EROSION CONTROL NARRATIVE

Size: px
Start display at page:

Download "EROSION CONTROL NARRATIVE"

Transcription

1 EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment movement. This Erosion Control plan has been divided into four (4) phases; Initial, Interim, Final A and Final B. The initial phase will take place before construction activities begin on the site. The purpose of this phase will be to set up perimeter control construction best management practices (CBMP). This phase will consist of CBMPs such as silt fence, vehicle tracking control, concrete washout areas, stabilized staging areas, drainage swales/diversion ditches, and temporary sediment basins. These CBMPs will ensure proper sediment and erosion control as construction activities commence within the site. This phase will stay as is in the release plans dated June 12, After the Initial Phase erosion control CBMPs have been established, the Interim Erosion Control phase will begin. During this phase, construction activities such as clearing, grading, utility and infrastructure placement will begin. Rough cut street control will be in place during this phase once overlot grading is completed. In addition, as part of this phase, a temporary detention pond will be put in place, additional to the two sediment basins. All the Erosion Control design calculations for the temporary detention pond 0, sediment basin 1 and 2, as well as the temporary Diversion Ditch and swale have been included with this submittal. A basin map showing the tributary areas going into each of the sediment basins has been included in the report (see map SBTM). The percentage of imperviousness used to design the temporary detention pond 0 is 40% per the Residential % Imperviousness calculations, attached in this report. Diversion Ditch section EC A-A (see construction plans) has been sized for cfs which is the proposed flow from design points 22, 25, 30, and 27 (see Drainage Map). Drainage Swale section EC C-C (see construction plans) has been sized for cfs which is the sum of flows from proposed basins A- 23, A-24, A-25, A-26, A-27, and A-28 (see Drainage Map). Temporary Detention Pond 0 has been sized to required volume of 173, c.f. of storage (3.987 acre-feet), and the spillway weir has been designed for 167 cfs inflow, per the StormCAD results. Temporary Sediment Basin 1 and Sediment Basin 2, have been sized per UDFCD s sediment basin specifications of 3,600 cf/ac. Temporary Detention Pond 0 was designed with a temporary outlet structure as part of the roads draining to this pond will be paved before the Floodplain permit is granted. Sediment Basins 1 was designed to release the design volume through a 5 Floating Skimmer in no less than 48 hours per UDFCD s Sediment Basin Chapter 7, Volume 3. Sediment Basin 2 was designed as a standard sediment basin, using the SB-1 table in the above mention UDFCD chapter for a basin of 15 acres. This sediment basin will release through a riser pipe per the SB-1 table. The outlet structure, floating skimmer and riser pipe were designed in conformance with City of Thornton Standards and Specifications, UDFCD and State requirements. These CBMPs will ensure proper sediment and erosion control as construction activities commence within the site. The Final A phase will take place after the overlot grading has been completed. The Final A Phase will consists of the final stabilization of part of the site (see construction plans, paving area), including CBMPs such as surface roughening, mulching, permanent seeding, and inlet protection. While keeping previous CBMPs such as silt fence, and drainage swales/ditches. The Temporary Detention Pond 0 and the two Sediment Basins will remain during this phase. Final B phase will take place once the Floodplain permit has been issued and permanent stormwater facilities have been constructed, the temporary detention pond and sediment basins can be removed. As inlets/outlets are constructed, inlet/outlet protection will be placed. Final B phase will consists of the

2 final stabilization for the whole site, including CBMPs such as surface roughening, mulching, permanent seeding, and inlet protection. Applicable CBMPs will be kept in place until construction has been completed and final stabilization is complete. This phase will stay as is in the release plans dated June 12, 2017, called Final Erosion Control plans.

