1 241, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/ CONTRACT ID: PROJECT: STP 1502(488) CONTRACT: AWARD AMOUNT: $105,980, PROJECTED AMOUNT: $108,981, ADJ. PROJECTED AMOUNT: $109,222, CONTRACT: CONTRACTOR: SUNDT CONSTRUCTION, INC. HIGHWAY: SH 31 DISTRICT NAME: Dallas COUNTY: NAVARRO AREA ENGINEER: Juan Paredes, P.E. AREA NUMBER: 059 ESTIMATE NUMBER: 0025 LETTING DATE: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 06/26/2018 to 07/25/2018 NOTICE TO PROCEED DATE: 04/07/2016 ESTIMATE TYPE: PROG WORK BEGIN DATE: 10/26/2016 % COMPLETE: ACCEPTED DATE: 00/00/0000 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL TO DATE PREV TO DATE THIS ESTIMATE EARNINGS $44,793, $41,180, PARTICIPATING NON-PARTICIPATING $44,793, $41,180, RETAINAGE LIQUIDATED DAMAGES INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $3,613, $3,613, PAID TO CONTRACTOR $44,793, $41,180, $3,613, CONTRACT ADJUSTMENTS THIS ESTIMATE LINE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT: REMARKS: ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT: REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 14 CONTRACT TIME STATEMENT WORK BEGIN DATE: 10/26/2016 ASSESSED LIQ DAMAGES: 0 TIME CHARGES BEGIN: 10/04/2016 LIQ DAMAGE RATE: $2,59 BID DAYS: 1,033 LIQUIDATED DAMAGES: 0 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 1,033 PER DAY $2,59 DAYS CHARGED TO DATE: 444 TOTAL: PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 06/26/ /27/ /28/ /29/ /30/ /01/ SUNDAY 07/02/ /03/ /04/ HOLIDAY 07/05/ HOLIDAY TRAFFIC 07/06/ HOLIDAY TRAFFIC 07/07/ SATURDAY 07/08/ SUNDAY 07/09/ /10/ /11/ /12/ /13/ /14/ SATURDAY 07/15/ SUNDAY 07/16/ /17/ /18/ /19/ /20/ /21/ SATURDAY 07/22/ SUNDAY 07/23/ /24/ /25/ Diary Adjustment Date Days or PERIOD SUMMARY Days Charged Days Credited HOLIDAY 1 HOLIDAY TRAFFIC 2 SATURDAY 3 SUNDAY 4

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 14 WORK PERFORMED THIS PERIOD PROJECT STP 1502(488) CONTROL CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION QTY THIS ESTIMATE AMOUNT PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date PREPARING ROW STA 6, $727, EXCAVATION (ROADWAY) CY ,900 $83,40 813,76 451, EXCAVATION (CHANNEL) CY $1,83 5,22 6, EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY , $127, ,333, , EMBANKMENT (FINAL)(DENS CONT)(TY C3) CY , $133,67 119, , DRILL SEEDING (TEMP) (WARM) SY , $5, ,42 100, FL BS (CMP IN PLC)(TY D GR1-2)(8") SY 10 1, $14, , , FL BS (CMP IN PLC)(TY D GR1-2)(12") SY , $699, , , TEMPORARY L SHORING SF 10 1,040 $10,40 24,96 8, CL C CONC (ABUT)(HPC) CY $71, RETAINING WALL (MSE) SF 60 7, $442, , , PRESTR CONC GIRDER (TX54) LF , $1,957, , , RIPRAP (CONC) (CL B) (4") CY $33, WINGWALL (FW - 0) (HW=6 FT) EA 9,000 0 $18, WINGWALL (FW - S) (HW=5 FT) EA 4,700 0 $9, BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15,000 0 $15, ROCK FILTER DAMS (INSTALL) (TY 3) LF $7, ,25 1, TEMP SEDMT CONT FENCE (INSTALL) LF , $1, ,55 52, TEMP SEDMT CONT FENCE (REMOVE) LF $ ,55 4, BIODEG EROSN CONT LOGS (REMOVE) LF $ , CONSTRUCTING DETOURS SY $65, , , WK ZN PAV MRK REMOV (W)4"(SLD) LF , $1, ,12 44, WK ZN PAV MRK REMOV (Y)4"(SLD) LF ,690 $1, , , PORTABLE CHANGEABLE MESSAGE SIGN EA 10, $30, MATERIAL ON HAND DOL , $843, ,00 2,023, SUPP DESCR MATERIAL USED TOTAL EARNINGS THIS ESTIMATE $3,613,203.40

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 14 CONTRACT LINE S PROJECT CATEGORY STP 1502(488) CONTROL DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ PREPARING ROW STA 6, ,886, REMOVING CONC (PAV) SY , , , , REMOVING CONC (RIPRAP) SY , EXCAVATION (ROADWAY) CY , , ,706, EXCAVATION (CHANNEL) CY , , , EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY ,333, , ,253, EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 10 44, ,30 135, EMBANKMENT (FINAL)(DENS CONT)(TY C3) CY , , , DRILL SEEDING (TEMP) (WARM) SY , , , DRILL SEEDING (TEMP) (COOL) SY , , , DRILL SEEDING (PERM)(WARM OR COOL) SY ,376, , , VEGETATIVE WATERING MG 0 190, SOIL RETENTION BLANKETS (CL 1) (TY C) SY , , , FL BS (CMP IN PLC)(TY D GR1-2)(8") SY , ,37 388, FL BS (CMP IN PLC)(TY D GR1-2)(12") SY , , ,286, CEMENT TON , CEMENT TREAT (NEW BASE) (8") SY , , , SALV, HAUL & STKPL RCL APH PV (0 TO 6") SY , , , SLV, HAUL & STKPL RCL APH PV(8" TO 14") SY ,330 1, , , SALV, HAUL & STKPL RCL APH PV (0-12") SY , ,55 57, PRIME COAT(MC-30 OR AE-P) GAL , , , AH (CRS-2) GAL , , , AGGR(TY-D GR-4 SAC-B) CY 90 4, , D-GR HMA TY-B PG64-22 TON , , ,457, CONC PVMT (CONT REINF - CRCP) (13") SY , ,53 376, CONC PVMT (JOINTED - CPCD) (13") SY , , ,085, CEM STABIL BKFL CY , , TRENCH EXCAVATION PROTECTION LF 0 1, , , TEMPORARY L SHORING SF 10 24, , , DRILL SHAFT (18 IN) LF , , DRILL SHAFT (36 IN) LF , ,28 946, DRILL SHAFT (42 IN) LF , , , CL C CONC (ABUT)(HPC) CY , CL C CONC (BENT)(HPC) CY 650 3, , ,060, REINF CONC SLAB (HPC) SF , , ,250, APPROACH SLAB (HPC) CY 350 1, , RETAINING WALL (MSE) SF 60 38, , , PRESTR CONC GIRDER (TX46) LF 200 4, , , PRESTR CONC GIRDER (TX54) LF , , ,384, RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC) (CL B) (4") CY , RIPRAP (STONE TY R)(DRY)(12 IN) CY RIPRAP (STONE PROTECTION)(12 IN) CY 80 2, , RIPRAP (STONE PROTECTION)(18 IN) CY 80 4, , ,535.20

