Summary of Bids Received For

Size: px
Start display at page:

Download "Summary of Bids Received For"

Transcription

1 Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: Firm Name Bid Total $ $1,074, Howell Contractors Inc. $1,083, Sunesis Construction $1,221, Fields Excavating, Inc. $1,290, Ford Development Corp $1,335, $1,371, Bray Construction $1,453,150.00, Inc. $1,490, $1,671, Bid Sale Start Date 2/17/2015 Bid Opening Date 3/25/2015 Estimated Cost of Construction $1,429, amount read at bid opening $1,375, Bid Item Quantity Unit Bidders Firm Labor (UP)$ Materials (UP)$ 1 Special Excavation 25 CY Bray Construction Combined Unit $ Bid Item Total $ , Fields Excavating, Inc Ford Development Corp Howell Contractors Inc /24/2015 MSD_BT_Summary.rdl 1 of 8

2 Sunesis Construction Special Fill Material(Bank Run Gravel), Inc. 25 TON Bray Construction , , Fields Excavating, Inc Ford Development Corp Howell Contractors Inc Sunesis Construction Special Fill Material(No. 2 Gravel Bedding), Inc. 25 TON Bray Construction , , Fields Excavating, Inc Ford Development Corp , Howell Contractors Inc Sunesis Construction , /24/2015 MSD_BT_Summary.rdl 2 of 8

3 , Inc. 4 Concrete Masonry Cl. "C" 5 CY Bray Construction , Fields Excavating, Inc , Ford Development Corp , Howell Contractors Inc , Sunesis Construction Concrete Masonry Cl. "C" (Encasement, Cradles, Key Blocks), Inc CY Bray Construction , Fields Excavating, Inc , Ford Development Corp , Howell Contractors Inc , , , Sunesis Construction , ,750.00, Inc. 6 6" Conduit, Type "I" 1,484 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , /24/2015 MSD_BT_Summary.rdl 3 of 8

4 , Howell Contractors Inc , , , Sunesis Construction , ,628.00, Inc. 7 8" Conduit, Type "B" 2,910 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , ,164, Howell Contractors Inc , , , Sunesis Construction , ,003,950.00, Inc. 8 8" Conduit, Type "G" 599 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , /24/2015 MSD_BT_Summary.rdl 4 of 8

5 , Sunesis Construction , ,740.00, Inc. 9 6" Conduit, Type "G" 46 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , Sunesis Construction , " T-Branches on 8" Conduit, Including Bends, Inc , EA Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , , , Sunesis Construction ,375.00, Inc , /24/2015 MSD_BT_Summary.rdl 5 of 8

6 11 Standard Two-Way Cleanout 55 EA Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , Sunesis Construction , Video Taping of Installed Sewers, Inc , LS Bray Construction 18, , , Fields Excavating, Inc. 5, , , Ford Development Corp 2, , , , , , , , Howell Contractors Inc. 7, , , , , , , , , Sunesis Construction 3, , , , Remodel Bottom of Existing Manhole, Inc. 7, , , EA Bray Construction 4, , , , Fields Excavating, Inc , Ford Development Corp , , , , /24/2015 MSD_BT_Summary.rdl 6 of 8

7 Howell Contractors Inc. 3, , , , , , , , , , , Sunesis Construction , , , Standard Type "S" Manhole, Inc. 12 EA Bray Construction , , , , , , Fields Excavating, Inc. 1, , , , Ford Development Corp 2, , , , , , , , Howell Contractors Inc. 3, , , , , , , , , , , , Sunesis Construction , , , Ductile Iron Water Main and Fittings, Inc. 1 LS Bray Construction 2, , , , , , , , Fields Excavating, Inc. 3, , , , Ford Development Corp , , , , , , Howell Contractors Inc. 5, , , , , , , , , , , , /24/2015 MSD_BT_Summary.rdl 7 of 8

