1 Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC Midwest Communications Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Performance Evaluation Score Supplier Total Bid Amount 59, , , , , Total Event Score :Open:AGGREGAT E BASE Quantity Unit price Extended price 1, , , , , Total bid 1, , , , , Net unit price Total Score AB-3 AB3 AB3 Page 1 of 5 May 15, 2018

2 2:Open: Quantity Unit price Extended price , , , , Total bid , , , , Net unit price Total Score PATCHING PATCHING 2" Asphalt Patching 3:Open: Output: PO Quantity LF Unit price Extended price 35, , , , , Total bid 35, , , , , Net unit price Total Score LF Page 2 of 5 May 15, 2018

3 CURB & GUTTER CURB AND GUTTER Curb and gutter modified 4:Open: Quantity LF Unit price Extended price 15, , , , , Total bid 15, , , , , Net unit price Total Score LF CURB & GUTTER CURB GUTTER Comb curb gutter 5:Open: Quantity Unit price 1, ,200 1, Extended price 1, , , Total bid 1, , , Page 3 of 5 May 15, 2018

4 Net unit price 1, ,200 1, Total Score & FERTILIZER Seeding 6:Open:STEEL PLATE DRIVEWAY ACCESS Quantity EA Unit price Extended price 3, , Total bid 3, , Net unit price Total Score EA Steel plate 7:Open:TRAFIC CONTROL Output: PO Quantity Unit price 1, ,350 1, Page 4 of 5 May 15, 2018

5 Extended price 1, , , Total bid 1, , , Net unit price 1, ,350 1, Total Score Delivery Date 09/05/ /05/ /05/ /05/ /14/2018 TRAFIC CONTROL TRAFFIC CONTROL TRAFIC CONTROL TRAFIC CONTROL TRAFFIC CONTROL TRAFIC CONTROL Trafic control Page 5 of 5 May 15, 2018

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CORRECTION IN YELLOW ON LAST PAGE BID TABULATION and RECOMMENDATION May 11, 2016

CORRECTION IN YELLOW ON LAST PAGE BID TABULATION and RECOMMENDATION May 11, 2016 CORRECTION IN YELLOW ON LAST PAGE BID TABULATION and RECOMMENDATION May 11, 2016 BID NO: 2016-02 BID NAME: Suppression and Related Services DATE BID OPENED: Thursday, April 28, 2016, 11:00 am, local time

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

PES 1120: Homework assignment 1 [24 points] Part 1: fully graded questions [18 points]

PES 1120: Homework assignment 1 [24 points] Part 1: fully graded questions [18 points] PES 1120: Homework assignment 1 [24 points] Handed out: Friday January 31 Due in: Friday February 7, at the start of class Show all working and reasoning to receive full points. Part 1: fully graded questions

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

Roundabout Construction. SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

Roundabout Construction. SP LA 8 / US 171 Roundabout Leesville, LA Vernon Parish Roundabout Construction SP 373-01-0020 LA 8 / US 171 Roundabout Leesville, LA Vernon Parish What this presentation covers Recognition for District 08 Design and Traffic Sections Difference between a circle

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

The Highland - List of materials needed to construct a weather tight home.

The Highland - List of materials needed to construct a weather tight home. Page:1 The Highland - List of materials needed to construct a weather tight home. PLEASE NOTE: 1. 'While every attempt has been made in the preparation of this materals list to avoid mistakes, B&H Cedar

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

Illinois Municipal & County Electric Aggregation What Do I Need to Know?

Illinois Municipal & County Electric Aggregation What Do I Need to Know? Illinois Municipal & County Electric Aggregation What Do I Need to Know? I C C / I P A / C O M E D / A M E R E N I L L I N O I S O P T O U T M U N I C I P A L A N D C O U N T Y A G G R E G A T I O N W

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

Abitare Homeowners Association. Reserve Management Plan Type 1

Abitare Homeowners Association. Reserve Management Plan Type 1 Reserve Management Plan Type 1 Reserve Study With On-Site Analysis For 30-Year Projection Period Beginning January 1, 2016 Cover January 1, 2016 Page 2 Abitare Homeowners Association Reserve Management

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

Peavine Estates HOA. Annual Review Without Site Visit. Better Reserve Consultants. Start Date: 01/01/2015. Mari Jo Betterley, RSS

