1 262, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/ CONTRACT ID: PROJECT: NH 2017(990) CONTRACT: AWARD : 63,063, PROJECTED : 63,063, ADJ. PROJECTED : 63,326, CONTRACT: CONTRACTOR: FLATIRON CONSTRUCTORS, INC. HIGHWAY: IH 10 DISTRICT NAME: San Antonio COUNTY: BEXAR AREA ENGINEER: Eddie Reyes, P.E. AREA NUMBER: 058 ESTIMATE NUMBER: 0012 LETTING DATE: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD: 06/26/2018 to 07/25/2018 NOTICE TO PROCEED DATE: 06/14/2017 ESTIMATE TYPE: PROG WORK BEGIN DATE: 09/11/2017 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS 21,972, ,506, PARTICIPATING NON-PARTICIPATING 21,972, ,506, RETAINAGE LIQUIDATED DAMAGES INCENTIVE 35,60 35,60 DISINCENTIVE OTHER ADJUSTMENTS 1,465, ,465, PAID TO CONTRACTOR 22,008, ,542, ,465, CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 23 CONTRACT TIME STATEMENT WORK BEGIN DATE: 09/11/2017 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 07/14/2017 LIQ DAMAGE RATE: 2,59 DAYS: 624 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 6 DAYS AT CURRENT DAYS: 630 PER DAY 2,59 DAYS CHARGED : 247 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 06/26/ /27/ /28/ /29/ /30/ /01/ /02/ /03/ /04/ HOLIDAY 07/05/ HOLIDAY TRAFFIC 07/06/ /07/ /08/ SUNDAY 07/09/ /10/ /11/ /12/ /13/ /14/ /15/ SUNDAY 07/16/ /17/ /18/ /19/ /20/ /21/ /22/ SUNDAY 07/23/ /24/ /25/ Diary Adjustment Date Days or PERIOD SUMMARY Days Charged Days Credited HOLIDAY 1 HOLIDAY TRAFFIC 1 SUNDAY 3

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 23 WORK PERFORMED THIS PERIOD PROJECT NH 2017(990) CONTROL ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13, , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF ,730 90, , , PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,97 4, CRASH CUSH ATTEN (INSTL) EA 5, , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , ,17 1, EXCAVATION (ROADWAY) CY , , , , PRIME COAT (MC-30) GAL , , D-GR HMA TY-B PG64-22 TON , , , TEMPORARY L SHORING SF 20 3, ,65 50, , RETAINING WALL (MSE) SF , , , , FLOWABLE BACKFILL CY , , RC PIPE (CL III)(30 IN) LF , , RC PIPE (CL III)(36 IN) LF , RC PIPE (CL IV)(24 IN) LF , MANH (COMPL)(PRM)(48IN) EA 3, , INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT) EA 4, , EXCAVATION (ECIAL) CY , , , CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF ,870 66, ,08 2, BOERNE STAGE ROAD WESTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date CL C CONC (CAP) CY , BOERNE STAGE ROAD EASTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date CL C CONC (ABUT) CY , CL C CONC (CAP) CY , CL C CONC (COLUMN) CY , CONTRACTOR FORCE ACCOUNT WORK QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date MATERIAL ON HAND DOL , , ,00 2,425, LAW ENFORCEMENT PERSONNEL DOL , , ,00 119, FORCE ACCOUNT - CRASH CUSHION REPAIR #1 DOL , , ,00 191, SUPP DESCR MBGF and CRASH CUSHION REPAIR PROJECT NH 2017(990) CONTROL

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , , , PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,28 20, CRASH CUSH ATTEN (INSTL) EA 5, , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , , FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY , , , , PRIME COAT (MC-30) GAL , , , D-GR HMA TY-B PG64-22 TON , , , , D-GR HMA TY-D PG64-22 TON , , , CONC PVMT (CONT REINF - CRCP) (14") SY , , , , CL C CONC (RAIL FOUNDATION) CY , , RAIL (TY T223) LF , , , CAMP BULLIS RD WESTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date REINF CONC SLAB (BOX BEAM) SF , , , , CAMP BULLIS RD EASTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date REINF CONC SLAB (BOX BEAM) SF , , , , DOMINION ROAD WESTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PRESTR CONC U - BEAM (U40) LF , , , , DOMINION ROAD EASTBOUND BRIDGE QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PRESTR CONC U - BEAM (U40) LF , , , , TOTAL EARNINGS THIS ESTIMATE 1,465,639.60