3 DETENTION BASIN STAGE-STORAGE TABLE BUILDER Project: Willow Bend 1 UD-Detention, Version 3.07 (February 2017) Basin ID: Temporary Detention Pond 0 Depth Increment = ft Optional Optional Example Zone Configuration (Retention Pond) Stage - Storage Stage Override Length Width Area Override Area Volume Volume Description (ft) Stage (ft) (ft) (ft) (ft^2) Area (ft^2) (acre) (ft^3) (ac-ft) Required Volume Calculation Top of Micropool Selected BMP Type = EDB , , Watershed Area = acres , , Watershed Length = 3,218 ft , , Watershed Slope = ft/ft , , Watershed Imperviousness = 40.00% percent , , Percentage Hydrologic Soil Group A = 0.0% percent , , Percentage Hydrologic Soil Group B = 0.0% percent , , Percentage Hydrologic Soil Groups C/D = 100.0% percent , , Desired WQCV Drain Time = 40.0 hours , , Location for 1-hr Rainfall Depths = Thornton - Civic Center Water Quality Capture Volume (WQCV) = acre-feet Optional User Override Excess Urban Runoff Volume (EURV) = acre-feet 1-hr Precipitation 2-yr Runoff Volume (P1 = 0.97 in.) = acre-feet 0.97 inches 5-yr Runoff Volume (P1 = 1.38 in.) = acre-feet 1.38 inches 10-yr Runoff Volume (P1 = 1.37 in.) = acre-feet inches 25-yr Runoff Volume (P1 = 1.77 in.) = acre-feet inches 50-yr Runoff Volume (P1 = 2.1 in.) = acre-feet inches 100-yr Runoff Volume (P1 = 2.69 in.) = acre-feet 2.69 inches 500-yr Runoff Volume (P1 = 3.4 in.) = acre-feet inches Approximate 2-yr Detention Volume = acre-feet Approximate 5-yr Detention Volume = acre-feet Approximate 10-yr Detention Volume = acre-feet Approximate 25-yr Detention Volume = acre-feet Approximate 50-yr Detention Volume = acre-feet Approximate 100-yr Detention Volume = acre-feet Stage-Storage Calculation Zone 1 Volume (WQCV) = acre-feet Zone 2 Volume (EURV- Zone 1) = acre-feet Zone 3 Volume (100-year - Zones 1 & 2) = acre-feet Total Detention Basin Volume = acre-feet Initial Surcharge Volume (ISV) = user ft^3 Initial Surcharge Depth (ISD) = user ft Total Available Detention Depth (H total) = user ft Depth of Trickle Channel (H TC) = user ft Slope of Trickle Channel (S TC) = user ft/ft Slopes of Main Basin Sides (S main) = user H:V Basin Length-to-Width Ratio (R L/W) = user Initial Surcharge Area (A ISV) = user ft^2 Surcharge Volume Length (L ISV) = user ft Surcharge Volume Width (W ISV) = user ft Depth of Basin Floor (H FLOOR) = user ft Length of Basin Floor (L FLOOR) = user ft Width of Basin Floor (W FLOOR) = user ft Area of Basin Floor (A FLOOR) = user ft^2 Volume of Basin Floor (V FLOOR) = user ft^3 Depth of Main Basin (H MAIN) = user ft Length of Main Basin (L MAIN) = user ft Width of Main Basin (W MAIN) = user ft Area of Main Basin (A MAIN) = user ft^2 Volume of Main Basin (V MAIN) = user ft^3 Calculated Total Basin Volume (V total) = user acre-feet UD-Detention_v3.07-Sediment Pond 0.xlsm, Basin 5/23/2018, 12:33 PM

4 DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) User Defined Stage-Area Boolean for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC H_FLOOR L_FLOOR_OTHER Length, Width (ft.) ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.97 Zone 1 (WQCV) 1.97 Zone 1 (WQCV) 3.26 Zone 2 (EURV) 3.26 Zone 2 (EURV) 200 Area (sq.ft.) 5.57 Zone 3 (100-year 5.57 Zone 3 (100-year) Stage (ft) Length (ft) Width (ft) Area (sq.ft.) Area (acres) Volume (ac-ft) Stage (ft.) Area (acres) Volume (ac-ft) UD-Detention_v3.07-Sediment Pond 0.xlsm, Basin 5/23/2018, 12:33 PM

5 Detention Basin Outlet Structure Design Project: Willow Bend 1 Basin ID: Temporary Detention Pond 0 UD-Detention, Version 3.07 (February 2017) Stage (ft) Zone Volume (ac-ft) Outlet Type Zone 1 (WQCV) Orifice Plate Zone 2 (EURV) Orifice Plate Zone 3 (100-year) Weir&Pipe (Restrict) Example Zone Configuration (Retention Pond) Total User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft 2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate Invert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 1.806E-02 ft 2 Depth at top of Zone using Orifice Plate = 3.26 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = 2.60 sq. inches (diameter = 1-13/16 inches) Elliptical Slot Area = N/A ft 2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) Row 9 (optional) Stage of Orifice Centroid (ft) 2.74 Orifice Area (sq. inches) 2.60 Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft 2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 4.50 N/A ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, H t = 4.50 N/A feet Overflow Weir Front Edge Length = 5.67 N/A feet Over Flow Weir Slope Length = 2.92 N/A feet Overflow Weir Slope = 0.00 N/A H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area = 3.23 N/A should be > 4 Horiz. Length of Weir Sides = 2.92 N/A feet Overflow Grate Open Area w/o Debris = N/A ft 2 Overflow Grate Open Area % = 80% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 6.62 N/A ft 2 Debris Clogging % = 50% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 4.11 N/A ft 2 Outlet Pipe Diameter = N/A inches Outlet Orifice Centroid = 0.97 N/A feet Restrictor Plate Height Above Pipe Invert = inches Half-Central Angle of Restrictor Plate on Pipe = 1.70 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway Spillway Invert Stage= 6.00 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.60 feet Spillway Crest Length = feet Stage at Top of Freeboard = 7.60 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 1.19 acres Freeboard above Max Water Surface = 1.00 feet Routed Hydrograph Results Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) = Calculated Runoff Volume (acre-ft) = OPTIONAL Override Runoff Volume (acre-ft) = Inflow Hydrograph Volume (acre-ft) = Predevelopment Unit Peak Flow, q (cfs/acre) = Predevelopment Peak Q (cfs) = Peak Inflow Q (cfs) = Peak Outflow Q (cfs) = Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A Structure Controlling Flow = Plate Plate Plate Plate Plate Overflow Grate 1 Overflow Grate 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) = N/A N/A N/A N/A N/A Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) = Time to Drain 99% of Inflow Volume (hours) = Maximum Ponding Depth (ft) = Area at Maximum Ponding Depth (acres) = Maximum Volume Stored (acre-ft) =