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 14 CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 100 2, , CONC BOX CULV (4 FT X 2 FT) LF , CONC BOX CULV (4 FT X 3 FT) LF , CONC BOX CULV (5 FT X 3 FT) LF , CONC BOX CULV (6 FT X 3 FT) LF , CONC BOX CULV (7 FT X 3 FT) LF , CONC BOX CULV (8 FT X 4 FT) LF , CONC BOX CULV (8 FT X 5 FT) LF , CONC BOX CULV (10 FT X 5 FT) LF , , , RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF , ,57 196, RC PIPE (CL III)(36 IN) LF , RC PIPE (CL IV)(18 IN) LF , RC PIPE (CL IV)(24 IN) LF , , RC PIPE (CL IV)(48 IN) LF , INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 4, , INLET (COMPL)(PAZD)(RC)(5FTX5FT) EA 5, , INLET (COMPL)(TY MSE1) EA 6, , HEADWALL (CH - FW - 0) (DIA= 36 IN) EA 3, , HEADWALL (CH - FW - 0) (DIA= 48 IN) EA 9, , HEADWALL (CH - FW - 15) (DIA= 36 IN) EA 5, , HEADWALL (CH - FW - 30) (DIA= 36 IN) EA 4, , HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 7, , WINGWALL (FW - 0) (HW=5 FT) EA 10, , WINGWALL (FW - 0) (HW=6 FT) EA 9, , WINGWALL (FW - 0) (HW=8 FT) EA 10, , WINGWALL (FW - S) (HW=10 FT) EA 17, , WINGWALL (FW - S) (HW=4 FT) EA 3, , WINGWALL (FW - S) (HW=5 FT) EA 4, , WINGWALL (FW - S) (HW=6 FT) EA 6, , WINGWALL (FW - S) (HW=7 FT) EA 8, , WINGWALL (PW - 1) (HW=9 FT) EA 27, , SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C) EA 4, , SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C) EA 2, , SET (TY I)(S=3 FT)(HW= 7 FT)(3:1)(C) EA 4, , SET (TY I)(S= 3 FT)(HW= 8 FT)(3:1) (C) EA 5, , SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 3, , SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C) EA 4, , SET (TY I)(S= 7 FT)(HW= 9 FT)(3:1) (C) EA 9, , SET (TY II) (18 IN) (RCP) (6: 1) (C) EA , SET (TY II) (24 IN) (RCP) (3: 1) (C) EA , SET (TY II) (24 IN) (RCP) (4: 1) (C) EA , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA SET (TY II) (24 IN) (RCP) (6: 1) (P) EA , JACK BOR OR TUN PIPE(24 IN)(RC)(CL III) LF , JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV) LF , REMOV STR (WINGWALL) EA , REMOV STR (HEADWALL) EA

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 14 CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ MOBILIZATION LS 3,000, ,700, BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15, , ROCK FILTER DAMS (INSTALL) (TY 1) LF , ROCK FILTER DAMS (INSTALL) (TY 3) LF 60 6, , , ROCK FILTER DAMS (REMOVE) LF , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , , CONSTRUCTION EXITS (REMOVE) SY , TEMP SEDMT CONT FENCE (INSTALL) LF , ,73 65, TEMP SEDMT CONT FENCE (REMOVE) LF , ,55 1, BIODEG EROSN CONT LOGS (INSTL) (8") LF 0 2, ,72 13, BIODEG EROSN CONT LOGS (REMOVE) LF , CONSTRUCTING DETOURS SY ,450-12,720 17, ,344, PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF , ,96 1,483, UNIQUE CHANGE ORDER 8 DOL , Purchase CTB from adjacent project PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 0 75, ,86 53, MTL W-BEAM GD FEN (STEEL POST) LF , , REMOVE METAL BEAM GUARD FENCE LF , , , REMOVE TERMINAL ANCHOR SECTION EA GUARDRAIL END TREATMENT (REMOVE) EA GDRAIL END TRT(INST)(WOOD POST)(TY II) EA 2, , CRASH CUSH ATTEN (MOVE & RESET) EA 1, , CRASH CUSH ATTEN (REMOVE) EA , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4, , CRASH CUSH ATTEN (INSTL)(S)(N)(70) EA 5, , CONDT (PVC) (SCH 40) (2") LF , ,26 12, GROUND BOX TY A (122311)W/APRON EA , INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR) EA WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,41 4, WK ZN PAV MRK REMOV (W)4"(SLD) LF ,370 1,750 44, , WK ZN PAV MRK REMOV (Y)4"(SLD) LF , ,770 49,06 24, REFL PAV MRKR TY II-C-R EA , ELIM EXT PAV MRK & MRKS (4") LF , ,04 8, POST AND CABLE FENCE (REMOVAL) LF , ,28 4, POST AND CABLE FENCE (REMV CONC ANCHOR) EA PORTABLE CHANGEABLE MESSAGE SIGN EA 10, , MATERIAL ON HAND DOL 0 10, ,193, ,193, MATERIAL RECEIVED MATERIAL ON HAND DOL -0 10, ,023, ,023, MATERIAL USED PRODUCTION PAYMENT ADJUSTMENT DOL 0 800, , , PLACEMENT PAYMENT ADJUSTMENT DOL 0 800, , , PARTNERING DOL 0 0 3, , , TxDOT cost of Partnering meeting for CSJ UNIQUE CHANGE ORDER 2 DOL , , , Field office modifications-install and set up