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 23 CONTRACT S PROJECT NH 2017(990) CONTROL ROADWAY S SUPP BARRICADES, SIGNS AND TRAFFIC HANDLING MO 13, , CONSTRUCTING DETOURS SY 80 3, , , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , , , PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF , PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF , PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,71 13, CRASH CUSH ATTEN (INSTL) EA 5, , CRASH CUSH ATTEN (MOVE & RESET) EA WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,15 1, WK ZN PAV MRK REMOV (Y)4"(SLD) LF , , , ELIM EXT PAV MRK & MRKS (4") LF , , , PORTABLE CHANGEABLE MESSAGE SIGN EA 15, , ROCK FILTER DAMS (INSTALL) (TY 2) LF , , ROCK FILTER DAMS (INSTALL) (TY 4) LF , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , , , TEMP SEDMT CONT FENCE (INSTALL) LF , ,17 4, BIODEG EROSN CONT LOGS (INSTL) (8") LF PREPARING ROW STA 14, ,548, EXCAVATION (ROADWAY) CY , , , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY , , PRIME COAT (MC-30) GAL , , D-GR HMA TY-B PG64-22 TON , , , D-GR HMA TY-D PG64-22 TON , , CL C CONC (RAIL FOUNDATION) CY , , RIPRAP (CONC)(4 IN) CY , MOBILIZATION LS 4,344, ,910, REMOVING METAL BEAM GUARD FENCE LF ,700 1,70 9, CRASH CUSH ATTEN (INSTL) EA 5, , TEMPORARY L SHORING SF 20 50, , , RETAINING WALL (MSE) SF , , ,082, RIPRAP (CONC)(5 IN) CY , CONC BOX CULV (10 FT X 6 FT)(EXTEND) LF , WINGWALL (PW - 2) (HW=8 FT) EA 24, , ADJUSTING INLET (CAP) EA 1, , REMOV STR (WINGWALL) EA , FLOWABLE BACKFILL CY , , TRENCH EXCAVATION PROTECTION LF , , , CONC BOX CULV (4 FT X 4 FT) LF 300 1, , RC PIPE (CL III)(24 IN) LF , , RC PIPE (CL III)(30 IN) LF , , RC PIPE (CL III)(36 IN) LF , RC PIPE (CL IV)(24 IN) LF , MANH (COMPL)(PRM)(48IN) EA 3, ,652.18

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of ROADWAY S SUPP MANH (COMPL)(PRM)(72IN) EA 5, , INLET (COMPL)(PMBD)(4FT) EA 3, , INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT) EA 4, , INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3, , INLET (COMPL)(RWI)(TY I) EA 2, , ADJUSTING MANHOLES(CAP) EA 1, , EXCAVATION (ECIAL) CY , , , EMBANKMENT (FINAL)(ORD COMP)(TY C) CY , RIPRAP (CONC)(CL B)(5 IN) CY , , EXCAVATION (ECIAL) CY , CONDT (PVC) (SCH 80) (2") LF CONDT (PVC) (SCH 80) (3") LF , ELEC CONDR (NO.6) BARE LF , GROUND BOX TY D (162922)W/APRON EA , ELC SRV TY D 120/ (NS)AL(N)PS(U) EA 3, , INSTALL HWY TRF SIG (ISOLATED) EA 8, , RADAR COMMUNICATION CABLE LF , ,80 7, REMOVE RD IL ASM (TRANS-BASE) EA , CONDT (PVC) (SCH 40) (2") LF , , CONDT (PVC) (SCH 80) (2") (BORE) LF , , GROUND BOX TY A (122311)W/APRON EA , REMOVE LRSA EA , CONDT (PVC) (SCH 40) (2") LF CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF , ,87 66, ELC SRV TY D 120/ (NS)GS(N)TP(O) EA 3, , ITS RADIO (INSTALL ONLY) EA 3, , ITS POLE MNT CAB (TY 2)(CONF 2) EA 6, , ETHERNET SWITCH (INSTALL ONLY) EA MPEG 4 VIDEO ENR (INSTALL ONLY) EA UNIQUE CHANGE ORDER 1 DOL 28, , Furnish concrete testing and curing facility - Paid by LS UNIQUE CHANGE ORDER 2 DOL 31, , Remove rumble strip replace w/ ACP Pd by LS 002 BOERNE STAGE ROAD WESTBOUND BRIDGE Category Subtotal 9,735, SUPP DRILL SHAFT (36 IN) LF , , DRILL SHAFT (48 IN) LF , , CL C CONC (CAP) CY , CL C CONC (COLUMN) CY , BOERNE STAGE ROAD EASTBOUND BRIDGE Category Subtotal 240,511.35

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of BOERNE STAGE ROAD EASTBOUND BRIDGE SUPP DRILL SHAFT (36 IN) LF , , DRILL SHAFT (48 IN) LF , , CL C CONC (ABUT) CY , CL C CONC (CAP) CY , CL C CONC (COLUMN) CY , CONTRACTOR FORCE ACCOUNT WORK Category Subtotal 252, SUPP MATERIAL ON HAND DOL , ,425, ,425, FORCE ACCOUNT - SAFETY CONTINGENCY DOL , , , CONTRACTOR FORCE ACCOUNT 1 DOL , , , Item LAW ENFORCEMENT PERSONNEL DOL , , , FORCE ACCOUNT - CRASH CUSHION REPAIR #1 DOL , , , MBGF and CRASH CUSHION REPAIR FORCE ACCT-EROSION CONTROL MAINTENANCE DOL , Item BRIDGE FORCE ACCOUNT WORK Category Subtotal 2,769, SUPP EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL , " Item Pay by the LF PROJECT NH 2017(990) CONTROL ROADWAY S Category Subtotal 2, SUPP REMOVING METAL BEAM GUARD FENCE LF , , , CONSTRUCTING DETOURS SY 80 4, , , PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF , , , PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF , , PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF PORT CTB (MOVE)(SGL SLP)(TY 1) LF , ,16 58, PORT CTB (REMOVE)(LOW PROF)(TY 1) LF , , PORT CTB (REMOVE)(LOW PROF)(TY 2) LF CRASH CUSH ATTEN (INSTL) EA 5, , CRASH CUSH ATTEN (MOVE & RESET) EA , WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,20 1, WK ZN PAV MRK REMOV (W)4"(SLD) LF , , , WK ZN PAV MRK REMOV (Y)4"(SLD) LF , , ,182.16