Peavine Estates HOA. Annual Review Without Site Visit. Better Reserve Consultants. Start Date: 01/01/2015. Mari Jo Betterley, RSS Peavine Estates HOA Annual Review Without Site Visit Start Date: 01/01/2015 Better Reserve Consultants Mari Jo Betterley, RSS 0000025 Table of Contents Introduction Page 1 Important Information Page 8

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

BACKGROUND AND PROJECT DESCRIPTION

BACKGROUND AND PROJECT DESCRIPTION June 7, 2017 Applicant: Murdock Builders Location: Approximately 600 West 1200 North Prepared by: Brian Tucker Public Hearing Item: Yes Zone: A-2, RA-2 ATTACHMENTS 1. Findings for Decision. 2. Resolution

More information

Woodside Homes Association

Woodside Homes Association Woodside Homes Association Full Reserve Study Start Date: 01/01/2017 Better Reserve Consultants RSS Mari Jo Betterley, RSS 0000025 Table of Contents Introduction Page 3 Important Information Page 11 Pictures

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

Concrete Reinforcing Steel Institute Reinforcing Bar Forecast. August Version

Concrete Reinforcing Steel Institute Reinforcing Bar Forecast. August Version Concrete Reinforcing Steel Institute Reinforcing Bar Forecast August 2018 Version 2018-3 Copyright 2018 Concrete Reinforcing Steel Institute. Reproduction or further distribution of this report is not

More information

Process Nature of Process

Process Nature of Process AP Physics Free Response Practice Thermodynamics 1983B. The pv-diagram above represents the states of an ideal gas during one cycle of operation of a reversible heat engine. The cycle consists of the following

More information

CHANGE. Purchasing Agent: Name: John Jones Phone: Fax: Valid from/to: 09/01/ /31/2017. Please Deliver To:

CHANGE. Purchasing Agent: Name: John Jones Phone: Fax: Valid from/to: 09/01/ /31/2017. Please Deliver To: Page 1 of 16 Contract Change Approval Date: 09/01/2016 All using Agencies of the Commonwealth, Participating Political Subdivision, Authorities, Private Colleges and Universities Your SAP Vendor Number

More information

AM01 - System Offices. Purchase Order

AM01 - System Offices. Purchase Order Page 1 of 6 AM01 - System Offices Purchase Order P.O. Date: 12/16/2016 Purchase Order Number AM01-17-P041212 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number: 00001945

More information

Physics 101: Lecture 26 Conduction, Convection, Radiation

Physics 101: Lecture 26 Conduction, Convection, Radiation Final Physics 101: Lecture 26 Conduction, Convection, Radiation Today s lecture will cover Textbook Chapter 14.4-14.9 Physics 101: Lecture 26, Pg 1 Review Heat is FLOW of energy Flow of energy may increase

More information

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS Typical ADT (Average Daily Traffic) UAL COUNTY OADWAY STANDADS AND SPECIFICATIONS Local oad A Local oad B Local oad C Minor Collector Major Collector Arterial 0-120 120-600 600-1,500 1,250-5,000 >4,500

More information

Dump optimization Residual dose rates optimization Conclusions. E. Iliopoulou (HSE-RP-AS) EDMS Status RP Assessment - East Area Upgrade 1

Dump optimization Residual dose rates optimization Conclusions. E. Iliopoulou (HSE-RP-AS) EDMS Status RP Assessment - East Area Upgrade 1 E. Iliopoulou (HSE-RP-AS) EDMS 2025684 Status RP Assessment - East Area Upgrade 1 Status Report of the RP Assessment for the East Area Upgrade E. Iliopoulou (HSE-RP-AS), R. Froeschl (HSE-RP-AS), M. Van

More information

Public Building Commission of Chicago Contractor Payment Information

Public Building Commission of Chicago Contractor Payment Information Public Building Commission of Chicago Contractor Payment Information Project: CTA Bus Garage Program Contract Number: C16FT101914777 General Contractor: Co. Payment Application: #8R Amount Paid: $ 1,333,451.78