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 14 CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ UNIQUE CHANGE ORDER 3 DOL , , , Field office modifications-monthly items paid by invoice UNIQUE CHANGE ORDER 1 DOL , , , Remove unknown pipe conflicting with IH 45 detour constructi UNIQUE CHANGE ORDER 4 DOL 0 0 6, , , Cap existing inlets in IH 45 median UNIQUE CHANGE ORDER 5 DOL , , , IH 45 detour underdrain UNIQUE CHANGE ORDER 6 DOL , , , Flex Base paid by SY CATEGORY 002 DESCRIPTION CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $44,667, LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ LAW ENFORCEMENT PERSONNEL DOL 0 60, , , PAID by INVOICE FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 65, , , PAID by INVOICE FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,250, , , PAID by INVOICE Category Subtotal $126, PROJECT STP 1502(488) CONTROL CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT ($) OBLITERATING ABANDONED ROAD STA EMBANKMENT (FINAL)(ORD COMP)(TY B) CY COMPOST MANUF TOPSOIL (4") SY , BLOCK SODDING SY , SOIL RETENTION BLANKETS (CL 1) (TY A) SY , SALV, HAUL STKPL RCL AH PAV(0"TO 24") SY , D-GR HMA TY-C SAC-B PG70-22 TON 80 40, PLANE AH CONC PAV (1.5" TO 3") SY , CONC PVMT (CONT REINF - CRCP) (10.5") SY 60 36, CONC PVMT (JOINTED - CPCD) (10") SY 60 2, FULL - DEPTH REPAIR CPCD (10") SY DRILL SHAFT (SIGN MTS) (24 IN) LF DRILL SHAFT (RDWY ILL POLE) (30 IN) LF CL C CONC (RAIL FOUNDATION) CY RETAINING WALL (READ FOOTING) SF , PRESTR CONC GIRDER (TX70) LF 200 1, RIPRAP (CONC)(FLUME) CY

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of RIPRAP (MOW STRIP)(4 IN) CY 300 1, RAIL (TY T221)(HPC) LF 40 10, RAIL (TY T551)(HPC) LF 40 5, RAIL (TY T552)(HPC) LF 40 1, RAIL (TY SSTR)(HPC) LF 40 2, SEALED EXPANSION JOINT (5 IN) (SEJ - A) LF CONC BOX CULV (3 FT X 2 FT) LF CONC BOX CULV (6 FT X 4 FT) LF CONC BOX CULV (10 FT X 6 FT) LF RC PIPE (CL IV)(30 IN) LF INLET (COMPL)(POD)(FG)(3FTX3FT) EA 6, INLET (RAIL & GRATE) (TY II) EA 4, INLET(COMPL)(EXT)(RAIL & GRATE)(TY II) EA 1, HEADWALL (CH - FW - 45) (DIA= 36 IN) EA 10, WINGWALL (FW - 0) (HW=9 FT) EA 13, WINGWALL (FW - S) (HW=12 FT) EA 26, WINGWALL (PW - 1) (HW=4 FT) EA 7, WINGWALL (PW - 1) (HW=5 FT) EA 8, WINGWALL (PW - 1) (HW=6 FT) EA 12, WINGWALL (PW - 1) (HW=8 FT) EA 22, WINGWALL (SW - 0) (HW=3 FT) EA 2, SET (TY I)(S=10 FT)(HW=7FT)(3:1)(C) EA 33, SET (TY I)(S=10 FT)(HW=8FT)(3:1)(C) EA 35, SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C) EA 3, SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C) EA 2, SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C) EA 7, SET (TY II) (18 IN) (RCP) (4: 1) (C) EA SET (TY II) (18 IN) (RCP) (6: 1) (P) EA SET (TY II) (24 IN) (RCP) (3: 1) (P) EA REMOV STR (INLET) EA REMOV STR (PIPE) LF REMOV STR (BOX CULVERT) LF REMOVING ROCK RIPRAP LF UNIQUE CHANGE ORDER 9 DOL ,820 0 CONSTRUCTING DETOURS (CROSS STREETS) UOM=SY CONSTRUCTING DETOURS (EBSS) SY IH 45 Median Grade Difference PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF , PORT CTB (REMOVE)(LOW PROF)(TY 1) LF PORT CTB (REMOVE)(LOW PROF)(TY 2) LF PERM CTB (SGL SLOPE) (TY 1) (42 ) LF , PERM CTB (F-SHAPE) (TY 1) LF , PERM CTB(SGL SLOPE)(TY 1)(42)(HPC) LF , PERM CTB (SGL SLOPE) (MOD) LF 110 5, CONC CURB & GUTTER (TY II) LF 10 6, DRIVEWAYS (ACP) SY , TURNOUTS (ACP) SY CONC SIDEWALKS (4") SY , RUMBLE STRIPS (SHOULDER) LF , RUMBLE STRIPS (CENTERLINE) LF ,

9 CONTRACTOR'S ESTIMATE PACKAGE Page 9 of MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1, CABLE BARRIER TERMINAL SECTION (TL-3) EA 3, CRASH CUSH ATTEN (INSTL)(R)(N)(70) EA 11, CRASH CUSH ATTEN (INSTL)(S)(W)(TL3) EA 4, MAILBOX INSTALL-M (TWG-POST) TY 1 EA MAILBOX INSTALL-S (TWW-POST) TY 4 EA MAILBOX INSTALL-D (TWW-POST) TY 4 EA IN RD IL (TY SA) 40T-8 (250W EQ) LED EA 1, CONDT (PVC) (SCH 40) (2") (BORE) LF , CONDT (PVC) (SCH 80) (2") LF ELEC CONDR (NO.10) INSULATED LF , ELEC CONDR (NO.8) BARE LF , ELEC CONDR (NO.6) BARE LF , ELEC CONDR (NO.6) INSULATED LF , ELC SRV TY A 240/ (NS)SS(E)PS(U) EA 4, ELC SRV TY T 120/ (NS)GS(N)GC(O) EA 2, ALUMINUM SIGNS (TY G) SF IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TYS80(1)SA(U) EA IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA IN BRIDGE MNT CLEARANCE SGN ASSM(TY S) EA INSTALL LRSS (STRUCT STEEL) LB , INSTL DEL ASSM (D-SW)SZ 2(WC)GND EA INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI) EA INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) EA INSTL OM ASSM (OM-2Y)(WC)GND EA WK ZN PAV MRK REMOV (REFL) TY II-C-R EA WK ZN PAV MRK REMOV (W)24"(SLD) LF REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF , REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA REFL PAV MRK TY I (Y)8"(SLD)(100MIL) LF REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF , REFL PAV MRK TY II (W) 4" (BRK) LF , REFL PAV MRK TY II (W) 4" (SLD) LF , REFL PAV MRK TY II (W) 8" (SLD) LF , REFL PAV MRK TY II (W) 12" (LNDP) LF , REFL PAV MRK TY II (W) 12" (SLD) LF 0 8, REFL PAV MRK TY II (W) 24" (SLD) LF REFL PAV MRK TY II (W) (ARROW) EA REFL PAV MRK TY II (W) (DBL ARROW) EA REFL PAV MRK TY II (W) (WORD) EA REFL PAV MRK TY II (W) 36" (YLD TRI) EA REFL PAV MRK TY II (Y) 4" (BRK) LF REFL PAV MRK TY II (Y) 4" (SLD) LF , REFL PAV MRK TY II (Y) 8" (SLD) LF REFL PAV MRK TY II (Y) 12" (SLD) LF ,