6 FLOW [cfs] Detention Basin Outlet Structure Design UD-Detention, Version 3.07 (February 2017) COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2 500YR Count_Underdrain IN = eter = 3/8 inch) YR OUT Count_WQPlate = eter = 7/16 inch) 100YR IN 100YR Count_VertOrifice1 OUT = eter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean 50YR Count_VertOrifice2 IN = eter = 9/16 inch) 4 1 5yr, <72hr 0 50YR OUT Count_Weir1 = eter = 5/8 inch) >5yr, <120hr 0 25YR IN Count_Weir2 = er = 11/16 inch) Max Depth Row 25YR OUT 10YR Count_OutletPipe1 IN = eter = 3/4 inch) WQCV 186 Watershed Constraint Check 10YR Count_OutletPipe2 OUT = er = 13/16 inch) 2 Year 260 Slope COUNTA_2 5YR (Standard IN FSD Setup)= eter = 7/8 inch) EURV 307 Shape 4.96 MaxPondDepth_Error? 5YR OUT FALSE 0.67 er = 15/16 inch) 5 Year 370 2YR IN Hidden Parameters & Calculations 0.76 meter = 1 inch) 10 Year 404 Spillway Depth 2YR OUT 0.86 = 1-1/16 inches) 25 Year EURV IN WQ Plate Flow at 100yr depth = = 1-1/8 inches) 50 Year 531 EURV OUT CLOG #1= 40% 1.08 = 1-3/16 inches) 100 Year Z1_Boolean WQCV IN C dw #1 = = 1-1/4 inches) 500 Year Z2_Boolean WQCV OUT C do #1 = = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = = 1-3/8 inches) 1 Opening Message CLOG #2= #VALUE! 1.59 = 1-7/16 inches) Draintime Running C dw #2 = #VALUE! 1.73 = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4) C do #2 = #VALUE! 1.88 = 1-9/16 inches) Vertical Orifice Overflow Weir #2 Angle = #VALUE! 2.03 = 1-5/8 inches) Vertical Orifice Boolean 0 Underdrain Q at 100yr depth = /16 inches) Overflow Weir Max Depth VertOrifice1 Q at 100yr depth = = 1-3/4 inches) Overflow Weir 2 TIME [hr] yr Depth VertOrifice2 Q at 100yr depth = /16 inches) Outlet Pipe Freeboard PONDING DEPTH [ft] 7 EURV_draintime_user = 2.72 = 1-7/8 inches) Outlet Pipe Spillway Count_User_Hydrographs 500YR /16 inches) 0 Spillway Length CountA_3 100YR(EURV & 100yr) = eter = 2 inches) Button Visibility Boolean FALSE Time Interval CountA_4 50YR (100yr Only) = gular openings) 1 Button_Trigger 25YR 10YR 5YR 2YR EURV WQCV 0 Underdrain 1 WQCV Plate 0 EURV-WQCV Plate 0 EURV-WQCV VertOrifice 1 Outlet 90% Qpeak 0 Outlet Undetained DRAIN TIME [hr] AREA [ft^2], VOLUME [ft^3] 400, , , , , , ,000 User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] 1, , , OUTFLOW [cfs] 50, PONDING DEPTH [ft] S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound

7 Storm Inflow Hydrographs Detention Basin Outlet Structure Design Outflow Hydrograph Workbook Filename: UD-Detention, Version 3.07 (February 2017) The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 6.74 min 0:00: :06: Hydrograph 0:13: Constant 0:20: :26: :33: :40: :47: :53: :00: :07: :14: :20: :27: :34: :41: :47: :54: :01: :08: :14: :21: :28: :35: :41: :48: :55: :01: :08: :15: :22: :28: :35: :42: :49: :55: :02: :09: :16: :22: :29: :36: :43: :49: :56: :03: :10: :16: :23: :30: :37: :43: :50: :57: :03: :10: :17: :24: :30: :37: :44: :51: :57: :04: :11: :18: :24: :31: :38: :45: :51: :58: :05:

8 UD-Detention, Version 3.07 (February 2017) Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage - Storage Description Detention Basin Outlet Structure Design Stage Area Area Volume Volume Total Outflow [ft] [ft^2] [acres] [ft^3] [ac-ft] [cfs] For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable).

9 PROJECT : Willow Bend 1 DATE : 3/30/2018 PROJECT NO. : BY : IC Grate Capacity Calculations - TEMPORARY DETENTION POND 0 A. Verify grate can pass the 100-year flow: Q 100 = cfs Determine the area necessary to pass the required flow through grate: A = Q / (C*(2GH) 1/2 ) Q: cfs C: 0.65 G: 32.2 ft/s 2 H: 2.30 ft A open = 4.59 ft 2 (Required) Try: CDOT Close Mesh Grate Grate size: (L*W) 5.67 X 2.92 ft Area of grate = Ft 2 Bars Across Length Bar size: 4.0 in deep X 0.38 in wide spaced at 2.38 inches OC No. of bars = [(W ft * 12 in/ft) / Sp(in)] + 1 = 16 Bars Area of bars = L Bar * W Bar * Number of bars = 2.84 ft 2 Bars Across Width Bar size: in deep X 0.38 in wide spaced at 8 inches OC No. of bars = [(W ft * 12 in/ft) / Sp(in)] + 1 = 5 Bars Area of bars = L Bar * W Bar * Number of bars = 0.46 ft 2 Area of grate open to flow = A Grate - A Bars = ft 2 % Open = 80.1% Area** 6.63 Ft 2 > 4.59 Ft 2 Grate can pass the required flow ** 50% reduction of the open area of the inlet has been applied for a clogging factor

