1 3, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: PROJECT: NH 1502(056) CONTRACT: AWARD : $407, PROJECTED : $411, ADJ. PROJECTED : $415, CONTRACT: CONTRACTOR: H. V. CAVER, INC. HIGHWAY: US 82 DISTRICT NAME: Atlanta COUNTY: BOWIE AREA ENGINEER: Kenneth Icenhower AREA NUMBER: 055 ESTIMATE NUMBER: 0016 LETTING DATE: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 08/19/2016 to 09/29/2016 NOTICE TO PROCEED DATE: 05/15/2015 ESTIMATE TYPE: FINL WORK BEGIN DATE: 03/28/2016 % COMPLETE: 10 ACCEPTED DATE: 08/18/2016 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $471, $470, PARTICIPATING NON-PARTICIPATING $471, $470, RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $1,20 $1,20 PAID TO CONTRACTOR $471, $470, $1,20 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 7 CONTRACT TIME STATEMENT WORK BEGIN DATE: TIME CHARGES BEGIN: DAYS: C. O. ADJUSTED DAYS: CURRENT DAYS: DAYS CHARGED : 03/28/ /15/ ASSESSED LIQ DAMAGES: LIQ DAMAGE RATE: LIQUIDATED DAMAGES: TOTAL: 0 $59 0 DAYS AT PER DAY $59 PHYSICAL WORK COMPLETE: 00/00/0000 Date or DAILY BREAKDOWN Charged Credited 09/21/ CONTRACT COMPLETE - FINAL CORRECTIONS Diary Adjustment PERIOD SUMMARY Date or Charged Credited OTHER - SEE RMRKS 1

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 7 WORK PERFORMED THIS PERIOD PROJECT NH 1502(056) CONTROL CATEGORY 001 ROADWAY QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date MOBILIZATION LS 40, $1, TOTAL EARNINGS THIS ESTIMATE $1,20

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 7 CONTRACT S PROJECT CATEGORY NH 1502(056) CONTROL ROADWAY SUPP NET CO $ SUBGRADE WIDENING (DENS CONT) SY , , , BACKFILL (TY B) STA , BROADCAST SEED (PERM) (RURAL) (SANDY) SY , , , VEGETATIVE WATERING MG FL BS (CMP IN PLC)(TY D GR1-2)(8") SY , , , CEMENT TON , CEMENT TREAT (NEW BASE) (8") SY , , , CEMENT TREAT (SUBGRADE) (8") SY , ,80 11, PRIME COAT & BLOTTER (MC-30) GAL , AH (TIER I) GAL , ,29 23, AGGR(TY-PB GR-4 SAC-A) CY , SUPERPAVE MIXTURES -D PG76-22 TON , Change Aggregate from Type C to Type D PLANE CONC PAV (2 IN) SY , , FABRIC SY , FLOWABLE BACKFILL CY , REMOV STR (PIPE UNDERDRAIN) LF , , , MOBILIZATION LS 40, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2, , ROCK FILTER DAMS (INSTALL) (TY 2) LF , ROCK FILTER DAMS (REMOVE) LF TEMP SEDMT CONT FENCE (INSTALL) LF TEMP SEDMT CONT FENCE (REMOVE) LF DRIVEWAYS (ACP) SY , MAILBOX INSTALL-S (TWW-POST) TY 4 EA MAILBOX INSTALL-D (TWW-POST) TY 4 EA RELOCATE SM RD SN SUP&AM TY 10BWG EA RELOCATE SM RD SN SUP&AM TY TWT EA WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA REFL PAV MRK TY II (W) 4" (BRK) LF REFL PAV MRK TY II (W) 4" (SLD) LF , ,50 4, REFL PAV MRK TY II (Y) 4" (BRK) LF , ,06 1, REFL PAV MRK TY II (Y) 4" (SLD) LF , ,20 4, RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF , ,50 5, RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF , ,06 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , ,73 5, PREFAB PAV MRK TY B (W)(DBL ARROW) EA PREFAB PAV MRK TY C (W) (24") (SLD) LF PREFAB PAV MRK TY C (Y) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA ,125.00

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 7 Category Subtotal $471, PROJECT NH 1502(056) CONTROL CATEGORY 001 ROADWAY SUPP NET CO ($) BROADCAST SEED (TEMP) (WARM) SY BROADCAST SEED (TEMP) (COOL) SY SUPERPAVE MIXTURES -C PG76-22 TON DRIVEWAYS (SURF TREAT) SY FORCE ACCT-EROSION CONTROL MAINTENANCE DOL , MATERIAL ON HAND DOL CATEGORY 002 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP NET CO ($) FORCE ACCOUNT - SAFETY CONTINGENCY DOL , Category Subtotal TOTAL EARNINGS THIS CONTRACT $471,209.82