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of ROADWAY S SUPP ELIM EXT PAV MRK & MRKS (4") LF , , , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , , , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , BIODEG EROSN CONT LOGS (INSTL) (8") LF , PREPARING ROW STA 14, ,667, EXCAVATION (ROADWAY) CY , , , EMBANKMENT (FINAL)(ORD COMP)(TY B) CY , , , FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS) CY , , , PRIME COAT (MC-30) GAL , , , D-GR HMA TY-B PG64-22 TON , , , D-GR HMA TY-D PG64-22 TON , , , CONC PVMT (CONT REINF - CRCP) (14") SY , , , CL C CONC (RAIL FOUNDATION) CY , , RIPRAP (CONC)(4 IN) CY , RAIL (TY T223) LF , , , TEMPORARY L SHORING SF 20 8, , , EXTERIOR DRAINAGE S Category Subtotal 5,919, SUPP ADJUSTING INLET (CAP) EA 1, , TRENCH EXCAVATION PROTECTION LF , , RC PIPE (CL III)(24 IN) LF , , , RC PIPE (CL III)(30 IN) LF MANH (COMPL)(PRM)(48IN) EA 3, , INLET (COMPL)(PMBD)(4FT) EA 3, , EMBANKMENT (FINAL)(ORD COMP)(TY C) CY EXCAVATION (ECIAL) CY , , , EMBANKMENT (FINAL)(ORD COMP)(TY C) CY , , , RC PIPE (CL III)(24 IN) LF CONDT (PVC) (SCH 40) (2") LF , , CONDT (PVC) (SCH 80) (2") (BORE) LF , ELEC CONDR (NO.8) BARE LF , GROUND BOX TY A (122311)W/APRON EA , DRILL SHAFT (SIGN MTS) (30 IN) LF , DRILL SHAFT (SIGN MTS) (36 IN) LF , REMOVE OVERHD SIGN SUP EA 3, , CONDT (PVC) (SCH 80) (2") (BORE) LF , ELEC CONDR (NO.6) INSULATED LF , ELC SRV TY D 120/ (NS)GS(N)TP(O) EA 3, , CCTV FIELD EQUIPMENT (ANALOG) EA 13, , ITS RADIO (INSTALL ONLY) EA 3, , ITS POLE MNT CAB (TY 2)(CONF 2) EA 6, , ETHERNET SWITCH (INSTALL ONLY) EA , MPEG 4 VIDEO ENR (INSTALL ONLY) EA

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of CAMP BULLIS RD WESTBOUND BRIDGE Category Subtotal 412, SUPP CEM STABIL BKFL CY , DRILL SHAFT (30 IN) LF , DRILL SHAFT (48 IN) LF , CL C CONC (ABUT)(EXTEND) CY , CL C CONC (CAP)(EXTEND) CY 1, , CL C CONC (COLUMN) CY , REINF CONC SLAB (BOX BEAM) SF , , , PRESTR CONC BOX BEAM (4B34) LF , , , CAMP BULLIS RD EASTBOUND BRIDGE Category Subtotal 415, SUPP CEM STABIL BKFL CY , DRILL SHAFT (30 IN) LF , DRILL SHAFT (48 IN) LF , CL C CONC (ABUT)(EXTEND) CY , CL C CONC (CAP)(EXTEND) CY 1, , CL C CONC (COLUMN) CY , REINF CONC SLAB (BOX BEAM) SF , , , PRESTR CONC BOX BEAM (4B34) LF , , , DOMINION ROAD WESTBOUND BRIDGE Category Subtotal 415, SUPP CEM STABIL BKFL CY , DRILL SHAFT (36 IN) LF , DRILL SHAFT (54 IN) LF , CL C CONC (ABUT) CY , CL C CONC (CAP) CY , CL C CONC (COLUMN) CY , PRESTR CONC U - BEAM (U40) LF , , , DOMINION ROAD EASTBOUND BRIDGE Category Subtotal 881, SUPP CEM STABIL BKFL CY , TEMPORARY L SHORING SF ,75 75, DRILL SHAFT (36 IN) LF , DRILL SHAFT (54 IN) LF , CL C CONC (ABUT) CY , CL C CONC (CAP) CY ,118.18