10 CONTRACTOR'S ESTIMATE PACKAGE Page 10 of PAVEMENT SEALER 4" LF , PAVEMENT SEALER 8" LF PAVEMENT SEALER 12" LF , PAVEMENT SEALER 24" LF PAVEMENT SEALER (YLD TRI) EA RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF , RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF , RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , REFL PAV MRKR TY II-A-A EA , PAV SURF PREP FOR MRK (4") LF , PAV SURF PREP FOR MRK (8") LF PAV SURF PREP FOR MRK (12") LF , PAV SURF PREP FOR MRK (24") LF PAV SURF PREP FOR MRK (36")(YLD TRI) EA VEH SIG SEC (12")LED(YEL) EA INSTALL RDSD FLASH BEACON ASSEMBLY EA 5, FULL - WIDTH MOWING AC PAYMENT ADJUSTMENT-POS DOL 0 1, PAYMENT ADJUSTMENT-NEG DOL -0 1, ON THE JOB TRAINING DOL , PAID BY THE HOUR DBE GOAL SHORTFALL DOL -0 1, EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL 0 1, EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL 0 1, DRILL SHAFT CORE HOLE PAYMENT DOL PAVEMENT THICKNESS PAY ADJ ( 360) DOL -0 1, RIDE PAYMENT ADJUSTMENT ( 341) DOL 0 1, RIDE PAYMENT ADJUSTMENT ( 360) DOL 0 1, UNIQUE CHANGE ORDER 7 DOL 13, Temp. Traffic Signals, Addl. Traffic Control, UNIQUE CHANGE ORDER 10 DOL 3, IH 45 Median Grade Traffic Cntrl Lane Closures UOM=EA UNIQUE CHANGE ORDER 11 DOL Steel Fence Post. Paid by EA UNIQUE CHANGE ORDER 12 DOL H Brace. Paid by EA WIRE FENCE (TY C) LF UNIQUE CHANGE ORDER 13 DOL Fence Gate (Water Gap) Paid by SF REMOV STR (SMALL FENCE) LF Category Subtotal TOTAL EARNINGS THIS CONTRACT $44,793,952.07

11 CONTRACTOR'S ESTIMATE PACKAGE Page 11 of 14 CONSTRUCTION ESTIMATE COMBINED DESCRIPTION BID QTY PAID TO DATE AMOUNT ($) PREPARING ROW STA 6, ,886, REMOVING CONC (PAV) SY , , , REMOVING CONC (RIPRAP) SY , EXCAVATION (ROADWAY) CY ,76 451, ,706, EXCAVATION (CHANNEL) CY ,22 6, , EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY ,333, , ,253, EMBANKMENT (FINAL) (DENS CONT) (TY C2) CY 10 44, , , EMBANKMENT (FINAL)(DENS CONT)(TY C3) CY , , , DRILL SEEDING (TEMP) (WARM) SY ,42 100, , DRILL SEEDING (TEMP) (COOL) SY ,42 108, , DRILL SEEDING (PERM)(WARM OR COOL) SY ,376, , , VEGETATIVE WATERING MG 0 190, SOIL RETENTION BLANKETS (CL 1) (TY C) SY , , , FL BS (CMP IN PLC)(TY D GR1-2)(8") SY , , , FL BS (CMP IN PLC)(TY D GR1-2)(12") SY , , ,286, CEMENT TON , CEMENT TREAT (NEW BASE) (8") SY , , SALV, HAUL & STKPL RCL APH PV (0 TO 6") SY , , , SLV, HAUL & STKPL RCL APH PV(8" TO 14") SY ,33 1, , SALV, HAUL & STKPL RCL APH PV (0-12") SY , ,550 57, PRIME COAT(MC-30 OR AE-P) GAL , , , AH (CRS-2) GAL ,67 21, , AGGR(TY-D GR-4 SAC-B) CY 90 4, , D-GR HMA TY-B PG64-22 TON , , ,457, PRODUCTION PAYMENT ADJUSTMENT DOL 0 800,00 16, , PLACEMENT PAYMENT ADJUSTMENT DOL 0 800,00 30, , CONC PVMT (CONT REINF - CRCP) (13") SY , , , CONC PVMT (JOINTED - CPCD) (13") SY , , ,085, CEM STABIL BKFL CY , , TRENCH EXCAVATION PROTECTION LF 0 1, , , TEMPORARY L SHORING SF 10 24,96 8, , DRILL SHAFT (18 IN) LF , , DRILL SHAFT (36 IN) LF , , , DRILL SHAFT (42 IN) LF , , , CL C CONC (ABUT)(HPC) CY , CL C CONC (BENT)(HPC) CY 650 3, , ,060, REINF CONC SLAB (HPC) SF ,97 125, ,250, APPROACH SLAB (HPC) CY 350 1, , RETAINING WALL (MSE) SF 60 38, , , PRESTR CONC GIRDER (TX46) LF 200 4, , , PRESTR CONC GIRDER (TX54) LF , , ,384, RIPRAP (CONC)(4 IN) CY , RIPRAP (CONC) (CL B) (4") CY ,948.95