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 7 CONSTRUCTION ESTIMATE COMBINED ($) SUBGRADE WIDENING (DENS CONT) SY , , , BACKFILL (TY B) STA , BROADCAST SEED (PERM) (RURAL) (SANDY) SY , , , VEGETATIVE WATERING MG FL BS (CMP IN PLC)(TY D GR1-2)(8") SY ,52 1, , CEMENT TON , CEMENT TREAT (NEW BASE) (8") SY ,52 1, , CEMENT TREAT (SUBGRADE) (8") SY ,70 2,800 11, PRIME COAT & BLOTTER (MC-30) GAL , AH (TIER I) GAL , ,290 23, AGGR(TY-PB GR-4 SAC-A) CY , SUPERPAVE MIXTURES -D PG76-22 TON , Change Aggregate from Type C to Type D PLANE CONC PAV (2 IN) SY , , FABRIC SY , FLOWABLE BACKFILL CY , REMOV STR (PIPE UNDERDRAIN) LF ,46 1, , MOBILIZATION LS 40, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2, , ROCK FILTER DAMS (INSTALL) (TY 2) LF , ROCK FILTER DAMS (REMOVE) LF TEMP SEDMT CONT FENCE (INSTALL) LF TEMP SEDMT CONT FENCE (REMOVE) LF DRIVEWAYS (ACP) SY , MAILBOX INSTALL-S (TWW-POST) TY 4 EA MAILBOX INSTALL-D (TWW-POST) TY 4 EA RELOCATE SM RD SN SUP&AM TY 10BWG EA RELOCATE SM RD SN SUP&AM TY TWT EA WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA REFL PAV MRK TY II (W) 4" (BRK) LF REFL PAV MRK TY II (W) 4" (SLD) LF ,20 4,500 4, REFL PAV MRK TY II (Y) 4" (BRK) LF ,05 1,060 1, REFL PAV MRK TY II (Y) 4" (SLD) LF ,20 4,200 4, RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF ,20 4,500 5, RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF ,05 1,060 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF ,20 4,730 5, PREFAB PAV MRK TY B (W)(DBL ARROW) EA PREFAB PAV MRK TY C (W) (24") (SLD) LF PREFAB PAV MRK TY C (Y) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA ,125.00

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 7 TOTAL EARNINGS $471,209.82

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD: 118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD: 455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD: 262,998.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 247 6.00 CONTRACT ID: 007207041 PROJECT: NH 2017(990) CONTRACT: 05173001 AWARD : 63,063,378.38 PROJECTED : 63,063,378.38 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description* Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UPDATED PROCUREMENT PLAN FOR WORKS DATE SUBMITTED: 23 JAN 2015 COUNTRY: COORDINATING

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

Rapid Response Team, LLC

Rapid Response Team, LLC 1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.

More information

2015 North Dakota Asphalt Conference

2015 North Dakota Asphalt Conference 2015 North Dakota Asphalt Conference NDDOT Implementation of AASHTO Flexible Pavement Design Part I ADT & ESALs Nickie Reis, P&AM Part II Structural Numbers Tom Bold, M&R March 31 - April 1, 2015 Part

More information

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT ITASCA COUNTY TRANSPORTATION DEPARTMENT Effective Date: November 1, 1989 Revised: November 18, 2014 Policy Number: Operations 89-4 Distribution: Commissioner's Office Engineer's Office All Garages Number

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox Compare Responses Event #: 1702 Status: Pending award Event Name: Curb Replacement Project T 841046.05 Number Of s: 7 Fit Excavating Quality Built Construction Dinkel Construction II, LLC Concrete Solutions,LLC

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014 Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) October 16, 2014 Presented by: Neil F. Tunison, Warren County Engineer Snow Removal Policy OPERATIONS SAFETY WARREN COUNTY ENGINEER S OFFICE (WCEO)

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

Lakeshore Landing Homeowners Association. Budget for Fiscal Year June 2013-May 2014

Lakeshore Landing Homeowners Association. Budget for Fiscal Year June 2013-May 2014 Lakeshore Landing Homeowners Association Budget for Fiscal Year June 2013-May 2014 PROPOSED INCOME 2013-2014 PROPOSED EXPENSE 2013-2014 PROPOSED RESERVES CLASS Common Fees $44,280 $30,375 $13,905 East

More information

Coconino County Common Snow Plow Questions/Concerns

Coconino County Common Snow Plow Questions/Concerns Coconino County Common Snow Plow Questions/Concerns I didn t know it snows so much in northern Arizona. Is this normal? According to the National Climatic Data Center, Flagstaff is the eighth snowiest