More information

FORECASTING FLUCTUATIONS OF ASPHALT CEMENT PRICE INDEX IN GEORGIA

FORECASTING FLUCTUATIONS OF ASPHALT CEMENT PRICE INDEX IN GEORGIA FORECASTING FLUCTUATIONS OF ASPHALT CEMENT PRICE INDEX IN GEORGIA Mohammad Ilbeigi, Baabak Ashuri, Ph.D., and Yang Hui Economics of the Sustainable Built Environment (ESBE) Lab, School of Building Construction

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 8 AM02 - Texas A&M University Purchase Order P.O. Date: 12/19/2016 Purchase Order Number AM02-17-P041414 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

An Implementation of the Contract Net Protocol Based on Marginal Cost Calculations

An Implementation of the Contract Net Protocol Based on Marginal Cost Calculations An Implementation of the Contract Net Protocol Based on Marginal Cost Calculations By Tuomas Sandholm 1993 Introduction Formalization of the idding and awarding decision process Formalization ased on marginal

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 13 AM02 - Texas A&M University Purchase Order P.O. Date: 12/20/2016 Purchase Order Number AM02-17-P041529 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

Stormwater Work Projects 2013

Stormwater Work Projects 2013 Stormwater Work Projects 2013 Pound Ln. A customer called in a complaint that every >me it rained, his driveway was flooded from the water coming off the roadway. Driveway Pound Ln. Pound Ln. 16 th Ave.

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN

PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN PLYMOUTH TOWNSHIP WAYNE COUNTY, MICHIGAN PLYMOUTH TOWNSHIP BOARD OF TRUSTEES SUPERVISOR HUNTERS CREEK ROAD REHABILITATI, S.A.D. SHANN PRICE CLERK NANCY CZELMAN TREASURER R EDWARDS BOARD OF TRUSTEES STEVE

More information

Lumber Supplies and Equipment. South Texas Moulding DBA Texas Wood Supply. McCoy's Building Supply. Precision Saw & Tooltex, Inc.

Lumber Supplies and Equipment. South Texas Moulding DBA Texas Wood Supply. McCoy's Building Supply. Precision Saw & Tooltex, Inc. Regular Lumber 2X4 Pre cut studs 1 200 Each 2x4-8' White pine 2 200 Each 2x4-12' White pine 3 200 Each 2x4-14' White pine 4 200 Each 2x4-16' White pine 5 200 Each 2x6-8' White pine 6 200 Each 2.88 0.29

More information

LOWHILL TOWNSHIP BOARD OF SUPERVISORS APRIL 3, 2014 MEETING MINUTES

LOWHILL TOWNSHIP BOARD OF SUPERVISORS APRIL 3, 2014 MEETING MINUTES LOWHILL TOWNSHIP BOARD OF SUPERVISORS APRIL 3, 2014 MEETING MINUTES The Lowhill Township Board of Supervisors meeting was called to order at 7:30 pm by Chairman Richard Hughes. Also present were, George

More information

Winning Farm of Winchester

Winning Farm of Winchester Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner

More information

STR Vision CPM. 5D softwaresolution for construction planning and execution

STR Vision CPM. 5D softwaresolution for construction planning and execution STR Vision CPM 5D softwaresolution for construction planning and execution BIM Revolution BIM means the use of sharing models digital representation to facilitate the design, construction and management

More information

The Medina County Engineer Quarterly Update

The Medina County Engineer Quarterly Update are not only for insuring the safety of the traveling public and prevention of damage to the highway rightof-way, but also to prevent possible liabilities to the property owner as well as the County or

More information

Exam 04: Chapters 08 and 09

Exam 04: Chapters 08 and 09 Name: Exam 04: Chapters 08 and 09 Select and solve four of the following problems to the best of your ability. You must choose two problem from each column. Please notice that it is possible to select

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

INVITATION TO BID. Martha L. Rehbein City Clerk. Publish: March 15 th, 2015 March 22 nd, 2015

INVITATION TO BID. Martha L. Rehbein City Clerk. Publish: March 15 th, 2015 March 22 nd, 2015 INVITATION TO BID Notice is hereby given that sealed bids will be received at the City Clerk's Office, City Hall, 435 Ryman Street, Missoula, MT 59802-4297 until 3:00 p.m., Monday, March 30 th, 2015 and