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of DOMINION ROAD EASTBOUND BRIDGE SUPP CL C CONC (COLUMN) CY , PRESTR CONC U - BEAM (U40) LF , , , Category Subtotal 927, PROJECT NH 2017(990) CONTROL ROADWAY S SUPP () PORT CTB (REMOVE)(SGL SLP)(TY 1) LF , PORT CTB (REMOVE)(LOW PROF)(TY 1) LF PORT CTB (REMOVE)(LOW PROF)(TY 2) LF CRASH CUSH ATTEN (REMOVE) EA WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF , WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF , WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , COMPOST MANUF TOPSOIL (4") SY , BLOCK SODDING SY , CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY , DRILL SEED (TEMP)(WARM OR COOL) SY , VEGETATIVE WATERING MG , SOIL RETENTION BLANKETS (CL 1) (TY A) SY , ROCK FILTER DAMS (REMOVE) LF , CONSTRUCTION EXITS (REMOVE) SY , TEMP SEDMT CONT FENCE (REMOVE) LF , BIODEG EROSN CONT LOGS (REMOVE) LF , REMOVING CONC (RIPRAP) SY , Removing concrete riprap omitted from plans UNIQUE CHANGE ORDER 3 DOL EXCAVATION (ROADWAY) Paid by CY AH (AC-15P) GAL , AGGR(TY-PB GR-4 SAC-B) CY , D-GR HMA TY-C SAC-A PG76-22 TON , STONE-MTRX-AH SMA-D SAC-A PG76-22 TON , PLANE AH CONC PAV(0" TO 2") SY , RIPRAP (MOW STRIP)(4 IN) CY RAIL (TY T223) LF , RAIL (TY SSTR) LF , RAIL (TY T80SS) LF 70 11, RAIL (TY T80SS) (MOD) LF PERM CTB (SGL SLOPE) (TY 1) (42 ) LF , PERM CTB (SGL SLOPE) (TY 3) (42 ) LF PERM CTB (SGL SLOPE) (TY 4) (42 ) LF PERM CTB (SGL SLOPE)(TY 1)(TRANSITION) LF COLORED TEXTURED CONC (4") SY

11 CONTRACTOR'S ESTIMATE PACKAGE Page 11 of MTL W-BEAM GD FEN (TIM POST) LF , MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, DOWNSTREAM ANCHOR TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, RIPRAP (MOW STRIP)(4 IN) CY RAIL (TY T223) LF , ANTI - GRAFFITI COATNG(PERMNENT-TY III) SF , CEM STABIL BKFL CY CONC BOX CULV (6 FT X 6 FT)(EXTEND) LF WINGWALL (PW - 2) (HW=7 FT) EA 10, RC PIPE (CL III)(18 IN) LF Add RCP Outfall Pipe at Walls A & B RC PIPE (CL III)(42 IN) LF INLET (COMPL)(PMBD)(5FT) EA 5, Replace 4' PMBD with 5' PMBD INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT) EA 3, INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT) EA 4, INLET (COMPL)(DROP)(TY 3) EA 3, INLET (COMPL)(RWI)(TY I) EA 3, Change junction box size JACK BOR OR TUN PIPE(24 IN)(RC)(CL III) LF JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV) LF Replace Class III RCP with Class IV RCP CONC SIDEWALKS (4") SY CL C CONC (MISC) CY RETAINING WALL (READ FOOTING) SF , CHAIN LINK FENCE (INSTALL) (6') LF , CHAIN LINK FENCE GATE (INSTALL)(6'X10') EA BATCH DETENTION POND EA 55, TRENCH EXCAVATION PROTECTION LF RIPRAP (CONC)(CL B)(5 IN) CY RC PIPE (CL III)(30 IN) LF SET (TY I) (30 IN) (4: 1) (C) EA 1, SET (TY II) (18 IN) (RCP) (4: 1) (C) EA Add SETon Outfall Pipes at Walls A & B ELEC CONDR (NO.6) INSULATED LF TRF SIG CBL (TY A)(14 AWG)(9 CONDR) LF , REMOVAL OF CONDUIT LF CONDUIT (PREPARE) LF GROUND BOX (PREPARE) EA ETHERNET CABLE AND CONNECTORS LF DRILL SHAFT (RDWY ILL POLE) (30 IN) LF IN RD IL (U/P) (TY 1) (150W EQ) LED EA 1, IN RD IL (U/P) (TY 1) (250W EQ) LED EA 1, IN RD IL (TY SA) 40B-8 (250W EQ) LED EA 2, IN RD IL (TY SA) 40B-8-8 (250W EQ) LED EA 3, IN RD IL (TY SA) 40T-8 (250W EQ) LED EA 2, IN RD IL (TY ) 48S-8-8 (400W EQ) LED EA 4, ELEC CONDR (NO.8) BARE LF , ELEC CONDR (NO.8) INSULATED LF , ELEC CONDR (NO.6) BARE LF , ELEC CONDR (NO.6) INSULATED LF ,