10 Chapter 12 Storage TEMPORARY DETENTION POND #0 RIPRAP RUNDOWN Figure Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 2

11 Chapter 12 Storage TEMPORARY DETENTION POND #0 SPILLWAY RIPRAP Figure Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 2

12 Determination of Culvert Headwater and Outlet Protection Project: Basin ID: Willow Bend 1 Sediment Pond 0 - Outfall Soil Type: Choose One: Sandy Non-Sandy Design Information (Input): Design Discharge Q = 36.3 cfs Circular Culvert: Barrel Diameter in Inches D = 36 inches Inlet Edge Type (Choose from pull-down list) Box Culvert: OR Barrel Height (Rise) in Feet Height (Rise) = ft Barrel Width (Span) in Feet Width (Span) = ft Inlet Edge Type (Choose from pull-down list) Number of Barrels No = 1 Inlet Elevation Elev IN = 5233 ft Outlet Elevation OR Slope Elev OUT = ft Culvert Length L = ft Manning's Roughness n = Bend Loss Coefficient k b = 0 Exit Loss Coefficient k x = 1 Tailwater Surface Elevation Elev Y t = ft Max Allowable Channel Velocity V = 5 ft/s Required Protection (Output): Tailwater Surface Height Y t = 1.20 ft Flow Area at Max Channel Velocity A t = 7.26 ft 2 Culvert Cross Sectional Area Available A = 7.07 ft 2 Entrance Loss Coefficient k e = 0.20 Friction Loss Coefficient k f = 1.00 Sum of All Losses Coefficients k s = 2.20 ft Culvert Normal Depth Y n = 1.97 ft Culvert Critical Depth Y c = 1.96 ft Tailwater Depth for Design d = 2.48 ft Adjusted Diameter OR Adjusted Rise D a = - ft Expansion Factor 1/(2*tan(Θ)) = 5.32 Flow/Diameter 2.5 OR Flow/(Span * Rise 1.5 ) Q/D^2.5 = 2.33 ft 0.5 /s Froude Number Fr = 0.98 Tailwater/Adjusted Diameter OR Tailwater/Adjusted Rise Yt/D = 0.40 Inlet Control Headwater HW I = 2.89 ft Outlet Control Headwater HW O = 2.69 Design Headwater Elevation HW = 5, ft Headwater/Diameter OR Headwater/Rise Ratio HW/D = 0.96 Minimum Theoretical Riprap Size d 50 = 6 in Nominal Riprap Size d 50 = 6 in UDFCD Riprap Type Type = VL Length of Protection L p = 17 ft Width of Protection T = 7 ft

13 Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Wednesday, May TEMPORARY DETENTION POND 0 - OUTFALL PIPE ANALYSIS Circular Diameter (ft) = 3.00 Invert Elev (ft) = Slope (%) = 0.50 N-Value = Calculations Compute by: Known Q Known Q (cfs) = Highlighted Depth (ft) = 1.98 Q (cfs) = Area (sqft) = 4.96 Velocity (ft/s) = 7.31 Wetted Perim (ft) = 5.70 Crit Depth, Yc (ft) = 1.96 Top Width (ft) = 2.84 EGL (ft) = 2.81 Elev (ft) Depth (ft) Section Reach (ft)

14 PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : BY : IC Sediment Basin Calculations - TEMP.SED. BASIN #1 Required Sediment Basin Volume Tributary Area (ac) Provided Volume Contour Elevation Actual Elevation Total Required Volume = 1.50 ac-ft ( Volume = 3600 CF/AC ) = 65,232 ft3 = 32,616 ft3 (50% Volume) Ft 2 1/3 (A1 + A2 + (A1A2) 1/2 ) D Total Volume (ft 3 ) Total Volume (ac-ft) 12, ,782 13,773 13, ,887 15,823 29, ,164 18,014 47, ,548 20,344 67, ,963 22,745 90, ,479 Elevation Depth Pond Overflow Crest Elev= % Sediment Basin Water Elev= Sediment Basin Water elevation= JANSEN STRAWN CONSULTING ENGINEERS 1165 S. Pennsylvania St. - Denver, CO p: f:

15 PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : BY : IC Overflow Weirs - TEMP.SED. BASIN #1 Pond Weir Tributary Area (ac) Depth (100-yr) Basin Slope (%) Basin Length (ft) % Soil Type %: A= 0.00% B= 0.00% C= % Max Allowable Release Rate Q 100 = cfs (q= 1.19 cfs/ac) aq (Equation 12-5) Weir Equation=>Q=CLH 3/2 Try Weir Release: Q 100 = cfs C= 3.00 L= 28 ft Flow Depth= 0.38 ft USE: 28' JANSEN STRAWN CONSULTING ENGINEERS 990 S. Broadway - Denver, CO p: f:

16 5 Faircloth Skimmer Cut Sheet J. W. Faircloth & Son, Inc Coupling Sch 40 INCLUDED coupling But connection not attached 1 5 pvc float 2 Vent with Silver tip Inlet 5 Aluminum straps suspending inlet 4 Sch 40 SOLID pvc barrel or arm SUPPLIED BY USER hose, ss clamps 4 threaded male nipple on outlet end 1 5 inlet extension 4 4 HEAD on center of inlet and orifice Skimmer shown in floating position 1. Hose attached to outlet using the threaded 4 nipple. Typical methods used: on a metal structure a steel stubout welded on the side at the bottom to the side with a 4 threaded coupling or reducers; on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel (solid, not foam core pipe) should be 1.4 times the depth of water with a minimum length of 8 so the inlet can be pulled to the side for maintenance. If more than 10 long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from 5 maximum inlet to a 4 barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice can be reduced using the plug and cutter provided to control the outflow rate. 5. Inlet is 8 pipe between the straps with slots cut in the inlet and aluminum screen door (smaller than shown in illustration) for access to the 5 inlet and orifice inside. 6. Capacity 32,832 cubic feet per day maximum with 5 inlet and 4 head. Inlet can be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. 5inchCut TM November 14, 2007

17 Chapter 12 Storage TEMPORARY SEDIMENT POND #1 RIPRAP RUNDOWN Figure Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 2

18 Chapter 12 Storage TEMPORARY SEDIMENT POND #1 SPILLWAY RIPRAP Figure Embankment protection details and rock sizing chart (adapted from Arapahoe County) September 2017 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 2

19 Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Friday, Apr TEMPORARY DIVERSION DITCH EC-A-A TO SEDIMENT BASIN #1 Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 2.00 Invert Elev (ft) = Slope (%) = 2.06 N-Value = Calculations Compute by: Known Q Known Q (cfs) = Highlighted Depth (ft) = 0.85 Q (cfs) = Area (sqft) = 7.01 Velocity (ft/s) = 4.04 Wetted Perim (ft) = Crit Depth, Yc (ft) = 0.83 Top Width (ft) = EGL (ft) = 1.10 Elev (ft) Depth (ft) Section Reach (ft)

20 PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : BY : IC Sediment Basin Calculations - TEMP.SED. BASIN #2 Required Sediment Basin Volume Tributary Area (ac) Provided Volume Contour Elevation Actual Elevation Total Required Volume = 1.28 ac-ft ( Volume = 3600 CF/AC ) = 55,908 ft3 = 27,954 (50% Volume) Ft 2 1/3 (A1 + A2 + (A1A2) 1/2 ) D Total Volume (ft 3 ) Total Volume (ac-ft) 10, ,531 11,619 11, ,433 13,471 25, ,436 15,424 40, ,539 17,477 57, ,742 19,630 77, ,047 21,884 99, Elevation Depth Pond Overflow Crest Elev= % Sediment Basin Water Elev= Sediment Basin Water elevation= JANSEN STRAWN CONSULTING ENGINEERS 1165 S. Pennsylvania St. - Denver, CO p: f:

21 PROJECT : Willow Bend DATE : 5/22/2018 PROJECT NO. : BY : IC Overflow Weirs Pond Weir Tributary Area (ac) Depth (100-yr) Basin Slope (%) Basin Length (ft) % Soil Type %: A= 0.00% B= 0.00% C= % Max Allowable Release Rate Q 100 = cfs (q= 1.15 cfs/ac) aq (Equation 12-5) Weir Equation=>Q=CLH 3/2 Try Weir Release: Q 100 = cfs C= 3.00 L= 22 ft Flow Depth= 0.39 ft USE: 22' JANSEN STRAWN CONSULTING ENGINEERS 990 S. Broadway - Denver, CO p: f:

22 Channel Report Hydraflow Express Extension for Autodesk AutoCAD Civil 3D by Autodesk, Inc. Tuesday, May TEMPORARY SWALE EC-C-C TO SEDIMENT BASIN #2 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 1.20 Invert Elev (ft) = Slope (%) = 1.52 N-Value = Calculations Compute by: Known Q Known Q (cfs) = Highlighted Depth (ft) = 1.08 Q (cfs) = Area (sqft) = 7.99 Velocity (ft/s) = 3.78 Wetted Perim (ft) = Crit Depth, Yc (ft) = 1.00 Top Width (ft) = EGL (ft) = 1.30 Elev (ft) Depth (ft) Section Reach (ft)

23 Sediment Basin (SB) SC-7 August 2013 Urban Drainage and Flood Control District SB-5 Urban Storm Drainage Criteria Manual Volume 3

24 SC-7 Sediment Basin (SB) SB-6 Urban Drainage and Flood Control District August 2013 Urban Storm Drainage Criteria Manual Volume 3

25 Sediment Basin (SB) SC-7 August 2013 Urban Drainage and Flood Control District SB-7 Urban Storm Drainage Criteria Manual Volume 3

EROSION CONTROL NARRATIVE

EROSION CONTROL NARRATIVE EROSION CONTROL NARRATIVE Erosion and sediment control has been designed for the Willow Bend Phase I Subdivision according to UDFCD and the City of Thornton criteria, in order to minimize erosion and sediment

More information

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO 88th Avenue and Pecos Street Stormwater Drainage Design Report Reeve & Associates, Inc. Solutions You Can Build On for Maverik, Inc. 88th Avenue and Pecos Street Thornton, CO submitted to Reeve & Associates,

More information

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO October 14, 2016 Revised: March 30, 2017 JN: 15096 Prepared for: PCS Group, Inc. 1001 16 th Street #3 B-180 Denver, CO 80265 P: 303.561.4905

More information

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado PRELIMINARY DRAINAGE REPORT Strategic Land Solutions, Inc. JN: 16-002-15 Report Date/History: July