More information

Geology 229 Engineering and Environmental Geology. Lecture 5. Engineering Properties of Rocks (West, Ch. 6)

Geology 229 Engineering and Environmental Geology. Lecture 5. Engineering Properties of Rocks (West, Ch. 6) Geology 229 Engineering and Environmental Geology Lecture 5 Engineering Properties of Rocks (West, Ch. 6) Outline of this Lecture 1. Triaxial rock mechanics test Mohr circle Combination of Coulomb shear

More information

2/20/2015. What s the problem? Example: Mayflower, AR TORNADO SHELTER DOORS: PERFORMANCE REQUIREMENTS, DEMONSTRATION. What are the consequences?

2/20/2015. What s the problem? Example: Mayflower, AR TORNADO SHELTER DOORS: PERFORMANCE REQUIREMENTS, DEMONSTRATION. What are the consequences? TORNADO SHELTER DOORS: PERFORMANCE REQUIREMENTS, DEMONSTRATION What s the problem? Presented to National Tornado Summit 2015 by Ernst W. Kiesling, PE, Ph.D., Research Professor National Wind Institute,

More information

HomeWorks Construction

HomeWorks Construction 1 Client: Kain - Put Back Home: Property: 11888 N. Coquillard Dr. South Bend, IN 46617 Operator: NKAIN Estimator: Adam Brown Business: (574) 876-8060 Company: Home Works E-mail: abrown@gohomeworks.com

More information

AM23 - Texas A&M University Health Science Purchase Order

AM23 - Texas A&M University Health Science Purchase Order Page 1 of 7 AM23 - Texas A&M University Health Science Purchase Order P.O. Date: 9/22/2016 Purchase Order Number AM23-17-P033061 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D

More information

AM02 - Texas A&M University. Purchase Order

AM02 - Texas A&M University. Purchase Order Page 1 of 9 AM02 - Texas A&M University Purchase Order P.O. Date: 2/23/2016 Purchase Order Number AM02-16-P014556 SHOW THIS NUMBER ON ALL PACKAGES, INVOICES AND SHIPPING PAPERS. V E N D O R Vendor Number:

More information

Price $3,100,000 Down Payment $620,000 (20%) Net Operating Income 345,320 Number of Rooms 58 Price/Room $53, CAP Rate 11.14% RRM 2.

Price $3,100,000 Down Payment $620,000 (20%) Net Operating Income 345,320 Number of Rooms 58 Price/Room $53, CAP Rate 11.14% RRM 2. S l e e p I n n & S u i t e s V a n B u r e n 1 6 3 3 N o r t h 1 2 t h C o u r t V a n B u r e n, A R Activity ID: X0060563 Price $3,100,000 Down Payment $620,000 (20%) Net Operating Income 345,320 Number

More information

DRAFT. Evaluation of Joint Sealant Materials, US-36, Doniphan County, Kansas. Report No. FHWA-KS-08-2

DRAFT. Evaluation of Joint Sealant Materials, US-36, Doniphan County, Kansas. Report No. FHWA-KS-08-2 Report No. FHWA-KS-08-2 final REPORT Evaluation of Joint Sealant Materials, US-36, Doniphan County, Kansas Rodney A. Montney, P.E. Robert F. Heinen John Wojakowski, P.E. Kansas Department of Transportation

More information

A C E. Applications. Applications Connections Extensions. Student 1 Student Below are some results from the bridge experiment in a CMP class.

A C E. Applications. Applications Connections Extensions. Student 1 Student Below are some results from the bridge experiment in a CMP class. A C E Applications Connections Extensions Applications 1. Below are some results from the bridge experiment in a CMP class. Bridge-Thickness Experiment Number of Layers 2 4 6 8 Breaking Weight (pennies)

More information

Functions of Several Random Variables (Ch. 5.5)

Functions of Several Random Variables (Ch. 5.5) (Ch. 5.5) Iowa State University Mar 7, 2013 Iowa State University Mar 7, 2013 1 / 37 Outline Iowa State University Mar 7, 2013 2 / 37 several random variables We often consider functions of random variables

More information

RECAP Bid # Due Date:

RECAP Bid # Due Date: Page 1 of 9 01 2 X 4 X 8 STUDS, HEM FIR 3.88 2.99 2.99 02 2 X 4 X 8 STUDS 3.88 3.60 3.60 03 2 X 4 X 92-5/8 STUDS, HEM FIR 4.14 3.15 3.15 04 2 X 4 X 10 HEM FIR 4.85 4.50 4.50 05 2 X 4 X 12 HEM FIR 5.83

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

Terms and Conditions. Order Credit. Payment. Cancellation. Returned Material. Claims. Prices. Delivery Charge. Minimum order is 100

Terms and Conditions. Order Credit. Payment. Cancellation. Returned Material. Claims. Prices. Delivery Charge. Minimum order is 100 Terms and Conditions Order Credit Payment Cancellation Returned Material Claims Prices Delivery Charge Minimum order is 0 All orders are subject to the approval of our credit department. If you are a new

More information

Part 1 is to be completed without notes, beam tables or a calculator. DO NOT turn Part 2 over until you have completed and turned in Part 1.

Part 1 is to be completed without notes, beam tables or a calculator. DO NOT turn Part 2 over until you have completed and turned in Part 1. NAME CM 3505 Fall 06 Test 2 Part 1 is to be completed without notes, beam tables or a calculator. Part 2 is to be completed after turning in Part 1. DO NOT turn Part 2 over until you have completed and

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information

EXPERIMENTAL AND COMPUTATIONAL MODELING OF UNSATURATED SOIL RESPONSE UNDER TRUE TRIAXIAL STRESS STATES

EXPERIMENTAL AND COMPUTATIONAL MODELING OF UNSATURATED SOIL RESPONSE UNDER TRUE TRIAXIAL STRESS STATES EXPERIMENTAL AND COMPUTATIONAL MODELING OF UNSATURATED SOIL RESPONSE UNDER TRUE TRIAXIAL STRESS STATES Laureano R. Hoyos The University of Texas at Arlington lhoyos@uta.edu Workshop on Nonlinear Modeling

More information

NARRAGANSETT BAY COMMISSION SPECIFICATIONS FOR SODIUM HYPOCHLORITE SOLUTION

NARRAGANSETT BAY COMMISSION SPECIFICATIONS FOR SODIUM HYPOCHLORITE SOLUTION The Narragansett Bay Commission Vincent J. Mesolella Corporate Office Building Chairman One Service Road Providence, RI 02905 Raymond J. Marshall 401 461 8848 Executive Director 401 461 6540 FAX http://www.narrabay.com

More information

Giant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute

Giant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute Giant Magellan Telescope Project Byeong-Gon Park Korea Astronomy and Space Science Institute 1 GMT Status for SSG Workshop @ High 1, Jan. 15-17, 2018. Telescope Design Overview Doubly segmented M1 8.4m

More information

AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS

AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS AASHTO-LRFD LIVE LOAD DISTRIBUTION SPECIFICATIONS By Toorak Zokaie, 1 Member, ASCE ABSTRACT: The live load distribution factors contained in the AASHTO-LRFD Bridge Design Specification present a major

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015 Public Disclosure Authorized The World Bank REPORT NO.: RES33110 Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF Public Disclosure Authorized LK WATER SUPPLY AND

More information

5. Two forces are applied to a 2.0-kilogram block on a frictionless horizontal surface, as shown in the diagram below.

5. Two forces are applied to a 2.0-kilogram block on a frictionless horizontal surface, as shown in the diagram below. 1. The greatest increase in the inertia of an object would be produced by increasing the A) mass of the object from 1.0 kg to 2.0 kg B) net force applied to the object from 1.0 N to 2.0 N C) time that

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

E-Community Check Request Checklist

E-Community Check Request Checklist E-Community Check Request Checklist The E-Community must complete the following information on each business approved for a loan or grant in order for the Kansas Center of Entrepreneurship (KCFE) to disburse

More information

EASTERN ARIZONA COLLEGE Pharmacy Calculations

EASTERN ARIZONA COLLEGE Pharmacy Calculations EASTERN ARIZONA COLLEGE Pharmacy Calculations Course Design 2016-2017 Course Information Division Allied Health Course Number HCE 115 Title Pharmacy Calculations Credits 2 Developed by Dr. Siripoon Lecture/Lab

More information