12 CONTRACTOR'S ESTIMATE PACKAGE Page 12 of RIPRAP (STONE TY R)(DRY)(12 IN) CY RIPRAP (STONE PROTECTION)(12 IN) CY 80 2, , RIPRAP (STONE PROTECTION)(18 IN) CY 80 4,37 1, , SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 100 2, , CONC BOX CULV (4 FT X 2 FT) LF , CONC BOX CULV (4 FT X 3 FT) LF , CONC BOX CULV (5 FT X 3 FT) LF , CONC BOX CULV (6 FT X 3 FT) LF , CONC BOX CULV (7 FT X 3 FT) LF , CONC BOX CULV (8 FT X 4 FT) LF , CONC BOX CULV (8 FT X 5 FT) LF , CONC BOX CULV (10 FT X 5 FT) LF , , , RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF , , , RC PIPE (CL III)(36 IN) LF , RC PIPE (CL IV)(18 IN) LF , RC PIPE (CL IV)(24 IN) LF , , RC PIPE (CL IV)(48 IN) LF , INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 4, , INLET (COMPL)(PAZD)(RC)(5FTX5FT) EA 5, , INLET (COMPL)(TY MSE1) EA 6, , HEADWALL (CH - FW - 0) (DIA= 36 IN) EA 3, , HEADWALL (CH - FW - 0) (DIA= 48 IN) EA 9, , HEADWALL (CH - FW - 15) (DIA= 36 IN) EA 5, , HEADWALL (CH - FW - 30) (DIA= 36 IN) EA 4, , HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 7, , WINGWALL (FW - 0) (HW=5 FT) EA 10, , WINGWALL (FW - 0) (HW=6 FT) EA 9, , WINGWALL (FW - 0) (HW=8 FT) EA 10, , WINGWALL (FW - S) (HW=10 FT) EA 17, , WINGWALL (FW - S) (HW=4 FT) EA 3, , WINGWALL (FW - S) (HW=5 FT) EA 4, , WINGWALL (FW - S) (HW=6 FT) EA 6, , WINGWALL (FW - S) (HW=7 FT) EA 8, , WINGWALL (PW - 1) (HW=9 FT) EA 27, , SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C) EA 4, , SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C) EA 2, , SET (TY I)(S=3 FT)(HW= 7 FT)(3:1)(C) EA 4, , SET (TY I)(S= 3 FT)(HW= 8 FT)(3:1) (C) EA 5, , SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 3, , SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C) EA 4, , SET (TY I)(S= 7 FT)(HW= 9 FT)(3:1) (C) EA 9, , SET (TY II) (18 IN) (RCP) (6: 1) (C) EA , SET (TY II) (24 IN) (RCP) (3: 1) (C) EA , SET (TY II) (24 IN) (RCP) (4: 1) (C) EA , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA SET (TY II) (24 IN) (RCP) (6: 1) (P) EA , JACK BOR OR TUN PIPE(24 IN)(RC)(CL III) LF , JACK BOR OR TUN PIPE(24 IN)(RC)(CL IV) LF ,269.00

13 CONTRACTOR'S ESTIMATE PACKAGE Page 13 of REMOV STR (WINGWALL) EA , REMOV STR (HEADWALL) EA MOBILIZATION LS 3,000, ,700, BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15, , ROCK FILTER DAMS (INSTALL) (TY 1) LF , ROCK FILTER DAMS (INSTALL) (TY 3) LF 60 6,25 1, , ROCK FILTER DAMS (REMOVE) LF , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , , CONSTRUCTION EXITS (REMOVE) SY , TEMP SEDMT CONT FENCE (INSTALL) LF ,55 52,730 65, TEMP SEDMT CONT FENCE (REMOVE) LF ,55 4,550 1, BIODEG EROSN CONT LOGS (INSTL) (8") LF 0 2,85 6,720 13, BIODEG EROSN CONT LOGS (REMOVE) LF , CONSTRUCTING DETOURS SY ,45 17, ,344, PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF ,59 32,960 1,483, PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 0 75,87 26,860 53, MTL W-BEAM GD FEN (STEEL POST) LF , , REMOVE METAL BEAM GUARD FENCE LF ,65 2, , REMOVE TERMINAL ANCHOR SECTION EA GUARDRAIL END TREATMENT (REMOVE) EA GDRAIL END TRT(INST)(WOOD POST)(TY II) EA 2, , CRASH CUSH ATTEN (MOVE & RESET) EA 1, , CRASH CUSH ATTEN (REMOVE) EA , CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4, , CRASH CUSH ATTEN (INSTL)(S)(N)(70) EA 5, , CONDT (PVC) (SCH 40) (2") LF , ,260 12, GROUND BOX TY A (122311)W/APRON EA , INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR) EA WK ZN PAV MRK REMOV (W)4"(BRK) LF , ,410 4, WK ZN PAV MRK REMOV (W)4"(SLD) LF ,37 44, , WK ZN PAV MRK REMOV (Y)4"(SLD) LF , ,060 24, REFL PAV MRKR TY II-C-R EA , ELIM EXT PAV MRK & MRKS (4") LF , ,040 8, POST AND CABLE FENCE (REMOVAL) LF ,28 8,280 4, POST AND CABLE FENCE (REMV CONC ANCHOR) EA PORTABLE CHANGEABLE MESSAGE SIGN EA 10, , MATERIAL ON HAND DOL -0 20,00 2,023, ,023, MATERIAL USED MATERIAL ON HAND DOL 0 20,00 6,193, ,193, MATERIAL RECEIVED LAW ENFORCEMENT PERSONNEL DOL 0 60,00 27, , PAID by INVOICE PARTNERING DOL 0 3, , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 65,00 11, , PAID by INVOICE FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,250,00 87, , PAID by INVOICE UNIQUE CHANGE ORDER 1 DOL 0 12, , UNIQUE CHANGE ORDER 2 DOL 0 21, ,816.25

14 CONTRACTOR'S ESTIMATE PACKAGE Page 14 of 14 Field office modifications-install and set up UNIQUE CHANGE ORDER 3 DOL 0 31, , Field office modifications-monthly items paid by invoice UNIQUE CHANGE ORDER 4 DOL 0 6, , UNIQUE CHANGE ORDER 5 DOL 0 84, , UNIQUE CHANGE ORDER 6 DOL , , Flex Base paid by SY UNIQUE CHANGE ORDER 8 DOL , Purchase CTB from adjacent project TOTAL EARNINGS TO DATE $44,793,952.07

