & Infrastructure 2000 South Colorado Boulevard, Suite 21000

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report SH-10 Bridge Over Council Hollow Creek Ottawa County, Oklahoma Project No. STPY-255F (191) EC Job Piece No. 30308 (06) April 1, 2015 Terracon Project No. 04155008 Prepared

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1 88 E. Marshall Street, Suite 0 Tulsa, OK 76 98 8 9 Phone 98 8 798 FAX DATE: April 9, 0 ADDENDUM NO.: PROJECT: New WW Hastings Hospital BID PACKAGE NO: Geotechnical Investigation RFP SUBMITTED BY: CNCR

More information

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project

Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No

Geotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,

More information

NAPLES MUNICIPAL AIRPORT

NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans

More information

RED ROCK. Report of Geotechnical Investigation TRIPLE SPAN BRIDGE OVER THE WASHITA RIVER CADDO COUNTY, OKLAHOMA STP-108C(299)CI; 28389(04)

RED ROCK. Report of Geotechnical Investigation TRIPLE SPAN BRIDGE OVER THE WASHITA RIVER CADDO COUNTY, OKLAHOMA STP-108C(299)CI; 28389(04) RED ROCK CONSULTING Report of Geotechnical Investigation OF TRIPLE SPAN BRIDGE OVER THE WASHITA RIVER CADDO COUNTY, OKLAHOMA STP-18C(299)CI; 28389(4) Prepared For: Cobb Engineering 4516 Northwest 36th

More information

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates

Drilled Shaft Foundations in Limestone. Dan Brown, P.E., Ph.D. Dan Brown and Associates Drilled Shaft Foundations in Limestone Dan Brown, P.E., Ph.D. Dan Brown and Associates Foundation Engineering How we teach our students Fundamental understanding of soil and rock behavior (good!) Focus

More information

Appendix 11-B Preliminary Geotechnical Investigation

Appendix 11-B Preliminary Geotechnical Investigation Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,

More information

Geotechnical Aspects of the Seismic Update to the ODOT Bridge Design Manual. Stuart Edwards, P.E Geotechnical Consultant Workshop

Geotechnical Aspects of the Seismic Update to the ODOT Bridge Design Manual. Stuart Edwards, P.E Geotechnical Consultant Workshop Geotechnical Aspects of the Seismic Update to the ODOT Bridge Design Manual Stuart Edwards, P.E. 2017 Geotechnical Consultant Workshop Changes Role of Geotechnical Engineer Background Methodology Worked

More information

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

GEOTECHNICAL EXPLORATION REPORT

GEOTECHNICAL EXPLORATION REPORT 110001_Report_Geotech, 2/ GEOTECHNICAL EXPLORATION REPORT BENSON STREET SEWER REPLACEMENT READING, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 20031 PREPARED FOR AECOM 219 MALSBURY ROAD CINCINNATI, OHIO 22

More information

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3 GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

6.2 Geotechnical Investigation and Construction Material Survey

6.2 Geotechnical Investigation and Construction Material Survey 6.2 Geotechnical Investigation and Construction Material Survey Geological surveys and investigations were conducted to obtain information on the subsurface geological condition required for the preliminary

More information

GZA GeoEnvironmental, Inc.

GZA GeoEnvironmental, Inc. GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring

More information

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia. REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU

More information

TIERRA. Florida License No Florida License No

TIERRA. Florida License No Florida License No March 9, 208 TIERRA AECOM 7650 West Courtney Campbell Cswy Tampa, FL 33607 Attn: RE: Mr. Edgar Figueroa, P.E. Geotechnical Engineering Services Report Purchase Order No.: 9532 AECOM Project Number: 6055499

More information

NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS

NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS NEW DOWN-HOLE PENETROMETER (DHP-CIGMAT) FOR CONSTRUCTION APPLICATIONS 1 2 C. Vipulanandan 1, Ph.D., M. ASCE and Omer F. Usluogullari 2 Chairman, Professor, Director of Center for Innovative Grouting Materials

More information

TP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan

More information

December 8, 2016 EEI Project No Mr. Gary Cowles Cowles, Murphy Glover & Associates, LLC 457 St. Michael Street Mobile, Alabama 36602

December 8, 2016 EEI Project No Mr. Gary Cowles Cowles, Murphy Glover & Associates, LLC 457 St. Michael Street Mobile, Alabama 36602 December, 2016 EEI Project No. 29192.00 Mr. Gary Cowles Cowles, Murphy Glover & Associates, LLC 457 St. Michael Street Mobile, Alabama 36602 Phone: 2514331611 Fax: 2514331411 email: gcowles@cmga.com Re:

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Appendix G GEOLOGICAL INVESTIGATION

Appendix G GEOLOGICAL INVESTIGATION Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR

More information

SOIL STABILITY ANALYSES

SOIL STABILITY ANALYSES AMERICAN WATER ENGINEERING SERVICES, LLC SOIL STABILITY ANALYSES OMLR 1 PERMIT APPLICATION VARRA PIT 2 AWES PROJECT # 0-0-VARRA July 27, 1 Prepared for: Prepared by: Varra Companies, Inc. AWES, LLC 80

More information

Appendix J. Geological Investigation

Appendix J. Geological Investigation Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report BOLIVAR BUSINESS PARK Bolivar, Missouri October 7, 2016 Project No. B5165061 Prepared for: City of Bolivar Bolivar, Missouri Prepared by: Terracon Consultants,

More information

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H SYMBOL SOURCE 8 9 1 SOIL DATA NATURAL SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY NO. CONTENT LIMIT LIMIT INDEX (%) (%) (%) (%) Client: County of Berthoud Project: Project No.: Boring B-2 S-1-5' 6.2 8

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014 CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a

More information

Geotechnical Engineering Report

Geotechnical Engineering Report REPORT COVER PAGE Geotechnical Engineering Report Proposed T-Line Structure Tahlequah, Oklahoma October 17, 2018 Terracon Project No. 04185192 Prepared for: GRDA Tulsa, Oklahoma Prepared by: Terracon Consultants,

More information

Technical Memorandum. Soil Borings

Technical Memorandum. Soil Borings Technical Memorandum To: Project File and Appendix F to Sediment Remedial Investigation Report From: Sara L. Leow, PE Subject: Geotechnical Investigation and Results Summary Date: February 213 Project:

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

Preliminary Geotechnical Engineering Report

Preliminary Geotechnical Engineering Report Preliminary Geotechnical Engineering Report Park 3 Barrow County, Georgia July, Terracon Project No. 4906 Prepared For: Winder Barrow Industrial Authority Prepared By: Terracon Consultants, Inc. Atlanta,

More information

FIFTH STREET GRADE SEPARATION CARSON CITY, NEVADA

FIFTH STREET GRADE SEPARATION CARSON CITY, NEVADA GEOTECHNICAL REPORT FIFTH STREET GRADE SEPARATION CARSON CITY, NEVADA JULY 2005 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT

More information

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142

More information

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)

H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,

More information

FIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK ELGIN, SOUTH CAROLINA S&ME Project No. 1611-04-450 Prepared For: KERSHAW COUNTY ECONOMIC DEVELOPMENT OFFICE Post

More information