12 CONTRACTOR'S ESTIMATE PACKAGE Page 12 of REMOVE GROUND BOX EA ELC SRV TY A 240/ (NS)SS(E)TP(O) EA 5, ALUMINUM SIGNS (TY G) SF IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1, IN SM RD SN SUP&AM (RAIL MOUNT) EA 1, REMOVE SM RD SN SUP&AM EA INSTALL LRSS (STRUCT STEEL) LB DRILL SHAFT (SIGN MTS) (30 IN) LF DRILL SHAFT (SIGN MTS) (36 IN) LF DRILL SHAFT (SIGN MTS) (42 IN) LF DRILL SHAFT (SIGN MTS) (48 IN) LF DRILL SHAFT (SIGN MTS) (54 IN) LF RIPRAP (MOW STRIP)(4 IN) CY PERM CTB (SGL SLOPE) (TY 3) (42 ) LF MTL W-BEAM GD FEN (TIM POST) LF DOWNSTREAM ANCHOR TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, ALUMINUM SIGNS (TY O) SF , INS OH SN SUP(25 FT CANT) EA 13, INS OH SN SUP(35 FT CANT) EA 18, INS OH SN SUP(40 FT CANT) EA 18, INS OH SN SUP(75 FT BRDG) EA 29, INS OH SN SUP(85 FT BRDG) EA 32, INS OH SN SUP(90 FT BRDG) EA 36, INS OH SN SUP(95 FT BRDG) EA 37, INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)(ARROW)(100MIL) EA REFL PAV MRK TY I(W)(LNDP ARW)(100MIL) EA REFL PAV MRK TY I (W)(WORD)(100MIL) EA REFL PAV MRK TY I (W)(SYMBOL)(100MIL) EA PAVEMENT SEALER 4" LF , PAVEMENT SEALER 6" LF , PAVEMENT SEALER 8" LF , PAVEMENT SEALER 12" LF , PAVEMENT SEALER (ARROW) EA PAVEMENT SEALER (WORD) EA PAVEMENT SEALER (LNDP ARROW) EA PAVEMENT SEALER (SYMBOL) EA PAVEMENT SEALER (NUMBER) EA RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF , PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF

13 CONTRACTOR'S ESTIMATE PACKAGE Page 13 of PREFAB PAV MRK TY C (W) (NUMBER) EA REFL PAV MRKR TY I-R EA REFL PAV MRKR TY II-C-R EA , DRILL SHAFT (SIGN MTS) (36 IN) LF DRILL SHAFT (SIGN MTS) (42 IN) LF DRILL SHAFT (SIGN MTS) (54 IN) LF RIPRAP (CONC)(CL B) CY RIPRAP (MOW STRIP)(4 IN) CY MTL W-BEAM GD FEN (TIM POST) LF DOWNSTREAM ANCHOR TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, CONDT (PVC) (SCH 40) (2") (CONC ENCSE) LF , CONDT (PVC) (SCH 80) (2") (BORE) LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , ELEC CONDR (NO.14) INSULATED LF , ELEC CONDR (NO.6) INSULATED LF , ELEC CONDR (NO.4) INSULATED LF , GROUND BOX TY A (122311)W/APRON EA GROUND BOX TY D (162922)W/APRON EA INS OH SN SUP(30 FT BAL TEE) EA 19, ITS SYSTEM SUPPORT EQUIPMENT LS 41, FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) LF , FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER) LF , FO LICE ENCLOSURE (TYPE 1) EA 3, CCTV FIELD EQUIPMENT (ANALOG) EA 13, INSTALL DMS (POLE MTD CABINET) EA 10, INSTALL DMS (FOUNDATION MTD CABINET) EA 19, RADAR VEHICLE SENSING DEVICE EA 10, ITS POLE (30 FT)(90 MPH) EA 2, ITS POLE (55 FT)(90 MPH) EA 9, ITS POLE (60 FT)(90 MPH) EA 10, ITS POLE MNT CAB (TY 1)(CONF 2) EA 5, INS LED WW SGN W/BASIC SOL PWR KIT EA 1, ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 5, ITS GND BOX(PCAST) TY 2 (366048)W/APRN EA 9, TERMINAL SERVER (INSTALL ONLY) EA EXCAVATION (ROADWAY) CY Excavation at Leon Creek omitted from the plans EMBANKMENT (FINAL)(ORD COMP)(TY B) CY Embankment at Leon Creek omitted from the plans UNIQUE CHANGE ORDER 5 DOL 9, Redesign cost for TSS Walls A,B, C, and D UNIQUE CHANGE ORDER 6 DOL Remove 32.2 SY of riprap omitted from the plans UNIQUE CHANGE ORDER 7 DOL 25, Hollow Soil Nails for Wall A UNIQUE CHANGE ORDER 8 DOL 24, Additional Shotcrete for TSS at Wall A REMOV STR (MANHOLE) EA 1, Remove manhole omitted from plans at Ponds C1-1 ans C REMOV STR (SET) EA Remove SET omitted from plans at Ponds C1-1 and C2-2

14 CONTRACTOR'S ESTIMATE PACKAGE Page 14 of REMOV STR (PIPE) LF Remove pipe omitted from plans at Ponds C1-1 and C INLET (COMPL)(PMBD)(4FT) EA 3, Replace with 5' PMBD 002 BOERNE STAGE ROAD WESTBOUND BRIDGE Category Subtotal SUPP () CEM STABIL BKFL CY TEMPORARY L SHORING SF 20 1, CL C CONC (ABUT) CY REINF CONC SLAB SF , PIPE (PVC) (SCH 40) (12 IN) LF APPROACH SLAB CY PRESTR CONC GIRDER (TX34) LF , RAIL (TY T223) LF RAIL (TY T80SS) LF RAIL (TY T80SS) (MOD) LF SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF REMOV STR (BRIDGE FT LENGTH) EA 45, BOERNE STAGE ROAD EASTBOUND BRIDGE Category Subtotal SUPP () CEM STABIL BKFL CY TEMPORARY L SHORING SF 20 1, REINF CONC SLAB SF , APPROACH SLAB CY PRESTR CONC GIRDER (TX34) LF , RAIL (TY T223) LF RAIL (TY T80SS) LF SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF REMOV STR (BRIDGE FT LENGTH) EA 45, CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP () PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-B PG64-22 Bonus PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-B PG64-22 Penalty PLACEMENT PAYMENT ADJUSTMENT DOL , D-GR HMA TY-B PG64-22 Bonus PLACEMENT PAYMENT ADJUSTMENT DOL

