1 Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: Firm Name Bid Total $ $1,074, Howell Contractors Inc. $1,083, Sunesis Construction $1,221, Fields Excavating, Inc. $1,290, Ford Development Corp $1,335, $1,371, Bray Construction $1,453,150.00, Inc. $1,490, $1,671, Bid Sale Start Date 2/17/2015 Bid Opening Date 3/25/2015 Estimated Cost of Construction $1,429, amount read at bid opening $1,375, Bid Item Quantity Unit Bidders Firm Labor (UP)$ Materials (UP)$ 1 Special Excavation 25 CY Bray Construction Combined Unit $ Bid Item Total $ , Fields Excavating, Inc Ford Development Corp Howell Contractors Inc /24/2015 MSD_BT_Summary.rdl 1 of 8
2 Sunesis Construction Special Fill Material(Bank Run Gravel), Inc. 25 TON Bray Construction , , Fields Excavating, Inc Ford Development Corp Howell Contractors Inc Sunesis Construction Special Fill Material(No. 2 Gravel Bedding), Inc. 25 TON Bray Construction , , Fields Excavating, Inc Ford Development Corp , Howell Contractors Inc Sunesis Construction , /24/2015 MSD_BT_Summary.rdl 2 of 8
3 , Inc. 4 Concrete Masonry Cl. "C" 5 CY Bray Construction , Fields Excavating, Inc , Ford Development Corp , Howell Contractors Inc , Sunesis Construction Concrete Masonry Cl. "C" (Encasement, Cradles, Key Blocks), Inc CY Bray Construction , Fields Excavating, Inc , Ford Development Corp , Howell Contractors Inc , , , Sunesis Construction , ,750.00, Inc. 6 6" Conduit, Type "I" 1,484 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , /24/2015 MSD_BT_Summary.rdl 3 of 8
4 , Howell Contractors Inc , , , Sunesis Construction , ,628.00, Inc. 7 8" Conduit, Type "B" 2,910 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , ,164, Howell Contractors Inc , , , Sunesis Construction , ,003,950.00, Inc. 8 8" Conduit, Type "G" 599 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , /24/2015 MSD_BT_Summary.rdl 4 of 8
5 , Sunesis Construction , ,740.00, Inc. 9 6" Conduit, Type "G" 46 LF Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , Sunesis Construction , " T-Branches on 8" Conduit, Including Bends, Inc , EA Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , , , Sunesis Construction ,375.00, Inc , /24/2015 MSD_BT_Summary.rdl 5 of 8
6 11 Standard Two-Way Cleanout 55 EA Bray Construction , Fields Excavating, Inc , Ford Development Corp , , Howell Contractors Inc , , , Sunesis Construction , Video Taping of Installed Sewers, Inc , LS Bray Construction 18, , , Fields Excavating, Inc. 5, , , Ford Development Corp 2, , , , , , , , Howell Contractors Inc. 7, , , , , , , , , Sunesis Construction 3, , , , Remodel Bottom of Existing Manhole, Inc. 7, , , EA Bray Construction 4, , , , Fields Excavating, Inc , Ford Development Corp , , , , /24/2015 MSD_BT_Summary.rdl 6 of 8
7 Howell Contractors Inc. 3, , , , , , , , , , , Sunesis Construction , , , Standard Type "S" Manhole, Inc. 12 EA Bray Construction , , , , , , Fields Excavating, Inc. 1, , , , Ford Development Corp 2, , , , , , , , Howell Contractors Inc. 3, , , , , , , , , , , , Sunesis Construction , , , Ductile Iron Water Main and Fittings, Inc. 1 LS Bray Construction 2, , , , , , , , Fields Excavating, Inc. 3, , , , Ford Development Corp , , , , , , Howell Contractors Inc. 5, , , , , , , , , , , , /24/2015 MSD_BT_Summary.rdl 7 of 8
8 Sunesis Construction 3, , , ,050.00, Inc. 16 Project Sign 1 EA Bray Construction 6, , , , Fields Excavating, Inc , , Ford Development Corp , , , , , Howell Contractors Inc , , Sunesis Construction , Inc. 17 Performance Bond 1 LS Bray Construction , , , , , Fields Excavating, Inc. 5, , , , Ford Development Corp 7, , , , , , , , Howell Contractors Inc , , , , , , , , , , , Sunesis Construction , , ,160.00, Inc. 14, , , /24/2015 MSD_BT_Summary.rdl 8 of 8
12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC
PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00
More informationNew Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS
PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB
More informationBob Rettig Construction and Consulting
1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,
More informationExhibit "A" Date: 1/27/2011
Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase
More informationFranklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation
2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,
More information10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %
ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:
2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58
More informationDOCUMENTATION WORKBOOK FY 2018
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:
1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.
More informationFranklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation
5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road
More informationCONTRACTOR'S ESTIMATE PACKAGE
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55
More informationDesigned by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days
Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction
More informationCITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY
CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works
More information20217 CLEAR STONE TON $14.20 $5, $ $ $ %
ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON
More informationAddendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address
CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing
More informationCritchfield Rd / SR-129
NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:
3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:
More informationTCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project
TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30
More informationPROGRAMMING CPM. Network Analysis. Goal:
PROGRAMMING CPM 5/21/13 Network Analysis Goal: Calculate completion time Calculate start and finish date for each activity Identify critical activities Identify requirements and flows of resources (materials,
More informationCITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION
CITY OF PUYALLUP PIERCE COUNTY WASHINGTON TOSCANOS SINKHOLE EVALUATION G&O #15470 OCTOBER 2015 TABLE OF CONTENTS BACKGROUND...1 EXISTING SYSTEM...1 Stormwater Conveyance System...1 Video Inspection...2
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:
-58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:
15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED
More informationPROPACIFIC BUILDERS CORPORATION
EXHIBIT A - COST PROPOSAL (1 of 10) PROPACIFIC BUILDERS CORPORATION (Formerly Guam Yooshin Corp.) P.O. Box 7446 TAMUNING, GUAM 96931 TEL 671-477-3109, FAX 671-477-7424 EMAIL: jgyc@guam.net September 01,
More informationGIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc.
GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc. November 21, 2013 APWA Conference, Brooklyn Park, MN MSA Professional
More informationU.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate
Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM
More informationAppendix C Benchmarking Cost Estimates
REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall
More informationPrime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels
To: Prime Estimating & Software Services, LLC 4248 Kensington High Street Naples, Florida, U.S.A. 3405 Att: Doug Baxter Phone: (239) 213-1237 Fax: (239) 213-1237 Project: Mock Metalwork Project Address:
More informationCarmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018
Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018 EXISTING CONDITION The proposed Carmel River Bank Stabilization at Rancho San Carlos Road Project
More informationGasketed Sewer Fittings SDR 35 Injection Molded in Sizes 4 12 Fabricated in Sizes 15 36
Gasketed Sewer Fittings SDR Injection Molded in Sizes Fabricated in Sizes G while extra heavy support is provided under the pipe stop at branch intersections for added strength. Where available, reducing
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84
More informationROCK EXCAVATION (GRADING) OPSS 206 INDEX
206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6
More informationADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1
State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,
More informationProject T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox
Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC
More informationAllo Fiber City Checklist
Allo Fiber City Checklist Experience Fiber Internet + TV + Phone Like Never Before. Gigabit Internet speeds have the power to move communities forward by contributing to economic development and heightening
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:
295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED
More informationORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:
38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:
More informationBob Rettig Construction and Consulting
1 Client: Sample A, Cov B Home: (714) 345-4265 Property: Main St. Anytown CA 92341 Operator Info: Operator: JOE Estimator: Business: 30262 Crown Valley Parkway, Suite B505 Business: (949) 481-1854 E-mail:
More informationCASE STUDIES. Introduction
Introduction The City of Winston-Salem faces the challenge of maintaining public infrastructure (e.g., water and sewer lines, storm drains, roads, culverts and bridges) while minimizing the potential impacts
More informationSimplex tableau CE 377K. April 2, 2015
CE 377K April 2, 2015 Review Reduced costs Basic and nonbasic variables OUTLINE Review by example: simplex method demonstration Outline Example You own a small firm producing construction materials for
More informationOttumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501
REISSUED 10/09/2017 SECTION 001116 ADVERTISEMENT FOR BIDS 1. Sealed bids will be received by Ottumwa Community School District for construction of the following: Ottumwa Schafer Stadium 8-Lane Track Bids
More informationBarrier Free Accessibility
1 Insured: George Robertson Home: (555) 555-5555 Property: 7930 Marshalls Corner Rd Pomfret, MD 20675 Claim Rep.: - Estimator: Tom Balmes Business: (586) 859-8042 Company: REPS Business: 26215 Pattow Roseville,
More informationWhite River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016
White River Update Jeanne Stypula, Supervising Engineer Advisory Committee Meeting April 26, 2016 Department of Natural Resources and Parks Water and Land Resources Division River and Floodplain Management
More informationTABULATION OF TENDERS
SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering
More informationMAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN
MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN BOLIVAR DAM SANDY CREEK OF THE TUSCARAWAS RIVER, OHIO PREPARED BY: COST ENGINEERING SECTION, USACE, HUNTINGTON DISTRICT AUGUST 2008
More informationDRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005
Fort Worth Central City Preliminary Design Current Working Estimate Appendix E January 2005 Updated April 2005 DRAFT Images courtesy of CDM, Gideon Toal, and Bing Thom Architects TARRANT WATER REGINAL
More informationTrinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226
1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:
More informationPrint Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report
Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94
More informationRestraining Thrust Forces. DIPRA Member Companies. DIPRA Website (www.dipra.org) DIPRA Computer Programs. AWWA Standards
DIPRA Member Companies 1915 DIPRA Website (www.dipra.org) DIPRA Computer Programs Thickness Design of Ductile Iron PIpe Hydraulic Analysis of Ductile Iron Pipe Thrust Restraint Design for Ductile Iron
More informationHomeWorks Construction
1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com
More informationCROA Road Maintenance Log
Nov 2009 Road Repair & Resurfacing: 9.5 mi. $8293 - Pine Mountain Excavation All CROA roadways 2010 ************************************************************************** Jan 2010 Snow Control: Snowplow
More informationTENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL
SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.
More informationAverage Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016
Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION
More informationBUILDING HOME CONSTRUCTION
1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68
More informationADDENDUM NO. 4. Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No.
ADDENDUM NO. 4 Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No. 359D South Orange County Community College District GeneralAll project
More informationTap Stand Construction
Tap Stand Construction Mambo Village By Ernest Liu and Crystal Wong July 2013 Formwork Construction 1. C u t 3 c m t h i c k t i m b e r p l a n k s t o t h e f o l l o w i n g s i z e s f o r t h e o
More informationSAN ANTONIO WATER SYSTEM
G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED
More informationTechnical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA
Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION
More informationMaterials. Use materials meeting the following.
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting
More informationAPPENDIX B DRAINAGE REPORT
APPENDIX B DRAINAGE REPORT B-1 South Lamar Blvd. Transportation Corridor Study Drainage Report Prepared for: City of Austin and HDR, Inc. Prepared by: and Services, Inc. Final 07-09-2015 Michael C. Meriwether,
More informationSaganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study
2015 Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study Appendix B Civil Design USACE Chicago District August 2015 TABLE OF CONTENTS INTRODUCTION... 3 General...
More informationFast and Furious Rebuilding and Widening the I-90 West Corridor
Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction
More informationProcurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable
I. General Plan 1. Bank s approval Date of the procurement Plan [Original: May 2016] 2. Date of General Notice: July 11, 2015 2. Period covered by this procurement plan: The procurement period of project
More informationCommonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for
Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation 14 Pages LABORATORY TESTING SECTION Method of Test for SAMPLING ROADWAY BITUMINOUS CONCRETE 1. SCOPE 1.1 This method covers
More informationSalt Reduction using Innovative
Salt Reduction using Innovative Technology 2018 Road Salt Symposium Bill Schneider Winter Maintenance Problem Transportation agencies are tasked with treating roadways during snow and ice events ODOT spends
More informationHorizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE
Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:
3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.
More informationDESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006
Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP
AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment
More informationAGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09
BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09 BIDDERS ADDRESS PHONE PLANT LOCATION Almond Aggregates,LLC 1140 McHenry Valley Road, Almond, NY 14804 (607) 276-6864 1140 McHenry Valley Road, Almond,
More informationUse of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio
Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert
More informationGeosynthetics Applications and Performance Reviews Select Case Histories
Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,
More informationINVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G
GEOTECHNICAL REPORT INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G City of Cape Coral Procurement Division 1015
More informationGEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS
LAMBERT-ST.LOUIS INTERNATIONAL AIRPORT EXPANSION PROGRAM (AEP) CONTRACT PSA 923 WORK AUTHORIZATION NO. 6 GEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS Prepared for City of
More informationADDENDUM NO. 3 SEWER CLEANING AND TELEVISING PROGRAM CITY OF HOWELL LIVINGSTON COUNTY, MICHIGAN. ONLINE ONLY
D W Mh Ny MD Fh Kh D MCk J B VDCk R N Ax Mh C MD J F B Ch E H D M M Gy J T R L F W R D D J B Rb F DF Th D LC Ab P Mkh Thy H S Th G Mxw Mh J Gz C L H-Sk By W Sh Ky M Sk J M Gh T J Sh A A U S C M A C Mh
More informationNORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES
Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management
More informationBID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION
BID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION To the Honorable Board of Directors Santa Maria Public Airport 3217 Terminal Drive Santa Maria, California 93455 GRANITE CONSTRUCTION COMPANY Name of Contractor
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:
0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:
More informationPurchase of Two (2) Snow Plows and Two (2) Plow Sub-frames.