8 Sunesis Construction 3, , , ,050.00, Inc. 16 Project Sign 1 EA Bray Construction 6, , , , Fields Excavating, Inc , , Ford Development Corp , , , , , Howell Contractors Inc , , Sunesis Construction , Inc. 17 Performance Bond 1 LS Bray Construction , , , , , Fields Excavating, Inc. 5, , , , Ford Development Corp 7, , , , , , , , Howell Contractors Inc , , , , , , , , , , , Sunesis Construction , , ,160.00, Inc. 14, , , /24/2015 MSD_BT_Summary.rdl 8 of 8

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

PROGRAMMING CPM. Network Analysis. Goal:

PROGRAMMING CPM. Network Analysis. Goal: PROGRAMMING CPM 5/21/13 Network Analysis Goal: Calculate completion time Calculate start and finish date for each activity Identify critical activities Identify requirements and flows of resources (materials,

More information

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION CITY OF PUYALLUP PIERCE COUNTY WASHINGTON TOSCANOS SINKHOLE EVALUATION G&O #15470 OCTOBER 2015 TABLE OF CONTENTS BACKGROUND...1 EXISTING SYSTEM...1 Stormwater Conveyance System...1 Video Inspection...2

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

PROPACIFIC BUILDERS CORPORATION

PROPACIFIC BUILDERS CORPORATION EXHIBIT A - COST PROPOSAL (1 of 10) PROPACIFIC BUILDERS CORPORATION (Formerly Guam Yooshin Corp.) P.O. Box 7446 TAMUNING, GUAM 96931 TEL 671-477-3109, FAX 671-477-7424 EMAIL: jgyc@guam.net September 01,

More information

GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc.

GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. November 21, 2013 APWA Conference, Brooklyn Park, MN MSA Professional

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels To: Prime Estimating & Software Services, LLC 4248 Kensington High Street Naples, Florida, U.S.A. 3405 Att: Doug Baxter Phone: (239) 213-1237 Fax: (239) 213-1237 Project: Mock Metalwork Project Address:

More information

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project

More information

Gasketed Sewer Fittings SDR 35 Injection Molded in Sizes 4 12 Fabricated in Sizes 15 36

Gasketed Sewer Fittings SDR 35 Injection Molded in Sizes 4 12 Fabricated in Sizes 15 36 Gasketed Sewer Fittings SDR Injection Molded in Sizes Fabricated in Sizes G while extra heavy support is provided under the pipe stop at branch intersections for added strength. Where available, reducing

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC

More information

Allo Fiber City Checklist

Allo Fiber City Checklist Allo Fiber City Checklist Experience Fiber Internet + TV + Phone Like Never Before. Gigabit Internet speeds have the power to move communities forward by contributing to economic development and heightening

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

ORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Cov B Home: (714) 345-4265 Property: Main St. Anytown CA 92341 Operator Info: Operator: JOE Estimator: Business: 30262 Crown Valley Parkway, Suite B505 Business: (949) 481-1854 E-mail:

More information

CASE STUDIES. Introduction

CASE STUDIES. Introduction Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts

More information

Simplex tableau CE 377K. April 2, 2015

Simplex tableau CE 377K. April 2, 2015 CE 377K April 2, 2015 Review Reduced costs Basic and nonbasic variables OUTLINE Review by example: simplex method demonstration Outline Example You own a small firm producing construction materials for

More information

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501 REISSUED 10/09/2017 SECTION 001116 ADVERTISEMENT FOR BIDS 1. Sealed bids will be received by Ottumwa Community School District for construction of the following: Ottumwa Schafer Stadium 8-Lane Track Bids

More information

Barrier Free Accessibility

Barrier Free Accessibility 1 Insured: George Robertson Home: (555) 555-5555 Property: 7930 Marshalls Corner Rd Pomfret, MD 20675 Claim Rep.: - Estimator: Tom Balmes Business: (586) 859-8042 Company: REPS Business: 26215 Pattow Roseville,

More information

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016 White River Update Jeanne Stypula, Supervising Engineer Advisory Committee Meeting April 26, 2016 Department of Natural Resources and Parks Water and Land Resources Division River and Floodplain Management

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN BOLIVAR DAM SANDY CREEK OF THE TUSCARAWAS RIVER, OHIO PREPARED BY: COST ENGINEERING SECTION, USACE, HUNTINGTON DISTRICT AUGUST 2008