15 CONTRACTOR'S ESTIMATE PACKAGE Page 15 of 23 D-GR HMA TY-B PG64-22 Penalty PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-C SAC-A PG72-22 Bonus PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-C SAC-A PG72-22 Penalty PLACEMENT PAYMENT ADJUSTMENT DOL , D-GR HMA TY-C SAC-A PG72-22 Bonus PLACEMENT PAYMENT ADJUSTMENT DOL , D-GR HMA TY-C SAC-A PG72-22 Penalty PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-C PG64-22 Bonus PRODUCTION PAYMENT ADJUSTMENT DOL , D-GR HMA TY-D PG64-22 Penalty PLACEMENT PAYMENT ADJUSTMENT DOL , D-GR HMA TY-D PG64-22 Bonus PLACEMENT PAYMENT ADJUSTMENT DOL , D-GR HMA TY-D PG64-22 Penalty PRODUCTION PAYMENT ADJUSTMENT DOL , Stone-MTRX-AH SMA-D SAC-A PG76-22 Bonus PRODUCTION PAYMENT ADJUSTMENT DOL , Stone-MTRX-AH SMA-D SAC-A PG76-22 Penalty PLACEMENT PAYMENT ADJUSTMENT DOL , Stone-MTRX-AH SMA-D SAC-A PG76-22 Bonus PLACEMENT PAYMENT ADJUSTMENT DOL , Stone-MTRX-AH SMA-D SAC-A PG76-22 Penalty PAYMENT ADJUSTMENT-POS DOL , PAYMENT ADJUSTMENT-NEG DOL , FORCE ACCOUNT-COMMER LAB USE DEDUCTION DOL , RIDE PAYMENT ADJUSTMENT ( 341) DOL , Schedule RIDE PAYMENT ADJUSTMENT ( 346) DOL , Schedule RIDE PAYMENT ADJUSTMENT ( 360) DOL , Schedule CONTRACTOR FORCE ACCOUNT 2 DOL 6, Substantial Completion (pay by the day) RUC DAMAGE ONLY DOL -1, IH 10 Phase 1C (pay by the hour) RUC DAMAGE ONLY DOL -1, IH 10 Phase 1D (pay by the hour) RUC DAMAGE ONLY DOL -1, IH 10 EB Phase 3 (pay by the hour) RUC DAMAGE ONLY DOL -1, IH 10 WB Phase 3 (pay by the hour) FORCE ACCT-SOIL AND GNDWTR MGT PLAN DOL , Item Category Subtotal

16 CONTRACTOR'S ESTIMATE PACKAGE Page 16 of BRIDGE FORCE ACCOUNT WORK SUPP () EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL " Item Pay by the LF EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL " Item Pay by the LF Category Subtotal PROJECT NH 2017(990) CONTROL ROADWAY S SUPP () PORT CTB (REMOVE)(SGL SLP)(TY 1) LF , CRASH CUSH ATTEN (REMOVE) EA WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF , WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , COMPOST MANUF TOPSOIL (4") SY , BLOCK SODDING SY , CELL FBR MLCH SEED(PERM)(URBAN)(CLAY) SY , DRILL SEED (TEMP)(WARM OR COOL) SY , VEGETATIVE WATERING MG , ROCK FILTER DAMS (INSTALL) (TY 2) LF , ROCK FILTER DAMS (REMOVE) LF , CONSTRUCTION EXITS (REMOVE) SY , BIODEG EROSN CONT LOGS (REMOVE) LF , AH (AC-15P) GAL , AGGR(TY-PB GR-4 SAC-B) CY , D-GR HMA TY-C SAC-A PG76-22 TON , STONE-MTRX-AH SMA-D SAC-A PG76-22 TON , FLEXIBLE PAVEMENT STRUCTURE REPAIR(14") SY PLANE AH CONC PAV(0" TO 2") SY , HALF - DEPTH REPAIR CRCP (8") SY RIPRAP (MOW STRIP)(4 IN) CY RAIL (TY T80SS) LF 70 12, RAIL (TY T80SS) (MOD) LF PERM CTB (SGL SLOPE) (TY 1) (42 ) LF ,