More information

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4 These calculations should be used when designing the outlet structures for extended wet and dry detention basins (Sections 4. 7 and 4.8). The water quality outlet size and the trash rack design will vary

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Continuing Education Course #101 Drainage Design with WinTR-55

Continuing Education Course #101 Drainage Design with WinTR-55 1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the

More information

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Autodesk Storm and Sanitary Analysis 2014 - Version 8.1.62 (Build 1) ----------------- *** Project Description *** File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF Analysis Options Flow

More information

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 603 Park Point Dr. Suite 100 Golden, CO 80401 (303)-801-2900 June 29, 2015 Revised August 14, 2015 CERTIFICATE

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread

More information

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area

More information

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229 Development Engineering Land Surveying Construction Administration District Services October 20, 2017 City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

More information

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS By Thomas T. Burke, Jr., PhD, PE Luke J. Sherry, PE, CFM Christopher B. Burke Engineering, Ltd. October 8, 2014 1 SEMINAR OUTLINE Overview of hydrologic

More information

WATER MANAGEMENT REPORT FOR PAGE ESTATES

WATER MANAGEMENT REPORT FOR PAGE ESTATES WATER MANAGEMENT REPORT FOR PAGE ESTATES SLB Consulting of SW Florida, LLC PO Box 2826 Bonita Springs, FL. 34133 Phone: 239-948-9566 sandra@slbconsult.com C.O.A. # 25395 September 1, 2014 Sandra L. Bottcher

More information

Section 4: Model Development and Application

Section 4: Model Development and Application Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK Prepared for The District of Columbia Department of Transportation Washington, D.C. Prepared by Parsons Transportation

More information

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collection... 2 Treatment... 3 Storage... 3 Disposal... 4 Soils...

More information

Introduction and Organization of Instructions The following is a brief outline for use the skimmer, how to size and shape the basin, how to construct

Introduction and Organization of Instructions The following is a brief outline for use the skimmer, how to size and shape the basin, how to construct A Manual for Designing, Installing, and Maintaining Skimmer Sediment Basins J. W. Faircloth & Son Post Office Box 757 Hillsborough, North Carolina 27278 Telephone/Fax (919) 732-1266 From fairclothskimmer.com,

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE March 18, 2003 This page left blank intentionally. March 18, 2003 G-2 FIGURES Page # Figure G.1 Estimated Runoff from Precipitation Over Different

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details Project Description File Name... 323 - Att Pond 3 East PIPES ONLY.SPF Project Options Flow Units... Elevation Type... Hydrology Method... EPA SWMM Infiltration Method... Link Routing Method... Enable Overflow

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water. Design Manual Chapter - Stormwater D - Storm Sewer Design D- Storm Sewer Sizing A. Introduction The purpose of this section is to outline the basic hydraulic principles in order to determine the storm

More information

Stormwater Capacity Analysis for Westover Branch Watershed

Stormwater Capacity Analysis for Westover Branch Watershed Stormwater Capacity Analysis for Westover Branch Watershed Pimmit Run Little Pimmit Run, Mainstem Stohman's Run Gulf Branch Pimmit Run Tributary Little Pimmit Run, W. Branch Little Pimmit Run, E. Branch

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Hydrology Study Report

Hydrology Study Report Hafeez Consulting www.hafeezconsulting.com Civil/ Structural Engineering, Design & Construction 1451 S. Hacienda St. Anaheim CA 92804 (714) 225-4565 Fax (714)917-2977 engineer@hafeezconsulting.com Hydrology

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT STORMWATER MANAGEMENT REPORT THE FAIRWAYS AT EDGEWOOD LOTS 5 & 6, BLOCK 1201 TOWNSHIP OF RIVER VALE BERGEN COUNTY, NEW JERSEY PREPARED BY: DAPHNE A. GALVIN PROFESSIONAL ENGINEER LICENSE NO. 24GE03434900

More information

Chapter 10 - Sacramento Method Examples

Chapter 10 - Sacramento Method Examples Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. High Street TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: High Street Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction

More information

Drainage Study for Civic Center Way

Drainage Study for Civic Center Way Drainage Study for 23401 Civic Center Way P.C.C.E. INC. CIVIL ENGINEERING AND DESIGN Drainage Study for 23401 Civic Center Way WHOLE FOODS AT THE PARK Prepared by: P.C.C.E. INC STEPHEN R. SMITH, P.E. 23801

More information

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)

More information

Basic Hydraulics June 2007

Basic Hydraulics  June 2007 Basic Hydraulics www.concrete-pipe.org June 2007 2007 Overview Open Channel Flow Manning Equation Basic Culvert Design Sanitary Sewer Design Flow, Velocity Stormwater Sewer Design Flow, Velocity 2 Open

More information

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5

Interconnected Channel and Pond Routing Model (ICPR) 2002 Streamline Technologies, Inc. Page 1 of 5 ==== Basins ============================================================================== Name: 1A Node: Swale 1 Status: Onsite : Type: SCS Unit Hydrograph CN Unit Hydrograph: Uh256 Peaking Factor: 256.0

More information

Wellsgate Terrace SPECIFICATIONS.