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 102 CONTRACT ID: 057401029 : BR 2018(319) CONTRACT: 12173211 AWARD : $2,595,950.00 ED : $2,833,949.00 ADJ. ED : $2,833,949.00 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 22 CONTRACT ID: 082301029 PROJECT: STP 2018(824) CONTRACT: 05183218 AWARD : $2,899,372.26 PROJECTED : $2,911,372.26 ADJ. PROJECTED : $2,911,372.26 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 29,097.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 126 CONTRACT ID: 100703021 PROJECT: STP 2016(509) CONTRACT: 02163245 AWARD : 2,844,207.34 PROJECTED : 2,915,909.34 ADJ. PROJECTED : 2,945,006.94

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 27,403.21 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 92 3.00 CONTRACT ID: 014011044 PROJECT: NH 1702(546) CONTRACT: 07173217 AWARD : $4,567,928.75 PROJECTED : $4,985,095.63 ADJ. PROJECTED : $5,012,498.84

More information

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/18-12.00 90 CONTRACT ID: 090922173 PROJECT: STP 2017(464)HES CONTRACT: 03173039 AWARD : $372,720.55 PROJECTED : $390,152.55 ADJ. PROJECTED : $390,152.55

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 462,346.70 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 332 13 CONTRACT ID: 000514080 PROJECT: IM 0201(189) CONTRACT: 04153049 AWARD : $11,801,426.99 PROJECTED : $12,168,144.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD: -58,265.40 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 517-7.00 8 CONTRACT ID: 271901008 PROJECT: STP 2013(029)HES CONTRACT: 09123212 AWARD AMOUNT: $2,899,581.31 PROJECTED AMOUNT: $2,928,572.31

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD: 20,521.28 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18-24.00 105 CONTRACT ID: 030001080 PROJECT: NH 1702(331) CONTRACT: 08173204 AWARD AMOUNT: $18,990,864.89 PROJECTED AMOUNT: $18,990,864.89 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 83 CONTRACT ID: 003917196 PROJECT: BR 2018(635) CONTRACT: 03183013 AWARD : $1,104,702.01 PROJECTED : $1,131,702.01 ADJ. PROJECTED : $1,131,702.01 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: 123,812.90 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 465 CONTRACT ID: 007207068 PROJECT: STP 1602(184)MM CONTRACT: 06163016 AWARD : $7,586,328.53 PROJECTED : $7,586,328.51 ADJ. PROJECTED : $7,710,141.41

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 3,525.14 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 28 CONTRACT ID: 004604060 PROJECT: NH 1502(056) CONTRACT: 04153051 AWARD : $407,780.13 PROJECTED : $411,881.13 ADJ. PROJECTED : $415,406.27

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: 295,531.64 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 393-153.00 CONTRACT ID: 003605033 PROJECT: STP 2015(350) CONTRACT: 12143021 AWARD : $6,989,144.86 PROJECTED : $6,989,144.86 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD: 140,750.73 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17-6.00 200 CONTRACT ID: 071801064 PROJECT: C 718-1-64 CONTRACT: 11153002 AWARD : $32,541,855.76 PROJECTED : $33,273,455.77 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD: 112,067.24 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 167-13.00 35.00 CONTRACT ID: 008701104 PROJECT: NH 2014(565) CONTRACT: 04143012 AWARD : $3,126,804.84 PROJECTED : $3,176,515.84 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 15,466.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 136-11.00 2.00 CONTRACT ID: 180801028 PROJECT: STP 1502(152)HES CONTRACT: 05153036 AWARD : $2,602,993.61 PROJECTED : $2,602,993.61 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 38,587.97 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 208 5.00 CONTRACT ID: 091800267 : STP 1702(453) CONTRACT: 07173236 AWARD : $1,699,468.03 ED : $1,727,168.03 ADJ. ED : $1,765,756.00 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD: 118,116.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 419 9 CONTRACT ID: 074704059 PROJECT: STP 2009(879)MM CONTRACT: 08093020 AWARD AMOUNT: $2,833,448.12 PROJECTED AMOUNT: $2,858,448.12 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 389,480.02 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 294-4.00-17.00 CONTRACT ID: 050601105 PROJECT: NH 1602(416) CONTRACT: 10163002 AWARD : $13,863,443.80 PROJECTED : $14,081,920.80 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD: 220,119.27 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 124 CONTRACT ID: 054303067 PROJECT: STP 2018(416)MM CONTRACT: 01183201 AWARD AMOUNT: $30,289,272.41 PROJECTED AMOUNT: $31,279,648.40 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD: 262,998.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 247 6.00 CONTRACT ID: 007207041 PROJECT: NH 2017(990) CONTRACT: 05173001 AWARD : 63,063,378.38 PROJECTED : 63,063,378.38 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 5,047,590.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 617 289.00 CONTRACT ID: 005006086 PROJECT: NH 1502(184) CONTRACT: 05153002 AWARD AMOUNT: $36,840,375.34 PROJECTED AMOUNT: $37,065,377.33

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD: 455,691.25 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 542 59.00 CONTRACT ID: 000505102 PROJECT: DMO 2012(263) CONTRACT: 05133202 AWARD : 18,434,933.58 PROJECTED : 18,604,933.60 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD: 231,995.19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 579 6 CONTRACT ID: 002407058 PROJECT: NH 1502(164) CONTRACT: 05153203 AWARD : 22,716,470.32 PROJECTED : 22,716,470.31 ADJ. PROJECTED : 22,948,465.50

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD: 2,852.08 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 49 CONTRACT ID: 001607132 PROJECT: IM 0352(341) CONTRACT: 02133206 AWARD : $287,874.50 PROJECTED : $287,874.50 ADJ. PROJECTED : $290,726.58

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD: 1,554,603.20 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 792 73 CONTRACT ID: 629050001 PROJECT: SUP - 629050001 CONTRACT: 10154031 AWARD AMOUNT: $1,697,780.64 PROJECTED AMOUNT: $1,697,780.64 ADJ.