17 CONTRACTOR'S ESTIMATE PACKAGE Page 17 of PERM CTB (SGL SLOPE) (TY 3) (42 ) LF , PERM CTB (SGL SLOPE) (TY 4) (42 ) LF PERM CTB (SGL SLOPE)(TY 1)(TRANSITION) LF REMOVE AND RELAY PAVERS SY Remove and Replace Pavers omitted from the plans MTL W-BEAM GD FEN (TIM POST) LF , MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, DOWNSTREAM ANCHOR TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, CL C CONC (RAIL FOUNDATION) CY RETAINING WALL (MSE) SF , RIPRAP (MOW STRIP)(4 IN) CY RAIL (TY T223) LF , RAIL (TY SSTR) LF ANTI - GRAFFITI COATNG(PERMNENT-TY III) SF , UNIQUE CHANGE ORDER 4 DOL 7, Adjust storm sewer due to conflict with exisitng utility 002 EXTERIOR DRAINAGE S Category Subtotal SUPP () RIPRAP (CONC)(5 IN) CY INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3, PIPE (PVC) (SCH 40) (6 IN) LF PIPE (PVC) (SCH 40) (12 IN) LF EXCAVATION (ECIAL) CY RIPRAP (CONC)(CL B)(5 IN) CY HAZARDOUS MATERIALS TRAP EA 5, TRENCH EXCAVATION PROTECTION LF TEMPORARY L SHORING SF 20 13, RETAINING WALL (CAST - IN - PLACE) SF , RIPRAP (CONC)(CL B)(5 IN) CY SET (TY I) (24 IN) (4: 1) (C) EA 1, PIPE (PVC) (SCH 40) (6 IN) LF PIPE (PVC) (SCH 40) (12 IN) LF HAZARDOUS MATERIALS TRAP EA 5, DRILL SHAFT (RDWY ILL POLE) (30 IN) LF IN RD IL AM (U/P) (TY IF) (150W) EA 2, IN RD IL (TY ) 48S-8-8 (400W EQ) LED EA 4, CONDT (RM) (3/4") LF ELEC CONDR (NO.12) BARE LF ELEC CONDR (NO.12) INSULATED LF ELEC CONDR (NO.8) INSULATED LF , ELC SRV TY A 240/ (NS)SS(E)TP(O) EA 5, IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA REMOVE SM RD SN SUP&AM EA DRILL SHAFT (SIGN MTS) (42 IN) LF DRILL SHAFT (SIGN MTS) (48 IN) LF

18 CONTRACTOR'S ESTIMATE PACKAGE Page 18 of DRILL SHAFT (SIGN MTS) (54 IN) LF ALUMINUM SIGNS (TY O) SF , INS OH SN SUP(20 FT CANT) EA 11, INS OH SN SUP(25 FT CANT) EA 13, INS OH SN SUP(30 FT CANT) EA 15, INS OH SN SUP(35 FT CANT) EA 18, INS OH SN SUP(40 FT CANT) EA 18, INS OH SN SUP(75 FT BRDG) EA 29, INS OH SN SUP(85 FT BRDG) EA 32, INS OH SN SUP(90 FT BRDG) EA 36, REMOVE OVERHD SIGN SUP (SIGN ONLY) EA INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA INSTL DEL ASSM (D-DW)SZ 2(WC)GND EA INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)(ARROW)(100MIL) EA REFL PAV MRK TY I(W)(LNDP ARW)(100MIL) EA REFL PAV MRK TY I (W)(WORD)(100MIL) EA REFL PAV MRK TY I (W)(SYMBOL)(100MIL) EA PAVEMENT SEALER 4" LF , PAVEMENT SEALER 6" LF , PAVEMENT SEALER 8" LF , PAVEMENT SEALER 12" LF , PAVEMENT SEALER (ARROW) EA PAVEMENT SEALER (WORD) EA PAVEMENT SEALER (LNDP ARROW) EA PAVEMENT SEALER (SYMBOL) EA RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) LF , REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF , PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF , PREFAB PAV MRK TY C (W) (NUMBER) EA REFL PAV MRKR TY I-R EA REFL PAV MRKR TY II-C-R EA , DRILL SHAFT (SIGN MTS) (36 IN) LF DRILL SHAFT (SIGN MTS) (42 IN) LF DRILL SHAFT (SIGN MTS) (54 IN) LF RIPRAP (CONC)(CL B) CY RIPRAP (MOW STRIP)(4 IN) CY MTL W-BEAM GD FEN (TIM POST) LF DOWNSTREAM ANCHOR TERMINAL SECTION EA GUARDRAIL END TREATMENT (INSTALL) EA 2, CONDT (PVC) (SCH 40) (2") (CONC ENCSE) LF , CONDT (PVC) (SCH 40) (3") (CONC ENCSE) LF , CONDT (PVC) (SCH 80) (3") (BORE) LF , CONDT (RM) (3") LF , ELEC CONDR (NO.14) INSULATED LF ,