Wellsgate Terrace SPECIFICATIONS. GRADING NOTES: 1. LOT GRADING SHALL BE COMPLETED TO PROVE SUFFICIENT DIRT ON EACH PAD TO ACHIEVE THE CRITICAL PAD GRADES AND SPOT GRADES ON EACH LOT. AFTER ACHIEVING CRITICAL PAD GRADES INDICATED ON THIS

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

STORMWATER DESIGN CALCULATIONS

STORMWATER DESIGN CALCULATIONS STORMWATER DESIGN CALCULATIONS REF : C7011-2390 AT 19a-23 MEMORIAL AVENUE BLACKWALL FOR MR KERR Contents 1.0 Detention System Requirements 1.1 Storage-Area calcs. 1.2 Data Files for Pre & Post Developed

More information

The Effect of Stormwater Controls on Sediment Transport in Urban Streams

The Effect of Stormwater Controls on Sediment Transport in Urban Streams Hydrology Days 2004 The Effect of Stormwater Controls on Sediment Transport in Urban Streams Christine A. Rohrer, P.E. 1 Master s Candidate, Department of Civil Engineering, Colorado State University,

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 948 Hunt lub Road Ottawa, Ontario Report No. 12020-SWM August 27, 2012 Revised April 21, 2014 Revised December 9, 2014 Revised April 14, 2015 D. B. G R A Y E N G I N E E R

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. Gates TETRA TECH, INC. By: RH Date: 11/11/2016 Subject: Gates Road Checked By: JB Date: 11/13/2016 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction

More information

Guide to the use of the Erosion and Sediment Control Evaluation Tool

Guide to the use of the Erosion and Sediment Control Evaluation Tool Guide to the use of the Erosion and Sediment Control Evaluation Tool December 2017 If you require content in an alternate format please contact us at 905-895-1281 or by email at Accessibility@LSRCA.on.ca

More information

OPEN CHANNEL FLOW. One-dimensional - neglect vertical and lateral variations in velocity. In other words, Q v = (1) A. Figure 1. One-dimensional Flow

OPEN CHANNEL FLOW. One-dimensional - neglect vertical and lateral variations in velocity. In other words, Q v = (1) A. Figure 1. One-dimensional Flow OPEN CHANNEL FLOW Page 1 OPEN CHANNEL FLOW Open Channel Flow (OCF) is flow with one boundary exposed to atmospheric pressure. The flow is not pressurized and occurs because of gravity. Flow Classification

More information

Drainage Analysis. Appendix F

Drainage Analysis. Appendix F Drainage Analysis Appendix F Golden View Drive Elizabeth Street LMORE CREEK Ricky Road Rabbit Creek Road LITTLE RABBIT CREEK East 156th Avenue MOA Project #10-026 Golden View Drive Intersection

More information

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase. Gates TETRA TECH, INC. By: RH Date: 1/30/2017 Subject: Gates Road Checked By: JB Date: 2/1/2017 PCSM Design and Evaluation PURPOSE: The purpose of these calculations is to design a Post-Construction Stormwater

More information

Rock Sizing for Small Dam Spillways

Rock Sizing for Small Dam Spillways Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute

More information

Module 5: Channel and Slope Protection Example Assignments

Module 5: Channel and Slope Protection Example Assignments Module 5: Channel and Slope Protection Example Assignments A) Example Project Assignment on Slope and Swale Design North America Green Software Example (Erosion Control Materials Design Software) The following

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO

WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO PROJECT NO. 181710214 Prepared for: CPR ENTITLEMENTS 31 N. TEJON, SUITE 500 COLORADO SPRINGS, CO 80903 719.377.0244 Prepared by: STANTEC

More information

9. Flood Routing. chapter Two

9. Flood Routing. chapter Two 9. Flood Routing Flow routing is a mathematical procedure for predicting the changing magnitude, speed, and shape of a flood wave as a function of time at one or more points along a watercourse (waterway

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Objectives: After completing this assignment, you should be able to:

Objectives: After completing this assignment, you should be able to: Data Analysis Assignment #1 Evaluating the effects of watershed land use on storm runoff Assignment due: 21 February 2013, 5 pm Objectives: After completing this assignment, you should be able to: 1) Calculate

More information

HYDROLOGY REPORT Tentative Tract No. 5978

HYDROLOGY REPORT Tentative Tract No. 5978 ATTACHMENT 5 October 2016 HYDROLOGY REPORT Tentative Tract No. 5978 City of Simi Valley County of Ventura Prepared For: Landsea Holdings Corporation 7525 Irvine Center Drive Suite 200 Irvine, CA 92618

More information

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX STREAM RESTORATION 2016 AWRA Summer Specialty Conference, GIS and Water Resources IX Innovative Use of 2D Hydraulic Modeling in Stream Restoration Design Presented by: Li Gao, PE and Robert Scrafford,

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention

More information

APPENDIX B HYDROLOGY

APPENDIX B HYDROLOGY APPENDIX B HYDROLOGY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROBABLE MAXIMUM PRECIPITATION (PMP)... 1 3.0 DESIGN FLOW CALCULATION... 1 4.0 DIVERSION CHANNEL SIZING... 2 5.0 REFERENCES... 4 LIST OF

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

Open Channel Flow Part 2. Ch 10 Young, notes, handouts

Open Channel Flow Part 2. Ch 10 Young, notes, handouts Open Channel Flow Part 2 Ch 10 Young, notes, handouts Uniform Channel Flow Many situations have a good approximation d(v,y,q)/dx=0 Uniform flow Look at extended Bernoulli equation Friction slope exactly