More information

DRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005

DRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005 Fort Worth Central City Preliminary Design Current Working Estimate Appendix E January 2005 Updated April 2005 DRAFT Images courtesy of CDM, Gideon Toal, and Bing Thom Architects TARRANT WATER REGINAL

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

Restraining Thrust Forces. DIPRA Member Companies. DIPRA Website (www.dipra.org) DIPRA Computer Programs. AWWA Standards

Restraining Thrust Forces. DIPRA Member Companies. DIPRA Website (www.dipra.org) DIPRA Computer Programs. AWWA Standards DIPRA Member Companies 1915 DIPRA Website (www.dipra.org) DIPRA Computer Programs Thickness Design of Ductile Iron PIpe Hydraulic Analysis of Ductile Iron Pipe Thrust Restraint Design for Ductile Iron

More information

HomeWorks Construction

HomeWorks Construction 1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com

More information

CROA Road Maintenance Log

CROA Road Maintenance Log Nov 2009 Road Repair & Resurfacing: 9.5 mi. $8293 - Pine Mountain Excavation All CROA roadways 2010 ************************************************************************** Jan 2010 Snow Control: Snowplow

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

ADDENDUM NO. 4. Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No.

ADDENDUM NO. 4. Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No. ADDENDUM NO. 4 Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No. 359D South Orange County Community College District GeneralAll project

More information

Tap Stand Construction

Tap Stand Construction Tap Stand Construction Mambo Village By Ernest Liu and Crystal Wong July 2013 Formwork Construction 1. C u t 3 c m t h i c k t i m b e r p l a n k s t o t h e f o l l o w i n g s i z e s f o r t h e o

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA

Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

APPENDIX B DRAINAGE REPORT

APPENDIX B DRAINAGE REPORT APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,

More information

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study 2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project

More information

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation 14 Pages LABORATORY TESTING SECTION Method of Test for SAMPLING ROADWAY BITUMINOUS CONCRETE 1. SCOPE 1.1 This method covers

More information

Salt Reduction using Innovative

Salt Reduction using Innovative Salt Reduction using Innovative Technology 2018 Road Salt Symposium Bill Schneider Winter Maintenance Problem Transportation agencies are tasked with treating roadways during snow and ice events ODOT spends

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

AGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09

AGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BIDDERS ADDRESS PHONE PLANT LOCATION Almond Aggregates,LLC 1140 McHenry Valley Road, Almond, NY 14804 (607) 276-6864 1140 McHenry Valley Road, Almond,

More information

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015

More information

GEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS

GEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS LAMBERT-ST.LOUIS INTERNATIONAL AIRPORT EXPANSION PROGRAM (AEP) CONTRACT PSA 923 WORK AUTHORIZATION NO. 6 GEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS Prepared for City of

More information

ADDENDUM NO. 3 SEWER CLEANING AND TELEVISING PROGRAM CITY OF HOWELL LIVINGSTON COUNTY, MICHIGAN. ONLINE ONLY

ADDENDUM NO. 3 SEWER CLEANING AND TELEVISING PROGRAM CITY OF HOWELL LIVINGSTON COUNTY, MICHIGAN. ONLINE ONLY D W Mh Ny MD Fh Kh D MCk J B VDCk R N Ax Mh C MD J F B Ch E H D M M Gy J T R L F W R D D J B Rb F DF Th D LC Ab P Mkh Thy H S Th G Mxw Mh J Gz C L H-Sk By W Sh Ky M Sk J M Gh T J Sh A A U S C M A C Mh

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

BID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION

BID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION BID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION To the Honorable Board of Directors Santa Maria Public Airport 3217 Terminal Drive Santa Maria, California 93455 GRANITE CONSTRUCTION COMPANY Name of Contractor

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

Purchase of Two (2) Snow Plows and Two (2) Plow Sub-frames.