19 CONTRACTOR'S ESTIMATE PACKAGE Page 19 of ELEC CONDR (NO.4) INSULATED LF GROUND BOX TY A (122311)W/APRON EA GROUND BOX TY D (162922)W/APRON EA REMOVE ELECTRICAL SERVICES EA INS OH SN SUP(30 FT BAL TEE) EA 19, FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) LF , FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER) LF , FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER) LF , FIBER OPTIC PATCH PANEL (144 POSITION) EA 7, FO LICE ENCLOSURE (TYPE 1) EA 3, FO LICE ENCLOSURE (TYPE 3) EA 3, REMOVE CCTV FIELD EQUIPMENT EA 1, CONDUIT (PREPARE) LF , MANHOLE (PREPARE) EA GROUND BOX (PREPARE) EA INSTALL DMS (POLE MTD CABINET) EA 10, INSTALL DMS (FOUNDATION MTD CABINET) EA 19, RADAR VEHICLE SENSING DEVICE EA 10, ITS POLE (30 FT)(90 MPH) EA 2, ITS POLE (40 FT)(REM) EA 2, ITS POLE (55 FT)(90 MPH) EA 9, ITS POLE (8 FT)(COSS/OSB) EA 4, ITS POLE MNT CAB (TY 1)(CONF 2) EA 5, ITS POLE MNT CAB (TY 2)(CONF 2)(REM) EA 1, REMOVE EXISTING LANE CONTROL SYSTEM EA 3, REMOVE EXIST FIB OPT DMS SYS(TY-3) EA 6, REMOVE EXIST RVSD EA 1, INS LED WW SGN W/BASIC SOL PWR KIT EA 1, ITS GND BOX(PCAST) TY 1 (243636)W/APRN EA 5, ITS GND BOX(PCAST) TY 2 (366048)W/APRN EA 9, TERMINAL SERVER (INSTALL ONLY) EA CAMP BULLIS RD WESTBOUND BRIDGE Category Subtotal SUPP () TEMPORARY L SHORING SF APPROACH SLAB CY RAIL (TY SSTR) LF RAIL (TY SSTR)(MOD)(ILLUM) LF SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF CONC STR REPAIR (VERTICAL & OVERHEAD) SF CLEANING AND SEALING EXISTING JOINTS LF CAMP BULLIS RD EASTBOUND BRIDGE Category Subtotal SUPP () TEMPORARY L SHORING SF

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 241,240.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 444 CONTRACT ID: 016211001 PROJECT: STP 1502(488) CONTRACT: 11153201 AWARD AMOUNT: $105,980,139.92 PROJECTED AMOUNT: $108,981,339.92 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD: 118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD: 455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

ORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM G:\TXC\Projects\SAWS\SAWS - Glad\03_CADD\01_Sheets\Glad_Water\01_Sheets\1 GLAD WATR CVR.dwg Sep 13, 2017-1:44pm acalderon SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5025 2017 SMP GLAD FROM PIEDMONT

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

Tropical E.S. - BUDGET

Tropical E.S. - BUDGET Tropical E.S. - BUDGET Replace HVAC Chiller and Cooling Tower Description Budget COMMENTS GMP Design $45,90.92 Heard Construction $5,885.00 DDC Engineering Sub-Total Overhead @ 0% Profit @ 5% Contingency

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B )

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Khuntlipalli,Bargarh ( PACKAGE - B ) Sl. 1 2 Description of Work Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

Rapid Response Team, LLC

Rapid Response Team, LLC 1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description What s New in the World of Winter Maintenance Technology Dennis Burkheimer Winter Operations Administrator Iowa Department of Transportation John Scharffbillig Fleet Manager Minnesota Department of Transportation

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill

More information

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio Mitchell W. Weber, P.G. Gannett Fleming Engineers & Architects, P.C. Greg Bachman, P.E., P.S. County of Summit Engineer Robert

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

**Temporary Erosion Control**

**Temporary Erosion Control** Construction operations And methods **Temporary Erosion Control** The test will more than likely just have a basic word problem dealing with Erosion control, if it has anything on the test. So just review,

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS 1 PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS Nishantha Bandara, Ph.D., P.E. Department of Civil Engineering Lawrence Technological University 21000

More information

St. Tammany: Transportation Systems Management Study (Covington) RPC Project No. (LA21-COV) State Project No F.A.P. No.

St. Tammany: Transportation Systems Management Study (Covington) RPC Project No. (LA21-COV) State Project No F.A.P. No. St. Tammany: Transportation Systems Management Study (Covington) RPC Project o. (LA21-COV) State Project o. 700-52-0197 F.A.P. o. P-5208(514) LA 21 (Boston Street) Lee Lane to ew Hampshire Street Prepared

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/10/2019 7:20:01 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Rock Scaling Recommendations Logan Creek Drive Cut Slope Rock Scaling Recommendations Logan Creek Drive Cut Slope US 50, Milepost DO 8.47 to DO 8.61 Douglas County, Nevada January 2008 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD.

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT. for SR 3062, SECTION 29S STRASBURG ROAD. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION DISTRICT 6-0 HYDROLOGIC AND HYDRAULIC REPORT for SR 3062, SECTION 29S STRASBURG ROAD over WEST BRANCH OF BRANDYWINE CREEK EAST FALLOWFIELD TOWNSHIP, CHESTER COUNTY

More information

Case Histories and Practical Examples

Case Histories and Practical Examples SUMMER SCHOOL SIIV 2012 - ROAD SAFETY MANAGEMENT Theoretical principles and practical application in the framework of the European Directive 2008/96/CE Catania 24-28 September 2012 Case Histories and Practical

More information

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Fast and Furious Rebuilding and Widening the I-90 West Corridor Fast and Furious Rebuilding and Widening the I-90 West Corridor Peter Foernssler, P.E., S.E. Deputy Chief, Illinois Tollway Marty Ross, P.E. Design Corridor Manager, TranSystems Jason Wenberg, P.E. Construction

More information