More information

Bushkill Creek 3 rd Street Dam Removal Analysis

Bushkill Creek 3 rd Street Dam Removal Analysis Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents

More information

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Appendix E Guidance for Shallow Flooding Analyses and Mapping Appendix E Guidance for Shallow Flooding Analyses and Mapping E.1 Introduction Different types of shallow flooding commonly occur throughout the United States. Types of flows that result in shallow flooding

More information

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE HYDRA ENGINEERING AND CONSTRUCTION, LLC C.A. #28124 DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE Wakulla County, Florida August 8, 2016 PREPARED FOR: The North West Florida Water Management District Hydra

More information

Monitoring Considerations and Costs

Monitoring Considerations and Costs Monitoring Considerations and Costs Stormwater BMP Selection, Design, and Monitoring Florida Stormwater Association September 9, 2016 Harvey H. Harper, Ph.D., P.E. Environmental Research & Design, Inc.

More information

Rock Sizing for Multi-Pipe & Culvert Outlets

Rock Sizing for Multi-Pipe & Culvert Outlets Rock Sizing for Multi-Pipe & Culvert Outlets STORMWATER AND WATERWAY MANAGEMENT PRACTICES Photo 1 Rock pad outlet structure at end of a duel stormwater pipe outlet Photo 2 Rock pad outlet structure at

More information

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS APPENDIX A: EROSION & SEDIMENT CONTROL FORMS Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL FORMS Appendix-1 This page intentionally left blank. Croy Engineering # 1580.08 EROSION & SEDIMENT CONTROL

More information

Determination of Urban Runoff Using ILLUDAS and GIS

Determination of Urban Runoff Using ILLUDAS and GIS Texas A&M University Department of Civil Engineering Instructor: Dr. Francisco Olivera CVEN689 Applications of GIS to Civil Engineering Determination of Urban Runoff Using ILLUDAS and GIS Tae Jin Kim 03.

More information

Rock Sizing for Batter Chutes

Rock Sizing for Batter Chutes Rock Sizing for Batter Chutes STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined batter chute Photo 2 Rock-lined batter chute 1. Introduction In the stormwater industry a chute is a steep drainage channel,

More information

Rucker Pond. Background

Rucker Pond. Background Rucker Pond Background The Rucker Basin consists of two subbasins (East and West) that drain to a single area known as Rucker Pond. Both subbasins have the same hydraulic parameters, but have different

More information

Appendix B Equations and Examples

Appendix B Equations and Examples Equations and Examples Purpose The purpose of this appendix is to provide background equations and example problems for clarity of calculations used throughout the manual. This appendix is divided into

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00'

DAVID NOEL KELLY CIVIL. David Noel Kelly :24:14-04'00' DAVID NOEL KELLY CIVIL David Noel Kelly 2014.07.22 10:24:14-04'00' TABLE OF CONTENTS Stormwater Management Summary Checklist for Stormwater Report Illicit Discharge Statement Runoff Summary Existing Conditions

More information

GIS Enabled Automated Culvert Design

GIS Enabled Automated Culvert Design GIS Enabled Automated Culvert Design ASHTON GREER PH.D. STUDENT, THE UNIVERSITY OF ALABAMA DR. ANDREW GRAETTINGER, LEAH CLIFTON, ZACHARY WILBANKS, BRADFORD WILSON Outline Culvert Background Project Objectives

More information

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS Routing MODULE - ROUTING METHODS Routing is the process of find the distribution of flow rate and depth in space and time along a river or storm sewer. Routing is also called Flow routing or flood routing.

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Sediment Control Log (SCL)

Sediment Control Log (SCL) Description A sediment control log is a linear roll made of natural materials such as straw, coconut fiber, or other fibrous material trenched into the ground and held with a wooden stake. Sediment control

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

Caledon Villas Corporation

Caledon Villas Corporation Caledon Villas Corporation Functional Servicing Report Caledon Villas Residential Subdivision Town of Caledon Project No. L11-557 April 2014 Caledon Villas Corporation Town of Caledon Caledon Villas Residential

More information

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design DRAINAGE REPORT Ministry of Transportation and Infrastructure Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design December 14, 2017 Reviewed by: Amanda Rust, P. Eng. Senior Drainage

More information

Instream Sediment Control Systems

Instream Sediment Control Systems Instream Sediment Control Systems INSTREAM PRACTICES Photo 1 Photo 2 Modular sediment The information contained within this series of fact sheets deals only with the design of temporary instream sediment

More information

Section 3.0 Existing Systems Hydrology and Hydraulics

Section 3.0 Existing Systems Hydrology and Hydraulics Section 3.0 Existing Systems Hydrology and Hydraulics This chapter summarizes the results and methodology of MACTEC s evaluation of the existing drainage systems and lakes for the City of Maitland, Florida.

More information

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion

Chapter Introduction EROSION AND SEDIMENT CONTROL. Erosion Chapter 8. EROSION AND SEDIMENT CONTROL 8.1. Introduction Natural erosion has been occurring since the earth was formed. This process, which generally occurs at a relatively slow rate, has shaped and molded

More information

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load Large-Scale Sediment Retention Device Testing (ASTM D 7351) of SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load February 2010 Submitted to: SedCatch Environmental Products 8380 Point O

More information