More information

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, % ACCOUNT NO. 10154-403-172 ACCOUNT NO. 10154-403-174 ACCOUNT NO. 11712-84-174-84600 ACCOUNT NO. 10154-403-172 10701 TRAFFIC CONTROL 1.00 LUMP SUM $4,000.00 $4,000.00 0.00 $0.00 1.00 $4,000.00 1.00 $4,000.00

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ % ACCOUNT NO: 10332-84-174-84300: 54250(91223) ACCOUNT NO: 10529-403-172: 54440 (91226) ACCOUNT NO: 10463-51-130: 54250 (91223) ACCOUNT NO: 10332-84-174-84300: 54250 (91223) 20217 CLEAR STONE 375.00 TON

More information

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas 76702-2570 254 / 750-6640 Fax: 254 / 750-8063 www.waco-texas.com Date: 11/6/17 RFB No: 2017-066 Commodity: Sidewalk Improvement Plans Closing

More information

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation 2/20/2015 Page 1 of 16 Strawser Paving Co., Inc. Double Z Construction Co Decker Construction Company Shelly & Sands, Inc. 1595 Frank Road 2550 Harrison Road 3040 McKinley Avenue P.O.Box 2469 Columbus,

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

TABULATION OF TENDERS

TABULATION OF TENDERS SECTION 1: Bridge Construction (Structure) ste) ROAD NO: 75 SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M. D. Steele Construction Ltd. 6,878,000.00 6,878,000.00 Gateway Construction & Engineering

More information

DOCUMENTATION WORKBOOK FY 2018

DOCUMENTATION WORKBOOK FY 2018 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2018 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016 Average Bid Prices for Awarded s Page 1 Number Description Units Quantity Dollars (000S) Average Price 2011 2011601/00003 CONSTRUCTION SURVEYING LS 28.00 1241.85 $44,351.96 28 2011 2011601/00010 VIBRATION

More information

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL M.D. Steele Construction Ltd. 886,000.00 886,000.00 Gateway Construction & Engineering Ltd. 973,368.80 973,368.80 Graham Construction and Engineering Inc.

More information

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006 Design Bulletin 39 - Revised Tender Submission Requirements DESIGN BULLETIN No. 39/2006 (Revised June 2007) TENDER SUBMISSION REQUIREMENTS June 2007 Amendment to Design Bulletin #39/2006 This amendment

More information

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1. Supplemental Technical Specification for SEDIMENT TUBES SCDOT Designation: SC-M-815-1 (03/08) 1.0 Sediment Tubes This Supplemental Specification replaces sections 815.1.1.2, 815.2.3, 815.4.5, 815.5, and

More information

Exhibit "A" Date: 1/27/2011

Exhibit A Date: 1/27/2011 Exhibit "A" Date: 1/27/2011 To: Bentley Communities Contact: Doug Knox Address: 1595 Paoli Pike Phone: 610-430-3700 West Chester, PA 19380 Fax: 610-430-3228 Project Name: Culbertson Village (Eastern Quadrent)(Phase

More information

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections Nathan Saxe Administrator, Ecology and Waterway Permitting Section Back to Basics: Erosion and Sediment Control FHWA INDOT Quality Assurance Review (QAR) Results 1 Agenda INDOT Office of Environmental

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation 5/09/2016 Page 1 of 50 George J. Igel Co., Inc. Trucco Construction Co., Inc. Shelly & Sands, Inc. Elite Excavating Co. Of Ohio, Inc. 2040 Alum Creek Dr 3531 Airport Rd P.O.Box 2469 4500 Snodgrass Road

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University The BMP worked fine until last week when it rained! Turbidity Best Management Practices

More information

Specifications Whitcomb Elementary School Demolition January 15, 2016

Specifications Whitcomb Elementary School Demolition January 15, 2016 SECTION 31 2500 - EROSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The provisions of the Contract Documents apply to the work of this Section. B. The Virginia Erosion and Sediment Control Handbook,

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY Cape Coral, FL Prepared for: The City of Cape Coral Public Works

More information

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP 716.1 Description. This work shall consist of furnishing, installing, maintaining, and removing temporary erosion protection and sediment

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results of the research. The presentation is regarded as fully

More information

Case Histories and Practical Examples

Case Histories and Practical Examples SUMMER SCHOOL SIIV 2012 - ROAD SAFETY MANAGEMENT Theoretical principles and practical application in the framework of the European Directive 2008/96/CE Catania 24-28 September 2012 Case Histories and Practical

More information

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN ALUMINUM STRUCTURAL PLATE EADWALLS AASTO LRFD BASIS OF DESIGN LANE ENTERPRISES, INC. www.lane-enterprises.com Required Backfill and Load Cases: ALUMINUM STRUCTURAL PLATE EADWALLS BASIS OF DESIGN Backfill

More information

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) 10/23/2017 Header Information Colorado Department of Transportation Structure Inspection and Inventory Report (English Units) Bridge Name: D-02-PR-030A Inspection Date: 12/2/2015 Sufficiency Rating: Inspection

More information

Stormwater Inlet Sediment Traps

Stormwater Inlet Sediment Traps Stormwater Inlet Sediment Traps SEDIMENT CONTROL TECHNIQUES Photo 1 Kerb inlet Photo 2 Field (drop) inlet Table 1 provides the recommended default classification of various sediment control systems suitable

More information

Critchfield Rd / SR-129

Critchfield Rd / SR-129 NOVEMBER 27, 2017 Critchfield Rd / SR-129 Intersection Safety Study Alternatives Report CRITCHFIELD INTERSECTION SAFETY STUDY Contents Introduction...1 Purpose...2 Existing Conditions...2 Proposed Alternatives...2

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 Spike in Tree Elevation = 102.95 Elevation

More information

CONSTRUCTION EXIT SEDIMENT BARRIER

CONSTRUCTION EXIT SEDIMENT BARRIER 241428_itizen ield Guide_v3 2/22/06 11:09 M Page 1 (1,1) ONSTRUTION EXIT stone pad located where traffic leaves a construction site to eliminate the transport of soil to public streets. SEDIMENT BRRIER

More information

OC Public Works El Niño Storm Preparation 2015

OC Public Works El Niño Storm Preparation 2015 OC Public Works El Niño Storm Preparation 2015 December 8, 2015 Overview About OC Public Works Storm Preparation Pre-Storm During Storm Post-Storm Storm Preparation Canyon and Burn Areas County Department

More information

December 11, 2006 File:

December 11, 2006 File: December 11, 2006 File: 15-85-38 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, Alberta T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (SWAN HILLS AREA)

More information

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 Managing an Extreme Weather Event of Prolonged Duration May 22, 2013 MISSOURI RIVER FLOOD OF 2011 M I C H A E L J. K E N N E R L Y P. E. D I R E C T O R O F T H E O F F I C E O F D E S I G N I O W A D