Purchase of Two (2) Snow Plows and Two (2) Plow Sub-frames. INVITATION TO BID Notice is hereby given that sealed bids will be received at the City Clerk's Office, City Hall, 435 Ryman Street, Missoula, MT 59802 until 2:00 p.m., Tuesday, June 25 th, 2013 and will

More information

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS Lecturer PhD. eng. MAGDOLNA EVA KONCSAG, 1 Decembrie 1918 University of Alba Iulia, Romania ABSTRACT.

More information

City of Grand Island Tuesday, October 13, 2015 Council Session

City of Grand Island Tuesday, October 13, 2015 Council Session City of Grand Island Tuesday, October 13, 2015 Council Session Item G-8 #2015-276 - Approving Bid Award for Snow Removal Services 2015/2016 for the Streets Division of the Public Works Department Staff

More information

ADDENDUM NO. 1. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB #

ADDENDUM NO. 1. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB # ADDENDUM NO. 1 DATE: January 23, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: 23.18 --- Wakulla Co ITB #214-3

More information

REQUEST FOR QUALIFICATIONS ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS ENGINEERING SERVICES The City of Mobile is soliciting statements of interest from qualified firms and individuals interested in providing professional engineering and land surveying

More information

BID SUMMARY. CCR Hilb & Bldg C Renovation 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction. General Construction

BID SUMMARY. CCR Hilb & Bldg C Renovation 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction. General Construction Project Manager: Robert Rauscher BID SUMMARY 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction General Construction Non Colllusion Affidavit INLAND BUILDING CONSTRUCTION X X X X X

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

Bramley Grange, Horsham Road, Bramley, Surrey

Bramley Grange, Horsham Road, Bramley, Surrey Bramley Grange, Horsham Road, Bramley, Surrey An Archaeological Evaluation for English Villages Housing Association by Stephen Hammond Thames Valley Archaeological Services Ltd Site Code BGB 03/95 October

More information

HDD PA-IN RD (W-N57 and W-N56)

HDD PA-IN RD (W-N57 and W-N56) HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing

More information

SFI Electronics Technology APPROVAL SHEET. Customer Information. Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D

SFI Electronics Technology APPROVAL SHEET. Customer Information. Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D APPROVAL SHEET Customer Information Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D Vendor Information Name: Part Name Part No. SFI ELECTRONICS TECHNOLOGY CORP. INC. SMD GDT series Lot

More information

twist turn siting instructions and considerations

twist turn siting instructions and considerations & turn siting instructions and considerations C O N T E N T S R E N D E R I N G S S I T I N G S C H E M E S SCHEME 1 - recommended - technical drawings - elevation - illustrator plan image SCHEME 2 optional

More information

The Preliminary Study of the Impact of Liquefaction on Water Pipes

The Preliminary Study of the Impact of Liquefaction on Water Pipes The Preliminary Study of the Impact of Liquefaction on Water Pipes Jerry J. Chen and Y.C. Chou ABSTRACT Damages to the existing tap-water pipes have been found after earthquake. Some of these damages are

More information

Business: Address, City, State, zip code

Business: Address, City, State, zip code Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim

More information

Nature and Detection of Void-Induced Pavement Failures

Nature and Detection of Void-Induced Pavement Failures TRANSPORTA T/ON RESEARCH RECORD 1505 9 Nature and Detection of Void-Induced Pavement Failures H. TOMITA, H. TADA, T. NANBU, K. CHOU, T. NAKAMURA, AND T. McGREGOR Pavement failures caused by substructure

More information

Sample Preliminary Cost Estimate Solana Consultants

Sample Preliminary Cost Estimate Solana Consultants Sample Preliminary Cost Estimate Solana Project Number: Project Name: Address: 1111 Summer St., Anywhere, CA 99990 Date: 1/1/2007 Estimator: Norman Shaw 05-102 Sample Preliminary Estimate Privileged information

More information

404 Nationwide Permit: File No. SPL PKK FWS-LA-14B F0556 Streambed Alteration Agreement Notification No.

404 Nationwide Permit: File No. SPL PKK FWS-LA-14B F0556 Streambed Alteration Agreement Notification No. HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 619.462.1515 tel 619.462.0552 fax www.helixepi.com July 17, 2017 Ms. Colleen Draguesku Carlsbad Fish and Wildlife Office 2177

More information