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016 ! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

REQUEST FOR PROPOSALS CLOSING DATE:

REQUEST FOR PROPOSALS CLOSING DATE: Request for Proposals 110 Westlake Drive City of West Lake Hills 110 Westlake Drive REQUEST FOR PROPOSALS CLOSING DATE: Tuesday, October 23, 2018 City of West Lake Hills Request for Proposals 1 I. INTRODUCTION

More information

HAZUS-MH: Earthquake Event Report

HAZUS-MH: Earthquake Event Report HAZUS-MH: Earthquake Event Report Region Name: El Paso County Earthquake Scenario: El Paso County Random EQ Print Date: February 08, 2006 Disclaimer: The estimates of social and economic impacts contained

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board Investigation of Hot Mix Asphalt Surfaced Pavements Skid Resistance in Maryland State Highway Network System By Wenbing Song, Xin Chen, Timothy Smith, and Adel Hedfi Wenbing Song MDSHA, Office of Material

More information

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy Fundy Ocean Research Center for Energy SNOW REMOVAL - REQUEST FOR PROPOSAL Snow Removal/Clearing and Sanding/Salting for Winter 2016-17 Sites 1. FORCE Sub-Station Driveway (portion of Old Black Rock Road),

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

20. Security Classif. (of this page) Unclassified

20. Security Classif. (of this page) Unclassified 1. Report No. FHWA/TX-04/0-4185-2 Technical Report Documentation Page 2. Government Accession No. 3. Recipient s Catalog No. 4. Title and Subtitle HAMBURG WHEEL TRACKING DEVICE RESULTS ON PLANT AND FIELD

More information

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800) Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation

More information

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CUSTER COUNTY SNOW REMOVAL PROCEDURES CUSER COUNY SNOW REMOVAL PROCEDURES Prioritization of Plow Routes County-maintained roads are plowed based upon the following prioritization criteria: 1. Arterial Roadways and School Bus routes: Arterial

More information

Snow & Ice Removal Policy. October 27 th, The Village of New Lenox Public Works 2401 Ellis Rd

Snow & Ice Removal Policy. October 27 th, The Village of New Lenox Public Works 2401 Ellis Rd October 27 th, 2014 The Village of New Lenox Public Works 2401 Ellis Rd TABLE OF CONTENTS The Plan s Objective: 2 Notification and Response: 2 Snow Removal Operations: 2 Table 1: Snowfalls and Typical

More information

Snow Removal Winchester Department of Public Works

Snow Removal Winchester Department of Public Works Snow Removal Winchester Department of Public Works Town of Winchester Board of Selectmen Meeting Neil H. Amwake, P.E. November 4, 2013 Presentation Outline Goals and Objectives 1. Connecticut snowfall

More information

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels To: Prime Estimating & Software Services, LLC 4248 Kensington High Street Naples, Florida, U.S.A. 3405 Att: Doug Baxter Phone: (239) 213-1237 Fax: (239) 213-1237 Project: Mock Metalwork Project Address:

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE ROD INVENTORY FOR CERTIFICTION OF MILEGE Kay F outs Road Inventory Supervisor, IS H C ISHC ROD IN V E N T O R Y SECTIO N ND DT C O L L E C T IO N s provided in the Indiana Code, the Indiana State Highway

More information

SNOWPLOWING/ICE CONTROL POLICY

SNOWPLOWING/ICE CONTROL POLICY SNOWPLOWING/ICE CONTROL POLICY BACKGROUND: The Town of White Bear, Minnesota, finds that in the best interest of the residents of the Town to assume basic responsibility for the control of snow and ice

More information

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response AASHTO Committee on Maintenance 2018 Annual Meeting July 25, 2018 Hurricane Irma- Preparation and Response Rudy Powell Director, Office of Maintenance Satellite Aerial Image (September 10, 2017) Hurricane

More information

CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, :00 P.M.

CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, :00 P.M. CAPTAIN S KEY DEPENDENT DISTRICT PALM BEACH COUNTY REGULAR BOARD MEETING NOVEMBER 14, 2017 6:00 P.M. Special District Services, Inc. The Oaks Center 2501A Burns Road Palm Beach Gardens, FL 33410 www.captainskeydd.org

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1 State of California Natural Resources Agency Edmund G. Brown Jr., Governor DEPARTMENT OF PARKS AND RECREATION Major General Anthony L. Jackson, USMC (Ret), Director ADDENDA #1 CONTRACT # C1247040 May 3,

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

9/12/2014 O V E RV I E W

9/12/2014 O V E RV I E W K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68