INVITATION TO BID Notice is hereby given that sealed bids will be received at the City Clerk's Office, City Hall, 435 Ryman Street, Missoula, MT 59802 until 2:00 p.m., Tuesday, June 25 th, 2013 and will
More informationCADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS
CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS Lecturer PhD. eng. MAGDOLNA EVA KONCSAG, 1 Decembrie 1918 University of Alba Iulia, Romania ABSTRACT.
More informationCity of Grand Island Tuesday, October 13, 2015 Council Session
City of Grand Island Tuesday, October 13, 2015 Council Session Item G-8 #2015-276 - Approving Bid Award for Snow Removal Services 2015/2016 for the Streets Division of the Public Works Department Staff
More informationADDENDUM NO. 1. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB #
ADDENDUM NO. 1 DATE: January 23, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: 23.18 --- Wakulla Co ITB #214-3
More informationREQUEST FOR QUALIFICATIONS ENGINEERING SERVICES
REQUEST FOR QUALIFICATIONS ENGINEERING SERVICES The City of Mobile is soliciting statements of interest from qualified firms and individuals interested in providing professional engineering and land surveying
More informationBID SUMMARY. CCR Hilb & Bldg C Renovation 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction. General Construction
Project Manager: Robert Rauscher BID SUMMARY 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction General Construction Non Colllusion Affidavit INLAND BUILDING CONSTRUCTION X X X X X
More information9/12/2014 O V E RV I E W
K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»
More informationBramley Grange, Horsham Road, Bramley, Surrey
Bramley Grange, Horsham Road, Bramley, Surrey An Archaeological Evaluation for English Villages Housing Association by Stephen Hammond Thames Valley Archaeological Services Ltd Site Code BGB 03/95 October
More informationHDD PA-IN RD (W-N57 and W-N56)
HDD PA-IN-0048.0000-RD (W-N57 and W-N56) Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing
More informationSFI Electronics Technology APPROVAL SHEET. Customer Information. Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D
APPROVAL SHEET Customer Information Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D Vendor Information Name: Part Name Part No. SFI ELECTRONICS TECHNOLOGY CORP. INC. SMD GDT series Lot
More informationtwist turn siting instructions and considerations
& turn siting instructions and considerations C O N T E N T S R E N D E R I N G S S I T I N G S C H E M E S SCHEME 1 - recommended - technical drawings - elevation - illustrator plan image SCHEME 2 optional
More informationThe Preliminary Study of the Impact of Liquefaction on Water Pipes
The Preliminary Study of the Impact of Liquefaction on Water Pipes Jerry J. Chen and Y.C. Chou ABSTRACT Damages to the existing tap-water pipes have been found after earthquake. Some of these damages are
More informationBusiness: Address, City, State, zip code
Insured: Property: X X X X X X X X X Reference: Company: XXXXX Sample State Insurance Contractor: xxxxxx xxxx Business: (xxx) xxx-xxxx Company: xxxxx xxxxx xxx. E-mail: xxxxxx@gmail.com Business: Claim
More informationNature and Detection of Void-Induced Pavement Failures
TRANSPORTA T/ON RESEARCH RECORD 1505 9 Nature and Detection of Void-Induced Pavement Failures H. TOMITA, H. TADA, T. NANBU, K. CHOU, T. NAKAMURA, AND T. McGREGOR Pavement failures caused by substructure
More informationSample Preliminary Cost Estimate Solana Consultants
Sample Preliminary Cost Estimate Solana Project Number: Project Name: Address: 1111 Summer St., Anywhere, CA 99990 Date: 1/1/2007 Estimator: Norman Shaw 05-102 Sample Preliminary Estimate Privileged information
More information404 Nationwide Permit: File No. SPL PKK FWS-LA-14B F0556 Streambed Alteration Agreement Notification No.
HELIX Environmental Planning, Inc. 7578 El Cajon Boulevard La Mesa, CA 91942 619.462.1515 tel 619.462.0552 fax www.helixepi.com July 17, 2017 Ms. Colleen Draguesku Carlsbad Fish and Wildlife Office 2177
More information