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

BUILDING HOME CONSTRUCTION

BUILDING HOME CONSTRUCTION 1 Area Items: DECK # 1 CONST-COMPANY Proposed DECK # 1 DESCRIPTION QNTY REMOVE REPLACE TOTAL 1. Stair stringer - Labor only 96.00 LF 0.00 4.47 429.12 2. Stair riser - Labor only 28.00 EA 0.00 12.56 351.68

More information

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by Monitoring Scour Critical Bridges During Floods For Local Bridge Owners Presented by SAFETY FIRST DO NOT ENDANGER YOURSELF OR OTHERS WHILE MONITORING BRIDGES DO NOT ENTER FLOOD WATERS FLOOD WATERS INCLUDE

More information

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report Cost Estimate Report Title Page Plan J. without trails Springfield, Missouri Flood Risk Management Feasibility Study Class 4 Cost Estimate P2 Number 354082 Estimated by Designed by Prepared by Cost Engineering

More information

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade January 2010 Revision 0 Contents 1. Introduction 1 1.1 Purpose 1 1.2 Objectives 1 1.3 Relevant Environmental Legislation, Guidelines and Policies

More information

Appendix C Benchmarking Cost Estimates

Appendix C Benchmarking Cost Estimates REPORT Appendix C Benchmarking Cost Estimates C-1 Table C-1 Permits, Notifications & Location Services Notes: Costs associated with delays in construction have not been included in this estimate OneCall

More information

ORIGINATOR: CITY OF MADISON STREETS DIVISION REV. DATE: _ PLOT NAME: _ PLOT SCALE: _ SHORELINE TREATMENT SCHEDULE PROJECT NO. 10332/10529 U-10 SHORELINE TREATMENT SCHEDULE MAINLAND CITY OF MADISON MAINLAND

More information

Abitare Homeowners Association. Reserve Management Plan Type 1

Abitare Homeowners Association. Reserve Management Plan Type 1 Reserve Management Plan Type 1 Reserve Study With On-Site Analysis For 30-Year Projection Period Beginning January 1, 2016 Cover January 1, 2016 Page 2 Abitare Homeowners Association Reserve Management

More information

Rapid Response Team, LLC

Rapid Response Team, LLC 1 Insured: Cordero, Esther Home: (407) 433-6956 Property: 602 Green Dr. Kissimmee, FL 34759 Claim Rep.: Taye Garnett Business: (561) 988-9170 x 3612 Position: Claims Adjuster E-mail: tgarnett@peoplestrustinsurance.

More information

Summary of Bids Received For

Summary of Bids Received For Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction

More information

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226 1 Insured: Property: SHANE KATZ 198 S. HOLLAND ST. LAKEWOOD, CO 80226 Estimator: James Mosel Business: (720) 456-8329 Business: E-mail: james@trinityconstructionserv Aurora, CO 80017 ices.com Claim Number:

More information

SPECIFICATION FOR RAMM UPDATING OF ROADS

SPECIFICATION FOR RAMM UPDATING OF ROADS SPECIFICATION FOR RAMM UPDATING OF ROADS 1. SCOPE This specification sets out the general requirements for consultants specialising in, and being fully conversant with Road Assessment and Maintenance Management

More information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8 August 14, 2013 Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region Geohazard Assessment 2013

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587

Contractor: Business: (281) Company: A- Select Services Business: 1310 Iowa Street suite 200 South Houston, TX 77587 Property: Any Street Pasadena, TX 77505 Estimator: Butch Bragg Contractor: Business: (281) 998-1800 Company: A- Select Services Business: suite 200 South Houston, TX 77587 Claim Number: Policy Number:

More information

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION PAGE No. DESCRIPTION 1 Cover Page 2 Overview Map 3 Western Road Plan View 4 Eastern Road Plan View West Road Profiles & Cross Sections 6-7 East Road Profiles 8- East Road Cross Sections 11-14 Campsite

More information

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management

Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Maricopa County Department of Transportation (MCDOT) GIS Innovations in Transportation Asset Management Presented By Steve Hossack, GIS Database Administrator 2018 ITE/IMSA Spring Conference Maricopa County

More information

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Print Date Tue 29 December 2015 Eff. Date 10/1/2015 U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate Time 13:18:11 Title Page Estimated by AECOM

More information

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border

Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Amistad Dam Investigation and Oversight: Karst- Founded Dam on the USA-Mexico Border Brook Brosi, CPG, PG USACE Lisa Nowicki Perks, PG USACE Kimberly Heenan, PE AECOM US Army Corps of Engineers BUILDING

More information

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES Page 1 of 5 NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES 1. GENERAL Install, maintain and remove appropriate Temporary Best Management

More information

401 PLANTMIX BITUMINOUS PAVEMENTS GENERAL Rev. June 10, 2004 401.03.16 SURFACING MISCELLANEOUS AREAS: Surfacing of road approaches and connections, street intersection areas, frontage roads, island areas,

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) BUILDING AND SAFETY DIVISION TELEPHONE (949) 724-6300 BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013) Payment: When a plan is required by the Administrative Authority to be submitted, a plan check

More information

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Rock Scaling Recommendations Logan Creek Drive Cut Slope Rock Scaling Recommendations Logan Creek Drive Cut Slope US 50, Milepost DO 8.47 to DO 8.61 Douglas County, Nevada January 2008 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS

More information

Countermeasure Calculations and Design

Countermeasure Calculations and Design Countermeasure Calculations and Design Summarized from Bridge Scour and Stream Instability Countermeasures, Experience, Selection, and Design Guidance, Second Edition, Publication No. FHWA NHI 01-003,

More information

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES GENERAL NOTES. NEW & RELOCATED ROADWAY SIGNS NOT SHOWN FOR CLARITY BUT, ARE INCLUDING IN CONCEPTUAL DESIGN COST ESTIMATE. KEYNOTES E X I S T I N G D E V E L O P M E N T. NEW 5' WIDE CONCRETE SIDEWALK.

More information

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days Independent Government Estimate Updated 6/22/18 Title Page Estimated by NAVFAC Cost Designed by Prepared by NAVFAC Cost Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction

More information

Bob Rettig Construction and Consulting

Bob Rettig Construction and Consulting 1 Client: Sample A, Code Home: (714) 345-4265 Property: Main St. Anytown, Ca. 90000 Operator Info: Operator: JOE Estimator: 2 Company: Bob Rettig Construction Consulting Business: 30262 Crown Valley Parkway,

More information

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist Name of Permittee: Rock Koshkonong Lake District (RKLD) Construction Site (Project) Name: Lake Koshkonong

More information